DETAIL EXPERIENCES
prepare the training syllabus, training material, including questions about theory
and best practice
Coal Fired Steam Power Plant PLTU Muara Jawa 2 x 100 MW Project, located at Teluk
Balikpapan, Balikpapan East Kalimantan Indonesia Client by PT. PLN (Persero), with Project
Value USD $ 240,000,000 (June 2010).
b.
Coal Fired Steam Power Plant PLTU Teluk Teluk Tenayan 2 x 100 MW Project, located at
Teluk Tenayan, Riau Sumatera Indonesia Client by PT. PLN (Persero), with Project Value
USD $ 240,000,000 (June 2010).
c.
Geothermal Power Plant Patuha 2x55 MW, Project located at South Bandung West Java
Indonesia Client by PT. Geodipa a subsidiary of PLN (Persero), with Project Value USD $
110,000,000 (April 2010).
d.
Coal Fired Steam Power Plant PLTU Tonasa 2 x 35 MW Project, Tonasa, South Sulawesi
Indonesia Client by PT. Semen Tonasa, with Project Value USD $ 135,000,000 (Sep 2009).
e.
Coal Fired Steam Power Plant PLTU Lampung 2 x 100 150 MW Project, located at
Lampung Sumatera Indonesia Client by PT. Indonesia Power a Subsidiary of PT PLN
(Persero), with Project Value USD $ 240,000,000 (June 2008).
f.
Coal Fired Steam Power Plant Accelerated Program PLTU Kalimantan Barat #2, 2 x 50 MW
Project, located at Parit Baru, Kalimantan Barat Indonesia Client by PT PLN (Persero), with
Project Value USD $ 120,000,000 (May 2008).
g.
Independent Power Produce (IPP) or Build Operate and Transfer (BOT) for Generating and
Supply of Electricity Project 300 MW, located at Cilegon West Java Indonesia Client by PT
Krakatau Daya Listrik a Subsidiary of PT Krakatau Steel, with Project Value USD $
3500,000,000 (May 2008).
Page 2 of 20
h.
i.
Gas Turbine Generating Plant PLTG Sumatera Barat 1 x 120 MW Project, located at
Sumatera Barat Indonesia, Client by PT. PLN (Persero), with Project Value USD $
160,000,000 (Oct 2007).
j.
Gas Turbine Generating Plant PLTG Sumatera Barat 2 x 40 MW Project, located at Sumatera
Barat Indonesia, Client by PT. PLN (Persero), with Project Value USD $ 90,000,000 (Sept
2007)
k.
Coal Fired Steam Power Plant PLTU Nangru Aceh Darussalam 2 x 100 150 MW Project,
located at Nangru Aceh Darussalam, Aceh Sumatera Indonesia, Client by PT. PLN
(Persero), with Project Value USD $ 275,000,000 (August 2007).
l.
Coal Fired Steam Power Plant PLTU Sumatera Barat 2 x 100 150 MW Project, located at
Sumatera Barat Indonesia Client by PT. PLN (Persero), with Project Value USD $
235,000,000 (June 2007).
m.
Coal Fired Steam Power Plant PLTU Lampung Baru 2 x 100 150 MW Project, located at
Lampung Sumatera Indonesia Client by PT. PLN (Persero), with Project Value USD $
200,000,000 (June 2007)
n.
Independent Power Produce (IPP) Build Operate and Transfer of Coal Fired Steam Power
Plant PLTU Kalimantan Timur Project 2 x 65 MW Project, located at Kalimantan Timur
Indonesia Client by PT. PLN (Persero), with Project Value USD $ 155, 000, 000 (April 2007).
o.
Coal Fired Steam Power Plant Accelerated Program PLTU Pelabuhan Ratu 3 x 300 MW,
located at Pelabuhan Ratu West Java Indoensia Client by PT PLN (Persero), with Project
Value USD. $ 900,000,000, (Feb 2007)
p.
Hydro Electric Power Plant, PLTA Genyem 2 x 10 MW Project, located at Papua Irian
Indoensia Client by PT PLN (Persero), ADB Loan Project with Project Value USD $
50,000,000. (Sept 2006)
q.
Package II, Mini Hydro Electric Power Plant PLTM 5,5 MW, located at Ndunga, Santong,
Prafi, NTB Indonesia Client by PT. PLN (Persero), ADB Loan Project with Project Value
24,000,000 (June 2006).
r.
Hydro Electric Power Plant PLTA Poigar 2 x 15 MW, located at Poigar North Sulawesi
Indonesia Client by PT PLN (Persero), ADB Loan Project with Project Value USD $
65,000,000. (Feb 2006)
s.
Package I, Mini Hydro Electric Power Plant PLTM 5,0 MW, located at Lobong, Mongango
and Merasap Indonesia Client by PT. PLN (Persero), ADB Loan Project with Project Value
USD $ 10,000,000 (Sept 2005).
t.
Page 3 of 20
EPC CPP/PPGJ Gundih, Owner by PT Pertamina EP, Project Located at Cepu Central Java,
Project Value USD. $. 120,000,000 (Jun 2010)
b.
EPC DPPU Bandara Selaparang Mataram, Located at Selaparang Mataram NTB Indonesia
Owner PT Pertamina Jastek, Project Value USD $. 12,800,000 (April 2010)
c.
Relocation Depot LPG Terminal Tanjung Priok, Owner by PT Pertamina Jasa Teknik, Project
Located at Tanjung Priok Jakarta Indonesia, Project Value USD $. 10,000,000 (Apr 2010)
d.
EPC Pipe Line Cikande Bojonegara dia 24 24 Km, Owner by PT PGN, Project Located at
Cikande Bojonegara West Java, Project Value USS. $ 12,500,000 (Sep 2009)
e.
EPC Pipe Line Tasikmalaya Ujung Berung, South Bandung, West Java Indonesia, Owner
PT Pertamina Jastek, Project Located at Padalarang Bandung West Java Indonesia, Project
Value USD. $. 20,000,000 (Dec 2009)
f.
EPC LPG Tankage Terminal Tanjung Sekong Cap 4 x 2,500 Mts, Owner PT Pertamina
Jastek, Project Located at Tanjung Sekong Cilegon West Java Indonesia, Project Value USD
$. 30,000,000 (Mar 2009)
g.
EPC LPG Tankage Terminal Lampung Cap 2 x 2,500 Mts, Owner PT Pertamina Jastek,
Project Located at Lampung Sumatera Indonesia, Project Value USD $. 15,000,000 (May
2009)
h.
EPC LPG Tankage Terminal Bali Cap 2 x 1,500 Mts, Owner PT Pertamina Jastek, Project
Located at Sanggaran Bali Indonesia, Project Value USD $. 11,000,000 (Jun 2009)
i.
EPC Balongan Crude Oil Tankage Terminal Cap 3 x 400 MB, Owner by PT Pertamina
Pengolahan Balongan, Project Located at Balongan West Java Indonesia, Project Value USD
$. 35,500,000 (Mar 2009).
j.
EPC - 1 Production Facilities Plant Project, located at Banyu Urip Cepu Central of Java
Indonesia and Client by Exxon Mobil Cepu Limited (April 2008).
k.
EPC-2 Export Onshore Pipeline System Project, located at Banyu Urip Cepu Central of Java
Indonesia and Client by Exxon Mobil Cepu Limited (April 2008).
l.
Re-tender 2nd, Pembangunan Tangkage Terminal Transit Bau Bau Project, located at
Sulawesi Indonesia and Client by PT. Pertamina (June 2008).
m.
Re-tender 2nd, Pembangunan Tank Terminal Naftha Project, located at Balongan West Java
Indonesia Client by PT Pertamina (March 2008).
n.
Mini LPG Plant Project, Tambun Bekasi, West Java Indonesia Client by PT. Odira (Nov
2004)
o.
Pipeline Project Grissik, Pagardewa & Labuhan Maringgai, located at Sumatera Indonesia
Client by PT. Perusahaan Gas Negara (PGN) (Oct 2004).
Page 4 of 20
EPC Palm Oil Cap 60 ton/hour, Owner by PT PTPN VIII, Project Located at Bandung West
Java Indonesia, Project Value USD $. 8,000,000 (Sep 2009),
b.
Coal Handling Facility Cap 500 ton/hours, Owner PT Tambang Bukit Asam, Project Located
Lampung Sumatera Indonesia, Project Value USD $. 6,000,000 (Sep 2009)
EPC Civil Work and Infrastructure Alumina Plant Tayan, Owner PT ICA, Project Located at
Teluk Tayan West Kalimantan Indoensia, Project Value USD $. 27,000,000 (Feb 2009),
c.
d.
EPC Steam Generator Cap 2 x 120 ton/hours, Owner PT Kertas Leces Probolinggo, Project
Located at Probolinggo East Java Indonesia, Project Value USD $. 18,000,000 (Jun 2009).
e.
EPC Palm Oil Cap 60 ton/hour, Owner by PT PTPN III, Project Located at Medan Sumatera
Indonesia, Project Value USD $. 8,000,000 (Sep 2009),
f.
Accommodations Camp, Yard Investment Project Karimun Island, Client by PT. Saipem
Indonesia Singapore, with Project Value USD $ 36,000,000 (2007),
g.
Main Office and Administration Building, Yard Investment Project Karimun Island, Client by
PT. Saipem Indonesia Singapore, with Project Value USD $ 21,000,000 (2007),
h.
Packing Plant Bosowa Samarinda East Kaltim Indonesia Client by PT Bosowa, with Project
Value USD $ 26,000,000. (2004).
May.15,2009 - May.31,2010
Chevron Indonesia Company, JOI Project Sentral Senayan I, Jakarta,
Representative / HES Officer
HES Chevron
1. Making and designing Construction Safety Work Practice (CSWP) of HES (Health,
Environmental and Safety) consist of in preparing :
to encourage and control that, all contractor be ensure had made HES Plan prior
starting the construction works, consist of : hazards risk identification and risk
control, target and HSE program, operational standard procedure, implementation,
design of ERP system, monitoring and controlling /supervising, and etc are related in
HSE
6. To execute safety morning talk, HES Tool book meeting, safety talk, safety patrol and
safety meeting (every week),.
7. To ensure that contractor had made Job safety Analysis before starting work, in each job of
installation and high potensial hazards
8. Monitoring and Controlling of JSA and permit of work before work
9. Giving HES Socialization to all employees and associated
10. Giving corrective actions and preventive actions or other solutions/ suggestions to repair or
improve the system.
11. Giving HES consultation to the Contractor .
12. Making report directly to Project Manager.
November 2003 2009
PT Adhi Karya(Persero), Tbk EPC (Perekayasaan) Division / As a HSE Manager
Has responsibility in designing implementation of the Occupational Health, Safety & Environment
Management.(OHSEM) System and in encouraging to continue realization of their system, by
means of :
1. Making and designing of OHSEMS in all work-activities consist of in preparing :
making Safety-Plan for each project is consist of : hazards risk identification and risk
control, target and HSE program, operational standard procedure, implementation,
design of ERP system, monitoring and controlling /supervising, and etc are related in
HSE
Page 6 of 20
making Safety-Plan, consist of : hazards risk identification and risk control, target and
HSE program, operational standard procedure, implementation, design of ERP system,
monitoring and controlling /supervising, and etc are related in HSE
making Safety-Plan for the project is consist of : hazards risk identification and risk
control, target and HSE program, operational standard procedure, implementation,
design of ERP system, monitoring and controlling /supervising, and etc are related in
HSE
2. Monitoring and controlling in good implementing of OHSM system
3. Making Audit-Plan and executing internal audit.
Page 7 of 20
4. Making OSHMS Training-Plan including curriculum and syllabus, training time schedule,
5. Giving corrective actions and preventive actions or other solutions/ suggestions to repair or
improve the system.
December1990 August 1999
PT. PP (persero), Head Office Jakarta / As a Manager of Quality Management & Safety,
Health & Environment management
making Safety-Plan for each project is consist of : hazards risk identification and risk
control, target and HSE program, operational standard procedure, implementation,
design of ERP system, monitoring and controlling /supervising, and etc are related in
HSE
Corrective action of all non conformance and continuous quality improvement of QAM
& OHSEM system
2. Monitoring / supervising the day-to-day activities in implementing QAM and OHSEM
system
3. Controlling the realization of QAM and OHSEM implementation by inspection to project
and internal auditing with making Audit-Plan and executing their plan.
4. Continuing the improvement process of QAM and OHSEM to find an efficiency and an
effective way to improve the systems.
5. Making Training-Plan program in QAM & OHSEM including curriculum and syllabus,
training time schedule, implementation for the employees.
6. Giving corrective actions and preventive actions or other solutions/ suggestions to repair or
improve the system.
7. Contributing design of company corporate plan for 5 years forecasting.
8. Function as an Expert of QAM of ISO 9000 & OHSEM system and giving consultation to
those who need improvement program in company organization .
9. Making report directly to The Director and Division Manager.
I n Quality of Equipm ent P roduction M anagem ent has responsibility in managing the
project to provide strong basis for company benefit, by ;
1. Making Production-Plan consist of, work plan, material requirement, production system,
production target, budgets, implementation, monitoring & controlling, and evaluation
progress to get quick corrective action or improvement program to Optimize and develop
production team for all project which are using of equipment.
Page 8 of 20
Has responsibility in preparing the ready use of equipment in each time and to prepare analysis of
equipment productivity in operation by ;
1. Optimizing the productivity and making budgets of each equipment,
2. To prepare equipment cost estimate for a new project and / or for Preparation of prequalification proposal, bid proposal and all tender requirement for equipment cost estimate
3. Analysis and evaluation of equipment productivity and performance
1. Designing the Total Productive Maintenance Management (TPMM) which consist of
control of preventive & predictive maintenance, breakdown and trouble shooting, effective
and efficiency of necessary spare part application, and evaluation of result maintenance for
the forecasting of equipment repairing program.
2. Optimizing the productivity and making equipment cost estimates,
3. Analyzing and evaluating the useful-life of equipment or other assets and giving value to
know how far, it have achieved break-event-point to the return on investment of a capital
expense in order to take a decision.
4. Designing the integrated management system of Total Quality Management (TQM) and
Total Quality control (TQC)
5. Making report directly to the Branch Manager.
Page 9 of 20
Equipm ent P roduction M anagem ent . has responsibility in managing the project to
provide strong basis for company benefit, in productivity all equipment by ;
1. Making Project-Plan consist of, production, method and work plan, equipment budgets,
implementation, monitoring & controlling, and evaluation progress to get quick corrective
action or improvement program to Optimize and develop production team.
2. Analysis and evaluation of equipment productivity and performance, also Optimizing
the productivity of each equipment, with program in :
controlling (analysis and evaluate) the Equipment performance
to prepare all equipment ready for use, including maintenance, and repair,
to effective monitor of equipment productivity and performance
to make and manage of record and historical of equipment
to count the budget of equipment cost estimate every in the project,
3. To execute of Total Productive Maintenance Management (TPMM) which consist of
control of preventive & predictive maintenance, breakdown and trouble shooting, effective
and efficiency of necessary spare part application, and evaluation of result maintenance for the
forecasting of equipment repairing program.
4. Monitoring / supervising the day-to-day activities in implementing the realization of TPMM
and control of equipment production
5. Organizing and managing all personnel (especially in mechanic staffs, mechanics &
mechanic supervisors).
6. Managing and controlling the necessities of heavy equipment spare part in projects
including inventory control.
7. Making integrated systems of Total Quality Management (TQM) and Total Quality
control (TQC)
8. Making report directly to the Project Manager.
Jul.01,1983
Feb.10,1985
P roject M anagem ent . has responsibility in managing the project to provide strong basis for
company benefit, in productivity of earth moving equipment in civil work, by ;
1. Making Time-Schedule by Critical Path Method and Pert Network system, Bar chart and Scurve, to provide easy evaluation and controlling the project performance of budget &
productions plan.
2. Making Project-Plan consist of, production, method and work plan, material requirement,
budgets, implementation, monitoring & controlling, and evaluation progress to get quick
corrective action or improvement program to Optimize and develop production team.
3. Monitoring / supervising the day-to-day activities in implementing the realization of Project
Plan and control of production team
4. Controlling and evaluating the equipment performance to support heavy construction
works.
5. Managing and controlling the necessities of heavy equipment spare part in projects
including inventory control.
6. Making integrated systems of Total Quality Management (TQM) and Total Quality
control (TQC)
Added Task
7. To involve manage of re export material & equipment leave from project, base on OB 23
Regulation
To choice, equipment are not effective & efficient or equipment are low performance in
production, which are must be re export
Page 11 of 20
To execute coordination with, local government and custom department, to get equipment
exit permit for re export material
Manage and pay tax of equipment must be re export
P roject M anagem ent . has responsibility in managing the project to provide strong basis for
company benefit, in productivity of earth moving equipment by ;
1. Making Time-Schedule by Critical Path Method and Pert Network system, Bar chart and Scurve, to provide easy evaluation and controlling the project performance of budget &
productions plan.
2. Making Project-Plan consist of, production, method and work plan, material requirement,
budgets, implementation, monitoring & controlling, and evaluation progress to get quick
corrective action or improvement program to Optimize and develop production team.
3. Monitoring / supervising the day-to-day activities in implementing the realization of Project
Plan and control of production team
4. Controlling and evaluating the equipment performance to support heavy construction
works.
5. Managing and controlling the necessities of heavy equipment spare part in projects
including inventory control.
6. Making integrated systems of Total Quality Management (TQM) and Total Quality
control (TQC)
7. Making report directly to the General Manager and Branch Manager.
June 1981 February 1983
PT PP (Persero) Jakarta Branch / As a Mechanic Qualified & Engineering Staff
Job Description and Responsibilities as follow:
EDUCATION
BACHELOR OF MECHANICAL ENGINEERING
Graduated from Institute Technology 10 Nopember Surabaya (ITS), April 22, 1978, Surabaya
INFORMATIC TECHNOLOGY
Graduated from Persada Indonesia YAI University, July 12, 1999, Jakarta
Page 13 of 20
MASTER OF SCIENCE
Graduated from Senior University International, November 20, 1999
MAGISTER MANAGEMENT TECHNOLOGY OF OCCUPATIONAL HEALTH AND SAFETY
IMNI University, November 10, 2008, Jakarta
1.
2.
3.
4.
5.
6.
7.
8.
Kind of Course
Institution
ALPK3-Indonesia
& Depnakertrans
Jakarta
PT SucofindoDepnakertrans
Jakarta
Lead Auditor of
Environmental
Management System by
IRCA
Hazop
PT Sucofindo
Jakarta
FKM -UI
Jakarta
Pelatihan Mindset
Transformasi untuk trainer,
fasilitator dan pembicara
Pelatihan Assessor
A2K4-I
9.
10.
Pelatihan Assessor
11.
Place
Time/Period
15-17
November
2011
26-28
November
2011
21-23 July
2010
Certificate
Date
17
November
2011
28
November
2011
23 July
2010
Jakarta
20 Maret
2010
14 Juli 2007
23 Maret
2010
14 Juli 2007
PT Dian
Anugerah
Konsultindo &
A2K4-Indonesia
PII
Ged. PT Adhi
Karya
Pasar Minggu
26,27 Mei
& 2,3, 4 Juni
2006
4 Juni 2005
Jakarta
17 18 Juli
2006
18 Juli 2006
Asian Business
Consultants
Forum Peduli
Energi Dan
Lingkungan
(FPEL)
Direktorat
Jenderal
Manajemen
Pendidikan Dasar
dan Menengah,
Departemen
Pendidikan
Nasional
PT Acumen
Indonesia
Jakarta
27 May. 2005
Jakarta
01 Jun. 2005
27 May.
2005
01 Jun.
2005
PPPG
Teknologi
Bandung
25 s/d 29 Juli
2005
29 Juli 2005
Jakarta
25 Oct. 2004
25 Oct.
2004
Page 14 of 20
Kind of Course
12.
Design)
ESQ Leader Training
31.
Hoisting Equipment
Inspector
Institution
Place
Time/Period
ESQ Leadership
Center
INKINDO
Jakarta
Jakarta
10-12 Sept.
2004
01 Sept 2004
PT Centria
Integrity Advisory
DK3N
Jakarta
16 Juni. 2004
Jakarta
27 April. 2004
PT Acumen
Indonesia
PT Acumen
Indonesia
JICOSH
Jakarta
02 Oct. 2003
Jakarta
01 Oct. 2003
Tokyo- Japan
Safety National
Council
Manpower
Department
Jakarta
21 Peb..s/d
10 Mar. 2000
11 12 Jan.
2001
25 Mar. 1999
Public Works
Department
Manpower
Department RI
Jakarta
Lembaga
Manajemen. YAI
Man-Power
Department. JICA
Kanwil Depnaker
DKI
Jakarta
Certificate
Date
12 Sept.
2004
01 Sept
2004
16 Juni.
2004
27 April.
2004
02 Oct.
2003
01 Oct.
2003
10 Mar.
2000
12 Jan.
2001
25 Mar.
1999
23 31 Mar.
1998
07 10 Dec.
1998
31 Mar.
1998
10 Dec.
1998
Jakarta
23 Aug. 1997
Jakarta
21 Aug. 1997
23 Aug.
1997
21 Aug.
1997
Jakarta
01 Aug. 1997
01 Aug.
1997
Manpower
Ministry, RI
Jakarta
27 Oct. 1997
27 Oct.
1997
Kanwil Depnaker
DKI
Jakarta
25 Sept. 1997
25 Sept.
1997
Safety National
Council
POTAIN Centre
De Form.
Depnaker
Cevest
Depnaker
Lembaga
Jakarta
26 27 Nov.
1996
19 28 Jun.
1996
10 14 Jun.
1996
12 Aug. 1995
27 Nov.
1996
28 Jun.
1996
14 Jun.
1996
12 Aug.
1995
Jakarta
La Clayete France
Bekasi
Jakarta
Page 15 of 20
Kind of Course
Improving Customer
Satisfaction.
33. Team Work & Motivation
Build.
34. Sap Executive Briefing On
SPC
35. Callibration & Maintenance
Institution
PT.Ganindo.
Dale Carnegie &
Ass.
Dale Carnegie &
Ass. Inc.
PQM Consultants
Place
Time/Period
Jakarta
29 Sept. 1994
Jakarta
14 Sept.1994
Jakarta
22 Jun. 1994
LIPI
Jakarta
Asian Business
Consultans.
Asian Business
Consultant.
Dewan Standar
Nasional (DSN)
Jakarta
07 10 Jun.
1994
22 23 Mar.
1994
16 17 Nov.
1993
02 04 Nov.
1993
LM FEUI
Jakarta
Evaluation Of Quality
Control.
41. Macro Lotus 1-2-3
PMMI
Jakarta
PT Sarana
Solusindo Int .
Jakarta
Jakarta
44.
YMMI
Jakarta
45.
Jakarta
46.
Interaction Management
LM FEUI - PT.
PP (Persero)
PT. PP (Persero).
Departemen PU
Jakarta
PT United
Tractors
Fuji Koeki, Ltd.
Jakarta
7,8, 12,13
Nov. 1991
23 28 Jun.
1990
19 Jul. 1985
Tokyo- Japan
32.
36.
40.
42.
43.
Managerial Skill
Upgrading Of
Implementing P4
48. Heavy Equipment
Application
49. Heavy Equipment Training
47.
Jakarta
Jakarta
Jakarta
Jakarta
50.
Supervisor Heavy
Equipment .
Maruma Tractors
& Equipment.
Tokyo- Japan
51.
Training of Equipment
Management
LPPM DEPT.
PU
Jakarta
26 April s/d
05 Mei, 1993
18 19 Jan.
1993
26 Agustus
s/d 21
September,
1992
12 15 May.
1992
2528Sept.1991
2325Sept.1991
02 Sept.1991
Certificate
Date
29 Sept.
1994
14 Sept.
1994
22 Jun.
1994
10 Jun.
1994
23 Mar.
1994
17 Nov.
1993
04 Nov.
1993
05 Mei,
1993
19 Jan.
1993
21 Sept.
1992
15 May.
1992
28 Sept.
1991
25 Sept.
1991
02 Sept.
1991
13 Nov.
1991
28 Jun.
1990
19 Jul. 1985
13, May.
1980
15 Novem.
1979
31 Mar.
1979
Page 16 of 20
COMPUTER SKILL
Lotus
MS-Word
MS-Excel
Power Point
MS-Project
FIRMS
From
To
June.02,2010
Until Now
May.15,2009
May.31,2010
May.30,2009
June.01,2010
Nov.20,2003
May.30,2009
Maret 20,2006
Nov.20,2003
December 30
2003
August 05,
2005
Dec.20,2005
August
301999
Januari, 2004
June 18,2003
Nov.17,2003
May 27,2002
July 22,2002
Jan.01, 2002
May.24, 2002
Page 17 of 20
Feb.09, 2002
Oct.22, 2001
Dec.20, 2001
Feb 15,2000
April15,2000
Oct.05,1999
Nov.10, 1999
Oct.30,1997
September,2000
Dec.10,1998
Aug.31,1999
Oct.27,1997
Aug.31,1999
May.02,1994
Aug.31,1999
Apr.01,1994
Aug.31,1999
Nov.18,1993
Aug.31,1999
May.02,1994
Apr.31,1995
Dec.01,1990
Mar.31,1993
Aug.01,1988
Dec.15,1989
Page 18 of 20
Aug.01,1987
Aug.15,1988
Jul.07,1985
Jul.30,1987
Jul.01,1983
Jul.10,1985
Feb.01,1983
Jun.30,1983
Feb.01,1983
Feb.28,1983
Feb.01,1983
Apr.01,1983
Nov.16,1981
Feb.01,1983
Jun.01,1981
Feb.01,1983
PT PP (Persero) Jakarta
Qualified/Engineering Staff
Aug.31,1979
Apr.30,1980
Aug.31,1979
Apr.30,1980
May.02,1978
Aug.30,1979
Branch /
As
Mechanic
ORGANIZATION (NGO)
From
To
Institution / Position
November 25,
2012
Until Now
August 20,2005
November 25,
2012
July 27,2007
Until Now
1995
Until Now
Page 19 of 20
REWARDED
From
Intitution
Kind of Awards
August 19,2009
International
Professional
Award (IPA
2009)
September
18,2007
Institute for
certification of
competences on
OSH_ICCOSH, /
August 26,2007
PT
Pembangunan
Perumahan
(Persero)
PERSONAL DETAILS
Address
Home Phone
+6221-8217670
Office Phone
Hanphone
:
:
+62-812-940-5983
anaszaini.iksan@gmail.com,
Nationality
Indonesian
Religious
Moslem
Language
Around 33 Years