Note that all documents that are linked to the Scope Statement become part of the Project
Scope and require the same degree of management control. Such documents should be
maintained in a separate Scope directory along with the Scope Statement.
Project Name:
Diamond Mall
Prepared by:
Date (MM/DD/YYYY):
2/25/2014
Date
(MM/DD/YYYY)
1.0
2/25/2014
Comments
Complete project scope document
Page 1
1. Executive Summary
To build a diamond Mall (actually give a feel/design of a shopping mall using 3d
elements in the limits of jquery, java etc.) the diamond mall will allow diamond dealers
to open their own stores inside the mall in few simple steps.
1.
2.
3.
Gold plan which is free that will give to a gold member a basic store without the option to modify his store.
Platinum member that will allow the member to choose between 5 different templates with different layouts.
Diamond member that will be able to choose between all the template (platinum/gold) and will also receive
a custom cms to customize and modify the store as he likes.
Each store owner will receive an admin panel where he can upload his products, payment details, track his orders
and basically a basic store owner admin panel.
Each admin panel will be customizing with his own features according to the different types of accounts.
Admin of the shopping mall will get a fully details admin panel to control all stores, users, customers, clients and
everything else regarding to the system.
2. Business Objectives
2.1 Product Description (Solution):
The proposed solution is an ecommerce platform which will give diamond dealers a platform to create
their own stores in less than 5 minutes. These stores will allow the diamond dealers to sell products as
well as create auctions for products in which other diamond dealers can bid.
2.2 Business Objectives:
The primary business objective can be summarized as providing a platform which will enable interested
diamond dealers to setup a store and sell their products. In return these diamond dealers will purchase
membership plans with varying features and pay a corresponding yearly fee to the ecommerce platform
owner.
3. Project Description
3.1 Project Scope
Includes (list Deliverables):
Ecommerce platform
Bidding system
Membership module
3. Project Description
3.2 Project Completion Criteria:
Project shall be submitted according to milestones mentioned. The project stakeholders shall take a look
at the solution
3.3 External Dependencies:
Features which require additional input from the project stakeholders shall be external dependencies and
there might be milestone delays due to this dependency.
3.4 Assumptions:
Since it's been mentioned that a basic ecommerce platform is required as a basis of the entire platform
most of the features of the ecommerce have been assumed as required. These can be removed or
added later depending on feedback.
3.5 Constraints:
4. Project Milestones
Target date has been assumed as starting from 1st March 2014. The target dates for project
milestones have been mentioned accordingly. These may change as the project start date
changes.
Project Milestone
Target Date*
(MM/DD/YYYY)
Project Start
Testing (5days)
5. Project Approach
5.1 Primary Plans
5.2 Scheduled Status Meetings (Insert rows as needed):
Page 3
5. Project Approach
Meeting
Purpose
Frequency
Twice weekly
Milestone tracking
Weekly
5.5 Change
Management:
Purpose
Provide detailed information of the work
done every week in lieu of the project
planning document
Weekly
5.8 Resource
Management:
Frequency
The project team will produce a Resource Management Plan that will
document the following:
Lists all major goods and services required in the project along with
cost estimates and quality information.
Indicates which goods and services will be obtained from sources
outside the Organization
Indicates who is assigned to the project and when.
Page 4
Page 5
Basic Features
Page 6
Bidding System
Create auctions
Product listing
Bid complete
Customize store
Online chat
Contac by email
Diamond Mall
Project Manager:
The purpose of this document is to provide a vehicle for documenting the initial planning efforts for the project. It is
used to reach a satisfactory level of mutual agreement among the Project Manager, Project Sponsors and Owners
with respect to the objectives and scope of the project before significant resources are committed and expenses
incurred.
I have reviewed the information contained in this Project Scope Statement and agree:
Name
Role
Signature
Date
(MM/DD/YYYY)
The signatures above indicate an understanding of the purpose and content of this document by those
signing it. By signing this document, they agree to this as the formal Project Scope Statement document.
Page 8