Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SAFETY
1. Check for looseness at marking
bolt & nut.
PREVENTIVE
1.To carry out insulation reading, Should be > 500
MegaOhm
METHOD
1. SOP - Cara
penggunaan
clamp
multimeter.
LIFE CYCLE
3. Nama Motor
Part.
1.Check
voltage at Red,
Yellow, Blue
terminal.
Check
marking at
bolt and nut
to be aligned
Fluke
Ti400
3 Temperature
reading point
4. Check Insulation at U,V, W inside Terminal Box.
Tool: Insulation meter
Remark: Sensitive to Electromagentic Wave. (walkie
talkie must be turned OFF)
Turn OFF Control Panel Power Supply and disconnect
input cable inside Motor Terminal Box.
Measuring point
(Terminal U,V,W)
Cooling
Fan
Measuring
point
(Terminal
R,Y,B)
4. SKF-Tool vibation