Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 1 & 2
Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA

FOR CLUSTER NO. 1 & 2


8.04

Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

FOR CLUSTER NO. 3


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

2.30

FOR CLUSTER NO. 4


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

4.48

FOR CLUSTER NO. 5


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

17.93
1

FOR CLUSTER NO. 6


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

14.53
52.30
1

FOR CLUSTER NO. 7 & 28


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

15.89

m3/h

180.77

TOTAL DISCHARGE OF ALL RUNNING PUMPS


DESIGN PARAMETERS
Velocity through suction bellmouth
Velocity through suction header pipe
Velocity through suction pipe
Velocity through delivery pipe
Lateral velocity through suction main header
Velocity through main delivery header
DESIGN PARAMETERS
Value of New Hazen William's Coefficent Cr for pipes
BELL MOUTH INSIDE CWR
Velocity through bellmouth
Size of bellmouth at suction (area=Q/V)
Adopted Size of Bell mouth

Pratibha Industries Limited, Mumbai

28.93
1

8.29
1

16.14
1

4.98

57.20
1

m/s
m/s
m/s
m/s
m/s
m/s

0.75
1.6
1.6
2.5
0.5
1.6

min
max

1
1

m/s
mm
mm

0.75
292.04
300

1 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 1 & 2
Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
Actual Velocity through Bell mouth
Minor Losses for enterance at Bell Mouth
SUCTION HEADER FROM CWR
Velocity through suction header
Size of suction header
Adopted Size of suction header
Actual Velocity through suction header
Minor Losses in Suction Header-50 m length
Minor Loss for Gate Valve at Suction Header
SUCTION HEADER (Main)
Velocity of suction header
Size of suction header
Adopted Size of Suction Header (as per tender condition)
Actual Velocity through suction Header
Minor Losses for Main Suction Header-20 m length

m/s
m

0.71
0.0051

m/s
mm
mm
m/s
m
m

1.6
199.95
250
1.02
0.1761
0.0267

m/s
mm
mm
m/s
m

0.5
357.68
450
0.32
0.0042

m/s
m3/h
mm
mm
m/s
m
m

1.60
1
28.93
79.98
100
1.02
0.02
0.03

m/s
mm
mm
m/s
m
m
m

2.5
63.99
80
1.60
0.15
0.130
0.782

m/s
mm
mm
m/s
m
m
m
m
mm
m/s
m
m
m

1.600
79.98
100
1.024
0.105
0.065
0.222
0.039
80
1.60
0.261
0.013
0.030

FOR CLUSTER NO. 1 & 2


SUCTION PIPE OF EACH PUMPS
Velocity through suction pipe
Number of Running Pumps
Discharge of each pump
Size of suction pipe to individual pumps
Adopted Size of Suction Pipe
Actual Velocity through suction pipe
Minor Losses in Suction Pipe of Pump 2m length
Minor Loss for Gate Valve at Suction Pipe
SIZE OF DELIVERY PIPE
Velocity of flow
Dia of delivery pipe
Adopted Size of Delivery Pipe
Actual Velocity through Delivery pipe
Minor Losses in Delivery Pipe of Pump 5m length
Minor Loss for Gate Valve at Delivery Pipe (2 Nos.)
Minor Loss for Non Return Valve at Delivery Pipe
SIZE OF DELIVERY HEADER PIPE
Velocity of flow
Dia of header pipe
Adopted Size of Delivery Header
Actual Velocity through Delivery Header
Minor Losses in Delivery Pipe of Pump 10m length
Minor Loss for Gate Valve at Delivery Pipe
Minor Loss for Non Return Valve at Delivery Pipe
Minor Loss for Gate Valve at Delivery Pipe
Adopted Size of Electro Magnetic Flow Meter
Actual Velocity due to Electro Magnetic Flow Meter
Minor Losses for Elctro Magnatic Flow meter
Minor Losses Due to Reducers
Minor Losses Due to Enlargements

Pratibha Industries Limited, Mumbai

2 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 1 & 2
Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
PARATICULARS
Actual Velocity in suction pipe
Actual Velocity in delivery pipe
Design Discharge of each pump
HEAD CALCULATIONS
FGL at Pump House at Kiratpura
RL of Pump Floor Level at Kiratpura
Highest level along the most critical path at Nandlalpura
Static Difference
Friction Loss in Pipe Line (From Hydraulic Calulation)
Add minor losses in specials in Pump House
Headloss at exit point
Total head of pump required
Design Head
Minimum Head
Combined Efficiency of Pumping Set as per Clause 1.5(VI)
KW of Pump required for Average Head
Add 20% over Pump KW
Selected Motor rating

m/s
m/s
m3/h
m3/Sec

1.02
1.60
28.93
0.008

m
m
m
m
m
m
m
m
Say m

318.600
317.000
362.129
45.129
17.724
2.06
1.00
65.91
66.00

66.00
0.60
8.67
10.40
11

wQh/102/eff.
Kw

DUTY CONDITIONS OF SELECTED PUMP SET FOR CL


1&2
m3/h
Discharge
28.93
Head
m
66
Selected motor rating as per claculations
Kw
11.0
*
Kilowatt rating for motor calculated here with is only for Electrical load calculation purpose. Actual
Rating of motor will be given by Manufacturer.

Pratibha Industries Limited, Mumbai

3 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 3


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
FOR CLUSTER NO. 1 & 2
Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

8.04
28.93
1

FOR CLUSTER NO. 3


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

2.30

FOR CLUSTER NO. 4


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

4.48

FOR CLUSTER NO. 5


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

17.93
1

FOR CLUSTER NO. 6


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

14.53
52.30
1

FOR CLUSTER NO. 7 & 28


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

15.89

m3/h

180.77

TOTAL DISCHARGE OF ALL RUNNING PUMPS


DESIGN PARAMETERS
Velocity through suction bellmouth
Velocity through suction header pipe
Velocity through suction pipe
Velocity through delivery pipe
Lateral velocity through suction main header
Velocity through main delivery header
DESIGN PARAMETERS
Value of New Hazen William's Coefficent Cr for pipes
BELL MOUTH INSIDE CWR
Velocity through bellmouth
Size of bellmouth at suction (area=Q/V)
Adopted Size of Bell mouth

Pratibha Industries Limited, Mumbai

8.29
1

16.14
1

4.98

57.20
1

m/s
m/s
m/s
m/s
m/s
m/s

0.75
1.6
1.6
2.5
0.5
1.6

min
max

1
1

m/s
mm
mm

0.75
292.04
300

4 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 3


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
Actual Velocity through Bell mouth
Minor Losses for enterance at Bell Mouth
SUCTION HEADER FROM CWR
Velocity through suction header
Size of suction header
Adopted Size of suction header
Actual Velocity through suction header
Minor Losses in Suction Header-50 m length
Minor Loss for Gate Valve at Suction Header
SUCTION HEADER (Main)
Velocity of suction header
Size of suction header
Adopted Size of Suction Header (as per tender condition)
Actual Velocity through suction Header
Minor Losses for Main Suction Header-20 m length

m/s
m

0.71
0.0051

m/s
mm
mm
m/s
m
m

1.6
199.95
250
1.02
0.1761
0.0267

m/s
mm
mm
m/s
m

0.5
357.68
450
0.32
0.0042

m/s
m3/h
mm
mm
m/s
m
m

1.60
1
8.29
42.81
80
0.46
0.06
0.01

m/s
mm
mm
m/s
m
m
m

2.5
34.25
80
0.46
0.15
0.011
0.064

m/s
mm
mm
m/s
m
m
m
m
mm
m/s
m
m
m

1.600
42.81
80
0.458
0.307
0.005
0.018
0.003
80
0.46
0.021
0.001
0.002

FOR CLUSTER NO. 3


SUCTION PIPE OF EACH PUMPS
Velocity through suction pipe
Number of Running Pumps
Discharge of each pump
Size of suction pipe to individual pumps
Adopted Size of Suction Pipe
Actual Velocity through suction pipe
Minor Losses in Suction Pipe of Pump 2m length
Minor Loss for Gate Valve at Suction Pipe
SIZE OF DELIVERY PIPE
Velocity of flow
Dia of delivery pipe
Adopted Size of Delivery Pipe
Actual Velocity through Delivery pipe
Minor Losses in Delivery Pipe of Pump 5m length
Minor Loss for Gate Valve at Delivery Pipe (2 Nos.)
Minor Loss for Non Return Valve at Delivery Pipe
SIZE OF DELIVERY HEADER PIPE
Velocity of flow
Dia of header pipe
Adopted Size of Delivery Header
Actual Velocity through Delivery Header
Minor Losses in Delivery Pipe of Pump 10m length
Minor Loss for Gate Valve at Delivery Pipe
Minor Loss for Non Return Valve at Delivery Pipe
Minor Loss for Gate Valve at Delivery Pipe
Adopted Size of Electro Magnetic Flow Meter
Actual Velocity due to Electro Magnetic Flow Meter
Minor Losses for Elctro Magnatic Flow meter
Minor Losses Due to Reducers
Minor Losses Due to Enlargements

Pratibha Industries Limited, Mumbai

5 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 3


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
PARATICULARS
Actual Velocity in suction pipe
Actual Velocity in delivery pipe
Design Discharge of each pump
HEAD CALCULATIONS
FGL at Pump House at Kiratpura
RL of Pump Floor Level at Kiratpura
Highest level along the most critical path at Bheempura
Static Difference
Friction Loss in Pipe Line (From Hydraulic Calulation)
Add minor losses in specials in Pump House
Headloss at exit point
Total head of pump required
Design Head
Minimum Head
Combined Efficiency of Pumping Set as per Clause 1.5(VI)
KW of Pump required for Average Head
Add 40% over Pump KW
Selected Motor rating

m/s
m/s
m3/h
m3/Sec

0.46
0.46
8.29
0.002

m
m
m
m
m
m
m
m
Say m

318.600
317.000
369.078
52.078
6.688
0.87
1.00
60.63
61.00

61.00
0.55
2.50
3.50
3.7

wQh/102/eff.
Kw

DUTY CONDITIONS OF SELECTED PUMP SET FOR CL


3
3
m /h
Discharge
8.29
Head
m
61
Selected motor rating as per claculations
Kw
3.7
*
Kilowatt rating for motor calculated here with is only for Electrical load calculation purpose. Actual
Rating of motor will be given by Manufacturer.

Pratibha Industries Limited, Mumbai

6 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 4


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
FOR CLUSTER NO. 1 & 2
Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

FOR CLUSTER NO. 3


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

2.30

Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

4.48

FOR CLUSTER NO. 5


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

17.93
1

FOR CLUSTER NO. 6


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

14.53
52.30
1

FOR CLUSTER NO. 7 & 28


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

15.89

m3/h

180.77

8.04
28.93
1

8.29
1

FOR CLUSTER NO. 4

TOTAL DISCHARGE OF ALL RUNNING PUMPS


DESIGN PARAMETERS
Velocity through suction bellmouth
Velocity through suction header pipe
Velocity through suction pipe
Velocity through delivery pipe
Lateral velocity through suction main header
Velocity through main delivery header
DESIGN PARAMETERS
Value of New Hazen William's Coefficent Cr for pipes
BELL MOUTH INSIDE CWR
Velocity through bellmouth
Size of bellmouth at suction (area=Q/V)
Adopted Size of Bell mouth

Pratibha Industries Limited, Mumbai

16.14
1

4.98

57.20
1

m/s
m/s
m/s
m/s
m/s
m/s

0.75
1.6
1.6
2.5
0.5
1.6

min
max

1
1

m/s
mm
mm

0.75
292.04
300

7 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 4


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
Actual Velocity through Bell mouth
Minor Losses for enterance at Bell Mouth
SUCTION HEADER FROM CWR
Velocity through suction header
Size of suction header
Adopted Size of suction header
Actual Velocity through suction header
Minor Losses in Suction Header-50 m length
Minor Loss for Gate Valve at Suction Header
SUCTION HEADER (Main)
Velocity of suction header
Size of suction header
Adopted Size of Suction Header (as per tender condition)
Actual Velocity through suction Header
Minor Losses for Main Suction Header-20 m length

m/s
m

0.71
0.0051

m/s
mm
mm
m/s
m
m

1.6
199.95
250
1.02
0.1761
0.0267

m/s
mm
mm
m/s
m

0.5
357.68
450
0.32
0.0042

m/s
m3/h
mm
mm
m/s
m
m

1.60
1
16.14
59.75
80
0.89
0.06
0.02

m/s
mm
mm
m/s
m
m
m

2.5
47.80
80
0.89
0.15
0.041
0.244

m/s
mm
mm
m/s
m
m
m
m
mm
m/s
m
m
m

1.600
59.75
80
0.892
0.307
0.020
0.069
0.012
80
0.89
0.081
0.004
0.009

FOR CLUSTER NO. 4


SUCTION PIPE OF EACH PUMPS
Velocity through suction pipe
Number of Running Pumps
Discharge of each pump
Size of suction pipe to individual pumps
Adopted Size of Suction Pipe
Actual Velocity through suction pipe
Minor Losses in Suction Pipe of Pump 2m length
Minor Loss for Gate Valve at Suction Pipe
SIZE OF DELIVERY PIPE
Velocity of flow
Dia of delivery pipe
Adopted Size of Delivery Pipe
Actual Velocity through Delivery pipe
Minor Losses in Delivery Pipe of Pump 5m length
Minor Loss for Gate Valve at Delivery Pipe (2 Nos.)
Minor Loss for Non Return Valve at Delivery Pipe
SIZE OF DELIVERY HEADER PIPE
Velocity of flow
Dia of header pipe
Adopted Size of Delivery Header
Actual Velocity through Delivery Header
Minor Losses in Delivery Pipe of Pump 10m length
Minor Loss for Gate Valve at Delivery Pipe
Minor Loss for Non Return Valve at Delivery Pipe
Minor Loss for Gate Valve at Delivery Pipe
Adopted Size of Electro Magnetic Flow Meter
Actual Velocity due to Electro Magnetic Flow Meter
Minor Losses for Elctro Magnatic Flow meter
Minor Losses Due to Reducers
Minor Losses Due to Enlargements

Pratibha Industries Limited, Mumbai

8 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 4


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
PARATICULARS
Actual Velocity in suction pipe
Actual Velocity in delivery pipe
Design Discharge of each pump
HEAD CALCULATIONS
FGL at Pump House at Kiratpura
RL of Pump Floor Level at Kiratpura
Inlet Level of ESR Kiratpura
Static Difference
Friction Loss in Pipe Line (From Hydraulic Calulation)
Add minor losses in specials in Pump House
Headloss at exit point
Total head of pump required
Design Head
Minimum Head
Combined Efficiency of Pumping Set as per Clause 1.5(VI)
KW of Pump required for Average Head
Add 40% over Pump KW
Selected Motor rating

m/s
m/s
m3/h
m3/Sec

0.89
0.89
16.14
0.004

m
m
m
m
m
m
m
m
Say m

318.600
317.000
344.310
27.310
0.801
1.23
1.00
30.34
31.00

31.00
0.55
2.48
3.47
3.7

wQh/102/eff.
Kw

DUTY CONDITIONS OF SELECTED PUMP SET FOR CL


4
3
m /h
Discharge
16.14
Head
m
31
Selected motor rating as per claculations
Kw
3.7
*
Kilowatt rating for motor calculated here with is only for Electrical load calculation purpose. Actual
Rating of motor will be given by Manufacturer.

Pratibha Industries Limited, Mumbai

9 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 5


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
FOR CLUSTER NO. 1 & 2
Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

FOR CLUSTER NO. 3


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

2.30

FOR CLUSTER NO. 4


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

4.48

8.04
28.93
1

8.29
1

16.14
1

FOR CLUSTER NO. 5


4.98

Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

17.93
1

FOR CLUSTER NO. 6


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

14.53
52.30
1

FOR CLUSTER NO. 7 & 28


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

15.89

m3/h

180.77

TOTAL DISCHARGE OF ALL RUNNING PUMPS


DESIGN PARAMETERS
Velocity through suction bellmouth
Velocity through suction header pipe
Velocity through suction pipe
Velocity through delivery pipe
Lateral velocity through suction main header
Velocity through main delivery header
DESIGN PARAMETERS
Value of New Hazen William's Coefficent Cr for pipes
BELL MOUTH INSIDE CWR
Velocity through bellmouth
Size of bellmouth at suction (area=Q/V)
Adopted Size of Bell mouth

Pratibha Industries Limited, Mumbai

57.20
1

m/s
m/s
m/s
m/s
m/s
m/s

0.75
1.6
1.6
2.5
0.5
1.6

min
max

1
1

m/s
mm
mm

0.75
292.04
300

10 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 5


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
Actual Velocity through Bell mouth
Minor Losses for enterance at Bell Mouth
SUCTION HEADER FROM CWR
Velocity through suction header
Size of suction header
Adopted Size of suction header
Actual Velocity through suction header
Minor Losses in Suction Header-50 m length
Minor Loss for Gate Valve at Suction Header
SUCTION HEADER (Main)
Velocity of suction header
Size of suction header
Adopted Size of Suction Header (as per tender condition)
Actual Velocity through suction Header
Minor Losses for Main Suction Header-20 m length

m/s
m

0.71
0.0051

m/s
mm
mm
m/s
m
m

1.6
199.95
250
1.02
0.1761
0.0267

m/s
mm
mm
m/s
m

0.5
357.68
450
0.32
0.0042

m/s
m3/h
mm
mm
m/s
m
m

1.60
1
17.93
62.97
80
0.99
0.06
0.03

m/s
mm
mm
m/s
m
m
m

2.5
50.37
80
0.99
0.15
0.050
0.300

m/s
mm
mm
m/s
m
m
m
m
mm
m/s
m
m
m

1.600
62.97
80
0.991
0.307
0.025
0.085
0.015
80
0.99
0.100
0.005
0.012

FOR CLUSTER NO. 5


SUCTION PIPE OF EACH PUMPS
Velocity through suction pipe
Number of Running Pumps
Discharge of each pump
Size of suction pipe to individual pumps
Adopted Size of Suction Pipe
Actual Velocity through suction pipe
Minor Losses in Suction Pipe of Pump 2m length
Minor Loss for Gate Valve at Suction Pipe
SIZE OF DELIVERY PIPE
Velocity of flow
Dia of delivery pipe
Adopted Size of Delivery Pipe
Actual Velocity through Delivery pipe
Minor Losses in Delivery Pipe of Pump 5m length
Minor Loss for Gate Valve at Delivery Pipe (2 Nos.)
Minor Loss for Non Return Valve at Delivery Pipe
SIZE OF DELIVERY HEADER PIPE
Velocity of flow
Dia of header pipe
Adopted Size of Delivery Header
Actual Velocity through Delivery Header
Minor Losses in Delivery Pipe of Pump 10m length
Minor Loss for Gate Valve at Delivery Pipe
Minor Loss for Non Return Valve at Delivery Pipe
Minor Loss for Gate Valve at Delivery Pipe
Adopted Size of Electro Magnetic Flow Meter
Actual Velocity due to Electro Magnetic Flow Meter
Minor Losses for Elctro Magnatic Flow meter
Minor Losses Due to Reducers
Minor Losses Due to Enlargements

Pratibha Industries Limited, Mumbai

11 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 5


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
PARATICULARS
Actual Velocity in suction pipe
Actual Velocity in delivery pipe
Design Discharge of each pump
HEAD CALCULATIONS
FGL at Pump House at Kiratpura
RL of Pump Floor Level at Kiratpura
Highest level along the most critical path at Heerapura
Static Difference
Friction Loss in Pipe Line (From Hydraulic Calulation)
Add minor losses in specials in Pump House
Headloss at exit point
Total head of pump required
Design Head
Minimum Head
Combined Efficiency of Pumping Set as per Clause 1.5(VI)
KW of Pump required for Average Head
Add 30% over Pump KW
Selected Motor rating
DUTY CONDITIONS OF SELECTED PUMP SET FOR CL
Discharge
Head
Selected motor rating as per claculations
*

m/s
m/s
m3/h
m3/Sec

0.99
0.99
17.93
0.005

m
m
m
m
m
m
m
m
Say m

318.600
317.000
364.238
47.238
20.041
1.35
1.00
69.63
70.00

70.00
0.55
6.21
8.08
9.3

wQh/102/eff.
Kw
5
m /h
m
Kw
3

17.93
70
9.3

Kilowatt rating for motor calculated here with is only for Electrical load calculation purpose. Actual
Rating of motor will be given by Manufacturer.

Pratibha Industries Limited, Mumbai

12 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 6


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
FOR CLUSTER NO. 1 & 2
Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

FOR CLUSTER NO. 3


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

2.30

FOR CLUSTER NO. 4


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

4.48
16.14
1

FOR CLUSTER NO. 5


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

17.93
1

Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

14.53
52.30
1

FOR CLUSTER NO. 7 & 28


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

15.89

m3/h

180.77

8.04
28.93
1

8.29
1

4.98

FOR CLUSTER NO. 6

TOTAL DISCHARGE OF ALL RUNNING PUMPS


DESIGN PARAMETERS
Velocity through suction bellmouth
Velocity through suction header pipe
Velocity through suction pipe
Velocity through delivery pipe
Lateral velocity through suction main header
Velocity through main delivery header
DESIGN PARAMETERS
Value of New Hazen William's Coefficent Cr for pipes
BELL MOUTH INSIDE CWR
Velocity through bellmouth
Size of bellmouth at suction (area=Q/V)
Adopted Size of Bell mouth

Pratibha Industries Limited, Mumbai

57.20
1

m/s
m/s
m/s
m/s
m/s
m/s

0.75
1.6
1.6
2.5
0.5
1.6

min
max

1
1

m/s
mm
mm

0.75
292.04
300

13 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 6


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
Actual Velocity through Bell mouth
Minor Losses for enterance at Bell Mouth
SUCTION HEADER FROM CWR
Velocity through suction header
Size of suction header
Adopted Size of suction header
Actual Velocity through suction header
Minor Losses in Suction Header-50 m length
Minor Loss for Gate Valve at Suction Header
SUCTION HEADER (Main)
Velocity of suction header
Size of suction header
Adopted Size of Suction Header (as per tender condition)
Actual Velocity through suction Header
Minor Losses for Main Suction Header-20 m length

m/s
m

0.71
0.0051

m/s
mm
mm
m/s
m
m

1.6
199.95
250
1.02
0.1761
0.0267

m/s
mm
mm
m/s
m

0.5
357.68
450
0.32
0.0042

m/s
m3/h
mm
mm
m/s
m
m

1.60
1
52.30
107.54
125
1.18
0.01
0.04

m/s
mm
mm
m/s
m
m
m

2.5
86.04
100
1.85
0.05
0.175
1.047

m/s
mm
mm
m/s
m
m
m
m
mm
m/s
m
m
m

1.600
107.54
125
1.184
0.036
0.087
0.297
0.052
100
1.85
0.349
0.017
0.040

FOR CLUSTER NO. 6


SUCTION PIPE OF EACH PUMPS
Velocity through suction pipe
Number of Running Pumps
Discharge of each pump
Size of suction pipe to individual pumps
Adopted Size of Suction Pipe
Actual Velocity through suction pipe
Minor Losses in Suction Pipe of Pump 2m length
Minor Loss for Gate Valve at Suction Pipe
SIZE OF DELIVERY PIPE
Velocity of flow
Dia of delivery pipe
Adopted Size of Delivery Pipe
Actual Velocity through Delivery pipe
Minor Losses in Delivery Pipe of Pump 5m length
Minor Loss for Gate Valve at Delivery Pipe (2 Nos.)
Minor Loss for Non Return Valve at Delivery Pipe
SIZE OF DELIVERY HEADER PIPE
Velocity of flow
Dia of header pipe
Adopted Size of Delivery Header
Actual Velocity through Delivery Header
Minor Losses in Delivery Pipe of Pump 10m length
Minor Loss for Gate Valve at Delivery Pipe
Minor Loss for Non Return Valve at Delivery Pipe
Minor Loss for Gate Valve at Delivery Pipe
Adopted Size of Electro Magnetic Flow Meter
Actual Velocity due to Electro Magnetic Flow Meter
Minor Losses for Elctro Magnatic Flow meter
Minor Losses Due to Reducers
Minor Losses Due to Enlargements

Pratibha Industries Limited, Mumbai

14 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 6


Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
PARATICULARS
Actual Velocity in suction pipe
Actual Velocity in delivery pipe
Design Discharge of each pump
HEAD CALCULATIONS
FGL at Pump House at Kiratpura
RL of Pump Floor Level at Kiratpura
Highest level along the most critical path at Beer Ramchandrapura
Static Difference
Friction Loss in Pipe Line (From Hydraulic Calulation)
Add minor losses in specials in Pump House
Headloss at exit point
Total head of pump required
Design Head
Minimum Head
Combined Efficiency of Pumping Set as per Clause 1.5(VI)
KW of Pump required for Average Head
Add 15% over Pump KW
Selected Motor rating

m/s
m/s
m3/h
m3/Sec

1.18
1.85
52.30
0.015

m
m
m
m
m
m
m
m
Say m

318.600
317.000
361.853
44.853
24.909
2.41
1.00
73.17
74.00

74.00
0.60
17.56
20.20
22

wQh/102/eff.
Kw

DUTY CONDITIONS OF SELECTED PUMP SET FOR CL


6
3
m /h
Discharge
52.30
Head
m
74
Selected motor rating as per claculations
Kw
22.0
*
Kilowatt rating for motor calculated here with is only for Electrical load calculation purpose. Actual
Rating of motor will be given by Manufacturer.

Pratibha Industries Limited, Mumbai

15 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 7 & 28
Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
FOR CLUSTER NO. 1 & 2
Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

FOR CLUSTER NO. 3


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

2.30

FOR CLUSTER NO. 4


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

4.48
16.14
1

FOR CLUSTER NO. 5


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

17.93
1

FOR CLUSTER NO. 6


Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

14.53
52.30
1

Flow of Water
Flow of Water
Number of Running Pumps

lps
m3/h
No

15.89

TOTAL DISCHARGE OF ALL RUNNING PUMPS


DESIGN PARAMETERS
Velocity through suction bellmouth
Velocity through suction header pipe
Velocity through suction pipe
Velocity through delivery pipe
Lateral velocity through suction main header
Velocity through main delivery header

m3/h

180.77

8.04
28.93
1

8.29
1

4.98

FOR CLUSTER NO. 7 & 28

DESIGN PARAMETERS
Value of New Hazen William's Coefficent Cr for pipes
BELL MOUTH INSIDE CWR
Velocity through bellmouth
Size of bellmouth at suction (area=Q/V)
Adopted Size of Bell mouth

Pratibha Industries Limited, Mumbai

57.20
1

m/s
m/s
m/s
m/s
m/s
m/s

0.75
1.6
1.6
2.5
0.5
1.6

min
max

1
1

m/s
mm
mm

0.75
292.04
300

16 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 7 & 28
Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
Actual Velocity through Bell mouth
Minor Losses for enterance at Bell Mouth
SUCTION HEADER FROM CWR
Velocity through suction header
Size of suction header
Adopted Size of suction header
Actual Velocity through suction header
Minor Losses in Suction Header-50 m length
Minor Loss for Gate Valve at Suction Header
SUCTION HEADER (Main)
Velocity of suction header
Size of suction header
Adopted Size of Suction Header (as per tender condition)
Actual Velocity through suction Header
Minor Losses for Main Suction Header-20 m length

m/s
m

0.71
0.0051

m/s
mm
mm
m/s
m
m

1.6
199.95
250
1.02
0.1761
0.0267

m/s
mm
mm
m/s
m

0.5
357.68
450
0.32
0.0042

m/s
m3/h
mm
mm
m/s
m
m

1.60
1
57.20
112.47
125
1.30
0.01
0.04

m/s
mm
mm
m/s
m
m
m

2.5
89.98
125
1.30
0.02
0.086
0.513

m/s
mm
mm
m/s
m
m
m
m
mm
m/s
m
m
m

1.600
112.47
125
1.295
0.036
0.043
0.145
0.026
100
2.02
0.418
0.021
0.048

FOR CLUSTER NO. 7 & 28


SUCTION PIPE OF EACH PUMPS
Velocity through suction pipe
Number of Running Pumps
Discharge of each pump
Size of suction pipe to individual pumps
Adopted Size of Suction Pipe
Actual Velocity through suction pipe
Minor Losses in Suction Pipe of Pump 2m length
Minor Loss for Gate Valve at Suction Pipe
SIZE OF DELIVERY PIPE
Velocity of flow
Dia of delivery pipe
Adopted Size of Delivery Pipe
Actual Velocity through Delivery pipe
Minor Losses in Delivery Pipe of Pump 5m length
Minor Loss for Gate Valve at Delivery Pipe (2 Nos.)
Minor Loss for Non Return Valve at Delivery Pipe
SIZE OF DELIVERY HEADER PIPE
Velocity of flow
Dia of header pipe
Adopted Size of Delivery Header
Actual Velocity through Delivery Header
Minor Losses in Delivery Pipe of Pump 10m length
Minor Loss for Gate Valve at Delivery Pipe
Minor Loss for Non Return Valve at Delivery Pipe
Minor Loss for Gate Valve at Delivery Pipe
Adopted Size of Electro Magnetic Flow Meter
Actual Velocity due to Electro Magnetic Flow Meter
Minor Losses for Elctro Magnatic Flow meter
Minor Losses Due to Reducers
Minor Losses Due to Enlargements

Pratibha Industries Limited, Mumbai

17 / 18

325926754.xls

Clear Water Pumps and Piping For Pumiping Station at Kiratpura-Cl 7 & 28
Configuration of Pumps selected is 1+1 (1 working + 1 Standby)
DESIGN DATA
PARATICULARS
Actual Velocity in suction pipe
Actual Velocity in delivery pipe
Design Discharge of each pump
HEAD CALCULATIONS
FGL at Pump House at Kiratpura
RL of Pump Floor Level at Kiratpura
Highest level along the most critical path at Chittora-1
Static Difference
Friction Loss in Pipe Line (From Hydraulic Calulation)
Add minor losses in specials in Pump House
Headloss at exit point
Total head of pump required
Design Head
Minimum Head
Combined Efficiency of Pumping Set as per Clause 1.5(VI)
KW of Pump required for Average Head
Add 15% over Pump KW
Selected Motor rating

m/s
m/s
m3/h
m3/Sec

1.30
1.30
57.20
0.016

m
m
m
m
m
m
m
m
Say m

318.600
317.000
340.502
23.502
53.270
1.61
1.00
79.39
80.00

80.00
0.60
20.77
23.88
30

wQh/102/eff.
Kw

DUTY CONDITIONS OF SELECTED PUMP SET FOR CL


7 & 28
m3/h
Discharge
57.20
Head
m
80
Selected motor rating as per claculations
Kw
30.0
*
Kilowatt rating for motor calculated here with is only for Electrical load calculation purpose. Actual
Rating of motor will be given by Manufacturer.