PROJECT NAME
CLEAN BOILER UNIT 02 POWER PLANT (IRPC)
By :
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
2 of 17
General
This document is the technical for Cleaning Boiler unit 02 power Plant of
IRPC PUBLIC COMPANY LIMITED with regard to safety in the workplace. That is
specified in the attached document bidding package. We are HYDRODYNE
SERVICES to prepare the proposal to bidding and technical step for Cleaning
Boiler unit 02 power Plant.
Summary scope:
This proposal and detail cover the requirement for the Boiler internal
cleaning, transfer oil and waste.
Contractor shall supply all material, equipments and necessary in order to meet all
requirement of proper and workman like cleaning procedure;
1. Isolate blind.
2. Open and Close manhole.
3. Air Ventilation.
4. High Pressure water Jet/Manual cleaning inside boiler and condenser.
5. Mobilization and De- Mobilization Equipment and tool.
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
3 of 17
CONTENT
DESCRIPTION
PAGE
(MR.SARUNYU TONGTAJA)
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
4 of 17
Senior
Sale Engineer
SECTION 1
MANPOWERS AND EQUIPMENT/TOOL LOADING
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
5 of 17
SECTION 2
ORGANIZATION CHART
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
6 of 17
SECTION 3
PROCEDURE OF WORK
1. Cleaning inside Boiler
1.1.
1.3.1.
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
7 of 17
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
8 of 17
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Manual
Cleaning
High Pressure
water jet Cleaning
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
9 of 17
Penhouse Zone
Economizer Zone
Air
Flush/Manual
Cleaning
High Pressure
water jet Cleaning
Furnace Zone
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
10 of 17
2.4.
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
11 of 17
High Pressure
water jet Cleaning
Electrostatic precipitator
(EP).
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
12 of 17
3.4.
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
13 of 17
B. Close manhole (a new bolt, nut, gasket and torque standard (If
any)).
C. De-blind (a new bolt, nut, gasket and torque standard).
D.Housekeeping around site.
E. De-Mobilization Equipment/Tool.
4. Cleaning Condenser.
4.1.
Cleaning Condenser
A. Prepare PPE and Confine permit approval by IRPC.
B. Prepare Oxygen alert and other safety tool ( SCBA standby).
C. Install lighting 220 V. outside condenser.
D.Start up High pressure water jet. (Ventilation has running every
time)
E. Cleaning inside tube and cover condenser.
F. Visual inspection Cleaning by IRPC & HDS (Approved by IRPC).
G.Replace Aluminum Catode.
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
4.4.
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
14 of 17
5.2.
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
15 of 17
SECTION 4
SCOPE OF SUPPLY
ITEM
1
2
3
4
5
6
7
8
9
10
11
12
DESCRIPTION
All Equipment and Tool for Project
Manpower for Project
Transportation Equipment and tool
Consumable
Change New Bolt, Nut, Gasket (Close system for Cleaning work)
Safety tools
Waste Disposal
N2 (If request)
Air, Electrical
Site Area
Water for Clean
Steam (If request)
Sarunyu.T
PROVIDER
HDS
HDS
HDS
HDS
HDS
HDS
IRPC
IRPC
IRPC
IRPC
IRPC
IRPC
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
16 of 17
SECTION 5
SCHEDULE PLAN
Sarunyu.T
Approve By :
Position:
Date: 21/09/2013
Owner: MSS Section. (IRPC)
Customer:
Rev.
IRPC PW
Date:
0
Page:
19/09/2013
17 of 17
SECTION 6
SAFETY MANAGEMENT