TRANING REPORT
ON
Submitted to:
Submitted by:
MR.KEWAL SINGH
SABIRA BATOOL
HOD, CE.
CE 8 T H SEM
EXTENTION OF
MAULANA AZAD
ACKNOWLEDGEMENT
As The Professional Courses Not Only Require the Theoretical Knowledge but Practical Knowledge too that is
Why University Started Conducting Training Programs for the Students. So That They Can Get Ample View Of
Practical Problems I Find It a matter Of Honour In Showing The Feeling Of Indebtedness & Thankfulness To
The Mr.Kewal Singh (H.O.D) Of Civil Department School Of Engineering And Technology For
Providing This Opportunity To Carry Out The Four Months Industrial Training. The Constant Guidance And
Encouragement Mr Nitish Malik assistant professor & Er.Dharmender Kamboj (Training & Placement
Cell.) Has Been Of Great Help In Carrying Out The Project Work And Is Acknowledged With Reverential. It Is
My Privilege To Express My Profound Ineptness, My Deep Sense Of Gratitude To Roshan Real Estate Pvt
Ltd. H.O At Malviya Nagar For Showing Trust In Me And Assigning Me Such An Important And Interesting
Project And Also For Sparing Time From His Schedule To Discuss & Clarify Issues Related To This Project.
I Sincerely Thank To my Project Guide Er.Najeeb Qadri(PM) Er.Tarun
Shetty (P.E) Er.Taj (A.E) Er.Bittu (S.E) Er.Waqar (S.E) Er.Punit Kumar (Quality Control Inspector)
And Durga (Foreman) For Guidance And Encouragement In Carrying Out This Project Work .I Wish To
Express My Sincerely Gratitude To Er.Taj (A.E) For Providing Me An Opportunity To Do My Project Work
On Extension Of Maulana Azad Institute Of Dental & Science At Old Delhi (Near Feroz Shah Kotla Cricket
Stadium) In Roshan Real Estate Pvt Ltd.
I Am Also Very Thankful To My Friends And Family Members Who Supported
Me Encouraged Me All The Time To Through This Whole Project.
Sabira Batool
Uni.Roll no:
INTRODUCTION OF MY WORK
I have Completed Fourth Month Industrial Training In Extension of Maulana Azad
Institute of Dental & Science" Bahadur Shah Zafar Marg at Delhi Gate (Near Feroz Shah
Kotla Cricket Stadium).
During The Training Period I Am Supervising And Monitoring The Various
On Going Construction Works At The Construction Site Under The Guidance Of Engineer In
Charge At Site.
My task during Training
Brick Work
Column layout & Concreting
Check Slab Shuttering & Concreting
Some Cheeping works from Jack hammer
Scaffolding & Formwork
Slump Test
Silt test
Brick test
Project Type: - Educational Building
Location: - Bahadur Shah Zafar Marg (Delhi Gate)
Name of the Project: - Extension of Maulana Azad Institute of Dental &Science
Signature.
(Sabira batool)
STUDENT DECLARATION
I Sabira Batool Student Of B-Tech (Civil)-8th Semester College Roll No 12BTCE30 Has Undergone
Industrial Training In Roshan Real Estate Pvt Ltd As per Required Of Four Months Project. Semester For
The Award Of Degree Of B-Tech Civil Engineering School Of Engineering & Technology (Soldha
Bahadurgarh Distt.Jhajjar) And Prepared The Report Entitled Extension Of Maulana Azad Institute Of
Dental & Science Old Delhi Which Is An Authentic Record Of My Work Carried Out At Delhi Gate .
If Any Discrepancy Is Found Regarding The Originality Of This Project I May Be Held Responsible I Have
Not Copied From Any Report Submitted Earlier This Or Any Other College As Well As University .This Is
Purely Original And Authentic Work.
Sabira Batool
Univ.Roll No.
INDEX
CONTENT
1.
2.
3.
4.
Page No.
11
12
13
14-16
Methodology of work
17
5. Waterproofing
18
19-20
Plywood Formwork
Steel Formwork
Normal Size of Formwork
21-22
8. Scaffolding
23-25
Materials
Types Of Scaffolding
Individual Component
Types of Scaffolding
Individual Components
(SCHOOL OF ENGINEERING & TECHNOLOGY)
EXTENTION OF MAULANA AZAD INSTITUTE OF DENTAL & SCIENCE
7
9. Retaining Wall
26
27
10. Column
28-30
Column Layout
Methods Of Construction
Specification
12.Laying Of Beams & Slabs
Specification Of Beam
Specification Of Slabs
13.Laying Of Stairs & Lift
Specification Of Stairs & Lift
31-32
33-35
Bricks Details
36
English Bond (230 mm)
Stretcher Bond (115 Mm)
14.How To Build A Brick Wall
15.Methods Of Plastering
Internal PlasteXSAring On Surface Of Brick And Concrete
External Wall Plastering
Improving Joints Of Brick Wall & Concrete
37-38
39
40
8
41
42
43-45
46-47
48
49-50
51-56
51
52-53
54
55
56
57
58
59
Of Apartment Hotels And Residential Mobile Home Sites.(Development On Own Account Involving
Construction Is Classified In Class A).Roshan Real Estates Private Limited's Annual General Meeting (AGM)
Was Last Held On 30 September 2014 And As Per Records From Ministry Of Corporate Affairs (MCA), Its
Balance Sheet Was Last Filed On 31 March 2014.
Directors of Roshan Real Estates Private Limited Are Syed Rashid Ali,
Roshan Real Estates Private Limited's Corporate Identification Number Is (CIN) U70101DL1997PTC089296
and Its Registration Number Is 89296.Its Email Address Is Midhasandeep@Hotmail.Com and Its Registered
Address Is 269-C Hauz Rani New Delhi DL 110017
Current Status of Roshan Real Estates Private Limited Is - Active.
3. Students Profile
Sabira Batool
Haji Nissar Ali
School Of Engineering & Technology
B-Tech (Civil Engineering)
12BTCE
2012-2016
11
E-Mail Id:
Contact No:
Name Of Organization:
Inbox4sabira@Gmail.Com
8295604254 & 9469734234
Extension Of Maulana Azad Institute
s
Architectural drawings:- Achitectural drawing are the heart of the
any project.because it
13
14
location.
Positioning of central co.ordinate as per grid plan:The center point was marked with the help of a total
station as per the grid drawing with respect to this center
point.co.ordinate system are the most important parts of
any construction because its decided to all column are in
exact position.
15
iii.
iv.
from the ground level.of the building but ramp is 1.8 meter
Layout of foundation:- After casting of raft foundation
again the layout of column was done in order to check the
actual position of vertical bars of column. the layout was
also helpful to place the shuttering on actual postion so
that the column should be in proper position according to
drawing (column layout drawing).
16
17
reinforcement.
18
19
20
21
22
upto 20 to 25% of
Raft foundation:- Raft foundation are used to spread the load from a
structure over a large area.normally the entire area of the structure.raft
foundation are used when large load is to be distributed and it is not
provide individual footings.We can say that raft foundation are used to
where the soil bearing capacity is low as well as present soil is soft or
loose particle. therefore raft foundation are to be used spread the load
over a larger area.
Specification of raft foundation: Area of raft foundation: Thickness of raft :- 1200 mm
Grade of concrete :- M25 (1:1:2)
Grade of steel:- Fe500
25
27
Sr No.
Beam
Name of Beam
Number of Beam
1.
Size
230x60
B2,B3,B7,B8,B9,B11,B12,B14,B15
47
,B16,B29
B30A,B31A,B33,B37,B40,B41,B42
,B43,B45
B46,B50,B51,B52,B64,B64A,B64B
,B70,B71
B73,B74,B75,B78,B84,B85,B86,B
87A,B87B
B88,B95,B98,B99,B100,B101,B10
2.
400X60
3
B4,B5,B18,B19,B20,B21,B23,B25,
B26,B27,B28,B29,B32,B34,B35,B
41
38,B44,B48A,B48B,B51A,B51B,B5
3,B54,B55,B56,B57,B65,B66,B67,
B68,B69,B72,B72A,B77,B90,B91,
3.
230X75
B97,B102,B104,B105
B1,B13,B47
4.
0
230X25
B10
5.
0
400X25
B17,B39,B45,B49,B76,B76,B89,B
6.
0
300X60
93
B22,B59,B59A,B60,B61,B62,B81,
14
7.
0
400X85
B83,B92A,B92B,B96
B30,B31
8,.
0
150X17
B9A
9.
5
230X60
B36,B80
10.
0
300X15
HB1
11.
0
300X17
HB228
TOTAL
120
Specification of Beams:-
29
30
Size of
Name of Column
Number
Colum
of
n
600x60
C2,C25,C26,C27,C29,C30,C32,C34,C38A,
Column
16
0
450X90
C38B,C39,C40,C41,C41B,C42,
C1,C4,C5,C6,C7,C11,C12,C13,C14A,C14B,
36
C17A,C17B,C17C,C18A,C18B,C18C,C18D,
C19,C20,C21,C22,C23,C24C33,C34,C35,C36
A,C36B,C36
230X75 C3A,C3B,C3C,C8,C9A,C9B,C9C,C2,C28A,C28
18
B,C28C,C28D,C28E,C28F,C28G,C28H,C29,C
350X70
30
C10,C15,C16
0
300X90
C31
0
300X75
C12A
75
to
remove air bubbles at last step is curing it can be done by gunny bags
or pipes.
Lift:- lift is a vertical access that moves up and down inside a building
and carries people
from
Specification of Stairs
Riser : 150mm
Tread : 300mm
Flight thickness : 200mm
Landing Size : 2100mmx2000mm
34
step 5.to finish the beds.use the rounded edge of a brick jointer to
scrape the mortar into the joint.start with horizontal line and follow with
vertical line its easier to remove any excess
step 6.in the case of half brick thick wall.the 6mm dia reinforcement
wire which is provided
located and end of the bar should penetrate in the column by 10mm
minimum.the reinforcement needed only if the height of wall exceeds 1
meter only.
step 7.give the finished wall a gentle brush over and clean up any
mortar that has fallen into the floor before it dries. you can use water to
wash cement away from the floor.but be sure to keep it away from your
newly-built wall.
(SCHOOL OF ENGINEERING & TECHNOLOGY)
35
Advantage
1.high fire insulation
2.no breakage as campare toclay bricks
3.its uniform size , less mortar required 50%
Disadvantage
1.mechanical strength is low.
2.only modular size production
36
38
50mm & 75 mm
Retaining wall
40mm
Column
40mm
39
Lift column
40mm
Beams
25mm
Slab
20mm
Description of structural
Period of time
.
1
member
Walls, columns, & vertical sides of
1 to 2 days
2
3
4
5
beams
Slabs (props left under)
Beam soffits (props left under)
removal of props to slabs
For slabs spanning upto 4.5m
For slabs spanning upto 4.5m
Removal of props to beams &
arches
spanningupto 6m
spanning over 6m
40
3 days
7 days
7 days
14 days
14 days
21 days
Concrete Mixer Plant:- Mixer plants provides the facility to mix the
various ingredients of concrete in required proportion at the in order to
fulfil the quanties of concrete and without morelead distance . A
concrete plant also known as a batch plant is a device that combines
various ingredients to form concrete . some of these inputs include
sand,water,aggregate,fly-ash,cement and the centre of the concrete
41
42
concrete pumps.
1.
2.
3.
placing boom.
Transit Mixer:- it is used to transport the concrete from the place
of production to the site Nominal capacity of Transit mixer is 6
cum and Total geometric volume is 9 cum. It is a equipment
which is used for transpoting the concrte from batching plant
directly to the place where it is to be poured it has a wide range of
application specially for mass concreting works like high rise
building construction, Dam Airports etc.The angle of drum is 15
and drum speed varies from 0-4 rpm
44
have
JACK HAMMER
47
openings.
Features of jack hammer: Maximum chiseling performance =
5250 cusec/min
Weight
=
11.8 kg
QUALITY CONTROL AND TESTING:Various tests which are done on different materials are listed below:
Slump test
Compressive strenght test of concrete
Weight of steel
Silt content
Grading of Aggregate
Test of Bricks
Dimension Test
Water absorption test
Soundness test
Visual inspection test
(SCHOOL OF ENGINEERING & TECHNOLOGY)
EXTENTION OF MAULANA AZAD INSTITUTE OF DENTAL &
SCIENCE
Slump test:- This test is used to check the workability of concrete at
site.Steel mould is used which is in the form of frustrum of cone whose
dimensions are 100 mm at Top dia 200 mm at bottom dia length is
300mm and Rod 10mm dia.
Standard value:Sr.No.
Slump value
Degree of Workability
49
Uses at site
1
Less than 25
Very Low
2
25-75
Low
3
75-100
Medium
4
Greater than 100
High
Observation and calculation:-
Precast Work
Road pavement
R.C.C footing
Column,beam
Sr.No
Mix of
Water Cement
Slump
Remarks
.
1
2
3
Concrete
M25
M30
M35
ratio
0.50
0.46
0.44
value
115
112
110
Raft , Slab
Lift , Column
Column , Lift
50
Sr.N
D.O.
Locati
D.O.
Mix of
Loa Compre
Mark
Avg
on
concre
ssive
s of
(N/mm2)
te
(kN
strengt
cube
h
N/mm2)
03/02
/16
15/02
Raft
29/0
M30
740
34.33
C1
P.C.C
2/16
21/0
M2
720
31.67
C7
M35
930
42.3
C12
41.8
M25
728
32.1
C20
31.7
M30
820
37.8
C30
34.9
/16
3
29/02 COLUM
03/0
/16
2/16
16/03
Trimix
11/0
/16
5
31/03
/16
33.56
3/16
Slab
29/0
4/16
52
53
1.8
94.4
3
Grading Zon
passing
98.2
5.6
0.8
85-100
0-20
0-5
Weight
gm
0
411
2458
103
24
% retained
% passing
Grading Zone II
0
13.7
81.9
3.4
100
86.3
4.4
1
85-100
0-20
0-5
54
Grading
Grading Zone
Grading
Grading Zone
Sieve
10 mm
4.75
Zone I
100
90-100
II
100
90-100
Zone III
100
90-100
IV
100
90-100
mm
2.36
60-95
75-100
85-100
95-100
mm
1.18
30-70
55-90
75-100
90-100
mm
600
15-34
35-59
60-79
80-100
mic
300
5-20
8-30
12-40
15-50
mic
150
0-10
0-10
0-10
0-15
mic
grading zone of sieves, other than 600 micron IS sieve, by a total amount
not exceeding 5 percent, it shall be regarded as falling within that grading
zone.
Percentage passing for
General Requirements of Bricks: Visually the bricks shall be sound,compact and uniform in
shape.The bricks shall be free from visible cracks,and organic
matters.
The bricks shall be solid and with or without frog 10 to 20 mm
deep on one of its flat side.
In case of non-modular size of bricks,frog dimensions shall be the
same as for modular size bricks.
Hand-moulded bricks of 90 mm or 70 mm height shall be
moulded with a frog 10 to 20 mm deep on one of its flat sides .
55
56
58