Part 1
For IRRIGATION & CAD WORKS
and
LEADS & LIFTS (Common to all Departments)
dt: 25.07.2015
Sub:
Telangana Revised Standard Data for I&CAD works(Part-I) for the year 2015-16
approved-Printing & communication of Standard Data Reg.,
Ref:
(Part-I), Road & Bridges (Part-II), Building (Part-III) and Public Health (Part-IV) was held on
25.05.2015 @ 3.30 PM and approved the SoR. Based on the approval of BoCEs, the SoR for I&CAD
Dept(basic input required for arriving unit item rate as per Telangana Revised Standard data), I&CAD
Department,
items were
Page No.
i-xiii
IRRIGATION
Abstract of Items - Irrigation
1-45
46-47
IRR-DAW
IRR-DAW-1
48-59
IRR-DAW-2
IRR-DAW-3
IRR-DAW-4
IRR-DAW-5
IRR-DAW-6
59-78
78-84
84-87
87-95
96-104
IRR-TAW
IRR-TAW-1
IRR-TAW-2
IRR-TAW-3
IRR-TAW-4
IRR-TAW-5
IRR-TAW-6
105-113
113-116
116-122
122-123
123-128
128-130
IRR-CAW
IRR-CAW-1
IRR-CAW-2
IRR-CAW-3
IRR-CAW-4
IRR-CAW-5
IRR-CAW-6
IRR-CAW-7
IRR-CAW-8
131-146
146-153
153-158
158-163
163-171
171-173
173-217
217-229
IRR-CCDW
IRR-CCDW-1
IRR-CCDW-2
IRR-CCDW-3
IRR-CCDW-4
IRR-CCDW-5
IRR-CCDW-6
IRR-CCDW-7
229-235
235-261
261-263
263-270
270-274
274-280
280-284
IRR_GAW
285
285-291
291-310
310-314
314-317
IRR_GAW-1
IRR_GAW-2
IRR_GAW-3
IRR_GAW-4
Item Code
IRR-PMW
IRR-PMW-1
IRR-PMW-2
IRR-PMW-3
Page No.
318-328
328-338
338-354
COM-LDLFT
COM-LDLFT-1
A. Manual Works
B. Lead/Lift/Loading & Unloading Charges
(to follow MORTH standardsfor the items not covered ,as
applicable to roads and bridge works)
Notes on Lead and Lift
(Lead) Conveyance Charges for materials by head load
( Lead) Conveyance charges for machinery per kilometer for
transporting materials by tippers and trucks, excluding
loading, unloading and hire charges of machinery.
COM-LDLFT-2
COM-LDLFT-3
COM-LDLFT-4
COM-LDLFT-5
COM-LDLFT-6
COM-DTL-LDLFT-1
COM-DTL-LDLFT-4
COM-DTL-LDLFT-5
COM-DTL-LDLFT-6
356-356
356-356
356-356
LOADING AND UNLOADING CHARGES BY MANUAL
MEANS (Idle hire charges of trucks are not added)
LOADING AND UNLOADING CHARGES BY MANUAL
MEANS (including idle hire charges of trucks )
LOADING AND UNLOADING CHARGES BY MECHANICAL
MEANS (including idle hire charges of trucks )
LIFT CHARGES FOR MATERIALS BY HEAD LOAD
(Lead) Conveyance Charges for materials by head load
( Lead) Conveyance charges for machinery per kilometer for
transporting materials by tippers and trucks, excluding
loading, unloading and hire charges of machinery.
COM-DTL-LDLFT-2
COM-DTL-LDLFT-3
355-355
356-356
356-357
357-357
357-357
357-357
358-359
359-365
LOADING AND UNLOADING CHARGES BY MANUAL
MEANS (idle hire charges of trucks are not added)
LOADING AND UNLOADING CHARGES BY MANUAL
MEANS (including idle hire charges of trucks )
LOADING AND UNLOADING CHARGES BY MECHANICAL
MEANS (including idle hire charges of trucks )
LIFT CHARGES FOR MATERIALS BY HEAD LOAD
Hire Charges
365-366
366-367
367-368
368-369
370-371
The TS Revised Standard data for various construction items has come into
existence as per the Government orders G.O.Ms.No.49, I & CAD (PW: Reforms)
Dept., dt: 2-3-2009.
constituted a
standard data
Accordingly the data has been revised adopting the procedures and
guidelines given by CWC, Report on committee on cost control of river valley
Projects, BIS specifications, NHAI, MORTH, MORD, CPWD and Government
of Karnataka and revised data and formulated schedule of rates for all
infrastructure Departments (I&CAD, R&B, PR and PH). The team of senior
engineers interacted with the S.R Committee of Karnataka on implementation
and improvements needed. For irrigation works, the data pattern as adopted by
Karnataka has been considered and for other Departments, the data adopted
by MORTH, MORD and NHAI etc. is considered.
b) The second step is to work out the details of inputs. This enables to
generate the unit work item rates, by incorporating the use rates of
machinery, materials, labour charges and other supplementary parameters.
c) (c) The third step is to develop software tool to generate unit rate using the
software (completed for irrigation works by the SPI Unit of Irrigation)
3. The Detailed draft data was communicated to all the HODs and interacted
through many seminars and discussions and incorporated the relevant
features. The Board of chief engineers in their meetings have recommended for
acceptance to the data formulated and schedule of rates. It was proposed to
examine the recommendations on important parameters, to refer to high level
committee, for their specific recommendations for adoption, as they are
common to all departments.
The committee made in depth study on the methodology and systems
followed by the reputed National organizations and other States and made
detailed
deliberations
with
HODs
and
representatives
of
Builders
ii
GUIDELINES
1)
The Revised Standard Data is formulated under four Parts, which are
applicable to all the Engineering Departments and other Organisations.
PART -1:
Irrigation& CAD (Dam and Allied Works, Canals and Allied Works,
Canal C.D. Works, Tunnels and Allied Works, Preliminary and
Maintenance Works, Hydraulic Gates and allied works and Leads
and Lifts applicable to all Departments
PART -2:
PART -3:
PART -4:
iii
factors such as power interruptions, minor break-downs, time for meals and other
needs of work-force, stray rains etc. Therefore, it is the general practice to consider
50 minutes as the actual working time per hour for working out the hourly / daily
out-put of machinery / work-force. CWC / BIS guide-lines stipulate the actual
working hours for the purpose of equipment planning and utilisation. The daily output is computed duly considering the actual available working time and feed back
from the field.
For gate and hoist works, it is the general practice to specify the quantity
of work in terms of number of sets of embedded parts / gates. The
requirement of
The data for gates and E.M. Parts is arrived per Ton quantity.
The data for Hoists and Gantry Cranes is worked out on the basis of
capacity in tonnage
4) The lead and lift charges provided in PART-I (B) are generally applicable
and common to all Departments. Any item is not covered in this part, the
rates as provided in the data of the relevant works may be adopted in
preparation of estimates.
5) The basic material inputs needed for all works are listed and incorporated in
the data. The requirements are analyzed and the specifications adopted shall
confirm to Standards published by the BIS.
For sand, gravel , murum, stones , course aggregates etc, the rates are
to be fixed for delivery at Quarry, adding loading charges by machinery /
iv
manual means and idle hire charges of machinery (as per table under
chapter conveyance or lead and lift charges), as applicable.
For steel, Cement, AC sheets, GI sheets, Hume pipes, wood and stone
slabs, the rates are to be taken prevailing at major commercial centre
near project area. The lead charges, as applicable are to be added in
preparing estimates.
The specifications of the aggregates for sizes and gradation and its
adoption shall be as per IS 383.
However, If more than one area allowances, such as those for (1)
Municipalities (2) Agency / Tribal areas (3) Industrial areas are applicable
for a particular situation, only the maximum out of the allowable
percentages is to be allowed.
based on the
For the other machinery not covered by the list, the R&B and other users
may adopt hire charges as recommended by the MORTH.
v
8) Lead Charges
The basic work item rates provided in the Standard Data & Schedule of
rates include 50 m or 1 km as initial lead and no lead charges shall be
allowed where the source of material is within the initial lead specified in
item rate. Additional lead charges shall be allowed for the lead exceeding
initial lead specified in the item rate. The Guidelines may be followed
regarding adding Lead charges as given against each chapter.
The lead charges per unit quantity for conveyance of the materials are
worked out, and included in the schedule of rates in increment of 50 m for
head load and in increment of 1 km for mechanical mode.
The rates for lead charges by head load up to 150 meters and by
machinery up to 5 km, shall be cumulative and inclusive of lead charges
for preceding lead. For lead beyond 5 km, the lead charges shall be
worked out on per km basis.
vi
worked out,
The data and rates for lift charges is cumulative and are inclusive of rates
for preceding lifts also.
For
works
the
wastage
is
@2.5%
for
the
reinforcement rods above 36mm dia. and @ 5% for rods below 36mm
dia. Including overlaps, if they are not welded.
If welding is adopted for the reinforcement rods even for below 36mm
dia, 2.5% of wastage is only recommended.
12) Provision for rate of water:The Committee has recommended not to consider the water charges in
the Irrigation Project works. But, it may be considered in specific cases as per
the site conditions.
13) In respect of RCC works the rate for cement concrete for 1 cum is worked
separately for all grades based on Indian Standards. The rate for ton is
vii
The provision for VAT at 5% or as fixed by the Government from time to time
should be made separately in Part-B of the estimate. In the agreements it
should be mentioned that it will be reimbursed as per actual. The provisions
allowed in G.O.Ms.No.94, I&CAD, dt: 01.07.03, need not be added separately
for the items covered in the contractor overhead charges.
The provision for labour Cess at 1% or as fixed by the Government from time to
time should be made separately in Part-B of the estimate.
viii
Site accommodation, setting up plant, access road, water supply, electricity and
general site arrangements.
Expenditure on:
site supervision
Laboratory equipment and quality control including field and laboratory testing.
Minor T & P and survey instruments and setting outworks, including verification
of line, dimensions, trial pits and bore holes, where required.
Sundries
Financing Expenditure
ix
the central fabrication yard. It is difficult to determine the machinery and labour
components separately for fabrication and erection.
For the purpose of computation of excise duty to be included in the rate analysis
the machinery and labour components may apportioned at 75% for central
fabrication yard and 25% for field erection and commissioning. Therefore, 75% of
the machinery and labour components may be considered for assessing the extent
of excise duty to be added in the rate analysis.
18) DEWATERING & DESILTING:
The High level committee considering the local conditions of rainfall / seepage has
recommended towards de-watering and de-silting at 3 percent on the relevant
work component for which dewatering is required.
It is also proposed as per CWC guidelines, to keep a condition in the agreements
shall be incorporated, to fix a ceiling of 5% in extreme cases, with the specific
approval of chief engineer/Government.
19) Computerization Of Data:
20) For each chapter separate additional details are incorporated for clarity.
1.
Please select the item of work, as given in Index Code, and view the
relevant data.
2.
The common data items like, lead, lift, conveyance and manual
excavation (without involving contracting agencies) is applicable
to all Departments (volume-1).
3.
4.
5.
xi
SCHEDULE OF
RATES
(BOARD OF CHIEF ENGINEERS)
a) The Board Of Chief Engineers under the chairman ship of Engineer-inChief, (administration) I&CAD Department is the competent authority to
finalise and recommend the Schedule of Rates applicable for all engineering
Departments. The board has to assess and incorporate only the three basic
inputs required to generate unit work item rates as below.
Materials rates:
The basic input material rates common to all departmental works are
listed out and incorporated (in the chapter Basic inputs) The
material
all
For sand, gravel, murrum, stones, aggregates etc, the rates are for
delivery at Quarry including loading charges and idle hire charges. For steel,
Cement, AC sheets, GI sheets, Hume pipes, wood and stone slabs, the rates
prevailing at major commercial centre near project area has to be adopted.
Use rate of machinery:
The third parameter for incorporation in the Basic Inputs, is the use rate
of machinery. To arrive at the use rate of machinery, the inputs to be
incorporated are
The
to be
used in the
The prevailing fuel charges of petrol and diesel are ascertained and
average rate adopted
For the other machinery not covered by the list, the R&B and other
users may adopt hire charges as recommended by the MORTH
xiii
S.NO
Item description
Unit
Rate
Excavation for foundation in all kinds of soil including boulders upto 0.30 m
diameter for dam, spillway, intake structure and other appurtenant works and
placing the excavated soil neatly in dump area or disposing off the same as
directed etc., complete with initial lead upto 1 km and all lifts.
cum
120.10
cum
IRR-DAW-1
IRR-DAW-1-1
IRR-DAW-1-2
IRR-DAW-1-3
IRR-DAW-1-3-A
New Item 201415-1
cum
24.10
159.10
cum
cum
31.20
241.40
cum
cum
55.70
367.20
65.40
cum
IRR-DAW-1-4(a)
IRR-DAW-1-5(b)
cum
432.40
cum
cum
107.70
680.30
cum
118.00
IRR-DAW-1-6(c)
cum
cum
929.20
311.00
Chapterwise
item No.
S.NO
Item description
Unit
Rate
IRR-DAW-1-7
3
Preparing foundation bed for masonry or concrete by benching, stepping,
removing all loose material by wedging / chiselling and disposing off the same as
directed and cleaning the surface with air and water jet etc.,complete with initial
lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
sqm
35.60
IRR-DAW-1-8
IRR-DAW-1-9
10
Preparing foundation bed for cut-off trench filling in rock portion by removing
all loose materials by wedging / chiselling and disposing off the same as directed
etc., complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in
rock /masonry / concrete by percussion drilling using waggon drill or any
other suitable equipment including cost of all materials, machinery, labour,
redrilling through partially set grout wherever required etc., complete for drilling
upto 6 m depth from surface.
sqm
sqm
28.30
23.90
sqm
23.90
Rm
202.80
Rm
Rm
Rm
Rm
Rm
Rm
Rm
Rm
223.10
245.40
269.90
296.90
326.60
359.30
395.20
Rm
51.50
The item rate for drilling through rock / masonry / concrete includes redrilling
through partially set grout, if any, in the portion of the hole drilled and grouted.
.
IRR-DAW-1-10
IRR-DAW-111(a)
IRR-DAW-112(b)
IRR-DAW-1-13
IRR-DAW-1-14
11
12
13
14
15
IRR-DAW-2
IRR-DAW-2-1A
Rm
tonne
tonne
Curtain grouting with neat cement grout mix of suitable consistency under
specified pressure as directed in drilled holes by stage grouting method including
cost of all materials, machinery, labour, redrilling if necessary etc., complete with
initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads)
tonne
18.30
11093.30
2959.00
12054.50
tonne
Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel
bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in
bed rock and other end provided with L-bend for embedding in concrete /
masonry of over flow / non-over flow blocks and other appertenant works
including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1
proportion, driving anchor rod, cost of all materials, machinery, labour etc.,
complete with initial lead upto 1 km and all lifts.
Each
Each
Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with
one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm
dia. hole drilled in bed rock and other end provided with L- bend for embedding
in concrete / masonry for spillway and appurtenant works including drilling and
cleaning hole, filling hole with thick cement slurry, driving anchor rod, cost of all
materials, machinery, labour, steel wedge etc., complete with initial lead upto 1
km and all lifts.
Labour Component (including contractor's profit and Overheads)
46.90
Each
3813.80
940.30
109.60
863.90
Each
123.60
16
52115.67
tonne
tonne
3522.50
Chapterwise
item No.
S.NO
Item description
Unit
Rate
IRR-DAW-2-1B
17
IRR-DAW-2-2
IRR-DAW-2-2A
(new Item1 201011)
IRR-DAW-2-3
IRR-DAW-2-4
IRR-DAW-2-4A
(new Item2 201011)
IRR-DAW-2-4B
(new Item3 201011)
18
19
20
21
22
23
53545.14
tonne
tonne
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for plain
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 250
kg /cum with use of super plasticiser equla to 0.4% of cement content, CA :
0.98 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.35 cum ))
cum
cum
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for plain
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 300
kg /cum with use of super plasticiser equla to 0.4% of cement content, CA :
0.90 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.4 cum ))
cum
cum
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for plain
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 220
kg /cum with use of super plasticiser, CA: 0.98 cum, Blending Ratio of CA -40:30:20:10, FA: 0.37 cum )
cum.
cum.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating
structures, training walls, piers, abutments and such other locations with initial
lead upto 1 km and all lifts. ( Cement content : 310 kg / cum with use of super
plasticiser, CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)
cum.
cum.
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength
not less than 25 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating
structures, training walls, piers, abutments and such other locations with initial
lead upto 1 km and all lifts. ( Cement content : 360 kg / cum with use of super
plasticiser,CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength
not less than 25 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures,
training walls, piers, abutments and such other locations with initial lead upto 1 km
and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser,CA : 0.90
cum, blending ratio of CA--65:35, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
cum.
4701.30
4221.00
171.30
4584.80
171.30
3982.40
171.30
5554.00
338.00
5976.00
cum.
cum.
cum.
338.00
6124.90
338.00
Chapterwise
item No.
S.NO
IRR-DAW-2-5
IRR-DAW-2-6
IRR-DAW-2-7
IRR-DAW-2-8
IRR-DAW-2-9
IRR-DAW-2-10
Item description
Unit
Rate
24
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for plain
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 260
kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -50:30:20, FA : 0.40 cum)
cum.
5020.50
cum.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates with placing and sinking plums of size
150 to 80 mm upto 15 percent for gravity type structures including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete with initial
lead upto 1 km and all lifts. ( Cement content : 260 kg / cum of concrete with
use of plums and super plasticiser,, CA : 0.77 cum, Blending Ratio of CA :
50:30:20,FA : 0.34 cum, plums of size 150 to 80 mm : 0.25 cum)
cum.
cum.
25
26
27
28
29
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for plain
concrete works with initial lead upto 1 km and all lifts. ( Cement content 220
kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA :
50:30:20, FA : 0.40 cum )
Labour Component (including contractor's profit and Overheads)
cum.
cum.
cum.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
works of spillway bridge, blockouts and such other similar structures with
conjested reinforcement with initial lead upto 1 km and all lifts. ( Cement
content : 330 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending
Ratio of CA -- 65:35, FA : 0.44 cum).
cum.
cum.
Providing and forming porous concrete body drain of size 68.5 x 68.5 cm with 23
cm diameter central hole using cement and 20 mm down approved, clean, hard,
graded coarse aggregates in 1 : 3.50 proportion by volume including cost of all
materials, machinery, labour, formwork, curing etc., complete with initial lead
upto 1 km and all lifts.(M15 Cement content : 400kg/cum, CA : 1cum, Blending
Ratio of CA -- 65:35)
Labour Component (including contractor's profit and Overheads)
1202.30
4884.50
1173.20
4586.00
cum.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for plain
concrete works with initial lead upto 1 km and all lifts. ( Cement content : 280
kg /cum with use of super plasticiser,CA : 0.80 cum, Blending Ratio of CA -65:35, FA : 0.44 cum)
Rm
Rm
1088.20
4959.50
1114.40
6774.50
1580.70
2617.00
543.60
Chapterwise
item No.
S.NO
IRR-DAW-211(a)
IRR-DAW-212(b)
IRR-DAW-2-13
IRR-DAW-2-14
IRR-DAW-2-15
IRR-DAW-2-16
IRR-DAW-2-17
IRR_DAW-3
30
31
32
33
34
35
36
Item description
Unit
Rate
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
solid parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars
spaced approximately at 3.35 m c / c, 12.5 cm thick wall 80 cm height with 12.5
cm thick and 35 cm wide coping slab for wall and 12 .5 cm thick 40 cm x 40 cm
coping for pillars with top edges of kerb and coping chamferred / rounded as
directed etc., complete ( excluding cost of providing and placing
reinforcement steel and gate ) with initial lead upto 1 km and all lifts. (
Cement content 350 kg / cum with use of super plasticiser( 0.4% by wt.of
cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)
Rm
2428.60
Rm
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates including cost of all materials,
machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC
ornamental parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m
pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height
approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for
posts and pillars with top edges of kerb and coping chamferred or rounded as
directed etc., complete ( excluding cost of providing and placing reinforcement
steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 350
kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA-65:35, FA : 0.44 cum)
Rm
Rm
Providing and laying insitu M- 25 ( 28 days cube compressive strength not less
than 25 N / sq mm ) grade cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for wearing coat including cost of all materials,
machinery, labour, formwork, cleaning, batching, mixing, placing in position in
alternate panels, levelling, compacting, finishing, curing, packing joints with
asphalt mortar etc., complete with initial lead upto 1 km and all lifts. ( Cement
content : 380 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending
Ratio of CA--65:35, FA : 0.45 cum)
cum
cum
cum
cum
Conveying and fixing elastomeric bearing for spillway bridge including cleaning
and preparing surface, mixing and applying adhesive, fixing bearing in correct
position etc., including cost of all materials except bearings, machinery, labour
etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
Each
674.50
2440.10
716.10
5846.60
1351.80
82.30
13.10
331.20
Each
Providing and constructing 150 mm dia hume pipe weep holes for concrete /
masonry walls including providing 20 x 20 x 20 cm size porous concrete block
made of cement and 20 mm down coarse aggregate in 1 : 4 proportion
including 10 cm thick sand backing at the junction of wall and soil back fill, cost of
all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.
Rm
Rm
Rm
Rm
284.00
464.30
64.40
1764.50
297.30
Chapterwise
item No.
S.NO
Item description
Unit
Rate
IRR_DAW-3-1
37
3
Providing and constructing un-coursed rubble stone masonry using approved
stones in cement mortar 1 : 3 proportion including cost of all materials,
machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips,
curing etc., complete with initial lead upto 1 km and all lifts.( Cement content :
190 kg/cum of masonry, rubble stones : 0.85 cum,stone chips : 0.15 cum/cum,
FA : 0.4 cum)
Labour Component (including contractor's profit and Overheads)
cum
3218.20
IRR_DAW-3-2
IRR_DAW-3-3
38
39
IRR_DAW-3-4
IRR_DAW-3-5
40
41
IRR-DAW-3-7
IRR-DAW-3-8
42
43
44
IRR_DAW-4
IRR-DAW-4-1
1028.80
2875.70
1028.80
cum
3389.10
1146.50
cum
Providing and constructing coursed rubble face stone masonry using approved
rubble stones in cement mortar 1 : 4 proportion including cost of all materials,
machinery, labour, scaffolding,ramps, cleaning, packing mortar, wedging stone
cum
chips, curing etc., with initial lead upto 1 km and all lifts. ( Cement content :
134 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum,
FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm :
3.25 No)
Labour Component (including contractor's profit and Overheads)
cum
Providing and constructing chisel drafted and hammer dressed face stone
masonry with approved stones in cement mortar 1 : 3 proportion including
cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing
mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km
and all lifts.( Cement content : 167 kg/cum of masonry, rubble stones : 0.35
cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45
cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)
Labour Component (including contractor's profit and Overheads)
IRR-DAW-3-6
cum
cum
3068.40
1146.50
3560.90
1410.50
cum
Providing and constructing chisel drafted and hammer dressed face stone
masonry with approved stones in cement mortar 1 : 4 proportion including
cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing
mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km
and all lifts.( Cement content : 125 kg/cum of masonry, rubble stones : 0.35
cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45
cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)
cum
cum
sqm
sqm
sqm
sqm
3254.80
1410.50
122.10
82.40
112.40
82.40
45
sqm
sqm
515.30
163.00
Chapterwise
item No.
S.NO
Item description
Unit
Rate
Rm
14553.30
IRR-DAW-4-2
IRR-DAW-4-3
IRR-DAW-4-4
IRR-DAW-4-5
46
47
48
49
IRR-DAW-5
IRR-DAW-5-1
IRR-DAW-5-2
IRR-DAW-5-3
IRR-DAW-5-4
Rm
Rm
173.50
1753.10
Rm
Rm
114.50
7090.80
Rm
Rm
Rm
133.50
220.80
106.50
50
51
52
53
cum
cum
Providing cut-off trench filling using selected impervious soil from approved
borrow areas in layers of 25 to 30 cm before compaction including cost of all
materials, machinery, labour, all operations such as excavation, sorting out,
transportation, spreading soil to specified thickness, breaking clods, sectioning,
watering, compacting to density control of not less than 95 percent using Sheep
foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc.,
complete with initial lead upto 1 km and all lifts.
cum
cum
cum
cum
cum
cum
138.00
20.50
148.10
22.30
148.50
22.20
124.90
18.90
Chapterwise
item No.
S.NO
IRR-DAW-5-4-A
(New Item1 2011-12)
IRR-DAW-5-5
IRR-DAW-5-6
IRR-DAW-5-7
IRR-DAW-5-8
IRR-DAW-5-9
54
55
56
57
58
59
IRR-DAW-5-9-A
(New Item4-2012- 60
13)
IRR-DAW-5-10
IRR-DAW-6
61
Item description
Unit
Rate
cum
85.40
cum
cum
cum
cum
cum
cum
cum
Note: Useful rubble and stone chips will be issued at dump yard at the issue rate
for usefull rubble /stone chips. Sorting out and breaking charges included in rate
analysis.
Labour Component (including contractor's profit and Overheads)
cum
Providing and laying 30 cm diameter open jointed hume pipes with collars in
rock-toe for drainage including cost of all materials, machinery, labour etc.,
complete with lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads)
140.30
20.90
264.30
113.20
435.00
103.30
498.60
cum
Providing and constructing dry rubble rock-toe with rubble and stone chips
from dump yard including cost of all materials, machinery, labour, hand packing
rubble and stone chips, finishing top and sides to required slopes etc., complete
with initial lead upto 1 km and all lifts.
Providing and constructing Dry rock Pitching for Groynes using Un-Coursed
rubble stone of size 300 mm thick and Un-Coursed rubble stone chips from
Quarry to site of work including cost of all materials, Machinery, Labour charge
hand packing Un-Course rubble stone &chips to the designed profile with all
leads and lifts etc
Labour Component (including contractor's profit and Overheads)
18.90
cum
cum
cum
193.00
462.10
132.70
679.40
cum
Rm
Rm
132.70
824.80
29.50
Chapterwise
item No.
S.NO
IRR-DAW-6-1
IRR-DAW-6-2
IRR-DAW-6-3
IRR-DAW-6-4
Item description
Unit
Rate
62
Each
46639.10
Each
Providing and constructing longitudinal and cross graded filter drains using
sand and 80-20 mm and 20 mm down graded aggregates satisfying specified
filter creteria in layers as per specifications including cost of all materials,
machinery, labour, laying to required slopes, compaction etc. complete with
initial lead upto 50 m and all lifts.
cum
cum
cum
cum
Providing and constructing graded filter media below and behind rock-toe
consisting of 20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 20 mm size graded coarse aggregates satisfying filter creteria as per
specifications including cost of all materials, labour, machinery, laying to required
slope, compaction etc., complete with initial lead upto 50 m and all lifts.
cum
cum
63
64
65
IRR-DAW-6-4-A
(New Item2 2011- 66
12)
IRR-DAW-6-5
IRR-DAW-6-6
IRR-DAW-6-7
IRR-DAW-6-8
67
68
69
70
Providing and constructing graded filter media below and behind rock-toe
consisting of 30 cm thick, 80 - 20 mm size graded coarse aggregates
satisfying filter creteria as per specifications including cost of all materials,
labour, machinery, laying to required slope, compaction etc., complete with
initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
cum
sqm
sqm
cum
cum
9978.60
1013.10
138.40
1074.00
138.40
1017.40
124.30
1133.30
cum
Providing and laying filter media consisting of 2 layers of 250 gsm polypropeline non-woven filter fabric and 400 mm thick 20 mm down graded
coarse aggregate for vertical / inclined and horizontal filter blanket for
embankment including cost of all materials, machinery, labour etc., complete
with lead upto 50 m for aggregate and all leads for fabric and all lifts.
cum
46.80
950.60
53.90
778.30
110.20
1061.80
cum
sqm
sqm
145.40
893.60
162.80
Chapterwise
item No.
S.NO
IRR-DAW-6-9
IRR-DAW-6-10
IRR-DAW-6-11
IRR-DAW-6-12
IRR-DAW-6-13
71
72
73
74
75
sqm
1064.20
sqm
Providing and constructing 60 cm thick hand packed rough stone riprap over
a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40
mm size graded approved aggregates laid in layers of 15 cm thick each
including cost of all materials, machinery, labour, laying to required slopes,
wedging with stone chips etc., complete with initial lead upto 50 m and all
lifts.
Labour Component (including contractor's profit and Overheads)
IRR-TAW-1-3
IRR-TAW-1-4
78
79
sqm
sqm
sqm
Providing and constructing 90 cm thick hand packed rough stone riprap over
a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40
mm size graded approved aggregates laid in layers of 15 cm thick each including
cost of all materials, machinery, labour, laying to required slopes, wedging with
stone chips etc., complete with initial lead upto 50 m and all lifts.
sqm
sqm
Providing and laying Hariyala or other approved quality turfing sods for the
slopes of earthen embankments over 20 mm thick sand backing including cost of
all materials, machinery, labour including preparing surface, spreading sand,
watering for 15 days etc., complete with initial lead upto 1 km and all lifts.
sqm
sqm
Excavation for adit by tunnelling methods in all types of rock including cost
of all materials, machinery, labour, scaling excavated surface, ventilation,
lighting, drainage, removing and hauling the excavated muck outside adit upto
specified dump area and all other ancillary operations etc., complete with
initial lead upto 50 m and all lifts.
cum
cum
Excavation for vertical / inclined shaft in all types of soft / hard rock
including cost of all materials, machinery, labour, shoring, strutting, scaling
excavated surface, ventilation, lighting, drainage, removing and hauling
excavated muck outside shaft upto specified dump area and all other ancillary
operations etc., complete with initial lead upto 1 km and all lifts.
cum
cum
cum
cum
cum
cum
183.90
834.40
sqm
Providing and constructing 75 cm thick hand packed rough stone riprap over
a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40
mm size graded approved aggregates laid in layers of 15 cm thick each including
cost of all materials, machinery, labour, laying to required slopes, wedging with
stone chips, etc., complete with initial lead upto 50 m and all lifts.
EXCAVATION :
77
IRR-TAW-1
IRR-TAW-1-2
Rate
76
Unit
Chapter II
IRR-TAW
IRR-TAW-1-1
Item description
124.20
910.10
135.40
999.10
157.90
107.70
62.50
1750.60
590.50
2316.20
1177.80
1786.70
581.70
1839.00
600.60
10
Chapterwise
item No.
S.NO
IRR-TAW-1-5
80
Item description
Unit
Rate
cum
1887.90
NOTE: Where mucking is to be carried out through shaft using winch and
mucking tub system increase the basic rates for items 3, 4 & 5 by 8 percent.
Labour Component (including contractor's profit and Overheads)
IRR-TAW-1-6
81
IRR-TAW-2
IRR-TAW-2-1
IRR-TAW-2-2
IRR-TAW-2-3
(new Item4 201011)
IRR-TAW-3-2
IRR-TAW-3-3
IRR-TAW-3-4
cum
645.70
364.90
cum
89.80
82
83
84
IRR-TAW-3
IRR-TAW-3-1
cum
Kwhr
23.60
Kwhr
sqm
8.30
630.00
sqm
sqm
sqm
185.10
1524.00
185.10
85
86
87
88
Rm
Rm
Rm
315.30
1020.70
Rm
tonne
tonne
1063.40
tonne
tonne
290.50
88520.40
17121.30
22212.60
8555.10
11
Chapterwise
item No.
S.NO
Item description
Unit
Rate
IRR-TAW-3-5
89
3
Providing and fixing hard variety cut jungle wood for lagging / blocking
locations in tunnel wherever required including cost of all materials, machinery,
labour, fixing in position, lighting, ventilation, drainage etc complete with all
leads and lifts.
Labour Component (including contractor's profit and Overheads)
cum
34880.10
IRR-TAW-4
IRR-TAW-4-1
IRR-TAW-5-2
IRR-TAW-5-3
IRR-TAW-5-4
90
cum
cum
2478.30
780.40
91
92
93
94
IRR-TAW-6
IRR-TAW-6-1
1495.90
MASONRY WORKS :
IRR-TAW-5
IRR-TAW-5-1
cum
tonne
tonne
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates crushed from tunnel excavated muck
for filling and levelling over-cuts in bed due to geological faults etc., including
cost of all materials, machinery, labour, cleaning bed, batching, mixing,
conveying and laying, levelling, compacting, finishing, curing, lighting, ventilation,
drainage etc., complete with initial lead upto 1 km and all lifts. ( Cement
content : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40
cum, Superplasticizer 0.4% by wt. of cement)
cum
cum
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size
approved clean, hard, graded aggregates crushed from tunnel muck for kerb and
bed lining including cost of all materials, machinery, labour, formwork, batching,
mixing, conveying upto placing point in agitator cars, placing in position,
levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other
ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement
content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
cum
cum
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size
approved clean, hard, graded aggregates crushed from tunnel muck for sides
and arch lining including cost of all materials, machinery, labour, formwork,
batching, mixing, conveying upto placing point in agitator cars, placing in
position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and
all other ancillary operations etc., complete with lead upto 1 km and all lifts. (
Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of
cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
cum
cum
65041.30
10293.50
5763.00
783.90
7107.80
976.60
7312.40
768.20
95
Rm
Rm
399.10
151.60
12
Chapterwise
item No.
S.NO
IRR-TAW-6-2
IRR-TAW-6-3
96
97
Chapter III
IRR-CAW
IRR-CAW-1-2
Unit
Rate
tonne
11980.40
tonne
Rm
2318.70
365.50
Rm
62.80
IRR-CAW-1
IRR-CAW-1-1
Item description
98
99
EXCAVATION WORKS :
Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal,
seating of embankment, filter drains / catch water drains etc., including dressing
bed and sides to required level and profile, cost of all materials, machinery,
labour, placing the excavated soil neatly in dump area or for the formation of
service road / embankment as directed etc., complete with initial lead upto 1
km and all lifts.
Labour Component (including contractor's profit and Overheads)
Excavation in all kinds of soil including boulders upto 0.30 m dia for field
channels, seating of embankment for field channels etc., including dressing of
bed and sides to required profile, cost of all materials, machinery, labour, placing
the excavated stuff for formation of service road / embankment as directed etc.,
complete with lead upto 10 m and lift upto 3 m.
cum
93.90
cum
cum
23.90
50.00
IRR-CAW-1-3
IRR-CAW-1-4
IRR-CAW-1-5
cum
cum
19.20
127.40
cum
cum
35.60
83.00
cum
cum
31.80
196.40
cum
cum
i ) The rate under this item shall be adopted for canals designed for carrying
capacity of less than 15 cumecs or where the average depth excavation in hard
rock is less than 3 m.
ii ) The rate includes levelling canal bed by hammering / chiselling all rock
projections wherever required.
Labour Component (including contractor's profit and Overheads)
cum
64.50
486.60
139.10
13
Chapterwise
item No.
S.NO
Item description
3
Excavation in hard rock of all toughness including boulders above 1.2 m dia. by
approved controlled blasting methods for canals, cut-off trench of
embankment, filter / catch-water drains etc., including controlling fly-rock by
muffling arrangements such as placing 50 x 50 mm opening chain link mesh or
waste tyres and sand bags, monitoring ground vibrations at specified locations,
costof all materials, machinery, labour, placing excavated rock neatly in
IRR-CAW-1-7 (b) 104 approved dump area or other place as directed etc., complete with lead upto 1
km and all lifts.
i) The rate under this item shall be adopted for canals designed for carrying
capacity of less than 15 cumecs or where the average depth excavation in hard
rock is less than 3 m.
ii ) The rate under this item shall be adopted where the control of fly-rock and
ground vibrations is required.
Labour Component (including contractor's profit and Overheads)
Excavation in hard rock of all toughness including boulders above 1.2 m dia.
for dressing canal sides neatly on either side to required profile by line drilling
and smooth blasting including removing under-cuts by chiselling / hammering,
placing the excavated rock neatly in dump area or other place as directed, cost
of all materials, machinery, labour etc., complete with lead upto 1 km and all
lifts.
i) For excavation of canal below free board level combination of normal
controlled blasting and line drilling and smooth blasting shall be adopted to
IRR-CAW-1-8( c) 105 obtain neat side slopes. For the purpose of payment 1 m width of excavation on
either side shall be treated as excavation by line drilling and smooth blasting and
remaining portion shall be treated as excavation by normal / controlled blasting
as the case may be.
ii ) The rate under this item shall be adopted for canals designed for carrying
capacity of less than 15 cumecs or where the average depth of excavation in
hard rock is less than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the excavated
face has come off neatly as per specifications or atleast 50 percent of smooth
Labour Component (including contractor's profit and Overheads)
Unit
Rate
cum
617.90
cum
cum
137.10
1069.20
cum
366.30
Excavation in hard rock by blasting including boulders above 1.2 m dia. for
canals, seating embankment etc., including levelling bed by removing all
projections by hammering / chiselling, cost of all materials, machinery, labour,
placing the excavated rock neatly in approved dump area and levelling the same
as directed etc.,complete with initial lead upto 1 km and all lifts.
IRR-CAW-1-9(a)
106
cum
298.20
i ) The rate under this item shall be adopted for canals designed for carrying
capacity of more than 15 cumecs or where the average depth of excavation in
hard rock is more than 3 m.
ii ) The rate includes levelling canal bed by hammering /chiselling all rock
projections wherever required.
Labour Component (including contractor's profit and Overheads)
IRR-CAW-110(b)
Excavation in hard rock of all toughness including boulders above 1.2 m dia.
by approved controlled blasting methods for canals, cut-off trench of
embankment etc., including controlling fly-rock by muffling arrangements such
as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags,
monitoring ground vibrations at specified locations, cost of all materials,
machinery, labour, placing excavated rock neatly in approved dump area or
107 other place as directed etc., complete with lead upto 1 km and all lifts.
cum
cum
43.90
446.90
i ) The rate under this item shall be adopted for canals designed for carrying
capacity of more than 15 cumecs or where the average depth of excavation in
hard rock is more than 3 m.
ii ) The rate under this item shall be adopted where the control of fly-rock and
ground vibrations is required.
Labour Component (including contractor's profit and Overheads)
cum
50.20
14
Chapterwise
item No.
S.NO
IRR-CAW-111(c)
IRR-CAW-2
IRR-CAW-2-1
Item description
3
Excavation in hard rock of all toughness including boulders above 1.2 m dia.
for dressing canal sides neatly on either side to required profile by line drilling
and smooth blasting including removing under-cuts by chiselling / hammering,
placing the excavated rock neatly in dump area or other place as directed, cost
of all materials, machinery, labour etc., complete with lead upto 1 km and all
lifts.
i ) For excavation of canal below free board level combination of normal
controlled blasting and line drilling and smooth blasting shall be adopted to
108 obtain neat side slopes. For the purpose of payment 1 m width of excavation on
either side shall be treated as excavation by line drilling and smooth blasting and
remaining portion shall be treated as excavation by normal / controlled blasting
as the case may be.
ii ) The rate under this item shall be adopted for canals designed for carrying
capacity of more than 15 cumecs or where the average depth of excavation in
hard rock is more than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the excavated
face has come off neatly as per specifications or atleast 50 percent of smooth
Labour Component (including contractor's profit and Overheads)
IRR-CAW-2-3
IRR-CAW-2-4
IRR-CAW-2-5
Rate
cum
734.30
cum
113.20
IRR-CAW-2-2
Unit
cum
196.40
cum
cum
32.90
189.70
cum
cum
32.40
196.20
cum
cum
32.90
191.90
cum
cum
cum
34.70
178.70
30.00
15
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
169.70
IRR-CAW-2-6
IRR-CAW-2-7
IRR-CAW-2-8
IRR-CAW-3
IRR-CAW-3-1
IRR-CAW-3-2
IRR-CAW-3-3
cum
27.30
163.80
cum
cum
26.70
153.90
cum
24.50
IRR-CAW-3-4
cum
cum
149.00
cum
cum
25.20
143.70
cum
cum
24.90
144.80
cum
cum
cum
24.40
139.30
24.00
16
Chapterwise
item No.
S.NO
IRR-CAW-3-5
IRR-CAW-4
IRR-CAW-4-1
Item description
3
Providing semi-pervious / pervious casing embankment using soil from
approved dump area in layers of 25 cm before compaction including cost of
all materials, machinery, labour, all operations such as re-excavation, sorting
out, transporting, spreading in layer of specified thickness, breaking clods,
121
sectioning, compacting each layer without watering to density control of not
less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8
to 10 tonne power roller etc., complete with initial lead upto 1 km and all
lifts.
Labour Component (including contractor's profit and Overheads)
IRR-CAW-4-3
IRR-CAW-4-4
IRR-CAW-4-5
IRR-CAW-4-6
Rate
cum
130.60
cum
22.00
IRR-CAW-4-2
Unit
cum
66.60
cum
cum
10.10
61.20
cum
cum
10.30
66.60
cum
cum
10.10
61.20
cum
cum
10.30
51.00
cum
cum
7.40
281.50
IRR-CAW-5-1
cum
277.30
cum
cum
770.30
140.90
17
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
568.10
IRR-CAW-5-2
IRR-CAW-5-3
IRR-CAW-5-3-A
(New Item 3 2011-12)
IRR-CAW-5-4
IRR-CAW-5-5
IRR-CAW-5-6
IRR-CAW-5-8
IRR-CAW-5-9
Providing and constructing dry rubble rock-toe using rubble and stone chips
132 from approved source including cost of all materials, machinery, labour, hand
packing rubble and stone chips, finishing top and sides to required slopes etc.,
complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
Providing and constructing longitudinal and cross graded filter drains using
sand and 20 mm down graded aggregates satisfying specified filter creteria in
133 layers as per specifications including cost of all materials, machinery, labour,
laying to required slopes, compaction etc., complete with initial lead upto 50 m
and all lifts.
Labour Component (including contractor's profit and Overheads)
Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm
134 in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in
bed including excavation of drains and Cost of procuring of all materials
Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed
135 and sides using 1.181 Kgs of cement per each using 20 mm HG metal and
placing in local filters of size 600x600x750 mm in size including excavation of
drains and Cost of procuring of all materials
Labour Component (including contractor's profit and Overheads)
Providing and constructing 0.50 m thick vertical or inclined graded filter
media consisting of 15 cm thick sand layers and 20 cm thick 20 mm down coarse
136 aggregate layer using approved materials satisfying specified filter creteria as
per specifications including cost of all materials, machinery, labour, laying to
required slope, compaction etc., complete with initial lead upto 50 m and all
lifts.
Labour Component (including contractor's profit and Overheads)
Providing and constructing graded filter media below and behind rock-toe
consisting of 20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm
down size graded coarse aggregates satisfying filter creteria behind rock-toe and
137 15 cm thick sand, 20 cm thick 20 mm down coarse aggregate and 65 cm thick 40
mm down size coarse aggregate satisfying filter creiteria below rock-toe as per
specifications including cost of all materials, machinery, labour, laying to required
slope, compaction etc., complete with initial lead upto 50 m and all lifts.
IRR-CAW-511(b)
140.90
176.70
sqm
17.60
706.70
cum
IRR-CAW-510(a)
sqm
cum
133
IRR-CAW-5-7
cum
cum
70.40
537.60
cum
cum
100.90
916.80
cum
Rm
131.30
448.50
Rm
one plug
24.90
366.30
one plug
cum
105.70
1024.90
cum
cum
131.30
1198.60
cum
sqm
122.70
600.10
sqm
sqm
sqm
29.20
652.50
29.20
18
Chapterwise
item No.
1
IRR-CAW-6
IRR-CAW-6-1
IRR-CAW-6-2
S.NO
2
Item description
Unit
Rate
cum
489.70
IRR-CAW-7
IRR-CAW-7-1
IRR-CAW-7-2
IRR-CAW-7-3
IRR-CAW-7-4
Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from
approved borrow area including spreading soil in layers of thickness not
142 more than 15 cm, breaking clods, watering, compacting to density control of not
less than 98 percent or as stipulated, dressing to required profile etc., complete
with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads)
Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from
approved borrow area including spreading soil in layers of thickness not
143 more than 15 cm, breaking clods, watering, compacting to density control of not
less than 95 percent or as stipulated, dressing to required profile etc., complete
with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads)
Providing cohesive non-swelling ( CNS ) soil lining to canal using soil
collected in heaps along the edge of canal requiring CNS soil lining as part
of the disposal of excavated soil from canal excavation in CNS soil reach
144 including spreading in layers of thickness not more than 15 cm, breaking clods,
watering, compacting to density control of not less than 95 percent or as
stipulated, dressing to required profile etc., complete with lead upto upto 50 m
and all lifts.
Labour Component (including contractor's profit and Overheads)
Providing and fixing 20 x 20 x 75 cm size top surface neatly dressed canal
145 bed level stones including cost of all materials, labour, excavation, fixing in
position to correct level etc., complete with lead upto 50 m and all lifts.
Providing, fabricating and placing in position reinforcement steel bars for RCC
works including cleaning, straightening, cutting, bending, hooking, lapping, tying
146 with 1.25 mm dia.soft annealed steel wire, welding wherever required including
cost of all materials, machinery, labour etc., complete with initial lead upto 50
and all lifts.(1.05 tonne/tonne of steel)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-6
cum
cum
53.40
287.80
cum
68.90
IRR-CAW-7-5
cum
211.50
cum
cum
64.40
206.60
cum
cum
63.50
105.20
cum
Each
48.50
91.80
Each
kg
65.70
55.80
kg
sqm
sqm
7.30
464.10
29.70
19
Chapterwise
item No.
S.NO
Item description
Unit
Rate
sqm
484.80
IRR-CAW-7-7
IRR-CAW-7-8
Providing and laying 100 mm thick in situ M-15 (28 days cube compressive
strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down
size approved, clean, hard, graded aggregates for canal lining using, vibrating,
cylinder type mechanical paver including cost of all materials, machinery, labour,
cleaning, batching, mixing, placing in position, finishing, forming contraction
149 joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to
othere side of canal etc., complete with initial lead upto 1 Km and all lifts. ( 43
Gr Cement content: (300kg /cum) 30 kg / sqm for use of super
plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum, equivalent concrete volume:88 cum including the extra
quantity of concrete for curvatures and bends etc.,)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-9
IRR-CAW-7-10
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N /sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for bed and side lining of canal(150mm
thick) including finishing the junction of bed and sides to required curveture,
cost of all materials, machinery, labour, formwork including supports, cleaning,
151 batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. ( 43 Gr Cement content: 250
kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum,
Blending Ratio of CA--50:30:20, FA : 0.40 cum)
sqm
sqm
29.70
588.90
sqm
shifting
34.30
8830.60
shifting
cum
6428.80
4865.80
IRR-CAW-7-11
Providing and laying insitu vibrated M-10 (28 days cube compressive strength
not less than 10 N/sqm) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregade for bed and side lining of canal(100
mm thick) including, finishing the junction of bed and sides to required
152 curveture, cost of all materials, machinery, labour, formwork including supports
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead up to 50 m and all lifts ( 43 Gr Cement
content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-12
Providing and laying 100mm thick insitu vibrated M-10 (28 days cube
compressive strength-not less than 10.00 N / sq mm) grade cement concrete
using 40 mm down size approved, clean, hard, graded aggregates for bed and
side lining of canal lining using vibrating cylindertype mechanical paver
153 including cost of all materials mechinery labour batching mixing placing in
position forming contraction joints fixing pvc joint seiling strips shifting of paver
from one side of canal to other side etc.complete with all leads & lifts.
(Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of
cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
cum
cum
1129.00
5005.10
cum
sqm
sqm
1162.60
556.10
34.30
20
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
4910.50
IRR-CAW-7-13
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N /sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for bed and side lining of canal
including finishing the junction of bed and sides to required curveture, cost of all
154 materials, machinery, labour, formwork including supports, cleaning, batching,
mixing, placing in position, levelling, vibrating, finishing, curing etc., complete
with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum for use
of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA-65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-14
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N /sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for bed and side lining(150 mm thick)
of canal including finishing the junction of bed and sides to required curveture,
155 cost of all materials, machinery, labour, formwork including supports, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. (Cement content: 290 kg /
cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum,
Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-15
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N /sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for bed and side lining(of thickness
100 mm) of canal including finishing the junction of bed and sides to required
156 curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and all lifts. (Cement content:
300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum,
Blending Ratio of CA--65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-16
Providing and laying 150mm thick insitu vibrated M-15 (28 days cube
compressive strength-not less than 15.00 N / sq mm) grade cement concrete
using 20 mm down size approved, clean, hard, graded aggregates for bed and
side lining of canal lining using vibrating cylindertype mechanical paver including
cost of all materials mechinery labour batching mixing placing in position forming
157 contractiom joints fixing pvc joint seiling strips shifting of paver from one side of
canal to other side etc.complete with all leads & lifts. (Cement content: 300
kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum,
Blending Ratio of CA--65:35, FA : 0.44 cum)
(Paver)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-17
Providing and fixing pre-cast RCC template walls consisting of 0.05 cum M-15
grade concrete using 20 mm down size coarse aggregates and 10 kg
reinforcement steel moulded as per specifications and drawing in CM 1:4
158 proportion including cost of all materials, machinery, labour, formwork,
fabricating and placing reinforcement steel, mixing, laying, conveying and fixing
in position including necessary excavation for seating, finishing joints in CM 1:4,
curing etc., complete with initial lead upto 1 km and all lifts.
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-18
IRR-CAW-7-19
IRR-CAW-7-20
159
161
cum
cum
1162.60
5307.30
cum
cum
1230.20
5464.70
cum
sqm
1299.40
792.80
sqm
Rm
34.30
973.60
Rm
Each
257.10
114.20
Each
Each
44.90
160.80
Each
Each
Each
44.90
192.60
44.90
21
Chapterwise
item No.
S.NO
Item description
Unit
Rate
IRR-CAW-7-21
162
Each
253.90
IRR-CAW-7-22
IRR-CAW-7-23
IRR-CAW-7-24
IRR-CAW-7-25
IRR-CAW-7-26
IRR-CAW-7-27
IRR-CAW-7-28
IRR-CAW-7-29
IRR-CAW-7-30
163
Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep
164 holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete
with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and
165 side lining of canal laid on rock including cost of all materials, machinery, labour
etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
166
167
170
171
Each
Each
Each
44.90
221.30
22.50
268.70
Each
Each
sqm
sqm
sqm
91.80
44.90
7.70
373.30
67.10
85.90
sqm
Rm
Rm
Providing and fixing LDPE sheet for bed and sides of canal including cost of all
materials, labour, laying, joining etc., complete with all leads and lifts.
374.40
Each
Each
44.90
Each
169
Each
Each
62.30
48.00
41.80
175.30
Each
sqm
175.30
133.70
IRR-CAW-7-31
Providing and fixing LDPE sheet for bed and sides of canal including cost of all
172 materials, labour, laying, joining etc., complete with all leads and lifts.
Using 750 micron thick LDPE sheet.
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-32
Providing and fixing LDPE sheet for bed and sides of canal including cost of all
173 materials, labour, laying, joining etc., complete with all leads and lifts.
sqm
sqm
12.40
56.20
sqm
sqm
8.40
188.30
sqm
sqm
16.90
259.20
22
Chapterwise
item No.
S.NO
IRR-CAW-7-33
IRR-CAW-7-34
IRR-CAW-7-35
IRR-CAW-7-36
IRR-CAW-7-37
Item description
3
Labour Component (including contractor's profit and Overheads)
Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler
174 boards for stone masonry lining of canal including cost of all materials, labour
etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler
175 boards for cement concrete lining of canal including cost of all materials,
labour etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler
176 boards for cement concrete lining of canal including cost of all materials,
labour etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
Providing and forming 35 mm wide and 10 mm thick construction /
177 contraction joints for concrete lining by mastic filler including cost of all
materials, labour etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
Manufacturing 550 x 550 x 55 mm size PCC lining slabs in M-15 grade ( 28
days cube compressive strength not less than 15 N /sqmm ) cement concrete
using 20 mm down graded coarse aggregate including cost of all materials,
178 machinery, labour, batching, mixing, laying, compacting, formwork, finishing,
curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content :
300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum,
Blending Ratio of CA : 65:35, FA : 0.45cum)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-38
Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days
cube compressive strength not less than 15 N / sqmm ) cement concrete using
20 mm down graded coarse aggregate including cost of all materials,
179 machinery, labour, batching, mixing, laying, compacting, formwork, finishing,
curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content :
300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum,
Blending Ratio of CA : 65:35, FA : 0.45cum)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-39
IRR-CAW-7-40
IRR-CAW-7-41
IRR-CAW-7-42
Unit
Rate
4
sqm
Rm
192.60
Rm
Rm
7.70
81.60
Rm
Rm
7.70
120.70
Rm
Rm
7.70
7.60
Rm
Each
5.70
102.20
Each
Each
24.40
70.00
Each
Each
24.40
35.50
Each
Each
15.70
26.50
Each
Each
15.70
90.10
Each
Each
15.60
38.10
23
Chapterwise
item No.
S.NO
IRR-CAW-7-43
IRR-CAW-7-44
Item description
3
Labour Component (including contractor's profit and Overheads)
Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days
cube compressive strength not less than 15 N /sqmm ) cement concrete using
10 mm down graded coarse aggregate including cost of all materials,
184 machinery, labour, batching, mixing, laying, compacting, formwork, finishing,
curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content :
300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA
: 0.43cum)
Labour Component (including contractor's profit and Overheads)
Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion
for canal side lining using stones and chips from approved quarry including cost
of all materials, machinery, labour, forming weep holes at specified intervals,
185
finishing, curing etc., complete with initial lead upto 50 m and all
lifts.(Thickness of the masonry assumed: 0.3 m, rubble stones : 0.96 cum,
Stone Chips : 0.15cum,Through Stones 20 x 20 x 30cm : 1/sqm)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-45
Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for
canal side lining using stones from approved quarry including cost of all
186 materials, machinery, labour, forming weep holes at specified intervals, finishing,
curing etc., complete with initial lead upto 50m and all lifts.(with no pin
headers)(Thickness of the Masonry assumed:0.3 m, rubble stones : 1.1 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-7-46
IRR-CAW-7-47
IRR-CAW-8
IRR-CAW-8-1
IRR-CAW-8-2
Rate
4
Each
Each
25.80
Each
cum
15.70
2317.40
cum
cum
600.90
3444.70
cum
cum
1981.90
2179.10
cum
cum
678.20
3239.00
cum
1981.90
ROCK PITCHING
Providing and constructing 25 cm thick dry rubble stone pitching with pin
headers at 2 per sqm including cost of all materials, labour, hand packing,
189
finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones :
0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm)
Labour Component (including contractor's profit and Overheads)
If 15 cm thick murum bed is to be provided below pitching add
Labour Component (including contractor's profit and Overheads)
IRR-CAW-8-1-A
(New Item4 2011-12)
Unit
Providing and constructing 22.5 cm thick dry rubble stone pitching with pin
headers at 2 per sqm including cost of all materials, labour, hand packing,
190 finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones :
0.207 cum/sqm, Stone Chips : 0.3375cum/sqm, Pin Headers 30cm : 2/sqm)
(For Maintenance Works)
Labour Component (including contractor's profit and Overheads)
Providing and constructing 25 cm thick dry rubble stone pitching including
191 cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.33
cum/sqm)
Labour Component (including contractor's profit and Overheads)
Providing and constructing 225 mmm thick dry rubble stone pitching
192 including cost of all materials, labour, hand packing, finishing etc., complete with
initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones :
0.2475 cum/sqm) (For Maintenance Works)
Labour Component (including contractor's profit and Overheads)
sqm
200.50
sqm
sqm
sqm
37.60
sqm
190.40
46.70
14.10
sqm
sqm
46.70
213.40
sqm
sqm
sqm
110.30
153.70
99.30
24
Chapterwise
item No.
S.NO
Item description
Unit
Rate
sqm
220.50
IRR-CAW-8-3
Providing and constructing 30 cm thick dry rubble stone pitching with pin
headers at 2 per sqm including cost of all materials, labour, hand packing,
193
finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones :
0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)
Labour Component (including contractor's profit and Overheads)
IRR-CAW-8-4
IRR-CAW-8-5
IRR-CAW-8-6
IRR-CAW-8-7
IRR-CAW-8-8
IRR-CAW-8-9
195
sqm
IRR-CAW-8-12
IRR-CAW-8-13
46.70
256.10
sqm
sqm
IRR-CAW-8-11
sqm
Providing and constructing 45 cm thick dry rubble stone pitching with pin
headers at 2 per sqm including cost of all materials, labour, hand packing,
finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones :
0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)
IRR-CAW-8-10
sqm
sqm
132.40
331.90
65.70
384.10
sqm
sqm
198.50
561.10
sqm
sqm
79.90
469.70
sqm
sqm
17.70
294.60
sqm
sqm
46.70
314.60
sqm
sqm
65.70
617.50
sqm
sqm
76.30
768.50
sqm
sqm
sqm
104.60
104.00
59.40
25
Chapterwise
item No.
S.NO
IRR-CAW-8-14
Item description
3
Providing 10 cm thick approved type grass turfing to the side slopes of
canal icluding cost of all materials, labour, watering for minimum 15 days
204 etc.,complete with lead 50 m and all lifts.
with no sand
Labour Component (including contractor's profit and Overheads)
Chapter IV
IRR-CCDW
sqm
66.10
sqm
34.30
IRR-CCDW-1-2
Rate
IRR-CCDW-1
IRR-CCDW-1-1
Unit
206
cum
222.70
cum
222.70
cum
92.50
cum
18.60
207
cum
327.80
cum
327.80
208
cum
119.20
cum
20.70
IRR-CCDW-1-5
cum
336.60
cum
254.40
IRR-CCDW-1-6
cum
525.80
cum
317.80
211
cum
cum
981.80
318.70
26
Chapterwise
item No.
S.NO
Item description
Unit
Rate
Each
846.70
IRR-CCDW-1-8
IRR-CCDW-2
IRR-CCDW-2-1
IRR-CCDW-2-2
IRR-CCDW-2-3
Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel
anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock
212 and remaining length embedded in concrete / masonry including cost of all
materials, machinery, labour, drilling and cleaning hole, driving anchor rod,
grouting hole with thick cement slurry etc., complete with initial lead upto 50 m
and all lifts.
Labour Component (including contractor's profit and Overheads)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost of
all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in
216
position, levelling, vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA-35:30:20:15, FA : 0.35 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-5
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost of
all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in
217
position, levelling, vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-50:30:20, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-6
198.60
IRR-CCDW-2-4
Each
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost of
all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in
218
position, levelling, vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA-35:30:20:15, FA : 0.35 cum)
Labour Component (including contractor's profit and Overheads)
kg
56.10
kg
kg
7.70
70.10
kg
cum
9.20
4990.20
cum
cum
1170.80
4934.70
cum
cum
1219.70
4625.40
cum
cum
cum
1118.70
4696.50
1211.70
27
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
5442.80
IRR-CCDW-2-7
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for foundation filling including cost
of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing
219
in position, levelling, vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts. (Cement content: 310 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-50:30:20, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-8
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
220
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-9
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
221
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-10
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
222
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-11
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for sub-structure / super- structure
works including cost of all materials, machinery, labour, formwork, scaffolding,
223
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead upto 50 m and all lifts. (Cement content:
220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-12
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for well kerb including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
224 initial lead upto 50 m and all lifts. (Cement content: 350 kg / cum with use of
super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA-65:35, FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
cum
cum
1231.00
5877.80
cum
cum
1226.00
5912.30
cum
cum
1302.70
5535.60
cum
cum
1305.00
4968.80
cum
cum
cum
1212.60
7164.40
1575.40
28
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
6502.70
IRR-CCDW-2-13
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for well steining including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
225 initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of
super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-14
Providing and laying insitu M-15 ( 28 days cube compressive strength not less
than 15 N / sq mm ) grade cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for well bottom plug by tremie or skip box
226
method including cost of all materials, complete with initial lead upto 50 m and
all lifts.(Cement content: 350 kg / cum with use of super plasticiser(0.4% by
wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-15
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for well top plug including cost of all
materials, machinery, labour, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m
227
and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4%
by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
cum
cum
1439.40
5204.60
cum
cum
1130.00
4735.10
If water is to be brought from other place add only lead charges @ 500 ltrs /
cum
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-16
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for well cap including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with initial
228 lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-17
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for piers and abutments including
cost of all materials, labour, machinery, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
229 initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of
super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA-35:30:20:15, FA : 0.35 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-18
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for piers and abutments including
cost of all materials, labour, machinery, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
230 initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of
super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA-35:30:20:15, FA : 0.35 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
cum
cum
1112.60
5306.50
cum
cum
1132.40
5856.90
cum
cum
cum
1504.40
5618.70
1495.90
29
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
5534.70
IRR-CCDW-2-19
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength
not less than 10 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for piers and abutments including
cost of all materials, labour, machinery, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing etc., complete with
231 initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of
super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-20
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for cantiliver / counterfort retaining
walls including cost of all materials, machinery, labour, formwork, scaffolding,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
232 curing etc., complete with initial lead upto 50 m and all lifts. (Cement content:
320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :
0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-21
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates with placing and sinking plums of
size 150 to 80 mm upto 15 percent for gravity type retaining walls / piers /
abutments etc., including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,
233
finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of
cement),CA : 0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum,
plums of size 150 to 80 mm : 0.25cum )
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-22
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 40 mm down size
approved, clean, hard,graded aggregates for cast in-situ pipes including cost of
all materials, machinery, labour, cleaning, batching, mixing, placing in position,
234 levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m
and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4%
by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-23
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength
not less than 15 N / sq mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for cast in-situ pipes including cost of
all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in
position, levelling, vibrating, finishing, curing etc., complete with initial lead
235 upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA-35:30:20:15, FA : 0.35 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
cum
cum
1383.60
6423.10
cum
cum
1432.60
5633.00
cum
cum
1341.10
5385.60
cum
cum
cum
1267.30
5324.90
1315.40
30
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
8533.50
IRR-CCDW-2-24
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for deck slab & kerb including cost of
all materials,machinery, labour, formwork, scaffolding, cleaning, batching,
mixing, placing in position, levelling, vibrating, finishing, curing etc., complete
236 with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio
of CA--65:35, FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-25
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for columns and beams including
cost of all materials, labour, machinery, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing
237 etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg
/ cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum,
Blending Ratio of CA--65:35, FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-26
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less
than 20 N / sqmm ) grade cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for wearing coat including cost of all materials,
machinery, labour, formwork, cleaning, batching, mixing, placing in position in
alternate panels, levelling, compacting, finishing, curing, packing joints with
238 asphalt mortar etc., complete with initial lead upto 50 m and all lifts. (Cement
content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA
: 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-2-27
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength
not less than 20 N / sq mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for troughs including cost of all
materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing,
placing in position,levelling, vibrating, finishing, curing etc., complete with initial
239 lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum)
If water is to be brought from other place add only lead charges @ 500 ltr /
cum.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-3
IRR-CCDW-3-1
Sinking RCC wells vertically for foundation of piers and abutments in all
kinds of soil, sand and soft rock by approved well sinking method including
cost of all materials, machinery, labour, kent - ledge arrangements, disposal of
240 excavated material as disposal of excavated material as directed etc., complete
with lead upto 50 m for disposal of excavated material.(diameter of well
6.00m) (Data adopted from MORTH)
IRR-CCDW-4
cum
1887.40
7562.10
cum
cum
1721.70
5214.20
cum
cum
1161.70
6955.60
cum
1596.40
IRR-CCDW-3-2
cum
*Rm
3707.60
*Rm
*Rm
*Rm
5254.90
cum
769.60
cum
1603.10
2098.10
101.50
MASONRY WORKS :
31
Chapterwise
item No.
S.NO
Item description
Unit
Rate
cum
2564.50
IRR-CCDW-4-1
IRR-CCDW-4-2
IRR-CCDW-4-3
IRR-CCDW-4-4
IRR-CCDW-4-5
IRR-CCDW-4-6
IRR-CCDW-4-7
IRR-CCDW-4-8
IRR-CCDW-4-9
IRR-CCDW-4-10
IRR-CCDW-5
cum
cum
729.70
2626.50
cum
cum
747.90
3056.20
cum
cum
841.10
3185.50
cum
sqm
970.40
127.00
sqm
sqm
86.90
117.20
sqm
sqm
86.90
180.00
sqm
sqm
122.10
168.40
sqm
sqm
122.10
259.80
sqm
sqm
sqm
163.40
240.60
163.40
32
Chapterwise
item No.
S.NO
Item description
Unit
Rate
sqm
626.60
IRR-CCDW-5-1
Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping
set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion
252 by volume including cost of all materials, machinery, labour, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg /
sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-5-2
Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping
set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion
253 by volume including cost of all materials, machinery, labour, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg /
sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-5-3
Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping
set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion
254 by volume including cost of all materials, machinery, labour, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg /
sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-5-4
IRR-CCDW-5-5
Providing and laying insitu M-15 ( 28 days cube compressive strength not less
than 15 N / sqmm ) grade cement concrete using 20 mm down size approved
clean, hard, graded aggregates for coping slab including cost of all materials,
255 machinery, labour, formwork, cleaning surface, batching, mixing, placing in
position, levelling, compacting, finishing, curing etc., complete with initial lead
upto 50 m and initial lift upto 3 m. (Cement content: 300 kg / cum with use of
super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA-65:35, FA : 0.45 cum)
Labour Component (including contractor's profit and Overheads)
Providing and constructing protective railing consisting of in-situ railing posts
of size 15 x 15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre
to centre in M-20 grade concrete using 20 mm down size graded aggregates and
with each post reinforced by 4 Nos. of 8 mm dia main bars embedded in kerb
256
concrete for a depth of 40 cm and 5 Nos. of 6 mm dia. stirrups including fixing 3
rows of 40 mm dia. GI pipes with one coat of red oxide primer and two coats of
synthetic enamel paint, cost of all materials, machinery, labour, formwork,
finishing, curing etc., complete with lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-6
IRR-CCDW-6-1
Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
257 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)
Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
258 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-6-3
sqm
177.20
773.20
sqm
sqm
323.80
961.80
sqm
cum
512.40
6658.50
cum
Rm
1513.50
1349.40
Rm
169.10
IRR-CCDW-6-2
sqm
Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
259 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)
Labour Component (including contractor's profit and Overheads)
Joint
322.10
Joint
Joint
235.20
389.10
Joint
Joint
Joint
235.20
508.50
291.40
33
Chapterwise
item No.
S.NO
Item description
Unit
Rate
Joint
568.40
IRR-CCDW-6-4
Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
260 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
32.1 kg / joint, FA : 0.031cum/joint, Hemp Yarn : 0.25kg/joint)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-6-5
Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
261 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-6-6
Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
262 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-6-7
Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
263 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-6-8
Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
264 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-6-9
Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in
CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes
265 and collars ), machinery, labour, aligning, packing joints with hemp, finishing,
curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:
66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)
Labour Component (including contractor's profit and Overheads)
IRR-CCDW-7
IRR-CCDW-7-1
IRR-CCDW-7-2
IRR-CCDW-7-3
IRR-CCDW-7-4
Joint
Joint
291.40
690.10
Joint
Joint
347.70
733.60
Joint
Joint
347.70
811.20
Joint
Joint
382.90
874.20
Joint
Joint
382.90
1034.90
Joint
460.10
267
268
cum
cum
Providing and filling murrum / gravely soil ( CNS soil ) for foundation or
around pipes including breaking clods, spreading in layers of 10 to 15 cm,
watering, compaction by earth masters to achieve density control of not less
than 95 percent etc., complete with lead upto 50 m and all lifts.
cum
cum
Providing and filling murum / gravely soil ( CNS soil ) for foundation or
above pipes including breaking clods, spreading in layers of 10 to 15 cm,
watering, compaction by power roller to achieve density control of not less
than 98 percent etc., complete with lead upto 50 m and all lifts.
cum
cum
Providing and fixing one line dressed 111x35x25 cm thick IRC standard
kilometre stone in cement concrete M-10 grade with 40 mm down size
aggregates including excavating pit of size 70x45x40 cm, embedding the stone
269 by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved
quality and colour to exposed surfaces and lettering as directed, cost of all
materials, labour, finishing, curing etc., complete with initial lead upto 50 m and
all lifts.
Each
835.10
205.60
415.00
258.20
278.30
103.50
1420.20
34
Chapterwise
item No.
S.NO
IRR-CCDW-7-5
Chapter V
IRR-GAW
IRR-GAW-1-1
IRR-GAW-1-2
IRR-GAW-1-3
Item description
3
Labour Component (including contractor's profit and Overheads)
Providing and fixing one line dressed 65x15x10 cm thick IRC standard
hectometre stone in cement concrete M-10 grade with 40 mm down size
aggregates including excavating pit of size 50x45x40 cm, embedding the stone
270 by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved
quality and colour to exposed surfaces and lettering as directed, cost of all
materials, labour, finishing, curing etc., complete with initial lead upto 50 m and
all lifts.
Labour Component (including contractor's profit and Overheads)
IRR-GAW-2-1
Rate
4
Each
Each
1055.50
Each
374.90
IRR-GAW-1-4
Unit
RADIAL GATES
Walk way(cat walk)
Design, fabrication, supply, erection and commissioning of 1 metre wide
walkway connecting spillway piers / abutments at trunnion platform level
274 including cost of all materials, machinery, labour, cutting, etc., complete as per
specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added
extra as per scedule of rates under items in this chapter and add as applicable
separately)
Labour Component (including contractor's profit and Overheads)
tonne
145343.80
tonne
tonne
43697.40
129684.80
tonne
tonne
capacity
33286.70
41988.00
tonne
capacity
Rm
2660.00
99181.90
Rm
tonne
tonne
31657.90
160796.80
51925.90
35
Chapterwise
item No.
S.NO
IRR-GAW-2-2
Item description
3
vertical lift gates and stop log gate elements ( SLIDING GATES)
IRR-GAW-2-3
IRR-GAW-2-4
Unit
Rate
tonne
132071.40
tonne
tonne
tonne
capacity
113865.40
19338.30
231380.80
tonne
capacity
IRR-GAW-2-5
Rm
IRR-GAW-2-6
tonne
tonne
capacity
IRR-GAW-2-7
38393.90
tonne
19535.80
7342.50
Rm
479.80
131393.50
tonne
36338.10
70666.00
36
Chapterwise
item No.
S.NO
Item description
Unit
Rate
4
tonne
capacity
tonne
112880.70
IRR-GAW-2-8
IRR-GAW-2-9
IRR-GAW-2-10
IRR-GAW-2-11
IRR-GAW-2-12
New Item 201415-2
2538.00
tonne
tonne
capacity
32801.20
34920.60
tonne
capacity
tonne
capacity
1075.80
33260.70
tonne
capacity
tonne
capacity
4866.10
74976.20
tonne
capacity
Tonne
Tonne
6515.10
121623.80
24310.00
37
Chapterwise
item No.
S.NO
Item description
Unit
Rate
Tonne
77152.00
IRR-GAW-2-13
New Item 201415-3
IRR-GAW-2-14
New Item 201415-4
IRR-GAW-3
IRR-GAW-3-1
IRR-GAW-3-2
IRR-GAW-3-4
IRR-GAW-3-5
IRR-GAW-4
Tonne
20340.30
192481.40
Tonne
10291.50
IRR-GAW-3-3
Tonne
291
HOISTS:STRUCTURAL COMPONENTS-painting structurals on sand blasted surfaces with two coats of zinc
phosphate primer (airless spray preferred) 40microns/coat and one coat 65+/292
5 of alkyd based micaccous iron oxide paint followed by two coats of synthetic
enamel paint 25 microns/coat cost of all materials, labour, scaffolding etc.,
complete with all leads and all lifts
Labour Component (including contractor's profit and Overheads)
293
HOISTS:machineryCOMPONENTS-painting hoist machinery, on sand blasted surfaces with one coats of zinc
phosphate primer (airless spray preferred) 50microns/coat and three coats of
aluminium paint or synthetic enamel , 25 microns/coat cost of all materials,
labour, scaffolding etc., complete with all leads and all lifts
Labour Component (including contractor's profit and Overheads)
sqm
490.30
sqm
sqm
89.20
479.00
sqm
sqm
192.90
346.60
sqm
sqm
148.00
431.80
sqm
sqm
sqm
192.90
388.50
192.90
38
Chapterwise
item No.
S.NO
Item description
Unit
Rate
sqm
567.40
IRR-GAW-4-1
IRR-GAW-4-2
IRR-GAW-4-3
IRR-GAW-4-4
IRR-PMW-1-1
IRR-PMW-1-2
IRR-PMW-1-3
IRR-PMW-1-4
JUNGLE CLEARANCE :
Clearing thin jungle growth ( more than 50 percent open space ) including
297 bushes upto 30 cm / parthenium and other weeds including burning or
disposing off the same as directed etc., complete.
Labour Component (including contractor's profit and Overheads)
Clearing thick jungle growth ( less than 50 percent open space ) including
298 bushes upto 30 cm / parthenium and other weeds including burning or
disposing off the same as directed etc., complete.
Labour Component (including contractor's profit and Overheads)
Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girth
299 including excavation, stacking the materials neatly and levelling the surface etc.,
complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
Removing stumps, tree roots, roots of bamboo cluster etc., with girth above
300 1.50 m and upto 3.0 m including excavation, stacking the materials neatly and
levelling the area etc., complete with initial lead upto 50 m and all lifts.
Removing stumps, tree roots, roots of bamboo cluster etc., with girth above
301 3.0 m and upto 5.0 m including excavation, stacking the materials neatly and
levelling the area etc., complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-1-6
IRR-PMW-1-7
sqm
410.90
sqm
sqm
192.90
474.30
sqm
130.10
IRR-PMW-1-5
192.90
Chapter VI
IRR-PMW
IRR-PMW-1
sqm
302
303
sqm
1.30
sqm
sqm
1.20
2.00
sqm
Each
2.00
45.40
Each
Each
45.40
102.30
Each
Each
102.30
327.20
Each
Each
327.20
58.30
Each
Each
58.30
13.30
39
Chapterwise
item No.
S.NO
IRR-PMW-1-8
IRR-PMW-1-9
IRR-PMW-1-10
IRR-PMW-1-11
IRR-PMW-1-12
IRR-PMW-1-13
IRR-PMW-1-14
Item description
3
Labour Component (including contractor's profit and Overheads)
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal
304 of stumps and including burning or disposing off the materials as directed with
initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth
305 excluding removal of stumps and including burning or disposing off the materials
as directed with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps
306 and including stacking the materials neatly as directed with initial lead upto 50
m and all lifts.
Labour Component (including contractor's profit and Overheads)
Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps
307 and including stacking the materials neatly as directed with initial lead upto 50
m and all lifts.
Labour Component (including contractor's profit and Overheads)
Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps
308 and including stacking the materials neatly as directed with initial lead upto 50
m and all lifts.
Labour Component (including contractor's profit and Overheads)
Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps
309 and including stacking the materials neatly as directed with initial lead upto 50
m and all lifts.
Labour Component (including contractor's profit and Overheads)
Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps
310 and including stacking the materials neatly as directed with initial lead upto 50
m and all lifts.
Labour Component (including contractor's profit and Overheads)
Unit
Rate
4
Each
Each
12.80
Each
Each
12.80
25.70
Each
Each
25.70
86.60
Each
Each
83.60
303.20
Each
Each
292.60
606.40
Each
Each
585.10
1212.80
Each
Each
1170.20
1959.90
Each
1874.60
IRR-PMW-1-16
IRR-PMW-2
IRR-PMW-2-1
311
312
Additional rate for cutting tree for every 0.5 m increase in girth of tree beyond 3
m.
Labour Component (including contractor's profit and Overheads)
Cutting and burning or disposing off Apu / Jondu from marshy areas as
directed with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-2-3
687.40
Each
sqm
661.80
4.70
sqm
4.70
PRELIMINARY WORKS :
Earthwork excavation for trial pits / borrow pits and other investigation works
313 in all kinds of soil including boulders upto 30 cm dia and disposing off
excavated soil as directed with lead upto 10 m and lift upto 3 m.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-2-2
Each
Earthwork excavation for trial pits / borrow pits and other investigation works
314 in soft rock including disposing off the excavated rock as directed with lead
upto 10 m and lift upto 3 m.
Labour Component (including contractor's profit and Overheads)
cum
234.00
cum
cum
234.00
328.90
cum
stage
stage
328.90
292.00
232.30
40
Chapterwise
item No.
S.NO
IRR-PMW-2-4
Item description
3
Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or
inclined upto 10 degrees to vertical as directed including cost of all materials,
machinery, labour, water charges, reaming, collection of wash samples at
suitable intervals, logging and lebelling, supplying honne wood core box, fixing
casing pipes ( excluding cost of casing pipes ) etc., complete for depth
316 upto 30 m from surface.
1. For driiling through over-burden beyond 30 m from surface increase the rate
per Rm by 10 percent.
2. For providing HDPE or light black MS casing pipe add the cost of pipe per
Rm.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-2-5
IRR-PMW-2-5-A
(New Item 201415)-5
Rm
1173.70
Rm
Rm
1. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate
per Rm by 25 percent.
2. For driiling in hard rock beyond 60 m upto 90 m from surface increase the rate
per Rm by 40 percent.
Labour Component (including contractor's profit and Overheads)
Rm
Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard
Rock) including Masonry/CC (where drilling is not possible by casing
shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as
directed including cost of all materials, machinery, labour, water charges, and
318 redrilling in case of collapse of sides etc., complete for depth upto 30 m from
surface for Primary and Secondary Holes
Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard
Rock) including Masonry/CC (where drilling is not possible by casing
shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as
directed including cost of all materials, machinery, labour, water charges,
319 collection of core samples, logging and lebelling, supplying honne wood core box
and redrilling in case of collapse of sides etc., complete for depth upto 30 m
from surface for Test Holes
1. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-2-6
Rate
Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit
vertical / inclined upto 10 degree to vertical as directed including cost of all
materials, machinery, labour, water charges, collection of core samples, logging
and lebelling, supplying honne wood core box and redrilling in case of collapse of
317 sides etc., complete for depth upto 30 m from surface.
1. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-2-5-B
(New Item 201415)-6
Unit
Rm
413.70
5976.10
1666.10
3808.20
Rm
Rm
994.10
4628.70
Rm
Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical
/ inclined upto 10 degree to vertical as directed including cost of all materials,
machinery, labour, water charges,collection of core samples,logging, lebelling,
supplying honne wood core box and redrilling in case of collapse of sides etc.,
320 complete for depth upto 30 m from surface.
Rm
1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the rate
per Rm by 25 percent.
2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the rate
per Rm by 40 percent.
Labour Component (including contractor's profit and Overheads)
Rm
994.60
5815.50
1666.10
41
Chapterwise
item No.
S.NO
Item description
Unit
Rate
Rm
3580.30
IRR-PMW-2-6-A
(New Item 201415)-7
Drilling 47 mm (BX )dia core hole in all types of rocks (other than Hard
Rock) including Masonry/CC (where drilling is not possible by casing shoe)
using diamond core bit vertical / inclined upto 10 degree to vertical as directed
321 including cost of all materials, machinery, labour, water charges, and redrilling
in case of collapse of sides etc., complete for depth upto 30 m
1. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC
beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-2-7
IRR-PMW-2-8
NOTE:
IRR-PMW-2-9
323
IRR-PMW-3-1
IRR-PMW-3-2
IRR-PMW-3-3
IRR-PMW-3-5
IRR-PMW-3-6
994.10
143.50
Each
Each
110.10
498.00
327.80
4.00
6526.60
Each
2871.60
MAINTENANCE WORKS :
Removing dry stone rock-toe / rivetment and filter layers below rock-toe/
325 rivetment including stacking all materials separately as directed with initial
lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
Re-constructing 60 cm thick hand packed rough stone revetment with
through stones at 1.5 m c / c over a backing of 45 cm thick graded filter media
consisting of sand, 10 mm and 40 mm size graded aggregates satisfying filter
326 criteria laid in layers of 15 cm thick each using sand from approved quarry and
stones and filter aggregates obtained from revetment removed for reconstruction including cost of all machinery, labour, laying filter and stones to
specified slopes, wedging with chips, finishing etc. complete with initial lead
upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
Re-constructing dry rubble rock-toe and filter media for rock-toe consisting
of sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in
layers of 15 cm thick each using sand from approved quarry and stones and filter
327
aggregates obtained from rock-toe removed for re-construction including cost of
all machinery, labour, laying filter and stones to specified slopes, wedging with
chips, finishing etc. complete with initial lead upto 50 m and all lifts.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-3-4
Each
Rm
cum
189.40
cum
sqm
189.40
239.10
sqm
cum
141.80
265.40
cum
sqm
203.00
58.40
sqm
sqm
49.40
50.90
sqm
Each
Each
50.90
64.40
64.40
42
Chapterwise
item No.
S.NO
Item description
Unit
Rate
IRR-PMW-3-7
331
Each
144.90
IRR-PMW-3-8
IRR-PMW-3-9
IRR-PMW-3-10
IRR-PMW-3-11
IRR-PMW-3-12
IRR-PMW-3-13
IRR-PMW-3-14
Repairing rain cuts / resectioning canal slopes to required lines and grades
336 as directed using available soil including dressing, clod breaking, packing,
tamping etc., complete with all leads and lifts.
Labour Component (including contractor's profit and Overheads)
337
Cleaning dam parapet inner face and top using oxalic acid and water by
338 scrubbing / brushing and washing to remove all surface coatings etc., complete
.
Labour Component (including contractor's profit and Overheads)
IRR-PMW-3-15
IRR-PMW-3-16
IRR-PMW-3-17
IRR-PMW-3-18
IRR-PMW-3-19
Each
cum
144.90
184.20
cum
cum
29.90
210.80
cum
cum
35.70
167.40
cum
cum
28.50
190.80
cum
sqm
33.70
3.30
sqm
Rm
3.30
36.90
Rm
Rm
Rm
29.50
33.00
21.10
43
Chapterwise
item No.
S.NO
IRR-PMW-3-20
IRR-PMW-3-21
Item description
3
Excavation and removal of silt and silt mixed with sand from canal bed in
dry condition including disposing off the same in spoil bank or on the canal
339
embankment in layers as directed etc., complete with initial lead upto 50 m and
all lifts.
Labour Component (including contractor's profit and Overheads)
Excavation and removal of silt or silt mixed with sand in slussy condition
340 from canal bed including disposing off the same in spoil bank or on the canal
embankment in layers as directed etc., complete with initial lead upto 50 m and
all lifts.
Labour Component (including contractor's profit and Overheads)
Unit
Rate
cum
140.90
cum
cum
140.90
176.10
cum
cum
176.10
94.70
cum
cum
14.10
45.60
6.80
IRR-PMW-3-26
New Item 201415-8
COM-MWRK
COM-MWRK-1
cum
6.10
cum
1.10
349
Sqm
5.70
Sqm
7.80
Sqm
5.30
Sqm
4.40
Sqm
5.30
Sqm
1.70
Sqm
408.60
Sqm
154.52
New extra items-- common item for all earth works using only manual labour for all other works
without involving contractors
(Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for
foundations of canal cross drainage and other appurtenant structures and
placing excavated stuff neatly in specified dump area or disposing off the same
351
as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m.
(WIthout involving the contractors for specified works )
With 3 Cum per day output
cum
103.30
44
Chapterwise
item No.
S.NO
Item description
Unit
Rate
COM-MWRK-2
cum
124
COM-MWRK-3
cum
233.10
COM-MWRK-4
cum
462.70
45
Chapter - I
DAM AND ALLIED WORKS - Standard Data
3. The Leads for Steel and Cement shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total
lead charges. No loading and unloading charges shall be allowed for any item. (same as above)
Example:
Total lead for earth from approved borrow area :
15 Km
Initial lead included in the basic rate in the SR :
1 Km
Additional lead charges : Lead charges for 5 km
Rs.
83.60
Lead charges for next 10 km
Rs.
125
Total lead charges for 15 km /cum
Rs.
208.60
Less 1 km initial lead charges /cum Rs.
31.30 (-)
Net additional lead charges / cum
Rs.
177.30
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For conveyance of materials, the
lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without deducting the 50 m initial lead charges
DAW - Work Items
IRR-DAW-1
IRR-DAW-1-1
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
Unit
Quantity
NIL
0.00
0.00
Rs:
UNIT
880 cum
Rate
Amount
in Rs.
in Rs
0.00 0.00
0.00 0.00
0.00
B. MACHINERY:
Sl No
1
2
Description
Shovel 0.85 cum capacity
Fuel / Energy charges
Dumpers 5 cum capacity 6 Nos
Unit
Hour
Hour
Hour
Quantity
8.00
8.00
48.00
Rate
Amount
in Rs.
in Rs
1706.60 13652.80
893.90 7151.20
580.70 27873.60
48
48.00
8.00
8.00
409.60
446.70
307.20
Rs:
19660.80
3573.60
2457.60
74369.60
221.00
212.20
165.80
400.00
310.00
Rs:
Amount
in Rs
1768.00
10185.60
1326.40
400.00
4960.00
18640.00
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
Quantity
Rate
in Rs.
Hour
Hour
Hour
Day
Day
Total cost of Labour
labour component/unit qty
21.20
Add contractor's profit and overhead charges
13.615% 2.90
labour component/unit qty (including contractor's profit)
24.10
8.00
48.00
8.00
1.00
16.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
880.00
Rate per
cum (A+B+C+D)/880
IRR-DAW-1-2
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
13.615%
cum
0.00
74369.60
18640.00
93009.60
12663.26
105672.86
120.10
Excavation for foundation in ordinary rock (including HDR) without blasting including
boulders above 0.3 m upto 0.6 m dia for dam, spillway, intake structure and
other appurtenant works and placing the excavated material neatly in dump
area or disposing off the same as directed etc., complete with initial lead
upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
Particulars
Unit
Quantity
NIL
0.00
0.00
Total cost of Materials
UNIT :
520 cum
Rate
Amount
in Rs.
in Rs.
0.00 0.00
0.00 0.00
Rs: 0.00
B. MACHINERY:
Sl No Description
1
2
3
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
8.00
8.00
32.00
32.00
8.00
8.00
Rate
in Rs.
1706.60
893.90
580.70
409.60
446.70
307.20
Rs:
Amount
in Rs
13652.80
7151.20
18582.40
13107.20
3573.60
2457.60
58524.80
Rate
in Rs.
221.00
212.20
165.80
400.00
370.00
310.00
Rs.
Amount
in Rs
1768.00
6790.40
1326.40
400.00
925.00
3100.00
14309.80
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
0.00
58524.80
14309.80
72834.60
9916.43
82751.03
159.10
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Quantity
Hour
Hour
Hour
Day
Day
Day
Total cost of Labour
labour component/unit qty
27.50
Add contractor's profit and overhead charges
13.615% 3.70
labour component/unit qty (including contractor's profit)
31.20
8.00
32.00
8.00
1.00
2.50
10.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
520.00
Rate per
cum (A+B+C+D)/520
13.615%
cum
49
IRR-DAW-1-3
DATA:
Excavation for foundation in hard rock (including F&F rock) requiring blasting including
boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure
and other appurtenant works and placing the excavated material neatly in
dump area or disposing off the same as directed etc., complete with initial
lead upto 1 km and all lifts.
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Description
Use rate of 1.5 m drill rod
Reconditioning charges @
Use rate of air hose 4 Nos.
Explosive small dia
Electric detonators
Fuse coil
Sundries
Total cost of Materials
Unit
UNIT :
520.00 cum.
Rate
Amount
in Rs.
in Rs
20.75 4482.00
448.20
11.56 300.63
70.00 7280.00
13.00 2002.00
11.00 3520.00
20.00 100.00
Rs. 18132.83
Quantity
Rm
216.00
10%
Hour
kg
Nos
Rm
LS
26.00
104.00
154.00
320.00
5.00
B. MACHINERY:
Sl No
Description
Unit
Quantity
Rate
in Rs.
1
2
3
4
5
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
8.00
8.00
32.00
32.00
8.00
8.00
13.00
13.00
26.00
26.00
1706.60
893.90
580.70
409.60
446.70
307.20
170.80
433.10
19.80
0.00
Rs:
Amount
in Rs
13652.80
7151.20
18582.40
13107.20
3573.60
2457.60
2220.40
5630.30
514.80
0.00
66890.30
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
10
11
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
Total cost of Labour
labour component/unit qty
49.00
Add contractor's profit and overhead charges
13.615% 6.70
labour component/unit qty (including contractor's profit)
55.70
Rate
in Rs.
8.00
32.00
8.00
13.00
26.00
1.00
1.00
1.00
2.50
1.00
10.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
520.00
Rate per
cum. (A+B+C+D)/520
IRR-DAW-1-3A
New Item 2015-16-1
Total
13.615%
cum.
221.00
212.20
165.80
153.10
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs.
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Amount
in Rs
1768.00
6790.40
1326.40
1990.30
7961.20
400.00
480.00
370.00
925.00
370.00
3100.00
25481.30
18132.83
66890.30
25481.30
110504.43
15045.18
125549.61
241.40
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Description
Unit
Rm
Quantity
216.00
10%
UNIT :
520.00 cum.
Rate
Amount
in Rs.
in Rs
20.75 4482.00
448.20
50
2
3
4
3
4
5
6
Hour
Sq m
Nos.
kg
Nos
Rm
LS
26.00
500.00
190.00
104.00
154.00
320.00
5.00
11.56
67.38
81.70
70.00
23.00
11.00
20.00
Rs.
300.63
33687.50
15523.00
7280.00
3542.00
3520.00
100.00
68883.33
1706.60
893.90
1715.50
625.30
580.70
409.60
446.70
307.20
170.80
433.10
19.80
0.00
Rs:
Amount
in Rs
13652.80
7151.20
1715.50
625.30
18582.40
13107.20
3573.60
2457.60
2220.40
5630.30
514.80
0.00
69231.10
B. MACHINERY:
Sl No
Description
Unit
Quantity
Rate
in Rs.
1
2
3
4
5
6
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
8.00
8.00
1.00
1.00
32.00
32.00
8.00
8.00
13.00
13.00
26.00
26.00
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
10
11
12
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
Total cost of Labour
labour component/unit qty
57.60
Add contractor's profit and overhead charges
13.615% 7.80
labour component/unit qty (including contractor's profit)
65.40
Rate
in Rs.
8.00
1.00
32.00
8.00
13.00
26.00
3.00
1.50
2.00
2.50
2.00
18.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
cum.
IRR-DAW-1-4
(a)
221.00
221.00
212.20
165.80
153.10
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs.
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Amount
in Rs
1768.00
221.00
6790.40
1326.40
1990.30
7961.20
1200.00
720.00
740.00
925.00
740.00
5580.00
29962.30
68883.33
69231.10
29962.30
168076.73
22883.65
190960.38
367.20
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
7
Unit
Quantity
Rm
310.00
10%
Hour
kg
Nos
Nos
Rm
LS
48.00
95.00
10.00
333.00
450.00
5.00
UNIT
320.00 cum
Rate
Amount
in Rs.
in Rs
27.67 8576.67
857.67
11.56 555.00
70.00 6650.00
7.00 70.00
13.00 4329.00
11.00 4950.00
20.00 100.00
Rs: 26088.34
51
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
C. LABOUR:
Sl No
Description
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
8.00
8.00
24.00
24.00
4.00
4.00
1.00
1.00
24.00
24.00
48.00
48.00
Unit
Quantity
1
2
3
4
5
6
7
8
9
10
11
12
8.00
24.00
4.00
1.00
24.00
48.00
1.00
1.00
1.00
1.00
2.00
6.00
IRR-DAW-1-5
(b)
Amount
in Rs
13652.80
7151.20
13936.80
9830.40
1786.80
1228.80
1715.50
625.30
4099.20
10394.40
950.40
0.00
65371.60
Rate
in Rs.
Amount
in Rs
1768.00
5092.80
663.20
221.00
3674.40
14697.60
400.00
480.00
370.00
370.00
740.00
1860.00
30337.00
221.00
212.20
165.80
221.00
153.10
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Total
13.615%
cum
Rate
in Rs.
1706.60
893.90
580.70
409.60
446.70
307.20
1715.50
625.30
170.80
433.10
19.80
0.00
Rs.
26088.34
65371.60
30337.00
121796.94
16582.65
138379.59
432.40
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
7
8
9
B. MACHINERY:
Sl No
1
2
3
Particulars
Shovel 0.85 cum capacity
Fuel / Energy charges
Angle dozer 90 hp
Fuel / Energy charges
Dumpers 5 cum capacity 3 Nos.
Unit
Quantity
Rm
10%
Hour
sqm
Nos
kg
Nos
Nos
Rm
LS
Unit
Hour
Hour
Hour
Hour
Hour
UNIT :
480.00 cum
Rate
Amount
in Rs.
in Rs
27.67 12837.33
1283.73
11.56 809.38
67.38 48173.13
81.70 47386.00
70.00 10430.00
7.00 161.00
23.00 11500.00
11.00 7700.00
20.00 200.00
Rs: 140480.57
464.00
70.00
715.00
580.00
149.00
23.00
500.00
700.00
10.00
Quantity
Rate
in Rs.
12.00
12.00
2.00
2.00
36.00
1706.60
893.90
1715.50
625.30
580.70
Amount
in Rs
20479.20
10726.80
3431.00
1250.60
20905.20
52
36.00
4.00
4.00
35.00
35.00
70.00
70.00
1
2
3
4
5
6
7
8
9
10
11
13
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
Total cost of Labour
labour component/unit qty
103.90
Add contractor's profit and overhead charges
13.615% 14.10
labour component/unit qty (including contractor's profit)
118.00
12.00
2.00
36.00
4.00
35.00
70.00
4.50
1.50
3.00
2.50
2.50
20.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
IRR-DAW-1-6
( c)
Note :
14745.60
1786.80
1228.80
5978.00
15158.50
1386.00
0.00
97076.50
221.00
221.00
212.20
165.80
153.10
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs.
Amount
in Rs
2652.00
442.00
7639.20
663.20
5358.50
21434.00
1800.00
720.00
1110.00
925.00
925.00
6200.00
49868.90
Rate
in Rs.
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Total
13.615%
cum
409.60
446.70
307.20
170.80
433.10
19.80
0.00
Rs:
140480.57
97076.50
49868.90
287425.97
39133.05
326559.02
680.30
DATA:
RATE ANALYSIS
UNIT :
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
7
B. MACHINERY:
Sl No
Description
1
2
3
4
Unit
Quantity
Rate
in Rs.
Rm
138.00
10%
Hour
kg
Nos
Nos
Rm
LS
22.00
10.50
2.00
76.00
140.00
2.00
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
1.00
1.00
0.25
0.25
3.00
3.00
11.00
40.00 cum
Amount
in Rs
27.67 3818.00
381.80
11.56 254.38
70.00 735.00
7.00 14.00
23.00 1748.00
11.00 1540.00
20.00 40.00
Rs. 8531.18
Rate
in Rs.
1706.60
893.90
1715.50
625.30
580.70
409.60
170.80
Amount
in Rs
1706.60
893.90
428.88
156.33
1742.10
1228.80
1878.80
53
C. LABOUR:
Sl No
Description
Unit
11.00
22.00
22.00
Quantity
1.00
0.25
3.00
11.00
22.00
0.50
0.50
0.50
0.50
0.50
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
IRR-DAW-1-7
221.00
221.00
212.20
153.10
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs.
Amount
in Rs
221.00
55.25
636.60
1684.10
6736.40
200.00
240.00
185.00
185.00
185.00
620.00
10948.35
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
8531.18
13235.11
10948.35
32714.64
4454.1
37168.74
929.20
Total
13.615%
cum
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
Unit
Quantity
UNIT:
100.00 sqm
Amount
in Rs
0.00 0.00
0.00 0.00
Rs. 0.00
Rate
in Rs.
NIL
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
C. LABOUR:
Sl No
Description
Unit
Quantity
Rate
in Rs.
Hour
Hour
Hour
Hour
Unit
1
2
3
4
5
1.00
1.00
1.00
1.00
Quantity
170.80
433.10
3.00
38.50
Rs.
Amount
in Rs
170.80
433.10
3.00
38.50
645.40
153.10
77.70
370.00
310.00
370.00
Rs:
Amount
in Rs
153.10
77.70
740.00
775.00
740.00
2485.80
Rate
in Rs.
1.00
1.00
2.00
2.50
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
IRR-DAW-1-8
4764.10
435.60
0.00
13235.11
Rate
in Rs.
1
2
3
4
5
6
7
8
9
10
11
433.10
19.80
0.00
Rs:
Total
13.615%
sqm
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
0.00
645.40
2485.80
3131.20
426.31
3557.51
35.60
54
removing all loose materials by wedging / chiselling and disposing off the
same as directed etc., complete with initial lead upto 50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
Unit
Quantity
UNIT:
100.00 sqm
Amount
in Rs
0.00 0.00
0.00 0.00
Rs. 0.00
Rate
in Rs.
NIL
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
Unit
Quantity
Rate
in Rs.
NIL
Amount
in Rs
0.00 0.00
0.00 0.00
Rs. 0.00
0.00
0.00
Total cost of Machinery
C. LABOUR:
Sl No
Description
1
2
3
Crowbar man
Stone breaker
mazdoor
Unit
Quantity
Day
Day
Day
Rate
in Rs.
2.00
2.00
2.00
370.00
370.00
310.00
Rs:
IRR-DAW-1-9
NOTE:
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Amount
in Rs
740.00
740.00
620.00
2100.00
0.00
0.00
2100.00
2100.00
285.92
2385.92
23.90
Data
RATE ANALYSIS
UNIT:
A. MATERIALS:
Sl No
Particulars
1
2
3
B. MACHINERY:
Sl No
Description
1
2
3
Waggon drill
Fuel / Energy charges
Air compressor 8.5 cmm ( ele )
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
Unit
Quantity
Rm
Hour
Rm
Unit
96.00
8.00
96.00
Quantity
Hour
Hour
Hour
Hour
LS
Unit
Rate
in Rs.
96.00 Rm
Amount
in Rs
62.50 6000.00
18.63 149.00
6.68 641.09
Rs. 6790.09
Rate
in Rs.
8.00
8.00
8.00
8.00
2.00
Quantity
188.50
0.00
170.80
433.10
20.00
Rs:
Amount
in Rs
1508.00
0.00
1366.40
3464.80
40.00
6379.20
265.20
153.10
310.00
Rs:
Amount
in Rs
2121.60
1224.80
620.00
3966.40
Rate
in Rs.
8.00
8.00
2.00
ABSTRACT:
55
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
Rm
IRR-DAW-1-10
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
6790.09
6379.20
3966.40
17135.69
2333.02
19468.71
202.80
202.80
Rs: 202.80
10%
Rs: 20.28
Rs: 223.10
Rs: 223.10
10%
Rs: 22.31
Rs: 245.40
:
Rs: 245.40
10%
Rs: 24.54
Rs: 269.90
:
Rs: 269.90
10%
Rs 26.99
Rs: 296.90
:
Rs: 296.90
10%
Rs: 29.69
Rs: 326.60
:
Rs: 326.60
10%
Rs: 32.66
Rs: 359.30
Rs: 359.30
10%
Rs: 35.93
Rs: 395.20
Flushing grout holes of all sizes with water and air jets alternatively for an
average period of 30 minutes including water intake observations after
flushing, cost of all materials, machinery, labour etc., complete.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
B. MACHINERY:
Sl No
Description
1
2
3
Unit
Quantity
Hour
Hour
LS
Unit
16.00
16.00
2.00
Quantity
C. LABOUR:
Sl No
Description
Unit
UNIT :
192.00 Rm.
Rate
Amount
in Rs.
in Rs
11.56 184.96
11.56 184.96
20.00 40.00
Rs: 409.92
Rate
in Rs.
8.00
8.00
8.00
8.00
2.00
Quantity
170.80
433.10
3.00
38.50
20.00
Rs:
Amount
in Rs
1366.40
3464.80
24.00
308.00
40.00
5203.20
153.10
77.70
310.00
Rs:
Amount
in Rs
1224.80
621.60
1240.00
3086.40
Rate
in Rs.
8.00
8.00
4.00
56
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
Rm.
IRR-DAW-1-11
(a)
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
Cement
Use rate of 50 m pressure hose
Sundries ( packer assembly etc )
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
Unit
Quantity
tonne
Hour
LS
Unit
1.05
8.00
3.00
Quantity
Grouting equipment
Hour
Fuel / Energy charges
Hour
Pump 5 hp ( ele )
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Unit
UNIT :
1.05 tonne
Rate
Amount
in Rs.
in Rs
6300.00 6615.00
11.56 92.48
20.00 60.00
Rs: 6767.48
Rate
in Rs.
8.00
8.00
2.00
2.00
2.00
Quantity
1
2
3
24.90
38.50
3.00
38.50
20.00
Rs:
Amount
in Rs
199.20
308.00
6.00
77.00
40.00
630.20
244.90
77.70
310.00
Rs:
Amount
in Rs
1959.20
155.40
620.00
2734.60
Rs:
Rs:
Rs:
Rs:
Rs.
6767.48
630.20
2734.60
10132.28
1379.51
Rate
in Rs.
8.00
2.00
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
IRR-DAW-1-12
(b)
409.92
5203.20
3086.40
8699.52
1184.44
9883.96
51.50
Total
13.615%
129.70 Rs/Tonne
tonne
136.185
Rs: 11647.98
Rs: 11093.30
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
Cement
Use rate of 100 m pressure hose
Use rate of 400 m GI pipe
Sundries ( packer assembly etc )
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
Grouting equipment
Fuel / Energy charges
Pump 5 hp ( ele )
Fuel / Energy charges
Unit
Quantity
tonne
Hour
Hour
LS
Unit
Hour
Hour
Hour
Hour
1.05
8.00
8.00
3.00
Quantity
UNIT :
1.05 tonne
Rate
Amount
in Rs.
in Rs
6300.00 6615.00
23.13 185.04
0.72 5.76
20.00 60.00
Rs: 6865.80
Rate
in Rs.
8.00
8.00
2.00
2.00
24.90
38.50
3.00
38.50
Amount
in Rs
199.20
308.00
6.00
77.00
57
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Unit
2.00
Quantity
1
2
3
4
20.00 40.00
Rs: 630.20
Rate
in Rs.
8.00
2.00
1.00
3.00
244.90
77.70
480.00
310.00
Rs:
Amount
in Rs
1959.20
155.40
480.00
930.00
3524.60
Rs:
Rs:
Rs:
Rs:
Rs.
6865.80
630.20
3524.60
11020.60
1500.45
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
IRR-DAW-1-13
129.70 Rs/Tonne
tonne
136.185
Rs: 12657.24
Rs: 12054.50
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
Unit
Quantity
Rm
Hour
kg
kg
cum
Unit
37.50
4.00
303.22
75.00
0.05
Quantity
C. LABOUR:
Sl No
Description
Unit
UNIT:
25 Nos.
Rate
Amount
in Rs.
in Rs
62.50 2343.75
18.63 74.52
40.00 12128.80
6.30 472.50
760.00 38.00
Rs: 15057.57
Rate
in Rs.
4.00
4.00
4.00
4.00
Quantity
1
2
3
4
5
170.80
433.10
188.50
0.00
Rs:
Amount
in Rs
683.20
1732.40
754.00
0.00
3169.60
153.10
265.20
490.00
370.00
310.00
Rs:
Amount
in Rs
612.40
1060.80
245.00
185.00
310.00
2413.20
Rate
in Rs.
4.00
4.00
0.50
0.50
1.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
0.05
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
0.08
tonne @
Lead Charges for 1Km for Steel (including Loading
and Unloading Charges)
0.30
tonne @
Total cost for
25.00
Rs:
Rs:
Rs:
Rs:
Rs.
31.3 Rs./Cum
15057.57
3169.60
2413.20
20640.37
2810.19
1.565
129.7 Rs./Tonne
9.7275
Total
13.615%
151.5 Rs./Tonne
Nos.
45.93783
Rs: 23507.79
58
Rate per
IRR-DAW-1-14
Each
(A+B+C+D)/25
Rs: 940.30
Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods
with one end split and driven firmly using steel wedge into 1.25 m deep 45
to 50 mm dia. hole drilled in bed rock and other end provided with L- bend
for embedding in concrete / masonry for spillway and appurtenant works
including drilling and cleaning hole, filling hole with thick cement slurry,
driving anchor rod, cost of all materials, machinery, labour, steel wedge
etc., complete with initial lead upto 1 km and all lifts.
Consider 25 anchor rods for analysis.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
Unit
1
2
3
4
5
6
Quantity
Rm
Hour
kg
kg
LS
LS
31.25
3.00
277.92
62.50
5.00
10.00
Unit
Quantity
UNIT:
25.00 Nos.
Rate
Amount
in Rs.
in Rs
62.50 1953.13
18.63 55.89
40.00 11116.80
6.30 393.75
37.50 187.50
16.00 160.00
Rs: 13867.07
Rate
in Rs.
3.00
3.00
3.00
3.00
Quantity
1
2
3
4
5
6
170.80
433.10
188.50
0.00
Rs:
Amount
in Rs
512.40
1299.30
565.50
0.00
2377.20
153.10
265.20
490.00
370.00
415.00
310.00
Rs:
Amount
in Rs
459.30
795.60
245.00
185.00
415.00
620.00
2719.90
Rs:
Rs:
Rs:
Rs:
Rs.
13867.07
2377.20
2719.90
18964.17
2581.97
Rate
in Rs.
3.00
3.00
0.50
0.50
1.00
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
tonne @
0.28
tonne @
25.00
(A+B+C+D)/25
129.7 Rs./Tonne
151.5 Rs./Tonne
Nos.
IRR-DAW-2
IRR-DAW-2-1A
Providing, fabricating and placing in position reinforcement steel for RCC,below 36 dia rods
overlaps and wastages wherever required, tying with 1.25 mm diameter soft
annealed steel wire, including cost of all materials, machinery, labour etc.,
complete with initial lead upto 1 km and all lifts.
overlaps and wastage
as per NHAI-data
Lap jointing considered for bars upto 36 mm diameter.
DATA:
8.10625
42.10488
Rs: 21596.35
Rs: 863.90
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
B. MACHINERY:
Sl No
Description
Unit
Quantity
tonne
kg
Unit
1.05
9.00
Quantity
UNIT :
1.00 tonne
Rate
Amount
in Rs.
in Rs
40000.00 42000.00
70.00 630.00
Rs: 42630.00
Rate
Amount
59
in Rs.
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
Bar bender
mazdoor
Unit
Quantity
Rate
in Rs.
Day
Day
2.00
6.84
13.615%
52115.67
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
welding machine
fuel charges
Unit
1.025
70.00
Quantity
hour
hour
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
Quantity
B. MACHINERY:
Sl No
Description
welder
Bar bender
mazdoor
Unit
6226.19
159.075
tonne 52115.67
1
3
UNIT :
1.00 tonne
Rate
Amount
in Rs.
in Rs
40000.00 41000.00
11.00 770.00
Rs: 41770.00
Rate
in Rs.
Amount
in Rs
16.00 160.00
92.40 924.00
Rs: 1084.00
Rate
in Rs.
Amount
in Rs
415.00 1037.50
490.00 980.00
310.00 2120.40
4137.90
10.00
10.00
Quantity
day
Day
Day
2.50
2.00
6.84
IRR-DAW-2-2
DATA:
Amount
in Rs
490.00 980.00
310.00 2120.40
3100.40
42630.00
0.00
3100.40
45730.40
IRR-DAW-2-1B
Unit
in Rs
Rs: 0.00
13.615%
41770.00
1084.00
4137.90
46991.90
6397.95
155.2875
tonne 53545.14
53545.14
60
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
Unit
Quantity
kg
kg
cum
cum
cum
cum
cum
kg
sqm
Unit
60000.00
720.00
94.08
70.56
47.04
23.52
84.00
240.00
120.00
Quantity
Batching plant
Hour
Fuel / Energy charges
Hour
Air compressor 7 cmm ( ele )
Hour
Fuel / Energy charges
Hour
Tipper
Hour
Fuel / Energy charges
Hour
Tower crane 5 t
Hour
Fuel / Energy charges
Hour
Concrete bucket
Hour
Fuel / Energy charges
Hour
10 hp pump ( ele )
Hour
Fuel / Energy charges
Hour
Needle vibrator 60 mm dia ( ele )
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Unit
240.00 cum
Amount
in Rs
6.30 378000.00
6.30 4536.00
635.00 59740.80
1145.00 80791.20
1210.00 56918.40
875.00 20580.00
560.00 47040.00
95.00 22800.00
326.08 39129.60
Rs: 709536.00
Rate
in Rs.
Rate
in Rs.
518.10
423.40
131.90
346.40
446.70
307.20
867.10
200.20
15.80
0.00
6.70
77.00
9.70
11.50
20.00
Rs:
Amount
in Rs
4144.80
3387.20
1055.20
2771.20
14294.40
9830.40
13873.60
3203.20
632.00
0.00
53.60
616.00
155.20
184.00
200.00
54400.80
8.00
8.00
32.00
16.00
8.00
16.00
4.00
2.00
318.20
153.10
165.80
176.80
77.70
146.90
415.00
480.00
Amount
in Rs
2545.60
1224.80
5305.60
2828.80
621.60
2350.40
1660.00
960.00
2.00
2.00
2.00
6.00
2.00
120.00
310.00
310.00
310.00
310.00
310.00
119.70
Rs:
620.00
620.00
620.00
1860.00
620.00
14364.00
36200.80
8.00
8.00
8.00
8.00
32.00
32.00
16.00
16.00
40.00
40.00
8.00
8.00
16.00
16.00
10.00
Quantity
1
2
3
4
5
6
7
8
9
Rate
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Add for conveyor system @
Add for electric sub-station/ Demand charges @
Add for trestle bridge for tower crane track @
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
84.00
cum @
Lead Charges for 1 Km for CA
235.20 cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
60.72
tonne @
Total cost for
240.00
Rate per
cum
(A+B+C+D)/240
IRR-DAW-2-2A
New Item1-2010-11
Rs:
Rs:
Rs:
Rs:
Total
3.00%
2.5%
4.0%
Total
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
709536.00
54400.80
36200.80
800137.60
24004.13
20003.44
32005.50
Rs: 876150.67
Rs. 119287.91
2629.2
7103.04
7875.384
Rs: 1013046.20
Rs: 4221.00
61
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
Unit
Quantity
kg
kg
cum
cum
cum
cum
cum
kg
sqm
Unit
72000.00
720.00
86.40
64.80
43.20
21.60
96.00
288.00
120.00
Quantity
Batching plant
Hour
Fuel / Energy charges
Hour
Air compressor 7 cmm ( ele )
Hour
Fuel / Energy charges
Hour
Tipper
Hour
Fuel / Energy charges
Hour
Tower crane 5 t
Hour
Fuel / Energy charges
Hour
Concrete bucket
Hour
Fuel / Energy charges
Hour
10 hp pump ( ele )
Hour
Fuel / Energy charges
Hour
Needle vibrator 60 mm dia ( ele )
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Unit
UNIT:
240.00 cum
Rate
Amount
in Rs.
in Rs
6.30 453600.00
6.30 4536.00
635.00 54864.00
1145.00 74196.00
1210.00 52272.00
875.00 18900.00
560.00 53760.00
95.00 27360.00
326.08 39129.60
Rs: 778617.60
Rate
in Rs.
518.10
423.40
131.90
346.40
446.70
307.20
867.10
200.20
15.80
0.00
6.70
77.00
9.70
11.50
20.00
Rs:
Amount
in Rs
4144.80
3387.20
1055.20
2771.20
14294.40
9830.40
13873.60
3203.20
632.00
0.00
53.60
616.00
155.20
184.00
200.00
54400.80
8.00
8.00
32.00
16.00
8.00
16.00
4.00
2.00
318.20
153.10
165.80
176.80
77.70
146.90
415.00
480.00
Amount
in Rs
2545.60
1224.80
5305.60
2828.80
621.60
2350.40
1660.00
960.00
2.00
2.00
2.00
6.00
2.00
120.00
310.00
310.00
310.00
310.00
310.00
119.70
Rs:
620.00
620.00
620.00
1860.00
620.00
14364.00
36200.80
8.00
8.00
8.00
8.00
32.00
32.00
16.00
16.00
40.00
40.00
8.00
8.00
16.00
16.00
10.00
Quantity
1
2
3
4
5
6
7
8
9
Rate
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Add for conveyor system @
Add for electric sub-station/ Demand charges @
Add for trestle bridge for tower crane track @
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
96.00
cum @
Lead Charges for 1 Km for CA
216.00 cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
72.72
tonne @
Total cost for
240.00
Rate per
cum
(A+B+C+D)/240
IRR-DAW-2-3
Rs:
Rs:
Rs:
Rs:
Total
3.00%
2.5%
4.0%
Total
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
778617.60
54400.80
36200.80
869219.20
26076.58
21730.48
34768.77
Rs: 951795.03
Rs. 129586.89
3004.8
6523.20
9431.784
Rs: 1100341.70
Rs: 4584.80
62
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
Unit
Quantity
kg
kg
cum
cum
cum
cum
cum
kg
sqm
52800
720.00
94.08
70.56
47.04
23.52
88.8
211.20
120.00
Unit
Quantity
C. LABOUR:
Sl No
Description
Rate
in Rs.
518.10
423.40
131.90
346.40
446.70
307.20
867.10
200.20
15.80
0.00
6.70
77.00
9.70
11.50
20.00
Rs:
Amount
in Rs
4144.80
3387.20
1055.20
2771.20
14294.40
9830.40
13873.60
3203.20
632.00
0.00
53.60
616.00
155.20
184.00
200.00
54400.80
8.00
8.00
32.00
16.00
8.00
16.00
4.00
2.00
318.20
153.10
165.80
176.80
77.70
146.90
415.00
480.00
Amount
in Rs
2545.60
1224.80
5305.60
2828.80
621.60
2350.40
1660.00
960.00
2.00
2.00
2.00
6.00
2.00
120.00
310.00
310.00
310.00
310.00
310.00
119.70
Rs:
620.00
620.00
620.00
1860.00
620.00
14364.00
36200.80
8.00
8.00
8.00
8.00
32.00
32.00
16.00
16.00
40.00
40.00
8.00
8.00
16.00
16.00
10.00
Unit
Quantity
1
2
3
4
5
6
7
8
9
Rate
in Rs.
Rs:
Rs:
Rs:
Total
3.00%
2.5%
4.0%
Total
13.615%
UNIT:
240.00 cum
Rate
Amount
in Rs.
in Rs
6.30 332640.00
6.30 4536.00
635.00 59740.80
1145.00 80791.20
1210.00 56918.40
875.00 20580.00
560.00 49728.00
95.00 20064.00
326.08 39129.60
Rs: 664128.00
cum @
cum @
31.3 Rs./Cum
30.2 Rs./Cum
664128.00
54400.80
36200.80
Rs: 754729.60
22641.89
18868.24
30189.18
Rs: 826428.91
Rs. 112518.3
2779.44
7103.04
63
IRR-DAW-2-4
129.7 Rs./Tonne
cum
6941.544
Rs: 955771.23
Rs: 3982.40
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
74400
720.00
108
64.8
43.2
96
297.60
360.00
15%
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
UNIT:
240.00 cum
Rate
Amount
in Rs.
in Rs
6.30 468720.00
6.30 4536.00
1145.00 123660.00
1210.00 78408.00
875.00 37800.00
560.00 53760.00
95.00 28272.00
326.08 117388.80
17608.32
Rs: 930153.12
Rate
in Rs.
8.00
8.00
8.00
8.00
32.00
32.00
16.00
16.00
40.00
40.00
8.00
8.00
16.00
16.00
10.00
Quantity
518.10
423.40
131.90
346.40
446.70
307.20
867.10
200.20
15.80
0.00
6.70
77.00
9.70
11.50
20.00
Rs:
Rate
in Rs.
8.00
8.00
32.00
16.00
8.00
16.00
4.00
2.00
318.20
153.10
165.80
176.80
77.70
146.90
415.00
480.00
2.00
2.00
2.00
6.00
2.00
360.00
310.00
310.00
310.00
310.00
310.00
119.70
Rs:
Amount
in Rs
4144.80
3387.20
1055.20
2771.20
14294.40
9830.40
13873.60
3203.20
632.00
0.00
53.60
616.00
155.20
184.00
200.00
54400.80
Amount
in Rs
2545.60
1224.80
5305.60
2828.80
621.60
2350.40
1660.00
960.00
0.00
620.00
620.00
620.00
1860.00
620.00
43092.00
6463.80
71392.60
Rs: 930153.12
Rs: 54400.80
Rs: 71392.60
64
Total
3.0%
2.50%
4.0%
Total
13.615%
Rs: 1055946.52
31678.40
26398.66
42237.86
Rs: 1156261.44
Rs. 157425
3004.8
6523.20
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
9743.064
Rs: 1332957.50
Rs: 5554.00
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
Unit
Quantity
kg
kg
cum
cum
cum
cum
kg
sqm
86400
720.00
108
64.8
43.2
96
345.60
360.00
15%
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
UNIT:
240.00 cum
Rate
Amount
in Rs.
in Rs
6.30 544320.00
6.30 4536.00
1145.00 123660.00
1210.00 78408.00
875.00 37800.00
560.00 53760.00
95.00 32832.00
326.08 117388.80
17608.32
Rs: 1010313.12
Rate
in Rs.
8.00
8.00
8.00
8.00
32.00
32.00
16.00
16.00
40.00
40.00
8.00
8.00
16.00
16.00
10.00
Unit
Quantity
518.10
423.40
131.90
346.40
446.70
307.20
867.10
200.20
15.80
0.00
6.70
77.00
9.70
11.50
20.00
Rs:
Rate
in Rs.
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
8.00
8.00
32.00
16.00
8.00
16.00
4.00
2.00
318.20
153.10
165.80
176.80
77.70
146.90
415.00
480.00
Day
Day
Day
Day
Day
sqm
2.00
2.00
2.00
6.00
2.00
360.00
310.00
310.00
310.00
310.00
310.00
119.70
15%
Rs:
Amount
in Rs
4144.80
3387.20
1055.20
2771.20
14294.40
9830.40
13873.60
3203.20
632.00
0.00
53.60
616.00
155.20
184.00
200.00
54400.80
Amount
in Rs
2545.60
1224.80
5305.60
2828.80
621.60
2350.40
1660.00
960.00
0.00
620.00
620.00
620.00
1860.00
620.00
43092.00
6463.80
71392.60
297.50
65
Rs:
Rs:
Rs:
Rs:
Total
3.0%
2.50%
4.0%
Total
13.615%
1010313.12
54400.80
71392.60
1136106.52
34083.20
28402.66
45444.26
Rs: 1244036.64
Rs. 169375.59
3004.8
6523.20
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
11299.464
Rs: 1434239.69
Rs: 5976.00
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
Unit
Quantity
kg
kg
cum
cum
cum
kg
sqm
91200
720.00
140.4
75.6
96
364.80
360.00
15%
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
UNIT:
240.00 cum
Rate
Amount
in Rs.
in Rs
6.30 574560.00
6.30 4536.00
1210.00 169884.00
875.00 66150.00
560.00 53760.00
95.00 34656.00
326.08 117388.80
17608.32
Rs: 1038543.12
Rate
in Rs.
8.00
8.00
8.00
8.00
32.00
32.00
16.00
16.00
40.00
40.00
8.00
8.00
16.00
16.00
10.00
Quantity
518.10
423.40
131.90
346.40
446.70
307.20
867.10
200.20
15.80
0.00
6.70
77.00
9.70
11.50
20.00
Rs:
Rate
in Rs.
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
8.00
8.00
32.00
16.00
8.00
16.00
4.00
2.00
318.20
153.10
165.80
176.80
77.70
146.90
415.00
480.00
Day
Day
Day
2.00
2.00
2.00
310.00
310.00
310.00
Amount
in Rs
4144.80
3387.20
1055.20
2771.20
14294.40
9830.40
13873.60
3203.20
632.00
0.00
53.60
616.00
155.20
184.00
200.00
54400.80
Amount
in Rs
2545.60
1224.80
5305.60
2828.80
621.60
2350.40
1660.00
960.00
0.00
620.00
620.00
620.00
66
6.00
2.00
360.00
310.00 1860.00
310.00 620.00
119.70 43092.00
6463.80
Rs: 71392.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Add for aggregate conveyor system @
Add for electric sub-station / Demand charges @
Add for trestle bridge for tower crane track @
D.Add for contractor's profit and overheads on (A+B+C+other
Lead Charges for 1 Km for FA
96.00
cum @
Lead Charges for 1 Km for CA
216.00 cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
91.92
tonne @
Total cost for
240.00
Rate per
cum
(A+B+C+D)/240
IRR-DAW-2-5
Rs:
Rs:
Rs:
Rs:
Total
3.0%
2.50%
4.0%
Total
13.615%
1038543.12
54400.80
71392.60
1164336.52
34930.10
29108.41
46573.46
Rs: 1274948.49
Rs. 173584.24
3004.8
6523.20
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
11922.024
Rs: 1469982.75
Rs: 6124.90
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
3
Quantity
kg
kg
cum
cum
cum
cum
kg
sqm
3640.00
42.00
6.3
3.78
2.52
5.6
14.56
14.00
15%
Unit
Quantity
C. LABOUR:
Sl No
Description
1
2
3
4
5
Unit
UNIT :
14.00 cum
Rate
Amount
in Rs.
in Rs
6.30 22932.00
6.30 264.60
1145.00 7213.50
1210.00 4573.80
875.00 2205.00
560.00 3136.00
95.00 1383.20
217.39 3043.46
456.52
Rs: 45208.08
Rate
in Rs.
8.0
8.0
1.0
1.0
8.0
8.0
Unit
Quantity
51.70
38.50
6.70
77.00
8.00
7.70
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
64.00
61.60
930.90
Amount
in Rs
1632.80
77.70
1175.20
415.00
Rate
in Rs.
Hour
Hour
Hour
Day
8.00
1.00
8.00
1.00
204.10
77.70
146.90
415.00
Day
Day
Day
Day
Day
Day
sqm
2.00
9.00
4.00
3.00
14.00
1.00
14.00
310.00
310.00
310.00
310.00
310.00
310.00
79.80
15%
620.00
2790.00
1240.00
930.00
4340.00
310.00
1117.20
167.58
Rs: 14815.48
1058.20
13.615% 144.10
67
1202.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Rs.
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
5.60
Lead Charges for 1 Km for CA
12.60
13.615%
cum @
cum @
31.3 Rs./Cum
30.2 Rs./Cum
IRR-DAW-2-6
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
7
B. MACHINERY:
Sl No
Description
1
2
3
UNIT:
Unit
Quantity
kg
kg
cum
cum
cum
cum
cum
kg
sqm
15%
Unit
1
2
3
4
5
6
Unit
477.5554
Rs: 70286.77
Rs: 5020.50
16.45 cum
Amount
in Rs
6.30 26945.10
6.30 310.91
1145.00 7247.85
1210.00 4598.00
875.00 2213.75
360.00 1480.50
560.00 3132.08
95.00 1625.26
217.39 3576.07
536.41
Rs: 51665.93
Rate
in Rs.
4277
49.35
6.33
3.8
2.53
4.11
5.59
17.11
16.45
Quantity
C. LABOUR:
Sl No
Description
129.7 Rs./Tonne
cum
45208.08
930.90
14815.48
60954.46
8298.95
175.28
380.52
Rate
in Rs.
51.70
38.50
6.70
77.00
9.70
11.50
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
77.60
92.00
974.90
8.00
1.00
8.00
1.00
1.00
204.10
77.70
146.90
415.00
400.00
Amount
in Rs
1632.80
77.70
1175.20
415.00
400.00
2.00
9.00
4.00
1.00
4.00
13.99
3.00
1.00
16.45
310.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
79.80
8.00
8.00
1.00
1.00
8.00
8.00
Quantity
Rate
in Rs.
620.00
2790.00
1240.00
310.00
1240.00
4335.66
930.00
310.00
1312.71
196.91
Rs: 16985.98
ABSTRACT:
68
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
5.59
cum @
Lead Charges for 1 Km for CA and Plums
16.77
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
4.33
tonne @
Total cost for
16.45
Rate per
cum
(A+B+C+D)/16.45
IRR-DAW-2-7
Rs:
Rs:
Rs:
Rs:
Rs.
Total
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
51665.93
974.90
16985.98
69626.81
9479.69
175.0609
506.53
561.1276
Rs: 80349.22
Rs: 4884.50
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
3
Unit
Quantity
kg
kg
cum
cum
cum
cum
kg
sqm
3636.60
49.59
7.44
4.46
2.98
6.61
14.55
16.53
15%
Unit
Quantity
51.70
38.50
6.70
77.00
8.00
7.70
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
64.00
61.60
930.90
8.00
1.00
8.00
1.00
204.10
77.70
146.90
415.00
Amount
in Rs
1632.80
77.70
1175.20
415.00
2.00
9.00
4.00
3.00
16.53
1.00
16.53
310.00
310.00
310.00
310.00
310.00
310.00
79.80
13.615%
Rs:
Rs:
Rs:
Rs:
Rs.
C. LABOUR:
Sl No
Description
UNIT:
16.53 cum
Rate
Amount
in Rs.
in Rs
6.30 22910.58
6.30 312.42
1145.00 8517.08
1210.00 5400.35
875.00 2603.48
560.00 3702.72
95.00 1381.91
217.39 3593.46
539.02
Rs: 48961.02
Rate
in Rs.
8.00
8.00
1.00
1.00
8.00
8.00
Unit
Quantity
1
2
3
4
5
Rate
in Rs.
620.00
2790.00
1240.00
930.00
5124.30
310.00
1319.09
197.86
Rs: 15831.95
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
6.61
Lead Charges for 1 Km for CA
14.88
cum @
cum @
31.3 Rs./Cum
30.2 Rs./Cum
48961.02
930.90
15831.95
65723.87
8948.3
206.9556
449.29
tonne @
129.7 Rs./Tonne
478.09884
Total
69
IRR-DAW-2-8
DATA:
cum
16.53
(A+B+C+D)/16.53
cum
Rs: 75806.51
Rs: 4586.00
B. MACHINERY:
Sl No
Description
1
2
3
Unit
Quantity
kg
kg
cum
cum
cum
kg
sqm
4443.6
47.61
8.25
4.44
6.98
17.77
15.87
15%
Unit
Quantity
51.70
38.50
6.70
77.00
8.00
7.70
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
64.00
61.60
930.90
8.00
1.00
8.00
1.00
204.10
77.70
146.90
415.00
Amount
in Rs
1632.80
77.70
1175.20
415.00
2.00
9.00
4.00
3.00
15.87
1.00
15.87
310.00
310.00
310.00
310.00
310.00
310.00
79.80
13.615%
Rs:
Rs:
Rs:
Rs:
Rs.
C. LABOUR:
Sl No
Description
UNIT:
15.87 cum
Rate
Amount
in Rs.
in Rs
6.30 27994.68
6.30 299.94
1210.00 9985.40
875.00 3888.15
560.00 3910.37
95.00 1688.57
217.39 3449.98
517.50
Rs: 51734.59
Rate
in Rs.
8.00
8.00
1.00
1.00
8.00
8.00
Unit
Quantity
1
2
3
4
5
Rate
in Rs.
620.00
2790.00
1240.00
930.00
4919.70
310.00
1266.43
189.96
Rs: 15566.79
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
6.98
Lead Charges for 1 Km for CA
12.70
cum @
cum @
IRR-DAW-2-9
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
51734.59
930.90
15566.79
68232.28
9289.82
218.56164
383.42
582.50994
Rs: 78706.59
Rs: 4959.50
70
upto 1 km and all lifts. ( Cement content : 330 kg / cum with use of
super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35,
FA : 0.44 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
3
Unit
Quantity
kg
kg
cum
cum
cum
ltr
sqm
100%
Total cost of Materials
Unit
4445.1
40.41
7.00
3.77
5.93
17.78
33.68
Quantity
C. LABOUR:
Sl No
Description
Unit
UNIT:
13.47 cum
Rate
Amount
in Rs.
in Rs
6.30 28004.13
6.30 254.58
1210.00 8475.32
875.00 3300.15
560.00 3319.01
95.00 1689.14
217.39 7320.61
7320.61
Rs: 59683.55
Rate
in Rs.
8.00
8.00
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
51.70
38.50
6.70
77.00
8.00
7.70
Rs:
Rate
in Rs.
8.00
1.00
8.00
1.00
204.10
77.70
146.90
415.00
2.00
9.00
4.00
3.00
13.47
1.00
33.68
310.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
5.93
cum @
Lead Charges for 1 Km for CA
10.78
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
4.49
tonne @
Total cost for
13.47
Rate per
cum
(A+B+C+D)/13.47
IRR-DAW-2-10
Rs:
Rs:
Rs:
Rs:
Rs.
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
Amount
in Rs
413.60
308.00
6.70
77.00
64.00
61.60
930.90
Amount
in Rs
1632.80
77.70
1175.20
415.00
0.00
620.00
2790.00
1240.00
930.00
4175.70
310.00
2687.27
2687.27
18740.94
59683.55
930.90
18740.94
79355.39
10804.24
185.50884
325.44
581.77065
Rs: 91252.34
Rs: 6774.50
Providing and forming porous concrete body drain of size 68.5 x 68.5 cm
with 23 cm diameter central hole using cement and 20 mm down
approved, clean, hard, graded coarse aggregates in 1 : 3.50 proportion by
volume including cost of all materials, machinery, labour, formwork, curing
etc., complete with initial lead upto 1 km and all lifts.
(M15 Cement content : 400kg/cum, CA : 1cum,
Blending Ratio of CA -- 65:35)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
Cement
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Unit
kg
cum
cum
Quantity
3424
5.56
3.00
UNIT:
20.00 Rm
Rate
Amount
in Rs.
in Rs
6.30 21571.20
1210.00 6732.44
875.00 2621.50
71
B. MACHINERY:
Sl No
Description
1
2
sqm
Unit
76.00
Quantity
C. LABOUR:
Sl No
Description
Unit
55.13 4189.84
Rs: 35114.98
Rate
in Rs.
8.00
8.00
0.50
0.50
Quantity
1
2
3
4
51.70
38.50
6.70
77.00
Rs:
Rate
in Rs.
8.00
0.50
1.00
2.00
6.00
2.00
2.00
8.56
3.00
Amount
in Rs
204.10 1632.80
77.70 38.85
415.00 415.00
310.00
310.00
310.00
310.00
310.00
370.00
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for CA
8.56
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
3.42
tonne @
Total cost for
20.00
Rate per
Rm
(A+B+C+D)/20
IRR-DAW-2-11
(a)
Rs:
Rs:
Rs:
Rs:
Rs.
13.615%
30.2 Rs./Cum
129.7 Rs./Tonne
Rm
Amount
in Rs
413.60
308.00
3.35
38.50
763.45
620.00
1860.00
620.00
620.00
2653.60
1110.00
9570.25
35114.98
763.45
9570.25
45448.68
6187.84
258.51
444.0928
Rs: 52339.12
Rs: 2617.00
72
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
7
Cement mix
Cement for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Fine aggregate (Un-Screened )
Super plasticiser
Use rate of shuttering
Scaffolding of shuttering @
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
Unit
Quantity
kg
kg
cum
cum
cum
kg
sqm
3034.5
43.35
4.51
2.43
3.81
12.14
95.00
15%
LS
Unit
2.00
Quantity
51.70
38.50
8.00
7.70
6.70
77.00
Rs:
Amount
in Rs
413.60
308.00
64.00
61.60
3.35
38.50
889.05
8.00
0.50
8.00
2.00
1.00
204.10
77.70
146.90
415.00
400.00
Amount
in Rs
1632.80
38.85
1175.20
830.00
400.00
2.00
9.00
4.00
2.00
8.67
2.00
95.00
310.00
310.00
310.00
310.00
310.00
310.00
79.80
13.615%
Rs:
Rs:
Rs:
Rs:
Rs.
C. LABOUR:
Sl No
Description
Unit
UNIT:
36.00 Rm
Rate
Amount
in Rs.
in Rs
6.30 19117.35
6.30 273.11
1210.00 5457.10
875.00 2126.25
560.00 2133.60
95.00 1153.11
217.39 20652.05
3097.81
20.00 40.00
Rs: 54050.38
Rate
in Rs.
8.00
8.00
8.00
8.00
0.50
0.50
Quantity
1
2
3
4
5
6
Rate
in Rs.
620.00
2790.00
1240.00
620.00
2687.70
620.00
7581.00
1137.15
Rs: 21372.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
3.81
cum @
Lead Charges for 1 Km for CA
6.94
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
3.08
tonne @
Total cost for
36.00
Rate per
Rm
(A+B+C+D)/36
IRR-DAW-2-12
(b)
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
Rm
54050.38
889.05
21372.70
76312.13
10389.9
119.253
209.59
399.19715
Rs: 87430.07
Rs: 2428.60
73
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
7
Cement mix
Cenent for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Fine aggregate (Un-Screened )
Super plasticiser
Use rate of shuttering
Scaffolding of shuttering @
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
Unit
Quantity
kg
kg
cum
cum
cum
kg
sqm
2450
35.00
3.64
1.96
3.08
9.80
115.00
15%
LS
Unit
2.00
Quantity
51.70
38.50
8.00
7.70
6.70
77.00
Rs:
Amount
in Rs
413.60
308.00
64.00
61.60
3.35
38.50
889.05
8.00
0.50
8.00
2.00
1.00
204.10
77.70
146.90
415.00
400.00
Amount
in Rs
1632.80
38.85
1175.20
830.00
400.00
2.00
9.00
4.00
2.00
7.00
2.00
115.00
310.00
310.00
310.00
310.00
310.00
310.00
79.80
13.615%
Rs:
Rs:
Rs:
Rs:
Rs.
C. LABOUR:
Sl No
Description
Unit
UNIT:
36.00 Rm
Rate
Amount
in Rs.
in Rs
6.30 15435.00
6.30 220.50
1210.00 4404.40
875.00 1715.00
560.00 1724.80
95.00 931.00
217.39 24999.85
3749.98
20.00 40.00
Rs: 53220.53
Rate
in Rs.
8.00
8.00
8.00
8.00
0.50
0.50
Quantity
1
2
3
4
5
6
Rate
in Rs.
620.00
2790.00
1240.00
620.00
2170.00
620.00
9177.00
1376.55
Rs: 22690.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
3.08
cum @
Lead Charges for 1 Km for CA
5.60
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
2.49
tonne @
Total cost for
36.00
Rate per
Rm
(A+B+C+D)/36
IRR-DAW-2-13
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
Rm
53220.53
889.05
22690.40
76799.98
10456.32
96.404
169.12
322.3045
Rs: 87844.13
Rs: 2440.10
74
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
Unit
Quantity
kg
kg
cum
cum
cum
kg
sqm
LS
4446
58.50
6.084
3.276
5.265
17.78
5.85
5.00
Unit
Quantity
C. LABOUR:
Sl No
Description
UNIT:
11.70 cum
Rate
Amount
in Rs.
in Rs
6.30
28009.80
6.30
368.55
1210.00
7361.64
875.00
2866.50
560.00
2948.40
95.00
1689.48
217.39
1271.73
20.00
100.00
Rs:
44616.10
Rate
in Rs.
51.70
38.50
6.70
77.00
Rs:
Amount
in Rs
413.60
308.00
3.35
38.50
763.45
8.00
0.50
3.00
1.00
204.10
77.70
415.00
400.00
Amount
in Rs
1632.80
38.85
1245.00
400.00
2.00
9.00
4.00
5.00
11.70
1.00
5.85
310.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
620.00
2790.00
1240.00
1550.00
3627.00
310.00
466.83
13920.48
8.00
8.00
0.50
0.50
Unit
Quantity
1
2
3
4
5
Rate
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
44616.10
Rs:
763.45
Rs:
13920.48
Rs:
59300.03
Rs. 8073.7
164.7945
282.67
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
5.27
Lead Charges for 1 Km for CA
9.36
13.615%
cum @
cum @
31.3 Rs./Cum
30.2 Rs./Cum
IRR-DAW-2-14
DATA:
129.7 Rs./Tonne
cum
584.23365
Rs: 68405.43
Rs: 5846.60
Unit
Quantity
LS
3.00
0.00
Unit
Hour
Quantity
UNIT:
500 cum
Rate
Amount
in Rs.
in Rs
20.00 60.00
0.00 0.00
Rs:
60.00
Rate
in Rs.
24.00
Amount
in Rs
170.20 4084.80
75
Compressor 125 hp - 1 No
Condenser with 30 hp motor - 1 No.
Ice makers 10 t / day each - 3 Nos.
Pump 2 hp for ice cutting - 3 Nos.
Pump 2 hp for pumping water-3 Nos.
Screw conveyor with 15 hp motor -1
Ice elevator with 5 hp motor - 1 No.
Fuel / Energy charges for system
Hour
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Unit
24.00
Quantity
1
2
1097.10 26330.40
Rs: 30415.20
Rate
in Rs.
24.00
6.00
3.00
310.00 1860.00
310.00 930.00
Rs: 5730.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
500.00 cum
Rate per
cum
(A+B+C+D)/500
IRR-DAW-2-15
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
13.615%
60.00
30415.20
5730.00
36205.20
4929.34
41134.54
82.30
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
B. MACHINERY:
Sl No
Description
1
Unit
Quantity
kg
LS
Unit
0.60
2.00
Quantity
Nil
UNIT:
6.00 Nos.
Rate
Amount
in Rs.
in Rs
348.00 208.80
20.00 40.00
Rs: 248.80
Rate
in Rs.
Amount
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
Amount
in Rs
480.00
400.00
620.00
1500.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
Marker / Erector
work inspector
mazdoor
Unit
Quantity
Day
Day
Day
1.00
1.00
2.00
IRR-DAW-2-16
Amount
in Rs
122.50 2940.00
Total
13.615%
480.00
400.00
310.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
248.80
0.00
1500.00
1748.80
238.1
1986.90
331.20
Providing and constructing 150 mm dia hume pipe weep holes for
concrete / masonry walls including providing 20 x 20 x 20 cm size porous
concrete block made of cement and 20 mm down coarse aggregate in
1 : 4 proportion including 10 cm thick sand backing at the junction of wall
and soil back fill, cost of all materials, machinery, labour etc., complete
with lead upto 1 km and all lifts.
76
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
B. MACHINERY:
Sl No
Description
1
Unit
Quantity
Rm
kg
cum
cum
Unit
2.90
3.00
0.01
0.02
Quantity
Nil
UNIT:
3.00 Rm
Rate
Amount
in Rs.
in Rs
350.00 1015.00
6.30 18.90
1210.00 9.68
560.00 11.20
Rs: 1054.78
Rate
in Rs.
Amount
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
Amount
in Rs
370.00 92.50
310.00 77.50
Rs: 170.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
Mason Class-II
mazdoor
Unit
Quantity
Day
Day
0.25
0.25
IRR-DAW-2-17
Rs:
Rs:
Rs:
Rs:
Rs.
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
Rm
1054.78
0.00
170.00
1224.78
166.75
0.626
0.24
0.3891
Rs: 1392.79
Rs: 464.30
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
Quantity
kg
kg
kg
Nos
sqm
LS
Unit
50.70
104.50
27.40
70.00
1.00
1.50
Quantity
Welding set
Hour
Fuel / Energy charges
Hour
Sundries (cutting torch/ welding guns etc)
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
Unit
Unit
UNIT:
7.50 Rm
Rate
Amount
in Rs.
in Rs
40.00 2028.00
40.00 4180.00
40.00 1096.00
11.00 770.00
650.00 650.00
20.00 30.00
Rs: 8754.00
Rate
in Rs.
8.00
8.00
2.00
Quantity
Day
Day
Day
Total cost of Labour
labour component/unit qty
261.70
Add contractor's profit and overhead charges
13.615% 35.60
labour component/unit qty (including contractor's profit)
297.30
16.00
92.40
20.00
Rs:
Amount
in Rs
128.00
739.20
40.00
907.20
480.00
415.00
310.00
Rs:
Amount
in Rs
720.00
622.50
620.00
1962.50
Rate
in Rs.
1.50
1.50
2.00
77
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
0.18
tonne @
7.50
(A+B+C+D)/7.50
IRR_DAW-3
IRR-DAW-3-1
DATA:
Rs:
Rs:
Rs:
Rs:
Rs.
151.5 Rs./Tonne
Rm
27.6639
Rs: 13233.93
Rs: 1764.50
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
B. MACHINERY:
Sl No
Description
1
2
C. LABOUR:
Sl No
Description
UNIT:
25.00
Unit
Quantity
kg
cum
cum
cum
Total cost of Materials
Unit
4750
21.25
3.75
10
Hour
Hour
Hour
Hour
Unit
Rate
in Rs.
6.30
330.00
360.00
760.00
Rs:
Quantity
Rate
in Rs.
51.70
38.50
6.70
77.00
Rs:
8.00
1.00
1.00
2.50
4.00
16.00
204.10
77.70
400.00
415.00
370.00
370.00
Amount
in Rs
1632.80
77.70
400.00
1037.50
1480.00
5920.00
2.00
6.00
4.00
10.00
1.00
4.00
12.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
620.00
1860.00
1240.00
3100.00
310.00
1240.00
3720.00
22638.00
Rs:
Rs:
Rs:
Rs:
Rs.
45887.50
805.30
22638.00
69330.80
9439.39
313
755.00
Quantity
Rate
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
10.00
cum @
Lead Charges for 1 Km for Stones/Stone Chips
25.00
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
4.75
tonne @
Total cost for
25.00
Rate per
cum
(A+B+C+D)/25
cum
Amount
in Rs
29925.00
7012.50
1350.00
7600.00
45887.50
Amount
in Rs
413.60
308.00
6.70
77.00
805.30
8.00
8.00
1.00
1.00
1
2
3
4
5
6
7
IRR-DAW-3-2
8754.00
907.20
1962.50
11623.70
1582.57
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
616.075
Rs: 80454.27
Rs: 3218.20
Providing and constructing un-coursed rubble stone masonry using approved stones in
cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding,
cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto
1 km and all lifts.
( Cement content : 143 kg/cum of masonry, rubble stones : 0.85 cum,
78
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
B. MACHINERY:
Sl No
Description
1
2
C. LABOUR:
Sl No
Description
Unit
Quantity
kg
cum
cum
cum
Unit
3575
21.25
3.75
10
Quantity
Hour
Hour
Hour
Hour
Unit
UNIT:
25.00 cum
Rate
Amount
in Rs.
in Rs
6.30 22522.50
330.00 7012.50
360.00 1350.00
760.00 7600.00
Rs:
38485.00
Rate
in Rs.
51.70
38.50
6.70
77.00
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
805.30
8.00
1.00
1.00
2.50
4.00
16.00
204.10
77.70
400.00
415.00
370.00
370.00
Amount
in Rs
1632.80
77.70
400.00
1037.50
1480.00
5920.00
2.00
6.00
4.00
10.00
1.00
4.00
12.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
620.00
1860.00
1240.00
3100.00
310.00
1240.00
3720.00
22638.00
Rs:
Rs:
Rs:
Rs:
Rs.
38485.00
805.30
22638.00
61928.30
8431.54
313
755.00
8.00
8.00
1.00
1.00
Quantity
1
2
3
4
5
6
7
Rate
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
10.00
cum @
Lead Charges for 1 Km for Stones/Stone Chips
25.00
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
3.58
tonne @
Total cost for
25.00
Rate per
cum
(A+B+C+D)/25
IRR-DAW-3-3
Total
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
463.6775
Rs: 71891.52
Rs: 2875.70
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
Unit
Quantity
4450
244
82
8.75
3.75
9.375
UNIT:
25.00 cum
Rate
Amount
in Rs.
in Rs
6.30 28035.00
22.00 5368.00
28.00 2296.00
330.00 2887.50
360.00 1350.00
760.00 7125.00
Rs: 47061.50
79
B. MACHINERY:
Sl No
Description
Unit
Quantity
Rate
in Rs.
51.70
38.50
6.70
77.00
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
805.30
8.00
1.00
1.00
7.00
2.50
4.00
16.00
204.10
77.70
400.00
370.00
415.00
370.00
370.00
Amount
in Rs
1632.80
77.70
400.00
2590.00
1037.50
1480.00
5920.00
2.00
6.00
4.00
10.00
1.00
4.00
12.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
620.00
1860.00
1240.00
3100.00
310.00
1240.00
3720.00
25228.00
Rs:
Rs:
Rs:
Rs:
Rs.
47061.50
805.30
25228.00
73094.80
9951.86
293.4375
809.66
8.00
8.00
1.00
1.00
Quantity
1
2
3
4
5
6
7
8
Rate
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
9.38
Lead Charges for 1 Km for Stones/Stone Chips
26.81
13.615%
cum @
cum @
31.3 Rs./Cum
30.2 Rs./Cum
IRR-DAW-3-4
129.7 Rs./Tonne
cum
577.165
Rs: 84726.92
Rs: 3389.10
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
Quantity
kg
Nos
Nos
cum
cum
cum
Unit
3350
244
82
8.75
3.75
9.375
Quantity
C. LABOUR:
Sl No
Description
1
Unit
Unit
Hour
UNIT:
25.00 cum
Rate
Amount
in Rs.
in Rs
6.30 21105.00
22.00 5368.00
28.00 2296.00
330.00 2887.50
360.00 1350.00
760.00 7125.00
Rs: 40131.50
Rate
in Rs.
8.00
8.00
1.00
1.00
Quantity
51.70
38.50
6.70
77.00
Rs:
Rate
in Rs.
8.00
Amount
in Rs
413.60
308.00
6.70
77.00
805.30
Amount
in Rs
204.10 1632.80
80
2
3
4
5
6
7
8
1.00
1.00
7.00
2.50
4.00
16.00
77.70
400.00
370.00
415.00
370.00
370.00
77.70
400.00
2590.00
1037.50
1480.00
5920.00
2.00
6.00
4.00
10.00
1.00
4.00
12.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
620.00
1860.00
1240.00
3100.00
310.00
1240.00
3720.00
25228.00
Rs:
Rs:
Rs:
Rs:
Rs.
40131.50
805.30
25228.00
66164.80
9008.34
293.4375
809.66
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
9.38
cum @
Lead Charges for 1 Km for Stones/Stone Chips
26.81
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
3.35
tonne @
Total cost for
25.00
Rate per
cum
(A+B+C+D)/25
IRR-DAW-3-5
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
434.495
Rs: 76710.73
Rs: 3068.40
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
Quantity
kg
Nos
Nos
cum
cum
cum
Unit
4175
250
85
8.75
3.75
8.75
Quantity
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
Unit
Unit
UNIT:
25.00 cum
Rate
Amount
in Rs.
in Rs
6.30 26302.50
22.00 5500.00
28.00 2380.00
330.00 2887.50
360.00 1350.00
760.00 6650.00
Rs: 45070.00
Rate
in Rs.
8.00
8.00
1.00
1.00
Quantity
51.70
38.50
6.70
77.00
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
805.30
Rate
in Rs.
Hour
Hour
Day
Day
Day
Day
Day
Day
8.00
1.00
1.00
14.00
7.00
2.50
4.00
16.00
204.10
77.70
400.00
415.00
370.00
415.00
370.00
370.00
Amount
in Rs
1632.80
77.70
400.00
5810.00
2590.00
1037.50
1480.00
5920.00
Day
Day
Day
Day
Day
2.00
6.00
4.00
10.00
1.00
310.00
310.00
310.00
310.00
310.00
620.00
1860.00
1240.00
3100.00
310.00
81
4.00
12.00
310.00 1240.00
310.00 3720.00
Rs: 31038.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Rs.
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
8.75
Lead Charges for 1 Km for Stones/Stone Chips
27.22
13.615%
cum @
cum @
31.3 Rs./Cum
30.2 Rs./Cum
IRR-DAW-3-6
129.7 Rs./Tonne
cum
45070.00
805.30
31038.00
76913.30
10471.75
273.875
821.89
541.4975
Rs: 89022.32
Rs: 3560.90
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
Unit
Quantity
kg
Nos
Nos
cum
cum
cum
Unit
3125
250
85
8.75
3.75
8.75
Quantity
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
Unit
UNIT:
25.00 cum
Rate
Amount
in Rs.
in Rs
6.30 19687.50
22.00 5500.00
28.00 2380.00
330.00 2887.50
360.00 1350.00
760.00 6650.00
Rs: 38455.00
Rate
in Rs.
51.70
38.50
6.70
77.00
Rs:
Amount
in Rs
413.60
308.00
6.70
77.00
805.30
8.00
1.00
1.00
14.00
7.00
2.50
4.00
16.00
204.10
77.70
400.00
415.00
370.00
415.00
370.00
370.00
Amount
in Rs
1632.80
77.70
400.00
5810.00
2590.00
1037.50
1480.00
5920.00
2.00
6.00
4.00
10.00
1.00
4.00
12.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
620.00
1860.00
1240.00
3100.00
310.00
1240.00
3720.00
31038.00
8.00
8.00
1.00
1.00
Quantity
Rate
in Rs.
Rs: 38455.00
Rs: 805.30
Rs: 31038.00
82
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
8.75
cum @
Lead Charges for 1 Km for Stones/Stone Chips
27.22
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
3.13
tonne @
Total cost for
25.00
Rate per
cum
(A+B+C+D)/25
IRR-DAW-3-7
Rs: 70298.30
Rs. 9571.11
273.875
821.89
13.615%
31.3 Rs./Cum
30.2 Rs./Cum
129.7 Rs./Tonne
cum
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
Cement
Sand (Screened )
Unit
Quantity
kg
cum
455.446
0.735
Unit
Quantity
1 NIL
(Manual mixing )
1
2
UNIT:
100.00 sqm
Rate
Amount
in Rs.
in Rs
6.30 2869.31
760.00 558.60
Rs: 3427.91
Rate
in Rs.
Amount
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
Amount
in Rs
415.00 4150.00
310.00 3100.00
Rs: 7250.00
0.00
0.00
Quantity
Day
Day
10.00
10.00
IRR-DAW-3-8
405.3125
Rs: 81370.49
Rs: 3254.80
Rs:
Rs:
Rs:
Rs:
Rs.
13.615%
31.3 Rs./Cum
129.7 Rs./Tonne
sqm
3427.91
0.00
7250.00
10677.91
1453.8
23.0055
59.071346
Rs: 12213.79
Rs: 122.10
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
Cement
Sand (Screened )
Unit
Quantity
kg
cum
321.80
0.74
Unit
Quantity
NIL
Manual mixing )
UNIT:
100.00 sqm
Rate
Amount
in Rs.
in Rs
6.30 2027.34
760.00 558.60
Rs: 2585.94
Rate
in Rs.
Amount
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
Amount
in Rs
415.00 4150.00
310.00 3100.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
Mason Class-I
mazdoor
Unit
Day
Day
Quantity
10.00
10.00
83
Rs: 7250.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
0.74
cum @
Lead Charges for 1Km for Cement (including Loading
and Unloading Charges)
0.32
tonne @
Total cost for
100.00
Rate per
sqm
(A+B+C+D)/100
IRR_DAW-4
IRR-DAW-4-1
DATA:
Rs:
Rs:
Rs:
Rs:
Rs.
13.615%
31.3 Rs./Cum
129.7 Rs./Tonne
sqm
2585.94
0.00
7250.00
9835.94
1339.16
23.0055
41.73746
Rs: 11239.84
Rs: 112.40
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
Cement
Sand (Screened )
Use rate of grout hose 25 m
Use rate of water hose 25 m
Use rate of guniting nozzle
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
4
Unit
Quantity
kg
cum
Hour
Hour
Hour
LS
609.90
1.09
8.00
8.00
8.00
2.00
Unit
Quantity
Guniting equipment
Hour
Fuel / Energy charges
Hour
Air compressor 8.5 cmm ( ele )
Hour
Fuel / Energy charges
Hour
Pump 10 hp ( ele )
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
UNIT :
36.00 sqm
Rate
Amount
in Rs.
in Rs
6.30 3842.37
760.00 828.40
5.78 46.25
5.78 46.25
3.50 28.00
20.00 40.00
Rs: 4831.27
Rate
in Rs.
110.10
0.00
170.80
433.10
6.70
77.00
20.00
Rs:
Amount
in Rs
880.80
0.00
1366.40
3464.80
6.70
77.00
40.00
5835.70
8.00
8.00
1.00
1.00
204.10
153.10
77.70
370.00
Amount
in Rs
1632.80
1224.80
77.70
370.00
2.00
2.00
2.00
310.00
310.00
310.00
Rs:
620.00
620.00
620.00
5165.30
8.00
8.00
8.00
8.00
1.00
1.00
2.00
Unit
Quantity
1
2
3
4
5
Rate
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
Add for scaffolding
3%
Total
13.615%
31.3 Rs./Cum
129.7 Rs./Tonne
sqm
4831.27
5835.70
5165.30
15832.27
395.81
Rs: 16228.08
Rs. 2209.45
34.117
79.10403
Rs: 18550.75
Rs: 515.30
84
IRR-DAW-4-2
DATA:
B. MACHINERY:
Sl No
Description
Unit
Quantity
kg
kg
Rm
kg
LS
LS
Unit
215.00
30.00
24.00
192.00
5.00
40.00
Quantity
Welder
Tinsmith
Bar bender
Pipe fitter
Mason Class-I
mazdoor
Unit
UNIT:
12.00 Rm
Rate
Amount
in Rs.
in Rs
680.00 146200.00
40.00 1200.00
110.00 2640.00
4.00 768.00
17.00 85.00
17.00 680.00
Rs:
151573.00
Rate
in Rs.
Amount
in Rs
17.00 136.00
17.00 170.00
Rs: 306.00
Rate
in Rs.
Amount
in Rs
415.00
415.00
245.00
240.00
207.50
310.00
1832.50
8.00
10.00
Quantity
Day
Day
Day
Day
Day
Day
1.00
1.00
0.50
0.50
0.50
1.00
415.00
415.00
490.00
480.00
415.00
310.00
Rs:
IRR-DAW-4-3
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
151573.00
306.00
1832.50
153711.50
20927.82
174639.32
14553.30
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
Unit
Quantity
Rm
kg
Rm
kg
LS
LS
Unit
LS
LS
24.50
30.00
24.00
192.00
5.00
25.00
Quantity
UNIT:
12.00 Rm.
Rate
Amount
in Rs.
in Rs
485.00 11882.50
40.00 1200.00
110.00 2640.00
4.00 768.00
17.00 85.00
17.00 425.00
Rs: 17000.50
Rate
in Rs.
8.00
10.00
Amount
in Rs
17.00 136.00
17.00 170.00
85
Welder
Bar bender
Pipe fitter
Mason Class-I
mazdoor
Unit
Rs: 306.00
Quantity
Day
Day
Day
Day
Day
Rate
in Rs.
0.50
0.50
0.50
0.50
1.00
IRR-DAW-4-4
17000.50
306.00
1210.00
18516.50
2521.02
21037.52
1753.10
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
B. MACHINERY:
Sl No
Description
1
C. LABOUR:
Sl No
Description
1
2
3
4
5
Welder
Tinsmith
Bar bender
Mason Class-I
mazdoor
Unit
Quantity
kg
kg
LS
Unit
77.00
15.00
10.00
Quantity
LS
LS
Unit
UNIT:
8.7 Rm
Rate
Amount
in Rs.
in Rs
680.00 52360.00
40.00 600.00
17.00 170.00
Rs: 53130.00
Rate
in Rs.
Amount
in Rs
20.00 60.00
17.00 85.00
Rs: 145.00
Rate
in Rs.
415.00
415.00
490.00
415.00
310.00
Rs:
Amount
in Rs
207.50
207.50
245.00
207.50
155.00
1022.50
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
53130.00
145.00
1022.50
54297.50
7392.6
61690.10
7090.80
3.00
5.00
Quantity
Day
Day
Day
Day
Day
0.5
0.5
0.5
0.5
0.5
DATA:
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
DATA:
IRR-DAW-4-5
415.00
490.00
480.00
415.00
310.00
Rs:
Amount
in Rs
207.50
245.00
240.00
207.50
310.00
1210.00
Unit
Quantity
Rate
UNIT:
8.70 Rm
Amount
86
in Rs.
1
2
3
B. MACHINERY:
Sl No
Description
1
Unit
9.00
10.00
2.00
Quantity
C. LABOUR:
Sl No
Description
1
2
3
4
Rm
kg
LS
Welder
Bar bender
Mason Class-I
mazdoor
Unit
47.00
40.00
17.00
Rs:
Rate
in Rs.
Amount
in Rs
20.00 10.00
17.00 8.50
18.50
Rate
in Rs.
Amount
in Rs
207.50
245.00
207.50
155.00
815.00
0.50
0.50
Quantity
Day
Day
Day
Day
0.50
0.50
0.50
0.50
415.00
490.00
415.00
310.00
Rs:
IRR-DAW-5-1
DATA:
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Total
13.615%
IRR_DAW-5
in Rs
423.00
400.00
34.00
857.00
857.00
18.50
815.00
1690.50
230.16
1920.66
220.80
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
Unit
Quantity
1 NIL
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
Quantity
Angle dozer 90 hp
Hour
Fuel / Energy charges
Hour
Shovel 0.85 cum capacity
Hour
Fuel / Energy charges
Hour
Tippers 5.00 cum capacity 5 Nos.
Hour
Fuel / Energy charges
Hour
Pump 5 hp ( ele )
Hour
Fuel / Energy charges
Hour
Water tanker 8000 ltr
Hour
Fuel / Energy charges
Hour
Vibratory Roller 8 tonne
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
Unit
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Day
5.50
5.50
8.00
8.00
40.00
40.00
4.00
4.00
8.00
8.00
6.50
6.50
2.00
Quantity
5.50
8.00
40.00
4.00
8.00
6.50
2.00
UNIT
825.00 cum
Rate
Amount
in Rs.
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
1715.50
625.30
1706.60
893.90
446.70
307.20
3.00
38.50
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs
9435.25
3439.15
13652.80
7151.20
17868.00
12288.00
12.00
154.00
3220.00
2457.60
8724.30
6866.60
40.00
85308.90
Rate
in Rs.
Amount
in Rs
1215.50
1768.00
6632.00
310.80
1326.40
1591.85
800.00
221.00
221.00
165.80
77.70
165.80
244.90
400.00
87
mazdoor
Day
Total cost of Labour
labour component/unit qty
18.00
Add contractor's profit and overhead charges
13.615% 2.50
labour component/unit qty (including contractor's profit)
20.50
4.00
310.00 1240.00
Rs: 14884.55
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
IRR-DAW-5-2
0.00
85308.90
14884.55
100193.45
13641.34
113834.79
138.00
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
Unit
Quantity
1 NIL
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No Description
1
2
3
4
5
6
7
Unit
Quantity
Angle dozer 90 hp
Hour
Fuel / Energy charges
Hour
Shovel 0.85 cum capacity
Hour
Fuel / Energy charges
Hour
Tippers 5.00 cum capacity 6 Nos.
Hour
Fuel / Energy charges
Hour
Pump 5 hp ( ele )
Hour
Fuel / Energy charges
Hour
Water tanker 8000 ltr
Hour
Fuel / Energy charges
Hour
Vibratory Roller 8 tonne
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No Description
Unit
5.50
5.50
8.00
8.00
48.00
48.00
4.00
4.00
8.00
8.00
6.50
6.50
2.00
Quantity
1
2
3
4
5
6
7
8
5.50
8.00
48.00
4.00
8.00
6.50
2.00
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
825.00 cum
Rate per
cum
(A+B+C+D)/825
IRR-DAW-5-3
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Total
13.615%
UNIT :
825.00 cum
Rate
Amount
in Rs.
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
1715.50
625.30
1706.60
893.90
446.70
307.20
3.00
38.50
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs
9435.25
3439.15
13652.80
7151.20
21441.60
14745.60
12.00
154.00
3220.00
2457.60
8724.30
6866.60
40.00
91340.10
Rate
in Rs.
221.00
221.00
165.80
77.70
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs
1215.50
1768.00
7958.40
310.80
1326.40
1591.85
800.00
1240.00
16210.95
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
0.00
91340.10
16210.95
107551.05
14643.08
122194.13
148.10
88
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
Unit
UNIT :
630 cum
Rate
Amount
in Rs.
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Quantity
1 NIL
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
Quantity
Angle dozer 90 hp
Hour
Fuel / Energy charges
Hour
Shovel 0.85 cum
Hour
Fuel / Energy charges
Hour
Tipper 5 cum
Hour
Fuel / Energy charges
Hour
Pump 5 hp ( ele )
Hour
Fuel / Energy charges
Hour
Water tanker 8000 ltr
Hour
Fuel / Energy charges
Hour
Vibratory Roller 8 tonne
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
Unit
Unit
4.00
4.00
8.00
8.00
32.00
32.00
3.00
3.00
5.00
5.00
5.00
5.00
5.00
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Total cost of Labour
labour component/unit qty
19.50
Add contractor's profit and overhead charges
13.615% 2.70
labour component/unit qty (including contractor's profit)
22.20
Rate
in Rs.
1715.50
625.30
1706.60
893.90
446.70
307.20
3.00
38.50
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs
6862.00
2501.20
13652.80
7151.20
14294.40
9830.40
9.00
115.50
2012.50
1536.00
6711.00
5282.00
100.00
70058.00
Rate
in Rs.
221.00
221.00
165.80
77.70
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs
884.00
1768.00
5305.60
233.10
829.00
1224.50
800.00
1240.00
12284.20
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
0.00
70058.00
12284.20
82342.20
11210.89
93553.09
148.50
4.00
8.00
32.00
3.00
5.00
5.00
2.00
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
630.00 cum
Rate per
cum
(A+B+C+D)/630
IRR-DAW-5-4
Total
13.615%
DATA:
RATE ANALYSIS
UNIT :
A. MATERIALS:
Sl No
Particulars
Unit
Quantity
1 NIL
Rate
in Rs.
0.00
0.00
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.85 cum
Fuel / Energy charges
Unit
Hour
Hour
Hour
Hour
Quantity
4.60
4.60
8.00
8.00
970.00 cum
Amount
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
1715.50
625.30
1706.60
893.90
Amount
in Rs
7891.30
2876.38
13652.80
7151.20
89
3
4
5
6
7
Tipper 5 cum
Fuel / Energy charges
Pump 5 hp ( ele )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
48.00
48.00
4.00
4.00
8.00
8.00
7.00
7.00
5.00
446.70
307.20
3.00
38.50
402.50
307.20
1342.20
1056.40
20.00
Rs:
Quantity
1
2
3
4
5
6
7
8
Rate
in Rs.
4.60
8.00
48.00
4.00
8.00
7.00
2.00
4.00
221.00
221.00
165.80
77.70
165.80
244.90
400.00
310.00
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
13.615%
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
21441.60
14745.60
12.00
154.00
3220.00
2457.60
9395.40
7394.80
100.00
90492.68
Amount
in Rs
1016.60
1768.00
7958.40
310.80
1326.40
1714.30
800.00
1240.00
16134.50
0.00
90492.68
16134.50
106627.18
14517.29
121144.47
124.90
DATA:
RATE ANALYSIS
UNIT :
A. MATERIALS:
Sl No
Particulars
Unit
Quantity
1 NIL
Rate
in Rs.
0.00
0.00
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.85 cum
Fuel / Energy charges
Tipper 5 cum
Fuel / Energy charges
Pump 5 hp ( ele )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Hour
Hour
Hour
Hour
Hour
Hour
4.60
4.60
8.00
8.00
48.00
48.00
4.00
4.00
8.00
8.00
7.00
7.00
5.00
Quantity
4.60
8.00
48.00
4.00
8.00
7.00
970.00 cum
Amount
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
1715.50
625.30
1706.60
893.90
446.70
307.20
3.00
38.50
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs
7891.30
2876.38
13652.80
7151.20
21441.60
14745.60
12.00
154.00
3220.00
2457.60
9395.40
7394.80
100.00
90492.68
Rate
in Rs.
Amount
in Rs
1016.60
1768.00
7958.40
310.80
1326.40
1714.30
221.00
221.00
165.80
77.70
165.80
244.90
90
7
8
work inspector
mazdoor
Day
Day
2.00
4.00
400.00 800.00
310.00 1240.00
Rs: 16134.50
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
Total
D.Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
970.00 cum
Rate per
cum
(A+B+C+D)/970
Deduct Rate for Proctar's density Control of 95% using 8T roller as per IRR-PMW-3-23
Add Rate for Proctor's Density control of 90% using 2T Roller as per IRR-PMW-3-24
Rate per
cum
Rs.
IRR-DAW-5-5
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
Unit
Quantity
NIL
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
Unit
Quantity
Angle dozer 90 hp
Hour
Fuel / Energy charges
Hour
Shovel 0.85 cum capacity
Hour
Fuel / Energy charges
Hour
Tippers 5.00 cum capacity 5 Nos.
Hour
Fuel / Energy charges
Hour
Pump 5 hp ( ele )
Hour
Fuel / Energy charges
Hour
Water tanker 8000 ltr
Hour
Fuel / Energy charges
Hour
Vibratory Roller 8 tonne
Hour
Fuel / Energy charges
Hour
Sundries
LS
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Unit
5.40
5.40
8.00
8.00
40.00
40.00
4.00
4.00
8.00
8.00
6.40
6.40
2.00
Quantity
1
2
3
4
5
6
7
8
5.40
8.00
40.00
4.00
8.00
6.40
2.00
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
807.00 cum
Rate per
cum
(A+B+C+D)/807
IRR-DAW-5-6
0.00
90492.68
16134.50
106627.18
14517.29
121144.47
124.90
45.60
6.10
85.40
Total
13.615%
UNIT :
807.00 cum
Rate
Amount
in Rs.
in Rs
0.00 0.00
0.00 0.00
Rs: 0.00
Rate
in Rs.
1715.50
625.30
1706.60
893.90
446.70
307.20
3.00
38.50
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs
9263.70
3376.62
13652.80
7151.20
17868.00
12288.00
12.00
154.00
3220.00
2457.60
8590.08
6760.96
40.00
84834.96
Rate
in Rs.
Amount
in Rs
1193.40
1768.00
6632.00
310.80
1326.40
1567.36
800.00
1240.00
14837.96
221.00
221.00
165.80
77.70
165.80
244.90
400.00
310.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
0.00
84834.96
14837.96
99672.92
13570.47
113243.39
140.30
Providing embankment adjacent to masonry / concrete structures and filling trial pits
91
using impervious soil from approved borrow areas in layers of 10 to 15 cm and compacting
each layer to density control of not less than 95 percent using pneumatic tampers or by
vibratory earth rammers including cost of all materials, machinery, labour, picking previous
layer, spreading soil in layer, breaking clods, watering etc., complete with initial lead upto
1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
UNIT :
Unit
Quantity
Hour
Rate
in Rs.
16.00
0.00
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.85 cum
Fuel / Energy charges
Tipper 5 cum
Fuel / Energy charges
Air compressor 8.5 cmm ( ele )
Fuel / Energy charges
Pump 5 hp ( ele )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Pneumatic tampers 2 Nos.
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No Description
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
0.15
0.15
0.80
0.80
3.00
3.00
8.00
8.00
0.40
0.40
0.80
0.80
16.00
16.00
1.00
Unit
Quantity
1
2
3
4
5
6
7
8
9
Rate
in Rs.
1715.50
625.30
1706.60
893.90
446.70
307.20
170.80
433.10
3.00
38.50
402.50
307.20
20.70
0.00
20.00
Rs:
Amount
in Rs
257.33
93.80
1365.28
715.12
1340.10
921.60
1366.40
3464.80
1.20
15.40
322.00
245.76
331.20
0.00
20.00
10459.98
Rate
in Rs.
Amount
in Rs
33.15
176.80
497.40
1224.80
31.08
132.64
3918.40
400.00
1550.00
7964.27
0.15
0.80
3.00
8.00
0.40
0.80
16.00
1.00
5.00
221.00
221.00
165.80
153.10
77.70
165.80
244.90
400.00
310.00
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
80.00 cum
Rate per
cum
(A+B+C+D)/80
IRR-DAW-5-7
80 cum
Amount
in Rs
11.56
185.00
0.00
0.00
Rs:
185.00
Rs:
185.00
Rs:
10459.98
Rs:
7964.27
Rs:
18609.25
Rs. 2533.65
Rs: 21142.90
Rs: 264.30
Total
13.615%
Providing and constructing rockfill embankment with 300 mm down graded stones and
quarry spalls from approved source including cost of all materials, machinery, labour, spreading
stones and spalls in layers, hand packing, wedging, finishing the surface to required slopes
etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
6
7
UNIT :
Unit
400
Quantity
Rate
in Rs.
Rm
387.00
42.67
10%
Hour
kg
Nos
Nos
Rm
LS
60.00
118.00
159.00
8.00
200.00
10.00
11.56
70.00
13.00
7.00
11.00
20.00
Rs:
cum
Amount
in Rs
16512.00
1651.20
693.75
8260.00
2067.00
56.00
2200.00
200.00
31639.95
92
B. MACHINERY:
Sl No Description
1
2
3
4
5
Unit
Quantity
C. LABOUR:
Sl No Description
Rate
in Rs.
30.00
30.00
60.00
60.00
4.00
4.00
8.00
8.00
24.00
24.00
Unit
Quantity
1
2
3
4
5
6
7
8
9
10
275.60
914.20
19.80
0.00
1715.50
625.30
1706.60
893.90
446.70
307.20
Rs:
Rate
in Rs.
30.00
60.00
8.00
24.00
4.00
1.00
1.00
2.00
2.00
10.00
195.90
306.20
221.00
165.80
221.00
480.00
370.00
400.00
370.00
310.00
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
400.00 cum
Rate per
cum
(A+B+C+D)/400
IRR-DAW-5-8
Amount
in Rs
8268.00
27426.00
1188.00
0.00
6862.00
2501.20
13652.80
7151.20
10720.80
7372.80
85142.80
Amount
in Rs
5877.00
18372.00
1768.00
3979.20
884.00
480.00
370.00
800.00
740.00
3100.00
36370.20
Rs:
31639.95
Rs:
85142.80
Rs:
36370.20
Rs: 153152.95
Rs. 20851.77
Rs: 174004.72
Rs: 435.00
Total
13.615%
Providing and constructing dry rubble rock-toe using rubble and stone chips from
approved source including cost of all materials, machinery, labour, hand packing rubble
and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto
1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
6
7
B. MACHINERY:
Sl No Description
1
2
3
4
UNIT :
Unit
Quantity
Rm
97.00
10%
Hour
kg
Nos
Nos
Rm
LS
15.00
30.00
40.00
2.00
50.00
2.00
Unit
Quantity
C. LABOUR:
Sl No Description
Rate
in Rs.
Unit
Rate
in Rs.
7.50
7.50
15.00
15.00
2.00
2.00
6.00
6.00
Quantity
100 cum
Amount
in Rs
42.67
4138.67
413.87
11.56
173.44
70.00
2100.00
13.00
520.00
7.00
14.00
11.00
550.00
20.00
40.00
Rs:
7949.97
275.60
914.20
19.80
0.00
1706.60
893.90
446.70
307.20
Rs:
Rate
in Rs.
Amount
in Rs
2067.00
6856.50
297.00
0.00
3413.20
1787.80
2680.20
1843.20
18944.90
Amount
in Rs
93
1
2
3
4
5
6
7
8
9
7.50
15.00
2.00
6.00
0.50
1.00
1.00
7.00
19.00
195.90
306.20
221.00
165.80
480.00
370.00
400.00
370.00
310.00
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
100.00 cum
Rate per
cum
(A+B+C+D)/100
IRR-DAW-5-9
Note:
DATA:
1469.25
4593.00
442.00
994.80
240.00
370.00
400.00
2590.00
5890.00
16989.05
Rs:
7949.97
Rs:
18944.90
Rs:
16989.05
Rs:
43883.92
Rs. 5974.8
Rs: 49858.72
Rs: 498.60
Total
13.615%
Providing and constructing dry rubble rock-toe with rubble and stone chips from dump
yard (Spoil Bank) including cost of all materials, machinery, labour, hand packing rubble and stone chips,
finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all
lifts.
Useful rubble and stone chips will be issued at dump yard at the issue rate for usefull rubble /
stone chips. Sorting out and breaking charges included in rate analysis.
RATE ANALYSIS
UNIT :
100 cum
A. MATERIALS:
Sl No Particulars
Unit
Quantity
Rate
Amount
in Rs.
in Rs
1
Useful rubble ( at dump yard )
cum
100.00
165.00
16500.00
2
Useful stone chips ( at dump yard )
cum
15.00
185.00
2775.00
Total cost of Materials
Rs:
19275.00
B. MACHINERY:
Sl No Description
1
2
Quantity
C. LABOUR:
Sl No Description
1
2
3
4
6
7
Unit
Unit
Hour
Hour
Day
Day
Day
Day
2.00
2.00
6.00
6.00
Quantity
2.00
6.00
7.00
1.00
2.00
21.00
Total
13.615%
Rate
in Rs.
1706.60
893.90
446.70
307.20
Rs:
Amount
in Rs
3413.20
1787.80
2680.20
1843.20
9724.40
Rate
in Rs.
Amount
in Rs
442.00
994.80
2590.00
400.00
740.00
6510.00
11676.80
221.00
165.80
370.00
400.00
370.00
310.00
Rs:
Rs:
19275.00
Rs:
9724.40
Rs:
11676.80
Rs:
40676.20
Rs. 5538.06
Rs: 46214.26
Rs: 462.10
Providing and constructing Dry rock Pitching for Groynes using Un-Coursed rubble stone of size 300 mm thick
IRR-DAW-5-9-A
(New Item 4 -2012-13) and Un-Coursed rubble stone chips from Quarry to site of work including cost of all materials, Machinery, Labour charge
hand packing Un-Course rubble stone &chips to the designed profile with all leads and lifts etc
94
DATA:
RATE ANALYSIS
UNIT :
A. MATERIALS:
Sl No Particulars
1
2
Unit
100 cum
Quantity
cum
cum
Rate
in Rs.
100.00
15.00
330.00
360.00
Rs:
1
2
Unit
C. LABOUR:
Sl No Description
1
2
3
4
6
7
Quantity
2.00
2.00
6.00
6.00
Unit
Rate
in Rs.
Quantity
Hour
Hour
Day
Day
Day
Day
Rate
in Rs.
221.00
165.80
370.00
400.00
370.00
310.00
Rs:
IRR-DAW-5-10
Amount
in Rs
1706.60
893.90
446.70
307.20
Rs:
2.00
6.00
7.00
1.00
2.00
21.00
Amount
in Rs
33000.00
5400.00
38400.00
3413.20
1787.80
2680.20
1843.20
9724.40
Amount
in Rs
442.00
994.80
2590.00
400.00
740.00
6510.00
11676.80
Rs:
38400.00
Rs:
9724.40
Rs:
11676.80
Rs:
59801.20
Rs. 8141.93
Rs: 67943.13
Rs: 679.40
Total
13.615%
Providing and laying 30 cm diameter open jointed hume pipes with collars in rock-toe for
drainage including cost of all materials, machinery, labour etc., complete with lead upto 1 km
and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
UNIT :
Unit
Quantity
Rm
Rate
in Rs.
100.00
0.00
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Mason Cl- II
mazdoor
Unit
Day
Day
0.00
0.00
Rs:
Quantity
Rate
in Rs.
2
6
100 Rm
Amount
in Rs
700.00
70000.00
0.00
Rs:
70000.00
Total
13.615%
370.00
310.00
Rs:
Amount
in Rs
0.00
0.00
0.00
Amount
in Rs
740.00
1860.00
2600.00
Rs:
70000.00
Rs:
0.00
Rs:
2600.00
Rs:
72600.00
Rs. 9884.49
Rs: 82484.49
Rs: 824.80
95
IRR_DAW-6
IRR-DAW-6-1
Providing and constructing 1.20 m internal diameter and average 3 m height RCC manhole with
60 cm dia. top cover in M-15 grade cement concrete using 20 mm down graded, clean, hard
coarse aggregate, 20 cm thick for bed / sides / top slab / 1.5 m long cut-off wall and 7.5 cm
thick for cover including providing 12 mm dia reinforcement bars at 30 cm c / c bothways for
bed / sides / cut-off wall / top slab / rungs and 8 mm dia bars at 15 cm c / c bothways for cover,
excavation for foundation, providing 30 cm dia hume pipe outlet, cost of all materials, machinery,
labour, formwork, scaffolding, batching, mixing, laying, vibrating, finishing, curing etc., complete
with lead upto 1 km and all lifts.
( Cement content : 300 kg/cum , CA : 0.80 cum, Blending Ratioof CA -- 65:35,
FA : 0.44 cum, superplasticizer (0.4% by wt. of cement)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
6
7
8
9
10
Cement
Cement for incidentals @ 3 kg / cum
Coarse aggregate 20 to 10 mm
Coarse aggregate 10 to 4.75 mm
Fine aggregate (Un-Screened )
Super plasticiser
Reinforcement steel with 5 % wastage
Binding wire
Hume pipe 300 mm dia
Use rate of shuttering
Scaffolding of shuttering @
Sundries
B. MACHINERY:
Sl No Description
1
2
3
4
C. LABOUR:
Sl No Description
1
2
3
4
UNIT
Unit
kg
kg
cum
cum
cum
kg
kg
kg
Rm
sqm
Unit
Unit
2.00
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
LS
1 Each
Amount
in Rs
6.30
8389.71
6.30
83.90
1210.00
2793.02
875.00
1087.56
560.00
1093.77
95.00
2246.34
40.00
6547.80
70.00
280.00
700.00
700.00
217.39
7826.04
391.30
20.00
40.00
Rs:
31479.43
Rate
in Rs.
1331.70
13.32
2.31
1.24
1.95
23.65
163.70
4.00
1.00
36.00
5%
LS
Total cost of Materials
Mason Cl- II
Day
Bar bender
Day
work inspector
Day
mazdoor
for excavation for foundation
Day
for bar bending
Day
for concreting
Day
for excavation for foundation
Day
for concreting
Day
for curing
Day
5
Labour for shuttering
sqm
Total cost of Labour
labour component/unit qty
8782.80
Add contractor's profit and overhead charges
13.615% 1195.80
labour component/unit qty (including contractor's profit)
9978.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Quantity
Rate
in Rs.
51.70
38.50
8.00
7.70
3.00
38.50
20.00
Rs:
Amount
in Rs
206.80
154.00
32.00
30.80
1.50
19.25
20.00
464.35
1.00
1.00
1.00
370.00
490.00
400.00
Amount
in Rs
370.00
490.00
400.00
2.00
1.00
5.00
2.00
4.00
1.00
36.00
310.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
620.00
310.00
1550.00
620.00
1240.00
310.00
2872.80
8782.80
Rs:
Rs:
Rs:
31479.43
464.35
8782.80
4.00
4.00
4.00
4.00
0.50
0.50
1.00
Quantity
Rate
in Rs.
96
31.3 Rs./Cum
30.2 Rs./Cum
tonne @
129.7 Rs./Tonne
0.16
tonne @
1.00
(A+B+C+D)/1.0
151.5 Rs./Tonne
Each
174.4487
24.799793
Rs: 46639.13
Rs: 46639.10
Providing and constructing longitudinal and cross graded filter drains using sand and 80-20
mm and 20 mm down graded aggregates satisfying specified filter creteria in layers as per
specifications including cost of all materials, machinery, labour, laying to required slopes,
compaction etc. complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
UNIT :
Unit
B. MACHINERY:
Sl No Description
1
Quantity
cum
cum
cum
cum
cum
47.50
17.865
1.99
24.49
8.16
Unit
Quantity
NIL
100 cum
Amount
in Rs
560.00
26600.00
635.00
11344.28
1145.00
2272.83
1210.00
29629.88
875.00
7142.19
Rs:
76989.16
Rate
in Rs.
Rate
in Rs.
0.00
0.00
Unit
work inspector
mazdoor
Quantity
Day
Day
1.00
38.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
400.00
310.00
Rs:
Amount
in Rs
400.00
11780.00
12180.00
Rs:
76989.16
Rs:
0.00
Rs:
12180.00
Rs:
89169.16
Rs. 12140.38
Rs: 101309.54
Rs: 1013.10
Total
13.615%
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
Rate
in Rs.
IRR-DAW-6-3
Rs:
40726.58
Rs. 5544.92
61.133908
107.25
cum @
cum @
IRR-DAW-6-2
Total
13.615%
Providing and constructing 1.40 m thick vertical or inclined graded filter media consisting of
20 cm thick sand layers, 25 cm thick 20 mm down coarse aggregate layers and 50 cm thick
80-20 mm coarse aggregate layer using approved materials satisfying specified filter creteria as
per specifications including cost of all materials, machinery, labour, laying to required slope,
compaction etc., complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
UNIT :
Unit
B. MACHINERY:
Sl No Description
Quantity
cum
cum
cum
cum
cum
Total cost of Materials
Unit
1 NIL
28.60
32.13
3.57
28.13
8.93
Quantity
Rate
in Rs.
0.00
0.00
100 cum
Amount
in Rs
560.00
16016.00
635.00
20402.55
1145.00
4087.65
1210.00
34031.25
875.00
7809.38
Rs:
82346.83
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
97
C. LABOUR:
Sl No Description
1
2
Unit
work inspector
mazdoor
Quantity
Day
Day
Rate
in Rs.
1.00
38.00
400.00
310.00
Rs:
IRR-DAW-6-4
Rs:
82346.83
Rs:
0.00
Rs:
12180.00
Rs:
94526.83
Rs. 12869.83
Rs: 107396.66
Rs: 1074.00
Total
13.615%
Providing and constructing graded filter media below and behind rock-toe consisting of
20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 - 20 mm size graded coarse
aggregates satisfying filter creteria as per specifications including cost of all materials, labour,
machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and
all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
UNIT
Unit
B. MACHINERY:
Sl No Description
1
Quantity
cum
cum
cum
cum
cum
23.55
42.39
4.71
22.05
7.35
Unit
Quantity
NIL
100 cum
Amount
in Rs
560.00
13188.00
635.00
26917.65
1145.00
5392.95
1210.00
26680.50
875.00
6431.25
Rs:
78610.35
Rate
in Rs.
Rate
in Rs.
0.00
0.00
Unit
work inspector
mazdoor
Quantity
Day
Day
1.00
34.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
100.00 cum
Rate per
cum
(A+B+C+D)/100
IRR-DAW-6-4-A
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
400.00
310.00
Rs:
Amount
in Rs
400.00
10540.00
10940.00
Rate
in Rs.
Amount
in Rs
400.00
11780.00
12180.00
Rs:
78610.35
Rs:
0.00
Rs:
10940.00
Rs:
89550.35
Rs. 12192.28
Rs: 101742.63
Rs: 1017.40
Total
13.615%
Providing and constructing graded filter media below and behind rock-toe consisting of
30 cm thick 80 - 20 mm size graded coarse
aggregates satisfying filter creteria as per specifications including cost of all materials, labour,
machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and
all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
UNIT
Unit
cum
cum
cum
cum
Quantity
100 cum
Amount
in Rs
635.00
22225.00
1145.00
62975.00
1210.00
6050.00
875.00
4375.00
Rate
in Rs.
35.00
55.00
5.00
5.00
98
Unit
Quantity
NIL
Total hire charges of Machinery
1
2
Unit
work inspector
mazdoor
Quantity
Day
Day
IRR-DAW-6-5
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
400.00
310.00
Rs:
Amount
in Rs
400.00
3720.00
4120.00
Rate
in Rs.
1.00
12.00
95625.00
Rate
in Rs.
0.00
0.00
C. LABOUR:
Sl No Description
Rs:
Rs:
95625.00
Rs:
0.00
Rs:
4120.00
Rs:
99745.00
Rs. 13580.28
Rs: 113325.28
Rs: 1133.30
Total
13.615%
Providing and laying filter media consisting of 2 layers of 250 gsm poly-propeline non-woven
filter fabric and 400 mm thick 20 mm down graded coarse aggregate for vertical / inclined
and horizontal filter blanket for embankment including cost of all materials, machinery, labour
etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
UNIT :
Unit
B. MACHINERY:
Sl No Description
1
Quantity
sqm
cum
cum
Unit
220.00
30.00
10.00
Quantity
NIL
100 sqm
Amount
in Rs
154.00
33880.00
1210.00
36300.00
875.00
8750.00
Rs:
78930.00
Rate
in Rs.
Rate
in Rs.
0.00
0.00
work inspector
mazdoor
Unit
Day
Day
Quantity
400.00
310.00
Rs:
Amount
in Rs
400.00
4340.00
4740.00
Rate
in Rs.
1.00
14.00
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
Total
13.615%
Rs:
78930.00
Rs:
0.00
Rs:
4740.00
Rs:
83670.00
Rs. 11391.67
99
IRR-DAW-6-6
100.00 sqm
(A+B+C+D)/100
sqm
Rs: 95061.67
Rs: 950.60
Providing and constructing 45 cm thick chimney filter using clean approved sand satisfying
filter creteria including cost of all materials, machinery, labour, compacting etc., complete with
initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
UNIT :
Unit
Sand (Un-Screened)
Quantity
cum
Rate
in Rs.
105.00
0.00
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Unit
work inspector
mazdoor
Quantity
Day
Day
IRR-DAW-6-7
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
400.00
310.00
Rs:
Amount
in Rs
400.00
9300.00
9700.00
Rate
in Rs.
1.00
30.00
100 cum
Amount
in Rs
560.00
58800.00
0.00
Rs:
58800.00
Rs:
58800.00
Rs:
0.00
Rs:
9700.00
Rs:
68500.00
Rs. 9326.28
Rs: 77826.28
Rs: 778.30
Total
13.615%
Providing and constructing 90 cm thick transition cum filter media behind rockfill using
approved sand and 80-20 mm and 20 mm down graded aggregates satisfying the filter creteria
in layers of 30 cm thickness each as per specifications including cost of all materials,
machinery, labour, laying each layer to required slope, compaction etc., complete with initial
lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
Sand (Un-Screened )
Coarse aggregate 80-40 mm
Coarse aggregate 40-20 mm
Coarse aggregate 20-10 mm
Coarse aggregate 10 mm down
Total cost of Materials
B. MACHINERY:
Sl No Description
1
UNIT :
Unit
Quantity
cum
cum
cum
cum
cum
Unit
34.00
30.60
3.40
25.50
8.50
Quantity
NIL
100 cum.
Amount
in Rs
560.00
19040.00
635.00
19431.00
1145.00
3893.00
1210.00
30855.00
875.00
7437.50
Rs:
80656.50
Rate
in Rs.
Rate
in Rs.
0.00
0.00
work inspector
mazdoor
Unit
Day
Day
Quantity
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
400.00
310.00
Rs:
Amount
in Rs
400.00
12400.00
12800.00
Rate
in Rs.
1.00
40.00
ABSTRACT:
100
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
100.00 cum.
Rate per
cum.
(A+B+C+D)/100
IRR-DAW-6-8
Rs:
80656.50
Rs:
0.00
Rs:
12800.00
Rs:
93456.50
Rs. 12724.1
Rs: 106180.60
Rs: 1061.80
Total
13.615%
Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to
75 cm long through stones at 1.50 m c / c over a backing of 45 cm thick graded filter media
consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 15 cm
thick each including cost of all materials, machinery, labour, laying to required slopes, wedging
with chips, finishing etc. complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
6
UNIT :
Unit
Sand (Un-Screened )
Coarse aggregate 10 mm down
Coarse aggregate 40-20 mm
Stone chips
Rough stones ( rubble ) 30 to 45 cm long
Through stones 65 to 75 cm long
Total cost of Materials
B. MACHINERY:
Sl No Description
1
Quantity
cum
cum
cum
cum
cum
Nos
15.30
15.30
15.30
9.00
57.60
44.00
Unit
Quantity
NIL
100 sqm
Amount
in Rs
560.00
8568.00
875.00
13387.50
1145.00
17518.50
360.00
3240.00
330.00
19008.00
59.00
2596.00
Rs:
64318.00
Rate
in Rs.
Rate
in Rs.
0.00
0.00
Unit
work inspector
Mason Class-II
mazdoor
Quantity
Day
Day
Day
IRR-DAW-6-9
400.00
370.00
310.00
Rs:
Amount
in Rs
400.00
3700.00
10230.00
14330.00
Rate
in Rs.
1.00
10.00
33.00
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
Rs:
64318.00
Rs:
0.00
Rs:
14330.00
Rs:
78648.00
Rs. 10707.93
Rs: 89355.93
Rs: 893.60
Total
13.615%
Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75
cm long through stones at 1.50 m c / c over a backing of 60 cm thick graded filter media
consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cm
thick each including cost of all materials, machinery, labour, laying to required slopes, wedging
with chips, finishing etc. complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
6
Sand (Un-Screened )
Coarse aggregate 10 mm down
Coarse aggregate 40-20 mm
Stone chips
Rough stones ( rubble ) 30 to 45 cm long
Through stones 65 to 75 cm long
Total cost of Materials
B. MACHINERY:
Sl No Description
1
NIL
UNIT :
Unit
Quantity
cum
cum
cum
cum
cum
Nos
Unit
100 sqm
Amount
in Rs
560.00
11424.00
875.00
17850.00
1145.00
23358.00
360.00
3240.00
330.00
19008.00
59.00
2596.00
Rs:
77476.00
Rate
in Rs.
20.40
20.40
20.40
9.00
57.60
44.00
Quantity
Rate
in Rs.
0.00
0.00
Amount
in Rs
0.00
101
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No Description
1
2
3
Unit
work inspector
Mason Class-II
mazdoor
Quantity
Day
Day
Day
IRR-DAW-6-10
400.00
370.00
310.00
Rs:
Amount
in Rs
400.00
3700.00
12090.00
16190.00
Rs:
77476.00
Rs:
0.00
Rs:
16190.00
Rs:
93666.00
Rs. 12752.63
Rs: 106418.63
Rs: 1064.20
Total
13.615%
Providing and constructing 60 cm thick hand packed rough stone riprap over a backing of
45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved
aggregates laid in layers of 15 cm thick each including cost of all materials, machinery,
labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto
50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
UNIT :
Unit
Sand (Un-Screened )
Coarse aggregate 10 mm down
Coarse aggregate 40-20 mm
Stone chips
Rough stones ( rubble )
Total cost of Materials
B. MACHINERY:
Sl No Description
1
Quantity
cum
cum
cum
cum
cum
100 sqm.
Amount
in Rs
560.00
8568.00
875.00
13387.50
1145.00
17518.50
360.00
3240.00
330.00
19800.00
Rs:
62514.00
Rate
in Rs.
15.30
15.30
15.30
9.00
60.00
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Unit
work inspector
Mason Class-II
mazdoor
Quantity
Day
Day
Day
1.00
5.00
28.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Total cost for
100.00 sqm.
Rate per
sqm.
(A+B+C+D)/100
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
400.00
370.00
310.00
Rs:
Amount
in Rs
400.00
1850.00
8680.00
10930.00
Rate
in Rs.
IRR-DAW-6-11
0.00
0.00
Rate
in Rs.
1.00
10.00
39.00
0.00
Rs:
Rs:
62514.00
Rs:
0.00
Rs:
10930.00
Rs:
73444.00
Rs. 9999.4
Rs: 83443.40
Rs: 834.40
Total
13.615%
Providing and constructing 75 cm thick hand packed rough stone riprap over a backing of
45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved
aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour,
laying to required slopes, wedging with stone chips, etc., complete with initial lead upto 50 m
and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
UNIT :
Unit
Quantity
Rate
100 sqm
Amount
102
in Rs.
1
2
3
4
5
Sand (Un-Screened )
Coarse aggregate 10 mm down
Coarse aggregate 40-20 mm
Stone chips
Rough stones ( rubble )
cum
cum
cum
cum
cum
Total cost of Materials
B. MACHINERY:
Sl No Description
1
Unit
15.30
15.30
15.30
11.00
75.00
Quantity
NIL
560.00
875.00
1145.00
360.00
330.00
Rs:
Rate
in Rs.
0.00
0.00
Unit
work inspector
Mason Class-II
mazdoor
Quantity
Day
Day
Day
IRR-DAW-6-12
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
400.00
370.00
310.00
Rs:
Amount
in Rs
400.00
2220.00
9300.00
11920.00
Rate
in Rs.
1.00
6.00
30.00
in Rs
8568.00
13387.50
17518.50
3960.00
24750.00
68184.00
Rs:
68184.00
Rs:
0.00
Rs:
11920.00
Rs:
80104.00
Rs. 10906.16
Rs: 91010.16
Rs: 910.10
Total
13.615%
Providing and constructing 90 cm thick hand packed rough stone riprap over a backing of
45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved
aggregates laid in layers of 15 cm thick each including cost of all materials, machinery,
labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto
50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
3
4
5
UNIT :
Unit
Sand (Un-Screened )
Coarse aggregate 10 mm down
Coarse aggregate 40-20 mm
Stone chips
Rough stones ( rubble )
B. MACHINERY:
Sl No Description
1
Quantity
cum
cum
cum
cum
cum
Total cost of Materials
Unit
15.30
15.30
15.30
13.50
90.00
Quantity
NIL
100 sqm
Amount
in Rs
560.00
8568.00
875.00
13387.50
1145.00
17518.50
360.00
4860.00
330.00
29700.00
Rs:
74034.00
Rate
in Rs.
Rate
in Rs.
0.00
0.00
work inspector
Mason Class-II
mazdoor
Unit
Day
Day
Day
Quantity
400.00
370.00
310.00
Rs:
Amount
in Rs
400.00
2960.00
10540.00
13900.00
Rate
in Rs.
1.00
8.00
34.00
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
Total
13.615%
Rs:
74034.00
Rs:
0.00
Rs:
13900.00
Rs:
87934.00
Rs. 11972.21
Rs: 99906.21
Rs: 999.10
103
IRR-DAW-6-13
Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen
embankments over 20 mm thick sand backing including cost of all materials, machinery,
labour including preparing surface, spreading sand, watering for 15 days etc., complete with
initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No Particulars
1
2
UNIT :
Unit
B. MACHINERY:
Sl No Description
1
Quantity
cum
sqm
Unit
Rate
in Rs.
2.00
100.00
Quantity
NIL
Rate
in Rs.
0.00
0.00
Unit
1
2
Quantity
0.00
0.00
Rs:
Amount
in Rs
0.00
0.00
0.00
425.00
310.00
Rs:
Amount
in Rs
850.00
4650.00
5500.00
Rate
in Rs.
2.00
15.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D.Add for contractor's profit and overheads on (A+B+C)
Lead Charges for 1 Km for FA
2.00
cum @
Total cost for
100.00 sqm.
Rate per
sqm.
(A+B+C+D)/100
100 sqm.
Amount
in Rs
560.00
1120.00
28.00
2800.00
Rs:
3920.00
Total
13.615%
31.3 Rs./Cum
Rs:
3920.00
Rs:
0.00
Rs:
5500.00
Rs:
9420.00
Rs. 1282.53
62.6
Rs: 10765.13
Rs: 107.70
104
Chapter - II
TUNNEL AND ALLIED WORKS - Standard Data
3. The Leads for Steel and Cement shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added
as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic
rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)
Example:
Total lead for earth from approved borrow area :
15 Km
Initial lead included in the basic rate in the SR :
1 Km
Additional lead charges : Lead charges for 5 km
Rs.
83.60
Lead charges for next 10 km
Rs.
125
Total lead charges for 15 km /cum
Rs.
208.60
Less 1 km initial lead charges /cum
Rs.
31.30 (-)
Net additional lead charges / cum
Rs.
177.30
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For
conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without
deducting the 50 m initial lead charges
TAW -Work Items
IRR-TAW-1
EXCAVATION :
IRR-TAW-1-1 Excavation for adit by tunnelling methods in all types of rock including cost of all materials,
machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and
hauling the excavated muck outside adit upto specified dump area and all other ancillary
operations etc., complete with initial lead upto 1km and all lifts.
105
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
Particulars
Unit
kg
Nos
Nos
Rm
Rm
10%
Hour
Hour
LS
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
8
9
Description
Unit
Drilling jumbo
Fuel / Energy charges
Air compressor 15 cmm ( ele )
Fuel / Energy charges
Jack hammer ( 4 x 5 hrs )
Fuel / Energy charges
Pusher leg
Fuel / Energy charges
Convey mucker
Fuel / Energy charges
Dumper ( 1 x 6.5 hrs )
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Ventilation fans 20 hp
Fuel / Energy charges
Sundries(explosive van / magazine )
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
Day
Quantity
38.50 cum
40.00
54.00
5.00
50.00
119.00
70.00
23.00
13.00
11.00
42.67
20.00
20.00
2.00
5.78
5.78
20.00
Rs:
Amount
in Rs.
2800.00
1242.00
65.00
550.00
5077.33
507.73
115.63
115.63
40.00
10513.32
Rate
in Rs.
368.40
43.90
138.80
962.30
19.80
0.00
12.70
0.00
822.80
267.90
580.70
409.60
6.70
77.00
11.50
154.00
20.00
Rs:
Amount
in Rs.
2947.20
351.20
694.00
4811.50
396.00
0.00
254.00
0.00
5348.20
1741.35
3774.55
2662.40
33.50
385.00
11.50
154.00
40.00
23604.40
Rate
in Rs.
163.30
163.30
306.20
163.30
212.20
77.70
26.80
590.00
480.00
415.00
480.00
370.00
370.00
400.00
Amount
in Rs.
1306.40
816.50
6124.00
1061.45
1379.30
388.50
26.80
295.00
480.00
830.00
480.00
740.00
740.00
1200.00
Quantity
8.00
8.00
5.00
5.00
20.00
20.00
20.00
20.00
6.50
6.50
6.50
6.50
5.00
5.00
1.00
1.00
2.00
Quantity
8.00
5.00
20.00
6.50
6.50
5.00
1.00
0.50
1.00
2.00
1.00
2.00
2.00
3.00
Rate
in Rs.
106
15
16
Day
4.00
415.00
1660.00
Day
Day
Day
4.00
2.00
2.00
310.00
310.00
310.00
Rs:
1240.00
620.00
620.00
20007.95
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
10513.32
23604.40
20007.95
54125.67
541.26
2435.66
866.01
1353.14
59321.73
Rs:
Rs:
Rs:
8076.65
67398.38
1750.60
519.70
13.615% 70.80
590.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
IRR-TAW-1-2 Excavation for vertical / inclined shaft in all types of soft / hard rock including cost of all
materials, machinery, labour, shoring, strutting, scaling excavated surface, ventilation, lighting,
drainage, removing and hauling excavated muck outside shaft upto specified dump area and
all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
9
10
Particulars
Unit
kg
Nos
Rm
Rm
10%
Hour
Hour
Shift
Hour
LS
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
2
UNIT :
Description
Unit
Hour
Hour
Quantity
30.00 cum
32.00
65.00
50.00
95.00
70.00
13.00
11.00
27.67
18.00
16.00
3.00
24.00
2.00
23.13
23.13
130.01
22.20
20.00
Rs:
Amount
in Rs.
2240.00
845.00
550.00
2628.33
262.83
416.25
370.00
390.04
532.68
40.00
8275.14
Rate
in Rs.
138.80
962.30
19.80
0.00
6.70
77.00
12.30
154.00
129.40
188.60
64.20
0.00
20.00
Rs:
Amount
in Rs.
624.60
4330.35
316.80
0.00
26.80
308.00
24.60
308.00
3623.20
5280.80
1540.80
0.00
40.00
16423.95
Rate
in Rs.
163.30
306.20
Amount
in Rs.
734.85
4899.20
Quantity
4.50
4.50
16.00
16.00
4.00
4.00
2.00
2.00
28.00
28.00
24.00
24.00
2.00
Quantity
4.50
16.00
Rate
in Rs.
107
3
4
5
6
7
8
9
10
11
12
13
14
77.70
77.70
244.90
590.00
480.00
415.00
480.00
370.00
370.00
400.00
415.00
310.80
155.40
6857.20
295.00
1920.00
830.00
480.00
740.00
1110.00
1600.00
2490.00
310.00
310.00
310.00
Rs:
7440.00
620.00
620.00
31102.45
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
8275.14
16423.95
31102.45
55801.54
558.02
2511.07
892.82
1395.04
61158.48
Rs:
Rs:
Rs:
8326.73
69485.21
2316.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
IRR-TAW-1-3 Excavation for tunnel by tunnelling methods in rock not requiring supports including cost
of all materials,machinery, labour, scaling excavated surface, removing under-cuts, ventilation,
lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified
dump area and all other ancillary operations etc., complete with initial lead upto 1 km and
all lifts.
DATA:
DATA:
:
:
:
:
:
:
:
:within
:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
4.50 m dia
D - shape
4.50
1000
0.30
0.20
5.50
500
By dumpers
UNIT :
Unit
kg
Nos
Nos
Rm
Quantity
54.00
68.00
10.00
50.00
m
m
m
m
m
m
48.60 cum
Rate
in Rs.
70.00
23.00
13.00
11.00
Amount
in Rs.
3780.00
1564.00
130.00
550.00
108
5
6
7
8
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
8
9
Rm
10%
Hour
Hour
LS
Description
Unit
Drilling jumbo
Fuel / Energy charges
Air compressor 15 cmm ( ele )
Fuel / Energy charges
Jack hammer ( 4 x 6.5 hrs )
Fuel / Energy charges
Pusher leg
Fuel / Energy charges
Convey mucker
Fuel / Energy charges
Dumper ( 2 x 6 hrs )
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Ventilation fans 20 hp
Fuel / Energy charges
Sundries(explosive van / magazine )
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Unit
150.00
42.67
24.00
24.00
2.00
5.78
5.78
20.00
Rs:
6400.00
640.00
138.75
138.75
40.00
13381.50
Rate
in Rs.
368.40
43.90
138.80
962.30
19.80
0.00
12.70
0.00
822.80
267.90
580.70
409.60
6.70
77.00
11.50
154.00
20.00
Rs:
Amount
in Rs.
3684.00
439.00
902.20
6254.95
514.80
0.00
330.20
0.00
4936.80
1607.40
6968.40
4915.20
43.55
500.50
23.00
308.00
40.00
31468.00
Rate
in Rs.
163.30
163.30
306.20
163.30
212.20
77.70
26.80
590.00
480.00
415.00
480.00
370.00
370.00
400.00
415.00
Amount
in Rs.
1633.00
1061.45
7961.20
979.80
2546.40
505.05
53.60
295.00
480.00
830.00
480.00
740.00
740.00
1200.00
1660.00
310.00
310.00
310.00
Rs:
2480.00
620.00
620.00
24885.50
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
13381.50
31468.00
24885.50
69735.00
697.35
3138.08
1115.76
1743.38
76429.56
Rs:
Rs:
Rs:
10405.88
86835.44
1786.70
Quantity
10.00
10.00
6.50
6.50
26.00
26.00
26.00
26.00
6.00
6.00
12.00
12.00
6.50
6.50
2.00
2.00
2.00
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
Day
Day
10.00
6.50
26.00
6.00
12.00
6.50
2.00
0.50
1.00
2.00
1.00
2.00
2.00
3.00
4.00
Day
Day
Day
8.00
2.00
2.00
512.00
13.615% 69.70
581.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
109
IRR-TAW-1-4 Excavation for tunnel by tunnelling methods including excavation for supports in all types of
soil / rock strata requiring supports ( excluding cost of providing supports ) including cost of
all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage,
removing and hauling the excavated muck outside tunnel upto specified dump area and all
other ancillary operations etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
Particulars
Unit
kg
Nos
Nos
Rm
Rm
10%
Hour
Hour
LS
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
8
9
Description
Unit
Drilling jumbo
Fuel / Energy charges
Air compressor 15 cmm ( ele )
Fuel / Energy charges
Jack hammer ( 4 x 6 hrs )
Fuel / Energy charges
Pusher leg
Fuel / Energy charges
Convey mucker
Fuel / Energy charges
Dumper ( 2 x 6 hrs )
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Ventilation fans 20 hp
Fuel / Energy charges
Sundries(explosive van / magazine )
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
UNIT :
Description
Unit
Quantity
46.00 cum
41.00
77.00
10.00
50.00
144.00
70.00
23.00
13.00
11.00
42.67
24.00
24.00
2.00
5.78
5.78
20.00
Rs:
Amount
in Rs.
2870.00
1771.00
130.00
550.00
6144.00
614.40
138.75
138.75
40.00
12396.90
Rate
in Rs.
368.40
43.90
138.80
962.30
19.80
0.00
12.70
0.00
822.80
267.90
580.70
409.60
6.70
77.00
11.50
154.00
20.00
Rs:
Amount
in Rs.
4052.40
482.90
832.80
5773.80
475.20
0.00
304.80
0.00
4936.80
1607.40
6968.40
4915.20
40.20
462.00
23.00
308.00
40.00
31222.90
Rate
in Rs.
163.30
163.30
306.20
163.30
212.20
77.70
26.80
590.00
480.00
415.00
480.00
370.00
370.00
400.00
415.00
Amount
in Rs.
1796.30
979.80
7348.80
979.80
2546.40
466.20
53.60
295.00
480.00
830.00
480.00
740.00
740.00
1200.00
1660.00
310.00
310.00
310.00
Rs:
2480.00
620.00
620.00
24315.90
Quantity
11.00
11.00
6.00
6.00
24.00
24.00
24.00
24.00
6.00
6.00
12.00
12.00
6.00
6.00
2.00
2.00
2.00
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
Day
Day
11.00
6.00
24.00
6.00
12.00
6.00
2.00
0.50
1.00
2.00
1.00
2.00
2.00
3.00
4.00
Day
Day
Day
8.00
2.00
2.00
Rate
in Rs.
528.60
13.615% 72.00
110
600.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
12396.90
31222.90
24315.90
67935.70
679.36
3057.11
1086.97
1698.39
74457.53
Rs:
Rs:
Rs:
10137.39
84594.92
1839.00
IRR-TAW-1-5 Excavation for tunnel by heading and benching tunnelling methods including excavation
for supports in all types of soil / rock strata requiring supports ( excluding cost of providing
supports ) for roof before benching including cost of all other materials, machinery, labour,
scaling excavated surface, ventilation, lighting, drainage removing and hauling excavated muck
outside tunnel upto specified dump area and all other ancillary operations etc., complete with
initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
Particulars
Unit
kg
Nos
Nos
Rm
Rm
10%
Hour
Hour
LS
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
UNIT :
Description
Drilling jumbo
Fuel / Energy charges
Air compressor 15 cmm ( ele )
Fuel / Energy charges
Jack hammer ( 4 x 6.5 hrs )
Fuel / Energy charges
Pusher leg
Fuel / Energy charges
Convey mucker
Fuel / Energy charges
Dumper ( 2 x 6.5 hrs )
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
50.00 cum
44.00
84.00
10.00
50.00
157.00
70.00
23.00
13.00
11.00
42.67
26.00
26.00
2.00
5.78
5.78
20.00
Rs:
Amount
in Rs.
3080.00
1932.00
130.00
550.00
6698.67
669.87
150.31
150.31
40.00
13401.16
Rate
in Rs.
368.40
43.90
138.80
962.30
19.80
0.00
12.70
0.00
822.80
267.90
580.70
409.60
6.70
77.00
Amount
in Rs.
4420.80
526.80
902.20
6254.95
514.80
0.00
330.20
0.00
5348.20
1741.35
7549.10
5324.80
43.55
500.50
Quantity
12.00
12.00
6.50
6.50
26.00
26.00
26.00
26.00
6.50
6.50
13.00
13.00
6.50
6.50
Rate
in Rs.
111
8
9
Ventilation fans 20 hp
Fuel / Energy charges
Sundries(explosive van / magazine )
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Hour
Hour
LS
Unit
3.00
3.00
2.00
Quantity
11.50
154.00
20.00
Rs:
34.50
462.00
40.00
33993.75
Amount
in Rs.
1959.60
1061.45
7961.20
1061.45
2758.60
505.05
80.40
295.00
480.00
830.00
960.00
1480.00
740.00
1200.00
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Day
Day
Day
12.00
6.50
26.00
6.50
13.00
6.50
3.00
0.50
1.00
2.00
2.00
4.00
2.00
3.00
Rate
in Rs.
163.30
163.30
306.20
163.30
212.20
77.70
26.80
590.00
480.00
415.00
480.00
370.00
370.00
400.00
Day
Day
4.00
4.00
415.00
415.00
1660.00
1660.00
Day
Day
Day
8.00
2.00
2.00
310.00
310.00
310.00
Rs:
2480.00
620.00
620.00
28412.75
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
13401.16
33993.75
28412.75
75807.66
758.08
3411.34
1212.92
1895.19
83085.19
Rs:
Rs:
Rs:
11312.05
94397.24
1887.90
568.30
13.615% 77.40
645.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
NOTE: Where mucking is to be carried out through shaft using winch and mucking tub system
increase the basic rates for items IRR-TAW-1-3, IRR-TAW-1-4 & IRR-TAW-1-5 by 8 percent.
IRR-TAW-1-6 Removing and hauling muck overfallen due to natural causes such as geological faults
etc., out of tunnel including breaking large fragments by blasting if necessary and disposing off
the same in specified dump area or as directed including cost of all materials, machinery,
labour, ventilation, drainage, lighting and all other ancillary operations etc., complete with
initial lead upto 1 km and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
Particulars
UNIT :
Unit
Rm
10%
kg
Nos.
Rm
Hour
Quantity
100.00 cum
Rate
in Rs.
15.00
27.67
8.00
30.00
20.00
4.00
70.00
13.00
11.00
5.78
Amount
in Rs.
415.00
41.50
560.00
390.00
220.00
23.13
112
6
7
B. MACHINERY:
Sl No
1
2
3
4
5
6
Hour
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
Unit
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
4.00
1.00
Quantity
1.00
1.00
4.00
4.00
1.00
1.00
6.00
6.00
12.00
12.00
1.00
Quantity
1.00
4.00
1.00
6.00
12.00
0.50
0.50
8.00
5.78
20.00
Rs:
23.13
20.00
1692.75
Rate
in Rs.
138.80
962.30
19.80
0.00
6.70
77.00
822.80
267.90
580.70
409.60
20.00
Rs:
Amount
in Rs.
138.80
962.30
79.20
0.00
6.70
77.00
4936.80
1607.40
6968.40
4915.20
20.00
19711.80
Rate
in Rs.
163.30
306.20
77.70
163.30
212.20
480.00
370.00
310.00
Rs:
Amount
in Rs.
163.30
1224.80
77.70
979.80
2546.40
240.00
185.00
2480.00
7897.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
1692.75
19711.80
7897.00
29301.55
293.02
1318.57
468.82
732.54
32114.50
Rs:
Rs:
Rs:
4372.39
36486.89
364.90
79.00
13.615% 10.80
89.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
IRR-TAW-2-1 Dewatering tunnel by pumping out water collected by natural drainage inside tunnel including
providing sump wherever necessary, cost of all materials, machinery, labour, drainage, lighting,
ventilation and all other ancillary operations etc., complete.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
Unit
Hour
LS
B. MACHINERY:
Sl No
1
2
UNIT :
Description
Electric pump 20 hp
Fuel / Energy charges
Unit
Hour
Hour
Quantity
15.00 Kwhr
Rate
in Rs.
4.67
20.00
Rs:
Amount
in Rs.
4.67
2.00
6.67
12.30
154.00
Amount
in Rs.
12.30
154.00
1.00
0.10
Quantity
1.00
1.00
Rate
in Rs.
113
Sundries(Starter/Switches ete)
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
LS
Unit
0.10
Quantity
20.00
Rs:
2.00
168.30
77.70
20.00
310.00
Rs:
Amount
in Rs.
77.70
1.00
31.00
109.70
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
6.67
168.30
109.70
284.67
2.85
12.81
4.55
7.12
311.99
Rs:
Rs:
Rs:
42.48
354.47
23.60
Rate
in Rs.
1
2
3
1.00%
4.50%
1.60%
2.50%
Total
IRR-TAW-2-2 Providing 25 mm thick guniting to sides and arch of tunnel in cement mortar 1 : 3 proportion
by weight including cost of all materials, machinery, labour, ventilation, lighting, drainage
and all other ancillary operations etc., complete with lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
Cement
Sand (Screened)
Use rate of grout hose 20 m
Use rate of water hose 20 m
Use rate of guniting nozzle
Sundries
Total cost of Materials
kg
cum
Hour
Hour
Hour
LS
B. MACHINERY:
Sl No
1
2
3
4
5
Description
Unit
Guniting equipment
Fuel / Energy charges
Air compressor 8.5 cmm ( ele )
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Drilling jumbo
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
2
3
4
5
6
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Day
Day
Quantity
600.00
1.10
8.00
8.00
8.00
2.00
Quantity
8.00
8.00
8.00
8.00
1.00
1.00
4.00
4.00
2.00
Quantity
8.00
8.00
1.00
4.00
1.00
6.00
36.00 sqm
Rate
in Rs.
6.30
760.00
5.78
5.78
3.50
20.00
Rs:
Amount
in Rs.
3780.00
836.00
46.25
46.25
28.00
40.00
4776.50
Rate
in Rs.
110.10
0.00
170.80
433.10
6.70
77.00
368.40
43.90
20.00
Rs:
Amount
in Rs.
880.80
0.00
1366.40
3464.80
6.70
77.00
1473.60
175.60
40.00
7484.90
Rate
in Rs.
204.10
153.10
77.70
163.30
415.00
310.00
Amount
in Rs.
1632.80
1224.80
77.70
653.20
415.00
1860.00
114
Rs:
5863.50
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
4776.50
7484.90
5863.50
18124.90
181.25
815.62
290.00
453.12
19864.89
13.615%
Rs:
cum @
31.3 Rs./Cum
2704.60
34.43
162.90
13.615% 22.20
185.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
0.60
tonne @
36.00 sqm
(A+B+C+D)/36.0
129.7 Rs./Tonne
Rs:
Rs:
77.82
22681.75
630.00
IRR-TAW-2-3 Shortcreting in two layers (each layer+38 mm thickness) for slabs duly fixing chain weld wire mesh
(new4 - 2011-12) 100 x 100x5 mm in between the two layers including cost and conveyance of all materials,
Data
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
Cement
Sand (Screened)
Coarse aggregate 10-4.75 mm size
Use rate of grout hose 20 m
Use rate of water hose 20 m
Use rate of guniting nozzle
Welded steel wire fabric 100 x 100 x 5 mm
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
1
2
3
4
5
Unit
kg
cum
cum
Hour
Hour
Hour
kg
LS
Description
Unit
Guniting equipment
Fuel / Energy charges
Air compressor 8.5 cmm ( ele )
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Drilling jumbo
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
2
3
4
5
6
Particulars
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Day
Day
Quantity
1548.00
2.41
1.03
8.00
8.00
8.00
108.00
2.00
Quantity
8.00
8.00
8.00
8.00
1.00
1.00
4.00
4.00
2.00
Quantity
8.00
8.00
1.00
4.00
1.00
6.00
36.00 sqm
Rate
in Rs.
6.30
760.00
875.00
5.78
5.78
3.50
165.00
20.00
Rs:
Amount
in Rs.
9752.40
1831.60
901.25
46.25
46.25
28.00
17820.00
40.00
30465.75
Rate
in Rs.
110.10
0.00
170.80
433.10
6.70
77.00
368.40
43.90
20.00
Rs:
Amount
in Rs.
880.80
0.00
1366.40
3464.80
6.70
77.00
1473.60
175.60
40.00
7484.90
Rate
in Rs.
204.10
153.10
77.70
163.30
415.00
310.00
Rs:
Amount
in Rs.
1632.80
1224.80
77.70
653.20
415.00
1860.00
5863.50
162.90
13.615% 22.20
115
185.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
30465.75
7484.90
5863.50
43814.15
438.14
1971.64
701.03
1095.35
48020.31
Total
D.Add for contractor's profit and overheads on (A+B+C+other
percentages)
13.615%
Rs:
Lead Charges for 1 Km for FA
2.41
cum @
31.3 Rs./Cum
Lead Charges for 1 Km for CA
1.03
cum @
30.2 Rs./Cum
Lead Charges for 1Km for Cement (including
Loading and Unloading Charges)
1.55
tonne @ 129.7 Rs./Tonne
Total cost for
36.00 sqm
Rs:
Rate per sqm
(A+B+C+D)/36.0
Rs:
6537.96
75.433
31.106
200.7756
54865.59
1524.00
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
Particulars
Unit
kg
kg
kg
kg
Rm
10%
Hour
Hour
LS
B. MACHINERY:
Sl No
1
2
3
4
5
6
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
2
3
4
5
6
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Day
Day
Quantity
20.00 Rm
86.91
65.94
6.18
4.00
20.00
40.00
40.00
40.00
90.00
42.67
6.00
6.00
5.00
5.78
5.78
20.00
Rs:
Amount
in Rs.
3476.55
2637.60
247.28
360.00
853.33
85.33
34.69
34.69
100.00
7829.47
Rate
in Rs.
138.80
962.30
6.70
77.00
19.80
0.00
12.70
0.00
368.40
43.90
20.00
Rs:
Amount
in Rs.
208.20
1443.45
6.70
77.00
118.80
0.00
76.20
0.00
1473.60
175.60
100.00
3679.55
Rate
in Rs.
163.30
77.70
306.20
163.30
415.00
415.00
Amount
in Rs.
244.95
77.70
1837.20
653.20
207.50
415.00
Quantity
1.50
1.50
1.00
1.00
6.00
6.00
6.00
6.00
4.00
4.00
5.00
Quantity
1.50
1.00
6.00
4.00
0.50
1.00
Rate
in Rs.
116
7
8
9
10
11
Turner
Blacksmith
Khalasi ( 2 x 0.5 )
Hammerman
mazdoor
Day
Day
Day
Day
Day
1.00
1.00
1.00
0.50
2.00
480.00
415.00
415.00
370.00
310.00
Rs:
480.00
415.00
415.00
185.00
620.00
5550.55
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
7829.47
3679.55
5550.55
17059.57
170.60
767.68
272.95
426.49
18697.29
277.50
13.615% 37.80
315.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
D.Add for contractor's profit and overheads on (A+B+C+other
percentages)
13.615%
Rs:
2545.64
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges)
0.16
tonne @ 151.5 Rs./Tonne 24.09389719
Total cost for
20.00 Rm
Rs:
21267.01
Rate per Rm
(A+B+C+D)/20.0
Rs:
1063.40
IRR-TAW-3-2 Providing and fixing 25 mm diameter steel rock bolts with resin bond cement capsule
anchorage including drilling 35 mm dia holes, inserting grout capsule, driving bolt,fixing 10 mm
thick plate washers and nuts and tightening the same by torque wrench after hardening of
cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other
ancillary operations etc., complete with lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
Particulars
Unit
kg
kg
Nos.
kg
Rm
10%
Hour
Hour
LS
B. MACHINERY:
Sl No
1
2
3
4
5
6
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
UNIT :
Description
Unit
Hour
Quantity
20.00 Rm
86.91
65.94
2.00
4.00
20.00
40.00
40.00
40.00
90.00
42.67
6.00
6.00
3.00
5.78
5.78
20.00
Rs:
Amount
in Rs.
3476.55
2637.60
80.00
360.00
853.33
85.33
34.69
34.69
60.00
7622.19
Rate
in Rs.
138.80
962.30
6.70
77.00
19.80
0.00
12.70
0.00
368.40
43.90
20.00
Rs:
Amount
in Rs.
208.20
1443.45
6.70
77.00
118.80
0.00
76.20
0.00
1473.60
175.60
60.00
3639.55
Rate
in Rs.
163.30
Amount
in Rs.
244.95
Quantity
1.50
1.50
1.00
1.00
6.00
6.00
6.00
6.00
4.00
4.00
3.00
Quantity
1.50
Rate
in Rs.
117
2
3
4
5
6
7
8
9
10
77.70
306.20
163.30
370.00
415.00
480.00
415.00
370.00
310.00
Rs:
77.70
1837.20
653.20
185.00
415.00
480.00
415.00
185.00
620.00
5113.05
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
7622.19
3639.55
5113.05
16374.79
163.75
736.87
262.00
409.37
17946.77
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
D.Add for contractor's profit and overheads on (A+B+C+other
percentages)
13.615%
Rs:
2443.45
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges)
0.15
tonne @ 151.5 Rs./Tonne 23.15734313
Total cost for
20.00 Rm
Rs:
20413.38
Rate per Rm
(A+B+C+D)/20.0
Rs:
1020.70
IRR-TAW-3-3 Providing, fabricating and fixing in position permanent structural steel supports as per details
including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting,
ventilation, drainage and all other ancillary operations etc., complete with initial lead upto
1 km and all lifts.
Data
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
Particulars
Unit
kg
kg
kg
B. MACHINERY:
Sl No
1
2
UNIT :
Description
Bending machine
Fuel / Energy charges
Welding set
760.00
115.00
150.00
40.00
40.00
40.00
Amount
in Rs.
30400.00
4600.00
6000.00
cum
cum
2.40
0.80
45.00
330.00
108.00
264.00
Nos.
125.00
11.00
1375.00
kg
LS
50.00
5.00
90.00
20.00
Rs:
4500.00
100.00
47347.00
42.60
115.50
16.00
Amount
in Rs.
340.80
924.00
256.00
Unit
Hour
Hour
Hour
Quantity
1.00 tonne
Quantity
8.00
8.00
16.00
Rate
in Rs.
Rate
in Rs.
118
3
4
C. LABOUR:
Sl No
Description
Hour
Hour
Hour
LS
Unit
16.00
12.00
12.00
30.00
Quantity
1
2
3
92.40
368.40
43.90
20.00
Rs:
1478.40
4420.80
526.80
600.00
8546.80
Rate
in Rs.
163.30
122.50
Amount
in Rs.
1959.60
980.00
480.00
415.00
415.00
480.00
415.00
370.00
480.00
830.00
830.00
1440.00
830.00
1480.00
415.00
370.00
415.00
830.00
740.00
830.00
480.00
480.00
370.00
415.00
Rs:
480.00
960.00
740.00
1660.00
15069.60
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
47347.00
8546.80
15069.60
70963.40
709.63
3193.35
1135.41
1774.09
77775.89
Rs:
10589.19
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
13.615%
tonne @
151.5 Rs./Tonne
1.00 tonne
(A+B+C+D)/1.0
Rs:
Rs:
155.2875
88520.36
88520.40
IRR-TAW-3-4 Providing, fabricating and fixing in position temperary structural steel supports as per details
and dismantling the same before concreting including cost of all materials, machinery, labour,
cutting, bending, welding, grinding, ventilation, lighting, drainage and all other ancillary
operations etc.,complete with initial lead upto 1 km and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS (for 20 uses):
Sl No
Particulars
1
2
3
4
5
6
UNIT :
Unit
760.00
115.00
150.00
40.00
40.00
40.00
Amount
in Rs.
30400.00
4600.00
6000.00
cum
cum
2.40
0.80
45.00
330.00
108.00
264.00
Nos.
125.00
11.00
1375.00
kg
50.00
90.00
4500.00
kg
kg
kg
Quantity
1.00 tonne
Rate
in Rs.
119
7
Sundries
Total cost of Materials for 20 uses of supports
Cost per use considering
B. MACHINERY (for fabrication):
Sl No
Description
1
2
3
Bending machine
Fuel / Energy charges
Welding set
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Cost per use considering
Drilling Jumbo
Fuel / Energy charges
Sundries
Total hire charges of Machinery
LS
20.00
20.00
Rs:
Rs:
400.00
47647.00
2382.35
42.60
115.50
16.00
92.40
20.00
Rs:
Rs:
Amount
in Rs.
340.80
924.00
256.00
1478.40
600.00
3599.20
179.96
Rate
in Rs.
368.40
43.90
20.00
Rs:
Amount
in Rs.
6631.20
790.20
200.00
7621.40
Amount
in Rs.
980.00
20 uses
Unit
Quantity
Hour
Hour
Hour
Hour
LS
Rate
in Rs.
8.00
8.00
16.00
16.00
30.00
20 uses
Unit
Quantity
Hour
Hour
LS
Unit
18.00
18.00
10.00
Quantity
Hour
8.00
Rate
in Rs.
122.50
Day
Day
Day
Day
Day
Day
1.00
2.00
2.00
3.00
2.00
4.00
480.00
415.00
415.00
480.00
415.00
370.00
480.00
830.00
830.00
1440.00
830.00
1480.00
Day
Day
Day
2.00
2.00
2.00
415.00
370.00
415.00
Rs:
Rs:
830.00
740.00
830.00
9270.00
463.50
Rate
in Rs.
163.30
Amount
in Rs.
1306.40
480.00
480.00
370.00
415.00
480.00
960.00
740.00
1660.00
480.00
480.00
370.00
415.00
Rs:
240.00
480.00
370.00
830.00
7066.40
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
2382.35
179.96
7621.40
463.50
7066.40
17713.61
177.14
797.11
283.42
442.84
20 uses
Unit
Quantity
1
2
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
120
Total
D.Add for contractor's profit and overheads on (A+B+C+other
percentages)
Lead Charges for 1Km for Steel (including
Loading and Unloading Charges)
Total cost for
Rate per tonne
Rs:
19414.12
Rs:
2643.23
151.5 Rs./Tonne
Rs:
Rs:
155.2875
22212.64
22212.60
13.615%
1.03
tonne @
1.00 tonne
(A+B+C+D)/1.0
IRR-TAW-3-5 Providing and fixing hard variety cut jungle wood for lagging / blocking locations in tunnel
wherever required including cost of all materials, machinery, labour, fixing in position, lighting,
ventilation, drainage etc complete with all leads and lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
UNIT :
Unit
cum
LS
Quantity
1.05
2.00
Description
Unit
Drilling jumbo
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
Quantity
2.00
2.00
Quantity
1
2
3
1.00 cum
Rate
in Rs.
24600.00
20.00
Rs:
Amount
in Rs.
25830.00
40.00
25870.00
Rate
in Rs.
368.40
43.90
Rs:
Amount
in Rs.
736.80
87.80
824.60
Rate
in Rs.
163.30
370.00
310.00
Rs:
Amount
in Rs.
326.60
370.00
620.00
1316.60
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
25870.00
824.60
1316.60
28011.20
280.11
1260.50
448.18
700.28
30700.28
Rs:
Rs:
Rs:
4179.84
34880.12
34880.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
UNIT :
Unit
Quantity
10.00 cum
Rate
in Rs.
Amount
in Rs.
121
1
2
3
4
Cement
Rubble stones
Stone chips
Sand (Screened)
kg
cum
cum
cum
Description
Unit
10 hp pump ( ele )
Fuel / energy charges
Total hire charges of Machinery
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
950.00
8.30
1.25
4.00
TOTAL
2.5%
Quantity
6.30
330.00
360.00
760.00
Rs:
Rs:
Rs:
Rate
in Rs.
1.00
1.00
Quantity
6.70
77.00
Rs:
Amount
in Rs.
6.70
77.00
83.70
Rate
in Rs.
Hour
Day
Day
Day
1.00
1.00
1.00
2.00
77.70
400.00
415.00
370.00
Amount
in Rs.
77.70
400.00
415.00
740.00
Day
Day
Day
Day
Day
Day
Day
1.00
2.00
2.00
1.00
4.00
1.00
3.00
TOTAL
15.0%
310.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
Rs:
Rs:
310.00
620.00
620.00
310.00
1240.00
310.00
930.00
5972.70
895.91
6868.61
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
12519.35
83.70
6868.61
19471.66
194.72
876.22
311.55
486.79
21340.93
13.615%
Rs:
cum @
31.3 Rs./Cum
cum @
30.2 Rs./Cum
2905.57
125.2
288.41
686.86
13.615% 93.50
780.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
5985.00
2739.00
450.00
3040.00
12214.00
305.35
12519.35
0.95
tonne @
10.00 cum
(A+B+C+D)/10.0
129.7 Rs./Tonne
Rs:
Rs:
123.215
24783.33
2478.30
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
Particulars
UNIT :
Unit
tonne
Quantity
1.05
1.00 tonne
Rate
in Rs.
40000.00
Amount
in Rs.
42000.00
122
2
3
B. MACHINERY:
Sl No
Description
kg
LS
Unit
Nil
13.50
5.00
Quantity
70.00
20.00
Rs:
945.00
100.00
43045.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
490.00
310.00
Rs:
Amount
in Rs.
4410.00
4650.00
9060.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
43045.00
0.00
9060.00
52105.00
521.05
2344.73
833.68
1302.63
57107.08
Rate
in Rs.
0.00
0.00
Description
Bar bender
mazdoor
Unit
Day
Day
Quantity
9.00
15.00
9060.00
13.615% 1233.50
10293.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
7775.13
159.075
65041.28
65041.30
IRR-TAW-5-2 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,
graded aggregates crushed from tunnel excavated muck for filling and levelling over-cuts
in bed due to geological faults etc., including cost of all materials, machinery, labour, cleaning
bed, batching, mixing, conveying and laying, levelling, compacting, finishing, curing, lighting,
ventilation, drainage etc., complete with initial lead upto 1 km and all lifts. ( Cement
content : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum,
Superplasticizer 0.4% by wt. of cement)
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
Particulars
Unit
kg
cum
cum
cum
cum
kg
LS
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
6160.00
12.60
7.56
5.04
11.20
24.64
2.00
Quantity
8.00
8.00
16.00
16.00
8.00
8.00
28.00 cum
Rate
in Rs.
6.30
1145.00
1210.00
875.00
560.00
95.00
20.00
Rs:
Amount
in Rs.
38808.00
14427.00
9147.60
4410.00
6272.00
2340.80
40.00
75445.40
Rate
in Rs.
405.40
346.40
758.40
893.90
6.70
77.00
Amount
in Rs.
3243.20
2771.20
12134.40
14302.40
53.60
616.00
123
4
5
C. LABOUR:
Sl No
Hour
Hour
LS
Description
Unit
1
2
3
4
5
6
7
8.00
8.00
2.00
8.00
7.70
20.00
Rs:
64.00
61.60
40.00
33286.40
Rate
in Rs.
318.20
265.20
77.70
146.90
415.00
400.00
Amount
in Rs.
2545.60
4243.20
621.60
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
620.00
930.00
620.00
2170.00
4340.00
620.00
620.00
19320.60
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
75445.40
33286.40
19320.60
128052.40
1280.52
5762.36
2048.84
3201.31
140345.43
13.615%
Rs:
cum @
31.3 Rs./Cum
cum @
30.2 Rs./Cum
19108.03
350.56
761.04
Quantity
Hour
Hour
Hour
Hour
Day
Day
8.00
16.00
8.00
8.00
1.00
1.00
Day
Day
Day
Day
Day
Day
Day
2.00
3.00
2.00
7.00
14.00
2.00
2.00
690.00
13.615% 93.90
783.90
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
6.16
tonne @
28.00 cum
(A+B+C+D)/28.0
129.7 Rs./Tonne
Rs:
Rs:
798.952
161364.01
5763.00
IRR-TAW-5-3 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard,
graded aggregates crushed from tunnel muck for kerb and bed lining including cost of all
materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in
agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting,
drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.
( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
Particulars
Cement 43 Gr
Cement for incidentals @ 1 kg / cum
Fine aggregate (Un-Screened )
Coarse aggregate 40-20 mm
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Super plasticiser
Use rate of shuttering for kerb / bed
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
Quantity
9240.00
28.00
11.20
12.60
7.56
5.04
36.96
28.00
28.00 cum
Rate
in Rs.
6.30
6.30
560.00
1145.00
1210.00
875.00
95.00
155.53
Amount
in Rs.
58212.00
176.40
6272.00
14427.00
9147.60
4410.00
3511.20
4354.81
124
Sundries
LS
2.00
20.00
Rs:
40.00
100551.01
Rate
in Rs.
405.40
346.40
758.40
893.90
8.00
7.70
6.70
77.00
20.00
Rs:
Amount
in Rs.
3243.20
2771.20
12134.40
14302.40
64.00
61.60
53.60
616.00
100.00
33346.40
Rate
in Rs.
318.20
265.20
146.90
77.70
Amount
in Rs.
2545.60
4243.20
1175.20
621.60
370.00
310.00
740.00
1860.00
310.00
930.00
310.00
620.00
310.00
620.00
415.00
370.00
310.00
400.00
79.80
Rs:
830.00
740.00
6510.00
400.00
2234.40
24070.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
100551.01
33346.40
24070.00
157967.41
1579.67
7108.53
2527.48
3949.19
173132.28
Description
C. LABOUR:
Sl No
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
8.00
8.00
16.00
16.00
8.00
8.00
8.00
8.00
5.00
Quantity
1
2
3
4
5
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
D.Add for contractor's profit and overheads on (A+B+C+other
percentages)
13.615%
Rs:
Lead Charges for 1 Km for FA
11.20
cum @
31.3 Rs./Cum
Lead Charges for 1 Km for CA
25.20
cum @
30.2 Rs./Cum
Lead Charges for 1Km for Cement (including
Loading and Unloading Charges)
9.27
tonne @ 129.7 Rs./Tonne
Total cost for
28.00 cum
Rs:
Rate per cum
(A+B+C+D)/28.0
Rs:
23571.96
350.56
761.04
1202.0596
199017.90
7107.80
IRR-TAW-5-4 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard,
graded aggregates crushed from tunnel muck for sides and arch lining including cost of all
materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in
agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting,
drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.
( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),
125
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
Cement 43 Gr
Cement for incidentals @ 1 kg / cum
Fine aggregate (Un-Screened )
Coarse aggregate 40-20 mm
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Super plasticiser
Use rate of end shuttering
Use rate of steel gantry
Sundries ( placer pipe etc )
Total cost of Materials
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
Description
C. LABOUR:
Sl No
1
2
3
4
5
6
7
Particulars
Description
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
sqm
LS
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
15840.00
48.00
19.20
21.60
12.96
8.64
63.36
6.00
100.00
5.00
Quantity
16.00
12.00
12.00
12.00
32.00
32.00
16.00
16.00
8.00
8.00
8.00
8.00
5.00
Quantity
48.00 cum
Rate
in Rs.
6.30
6.30
560.00
1145.00
1210.00
875.00
95.00
155.53
79.80
20.00
Rs:
Amount
in Rs.
99792.00
302.40
10752.00
24732.00
15681.60
7560.00
6019.20
933.17
7980.00
100.00
173852.37
Rate
in Rs.
170.80
433.10
405.40
346.40
758.40
893.90
102.00
2.00
8.00
7.70
6.70
77.00
20.00
Rs:
Amount
in Rs.
2732.80
5197.20
4864.80
4156.80
24268.80
28604.80
1632.00
32.00
64.00
61.60
53.60
616.00
100.00
72384.40
Amount
in Rs.
2449.60
5091.20
8486.40
268.80
1175.20
621.60
Hour
Hour
Hour
Hour
Hour
Hour
16.00
16.00
32.00
16.00
8.00
8.00
Rate
in Rs.
153.10
318.20
265.20
16.80
146.90
77.70
Day
Day
0.50
1.00
370.00
310.00
185.00
310.00
Day
Day
Day
Day
Day
0.50
0.50
1.00
3.00
1.00
590.00
370.00
370.00
415.00
310.00
295.00
185.00
370.00
1245.00
310.00
Day
Day
Day
0.50
0.50
0.50
590.00
480.00
370.00
295.00
240.00
185.00
126
370.00
415.00
310.00
370.00
1245.00
310.00
310.00
1550.00
310.00
79.80
620.00
478.80
415.00
310.00
400.00
1245.00
2790.00
1200.00
310.00
Rs:
930.00
32451.60
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
173852.37
72384.40
32451.60
278688.37
2786.88
12540.98
4459.01
6967.21
305442.46
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
D.Add for contractor's profit and overheads on (A+B+C+other
percentages)
13.615%
Rs:
Lead Charges for 1 Km for FA
19.20
cum @
31.3 Rs./Cum
Lead Charges for 1 Km for CA
43.20
cum @
30.2 Rs./Cum
Lead Charges for 1Km for Cement (including
Loading and Unloading Charges)
15.89
tonne @ 129.7 Rs./Tonne
Total cost for
48.00 cum
Rs:
Rate per cum
(A+B+C+D)/48.0
Rs:
IRR-TAW-6
41585.99
600.96
1304.64
2060.6736
350994.72
7312.40
IRR-TAW-6-1 Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack
hammer or stooper drills as directed to specified depth for consolidation / contact grouting
including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage
and all other ancillary operations etc., complete.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
1
2
3
4
5
6
Particulars
B. MACHINERY:
Sl No
UNIT :
Description
Unit
Quantity
Rm
100.00 Rm
Rate
in Rs.
100.00
42.67
32.00
32.00
3.00
5.78
5.78
20.00
Rs:
Amount
in Rs.
4266.67
426.67
185.00
185.00
60.00
5123.33
Rate
in Rs.
138.80
962.30
6.70
77.00
19.80
0.00
12.70
0.00
368.40
43.90
20.00
Amount
in Rs.
1110.40
7698.40
26.80
308.00
633.60
0.00
406.40
0.00
2947.20
351.20
100.00
10%
Hour
Hour
LS
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Quantity
8.00
8.00
4.00
4.00
32.00
32.00
32.00
32.00
8.00
8.00
5.00
127
Description
Unit
Quantity
1
2
3
4
5
Rs:
13582.00
Rate
in Rs.
163.30
77.70
306.20
163.30
310.00
Rs:
Amount
in Rs.
1306.40
310.80
9798.40
1306.40
620.00
13342.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
5123.33
13582.00
13342.00
32047.33
320.47
1442.13
512.76
801.18
35123.88
Rs:
Rs:
Rs:
4782.12
39905.99
399.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
IRR-TAW-6-2 Grouting cement slurry in grout holes under specified pressure for consolidation / contact
grouting including cost of all materials, machinery, labour, redrilling wherever necessary,
ventilation,lighting, drainage and other ancillary operations etc., complete with lead upto 1 km
and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Cement
Use rate of grouting hose 50 m
Use rate of water hose 50 m
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
1
2
3
4
Description
Grouting machine
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Drilling jumbo
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
Particulars
Description
UNIT :
Unit
tonne
Hour
Hour
LS
Unit
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
1.50
8.00
8.00
2.00
Quantity
8.00
8.00
2.00
2.00
2.00
2.00
2.00
Quantity
1.50 tonne
Rate
in Rs.
6300.00
11.56
11.56
20.00
Rs:
Amount
in Rs.
9450.00
92.50
92.50
40.00
9675.00
Rate
in Rs.
24.90
38.50
6.70
77.00
368.40
43.90
20.00
Rs:
Amount
in Rs.
199.20
308.00
13.40
154.00
736.80
87.80
40.00
1539.20
Rate
in Rs.
244.90
77.70
163.30
310.00
Rs:
Amount
in Rs.
1959.20
155.40
326.60
620.00
3061.20
128
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
9675.00
1539.20
3061.20
14275.40
142.75
642.39
228.41
356.89
15645.84
Rs:
2130.18
129.7 Rs./Tonne
Rs:
Rs:
194.55
17970.57
11980.40
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
13.615%
1.50
tonne @
1.50 tonne
(A+B+C+D)/1.50
IRR-TAW-6-3 Drilling 75 mm diameter drainage holes vertical or inclined in rock / concrete in tunnel by
percussion drilling using waggon drill or other suitable drilling equipment including cost of all
materials, machinery, labour, ventilation, lighting, drainage etc., complete.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
B. MACHINERY:
Sl No
1
2
3
4
Particulars
Description
Waggon drill
Fuel / Energy charges
Air compressor 15 cmm ( ele )
Fuel / Energy charges
Pump 10 hp ( ele )
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
UNIT :
Unit
Rm
Hour
Hour
Rm
Unit
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
120.00
16.00
16.00
120.00
Quantity
16.00
16.00
8.00
8.00
6.00
6.00
2.00
Quantity
1
2
3
4
120.00 Rm
Rate
in Rs.
125.00
4.63
4.63
8.90
Rs:
Amount
in Rs.
15000.00
74.00
74.00
1068.48
16216.48
Rate
in Rs.
188.50
0.00
138.80
962.30
6.70
77.00
20.00
Rs:
Amount
in Rs.
3016.00
0.00
1110.40
7698.40
40.20
462.00
40.00
12367.00
Rate
in Rs.
265.20
163.30
77.70
310.00
Rs:
Amount
in Rs.
4243.20
1306.40
466.20
620.00
6635.80
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
16216.48
12367.00
6635.80
35219.28
352.19
1584.87
563.51
880.48
38600.33
Rs:
Rs:
5255.44
43855.77
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
1.00%
4.50%
1.60%
2.50%
Total
129
Rate per Rm
(A+B+C+D)/120.0
Rs:
365.50
130
Chapter III
CANAL AND ALLIED WORKS - Standard Data
3. The Leads for Steel and Cement shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead
charges are to be added as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included
in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.
(same as above)
Example:
Total lead for earth from approved borrow area :
15 Km
Initial lead included in the basic rate in the SR :
1 Km
Additional lead charges :
Lead charges for 5 km
Rs.
83.60
Lead charges for next 10 km
Rs.
125
Total lead charges for 15 km /cum
Rs.
208.60
Less 1 km initial lead charges /cum
Rs.
31.30 (-)
Net additional lead charges / cum
Rs.
177.30
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For
conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without
deducting the 50 m initial lead charges
CAW-Work Items
IRR-CAW-1
EXCAVATION WORKS :
IRR-CAW-1-1
Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of
embankment, filter drains / catch water drains etc., including dressing bed and sides to
required level and profile, cost of all materials, machinery, labour, placing the excavated soil
neatly in dump area or for the formation of service road / embankment as directed etc.,
complete with initial lead upto 1 km and all lifts.
131
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
893.90
446.70
307.20
Rs:
Amount
in Rs.
13652.80
7151.20
21441.60
14745.60
56991.20
Rate
in Rs.
221.00
165.80
400.00
310.00
Rs:
Amount
in Rs.
1768.00
7958.40
400.00
9300.00
19426.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Rs:
Rs:
Rs:
Rs:
0.00
56991.20
19426.40
76417.60
Rs:
Rs:
Rs.
10404.26
86821.86
93.90
Unit
Quantity
NIL
0.00
0.00
Description
Unit
Hour
Hour
Hour
Hour
Description
Unit
C. LABOUR:
Sl No
1
2
3
4
Hour
Hour
Day
Day
Quantity
8.00
8.00
48.00
48.00
Quantity
8.00
48.00
1.00
30.00
IRR-CAW-1-2
925.00 cum
1706.60
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating
of embankment for field channels etc., including dressing of bed and sides to required profile,
cost of all materials, machinery, labour, placing the excavated stuff for formation of service
road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
NIL
Quantity
0.00
0.00
C. LABOUR:
Sl No
1
2
3
Description
Unit
Hour
Hour
Description
Unit
Hour
Day
Day
Quantity
8.00
8.00
Quantity
8.00
1.00
17.00
440.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
487.60
Rs:
Amount
in Rs.
8024.80
3900.80
11925.60
Rate
in Rs.
221.00
400.00
310.00
Amount
in Rs.
1768.00
400.00
5270.00
1003.10
132
IRR-CAW-1-3
7438.00
Rs:
Rs:
Rs:
Rs:
0.00
11925.60
7438.00
19363.60
Rs:
Rs:
Rs.
2636.35
21999.95
50.00
Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia. for
canals, seating of embankment, filter drain / catch water drains etc., including dressing of
bed and sides to required level and profile, cost of all materials, machinery, labour, placing the
excavated soft rock neatly in dump area or for formation of service road as directed etc.,
complete with lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
0.00
0.00
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
Hour
Hour
Hour
Hour
Description
Unit
Hour
Hour
Day
Day
Day
Quantity
630.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
893.90
446.70
307.20
Rs:
Amount
in Rs.
13652.80
7151.20
17868.00
12288.00
50960.00
Rate
in Rs.
221.00
165.80
400.00
370.00
310.00
Rs:
Amount
in Rs.
1768.00
6632.00
400.00
4070.00
6820.00
19690.00
Rs:
Rs:
Rs:
Rs:
0.00
50960.00
19690.00
70650.00
Rs:
Rs:
Rs.
9619
80269.00
127.40
8.00
8.00
40.00
40.00
Quantity
8.00
40.00
1.00
11.00
22.00
1706.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
630.00 cum
Rate per
cum
(A+B+C+D)/630
IRR-CAW-1-4
Rs:
Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for
field channels, seating of embankment for field channels etc., including dressing of bed and
sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff
133
for formation of service road as directed etc.,complete with lead upto 10 m and lift upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
0.00
0.00
Description
Unit
Hour
Hour
Description
Unit
C. LABOUR:
Sl No
1
2
3
4
Hour
Day
Day
Day
Quantity
265.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
487.60
Rs:
Amount
in Rs.
8024.80
3900.80
11925.60
Rate
in Rs.
221.00
400.00
370.00
310.00
Rs:
Amount
in Rs.
1768.00
400.00
1850.00
3410.00
7428.00
Rs:
Rs:
Rs:
Rs:
0.00
11925.60
7428.00
19353.60
Rs:
Rs:
Rs.
2634.99
21988.59
83.00
8.00
8.00
Quantity
8.00
1.00
5.00
11.00
1003.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
265.00 cum
Rate per
cum
(A+B+C+D)/265
IRR-CAW-1-5
Excavation in hard rock (including F&F rock) requiring blasting including boulders
above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains
etc., including dressing bed and sides to required level and profile, cost of all materials,
machinery, labour, placing the excavated rock in dump area or for formation of service
road as directed etc., complete with lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
Rm
10%
Hour
316.00
24.00
11.56
Amount
in Rs.
6557.00
655.70
277.50
kg
Nos
Nos
Rm
LS
161.00
12.00
215.00
520.00
5.00
70.00
7.00
13.00
11.00
20.00
Rs:
11270.00
84.00
2795.00
5720.00
100.00
27459.20
Description
Unit
Unit
Hour
Quantity
805.00 cum
Rate
in Rs.
20.75
B. MACHINERY:
Sl No
particulars
UNIT :
Quantity
8.00
Rate
in Rs.
1706.60
Amount
in Rs.
13652.80
134
3
4
C. LABOUR:
Sl No
Hour
Hour
Hour
8.00
40.00
40.00
893.90
446.70
307.20
7151.20
17868.00
12288.00
Hour
Hour
Hour
Hour
12.00
12.00
39.00
39.00
275.60
914.20
19.80
0.00
Rs:
3307.20
10970.40
772.20
0.00
66009.80
Description
Unit
Rate
in Rs.
221.00
165.80
195.90
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
1768.00
6632.00
2350.80
11941.80
400.00
480.00
370.00
5920.00
5920.00
9920.00
45702.60
Quantity
1
2
3
4
5
6
7
8
9
10
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
805.00 cum
Rate per
cum
(A+B+C+D)/805
IRR-CAW-1-6
(a)
Note:
Rs: 27459.20
Rs: 66009.80
Rs: 45702.60
Rs: 139171.60
Rs: 18948.21
Rs: 158119.81
Rs.
196.40
Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for
canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed
by removing all projections by hammering / chiselling, cost of all materials, machinery, labour,
placing the excavated rock neatly in approved dump area and levelling the same as directed
etc., complete with initial lead upto 1 km and all lifts.
i ) The rate under this item shall be adopted for canals designed for carrying capacity of less
than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.
ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever
required.
135
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
1
2
3
4
5
C. LABOUR:
Sl No
Unit
Quantity
68.00 cum
Rm
10%
Hour
85.00
Rate
in Rs.
27.67
13.00
11.56
Amount
in Rs.
2351.67
235.17
150.31
kg
Nos
Nos
Rm
LS
21.20
4.00
59.00
90.00
2.00
70.00
7.00
13.00
11.00
20.00
Rs:
1484.00
28.00
767.00
990.00
40.00
6046.15
B. MACHINERY:
Sl No
particulars
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
1.10
1.10
0.25
0.25
4.40
4.40
Hour
Hour
Hour
Hour
6.50
6.50
13.00
13.00
Description
Unit
1
2
3
4
5
6
7
8
9
10
11
Quantity
Quantity
Rate
in Rs.
625.30
446.70
307.20
Amount
in Rs.
1877.26
983.29
428.88
156.33
1965.48
1351.68
275.60
914.20
19.80
0.00
Rs:
1791.40
5942.30
257.40
0.00
14754.01
Rate
in Rs.
221.00
221.00
165.80
195.90
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
243.10
55.25
729.52
1273.35
3980.60
200.00
480.00
370.00
185.00
185.00
620.00
8321.82
Rs:
Rs:
6046.15
14754.01
1706.60
893.90
1715.50
136
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
68.00 cum
Rate per
cum
(A+B+C+D)/68
IRR-CAW-1-7
(b)
Note:
Rs:
Rs:
8321.82
29121.98
Rs:
Rs:
Rs.
3964.96
33086.94
486.60
Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved
controlled blasting methods for canals, cut-off trench of embankment, filter / catch-water
drains etc., including controlling fly-rock by muffling arrangements such as placing
50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground
vibrations at specified locations, costof all materials, machinery, labour, placing excavated rock
neatly in approved dump area or other place as directed etc., complete with lead upto 1 km
and all lifts.
i ) The rate under this item shall be adopted for canals designed for carrying capacity of less
than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.
ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations
is required.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
Unit
Quantity
68.00 cum
Rm
10%
Hour
sqm
Nos
85.00
2
3
4
Rate
in Rs.
27.67
13.00
94.00
98.00
11.56
55.13
20.62
Amount
in Rs.
2351.67
235.17
150.31
5182.22
2020.76
5
6
7
kg
Nos
Nos
21.20
4.00
59.00
70.00
7.00
23.00
1484.00
28.00
1357.00
particulars
UNIT :
137
8
9
Fuse coil
Sundries
Rm
LS
90.00
2.00
11.00
20.00
Rs:
4
5
C. LABOUR:
Sl No
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
1.10
1.10
0.25
0.25
4.40
4.40
Hour
Hour
Hour
Hour
6.50
6.50
13.00
13.00
Description
Unit
1
2
3
4
5
6
7
8
9
10
11
Quantity
Quantity
Rate
in Rs.
625.30
446.70
307.20
Amount
in Rs.
1877.26
983.29
428.88
156.33
1965.48
1351.68
275.60
914.20
19.80
0.00
Rs:
1791.40
5942.30
257.40
0.00
14754.01
Rate
in Rs.
221.00
221.00
165.80
195.90
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
243.10
55.25
729.52
1273.35
3980.60
200.00
240.00
185.00
185.00
185.00
930.00
8206.82
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs.
13839.13
14754.01
8206.82
36799.96
184.00
36983.96
5035.37
42019.33
617.90
1706.60
893.90
1715.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Add for blasting studies & monitoring vibrations etc
D. Add for contractor's profit and overheads on
Total cost for
Rate per
cum
IRR-CAW-1-8
( c)
Note:
990.00
40.00
13839.13
Total
0.50%
Total
13.615%
68.00 cum
(A+B+C+D)/68
Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing
canal sides neatly on either side to required profile by line drilling and smooth blasting
including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in
dump area or other place as directed, cost of all materials, machinery, labour etc., complete
with lead upto 1 km and all lifts.
i) For excavation of canal below free board level combination of normal / controlled blasting and
line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose
of payment 1 m width of excavation on either side shall be treated as excavation by line drilling
and smooth blasting and remaining portion shall be treated as excavation by normal / controlled
blasting as the case may be.
ii ) The rate under this item shall be adopted for canals designed for carrying capacity of less
than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the excavated face has
come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for
138
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
3
4
Unit
UNIT :
Quantity
Rm
10%
Hour
63.00
kg
Nos
Rm
LS
3.50
22.00
20.00
1.00
B. MACHINERY:
Sl No
1
particulars
10.00
Description
Unit
Hour
Hour
Hour
Hour
0.28
0.28
1.12
1.12
Hour
Hour
Hour
Hour
5.00
5.00
10.00
10.00
Description
Unit
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
Quantity
Quantity
17.50 cum
Rate
Amount
in Rs.
in Rs.
27.67
1743.00
174.30
11.56
115.63
70.00
23.00
11.00
20.00
Rs:
Rate
in Rs.
245.00
506.00
220.00
20.00
3023.93
893.90
446.70
307.20
Amount
in Rs.
477.85
250.29
500.30
344.06
275.60
914.20
19.80
0.00
Rs:
1378.00
4571.00
198.00
0.00
7719.51
Rate
in Rs.
221.00
165.80
195.90
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
110.50
185.70
979.50
3062.00
200.00
240.00
185.00
185.00
185.00
310.00
5642.70
Rs:
3023.93
1706.60
139
IRR-CAW-1-9
(a)
Note:
Total
0.50%
Total
13.615%
17.50 cum
(A+B+C+D)/17.50
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs.
7719.51
5642.70
16386.13
81.93
16468.06
2242.13
18710.19
1069.20
Excavation in hard rock by blasting including boulders above 1.2 m dia. for canals, seating
embankment etc., including levelling bed by removing all projections by hammering / chiselling,
cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump
area and levelling the same as directed etc.,complete with initial lead upto 1 km and all lifts.
i ) The rate under this item shall be adopted for canals designed for carrying capacity of more
than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.
ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever
required.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
particulars
Unit:
Unit
Rm
104.00
Rate
in Rs.
150.00
Rm
104.00
6.68
694.51
12.00
27.67
332.00
33.20
Hour
10.50
18.63
195.56
Hour
kg
1.00
38.00
11.56
68.00
11.56
2584.00
Rm
10%
Quantity
386.00 Cum
Amount
in Rs.
15600.00
140
6
7
ANFO
Diesel oil
8
9
10
11
12
B. MACHINERY:
Sl No
1
2
3
4
5
6
C. LABOUR:
Sl No
Description
kg
ltr
155.00
35.00
48.00
59.10
7440.00
2068.50
kg
Nos
Rm
Rm
LS
4.00
20.00
145.00
20.00
5.00
70.00
7.00
10.00
11.00
20.00
Rs:
280.00
140.00
1450.00
220.00
100.00
31149.34
Rate
in Rs.
446.70
307.20
625.30
Amount
in Rs.
11096.03
7630.85
10597.99
5551.12
3431.00
1250.60
275.60
914.20
188.50
0.00
19.80
0.00
Rs:
3169.40
10513.30
1979.25
0.00
39.60
0.00
55259.13
Rate
in Rs.
165.80
221.00
221.00
195.90
265.20
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
4118.47
1372.41
442.00
2252.85
2784.60
612.40
800.00
480.00
370.00
370.00
370.00
930.00
14902.73
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
24.84
24.84
6.21
6.21
2.00
2.00
Hour
Hour
Hour
Hour
Hour
Hour
11.50
11.50
10.50
10.50
2.00
2.00
Description
Unit
Quantity
1
2
3
4
5
6
7
8
9
10
11
12
1706.60
893.90
1715.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
386.00 Cum
Rate per
Cum
(A+B+C+D)/386
Rs: 31149.34
Rs: 55259.13
Rs: 14902.73
Rs: 101311.20
Rs: 13793.52
Rs: 115104.72
Rs.
298.20
IRR-CAW-1-10 Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved
(b)
controlled blasting methods for canals, cut-off trench of embankment etc., including
controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening
chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified
locations, cost of all materials, machinery, labour, placing excavated rock neatly in approved
dump area or other place as directed etc., complete with lead upto 1 km and all lifts.
141
Note:
i ) The rate under this item shall be adopted for canals designed for carrying capacity of more
than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.
ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations
is required.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
Rm
104.00
Rm
104.00
6.68
694.51
Rm
10%
12.00
27.67
332.00
33.20
Hour
10.50
18.63
195.56
Hour
kg
kg
ltr
2.00
38.00
155.00
35.00
11.56
68.00
48.00
59.10
23.13
2584.00
7440.00
2068.50
kg
Nos
Rm
Nos
Rm
sqm
Nos
LS
4.00
20.00
120.00
12.00
20.00
132.00
110.00
20.00
70.00
7.00
45.00
21.00
11.00
198.00
16.62
20.00
Rs:
280.00
140.00
5400.00
252.00
220.00
26136.00
1828.20
400.00
63627.10
Rate
Amount
5
6
7
8
9
10
11
12
13
14
15
B. MACHINERY:
Sl No
Description
Unit
Unit
Quantity
386.00 cum
Rate
in Rs.
150.00
UNIT :
Quantity
Amount
in Rs.
15600.00
142
1
2
3
4
5
6
C. LABOUR:
Sl No
Hour
Hour
Hour
Hour
Hour
Hour
30.00
30.00
10.00
10.00
2.00
2.00
Hour
Hour
Hour
Hour
Hour
Hour
12.50
12.50
11.50
11.50
2.00
2.00
Description
Unit
1
2
3
4
5
6
7
8
9
10
11
12
Quantity
in Rs.
446.70
307.20
625.30
in Rs.
13401.00
9216.00
17066.00
8939.00
3431.00
1250.60
275.60
914.20
188.50
0.00
19.80
0.00
Rs:
3445.00
11427.50
2167.75
0.00
39.60
0.00
70383.45
Rate
in Rs.
165.80
221.00
221.00
195.90
265.20
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
4974.00
2210.00
442.00
2448.75
3049.80
612.40
600.00
240.00
185.00
370.00
370.00
1550.00
17051.95
1706.60
893.90
1715.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Add for blasting studies & monitoring vibrations etc
D. Add for contractor's profit and overheads on
Total cost for
Rate per
cum
Total
0.50%
Total
13.615%
386.00 cum
(A+B+C+D)/386
Rs: 63627.10
Rs: 70383.45
Rs: 17051.95
Rs: 151062.50
Rs:
755.31
Rs: 151817.81
Rs:
20670
Rs: 172487.81
Rs.
446.90
IRR-CAW-1-11 Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing
( c)
canal sides neatly on either side to required profile by line drilling and smooth blasting
including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in
dump area or other place as directed, cost of all materials, machinery, labour etc., complete
with lead upto 1 km and all lifts.
Note:
i ) For excavation of canal below free board level combination of normal / controlled blasting and
line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose
of payment 1 m width of excavation on either side shall be treated as excavation by line drilling
and smooth blasting and remaining portion shall be treated as excavation by normal / controlled
blasting as the case may be.
ii ) The rate under this item shall be adopted for canals designed for carrying capacity of more
than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.
iii ) The rate includes controlling fly-rock wherever required.
iv ) The rate under this item shall be paid only on ascertaining that the excavated face has
come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for
inspection and are spaced at specified interval.
v ) In case, where the above criteria is not fulfilled payment shall be restricted to rate provided
143
for excavation by normal blasting or controlled blasting as the case may be.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
Rm
121.00
Rm
121.00
6.68
808.04
Rm
10%
3.00
27.67
83.00
8.30
Hour
12.00
18.63
223.50
Hour
kg
kg
ltr
0.50
5.00
19.00
4.50
11.56
68.00
48.00
59.10
5.78
340.00
912.00
265.95
kg
Nos
Rm
Nos
Rm
LS
1.00
5.00
70.00
4.00
10.00
2.00
70.00
7.00
45.00
21.00
11.00
20.00
Rs:
70.00
35.00
3150.00
84.00
110.00
40.00
24285.57
Rate
in Rs.
446.70
307.20
625.30
Amount
in Rs.
2787.41
1916.93
2662.30
1394.48
857.75
312.65
275.60
914.20
188.50
0.00
19.80
0.00
Rs:
3706.82
12295.99
2488.20
0.00
9.90
0.00
28432.43
Rate
in Rs.
165.80
221.00
Amount
in Rs.
868.79
344.76
5
6
7
8
9
10
11
12
13
B. MACHINERY:
Sl No
1
2
3
4
5
6
C. LABOUR:
Sl No
1
2
Description
Unit
Unit
Quantity
97.00 cum
Rate
in Rs.
150.00
UNIT :
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
6.24
6.24
1.56
1.56
0.50
0.50
Hour
Hour
Hour
Hour
Hour
Hour
13.45
13.45
13.20
13.20
0.50
0.50
Description
Unit
Hour
Hour
Quantity
5.24
1.56
1706.60
893.90
1715.50
Amount
in Rs.
18150.00
144
3
4
5
6
7
8
9
10
11
12
Total
0.50%
Total
13.615%
97.00 cum
(A+B+C+D)/97
221.00
195.90
265.20
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
110.50
2634.86
3566.94
153.10
200.00
240.00
185.00
370.00
370.00
620.00
9663.95
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs.
24285.57
28432.43
9663.95
62381.94
311.91
62693.85
8535.77
71229.62
734.30
IRR-CAW-2
IRR-CAW-2-1
Providing impervious hearting embankment with selected soil from approved borrow areas in
layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
1
2
Description
Unit
Angle dozer
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 4 Nos.
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Hour
Hour
Quantity
3.40
3.40
8.00
8.00
32.00
32.00
2.00
2.00
4.00
4.00
5.10
5.10
5.00
Quantity
3.40
8.00
412.80 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
20.00
Rs:
Amount
in Rs.
5832.70
2126.02
8024.80
3900.80
14294.40
9830.40
20.40
162.60
1610.00
1228.80
6845.22
5387.64
100.00
59363.78
Rate
in Rs.
221.00
221.00
Amount
in Rs.
751.40
1768.00
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
145
3
4
5
6
7
8
IRR-CAW-2-2
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
5305.60
207.20
663.20
1248.99
800.00
1240.00
11984.39
Rs:
Rs:
Rs:
Rs:
0.00
59363.78
11984.39
71348.17
Rs:
Rs:
Rs.
9714.05
81062.22
196.40
Providing impervious hearting embankment with selected soil from approved borrow areas in
layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
1
2
3
4
5
6
7
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.5 cum
Fuel / Energy charges
Tippers 5 cum
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Day
Quantity
3.40
3.40
8.00
8.00
32.00
32.00
2.00
2.00
4.00
4.00
4.18
4.18
5.00
Quantity
3.40
8.00
32.00
2.00
4.00
4.18
2.00
412.80 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
5832.70
2126.02
8024.80
3900.80
14294.40
9830.40
20.40
162.60
1610.00
1228.80
5610.40
4415.75
100.00
57157.07
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
Amount
in Rs.
751.40
1768.00
5305.60
207.20
663.20
1023.68
800.00
146
mazdoor
Day
Total cost of Labour
4.00
310.00
Rs:
28.50
13.615% 3.90
32.40
1240.00
11759.08
Rs:
Rs:
Rs:
Rs:
0.00
57157.07
11759.08
68916.15
Rs:
Rs:
Rs.
9382.93
78299.08
189.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
412.80 cum
Rate per
cum
(A+B+C+D)/412.80
IRR-CAW-2-3
Providing semi-pervious / pervious casing embankment using soil from approved borrow area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting to density control of not less
than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller
etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 3 Nos.
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Quantity
3.40
3.40
8.00
8.00
32.00
32.00
2.00
2.00
4.00
4.00
5.10
5.10
2.00
Quantity
3.40
8.00
32.00
2.00
4.00
5.10
2.00
4.00
13.615%
412.80 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
5832.70
2126.02
8024.80
3900.80
14294.40
9830.40
20.40
162.60
1610.00
1228.80
6845.22
5387.64
40.00
59303.78
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
29.00
3.90
32.90
Amount
in Rs.
751.40
1768.00
5305.60
207.20
663.20
1248.99
800.00
1240.00
11984.39
147
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
412.80 cum
Rate per
cum
(A+B+C+D)/412.80
IRR-CAW-2-4
Rs:
Rs:
Rs:
Rs:
0.00
59303.78
11984.39
71288.17
Rs:
Rs:
Rs.
9705.88
80994.05
196.20
Providing semi-pervious / pervious casing embankment using soil from approved borrow area
in layers of 25cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting to density control of not less
than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller
etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.5 cum
Fuel / Energy charges
Tippers 5 cum
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
1
2
3
4
5
6
7
8
Quantity
3.40
3.40
8.00
8.00
32.00
32.00
2.00
2.00
4.00
4.00
4.17
4.17
5.00
Quantity
412.80 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
5832.70
2126.02
8024.80
3900.80
14294.40
9830.40
20.40
162.60
1610.00
1228.80
5596.97
4405.19
100.00
57133.08
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
751.40
1768.00
5305.60
207.20
663.20
979.60
1668.00
1240.00
12583.00
Rs:
Rs:
Rs:
Rs:
0.00
57133.08
12583.00
69716.08
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
148
IRR-CAW-2-5
Rs:
Rs:
Rs.
Providing semi-pervious / pervious casing embankment using soil from approved borrow area
in layers of 25cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, compacting each layer without watering to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Nill
0.00
0.00
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 3 Nos.
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Hour
Hour
Hour
Hour
Day
Day
Quantity
3.40
3.40
8.00
8.00
32.00
32.00
4.17
4.17
2.00
Quantity
3.40
8.00
32.00
4.17
2.00
4.00
412.80 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
5832.70
2126.02
8024.80
3900.80
14294.40
9830.40
5596.97
4405.19
40.00
54051.28
Rate
in Rs.
221.00
221.00
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
751.40
1768.00
5305.60
1021.23
800.00
1240.00
10886.23
Rs:
Rs:
Rs:
Rs:
0.00
54051.28
10886.23
64937.52
Rs:
Rs:
Rs.
8841.24
73778.76
178.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
412.80 cum
Rate per
cum
(A+B+C+D)/412.80
IRR-CAW-2-6
9491.84
79207.92
191.90
Providing hearting / casing embankment with homogeneous soil from approved borrow
areas in layers of 25 cm before compaction including cost of all materials, machinery,
labour, all operations such as excavation, sorting out, transporting, spreading in layer of
specified thickness, breaking clods, sectioning, watering, compacting each layer to density
control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
149
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
Description
Unit
Angle dozer
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 6 Nos.
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
Quantity
6.06
6.06
8.00
8.00
48.00
48.00
3.00
3.00
6.00
6.00
7.53
7.53
2.00
Quantity
1
2
3
4
5
6
7
8
677.28 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
10395.93
3789.32
8024.80
3900.80
21441.60
14745.60
30.60
243.90
2415.00
1843.20
10106.77
7954.69
40.00
84932.21
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
1339.26
1768.00
7958.40
310.80
994.80
1844.10
800.00
1240.00
16255.36
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
677.28 cum
Rate per
cum
(A+B+C+D)/677.28
IRR-CAW-2-7
Rs:
0.00
Rs: 84932.21
Rs: 16255.36
Rs: 101187.56
Rs: 13776.69
Rs: 114964.25
Rs.
169.70
Providing hearting / casing embankment with homogeneous soil from approved borrow
areas in layers of 25 cm before compaction including cost of all materials, machinery,
labour, all operations such as excavation, sorting out, transporting, spreading in layer of
specified thickness, breaking clods, sectioning, watering, compacting each layer to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
677.28 cum
Rate
in Rs.
Amount
in Rs.
150
Nill
0.00
0.00
0.00
0.00
Rs:
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
10395.93
3789.32
8024.80
3900.80
21441.60
14745.60
30.60
243.90
2415.00
1843.20
8267.95
6507.42
100.00
81706.12
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
1339.26
1768.00
7958.40
310.80
994.80
1508.58
800.00
1240.00
15919.84
Rs:
Rs:
Rs:
Rs:
0.00
81706.12
15919.84
97625.97
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.5 cum
Fuel / Energy charges
Tippers 5 cum 3 Nos
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
Quantity
6.06
6.06
8.00
8.00
48.00
48.00
3.00
3.00
6.00
6.00
6.16
6.16
5.00
Quantity
1
2
3
4
5
6
7
8
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
677.28 cum
Rate per
cum
(A+B+C+D)/677.28
IRR-CAW-2-8
Rs: 13291.78
Rs: 110917.75
Rs.
163.80
Providing casing embankment using homogeneous soil from approved borrow area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as excavation, sortingout, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, compacting each layer without watering to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
Description
Unit
Quantity
677.28 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
Amount
in Rs.
151
1
2
3
4
5
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 4 Nos.
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
1
2
3
4
5
6
Hour
Hour
Hour
Hour
Day
Day
6.06
6.06
8.00
8.00
48.00
48.00
6.16
6.16
2.00
Quantity
6.06
8.00
48.00
6.16
2.00
4.00
1715.50
625.30
1003.10
487.60
446.70
307.20
1342.20
1056.40
20.00
Rs:
10395.93
3789.32
8024.80
3900.80
21441.60
14745.60
8267.95
6507.42
40.00
77113.42
Rate
in Rs.
221.00
221.00
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
1339.26
1768.00
7958.40
1508.58
800.00
1240.00
14614.24
Rs:
Rs:
Rs:
Rs:
0.00
77113.42
14614.24
91727.67
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
677.28 cum
Rate per
cum
(A+B+C+D)/677.28
Rs: 12488.72
Rs: 104216.39
Rs.
153.90
IRR-CAW-3
IRR-CAW-3-1
Providing impervious hearting embankment with soil from approved dump areas in layers
of 25 cm before compaction including cost of all materials, machinery, labour, all
operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to achieve density
control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
Description
Angle dozer
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 6 Nos.
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
4.04
4.04
8.00
8.00
48.00
48.00
3.00
3.00
6.00
6.00
7.50
735.36 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
Amount
in Rs.
6930.62
2526.21
8024.80
3900.80
21441.60
14745.60
30.60
243.90
2415.00
1843.20
10066.50
152
Hour
LS
Description
Unit
C. LABOUR:
Sl No
7.50 1056.40
2.00
20.00
Rs:
Quantity
1
2
3
4
5
6
7
8
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
791.18
1768.00
7958.40
310.80
994.80
1836.75
800.00
1860.00
16319.93
Rs:
Rs:
Rs:
Rs:
0.00
80131.83
16319.93
96451.76
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
735.36 cum
Rate per
cum
(A+B+C+D)/735.36
IRR-CAW-3-2
7923.00
40.00
80131.83
Rs: 13131.91
Rs: 109583.67
Rs.
149.00
Providing impervious hearting embankment with soil from approved dump areas in layers
of 25 cm before compaction including cost of all materials, machinery, labour, all
operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to achieve density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.5 cum
Fuel / Energy charges
Tippers 5 cum
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Quantity
4.04
4.04
8.00
8.00
48.00
48.00
3.00
3.00
6.00
6.00
6.13
6.13
5.00
Quantity
735.36 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
6930.62
2526.21
8024.80
3900.80
21441.60
14745.60
30.60
243.90
2415.00
1843.20
8227.69
6475.73
100.00
76905.75
Rate
Amount
153
1
2
3
4
5
6
7
8
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
in Rs.
892.84
1768.00
7958.40
310.80
994.80
1501.24
800.00
1860.00
16086.08
Rs:
Rs:
Rs:
Rs:
0.00
76905.75
16086.08
92991.83
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
735.36 cum
Rate per
cum
(A+B+C+D)/735.36
IRR-CAW-3-3
Rs: 12660.84
Rs: 105652.67
Rs.
143.70
Providing semi-pervious / pervious casing embankment using soil from approved dump area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 6 Nos
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Quantity
4.22
4.22
8.00
8.00
48.00
48.00
3.00
3.00
6.00
6.00
7.82
7.82
2.00
Quantity
4.22
8.00
48.00
3.00
6.00
768.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
7239.41
2638.77
8024.80
3900.80
21441.60
14745.60
30.60
243.90
2415.00
1843.20
10496.00
8261.05
40.00
81320.73
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
Amount
in Rs.
932.62
1768.00
7958.40
310.80
994.80
154
6
7
8
Hour
Day
Day
7.82
2.00
6.00
IRR-CAW-3-4
244.90
400.00
310.00
Rs:
1915.12
800.00
1860.00
16539.74
Rs:
Rs:
Rs:
Rs:
0.00
81320.73
16539.74
97860.47
Rs:
13323.7
Rs: 111184.17
Rs.
144.80
Providing semi-pervious / pervious casing embankment using soil from approved dump area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, watering, compacting each layer to density control of
not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.5 cum
Fuel / Energy charges
Tippers 5 cum of 6 Nos
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Quantity
4.22
4.22
8.00
8.00
48.00
48.00
3.00
3.00
6.00
6.00
6.40
6.40
5.00
Quantity
4.22
8.00
48.00
3.00
6.00
6.40
2.00
6.00
768.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
7239.41
2638.77
8024.80
3900.80
21441.60
14745.60
30.60
243.90
2415.00
1843.20
8590.08
6760.96
100.00
77974.72
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
21.10
Amount
in Rs.
932.62
1768.00
7958.40
310.80
994.80
1567.36
800.00
1860.00
16191.98
155
13.615% 2.90
24.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
768.00 cum
Rate per
cum
(A+B+C+D)/768
IRR-CAW-3-5
Rs:
Rs:
Rs:
Rs:
0.00
77974.72
16191.98
94166.70
Rs:
12820.8
Rs: 106987.50
Rs.
139.30
Providing semi-pervious / pervious casing embankment using soil from approved dump area
in layers of 25 cm before compaction including cost of all materials, machinery, labour,
all operations such as re-excavation, sorting out, transporting, spreading in layer of specified
thickness, breaking clods, sectioning, compacting each layer without watering to density
control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/
8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Nill
0.00
0.00
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 6 Nos.
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Hour
Hour
Hour
Hour
Day
Day
Quantity
4.22
4.22
8.00
8.00
48.00
48.00
6.40
6.40
2.00
Quantity
4.22
8.00
48.00
6.40
2.00
6.00
768.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
7239.41
2638.77
8024.80
3900.80
21441.60
14745.60
8590.08
6760.96
40.00
73382.02
Rate
in Rs.
221.00
221.00
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
932.62
1768.00
7958.40
1567.36
800.00
1860.00
14886.38
Rs:
Rs:
Rs:
Rs:
0.00
73382.02
14886.38
88268.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
768.00 cum
Rate per
cum
(A+B+C+D)/768
Rs: 12017.74
Rs: 100286.14
Rs.
130.60
156
IRR-CAW-4
IRR-CAW-4-1
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
Quantity
3.60
3.60
3.00
3.00
5.00
5.00
7.30
7.30
2.00
Quantity
1
2
3
4
5
6
600.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
6175.80
2251.08
30.60
243.90
2012.50
1536.00
9798.06
7711.72
40.00
29799.66
Rate
in Rs.
221.00
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
795.60
310.80
829.00
1787.77
400.00
1240.00
5363.17
Rs:
Rs:
Rs:
Rs:
0.00
29799.66
5363.17
35162.83
Rs:
Rs:
Rs.
4787.42
39950.25
66.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
600.00 cum
Rate per
cum
(A+B+C+D)/600
IRR-CAW-4-2
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
600.00 cum
Rate
Amount
157
Nill
0.00
0.00
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
Quantity
3.60
3.60
3.00
3.00
5.00
5.00
6.06
6.06
5.00
Quantity
1
2
3
4
5
6
in Rs.
0.00
0.00
Rs:
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
6175.80
2251.08
30.60
243.90
2012.50
1536.00
8133.73
6401.78
100.00
26885.40
Rate
in Rs.
221.00
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
795.60
310.80
829.00
1484.09
800.00
1240.00
5459.49
Rs:
Rs:
Rs:
Rs:
0.00
26885.40
5459.49
32344.89
Rs:
Rs:
Rs.
4403.76
36748.65
61.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
600.00 cum
Rate per
cum
(A+B+C+D)/600
IRR-CAW-4-3
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
Description
Angle dozer 90 hp
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Unit
Hour
Hour
Hour
Hour
Quantity
3.60
3.60
3.00
3.00
600.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
10.20
81.30
Amount
in Rs.
6175.80
2251.08
30.60
243.90
158
3
4
5
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
5.00 402.50
5.00 307.20
7.30 1342.20
7.30 1056.40
2.00
20.00
Rs:
Quantity
1
2
3
4
5
6
Rate
in Rs.
221.00
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
795.60
310.80
829.00
1787.77
400.00
1240.00
5363.17
Rs:
Rs:
Rs:
Rs:
0.00
29799.66
5363.17
35162.83
Rs:
Rs:
Rs.
4787.42
39950.25
66.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
600.00 cum
Rate per
cum
(A+B+C+D)/600
IRR-CAW-4-4
2012.50
1536.00
9798.06
7711.72
40.00
29799.66
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
C. LABOUR:
Sl No
1
2
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
Hour
Hour
Quantity
3.60
3.60
3.00
3.00
5.00
5.00
6.1
6.1
5.00
Quantity
3.60
3.00
600.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
6175.80
2251.08
30.60
243.90
2012.50
1536.00
8133.73
6401.78
100.00
26885.40
Rate
in Rs.
221.00
103.60
Amount
in Rs.
795.60
310.80
159
3
4
5
6
IRR-CAW-4-5
165.80
244.90
400.00
310.00
Rs:
829.00
1484.09
800.00
1240.00
5459.49
Rs:
Rs:
Rs:
Rs:
0.00
26885.40
5459.49
32344.89
Rs:
Rs:
Rs.
4403.76
36748.65
61.20
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Nill
0.00
C. LABOUR:
Sl No
1
2
3
4
Description
Unit
Angle dozer 90 hp
Fuel / Energy charges
Vibratory Roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
LS
Description
Unit
Quantity
3.60
3.60
6.06
6.06
2.00
Quantity
Hour
Hour
Day
Day
3.60
6.06
1.00
4.00
600.00 cum
Rate
in Rs.
0.00
0.00
Rs:
0.00
Rate
in Rs.
1715.50
625.30
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
6175.80
2251.08
8133.73
6401.78
40.00
23002.40
Rate
in Rs.
221.00
244.90
400.00
310.00
Rs:
Amount
in Rs.
795.60
1484.09
400.00
1240.00
3919.69
Rs:
Rs:
Rs:
Rs:
0.00
23002.40
3919.69
26922.09
Rs:
Rs:
Rs.
3665.44
30587.53
51.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
600.00 cum
Rate per
cum
(A+B+C+D)/600
Amount
in Rs.
160
IRR-CAW-4-6
Providing compacted embankment for field irrigation channels with gravely soil from
approved borrow area including sorting out, spreading in layers of 15 cm thickness, breaking
clods, watering, compacting, dressing sides to required slopes etc.,complete with lead upto
50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
Description
Unit
5 hp pump ( diesel )
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
C. LABOUR:
Sl No
Quantity
1.00
1.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
10.20
81.30
91.50
Amount
in Rs.
103.60
400.00
925.00
0.00
Hour
Day
Day
1.00
1.00
2.50
Rate
in Rs.
103.60
400.00
370.00
Day
5.00
310.00
1550.00
Day
Day
2.50
5.00
310.00
310.00
775.00
1550.00
400.00
400.00
Rs:
400.00
400.00
6103.60
Rs:
Rs:
Rs:
Rs:
0.00
91.50
6103.60
6195.10
Rs:
Rs:
Rs.
843.46
7038.56
281.50
1
2
3
4
Quantity
25.00 cum
5
6
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
25.00 cum
Rate per
cum
(A+B+C+D)/25
IRR-CAW-5
IRR-CAW-5-1
Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials,
machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
UNIT :
particulars
Unit
cum
cum
B. MACHINERY:
Sl No
Description
Unit
Quantity
10.00
4.00
Quantity
10.00 cum
Rate
in Rs.
330.00
560.00
Rs:
Amount
in Rs.
3300.00
2240.00
5540.00
Rate
Amount
161
Nil
0.00
0.00
Description
mazdoor
Unit
Day
Quantity
4.00
in Rs.
0.00
0.00
Rs:
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1240.00
1240.00
Rs:
Rs:
Rs:
Rs:
5540.00
0.00
1240.00
6780.00
Rs:
Rs:
Rs.
923.1
7703.10
770.30
IRR-CAW-5-2
Providing rubble and Murum filling in layers of 22.5 to 30 cm including cost of all materials,
machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
UNIT :
particulars
Unit
cum
cum
B. MACHINERY:
Sl No
Description
Unit
Nil
Quantity
10.00
4.00
Quantity
0.00
0.00
Description
mazdoor
Unit
Day
Quantity
4.00
10.00 cum
Rate
in Rs.
330.00
115.00
Rs:
Amount
in Rs.
3300.00
460.00
3760.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1240.00
1240.00
Rs:
Rs:
Rs:
Rs:
3760.00
0.00
1240.00
5000.00
Rs:
Rs:
Rs.
680.75
5680.75
568.10
IRR-CAW-5-3
Providing and laying 25 cm thick sand blanket below embankment including cost of all
materials, machinery, labour, spreading to specified thickness etc., complete with initial lead
upto 50 m and all lifts.
162
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
cum
Quantity
25.00
0.00
Description
Unit
Quantity
Nil
0.00
0.00
Description
mazdoor
Unit
Quantity
Day
5.00
100.00 sqm
Rate
in Rs.
560.00
0.00
Rs:
Amount
in Rs.
14000.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1550.00
1550.00
Rs:
Rs:
Rs:
Rs:
14000.00
0.00
1550.00
15550.00
Rs:
Rs:
Rs.
2117.13
17667.13
176.70
14000.00
IRR-CAW-5-3-A Providing and laying sand blanket below embankment including cost of all
(New Item3- 2011-12)
materials, machinery, labour, spreading to specified thickness etc., complete with initial lead
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
cum
Quantity
100.00
0.00
Description
Unit
Quantity
Nil
0.00
0.00
Description
mazdoor
Unit
Day
Quantity
20.00
100.00 cum
Rate
in Rs.
560.00
0.00
Rs:
Amount
in Rs.
56000.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
6200.00
6200.00
56000.00
163
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 cum
Rate per
cum
(A+B+C+D)/100
IRR-CAW-5-4
56000.00
0.00
6200.00
62200.00
Rs:
Rs:
Rs.
8468.53
70668.53
706.70
Providing and constructing dry rubble rock-toe using rubble and stone chips from
approved source including cost of all materials, machinery, labour, hand packing rubble
and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto
50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
particulars
Rubble
Stone chips
Sundries
UNIT :
Unit
cum
cum
LS
Quantity
100.00
15.00
2.00
Description
Unit
Nil
Quantity
0.00
0.00
Description
work inspector
Mason Class-II
mazdoor
Unit
Day
Day
Day
Quantity
1.00
7.00
19.00
100.00 cum
Rate
in Rs.
330.00
360.00
20.00
Rs:
Amount
in Rs.
33000.00
5400.00
40.00
38440.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
2590.00
5890.00
8880.00
Rs:
Rs:
Rs:
Rs:
38440.00
0.00
8880.00
47320.00
Rs:
Rs:
Rs.
6442.62
53762.62
537.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 cum
Rate per
cum
(A+B+C+D)/100
IRR-CAW-5-5
Rs:
Rs:
Rs:
Rs:
0.00
Providing and constructing longitudinal and cross graded filter drains using sand and
20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications
including cost of all materials, machinery, labour, laying to required slopes, compaction etc.,
complete with initial lead upto 50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 cum
Rate
in Rs.
560.00
Amount
in Rs.
43008.00
21054.00
Sand (Un-Screened )
cum
76.80
cum
17.40 1210.00
164
B. MACHINERY:
Sl No
Description
cum
Unit
5.80
Quantity
Nil
0.00
0.00
Description
work inspector
mazdoor
Unit
Quantity
Day
Day
1.00
36.00
875.00
Rs:
5075.00
69137.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
11160.00
11560.00
Rs:
Rs:
Rs:
Rs:
69137.00
0.00
11560.00
80697.00
Rs:
Rs:
Rs.
10986.9
91683.90
916.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 cum
Rate per
cum
(A+B+C+D)/100
IRR-CAW-5-6
DATA:
0.00
Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and
filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including
Excavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts.
RATE ANALYSIS
A. MATERIALS:
Sl.No
Particulars
1
12 mm to 40 mm metal
2
Sand (Un-Screened )
Total cost of Materials
B. MACHINERY
Sl.No
Description
1
C. LABOUR
Sl.No
1
2
Unit
Cum
cum
Unit
100 mt
Rate in RsAmount in Rs.
13.5 1145.00 15457.50
36 560.00 20160.00
Rs.
35617.5
Quantity
Cum
Particulars
Unit
Labour for Sand laying
Cum
Labour for Metal laying
Cum
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges
13.615%
labour component/unit qty (including contractor's profit)
ABSTRACT
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Unit:
Qty
45
Qty
5.14
1.93
Rate in Rs.
Amount in Rs.
37.00
Total Rs.
1665.00
1665
21.90
3.00
24.90
Rs.
Rs.
Rs.
Total
Rs:
Rs:
Rs:
Rs.
35617.5
1665
2191.7
39474.20
5374.41
44848.61
448.50
165
IRR-CAW-5-7
Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides
using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size
600x600x750 mm in size including Excavation of drains and Cost of procuring of all materials
including 50 m lead and for all lifts.
DATA
Rate Analysis
Unit
1 Plug
A. MATERIALS:
Sl.No
1
2
3
Particulars
Coarse aggregate
Sand (Un-Screened )
Cement
Total cost of Materials
Unit
Cum
cum
Kg
Rate in Amount in
Qty
Rs
Rs.
0.08 1210.00
97.28
0.203 560.00
113.68
1.181
6.30
7.44
Rs.
218.40
B. MACHINERY
Sl.No
1
2
Description
Excavation of drain with Excavator
Machine mixing Charges
Total hire charges of Machinery
Unit
Cum
Cum
Quantity
0.27
0.003
Rate in
Rs.
Amount in
Rs.
37.00
338.90
Total Rs.
9.99
1.02
11.01
C. LABOUR
Sl.No
1
Particulars
Unit
Day
Qty
0.30
Mazdoor
Total cost of Labour
labour component/unit qty
93.00
Add contractor's profit and overhead charges
13.615% 12.70
labour component/unit qty (including contractor's profit)
105.70
ABSTRACT
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs.
Rs.
Rs.
Total
Rs:
IRR-CAW-5-8
Rate in Amount in
Rs
Rs.
310.00
93.00
Rs.
93.00
218.40
11.01
93.00
322.41
Rs:
Rs:
Rs.
43.9
366.31
366.30
Providing and constructing 0.50 m thick vertical or inclined graded filter media consisting of
15 cm thick sand layers and 20 cm thick 20 mm down coarse aggregate layer using approved
materials satisfying specified filter creteria as per specifications including cost of all materials,
machinery, labour, laying to required slope, compaction etc., complete with initial lead upto
50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 cum
Rate
in Rs.
560.00
Amount
in Rs.
33600.00
Sand (Un-Screened )
cum
60.00
cum
30.00 1210.00
36300.00
cum
10.00
875.00
Rs:
8750.00
78650.00
Rate
in Rs.
0.00
0.00
Amount
in Rs.
0.00
0.00
B. MACHINERY:
Sl No
1
Description
Nil
Unit
Quantity
0.00
0.00
166
Description
work inspector
mazdoor
Unit
Day
Day
Quantity
1.00
36.00
Rs:
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
11160.00
11560.00
Rs:
Rs:
Rs:
Rs:
78650.00
0.00
11560.00
90210.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 cum
Rate per
cum
(A+B+C+D)/100.0
IRR-CAW-5-9
Rs: 12282.09
Rs: 102492.09
Rs.
1024.90
Providing and constructing graded filter media below and behind rock-toe consisting of
20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm down size graded coarse
aggregates satisfying filter creteria behind rock-toe and 15 cm thick sand, 20 cm thick 20 mm
down coarse aggregate and 65 cm thick 40 mm down size coarse aggregate satisfying filter
creiteria below rock-toe as per specifications including cost of all materials, machinery, labour,
laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
UNIT :
particulars
Unit
Sand (Un-Screened )
Coarse aggregate 40-20 mm
Coarse aggregate 20-10 mm
Coarse aggregate 10 mm down
Total cost of Materials
cum
cum
cum
cum
B. MACHINERY:
Sl No
Description
Unit
Nil
Quantity
58.77
52.70
50.70
13.80
Quantity
0.00
0.00
Description
work inspector
mazdoors
Unit
Day
Day
Quantity
1.00
60.00
176.00 cum
Rate
Amount
in Rs.
in Rs.
560.00 32911.20
1145.00 60341.50
1210.00 61347.00
875.00 12075.00
Rs: 166674.70
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
18600.00
19000.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
176.00 cum
Rate per
cum
(A+B+C+D)/176.0
Rs: 166674.70
Rs:
0.00
Rs: 19000.00
Rs: 185674.70
Rs: 25279.61
Rs: 210954.31
Rs.
1198.60
167
IRR-CAW-5-10 Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter
(a)
fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including
cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m
a. for aggregate and all leads for fabric and all lifts.
Using 200 gsm filter fabric.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
B. MACHINERY:
Sl No
Description
UNIT :
Unit
sqm
cum
cum
Unit
Quantity
Rate
in Rs.
210.00 132.00
15.00 1210.00
5.00 875.00
Rs:
Quantity
Nil
0.00
0.00
Description
work inspector
mazdoor
Unit
100.00 sqm
Quantity
Day
Day
1.00
7.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
2170.00
2570.00
Rs:
Rs:
Rs:
Rs:
50245.00
0.00
2570.00
52815.00
Rs:
Rs:
Rs.
7190.76
60005.76
600.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
Amount
in Rs.
27720.00
18150.00
4375.00
50245.00
IRR-CAW-5-11 Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter
(b)
fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including
cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m
for aggregate and all leads for fabric and all lifts.
b. Using 250 gsm filter fabric.
168
Data
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
UNIT :
particulars
Unit
sqm
cum
cum
B. MACHINERY:
Sl No
Description
Unit
Quantity
Rate
in Rs.
210.00 154.00
15.00 1210.00
5.00 875.00
Rs:
Quantity
Nil
0.00
0.00
Description
work inspector
mazdoor
Unit
100.00 sqm
Quantity
Day
Day
1.00
7.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
2170.00
2570.00
Rs:
Rs:
Rs:
Rs:
54865.00
0.00
2570.00
57435.00
Rs:
Rs:
Rs.
7819.78
65254.78
652.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
Amount
in Rs.
32340.00
18150.00
4375.00
54865.00
IRR-CAW-6
IRR-CAW-6-1
Providing and constructing rockfill casing to canal embankment with graded stones and
spalls from approved quarry including cost of all materials, machinery, labour, spreading
stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc.,
complete with initial lead upto 50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
UNIT :
particulars
Unit
cum
B. MACHINERY:
Sl No
Description
Unit
Quantity
100.00
15.00
Quantity
Nil
0.00
0.00
Description
Mason Cl- II
mazdoor
Unit
Quantity
Day
Day
6.00
8.00
100.00 cum
Rate
in Rs.
330.00
360.00
Rs:
Amount
in Rs.
33000.00
5400.00
38400.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
310.00
Rs:
Amount
in Rs.
2220.00
2480.00
4700.00
47.00
169
IRR-CAW-6-2
Note:
Rs:
Rs:
Rs:
Rs:
38400.00
0.00
4700.00
43100.00
Rs:
Rs:
Rs.
5868.07
48968.07
489.70
Providing and constructing rockfill casing to canal embankment with graded stones and
spalls available in dump yard (spoil bank) including cost of all materials, machinery, labour, spreading
stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc.,
complete with initial lead upto 50 m and all lifts.
Stones and spalls available in dump yard shall be issued at specified issue rate.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
B. MACHINERY:
Sl No
Description
UNIT :
Unit
cum
Quantity
100.00
Unit
Quantity
0.00
0.00
1
2
3
Description
Mason Cl- II
Crowbarman
mazdoor
Rate
in Rs.
165.00
Amount
in Rs.
16500.00
185.00
Rs:
2775.00
19275.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
370.00
310.00
Rs:
Amount
in Rs.
2220.00
740.00
3100.00
6060.00
Rs:
Rs:
Rs:
Rs:
19275.00
0.00
6060.00
25335.00
Rs:
Rs:
Rs.
3449.36
28784.36
287.80
15.00
Nil
C. LABOUR:
Sl No
100.00 cum
Unit
Day
Day
Day
Quantity
6.00
2.00
10.00
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 cum
Rate per
cum
(A+B+C+D)/100.0
IRR-CAW-7
IRR-CAW-7-1
Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow
area including spreading soil in layers of thickness not more than 15 cm, breaking clods,
watering, compacting to density control of not less than 98 percent or as stipulated,
dressing to required profile etc., complete with initial lead upto 1 km and all lifts.
DATA:
0.50 cum
170
:
:
:
:
:
:
:
:
say :
say :
say :
0.58
5.00
1
20
25
2.00
32
0.50
4.00
8
4.30
:
:
:
:
:
:
:
:
say :
4.30
3.00
2.00
2.40
0.50
12.20
3
16.40
394
cum
cum
km
km / hr
km / hr
min
sec
cum
cum
buckets
min
min
min
min
min
min
min
Nos
cum
cum
Total
No. of tippers to match corrected cycle time of shovel ( 12.60 / 4.00 )
Output of tipper / hr with 50 min working / hr ( 50 x 4.00 / 12.20 )
Output for 3 tippers per day ( 3 x 16.40 x 8 )
Stripping of borrow area :
Generally borrow area is stripped once in a week for 6 days requirement of soil.
Area to be stripped assuming 2.0 m depth of cut ( 394 x 6 / 2.0 )
:
1182 sqm
Depth of stripping
:
0.2 m
Quantity of stripping considering 5 % extra area ( 1182x1.05x0.20 )
:
248 cum
Output of dozer per hr with 50 min / hr working for stripping
:
72 cum
Time required for stripping 248 cum
:
3.5 hours
Consider 5 hours including time for levelling stripped siol / shifting time.
Requirement of dozer for one day work of 394 cum
say :
1.00 hours
Collection of soil for embankment:
Deploy one 0.50 cum capacity shovel for 8 hours for digging and loading soil.
Deploy 3 tippers of 5.00 cum capacity for 8 hours to convey soil to embankment area.
Spreading soil in 15 cm layer:
In view of narrow width spreading soil by dozer is generally not be possible.
Soil collected in heaps along the edge of the canal can be pushed down by dozer to the extent
required and further spreading in layers of specified thickness has to be carried out by manual
labour. Deploy dozer for 2.00 hour for pushing soil.
Output of mazdoor for levelling per day
:
20 cum
Consider 27 mazdoors for levelling 551.6 cum soil including extra soil to be laid for roller
margin.
Watering;
Generally soil in the borrow area will be in moist condition. In the beginning of the season no
watering may be necessary and in summer months about 8 to 10 percent watering may be
needed to maintain soil moisture within OMC plus or minus 3 percent limit. Assuming seasonal
average of 5 % watering by weight, the daily requirement of water for 394 cum of embankment
will be about 4 tanker loads of 8000 ltrs each.
Deploy 8000 ltr capacity water tanker for 4 hours daily for watering before rolling.
Consider 2 mazdoors for spraying water.
Compaction:
Since dozer is not considered for spreading soil about 25 percent extra roller passes needed.
Generally about 10 to 12 passes of diesel road roller is adequate for achieving 98 percent density
control for 25 cm thick loose layer.
Effective length of roller drum
:
1.50 m
Speed of roller per hour
:
3.00 km
Thickness of layer
:
0.15 m
Number of roller passes to achieve specified density control
:
12 Nos
Output of roller / hr with 50 min /hr working and 75 % effenciancy
50 / 60 ( 1.5 x 3000 x 0.15 x 0.75 / 12 )
35.15625 say :
35.15 cum/hour
Time for rolling 394 cum spread soil
11.2091 say :
11.5 hours
Sorting out/ sectioning etc :
Assume 4 mazdoors for sorting out.
No extra labour required for sectioning as trimming roller margin forms part of the soil collection
for bed lining.However 5 mazdoors considered for finishing to required slopes.
DATA:
RATE ANALYSIS
UNIT :
394.00 cum
A. MATERIALS:
171
Sl No
particulars
Nil
Unit
Quantity
0.00
0.00
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
Quantity
8.00
8.00
3.00
3.00
24.00
24.00
4.00
4.00
4.00
4.00
11.50
11.50
5.00
Quantity
1
2
3
4
5
6
7
8
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1003.10
487.60
1715.50
625.30
446.70
307.20
10.20
81.30
402.50
307.20
197.20
731.40
20.00
Rs:
Amount
in Rs.
8024.80
3900.80
5146.50
1875.90
10720.80
7372.80
40.80
325.20
1610.00
1228.80
2267.80
8411.10
100.00
51025.30
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
195.90
400.00
310.00
Rs:
Amount
in Rs.
1768.00
663.00
3979.20
414.40
663.20
2252.85
800.00
11780.00
22320.65
Rs:
Rs:
Rs:
Rs:
0.00
51025.30
22320.65
73345.95
Rs:
Rs:
Rs.
9986.05
83332.00
211.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
394.00 cum
Rate per
cum
(A+B+C+D)/394.0
IRR-CAW-7-2
Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow
area including spreading soil in layers of thickness not more than 15 cm, breaking clods,
watering, compacting to density control of not less than 95 percent or as stipulated,
dressing to required profile etc., complete with initial lead upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
Nil
Total cost of Materials
UNIT :
Unit
Quantity
0.00
0.00
394.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
B. MACHINERY:
172
Sl No
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Description
Unit
2
3
4
5
6
7
C. LABOUR:
Sl No
Quantity
8.00
8.00
3.00
3.00
24.00
24.00
4.00
4.00
4.00
4.00
10.00
10.00
5.00
Quantity
1
2
3
4
5
6
7
8
Rate
in Rs.
1003.10
487.60
1715.50
625.30
446.70
307.20
10.20
81.30
402.50
307.20
197.20
731.40
20.00
Rs:
Amount
in Rs.
8024.80
3900.80
5146.50
1875.90
10720.80
7372.80
40.80
325.20
1610.00
1228.80
1972.00
7314.00
100.00
49632.40
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
195.90
400.00
310.00
Rs:
Amount
in Rs.
1768.00
663.00
3979.20
414.40
663.20
1959.00
800.00
11780.00
22026.80
Rs:
Rs:
Rs:
Rs:
0.00
49632.40
22026.80
71659.20
Rs:
Rs:
Rs.
9756.4
81415.60
206.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
394.00 cum
Rate per
cum
(A+B+C+D)/394.0
IRR-CAW-7-3
Providing cohesive non-swelling ( CNS ) soil lining to canal using soil collected in heaps
along the edge of canal requiring CNS soil lining as part of the disposal of excavated soil from
canal excavation in CNS soil reach including spreading in layers of thickness not more than
15 cm, breaking clods, watering, compacting to density control of not less than 95 percent
or as stipulated, dressing to required profile etc., complete with lead upto upto 50 m and all
lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Nil
Quantity
0.00
0.00
Description
Angle Dozer 90 hp
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Unit
Hour
Hour
Hour
Hour
Quantity
1.50
1.50
5.00
5.00
394.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
10.20
81.30
Amount
in Rs.
2573.25
937.95
51.00
406.50
173
3
4
5
Hour
Hour
Hour
Hour
LS
Description
Unit
C. LABOUR:
Sl No
5.00
5.00
13.00
13.00
5.00
Quantity
1
2
3
4
5
6
402.50
307.20
197.20
731.40
20.00
Rs:
2012.50
1536.00
2563.60
9508.20
100.00
19689.00
Rate
in Rs.
221.00
103.60
165.80
195.90
400.00
310.00
Rs:
Amount
in Rs.
331.50
518.00
829.00
2546.70
800.00
11780.00
16805.20
Rs:
Rs:
Rs:
Rs:
0.00
19689.00
16805.20
36494.20
Rs:
Rs:
Rs.
4968.69
41462.89
105.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
394.00 cum
Rate per
cum
(A+B+C+D)/394.0
IRR-CAW-7-4
Providing and fixing 20 x 20 x 75 cm size top surface neatly dressed canal bed level
stones including cost of all materials, labour, excavation, fixing in position to correct level etc.,
complete with lead upto 50 m and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Each
Quantity
32.00
0.00
Description
Unit
Nil
Quantity
0.00
0.00
Description
1
2
3
Unit
Quantity
work inspector
Day
1.00
Stone chiseller Cl- I
Day
2.00
mazdoor
Day
2.00
Total cost of Labour
labour component/unit qty
57.80
Add contractor's profit and overhead charges
13.615% 7.90
labour component/unit qty (including contractor's profit)
65.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
32 Nos.
Rate
in Rs.
23.00
0.00
Rs:
Amount
in Rs.
736.00
0.00
736.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
400.00
415.00
310.00
Rs:
Amount
in Rs.
400.00
830.00
620.00
1850.00
Rs:
Rs:
Rs:
736.00
0.00
1850.00
0.00
174
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
32.00 Nos.
Rate per
each
(A+B+C+D)/32.0
IRR-CAW-7-5
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Rs:
Rs:
Rs.
352.08
2938.08
91.80
UNIT : 1000.00 kg
particulars
Unit
kg
kg
LS
B. MACHINERY:
Sl No
Description
Unit
Quantity
1050.00
8.00
10.00
Quantity
Nil
0.00
0.00
Description
Bar bender
mazdoor
Unit
Quantity
Day
Day
6.00
11.00
Rate
in Rs.
40.00
70.00
20.00
Rs:
Amount
in Rs.
42000.00
560.00
200.00
42760.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
490.00
310.00
Rs:
Amount
in Rs.
2940.00
3410.00
6350.00
Rs:
Rs:
Rs:
Rs:
42760.00
0.00
6350.00
49110.00
Rs:
Rs:
Rs.
6686.33
55796.33
55.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
1000.00 kg
Rate per
kg
(A+B+C+D)/1000.0
DATA:
2586.00
Providing, fabricating and placing in position reinforcement steel bars for RCC works
including cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.
soft annealed steel wire, welding wherever required including cost of all materials, machinery,
labour etc., complete with initial lead upto 50 and all lifts.
DATA
IRR-CAW-7-6
Rs:
Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not less
than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard,
graded aggregates for canal lining using vibrating cylinder type mechanical paver including
cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,
finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts.
(43 Gr Cement content: 300 kg /cum (22.5 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum equivalent concrete volume:79.2 cum including the extra quantity of
concrete for curvatures and bends etc.,)
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
1
2
Cement 43 Gr
Coarse aggregate 20-10 mm
UNIT :
Unit
kg
cum
960 sqm
Quantity
Rate
Amount
in Rs.
in Rs.
23760.00
6.30 149688.00
41.18 1210.00 49832.64
175
3
4
5
6
7
cum
cum
kg
Rm
sqm
LS
22.18
35.64
95.04
640.00
960.00
5.00
Unit
Quantity
Batching plant
Lubricants etc @ 5 %
Transit mixer 3 Nos
Fuel / Energy charges
Mechanical paver
Lubricants etc @ 5 %
DG set for batching plant 50 KVA
Fuel / Energy charges
DG set for paver 30 KVA
Fuel / Energy charges
Shovel 0.5 cum / Loader
Fuel / Energy charges
Water tanker
Fuel / Energy charges
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
8.00
8.00
24.00
24.00
8.00
8.00
8.00
8.00
8.00
8.00
2.00
2.00
8.00
8.00
Hour
Hour
LS
8.00
8.00
5.00
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
9
C. LABOUR:
Sl No
Description
Unit
Quantity
1
2
3
4
5
6
7
8
9
10
11
12
13
14
2%
0.5%
1%
875.00 19404.00
560.00 19958.40
95.00
9028.80
47.00 30080.00
0.88
842.40
20.00
100.00
Rs: 278934.24
Rate
in Rs.
405.40
20.27
758.40
893.90
356.50
17.83
85.10
975.20
65.80
650.10
1003.10
487.60
402.50
307.20
Amount
in Rs.
3243.20
162.16
18201.60
21453.60
2852.00
142.60
680.80
7801.60
526.40
5200.80
2006.20
975.20
3220.00
2457.60
10.20
81.30
20.00
Rs:
81.60
650.40
100.00
69755.76
Rate
Amount
in Rs.
in Rs.
318.20
2545.60
265.20
6364.80
391.90
3135.20
122.50
1960.00
221.00
442.00
165.80
1326.40
103.60
1657.60
415.00
830.00
415.00
415.00
415.00
415.00
480.00
480.00
400.00
800.00
310.00
1550.00
310.00
3100.00
Rs:
25021.60
Rs:
278934.24
Rs:
69755.76
Rs:
25021.6
Total
Rs:373711.6
Rs:
7474.232
Rs:
1868.558
Rs:
3737.116
Total
Rs: 386791.51
13.615%
Rs: 52661.66
cum @
31.3 Rs./Cum
1115.532
cum @
30.2 Rs./Cum1913.47
129.7 Rs./Tonne
3081.672
176
IRR-CAW-7-7
DATA:
960.00 sqm
(A+B+C+D)/960.0
Rs: 445563.84
Rs.
464.10
Providing and laying 80 mm thick in-situ M-15 ( 28 days cube compressive strength not less
than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard,
graded aggregates for canal lining using vibrating cylinder type mechanical paver including
cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,
finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver
from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts.
(43 Gr Cement content: 300 kg /cum (24 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum equivalent concrete volume:84.48 cum including the extra quantity of
concrete for curvatures and bends etc.,)
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
1
2
3
4
5
6
7
Unit
Quantity
kg
cum
cum
cum
kg
Rm
sqm
LS
25344.00
43.93
23.65
38.02
101.38
640.00
960.00
5.00
Unit
Quantity
Batching plant
Lubricants etc @ 5 %
Transit mixer 3 Nos
Fuel / Energy charges
Mechanical paver
Lubricants etc @ 5 %
DG set for batching plant 50 KVA
Fuel / Energy charges
DG set for paver 30 KVA
Fuel / Energy charges
Shovel 0.5 cum / Loader
Fuel / Energy charges
Water tanker
Fuel / Energy charges
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
8.00
8.00
24.00
24.00
8.00
8.00
8.00
8.00
8.00
8.00
2.00
2.00
8.00
8.00
Hour
Hour
LS
8.00
8.00
5.00
Cement 43 Gr
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Fine aggregate (Un-Screened )
Super plasticiser
PVC sealing strip
Use rate of paving cylinder
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
Description
1
2
3
4
5
6
7
8
9
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
10
11
UNIT :
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Day
Day
Quantity
8.00
24.00
8.00
16.00
2.00
8.00
16
2
1
1
1
960 sqm
Rate
Amount
in Rs.
in Rs.
6.30 159667.20
1210.00 53154.82
875.00 20697.60
560.00 21288.96
95.00
9630.72
47.00 30080.00
0.88
842.40
20.00
100.00
Rs: 295461.70
Rate
in Rs.
405.40
20.27
758.40
893.90
356.50
17.83
85.10
975.20
65.80
650.10
1003.10
487.60
402.50
307.20
Amount
in Rs.
3243.20
162.16
18201.60
21453.60
2852.00
142.60
680.80
7801.60
526.40
5200.80
2006.20
975.20
3220.00
2457.60
10.20
81.30
20.00
Rs:
81.60
650.40
100.00
69755.76
Rate
Amount
in Rs.
in Rs.
318.20
2545.60
265.20
6364.80
391.90
3135.20
122.50
1960.00
221.00
442.00
165.80
1326.40
103.60
1657.60
415.00
830.00
415.00
415.00
415.00
415.00
480.00
480.00
177
12
13
14
work inspector
Day
2 400.00
mazdoor ( BP site )
Day
5 310.00
mazdoor ( Paver site )
Day
10 310.00
Total cost of Labour
Rs:
labour component/unit qty
26.10
Add contractor's profit and overhead charges
13.615% 3.60
labour component/unit qty (including contractor's profit)
29.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Add for shifting & re-erection of BP @
Add for LH / RH shifting & erection of Paver @
Add for ledge cutting / erection of tracks etc @
2%
0.5%
1%
Rs:
295461.70
Rs:
69755.76
Rs:
25021.6
Total
Rs:
390239.06
Rs:
7804.7811
Rs:
1951.1953
Rs:
3902.3906
Total
Rs: 403897.42
13.615%
Rs: 54990.63
cum @
31.3 Rs./Cum
1189.9008
cum @
30.2 Rs./Cum2041.04
IRR-CAW-7-8
DATA:
800.00
1550.00
3100.00
25021.60
129.7 Rs./Tonne
3287.1168
Rs: 465406.11
Rs.
484.80
Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than
15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded
aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all
materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming
contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere
side of canal etc., complete with initial lead upto 1 Km and all lifts.
(43 Gr Cement content: 300 kg /cum (30 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.45 cum equivalent concrete volume:88 cum including the extra quantity of
concrete for curvatures and bends etc.,)
RATE ANALYSIS
A. MATERIALS:
Sl.No
Particulars
1
Cement 43 Gr
2
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
3
Fine aggregate (Un-Screened)
4
Super plasticiser
5
PVC sealing strip
6
Use rate of paving cylinder
Total cost of Materials
B. MACHINERY:
Sl.No
Particulars
1
Batching plant
2
Transit mixer 3 Nos
Fuel / Energy charges
3
Mechanical paver
lubricants etc @ 5%
4
DG set for batching plant 50 KVA
Fuel / Energy charges
5
DG set for paver 30 KVA
Fuel / Energy charges
6
Shovel 0.5 cum / Loader
Fuel / Energy charges
7
Water tanker
Fuel / Energy charges
Pump 5 hp (diesel) 2 Nos. 4 hrs
8
each
UNIT
Unit
Kg
cum
cum
cum
kg
Rm
sqm
Qty
Rate in Rs.
Amount
26400
6.30 166320.00
45.76 1210.00 55369.60
24.64 875.00 21560.00
39.6 560.00 22176.00
105.6
95.00 10032.00
533
47.00 25051.00
800 0.8775
702.00
Rs.
301210.6
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Qty
Rate in Rs.
Amount
8 405.40
3243.20
24 758.40 18201.60
24 893.90 21453.60
8 356.50
2852.00
8
17.83
142.60
8
85.10
680.80
8 975.20
7801.60
8
65.80
526.40
8 650.10
5200.80
2.00 1003.10
2006.20
2.00 487.60
975.20
8 402.50
3220.00
8 307.20
2457.60
Hour
800 Sqm
10.20
81.60
178
Unit
Quantity
1
2
3
4
5
6
7
8
9
10
11
12
13
14
81.30
Rs.
650.40
69493.6
Rate
Amount
in Rs.
in Rs.
318.20
2545.60
265.20
6364.80
391.90
3135.20
122.50
1960.00
221.00
442.00
165.80
1326.40
103.60
828.80
415.00
830.00
415.00
415.00
415.00
415.00
480.00
480.00
400.00
800.00
310.00
1550.00
310.00
3100.00
Rs:
24192.80
ABSTRACT
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs.
301210.6
Rs.
69493.6
Rs.
24192.80
TOTAL Rs. 394897
Add for shifting & re-erection of BP @
2% Rs.
7897.94
Add for LH / RH shifting & erection of Paver @
0.5% Rs.
1974.485
Add for ledge cutting / erection of tracks etc @
1% Rs.
3948.97
Total
Rs: 408718.40
D. Add for contractor's profit and overheads on (A+B+C+other 13.615%
Rs: 55647.01
Lead Charges for 1 Km for FA
39.60
cum @
31.3 Rs./Cum1239.48
Lead Charges for 1 Km for CA
70.40
cum @
30.2 Rs./Cum2126.08
Lead Charges for 1Km for Cement (including
Loading and Unloading Charges)
26.40
tonne @ 129.7 Rs./Tonne
3424.08
Total cost for
800.00 Sqm
Rs: 471155.05
Rate per
Sqm
(A+B+C+D)/800.0
Rs.
588.90
IRR-CAW-7-9
Note:
Dismantling, shifting and re-erecting mechanical concrete paver and DG set with all
accessories across canal CD work or other locations wherever shifting and re-erecting is
necessary including aligning paver correctly for continuing canal lining work, cost of all
materials, machinery, labour etc., complete with all leads and lifts.
Local shifting and re-erection of paver for LH and RH side lining included in concrete lining rates
under items IRR-CAW-7-7 and IRR-CAW-7-8 and saperate rate for shifting shall not be allowed.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
NIL
Quantity
0.00
Description
Tipper
Fuel / Energy charges
Sundries (ropes / rails etc)
Unit
Hour
Hour
LS
Quantity
4.00
1.00
1.00
1.00 Shifting
Rate
in Rs.
0.00
Amount
in Rs.
Rs:
0.00
Rate
in Rs.
446.70
307.20
20.00
Amount
in Rs.
1786.8
307.2
20
179
Description
Crew for Tipper
Crew for Paver
mazdoor
Unit
Hour
Hour
Day
Quantity
4.00
8.00
6.00
Rs:
2114.00
Rate
in Rs.
165.80
391.90
310.00
Rs:
Amount
in Rs.
663.2
3135.2
1860
5658.40
Rs:
Rs:
Rs:
Rs:
0.00
2114.00
5658.40
7772.40
Rs:
Rs:
Rs.
1058.21
8830.61
8830.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
1.00 Shifting
Rate per
Shifting
(A+B+C+D)/1.0
IRR-CAW-7-10 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal(150mm thick) including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 250 kg / cum )
( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
3
4
6
7
particulars
B. MACHINERY:
Sl No
Description
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
LS
Unit
Quantity
7042.5
28.17 cum
Rate
in Rs.
6.30
Amount
in Rs.
44367.75
140.85
6.30
887.355
12.68 1145.00 14514.593
7.61 1210.00 9203.139
5.07 875.00 4436.775
11.27 560.00
6310.08
28.17
95.00
2676.15
180
27.37
4925.94
2
20.00
40
Rs: 87361.78
Quantity
Rate
in Rs.
Amount
in Rs.
180
1
2
3
C. LABOUR:
Sl No
Hour
Hour
Hour
Hour
Hour
Hour
16.00
16.00
0.50
0.50
1.00
1.00
92.70
162.50
10.20
81.30
402.50
307.20
1483.2
2600
5.1
40.65
402.5
307.2
Hour
Hour
16.00
16.00
7.60
20.60
Rs:
121.6
329.6
5289.85
Description
Unit
Rate
in Rs.
204.10
103.60
165.80
146.90
400.00
415.00
415.00
Amount
in Rs.
3265.6
51.8
165.8
2350.4
400
830
415
310.00
310.00
310.00
310.00
310.00
Rs:
6820
2480
1860
8732.7
620
27991.30
Quantity
1
2
3
4
5
6
7
8
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
28.17 cum
Rate per
cum
(A+B+C+D)/28.17
Rs: 87361.78
Rs:
5289.85
Rs: 27991.30
Rs: 120642.93
Rs: 16425.54
Rs: 137068.47
Rs.
4865.80
IRR-CAW-7-11 Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than
10 N/sqm) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregade for bed and side lining of canal(100 mm thick) including, finishing the junction of bed and sides
to required curvature, cost of all materials, machinery, labour, formwork including supports
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead up to 50 m and all lifts (Cement content: 250 kg/cum)
( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA
RATE ANALYSIS
A. MATERIALS:
Sl.No
Particulars
1
Cement for mix
3
4
UNIT:
Unit
kg
kg
cum
cum
cum
cum
kg
27 cum
850.50
13911.75
8820.90
4252.50
6048.00
2565.00
181
sqm
270
C. LABOUR:
Sl No
Particulars
Unit
Qty
27.37
Total Rs.
Rs.
7388.91
86362.56
86362.56
Hour
Hour
Hour
Hour
Hour
Hour
16.00
16.00
0.50
0.50
1.00
1.00
92.70
162.50
10.20
81.30
402.50
307.20
1483.20
2600.00
5.10
40.65
402.50
307.20
Hour
Hour
4.00
4.00
7.60
20.60
Rs.
30.40
82.40
4951.45
Rate
in Rs.
204.10
103.60
165.80
146.90
400.00
415.00
415.00
Amount
in Rs.
3265.6
51.8
165.8
2350.4
400
830
415
310.00
310.00
310.00
310.00
310.00
Rs:
6820
2480
1860
8370
620
27628.60
Description
Unit
Quantity
1
2
3
4
5
6
7
8
Rs.
86362.56
Rs.
4951.45
Rs.
27628.60
Total Rs. 118942.61
Rs: 16194.04
Rs: 135136.65
Rs.
5005.10
IRR-CAW-7-12 Providing and laying100mm thick insitu vibrated M-10 (28 days cube compressive strength-not less than
10.00 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver
including cost of all materials mechinery labour batching mixing placing in position forming
contraction joints fixing pvc joint seiling strips shifting of paver from one side of canal to other
side etc.complete with 1 km lead & all lifts.
(Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl.No
Particulars
1
Cement 43 Gr
2
Coarse aggregate 40 mm
Coarse aggregate 20 mm
UNIT
Unit
Kg
cum
cum
800 Sqm
Qty Rate in Rs. Amount
22000.00
6.30
138600
39.60 1145.00
45342
23.76 1210.00
28749.6
182
3
4
5
6
Coarse aggregate 10 mm
Fine aggregate (Un-Screened)
Super plasticiser
PVC sealing strip
Use rate of paving cylinder
Total cost of Materials
B. MACHINERY:
Sl.No
Particulars
1
Batching plant
2
Transit mixer 3 Nos
Fuel / Energy charges
3
Mechanical paver
lubricants etc @ 5%
4
DG set for batching plant 50 KVA
Fuel / Energy charges
5
DG set for paver 30 KVA
Fuel / Energy charges
6
Shovel 0.5 cum / Loader
Fuel / Energy charges
7
Water tanker
Fuel / Energy charges
Pump 5 hp (diesel) 2 Nos. 4 hrs
8
each
Fuel / Energy charges
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
cum
cum
kg
Rm
sqm
15.84
35.20
88.00
533.00
800.00
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Unit
8.00
8.00
Quantity
1
2
3
4
5
6
7
8
9
10
11
12
13
14
875.00
13860
560.00
19712
95.00
8360
47.00
25051
0.878
702
Rs.
280376.60
10.20
81.30
Rs.
81.6
650.4
68370.63
Rate
Amount
in Rs.
in Rs.
318.20
2545.60
265.20
6364.80
391.90
3135.20
122.50
1960.00
221.00
442.00
165.80
1326.40
103.60
828.80
415.00
830.00
415.00
415.00
415.00
415.00
480.00
480.00
400.00
800.00
310.00
1550.00
310.00
3100.00
Rs:
24192.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs.
280376.60
Rs.
68370.63
Rs.
24192.80
TOTAL Rs.372940.03
Add for shifting & re-erection of BP @
2% Rs.
7458.8
Add for LH / RH shifting & erection of Paver @
0.5% Rs.
1864.7
Add for ledge cutting / erection of tracks etc @
1% Rs.
3729.4
Total
Rs: 385992.93
D. Add for contractor's profit and overheads on (A+B+C+other 13.615%
Rs: 52552.94
Lead Charges for 1 Km for FA
35.20
cum @
31.3 Rs./Cum1101.76
Lead Charges for 1 Km for CA
79.20
cum @
30.2 Rs./Cum2391.84
Lead Charges for 1Km for Cement (including
Loading and Unloading Charges)
Total cost for
Rate per
Sqm
22.00
tonne @
800.00 Sqm
(A+B+C+D)/800.0
129.7 Rs./Tonne
2853.4
Rs: 444892.87
Rs.
556.10
183
IRR-CAW-7-13 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 250 kg / cum )
(Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
B. MACHINERY:
Sl No
1
2
3
C. LABOUR:
Sl No
particulars
UNIT :
Unit
kg
kg
cum
cum
cum
kg
sqm
LS
Quantity
27.00 cum
Rate
in Rs.
6.30
Amount
in Rs.
42525
135
6.30
14.04 1210.00
7.56 875.00
12.15 560.00
27
95.00
270
27.37
2
20.00
Rs:
850.5
16988.4
6615
6804
2565
7388.91
40
83776.81
6750
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
16.00
16.00
0.50
0.50
1.00
1.00
92.70
162.50
10.20
81.30
402.50
307.20
1483.2
2600
5.1
40.65
402.5
307.2
Hour
Hour
16.00
16.00
7.60
20.60
Rs:
121.6
329.6
5289.85
Description
Unit
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
415.00
Amount
in Rs.
3265.6
51.8
165.8
2350.40
830
400
415
310.00
310.00
310.00
310.00
310.00
Rs:
6820
2480
1860
8370
620
27628.60
Rs:
Rs:
Rs:
83776.81
5289.85
27628.60
1
2
3
4
5
6
7
8
Quantity
Quantity
Rate
in Rs.
Amount
in Rs.
184
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
27.00 cum
Rate per
cum
(A+B+C+D)/27.0
Rs: 116695.26
Rs: 15888.06
Rs: 132583.32
Rs.
4910.50
IRR-CAW-7-14 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal(150 mm thick) including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 290 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
3
4
5
6
B. MACHINERY:
Sl No
1
2
3
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
particulars
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
LS
Quantity
24.92 cum
Rate
in Rs.
6.30
Amount
in Rs.
45528.84
124.6
6.30
11.21 1145.00
6.73 1210.00
4.49 875.00
9.97 560.00
28.91
95.00
166.14
27.37
2
20.00
Rs:
784.98
12840.03
8141.364
3924.90
5582.08
2746.18
4546.64
40.00
84135.02
7226.8
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
16.00
16.00
0.50
0.50
1.00
1.00
92.70
162.50
10.20
81.30
402.50
307.20
1483.20
2600.00
5.10
40.65
402.50
307.20
Hour
Hour
16.00
16.00
7.60
20.60
Rs:
121.60
329.60
5289.85
Description
Unit
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
415.00
Amount
in Rs.
3265.6
51.80
165.8
2350.40
830
400
415
310.00
310.00
310.00
310.00
310.00
Rs:
6820
2480
1860
7725.2
620
26983.80
Quantity
Quantity
Hour
Hour
Hour
Hour
Day
Day
Day
16.00
0.50
1.00
16.00
2.00
1.00
1.00
Day
Day
Day
Day
Day
22.00
8.00
6.00
24.92
2.00
Rate
in Rs.
Amount
in Rs.
1082.80
185
Rs: 84135.02
Rs:
5289.85
Rs: 26983.80
Rs: 116408.67
Rs: 15849.04
Rs: 132257.71
Rs.
5307.30
IRR-CAW-7-15 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal(100 mm thick) including finishing the junction of bed and sides
to required curveture, cost of all materials, machinery, labour, formwork including supports,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),
CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
6
7
B. MACHINERY:
Sl No
1
2
3
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
particulars
UNIT :
Unit
kg
kg
cum
cum
cum
kg
sqm
LS
Quantity
23.10 cum
Rate
in Rs.
6.30
Amount
in Rs.
43659
115.5
6.30
12.01 1210.00
6.47 875.00
10.40 560.00
27.72
95.00
231
27.37
2
20.00
Rs:
727.65
14534.52
5659.5
5821.2
2633.40
6321.62
40
79396.89
6930
Description
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
16.00
16.00
0.50
0.50
1.00
1.00
92.70
162.50
10.20
81.30
402.50
307.20
1483.2
2600
5.1
40.65
402.5
307.2
Hour
Hour
16.00
16.00
7.60
20.60
Rs:
121.6
329.6
5289.85
Description
Unit
Hour
Hour
Hour
Hour
Day
Day
Day
16.00
0.50
1.00
16.00
2.00
1.00
1.00
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
415.00
Amount
in Rs.
3265.6
51.8
165.8
2350.4
830
400
415
Day
22.00
310.00
6820
Quantity
Rate
in Rs.
Amount
in Rs.
186
310.00
310.00
310.00
310.00
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
23.10 cum
Rate per
cum
(A+B+C+D)/23.10
2480
1860
7161
620
26419.60
Rs: 79396.89
Rs:
5289.85
Rs: 26419.60
Rs: 111106.34
Rs: 15127.13
Rs: 126233.47
Rs.
5464.70
IRR-CAW-7-16 Providing and laying150mm thick insitu vibrated M-15 (28 days cube compressive strength-not less than
15.00 N / sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver
including cost of all materials mechinery labour batching mixing placing in position forming
contractiom joints fixing pvc joint seiling strips shifting of paver from one side of canal to other
side etc.complete with 1km lead & all lifts.
(43 Gr Cement content: 300 kg /cum (45 kg/ sqm) for
use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35,
FA : 0.44 cum equivalent concrete volume:132 cum including the extra quantity of
concrete for curvatures and bends etc.,)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl.No
Particulars
1
Cement 43 Gr
2
Coarse aggregate 20 mm
Coarse aggregate 10 mm
3
Fine aggregate (Un-Screened)
4
Super plasticiser
5
PVC sealing strip
6
Use rate of paving cylinder
Total cost of Materials
B. MACHINERY:
Sl.No
Particulars
1
Batching plant
2
Transit mixer 3 Nos
Fuel / Energy charges
3
Mechanical paver
lubricants etc @ 5%
4
DG set for batching plant 50 KVA
Fuel / Energy charges
5
DG set for paver 30 KVA
Fuel / Energy charges
6
Shovel 0.5 cum / Loader
Fuel / Energy charges
7
Water tanker
Fuel / Energy charges
Pump 5 hp (diesel) 2 Nos. 4 hrs
8
each
Fuel / Energy charges
Total hire charges of Machinery
UNIT
800 Sqm
Unit
Kg
cum
cum
cum
kg
Rm
sqm
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
8.00
8.00
10.20
81.30
Rs.
81.6
650.4
68370.63
C. LABOUR:
187
Sl No
Description
Unit
Quantity
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Rate
Amount
in Rs.
in Rs.
318.20
2545.60
265.20
6364.80
391.90
3135.20
122.50
1960.00
221.00
442.00
165.80
1326.40
103.60
828.80
415.00
830.00
415.00
415.00
415.00
415.00
480.00
480.00
400.00
800.00
310.00
1550.00
310.00
3100.00
Rs:
24192.80
ABSTRACT
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs.
438200.20
Rs.
68370.63
Rs.
24192.80
TOTAL Rs.530763.63
Add for shifting & re-erection of BP @
2% Rs.
10615.27
Add for LH / RH shifting & erection of Paver @
0.5% Rs.
2653.82
Add for ledge cutting / erection of tracks etc @
1% Rs.
5307.64
Total
Rs: 549340.36
D. Add for contractor's profit and overheads on (A+B+C+other 13.615%
Rs: 74792.69
Lead Charges for 1 Km for FA
58.08
cum @
31.3 Rs./Cum
1817.904
Lead Charges for 1 Km for CA
105.60
cum @
30.2 Rs./Cum3189.12
Lead Charges for 1Km for Cement (including
Loading and Unloading Charges)
39.60
tonne @ 129.7 Rs./Tonne
5136.12
Total cost for
800.00 Sqm
Rs: 634276.19
Rate per
Sqm
(A+B+C+D)/800.0
Rs.
792.80
IRR-CAW-7-17 Providing and fixing pre-cast RCC template walls consisting of 0.05 cum M-15 grade
concrete using 20 mm down size coarse aggregates and 10 kg reinforcement steel moulded
as per specifications and drawing in CM 1:4 proportion including cost of all materials,
machinery, labour, formwork, fabricating and placing reinforcement steel, mixing, laying,
conveying and fixing in position including necessary excavation for seating, finishing joints in
CM 1:4, curing etc., complete with initial lead upto 1 km and all lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
particulars
Cement 43 Gr
Sand (Un-Screened )
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Reinforcement steel
Binding wire
UNIT :
Unit
kg
cum
cum
cum
kg
kg
Quantity
310.00
0.50
0.50
0.30
200.00
3.00
20.00 templete
Rate
in Rs.
6.30
560.00
1210.00
875.00
40.00
70.00
Amount
in Rs.
1953
280
605
262.5
8000
210
188
6
7
B. MACHINERY:
Sl No
1
Description
Hand mixer
set
LS
Unit
Hour
20.00
1.00
Quantity
8.00
8.00
Description
Unit
Quantity
1
2
3
4
5
work inspector
Day
1.00
Mason Class I for fixing
Day
1.00
Mason Class II for casting
Day
2.00
Bar bender
Day
1.00
mazdoor ( casting yard )
Day
4.00
mazdoor ( for fixing )
Day
2.00
mazdoor for conveying
Day
2.00
Total cost of Labour
labour component/unit qty
226.30
Add contractor's profit and overhead charges
13.615% 30.80
labour component/unit qty (including contractor's profit)
257.10
ABSTRACT:
A. Cost of Materials including serignorage charges
B. Hire charges of Machinery
C. Cost of Labour
57.09 1141.7956
20.00
20
Rs: 12472.30
Rate
in Rs.
5.50
0.00
Rs:
Amount
in Rs.
44
0
44.00
Rate
in Rs.
400.00
415.00
370.00
490.00
310.00
310.00
310.00
Rs:
Amount
in Rs.
400
415
740
490
1240
620
620
4525.00
Rs: 12472.30
Rs:
44.00
Rs:
4525.00
Total
Rs: 17041.30
13.615%
Rs:
2320.17
cum @
31.3 Rs./Cum 15.65
cum @
30.2 Rs./Cum 24.16
129.7 Rs./Tonne
40.207
151.5 Rs./Tonne 30.3
Rs: 19471.78
Rs.
973.60
IRR-CAW-7-18 Providing and fixing 50 mm dia perforated GI pressure relief pipes 12.50 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Rm
1.25
LS
10.00
B. MACHINERY:
Sl No
1
Description
Unit
LS
Quantity
0.50
0.00
10 Nos.
Rate
in Rs.
320.00
Amount
in Rs.
400
20.00
Rs:
200
600.00
Rate
in Rs.
20.00
Amount
in Rs.
10
Rs:
10.00
C. LABOUR:
189
Sl No
1
Description
Pipe fitter
mazdoor
Unit
Quantity
Day
Day
0.50
0.50
Rate
in Rs.
480.00
310.00
Rs:
Amount
in Rs.
240
155
395.00
Rs:
Rs:
Rs:
Rs:
600.00
10.00
395.00
1005.00
Rs:
Rs:
Rs.
136.83
1141.83
114.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 Nos.
Rate per
each
(A+B+C+D)/10.0
IRR-CAW-7-19 Providing and fixing 50 mm dia perforated GI pressure relief pipes 22.50 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Rm
2.25
LS
10.00
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
LS
5.00
0.00
10 Nos.
Rate
in Rs.
320.00
Amount
in Rs.
720
20.00
Rs:
200
920.00
Rate
in Rs.
20.00
Amount
in Rs.
100
Rs:
100.00
Rate
in Rs.
480.00
310.00
Rs:
Amount
in Rs.
240
155
395.00
Rs:
Rs:
Rs:
Rs:
920.00
100.00
395.00
1415.00
Rs:
Rs:
Rs.
192.65
1607.65
160.80
Description
Pipe fitter
mazdoor
Unit
Quantity
Day
Day
0.50
0.50
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 Nos.
Rate per
No.
(A+B+C+D)/10.0
IRR-CAW-7-20 Providing and fixing 50 mm dia perforated GI pressure relief pipes 30 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
190
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Rm
3.00
LS
10.00
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
LS
7.00
0.00
10 Nos.
Rate
in Rs.
320.00
Amount
in Rs.
960.00
20.00
Rs:
200.00
1160.00
Rate
in Rs.
20.00
Amount
in Rs.
140.00
Rs:
140.00
Rate
in Rs.
480.00
310.00
Rs:
Amount
in Rs.
240.00
155.00
395.00
Rs:
Rs:
Rs:
Rs:
1160.00
140.00
395.00
1695.00
Rs:
Rs:
Rs.
230.77
1925.77
192.60
Description
Pipe fitter
mazdoor
Unit
Quantity
Day
Day
0.50
0.50
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 Nos.
Rate per
No.
(A+B+C+D)/10.0
IRR-CAW-7-21 Providing and fixing 50 mm dia perforated GI pressure relief pipes 45 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Rm
4.50
LS
10.00
B. MACHINERY:
Sl No
1
Description
Unit
LS
Quantity
10.00
0.00
Description
Unit
Quantity
10 Nos.
Rate
in Rs.
320.00
Amount
in Rs.
1440.00
20.00
Rs:
200.00
1640.00
Rate
in Rs.
20.00
Amount
in Rs.
200.00
Rs:
200.00
Rate
in Rs.
Amount
in Rs.
191
Pipe fitter
mazdoor
Day
Day
0.50
0.50
480.00
310.00
Rs:
240.00
155.00
395.00
Rs:
Rs:
Rs:
Rs:
1640.00
200.00
395.00
2235.00
Rs:
Rs:
Rs.
304.3
2539.30
253.90
IRR-CAW-7-22 Providing and fixing 50 mm dia perforated GI pressure relief pipes 75 cm long with
one end closed with perforated GI plate and other end provided with alluminium lid hinged
to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all
leads and lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
GI pipe 50 mm dia
Rm
7.50
LS
10.00
B. MACHINERY:
Sl No
1
Description
Unit
LS
Quantity
15.00
0.00
10 Nos.
Rate
in Rs.
320.00
Amount
in Rs.
2400.00
20.00
Rs:
200.00
2600.00
Rate
in Rs.
20.00
Amount
in Rs.
300.00
Rs:
300.00
Rate
in Rs.
480.00
310.00
Rs:
Amount
in Rs.
240.00
155.00
395.00
Rs:
Rs:
Rs:
Rs:
2600.00
300.00
395.00
3295.00
Rs:
Rs:
Rs.
448.61
3743.61
374.40
Description
Pipe fitter
mazdoor
Unit
Quantity
Day
Day
0.50
0.50
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 Nos.
Rate per
No.
(A+B+C+D)/10.0
IRR-CAW-7-23 Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes
including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all
leads and lifts.
192
DATA
RATE ANALYSIS
UNIT:
10 Nos.
A. MATERIALS:
Sl.No
1
Particulars
PVC pipe 100 mm dia 10 Nos
Total cost of Materials
Unit
Rm
Qty
10.00
Rate in Amount in
Rs
Rs.
175.00
1750.00
Rs.
1750.00
B. MACHINERY
Sl.No
1
Description
Unit
Rate in Amount in
Rs.
Rs.
0.00
0.00
0.00
0.00
Rs.
0.00
Quantity
Nill
Total hire chargs of Machinery
C. LABOUR
Sl.No
1
2
Particulars
Unit
Day
Day
Qty
0.25
0.25
Pipe fitter
Mazdoor
Total cost of Labour
labour component/unit qty
19.80
Add contractor's profit and overhead charges
13.615% 2.70
labour component/unit qty (including contractor's profit)
22.50
ABSTRACT
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rate in Amount in
Rs
Rs.
480.00
120.00
310.00
77.50
Rs.
197.50
Rs.
Rs.
Rs.
Total
Rs:
Rs:
Rs:
Rs.
1750.00
0.00
197.50
1947.50
265.15
2212.65
221.30
IRR-CAW-7-24 Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and side lining of
canal laid on rock including cost of all materials, machinery, labour etc., complete with all
leads and lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
Unit
Rm
B. MACHINERY:
Sl No
1
2
C. LABOUR:
Sl No
1
2
UNIT :
Hour
Description
Unit
Hour
Hour
Hour
Hour
Description
Unit
Quantity
10.00
10%
2.00
Quantity
1.00
1.00
2.00
2.00
Quantity
Hour
Hour
1.00
2.00
10 Nos.
Rate
in Rs.
27.67
11.56
Rs:
Amount
in Rs.
276.67
27.67
23.13
327.46
Rate
in Rs.
275.60
914.20
19.80
0.00
Rs:
Amount
in Rs.
275.60
914.20
39.60
0.00
1229.40
Rate
in Rs.
195.90
306.20
Rs:
Amount
in Rs.
195.90
612.40
808.30
80.80
193
Rs:
Rs:
Rs:
Rs:
327.46
1229.40
808.30
2365.16
Rs:
Rs:
Rs.
322.02
2687.18
268.70
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
UNIT :
particulars
Unit
cum
cum
B. MACHINERY:
Sl No
Description
Unit
Quantity
0.15
0.35
Quantity
Nil
0.00
10 Nos.
Rate
in Rs.
875.00
560.00
Rs:
Amount
in Rs.
131.25
196.00
327.25
Rate
in Rs.
0.00
Amount
in Rs.
Description
Mason Cl- II
mazdoor
Unit
Quantity
Day
Day
0.10
0.10
Rs:
0.00
Rate
in Rs.
370.00
310.00
Rs:
Amount
in Rs.
37.00
31.00
68.00
Rs:
Rs:
Rs:
Rs:
327.25
0.00
68.00
395.25
Rs:
Rs:
Rs.
53.81
449.06
44.90
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 Nos.
Rate per
No.
(A+B+C+D)/10.0
IRR-CAW-7-26 Providing and fixing 25 to 40 mm thick Shahabad / Talikota / other similar stone slabs
with pointing and finishing joints neatly in CM 1:3 proportion for canal / field channel lining
including cutting slabs to required size, mixing mortar, finishing joints neatly, curing etc.,
complete with lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 sqm
Rate
Amount
194
1
2
3
B. MACHINERY:
Sl No
1
sqm
kg
cum
Description
Unit
5 hp pump ( diesel )
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
C. LABOUR:
Sl No
105.00
200.00
0.40
Quantity
2.00
2.00
Quantity
1
2
3
4
5
Operator pump
Hour
2.00
work inspector
Day
1.00
Mason Class I
Day
4.00
Mason Class II
Day
2.00
mazdoor
Day
8.00
Cartman with Double Bullock cart for
6
water
Day
1.00
Total cost of Labour
labour component/unit qty
59.10
Add contractor's profit and overhead charges
13.615% 8.00
labour component/unit qty (including contractor's profit)
67.10
in Rs.
240.00
6.30
760.00
Rs:
in Rs.
25200.00
1260.00
304.00
26764.00
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
20.40
162.60
183.00
Rate
in Rs.
103.60
400.00
415.00
370.00
310.00
Amount
in Rs.
207.20
400.00
1660.00
740.00
2480.00
425.00
Rs:
425.00
5912.20
Rs:
Rs:
Rs:
Rs:
26764.00
183.00
5912.20
32859.20
Rs:
Rs:
Rs.
4473.78
37332.98
373.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
IRR-CAW-7-27 Fixing PCC slabs of various sizes in CM 1 : 3 proportion to the side slopes of canal
including preparing bed, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding
PCC slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
Unit
Cement 43 Gr
Sand (Screened)
Total cost of Materials
kg
cum
B. MACHINERY:
Sl No
1
C. LABOUR:
Sl No
1
2
3
4
UNIT :
Description
Unit
5 hp pump ( diesel )
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
Operator pump
work inspector
Mason Class I
mazdoor
Hour
Day
Day
Day
Quantity
240.00
0.50
Quantity
2.00
2.00
Quantity
2.00
1.00
4.00
9.00
100.00 sqm
Rate
in Rs.
6.30
760.00
Rs:
Amount
in Rs.
1512.00
380.00
1892.00
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
20.40
162.60
183.00
Rate
in Rs.
103.60
400.00
415.00
310.00
Amount
in Rs.
207.20
400.00
1660.00
2790.00
195
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
425.00
Rs:
425.00
5482.20
Rs:
Rs:
Rs:
Rs:
1892.00
183.00
5482.20
7557.20
Rs:
Rs:
Rs.
1028.91
8586.11
85.90
IRR-CAW-7-28 Fixing PCC lug slabs of various sizes in CM 1 : 3 proportion for supporting PCC slab lining
including necessary excavation, refilling, flush pointing joints in CM 1 : 3 propn, cost of all
materials ( excluding PCC lug slabs ), labour, finishing, curing etc., complete with initial lead
upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
Unit
Cement 43 Gr
Sand ( Screened)
Total cost of Materials
kg
cum
B. MACHINERY:
Sl No
1
C. LABOUR:
Sl No
UNIT :
Description
Unit
5 hp pump ( diesel )
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
Quantity
58.00
0.12
Quantity
1.00
1.00
Quantity
1
2
3
4
5
Operator pump
Hour
1.00
work inspector
Day
1.00
Mason Class I
Day
2.00
Mason Class II
Day
1.00
mazdoor
Day
5.00
Cartman with Double Bullock cart for
6
water
Day
1.00
Total cost of Labour
labour component/unit qty
36.80
Add contractor's profit and overhead charges
13.615% 5.00
labour component/unit qty (including contractor's profit)
41.80
100.00 Rm
Rate
in Rs.
6.30
760.00
Rs:
Amount
in Rs.
365.40
91.20
456.60
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
10.20
81.30
91.50
Rate
in Rs.
103.60
400.00
415.00
370.00
310.00
Amount
in Rs.
103.60
400.00
830.00
370.00
1550.00
425.00
Rs:
425.00
3678.60
Rs:
Rs:
Rs:
Rs:
456.60
91.50
3678.60
4226.70
Rs:
Rs:
Rs.
575.47
4802.17
48.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 Rm
Rate per
Rm
(A+B+C+D)/100.0
196
IRR-CAW-7-29 Fixing 30 cm height pre-cast drops for field channels as directed including excavation, etc.,
complete with all leads and lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Nill
Quantity
0.00
0.00
Description
Unit
Nill
Quantity
0.00
0.00
Description
work inspector
Mason Cl- II
mazdoor
Unit
Day
Day
Day
Quantity
1.00
1.00
1.00
7 Nos.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
370.00
310.00
1080.00
Rs:
Rs:
Rs:
Rs:
0.00
0.00
1080.00
1080.00
Rs:
Rs:
Rs.
147.04
1227.04
175.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
7.00 Nos.
Rate per
No.
(A+B+C+D)/7.00
0.00
0.00
IRR-CAW-7-30 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,
labour, laying, joining etc., complete with all leads and lifts.
a. Using 500 micron thick LDPE sheet.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
250.00 sqm
Rate
Amount
197
1
2
B. MACHINERY:
Sl No
Description
sqm
kg
Unit
275.00
4.00
Quantity
Nill
0.00
0.00
Description
Unit
Quantity
in Rs.
97.00
4.00
Rs:
in Rs.
26675.00
16.00
26691.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
Amount
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
250.00 sqm
Rate per
sqm
(A+B+C+D)/250.0
Note :
9.70
310.00
Rs:
2425.00
310.00
2735.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs.
26691.00
0.00
2735.00
29426.00
4006.35
33432.35
133.70
i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provide
average 75 mm thick sand backing to LDPE sheet.
For providing average 75 mm thick sand backing :
DATA:
( 250 x 0.075 )
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
18.75 cum
UNIT :
Unit
Quantity
cum
18.75
0.00
Description
Unit
Quantity
Nill
0.00
0.00
Description
mazdoor
Unit
Quantity
Day
Total cost of Labour
6.00
250.00 sqm
Rate
in Rs.
560.00
0.00
Rs:
Amount
in Rs.
10500.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1860.00
1860.00
Rs:
Rs:
10500.00
0.00
10500.00
198
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
250.00 sqm
Rate per
sqm
(A+B+C+D)/250.0
Rs:
Rs:
1860.00
12360.00
Rs:
Rs:
Rs.
1682.81
14042.81
56.20
IRR-CAW-7-31 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,
labour, laying, joining etc., complete with all leads and lifts.
b. Using 750 micron thick LDPE sheet.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
UNIT :
Unit
B. MACHINERY:
Sl No
Description
Quantity
275.00
4.00
Unit
Nill
Quantity
0.00
0.00
Description
Unit
Quantity
250.00 sqm
Rate
in Rs.
137.00
4.00
Rs:
Amount
in Rs.
37675.00
16.00
37691.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
Amount
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
250.00 sqm
Rate per
sqm
(A+B+C+D)/250.0
Note :
0.00
13.70
310.00
Rs:
3425.00
310.00
3735.00
Rs:
Rs:
Rs:
Rs:
37691.00
0.00
3735.00
41426.00
Rs:
Rs:
Rs.
5640.15
47066.15
188.30
i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provide
average 75 mm thick unscreened sand backing to LDPE sheet.
For providing average 75 mm thick sand backing add
per sqm
Rs:
56.20
IRR-CAW-7-32 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,
labour, laying, joining etc., complete with all leads and lifts.
c. Using 1000 micron thick LDPE sheet.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
UNIT :
Unit
Quantity
275.00
4.00
250.00 sqm
Rate
in Rs.
189.00
4.00
Amount
in Rs.
51975.00
16.00
199
Description
Unit
Quantity
Nill
0.00
0.00
Description
Unit
Quantity
Rs:
51991.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
Amount
in Rs.
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
250.00 sqm
Rate per
sqm
(A+B+C+D)/250.0
Note :
18.90
310.00
Rs:
4725.00
310.00
5035.00
Rs:
Rs:
Rs:
Rs:
51991.00
0.00
5035.00
57026.00
Rs:
Rs:
Rs.
7764.09
64790.09
259.20
i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provide
average 75 mm thick unscreened sand backing to LDPE sheet.
For providing average 75 mm thick sand backing add
per sqm
Rs:
56.20
IRR-CAW-7-33 Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler boards for
stone masonry lining of canal including cost of all materials, labour etc., complete with all
leads and lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
sqm
38.75
0.00
Description
Unit
Quantity
Nill
0.00
0.00
Description
Carpenter Cl- II
mazdoor
Unit
Quantity
Day
Day
1.00
1.00
100.00 Rm
Rate
in Rs.
Amount
in Rs.
420.00
0.00
Rs:
16275.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
370.00
310.00
Rs:
Amount
in Rs.
370.00
310.00
680.00
16275.00
0.00
200
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 Rm
Rate per
Rm
(A+B+C+D)/100.00
Rs:
Rs:
Rs:
Rs:
16275.00
0.00
680.00
16955.00
Rs:
Rs:
Rs.
2308.42
19263.42
192.60
IRR-CAW-7-34 Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for
cement concrete lining of canal including cost of all materials, labour etc., complete with all
leads and lifts.
DATA
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
sqm
100.00 Rm
Rate
in Rs.
10.00
0.00
650.00
0.00
Rs:
0.00
6500.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
310.00
Rs:
Amount
in Rs.
370.00
310.00
680.00
Rs:
Rs:
Rs:
Rs:
6500.00
0.00
680.00
7180.00
Rs:
Rs:
Rs.
977.56
8157.56
81.60
Description
Unit
Quantity
Nill
0.00
0.00
Description
Carpenter Cl- II
mazdoor
Unit
Quantity
Day
Day
1.00
1.00
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 Rm
Rate per
Rm
(A+B+C+D)/100.00
Amount
in Rs.
6500.00
IRR-CAW-7-35 Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards for
cement concrete lining of canal including cost of all materials, labour etc., complete with all
leads and lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
sqm
Quantity
15.30
0.00
100.00 Rm
Rate
in Rs.
Amount
in Rs.
9945.00
650.00
0.00
201
Description
Rs:
Unit
Quantity
Nill
0.00
0.00
Description
Carpenter Cl- II
mazdoor
Unit
Quantity
Day
Day
1.00
1.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
370.00
310.00
Rs:
Amount
in Rs.
370.00
310.00
680.00
Rs:
Rs:
Rs:
Rs:
9945.00
0.00
680.00
10625.00
Rs:
Rs:
Rs.
1446.59
12071.59
120.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 Rm
Rate per
Rm
(A+B+C+D)/100.00
9945.00
0.00
IRR-CAW-7-36 Providing and forming 35 mm wide and 10 mm thick construction / contraction joints
for concrete lining by mastic filler including cost of all materials, labour etc., complete with
all leads and lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
UNIT :
particulars
Unit
Asphalt 80/100 Gr
Sand (Screened )
Total cost of Materials
kg
cum
B. MACHINERY:
Sl No
Description
Unit
Quantity
35.00
0.04
Quantity
Nill
0.00
0.00
Description
Mason Cl- II
mazdoor
Unit
Quantity
Day
Day
0.50
1.00
100.00 Rm
Rate
in Rs.
4.00
760.00
Rs:
Amount
in Rs.
140.00
30.40
170.40
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
310.00
Rs:
Amount
in Rs.
185.00
310.00
495.00
Rs:
Rs:
Rs:
Rs:
170.40
0.00
495.00
665.40
202
Rs:
Rs:
Rs.
90.59
755.99
7.60
IRR-CAW-7-37 Manufacturing 550 x 550 x 55 mm size PCC lining slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N /sqmm ) cement concrete using 20 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum
equivalent concrete volume: 3.74 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
2
3
Unit
kg
kg
cum
cum
cum
kg
No.
B. MACHINERY:
Sl No
particulars
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Description
Unit
C. LABOUR:
Sl No
1
2
3
4
5
6
Quantity
1122.00
Rate
in Rs.
6.30
225.00
6.30
1.94 1210.00
1.05 875.00
1.68 560.00
4.49
95.00
225.00
5.19
Rs:
Quantity
Rate
in Rs.
Amount
in Rs.
7068.60
1417.50
2353.21
916.30
942.48
426.36
1167.34
14291.78
Amount
in Rs.
428.00
8.00
8.00
0.10
0.10
0.20
0.20
53.50
81.30
10.20
81.30
402.50
307.20
Rs:
650.40
1.02
8.13
80.50
61.44
1229.49
90%
Rs:
1106.54
Rate
in Rs.
204.10
103.60
165.80
415.00
400.00
Amount
in Rs.
1632.80
10.36
33.16
830.00
400.00
310.00
310.00
310.00
310.00
310.00
Rs:
930.00
620.00
310.00
310.00
310.00
5386.32
Rs:
4847.69
Rs:
14291.78
Quantity
225 Nos.
203
Rs:
Rs:
Rs:
1106.54
4847.69
20246.01
Rs:
Rs:
Rs.
2756.49
23002.50
102.20
IRR-CAW-7-38 Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm ) cement concrete using 20 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum,
equivalent concrete volume: 0.23 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
2
3
C. LABOUR:
Sl No
1
2
3
4
5
6
Unit
Quantity
25 Nos.
Rate
in Rs.
6.30
kg
69.00
kg
cum
cum
cum
kg
No.
12.50
6.30
0.12 1210.00
0.06 875.00
0.10 560.00
0.28
95.00
25.00
3.23
Rs:
B. MACHINERY:
Sl No
particulars
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Description
Unit
Quantity
Rate
in Rs.
Amount
in Rs.
434.70
78.75
144.72
56.35
57.96
26.22
80.79
879.49
Amount
in Rs.
428.00
8.00
8.00
0.10
0.10
0.20
0.20
53.50
81.30
10.20
81.30
402.50
307.20
Rs:
650.40
1.02
8.13
80.50
61.44
1229.49
10%
Rs:
122.95
Rate
in Rs.
204.10
103.60
165.80
415.00
400.00
Amount
in Rs.
1632.80
10.36
33.16
830.00
400.00
310.00
310.00
310.00
310.00
310.00
Rs:
930.00
620.00
310.00
310.00
310.00
5386.32
Rs:
538.63
Quantity
204
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
25.00 Nos.
Rate per
each
(A+B+C+D)/25.0
Rs:
Rs:
Rs:
Rs:
879.49
122.95
538.63
1541.07
Rs:
Rs:
Rs.
209.82
1750.89
70.00
IRR-CAW-7-39 Manufacturing 450 x 300 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
kg
270.00
2
3
4
5
kg
cum
cum
kg
No.
112.50
0.61
0.39
1.08
225.00
B. MACHINERY:
Sl No
1
2
3
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Description
Unit
Quantity
8.00
8.00
0.10
0.10
0.20
0.20
90%
Quantity
225 Nos.
Rate
in Rs.
6.30
Amount
in Rs.
1701.00
708.75
6.30
875.00
560.00
95.00
2.15
Rs:
535.50
216.72
102.60
483.83
3748.40
Rate
in Rs.
5.50
0.00
10.20
81.30
402.50
307.20
Rs:
Amount
in Rs.
44.00
0.00
1.02
8.13
80.50
61.44
195.09
Rs:
175.58
Rate
in Rs.
103.60
165.80
415.00
400.00
Amount
in Rs.
10.36
33.16
830.00
400.00
310.00
310.00
310.00
310.00
310.00
Rs:
620.00
620.00
310.00
310.00
310.00
3443.52
Rs:
3099.17
205
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
225.00 Nos.
Rate per
each
(A+B+C+D)/225.0
Rs:
Rs:
Rs:
Rs:
3748.40
175.58
3099.17
7023.14
Rs:
Rs:
Rs.
956.2
7979.34
35.50
IRR-CAW-7-40 Manucturing 450 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
kg
15.00
2
3
4
5
kg
cum
cum
kg
No.
7.50
0.03
0.02
0.06
25.00
B. MACHINERY:
Sl No
1
2
3
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Description
Unit
Quantity
8.00
8.00
0.10
0.10
0.20
0.20
10%
Quantity
25 Nos.
Rate
in Rs.
6.30
Amount
in Rs.
94.50
47.25
6.30
875.00
560.00
95.00
1.18
Rs:
29.75
12.04
5.70
29.54
218.78
Rate
in Rs.
5.50
0.00
10.20
81.30
402.50
307.20
Rs:
Amount
in Rs.
44.00
0.00
1.02
8.13
80.50
61.44
195.09
Rs:
19.51
Rate
in Rs.
103.60
165.80
415.00
400.00
Amount
in Rs.
10.36
33.16
830.00
400.00
310.00
310.00
310.00
310.00
310.00
Rs:
620.00
620.00
310.00
310.00
310.00
3443.52
Rs:
344.35
206
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
25.00 Nos.
Rate per
each
(A+B+C+D)/25.0
Rs:
Rs:
Rs:
Rs:
218.78
19.51
344.35
582.64
Rs:
Rs:
Rs.
79.33
661.97
26.50
IRR-CAW-7-41 Manufacturing 600 x 300 x 100mm size PCC lining slabs in M-15 grade (28 days cube
compressive strength not less than 15 N/Sqmm) cement concrete using 20mm down
grades coarse aggregate including cost of all materials, machinery, labour, batching,
mixing, laying, compacting, formwork, finishing, curing etc., complete with initial lead upto 50 m
and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.80 cum, FA : 0.45cum, Blending Ratio of CA--65:35)
DATA:
RATE ANALYSIS
UNIT:
225
Nos.
A. MATERIALS :
Sl. No
1
2
3
4
5
6
7
Particulars
Cement for mix
Unit
Kg
Kg
Quantity
1215
112.5
2.11
1.13
1.82
4.86
225
Rate
Amount in
Rs.
in Rs.
7654.50
6.30
708.75
6.30
2548.26
1210.00
992.25
875.00
1020.60
560.00
461.70
95.00
1.23
276.75
13662.81
B. MACHINERY :
Sl. No
1
2
3
C. LABOUR :
Sl. No
1
2
3
4
5
Particulars
Unit
Hour
Diesel mixer 300/200
Hour
Fuel/Energy charges
Hour
5 hp pump (diesel)
Hour
Fuel/Energy charges
Hour
Water tanker 8000 ltr
Hour
Fuel/Energy charges
Total hire charges of Machinery
Aportioned hire charges of
machinery @ 90% for lining slab
Rs.
Particulars
Crew for Pump
Crew for water tanker
Mason Class-I
Class II Mason
Mazdoor
For batching materials/laying
For demoulding/cleaning/oiling
For shifting slabs to curing pond
For stacking after curing
For cleaning & miscellaneous
Unit
Quantity
8
8
0.1
0.1
0.2
0.2
Rs.
90%
Quantity
Hour
Hour
Day
Day
0.1
0.2
2
1
Day
2
2
1
1
1
Day
Rate
Amount in
Rs.
in Rs.
428.00
53.50
650.40
81.30
1.02
10.20
8.13
81.30
80.50
402.50
61.44
307.20
1229.49
1106.54
Rate
Amount in
Rs.
in Rs.
10.36
103.60
33.16
165.80
830.00
415.00
370.00
370.00
310.00
310.00
310.00
310.00
310.00
620.00
620.00
310.00
310.00
310.00
207
ABSTRACT :
A. Cost of Materials
B. Hire Charges of machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
225.00 Nos.
Rate per
each
(A+B+C+D)/225.0
3413.52
3072.17
Rs.
Rs.
Rs.
Rs:
13662.81
1106.54
3072.17
17841.52
Rs:
Rs:
Rs.
2429.12
20270.64
90.10
IRR-CAW-7-42 Manucturing 400 x 400 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N / sqmm )cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
kg
324.00
2
3
4
5
kg
cum
cum
kg
No.
112.50
0.73
0.46
1.30
225.00
B. MACHINERY:
Sl No
1
2
3
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Description
Unit
Quantity
8.00
8.00
0.10
0.10
0.20
0.20
90%
Quantity
225 Nos.
Rate
in Rs.
6.30
Amount
in Rs.
2041.20
708.75
6.30
875.00
560.00
95.00
2.18
Rs:
642.60
260.06
123.12
489.46
4265.19
Rate
in Rs.
5.50
0.00
10.20
81.30
402.50
307.20
Rs:
Amount
in Rs.
44.00
0.00
1.02
8.13
80.50
61.44
195.09
Rs:
175.58
Amount
in Rs.
10.36
33.16
830.00
400.00
620.00
620.00
310.00
310.00
310.00
Hour
Hour
Day
Day
0.10
0.20
2.00
1.00
Rate
in Rs.
103.60
165.80
415.00
400.00
Day
Day
Day
Day
Day
2.00
2.00
1.00
1.00
1.00
310.00
310.00
310.00
310.00
310.00
208
Rs:
3443.52
Rs:
3099.17
Rs:
Rs:
Rs:
Rs:
4265.19
175.58
3099.17
7539.94
Rs:
Rs:
Rs.
1026.56
8566.50
38.10
IRR-CAW-7-43 Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube
compressive strength not less than 15 N /sqmm ) cement concrete using 10 mm down graded
coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,
compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),
CA : 0.68 cum, FA : 0.43cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
kg
13.50
2
3
4
5
kg
cum
cum
kg
No.
7.50
0.03
0.02
0.05
25.00
B. MACHINERY:
Sl No
1
2
3
C. LABOUR:
Sl No
1
2
3
4
5
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Description
Unit
Quantity
8.00
8.00
0.10
0.10
0.20
0.20
10%
Quantity
25 Nos.
Rate
in Rs.
6.30
Amount
in Rs.
85.05
47.25
6.30
875.00
560.00
95.00
1.15
Rs:
26.78
10.84
5.13
28.76
203.80
Rate
in Rs.
5.50
0.00
10.20
81.30
402.50
307.20
Rs:
Amount
in Rs.
44.00
0.00
1.02
8.13
80.50
61.44
195.09
Rs:
19.51
Amount
in Rs.
10.36
33.16
830.00
400.00
620.00
620.00
310.00
310.00
310.00
Hour
Hour
Day
Day
0.10
0.20
2.00
1.00
Rate
in Rs.
103.60
165.80
415.00
400.00
Day
Day
Day
Day
Day
2.00
2.00
1.00
1.00
1.00
310.00
310.00
310.00
310.00
310.00
209
Rs:
3443.52
Rs:
344.35
Rs:
Rs:
Rs:
Rs:
203.80
19.51
344.35
567.66
Rs:
Rs:
Rs.
77.29
644.95
25.80
IRR-CAW-7-44 Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side
lining using stones and chips from approved quarry including cost of all materials,
machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete
with initial lead upto 50 m and all lifts.
(Thickness of the masonry assumed: 0.3 m, rubble stones : 0.96 cum, Stone Chips : 0.15cum,
Through Stones 20 x 20 x 30cm : 1/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
1
2
Cement 43 Gr
Sand (Screened )
kg
cum
1152.00
4.00
3
4
5
cum
Nos
cum
9.60
32.00
1.50
B. MACHINERY:
Sl No
1
C. LABOUR:
Sl No
Description
Unit
5 hp pump ( diesel )
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
Quantity
4.00
4.00
Quantity
1
2
3
4
5
Operator pump
Hour
4.00
work inspector
Day
1.00
Mason Class I
Day
2.00
Mason Class II
Day
2.00
mazdoor
Day
8.00
Cartman with Double Bullock cart for
6
water
Day
1.00
Total cost of Labour
labour component/unit qty
528.90
Add contractor's profit and overhead charges
13.615% 72.00
labour component/unit qty (including contractor's profit)
600.90
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
10.00 cum
Rate
in Rs.
6.30
760.00
Amount
in Rs.
7257.60
3040.00
3168.00
330.00
23.00
360.00
Rs:
736.00
540.00
14741.60
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
40.80
325.20
366.00
Rate
in Rs.
103.60
400.00
415.00
370.00
310.00
Amount
in Rs.
414.40
400.00
830.00
740.00
2480.00
425.00
425.00
Rs:
5289.40
Rs:
Rs:
Rs:
Rs:
14741.60
366.00
5289.40
20397.00
210
Rs:
Rs:
Rs.
2777.05
23174.05
2317.40
IRR-CAW-7-45 Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side
lining using stones from approved quarry including cost of all materials, machinery,
labour, forming weep holes at specified intervals, finishing, curing etc., complete
with initial lead upto 50m and all lifts.(without pin headers) : 1.1 cum)
(Thickness of the Masonry assumed: 0.3 m , rubble stones
DATA:
RATE ANALYSIS
UNIT:
10
Cum
A.
MATERIALS
:
Sl. No
1
2
3
Particulars
Cement 43 Gr
Sand (Screened)
Uncoursed rubble stones at quarry
Unit
Kg
Cum
Cum
Quantity
979.2
3.4
11
Rate
Amount in
Rs.
in Rs.
6168.96
6.30
2584.00
760.00
3630.00
330.00
12382.96
B. MACHINERY :
Sl. No
1
2
Particulars
Unit
Quantity
8
4
5
Rs.
Rate
Amount in
Rs.
in Rs.
5.50
44.00
40.80
10.20
406.50
81.30
491.30
C. LABOUR :
Sl. No
Particulars
Unit
Quantity
1
2
3
4
5
Operator pump
Hour
4
Mason Class I
Day
13
Mason Class II
Day
6
Mazdoor
Day
29
Cartman with Double Bullock cart for
Day
1
water
Total Cost of Labour Rs.
labour component/unit qty
1744.40
Add contractor's profit and overhead charges
13.615% 237.50
labour component/unit qty (including contractor's profit)
1981.90
ABSTRACT :
A. Cost of Materials
B. Hire Charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 Cum
Rate per
Cum
(A+B+C+D)/10.0
Rate
Amount in
Rs.
in Rs.
414.40
103.60
5395.00
415.00
2220.00
370.00
310.00
8990.00
425.00
425.00
17444.40
Rs.
Rs.
Rs.
Rs:
12382.96
491.3
17444.40
30318.66
Rs:
Rs:
Rs.
4127.89
34446.55
3444.70
IRR-CAW-7-46 Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side
lining using stones and chips from canal excavation including cost of all materials,
211
machinery, labour, forming weep holes at specified interval, finishing, curing etc., complete
with initial lead upto 50 m and all lifts.
( rubble stones : 0.96 cum, Stone Chips : 0.15cum, Through Stones 20 x 20 x 30cm : 1/sqm)
Note:
Stones and chips will be issued from dump yard at specified issue rate.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
Cement 43 Gr
Sand (Screened )
Uncoursed rubble at dump yard
Through stones 20x20x30 cm
Stone chips at dump yard
Total cost of Materials
B. MACHINERY:
Sl No
1
C. LABOUR:
Sl No
particulars
UNIT :
Unit
kg
cum
cum
Nos
cum
Description
Unit
5 hp pump ( diesel )
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
Quantity
1144.00
4.00
9.60
32.00
1.50
Quantity
4.00
4.00
Quantity
1
2
3
4
5
6
Operator pump
Hour
4.00
work inspector
Day
1.00
Mason Class I
Day
2.00
Mason Class II
Day
2.00
Crowbarman
Day
1.00
mazdoor
Day
9.00
Cartman with Double Bullock cart for
7
water
Day
1.00
Total cost of Labour
labour component/unit qty
596.90
Add contractor's profit and overhead charges
13.615% 81.30
labour component/unit qty (including contractor's profit)
678.20
10.00 cum
Rate
in Rs.
6.30
760.00
165.00
23.00
185.00
Rs:
Amount
in Rs.
7207.20
3040.00
1584.00
736.00
277.50
12844.70
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
40.80
325.20
366.00
Rate
in Rs.
103.60
400.00
415.00
370.00
370.00
310.00
Amount
in Rs.
414.40
400.00
830.00
740.00
370.00
2790.00
425.00
425.00
Rs:
5969.40
Rs:
Rs:
Rs:
Rs:
12844.70
366.00
5969.40
19180.10
Rs:
Rs:
Rs.
2611.37
21791.47
2179.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 cum
Rate per
cum
(A+B+C+D)/10.0
IRR-CAW-7-47 Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining
using stones from canal excavation including cost of all materials, machinery, labour, forming weep holes at
specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.
( rubble stones : 1.1cum, cement : 98kg, sand 0.34 cum)
DATA:
RATE ANALYSIS
UNIT:
10
Cum
A.
MATERIALS
:
Sl. No
1
2
Particulars
Cement 43 Gr
Sand (Screened)
Unit
Kg
Cum
Quantity
980
3.4
Rate
Amount in
Rs.
in Rs.
6174.00
6.30
2584.00
760.00
212
11
165.00
1815.00
10573
B. MACHINERY :
Sl. No
1
2
Particulars
Unit
Quantity
8
4
5
Rs.
Rate
Amount in
Rs.
in Rs.
5.50
44.00
40.80
10.20
406.50
81.30
491.30
C. LABOUR :
Sl. No
Particulars
Unit
Quantity
1
2
3
4
5
Operator pump
Hour
4
Mason Class I
Day
13
Mason Class II
Day
6
Mazdoor
Day
29
Cartman with double bullock cart
Day
1
Total Cost of Labour Rs.
labour component/unit qty
1744.40
Add contractor's profit and overhead charges
13.615% 237.50
labour component/unit qty (including contractor's profit)
1981.90
ABSTRACT :
A. Cost of Materials
B. Hire Charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
10.00 Cum
Rate per
Cum
(A+B+C+D)/10.0
Rate
Amount in
Rs.
in Rs.
414.40
103.60
5395.00
415.00
2220.00
370.00
310.00
8990.00
425.00
425.00
17444.40
Rs.
Rs.
Rs.
Rs:
10573
491.3
17444.40
28508.70
Rs:
Rs:
Rs.
3881.46
32390.16
3239.00
IRR-CAW-8
ROCK PITCHING:
IRR-CAW-8-1
Providing and constructing 25 cm thick dry rubble stone pitching with pin headers at 2 per
sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.
( rubble stones : 0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 sqm
Rate
in Rs.
Amount
in Rs.
7590.00
cum
23.00
330.00
2
3
Nos
cum
200.00
3.75
23.00
360.00
Rs:
1350.00
13540.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
Amount
in Rs.
4600.00
B. MACHINERY:
Sl No
1
Description
Unit
Nill
Quantity
0.00
0.00
Description
Unit
Quantity
213
1
2
3
work inspector
Mason Class II
mazdoor
Day
Day
Day
1.00
5.00
6.00
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
Murum
UNIT :
Unit
cum
Quantity
18.00
0.00
Description
Unit
Quantity
Nill
0.00
0.00
400.00
1850.00
1860.00
4110.00
Rs:
Rs:
Rs:
Rs:
13540.00
0.00
4110.00
17650.00
Rs:
Rs:
Rs.
2403.05
20053.05
200.50
DATA:
400.00
370.00
310.00
Rs:
Description
mazdoor
Unit
Quantity
Day
4.00
100.00 sqm
Rate
in Rs.
115.00
0.00
Rs:
Amount
in Rs.
2070.00
0.00
2070.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1240.00
1240.00
Rs:
Rs:
Rs:
Rs:
2070.00
0.00
1240.00
3310.00
Rs:
Rs:
Rs.
450.66
3760.66
37.60
IRR-CAW-8-1-A Providing and constructing 22.5 cm thick dry rubble stone pitching with pin headers at 2 per
(New Item4 - 201112)
sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 sqm
Rate
Amount
214
in Rs.
in Rs.
6831.00
cum
20.70
330.00
2
3
Nos
cum
200.00
3.375
23.00
360.00
Rs:
1215.00
12646.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
1850.00
1860.00
4110.00
Rs:
Rs:
Rs:
Rs:
12646.00
0.00
4110.00
16756.00
Rs:
Rs:
Rs.
2281.33
19037.33
190.40
4600.00
B. MACHINERY:
Sl No
Description
Unit
Quantity
Nill
0.00
0.00
Description
work inspector
Mason Class II
mazdoor
Unit
Quantity
Day
Day
Day
1.00
5.00
6.00
Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour,
hand packing, finishing etc., complete
( rubble stones : 0.275 cum/sqm)
DATA:
RATE ANALYSIS
UNIT:
100
Sqm.
A. MATERIALS :
Sl. No
1
Particulars
Uncoursed rubble stones at quarry
Unit
Cum
Quantity
Rate
in Rs.
Amount in
Rs.
9075.00
27.50
330.00
9075
B. MACHINERY :
Sl. No
Particulars
Nil
Unit
Quantity
0
0
Rs.
Rate
in Rs.
Amount in
Rs.
0
0
0
C. LABOUR :
Sl. No
1
2
Particulars
Mason Class II
Mazdoor
Unit
Day
Day
Total Cost of Labour Rs.
Quantity
5.50
24.75
Rate
Amount in
Rs.
in Rs.
2035.00
370.00
310.00
7672.50
9707.50
97.10
215
ABSTRACT :
A. Cost of Materials
B. Hire Charges of Machinery
C. Cost of Labour
Rs.
Rs.
Rs.
Rs:
9075
0
9707.50
18782.50
2557.24
21339.74
213.40
Total
37.60
IRR-CAW-8-2-A Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour,
(New Item5 - 2011hand packing, finishing etc., complete
12)
DATA:
RATE ANALYSIS
UNIT:
100
Sqm.
A. MATERIALS :
Sl. No
1
2
Particulars
Unit
Quantity
24.75
3.40
Rate
Amount in
Rs.
in Rs.
3564.00
144.00
1224.00
360.00
4788
B. MACHINERY :
Sl. No
Particulars
Nil
Unit
Quantity
0
0
Rate
in Rs.
Amount in
Rs.
0
0
Rs.
C. LABOUR :
Sl. No
1
2
Particulars
Mason Class II
Mazdoor
Unit
Day
Day
Total Cost of Labour Rs.
Quantity
4.95
22.28
Rate
Amount in
Rs.
in Rs.
1831.50
370.00
310.00
6905.25
8736.75
ABSTRACT :
A. Cost of Materials
B. Hire Charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 Sqm.
Rate per
Sqm.
(A+B+C+D)/100.0
IRR-CAW-8-3
Rs.
Rs.
Rs.
Rs:
4788
0
8736.75
13524.75
Rs:
Rs:
Rs.
1841.39
15366.14
153.70
Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 per
sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.
216
( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 sqm
Rate
in Rs.
cum
27.50
330.00
2
3
Nos
cum
200.00
4.50
23.00
360.00
Rs:
Amount
in Rs.
9075.00
4600.00
B. MACHINERY:
Sl No
Description
Unit
Quantity
Nill
0.00
0.00
Description
work inspector
Mason Class II
mazdoor
Unit
Quantity
Day
Day
Day
1.00
5.00
6.00
IRR-CAW-8-4
DATA:
1620.00
15295.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
1850.00
1860.00
4110.00
Rs:
Rs:
Rs:
Rs:
15295.00
0.00
4110.00
19405.00
Rs:
Rs:
Rs.
2641.99
22046.99
220.50
0.00
37.60
RATE ANALYSIS
A. MATERIALS :
Sl No
Particulars
UNIT :
Unit
Cum
Quantity
33.00
100.00 sqm
Rate
in Rs
Amount
in Rs
10890.00
330.00
10890.00
B.MACHINERY :
Sl No
Description
Unit
Quantity
Rate
in Rs
Amount
in Rs
217
Nill
0.00
0.00
0.00
0.00
0.00
C.LABOUR :
Sl No
Description
Unit
Quantity
1
2
Mason Class II
Day
6.60
Mazdoor
Day
29.70
Total cost of labour
Rs :
labour component/unit qty
116.50
Add contractor's profit and overhead charges
13.615% 15.90
labour component/unit qty (including contractor's profit)
132.40
ABSTRACT
A.Cost of Materials including ryolty charges
B. Hire charges of Machinery
C.Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
If 15 cm thick murum bed is to be
NOTE:
provided below pitching
Add ( As per rate analysis under
item IRR-CAW-8-1 - Note)
IRR-CAW-8-5
Rate
in Rs
370.00
310.00
Amount
in Rs
2442.00
9207.00
11649.00
Rs:
Rs:
Rs:
Rs:
10890.00
0.00
11649.00
22539.00
Rs:
Rs:
Rs.
3068.68
25607.68
256.10
Rs :
37.60
Providing and constructing 45 cm thick dry rubble stone pitching with pin headers at 2 per
sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial
lead upto 50 m and all lifts.
( rubble stones : 0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 sqm
Rate
in Rs.
cum
40.00
330.00
2
3
Nos
cum
200.00
6.75
39.00
360.00
Rs:
Amount
in Rs.
13200.00
7800.00
B. MACHINERY:
Sl No
Description
Unit
Quantity
Nill
0.00
0.00
Description
work inspector
Mason Class II
mazdoor
Unit
Quantity
Day
Day
Day
1.00
7.00
9.00
2430.00
23430.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
2590.00
2790.00
5780.00
0.00
218
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
If 15 cm thick murum bed is to be
NOTE:
provided below pitching add
( As per rate analysis under item
IRR-CAW-8-1 - Note )
IRR-CAW-8-6
DATA:
Rs:
Rs:
Rs:
Rs:
23430.00
0.00
5780.00
29210.00
Rs:
Rs:
Rs.
3976.94
33186.94
331.90
37.60
RATE ANALYSIS
A. MATERIALS :
Sl No
Particulars
UNIT :
Unit
Cum
Quantity
49.50
100.00 sqm
Rate
in Rs
Amount
in Rs
16335.00
330.00
16335.00
B.MACHINERY :
Sl No
Description
Nill
Unit
Quantity
0.00
0.00
Rate
in Rs
0.00
0.00
Amount
in Rs
0.00
0.00
0.00
C.LABOUR :
Sl No
Description
Unit
Quantity
1
2
Mason Class II
Day
9.90
Mazdoor
Day
44.55
Total cost of labour
Rs :
labour component/unit qty
174.70
Add contractor's profit and overhead charges
13.615% 23.80
labour component/unit qty (including contractor's profit)
198.50
ABSTRACT
A.Cost of Materials including ryolty charges
B. Hire charges of Machinery
C.Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
If 15 cm thick murum bed is to be
NOTE:
provided below pitching
Add ( As per rate analysis under
item IRR-CAW-8-1 - Note)
Rate
in Rs
Amount
in Rs
370.00
310.00
3663.00
13810.50
17473.50
Rs:
Rs:
Rs:
Rs:
16335.00
0.00
17473.50
33808.50
Rs:
Rs:
Rs.
4603.03
38411.53
384.10
Rs :
37.60
219
IRR-CAW-8-7
Providing and constructing 30 cm thick rubble stone pitching set in CM 1: 5 proportion with
pin headers at 2 per sqm in including cost of all materials, labour, packing chips and mortar,
finishing, curing etc., complete with initial lead upto 50 m and all lifts.
( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
100.00 sqm
Rate
in Rs.
Amount
in Rs.
9075.00
cum
27.50
330.00
2
3
4
5
Nos
cum
kg
cum
200.00
4.50
3000.00
10.50
23.00
360.00
6.30
760.00
Rs:
1620.00
18900.00
7980.00
42175.00
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
20.40
162.60
183.00
Rate
in Rs.
103.60
400.00
370.00
310.00
425.00
Rs:
Amount
in Rs.
207.20
400.00
1850.00
3720.00
850.00
7027.20
Rs:
Rs:
Rs:
Rs:
42175.00
183.00
7027.20
49385.20
Rs:
Rs:
Rs.
6723.79
56108.99
561.10
4600.00
B. MACHINERY:
Sl No
1
Description
Unit
5 hp pump ( diesel )
Fuel / Energy charges
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Quantity
2.00
2.00
Unit
Quantity
1
2
3
4
5
IRR-CAW-8-8
37.60
Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion
including cost of all materials,labour, packing chips and mortar ,finishing etc.,complete
( rubble stones : 0.33 cum/sqm )
DATA:
RATE ANALYSIS
UNIT :
100.00 Sqm
A. MATERIALS :
Sl No
Particulars
Unit
Cum
Quantity
33.00
Rate
in Rs
Amount
in Rs
10890.00
330.00
220
2
3
Cement
Sand (Screened)
Total Cost of materials
Kg
Cum
3232.00
11.22
6.30
760.00
20361.60
8527.20
39778.80
Rate
in Rs
Amount
in Rs
Rs :
B.MACHINERY :
Sl No
Description
Nill
Unit
Quantity
0.00
0.00
0.00
0.00
C.LABOUR :
Sl No
Description
Unit
Quantity
1
2
3
Mason Class I
Day
0.54
Mason Class II
Day
1.26
Mazdoor
Day
2.80
Total cost of labour
Rs :
labour component/unit qty
15.60
Add contractor's profit and overhead charges
13.615% 2.10
labour component/unit qty (including contractor's profit)
17.70
ABSTRACT
A.Cost of Materials
B. Hire charges of Machinery
C.Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 Sqm
Rate per
Sqm
(A+B+C+D)/100.0
If 15 cm thick murum bed is to be
NOTE:
provided below pitching
Add ( As per rate analysis under
item IRR-CAW-8-1 - Note)
IRR-CAW-8-9
Rate
in Rs
Amount
in Rs
224.10
466.20
868.00
415.00
370.00
310.00
1558.30
Rs:
Rs:
Rs:
Rs:
39778.80
0.00
1558.30
41337.10
Rs:
Rs:
Rs.
5628.05
46965.15
469.70
Rs :
37.60
Providing and constructing 30 cm thick dry khandki stone pitching using 20 to 25 cm size
khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand
packing, finishing etc., complete with initial lead upto 50 m and all lifts.
( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm,
Pin Headers 30cm : 2/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
Nos
1200.00
2
3
Nos
cum
200.00
4.50
B. MACHINERY:
Sl No
1
Description
Unit
Nil
Quantity
0.00
0.00
Description
Unit
Quantity
100.00 sqm
Rate
in Rs.
13.00
Amount
in Rs.
15600.00
4600.00
23.00
360.00
Rs:
1620.00
21820.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
Amount
in Rs.
221
1
2
3
work inspector
Mason Class II
mazdoor
Day
Day
Day
1.00
5.00
6.00
400.00
370.00
310.00
Rs:
400.00
1850.00
1860.00
4110.00
Rs:
Rs:
Rs:
Rs:
21820.00
0.00
4110.00
25930.00
Rs:
Rs:
Rs.
3530.37
29460.37
294.60
37.60
IRR-CAW-8-10 Providing and constructing 45 cm thick dry khandki stone pitching using 25 to 30 cm size
khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand
packing, finishing etc., complete with initial lead upto 50 m and all lifts.
( Khandki stones 25- 30 cm height : 1200 Nos/sqm, Stone Chips : 0.0675cum/sqm,
Pin Headers 45cm : 2/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
particulars
B. MACHINERY:
Sl No
Description
UNIT :
Unit
Nos
Nos
cum
Unit
Quantity
730.00
200.00
6.75
Quantity
Nil
0.00
0.00
Description
work inspector
Mason Class II
mazdoor
Unit
Quantity
Day
Day
Day
1.00
7.00
9.00
100.00 sqm
Rate
in Rs.
16.00
39.00
360.00
Rs:
Amount
in Rs.
11680.00
7800.00
2430.00
21910.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
2590.00
2790.00
5780.00
Rs:
Rs:
Rs:
Rs:
21910.00
0.00
5780.00
27690.00
Rs:
Rs:
Rs.
3769.99
31459.99
314.60
222
NOTE:
37.60
IRR-CAW-8-11 Providing and constructing 30 cm thick khandki stone pitching using 20 to 25 cm size
khandki stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in
CM 1:3 proportion including cost of all materials, labour, packing chips and mortar, finishing,
curing etc.complete with initial lead upto 50 m and all lifts.
( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm,
Pin Headers 30cm : 2/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
B. MACHINERY:
Sl No
1
C. LABOUR:
Sl No
particulars
UNIT :
Unit
Nos
Nos
cum
kg
cum
Description
Unit
5 hp diesel pump
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
Quantity
1200.00
200.00
4.50
2902.00
9.67
Quantity
2.00
2.00
Quantity
1
2
3
4
5
100.00 sqm
Rate
in Rs.
13.00
23.00
360.00
6.30
760.00
Rs:
Amount
in Rs.
15600.00
4600.00
1620.00
18282.60
7349.20
47451.80
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
20.40
162.60
183.00
Rate
in Rs.
103.60
400.00
425.00
370.00
310.00
Rs:
Amount
in Rs.
207.20
400.00
850.00
1850.00
3410.00
6717.20
Rs:
Rs:
Rs:
Rs:
47451.80
183.00
6717.20
54352.00
Rs:
Rs:
Rs.
7400.02
61752.02
617.50
37.60
IRR-CAW-8-12 Providing and constructing 45 cm thick khandki stone pitching using 25 to 30 cm stones
with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1 : 3
proportion including cost of all materials, labour, packing chips and mortar, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
( Khandki stones 25- 30 cm height : 730 Nos/sqm, Stone Chips : 0.0675cum/sqm,
223
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
B. MACHINERY:
Sl No
1
particulars
UNIT :
Unit
Nos
Nos
cum
kg
cum
Description
Unit
5 hp diesel pump
Fuel / Energy charges
Total hire charges of Machinery
Hour
Hour
Description
Unit
C. LABOUR:
Sl No
Quantity
730.00
200.00
6.75
4050.00
13.99
Quantity
4.00
4.00
Quantity
1
2
3
4
5
100.00 sqm
Rate
in Rs.
16.00
39.00
360.00
6.30
760.00
Rs:
Amount
in Rs.
11680.00
7800.00
2430.00
25515.00
10632.40
58057.40
Rate
in Rs.
10.20
81.30
Rs:
Amount
in Rs.
40.80
325.20
366.00
Rate
in Rs.
103.60
400.00
425.00
370.00
310.00
Rs:
Amount
in Rs.
414.40
400.00
850.00
2590.00
4960.00
9214.40
Rs:
Rs:
Rs:
Rs:
58057.40
366.00
9214.40
67637.80
Rs:
Rs:
Rs.
9208.89
76846.69
768.50
37.60
IRR-CAW-8-13 Providing 10 cm thick approved type grass turfing to the side slopes of canal including cost of
all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.
(FA : 2 cum/sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
Turfing sods
Sand for filling
UNIT :
Unit
sqm
cum
Quantity
100.00
2.00
Description
Nill
Unit
Quantity
0.00
100.00 sqm
Rate
in Rs.
28.00
560.00
Rs:
Amount
in Rs.
2800.00
1120.00
3920.00
Rate
in Rs.
0.00
Amount
in Rs.
0.00
224
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
Unit
Quantity
1
2
3
work inspector
Day
0.10
Cartman with double bullock cart
Day
2.00
mazdoor
Day
14.00
Total cost of Labour
labour component/unit qty
52.30
Add contractor's profit and overhead charges
13.615% 7.10
labour component/unit qty (including contractor's profit)
59.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost for
100.00 sqm
Rate per
sqm
(A+B+C+D)/100.0
0.00
Rs:
0.00
0.00
Rate
in Rs.
400.00
425.00
310.00
Rs:
Amount
in Rs.
40.00
850.00
4340.00
5230.00
Rs:
Rs:
Rs:
Rs:
3920.00
0.00
5230.00
9150.00
Rs:
Rs:
Rs.
1245.77
10395.77
104.00
IRR-CAW-8-14 Providing 10 cm Thick approved type gross turfing to the side slopes of canal including cost of
all materials ,labour,watering for minimum 15 days etc.,,complete.
with initial lead upto 50 m and all lifts ( WITHOUT USING SAND)
DATA:
RATE ANALYSIS
UNIT :
100.00 Sqm
A. MATERIALS :
Sl No
1
Particulars
Turfing Sods
Total Cost of materials
Unit
Sqm
Quantity
100.00
Rate
in Rs
28.00
Rs :
Amount
in Rs
2800.00
2800.00
B.MACHINERY :
Sl No
Description
Nill
Unit
Quantity
0.00
0.00
Rate
in Rs
0.00
0.00
Amount
in Rs
0.00
0.00
0.00
C.LABOUR :
Sl No
Description
Unit
Quantity
1
2
Mazdoor
Day
7.00
Cart men with double bullock cart
Day
2.00
Total cost of labour
Rs :
labour component/unit qty
30.20
Add contractor's profit and overhead charges
13.615% 4.10
labour component/unit qty (including contractor's profit)
34.30
ABSTRACT
A.Cost of Materials including ryolty charges
B. Hire charges of Machinery
C.Cost of Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
13.615%
Rate
in Rs
310.00
425.00
Amount
in Rs
2170.00
850.00
3020.00
Rs:
Rs:
Rs:
Rs:
2800.00
0.00
3020.00
5820.00
Rs:
792.39
225
100.00 Sqm
(A+B+C+D)/100.0
Rs:
Rs.
6612.39
66.10
226
CHAPTER-IV
CANAL CROSS DRAINAGE WORKS - Standard Data
3. The Leads for Steel and Cement shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be
added as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included
in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.
(same as above)
Example:
Total lead for earth from approved borrow area :
15 Km
Initial lead included in the basic rate in the SR :
1 Km
Additional lead charges :
Lead charges forRs.
5 km
83.60
Lead charges for next 10 km
Rs.
125
Total lead charges for 15 km
Rs.
/cum
208.60
Less 1 km initial lead charges
Rs./cum
31.30 (-)
Net additional lead chargesRs.
/ cum
177.30
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For
conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without
deducting the 50 m initial lead charges
CCDW - Work Items
IRR-CCDW-1
IRR-CCDW-1-1
Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal
cross drainage and other appurtenant structures and placing the excavated stuff neatly in
specified dump area or disposing off the same as directed etc., complete with initial lead upto
50 m and initial lift upto 3 m.
DATA:
RATE ANALYSIS
UNIT :
10.00 cum
230
A. MATERIALS:
Sl No
Particulars
1
Unit
Quantity
NIL
0.00
0.00
Unit
Quantity
NIL
0.00
0.00
Unit
1
2
Day
Day
work inspector
mazdoor
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
Quantity
0.25
6.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
100.00
1860.00
1960.00
Rs:
Rs:
Rs:
Rs:
0.00
0.00
1960.00
1960.00
266.85
2226.85
222.70
196.00
13.615% 26.70
222.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
IRR-CCDW-1-2
DATA:
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
Unit
hour
hour
C. Labour:
Sl No
Description
Unit
1
2
3
day
day
hour
work inspector
Mazdoor
crew for excavator
Total in Rs.
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
Abstract
a) Material
b) Machinery
c) Labour
Total
Quantity
6.00
Rate
in Rs.
1706.60
Amount
in Rs.
10239.60
6.00
893.90
5363.40
15603.00
Rate
in Rs.
400.00
310.00
221.00
Amount
in Rs.
128.00
2480.00
1326.00
3934.00
Quantity
0.32
8.00
6.00
16.40
13.615% 2.20
18.60
Rs
Rs
Rs
Rs
0.00
15603.00
3934.00
19537.00
231
13.615% Rs:
240.00 cum
Rs:
(A+B+C+D)/240.0
Rs.
2659.96
22196.96
92.50
IRR-CCDW-1-3
Excavation in ordnary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia.
for foundations of canal cross drainage and other appurtenant structures and placing the
excavated stuff neatly in specified dump area or disposing off the same as directed etc.,
complete with initial lead upto 50 m and initial lift upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
UNIT :
Unit
Quantity
NIL
0.00
0.00
Unit
Quantity
NIL
0.00
0.00
Unit
1
2
3
4
Day
Day
Day
Day
Crowbarman
Stone breaker
work inspector
mazdoor
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
Quantity
1.25
1.25
0.25
6.00
10.00 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
370.00
400.00
310.00
Rs:
Amount
in Rs.
462.50
462.50
100.00
1860.00
2885.00
Rs:
Rs:
Rs:
Rs:
0.00
0.00
2885.00
2885.00
392.79
3277.79
327.80
288.50
13.615% 39.30
327.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
IRR-CCDW-1-4
DATA:
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
Excavation in ordnary rock without blasting for foundations of canal cross drainage
and other appurtenant structures and placing the excavated stuff neatly in specified dump
area or disposing off the same as directed etc., complete with initial
lead upto 50 m and initial lift upto 3 m.
( Data adopted from MORTH)
Mechanical Means
Unit = cum
Taking output = 180 cum
Unit:
180.00
A. Materials:
Sl No
Description
Unit
Quantity
Rate
in Rs.
NIL
0.00
0.00
B. Machinery:
Sl No
Description
Unit
1.0
hour
hour
C. Labour:
Sl No
Description
Unit
Quantity
cum
Amount
in Rs.
0.00
6.00
Rate
in Rs.
1706.60
Amount
in Rs.
10239.60
6.00
893.90
5363.40
15603.00
Rate
Amount
Quantity
232
1
2
3
work inspector
Mazdoor
crew for excavator
Total in Rs.
day
day
hour
0.24
6.00
6.00
Rs
Rs
Rs
Rs
13.615% Rs:
180.00 cum
Rs:
(A+B+C+D)/180.0
Rs.
Excavation in hard rock requiring blasting including boulders above 0.6 m upto 1.2 m dia. for
foundations of canal cross drainage and other appurtenant structures and placing the
excavated stuff neatly in specified dump area or disposing off the same as directed etc.,
complete with initial lead upto 50 m and initial lift upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
UNIT :
Unit
Quantity
Rm
10%
Hour
kg
Nos
Rm
LS
Unit
43.50
Quantity
Unit
1
2
3
4
5
6
7
8
Hour
Hour
Day
Day
Day
Day
Day
Day
3.00
3.00
6.00
6.00
Quantity
3.00
6.00
1.00
0.50
0.50
6.00
3.00
51.00
Rate
in Rs.
20.75
0.23
70.00
13.00
11.00
20.00
Rs:
Amount
in Rs.
902.63
90.26
1.39
1400.00
377.00
770.00
10.00
3551.28
Rate
in Rs.
275.60
914.20
19.80
0.00
Rs:
Amount
in Rs.
826.80
2742.60
118.80
0.00
3688.20
Rate
in Rs.
195.90
306.20
400.00
480.00
370.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
587.70
1837.20
400.00
240.00
185.00
2220.00
1110.00
15810.00
22389.90
Rs:
Rs:
Rs:
Rs:
3551.28
3688.20
22389.90
29629.38
4034.04
223.90
13.615% 30.50
254.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
0.00
15603.00
3282.00
18885.00
2571.19
21456.19
119.20
100 cum
6.00
20.00
29.00
70.00
0.50
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Crew for Air compressor
Crew for Jack hammer
work inspector
Blaster
Helper blaster
Crowbarman
Stone breaker
mazdoor
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
in Rs.
96.00
1860.00
1326.00
3282.00
18.20
13.615% 2.50
20.70
IRR-CCDW-1-5
in Rs.
400.00
310.00
221.00
Total
13.615% Rs:
233
100.00 cum
(A+B+C+D)/100.0
Rs:
Rs.
33663.415
336.60
IRR-CCDW-1-6
Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for
foundations of canal cross drainage and other appurtenant structures and placing the
excavated rock neatly in specified dump area or stack yard as directed etc., complete with
initial lead upto 50 m and initial lift upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
B. MACHINERY:
Sl No
Description
1
2
UNIT :
Unit
kg
No.
No.
Rm
Hour
Rm
10%
Unit
32.00
8.00
104.00
150.00
16.00
98.30
Quantity
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
1
2
3
4
5
6
7
8
Hour
Hour
Day
Day
Day
Day
Day
Day
Quantity
8.00
8.00
16.00
16.00
Quantity
8.00
16.00
1.00
1.00
1.00
6.00
6.00
51.00
100.00 cum
Rate
in Rs.
70.00
7.00
13.00
11.00
11.56
27.67
Rs:
Amount
in Rs.
2240.00
56.00
1352.00
1650.00
185.00
2719.63
271.96
8474.60
Rate
in Rs.
275.60
914.20
19.80
0.00
Rs:
Amount
in Rs.
2204.80
7313.60
316.80
0.00
9835.20
Rate
in Rs.
195.90
306.20
480.00
370.00
400.00
370.00
370.00
310.00
Rs:
Amount
in Rs.
1567.20
4899.20
480.00
370.00
400.00
2220.00
2220.00
15810.00
27966.40
Rs:
Rs:
Rs:
Rs:
8474.60
9835.20
27966.40
46276.20
6300.5
52576.70
525.80
279.70
13.615% 38.10
317.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
IRR-CCDW-1-7
DATA:
Total
13.615% Rs:
100.00 cum
Rs:
(A+B+C+D)/100.0
Rs.
Excavation in hard rock with blasting prohibited for foundations of canal cross drainage
and other appurtenant structures and placing the excavated rock neatly in
or stack yard as directed etc., complete with specified dump area initial lead upto 50 m and
initial lift upto 3 m.
Hard Rock ( blasting prohibited )
( Data adopted from MORTH)
Unit = cum
Taking output = 10 cum
Mechanical Means
10.00
A.Materials:
Sl No
Description
Unit
Quantity
Rate
in Rs.
cum
Amount
in Rs.
234
NIL
0.00
0.00
0.00
Amount
in Rs.
1447.80
b)
Machinery
Sl No
Description
Unit
1.0
hour
6.00
Rate
in Rs.
241.30
hour
6.00
731.40
4388.40
5836.20
Rate
in Rs.
400.00
310.00
195.90
Amount
in Rs.
80.00
1550.00
1175.40
2805.40
c) Labour
Sl No
Description
Unit
1
2
3
day
day
hour
work inspector
Mazdoor
crew for compressor
Total in Rs.
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
Abstract
a) Material
b) Machinery
c) Labour
Total
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Quantity
Quantity
0.20
5.00
6.00
280.50
13.615% 38.20
318.70
Rs
Rs
Rs
Rs
10.00 cum
(A+B+C+D)/10.0
13.615% Rs:
Rs:
Rs.
IRR-CCDW-1-8
Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with
1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in
concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning
hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead
upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
B. MACHINERY:
Sl No
Description
1
2
UNIT :
Unit
kg
kg
Rm
10%
Hour
Unit
5.00
101.00
12.50
2.00
Quantity
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
1
2
3
4
5
6
Hour
Hour
Day
Day
Day
Day
Quantity
1.00
1.00
2.00
2.00
Quantity
1.00
2.00
0.50
0.50
0.50
1.00
0.00
5836.20
2805.40
8641.60
1176.55
9818.15
981.80
10.00 Nos.
Rate
in Rs.
6.30
40.00
27.67
11.56
Rs:
Amount
in Rs.
31.50
4040.00
345.83
34.58
23.13
4475.04
Rate
in Rs.
275.60
914.20
19.80
0.00
Rs:
Amount
in Rs.
275.60
914.20
39.60
0.00
1229.40
Rate
in Rs.
195.90
306.20
370.00
490.00
400.00
310.00
Rs:
Amount
in Rs.
195.90
612.40
185.00
245.00
200.00
310.00
1748.30
174.80
13.615% 23.80
235
198.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per each
Total
13.615% Rs:
10.00 Nos.
Rs:
(A+B+C+D)/10.0
Rs.
Rs:
Rs:
Rs:
Rs:
IRR-CCDW-2
IRR-CCDW-2-1
Providing, fabricating and placing in position reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with
1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,
complete with initial lead upto 50 and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
Unit
1
2
3
kg
kg
LS
B. MACHINERY:
Sl No
Description
1
UNIT :
Unit
Quantity
1050.00
8.00
3.00
Quantity
Nil
0.00
0.00
Unit
1
2
3
Day
Day
Day
work inspector
Bar bender
mazdoor
Total cost of Labour
labour component/unit qty
Add contractor's profit and overhead charges
labour component/unit qty (including contractor's profit)
Quantity
1.00
6.00
11.00
1000.00 kg
Rate
in Rs.
40.00
70.00
20.00
Rs:
Amount
in Rs.
42000.00
560.00
60.00
42620.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
490.00
310.00
Rs:
Amount
in Rs.
400.00
2940.00
3410.00
6750.00
Rs:
Rs:
Rs:
Rs:
42620.00
0.00
6750.00
49370.00
6721.73
56091.73
56.10
6.80
13.615% 0.90
7.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per kg
IRR-CCDW-2-2
4475.04
1229.40
1748.30
7452.74
1014.69
8467.43
846.70
Total
13.615% Rs:
1000.00 kg
Rs:
(A+B+C+D)/1000.0
Rs.
Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x
100 x 10 mm angle and 250 x 12 mm plate for sinking for sinking 4.50 m outer diameter
foundation wells foundation wells including cost of all materials, machinery, labour, bending,
welding, providing anchors etc., complete with initial lead upto 50 m and all lifts.
236
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
Particulars
Unit
kg
kg
kg
cum
cum
Nos
LS
B. MACHINERY:
Sl No
1
2
3
Description
Unit
Bending machine
Fuel / Energy charges
Welding set
Fuel / Energy charges
Sundries
Total hire charges of Machinery
Hour
Hour
Hour
Hour
LS
C. LABOUR:
Sl No
1
2
3
4
UNIT :
Description
Unit
Quantity
216.10
342.30
56.60
0.50
1.50
300.00
5.00
Quantity
8.00
8.00
30.00
30.00
10.00
Quantity
Day
Day
Day
Day
2.00
5.00
1.00
5.00
615.00 kg
Rate
in Rs.
40.00
40.00
40.00
330.00
45.00
11.00
20.00
Rs:
Amount
in Rs.
8644.00
13692.00
2264.00
165.00
67.50
3300.00
100.00
28232.50
Rate
in Rs.
42.60
115.50
16.00
92.40
20.00
Rs:
Amount
in Rs.
340.80
924.00
480.00
2772.00
200.00
4716.80
Rate
in Rs.
480.00
415.00
400.00
310.00
Rs:
Amount
in Rs.
960.00
2075.00
400.00
1550.00
4985.00
Rs:
Rs:
Rs:
Rs:
28232.50
4716.80
4985.00
37934.30
5164.75
43099.05
70.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per kg
Total
13.615% Rs:
615.00 kg
Rs:
(A+B+C+D)/615.0
Rs.
IRR-CCDW-2-3 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Data
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
Quantity
3998.80
46.14
6.92
4.15
2.77
6.15
16.00
15.38
15.38 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
225.53
Amount
in Rs.
25192.44
290.68
7924.55
5024.65
2422.35
3445.12
1519.54
3468.64
237
Scaffolding @ of shuttering
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
1
2
3
4
10%
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
20.00
Rs:
346.86
10.00
49644.83
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
60.80
164.80
2059.45
Rate
in Rs.
204.10
103.60
165.80
146.90
400.00
415.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
400.00
415.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
930.00
4767.80
310.00
1227.32
122.73
15848.46
0.50
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
15.38 cum
Rs:
(A+B+C+D)/15.38
Rs.
49644.83
2059.45
15848.46
67552.73
9197.3
76750.03
4990.20
IRR-CCDW-2-4 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
cum
cum
kg
Quantity
3600.00
43.20
4.94
4.23
2.82
2.12
5.04
14.40
14.40 cum
Rate
in Rs.
6.30
6.30
635.00
1145.00
1210.00
875.00
560.00
95.00
Amount
in Rs.
22680.00
272.16
3136.39
4847.47
3415.10
1852.20
2822.40
1368.00
238
5
6
B. MACHINERY:
Sl No
1
2
3
4
sqm
10%
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
14.40
225.53
0.50
20.00
Rs:
3247.62
324.76
10.00
43976.11
Rate
in Rs.
92.70
162.50
10.20
81.30
402.50
307.20
8.20
30.80
Rs:
Amount
in Rs.
741.60
1300.00
5.10
40.65
402.50
307.20
65.60
246.40
3109.05
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
930.00
4464.00
310.00
1149.12
114.91
15458.63
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
14.40 cum
Rs:
(A+B+C+D)/14.40
Rs.
43976.11
3109.05
15458.63
62543.79
8515.34
71059.13
4934.70
IRR-CCDW-2-5 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
Quantity
3599.20
49.08
7.36
4.42
2.94
6.54
14.40
16.36 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
Amount
in Rs.
22674.96
309.20
8429.49
5344.81
2576.70
3664.64
1367.70
239
5
6
B. MACHINERY:
Sl No
1
2
3
4
sqm
10%
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
16.36
225.53
0.50
20.00
Rs:
3689.65
368.97
10.00
48436.12
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
60.80
164.80
2059.45
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
930.00
5071.60
310.00
1305.53
16107.73
Rs:
Rs:
Rs:
Rs:
48436.12
2059.45
16107.73
66603.30
9068.04
75671.34
4625.40
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Total
13.615% Rs:
16.36 cum
Rs:
(A+B+C+D)/16.36
Rs.
IRR-CCDW-2-6 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
cum
cum
kg
Quantity
3201.00
43.65
4.99
4.28
2.85
2.14
5.09
12.80
14.55 cum
Rate
in Rs.
6.30
6.30
635.00
1145.00
1210.00
875.00
560.00
95.00
Amount
in Rs.
20166.30
275.00
3169.06
4897.97
3450.68
1871.49
2851.80
1216.38
240
5
6
B. MACHINERY:
Sl No
1
2
3
4
sqm
10%
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
14.55
225.53
0.50
20.00
Rs:
3281.45
328.14
10.00
41518.27
Rate
in Rs.
92.70
162.50
10.20
81.30
402.50
307.20
8.20
30.80
Rs:
Amount
in Rs.
741.60
1300.00
5.10
40.65
402.50
307.20
65.60
246.40
3109.05
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
930.00
4510.50
310.00
1161.09
116.11
15518.30
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
14.55 cum
Rs:
(A+B+C+D)/14.55
Rs.
41518.27
3109.05
15518.30
60145.62
8188.83
68334.45
4696.50
IRR-CCDW-2-7 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for foundation filling including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 220 kg / cum )
(Cement content: 310 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
Quantity
4398.90
42.57
6.39
3.83
2.55
5.68
17.60
14.19 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
Amount
in Rs.
27713.07
268.19
7311.40
4635.87
2234.93
3178.56
1671.58
241
5
6
B. MACHINERY:
Sl No
1
2
3
4
sqm
10%
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
14.19
225.53
0.50
20.00
Rs:
3200.26
320.03
10.00
50543.88
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
60.80
164.80
2059.45
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
930.00
4398.90
310.00
1132.36
113.24
15375.10
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
14.19 cum
Rs:
(A+B+C+D)/14.19
Rs.
50543.88
2059.45
15375.10
67978.43
9255.26
77233.69
5442.80
IRR-CCDW-2-8 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
cum
kg
Quantity
4800.00
75.00
6.75
4.05
2.70
6.00
19.20
15.00 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
Amount
in Rs.
30240.00
472.50
7728.75
4900.50
2362.50
3360.00
1824.00
242
5
6
B. MACHINERY:
Sl No
1
2
3
4
sqm
25%
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
30.00
225.53
0.50
20.00
Rs:
6765.87
1691.47
10.00
59355.59
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
60.80
164.80
2059.45
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1240.00
4650.00
310.00
1197.00
299.25
16186.85
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
15.00 cum
Rs:
(A+B+C+D)/15.0
Rs.
59355.59
2059.45
16186.85
77601.89
10565.5
88167.39
5877.80
IRR-CCDW-2-9 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
kg
sqm
Quantity
5200.80
78.80
8.20
4.41
7.09
20.80
31.52
15.76 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
Amount
in Rs.
32765.04
496.44
9916.19
3861.20
3971.52
1976.30
7108.67
243
Scaffolding @ of shuttering
Sundries
Total cost of Materials
B. MACHINERY:
Sl No
1
2
3
4
25%
LS
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
20.00
Rs:
1777.17
10.00
61882.54
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
60.80
164.80
2059.45
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1240.00
4885.60
310.00
2515.30
628.82
18070.32
0.50
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
15.76 cum
Rs:
(A+B+C+D)/15.76
Rs.
61882.54
2059.45
18070.32
82012.31
11165.98
93178.289
5912.30
IRR-CCDW-2-10 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
kg
sqm
25%
Quantity
4398.80
78.55
8.17
4.40
7.07
17.60
31.42
15.71 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
Amount
in Rs.
27712.44
494.87
9884.73
3848.95
3958.92
1671.54
7086.12
1771.53
244
Sundries
LS
0.50
20.00
Rs:
10.00
56439.10
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
60.80
164.80
2059.45
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1240.00
4870.10
310.00
2507.32
626.83
18044.85
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
15.71 cum
Rs:
(A+B+C+D)/15.71
Rs.
56439.10
2059.45
18044.85
76543.40
10421.38
86964.777
5535.60
IRR-CCDW-2-11 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for sub-structure / super- structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
UNIT :
Unit
kg
kg
cum
cum
cum
kg
sqm
25%
LS
Quantity
18.00 cum
3960.00
90.00
9.36
5.04
8.10
15.84
36.00
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
0.50
20.00
Amount
in Rs.
24948.00
567.00
11325.60
4410.00
4536.00
1504.80
8119.04
2029.76
10.00
245
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
8.00
8.00
Quantity
1
2
3
4
5
6
7
Rs:
57450.21
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
60.80
164.80
2059.45
Rate
in Rs.
204.10
103.60
165.80
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
165.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1240.00
5580.00
310.00
2872.80
718.20
19211.60
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
18.00 cum
Rs:
(A+B+C+D)/18.0
Rs.
57450.21
2059.45
19211.60
78721.26
10717.9
89439.155
4968.80
IRR-CCDW-2-12 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well kerb including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
UNIT :
Particulars
Unit
kg
cum
cum
cum
kg
sqm
LS
Quantity
5250.00
7.80
4.20
6.75
21.00
82.50
0.50
15.00 cum
Rate
in Rs.
6.30
1210.00
875.00
560.00
95.00
248.08
20.00
Rs:
Amount
in Rs.
33075.00
9438.00
3675.00
3780.00
1995.00
20466.76
10.00
72439.76
246
B. MACHINERY:
Sl No
1
2
3
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
Unit
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
1
2
3
4
5
6
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
930.00
4650.00
310.00
6583.50
20798.30
Rs:
Rs:
Rs:
Rs:
72439.76
1349.75
20798.30
94587.81
12878.13
107465.94
7164.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
15.00 cum
Rs:
(A+B+C+D)/15.0
Rs.
IRR-CCDW-2-13 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for well steining including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
LS
B. MACHINERY:
Sl No
1
UNIT :
Description
Unit
Hour
Quantity
4800.00
30.00
6.75
4.05
2.70
6.00
19.20
60.00
0.50
Quantity
8.00
15.00 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
248.08
20.00
Rs:
Amount
in Rs.
30240.00
189.00
7728.75
4900.50
2362.50
3360.00
1824.00
14884.91
10.00
65499.66
Rate
in Rs.
53.50
Amount
in Rs.
428.00
247
2
3
C. LABOUR:
Sl No
Description
Hour
Hour
Hour
Hour
Hour
Unit
8.00
0.50
0.50
8.00
8.00
Quantity
1
2
3
4
5
6
81.30
10.20
81.30
7.60
20.60
Rs:
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
930.00
4650.00
310.00
4788.00
19002.80
Rs:
Rs:
Rs:
Rs:
65499.66
1349.75
19002.80
85852.21
11688.78
97540.99
6502.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
15.00 cum
Rs:
(A+B+C+D)/15.0
Rs.
IRR-CCDW-2-14 Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq
mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well bottom plug by tremie or skip box method including cost of all materials,
machinery, labour, batching, mixing, placing in position as per detailed specifications etc.,
complete with initial lead upto 50 m and all lifts. ( Cement content : 350 kg / cum )
(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
UNIT :
Unit
kg
cum
cum
cum
kg
Description
Unit
Hour
Hour
Hour
Hour
LS
Quantity
4900.00
7.28
3.92
6.30
19.60
TOTAL
1%
Quantity
8.00
8.00
0.50
0.50
5.00
14.00 cum
Rate
in Rs.
6.30
1210.00
875.00
560.00
95.00
Rs:
Rs:
Rs:
Amount
in Rs.
30870.00
8808.80
3430.00
3528.00
1862.00
48498.80
484.99
48983.79
Rate
in Rs.
53.50
81.30
10.20
81.30
20.00
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
100.00
1224.15
C. LABOUR:
248
Sl No
Description
Unit
Quantity
1
2
3
4
5
Rate
in Rs.
204.10
103.60
370.00
400.00
Amount
in Rs.
1632.80
51.80
370.00
400.00
310.00
310.00
310.00
310.00
310.00
Rs:
1240.00
3410.00
1240.00
620.00
4960.00
13924.60
Rs:
Rs:
Rs:
Rs:
48983.79
1224.15
13924.60
64132.54
8731.65
72864.19
5204.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
14.00 cum
Rs:
(A+B+C+D)/14.0
Rs.
IRR-CCDW-2-15 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for well top plug including cost of all materials, machinery, labour, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
Unit
kg
cum
cum
cum
cum
kg
B. MACHINERY:
Sl No
1
2
3
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
UNIT :
Description
Unit
Quantity
4001.20
6.43
3.86
2.57
5.72
16.00
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
14.29 cum
Rate
in Rs.
6.30
1145.00
1210.00
875.00
560.00
95.00
Rs:
Amount
in Rs.
25207.56
7362.92
4668.54
2250.68
3200.96
1520.46
44211.12
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
3410.00
Hour
Hour
Hour
Day
Day
8.00
0.50
8.00
1.00
1.00
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Day
11.00
310.00
249
310.00
310.00
310.00
310.00
Rs:
1240.00
930.00
4429.90
310.00
13994.70
Rs:
Rs:
Rs:
Rs:
44211.12
1349.75
13994.70
59555.57
8108.49
67664.06
4735.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
14.29 cum
Rs:
(A+B+C+D)/14.29
Rs.
IRR-CCDW-2-16 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for well cap including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
kg
sqm
LS
B. MACHINERY:
Sl No
1
2
3
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
UNIT :
Quantity
5200.80
78.80
8.20
4.41
7.09
20.80
15.76
0.50
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Description
Unit
Quantity
Hour
Hour
Hour
Day
Day
8.00
0.50
8.00
1.00
1.00
Day
Day
Day
Day
Day
sqm
11.00
4.00
3.00
15.76
1.00
15.76
15.76 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
20.00
Rs:
Amount
in Rs.
32765.04
496.44
9916.19
3861.20
3971.52
1976.30
3554.34
10.00
56551.03
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
930.00
4885.60
310.00
1257.65
15708.05
250
996.70
13.615% 135.70
1132.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
15.76 cum
Rs:
(A+B+C+D)/15.76
Rs.
56551.03
1349.75
15708.05
73608.83
10021.84
83630.67
5306.50
IRR-CCDW-2-17 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for piers and abutments including cost of all materials, labour, machinery,
formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
cum
kg
sqm
30%
B. MACHINERY:
Sl No
1
2
3
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
UNIT :
Description
Unit
Quantity
3600.00
72.00
4.94
4.23
2.82
2.12
5.04
14.40
39.60
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
14.40 cum
Rate
in Rs.
6.30
6.30
635.00
1145.00
1210.00
875.00
560.00
95.00
236.81
Rs:
Amount
in Rs.
22680.00
453.60
3136.39
4847.47
3415.10
1852.20
2822.40
1368.00
9377.50
2813.25
52765.91
Rate
in Rs.
92.70
162.50
10.20
81.30
8.20
30.80
Rs:
Amount
in Rs.
741.60
1300.00
5.10
40.65
65.60
246.40
2399.35
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1860.00
4464.00
310.00
3160.08
948.02
19066.90
Rs:
251
1504.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
14.40 cum
Rs:
(A+B+C+D)/14.40
Rs.
52765.91
2399.35
19066.90
74232.17
10106.71
84338.877
5856.90
IRR-CCDW-2-18 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for piers and abutments including cost of all materials, labour, machinery,
formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
cum
kg
sqm
30%
B. MACHINERY:
Sl No
1
2
3
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
UNIT :
Description
Unit
Quantity
3201.00
72.75
4.99
4.28
2.85
2.14
5.09
12.80
40.01
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
14.55 cum
Rate
in Rs.
6.30
6.30
635.00
1145.00
1210.00
875.00
560.00
95.00
236.81
Rs:
Amount
in Rs.
20166.30
458.33
3169.06
4897.97
3450.68
1871.49
2851.80
1216.38
9475.18
2842.55
50399.74
Rate
in Rs.
92.70
162.50
10.20
81.30
8.20
30.80
Rs:
Amount
in Rs.
741.60
1300.00
5.10
40.65
65.60
246.40
2399.35
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1860.00
4510.50
310.00
3193.00
957.90
19156.20
Rs:
252
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
14.55 cum
Rs:
(A+B+C+D)/14.55
Rs.
50399.74
2399.35
19156.20
71955.28
9796.71
81751.99
5618.70
IRR-CCDW-2-19 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than
10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for piers and abutments including cost of all materials, labour, machinery,
formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
30%
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Quantity
3599.20
81.80
7.36
4.42
2.94
6.54
14.40
44.99
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
16.36 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
236.81
Rs:
Amount
in Rs.
22674.96
515.34
8429.49
5344.81
2576.70
3664.64
1367.70
10653.88
3196.16
58423.68
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
1550.00
5071.60
310.00
3590.20
1077.06
19923.66
Rs:
Rs:
58423.68
1349.75
253
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Rs:
Rs:
Total
13.615% Rs:
16.36 cum
Rs:
(A+B+C+D)/16.36
Rs.
19923.66
79697.09
10850.76
90547.85
5534.70
IRR-CCDW-2-20 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates for cantiliver / counterfort retaining walls including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
25%
LS
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Quantity
5200.00
81.25
7.31
4.39
2.93
6.50
20.80
52.81
0.50
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
16.25 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
225.53
20.00
Rs:
Amount
in Rs.
32760.00
511.88
8372.81
5308.88
2559.38
3640.00
1976.00
11910.75
2977.69
10.00
70027.38
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
1550.00
5037.50
310.00
4214.44
1053.61
20490.35
Rs:
Rs:
Rs:
70027.38
1349.75
20490.35
254
Total
13.615% Rs:
16.25 cum
Rs:
(A+B+C+D)/16.25
Rs.
Rs:
91867.47
12507.76
104375.23
6423.10
IRR-CCDW-2-21 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded
aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity
type retaining walls / piers / abutments etc., including cost of all materials, machinery,
labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum,
plums of size 150 to 80 mm : 0.25cum )
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
cum
kg
sqm
30%
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Quantity
4703.40
72.36
6.92
4.15
2.77
4.52
6.15
18.81
49.75
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
18.09 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
360.00
560.00
95.00
225.53
Rs:
Amount
in Rs.
29631.42
455.87
7922.74
5023.50
2421.80
1628.10
3444.34
1787.29
11219.50
3365.85
66900.41
Rate
in Rs.
53.50
81.30
10.20
81.30
8.20
30.80
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
65.60
246.40
1436.15
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
1550.00
620.00
4767.80
620.00
310.00
3969.85
1190.96
21353.41
Rs:
66900.41
255
Rs:
Rs:
Rs:
Total
13.615% Rs:
18.09 cum
Rs:
(A+B+C+D)/18.09
Rs.
1436.15
21353.41
89689.97
12211.29
101901.26
5633.00
IRR-CCDW-2-22 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,graded
aggregates for cast in-situ pipes including cost of all materials, machinery, labour, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
kg
sqm
15%
LS
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Quantity
3998.80
76.90
6.92
4.15
2.77
6.15
16.00
30.76
0.50
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
15.38 cum
Rate
in Rs.
6.30
6.30
1145.00
1210.00
875.00
560.00
95.00
236.81
20.00
Rs:
Amount
in Rs.
25192.44
484.47
7924.55
5024.65
2422.35
3445.12
1519.54
7284.14
1092.62
10.00
54399.87
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
930.00
4767.80
310.00
2454.65
368.20
17155.45
Rs:
Rs:
Rs:
54399.87
1349.75
17155.45
256
Total
13.615% Rs:
15.38 cum
Rs:
(A+B+C+D)/15.38
Rs.
Rs:
72905.07
9926.02
82831.09
5385.60
IRR-CCDW-2-23 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than
15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded
aggregates for cast in-situ pipes including cost of all materials, labour, machinery, formwork,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
cum
cum
kg
sqm
15%
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
Unit
Quantity
3600.00
72.00
4.94
4.23
2.82
2.12
5.04
14.40
28.80
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
14.40 cum
Rate
in Rs.
6.30
6.30
635.00
1145.00
1210.00
875.00
560.00
95.00
236.81
Rs:
Amount
in Rs.
22680.00
453.60
3136.39
4847.47
3415.10
1852.20
2822.40
1368.00
6820.00
1023.00
48418.16
Rate
in Rs.
92.70
162.50
10.20
81.30
8.20
30.80
Rs:
Amount
in Rs.
741.60
1300.00
5.10
40.65
65.60
246.40
2399.35
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
930.00
4464.00
310.00
2298.24
344.74
16671.78
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total
13.615% Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
48418.16
2399.35
16671.78
67489.29
9188.67
257
14.40 cum
(A+B+C+D)/14.40
Rs:
Rs.
76677.96
5324.90
IRR-CCDW-2-24 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
kg
sqm
250%
LS
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
Unit
Quantity
5200.80
78.80
8.20
4.41
7.09
20.80
39.40
15.76 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
274.37
20.00
Rs:
Amount
in Rs.
32765.04
496.44
9916.19
3861.20
3971.52
1976.30
10810.26
27025.64
20.00
90842.59
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
830.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1240.00
4885.60
310.00
3144.12
7860.30
26179.82
1.00
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
Total
13.615% Rs:
15.76 cum
Rs:
(A+B+C+D)/15.76
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
90842.59
1349.75
26179.82
118372.16
16116.37
134488.53
8533.50
258
IRR-CCDW-2-25 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for columns and beams including cost of all materials, labour, machinery,
formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum.
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
kg
sqm
50%
LS
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
Unit
Quantity
5200.80
78.80
8.20
4.41
7.09
20.80
78.80
15.76 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
20.00
Rs:
Amount
in Rs.
32765.04
496.44
9916.19
3861.20
3971.52
1976.30
17771.69
8885.84
20.00
79664.22
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
930.00
4885.60
310.00
6288.24
3144.12
23882.76
1.00
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
Total
13.615% Rs:
15.76 cum
Rs:
(A+B+C+D)/15.76
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
79664.22
1349.75
23882.76
104896.73
14281.69
119178.42
7562.10
IRR-CCDW-2-26 Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /
259
Note:
sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for wearing coat including cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,
finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m
and all lifts.
If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
kg
sqm
LS
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
Unit
Quantity
5200.80
78.80
8.20
4.41
7.09
20.80
7.88
5.00
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
15.76 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
20.00
Rs:
Amount
in Rs.
32765.04
496.44
9916.19
3861.20
3971.52
1976.30
1777.17
100.00
54863.86
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
830.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
1240.00
4885.60
620.00
628.82
16114.22
Rs:
Rs:
Rs:
Rs:
54863.86
1349.75
16114.22
72327.84
9847.44
82175.28
5214.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
15.76 cum
Rs:
(A+B+C+D)/15.76
Rs.
IRR-CCDW-2-27 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than
20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates for troughs including cost of all materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.
260
Note:
If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data
(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
kg
sqm
25%
LS
B. MACHINERY:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
Unit
Quantity
5200.80
78.80
8.20
4.41
7.09
20.80
70.92
15.76 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
20.00
Rs:
Amount
in Rs.
32765.04
496.44
9916.19
3861.20
3971.52
1976.30
15994.52
3998.63
10.00
72989.84
Rate
in Rs.
53.50
81.30
10.20
81.30
7.60
20.60
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
60.80
164.80
1349.75
Rate
in Rs.
204.10
103.60
146.90
415.00
400.00
Amount
in Rs.
1632.80
51.80
1175.20
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
3410.00
1240.00
1550.00
4885.60
310.00
5659.42
1414.85
22144.67
0.50
Quantity
8.00
8.00
0.50
0.50
8.00
8.00
Quantity
Total
13.615% Rs:
15.76 cum
Rs:
(A+B+C+D)/15.76
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
72989.84
1349.75
22144.67
96484.26
13136.33
109620.59
6955.60
IRR-CCDW-3-1 Sinking RCC wells vertically for foundation of piers and abutments in all kinds of soil,
DATA:
Unit = Running meter
Taking output = 1m
diameter of well = 6.00m
(i)
Depth below bed level upto 3.0m
Rate of sinking = 0.50 m /hour
a) Labour
261
0.12
1.00
2.00
370.00 day
415.00 day
310.00 day
44.40
415.00
620.00
1079.40
1039.40
614.40
331.60
198.54
2183.94
3263.34
444.30
3707.64
3707.60
1411.00
192.10
1603.10
a) Labour
0.15
1.25
2.50
370.00 day
415.00 day
310.00 day
55.50
518.75
775.00
1349.25
1559.10
921.60
497.40
297.81
3275.91
4625.16
629.72
5254.88
5254.90
1846.70
251.40
2098.10
IRR-CCDW-3-2 Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering,
ramming as directed including cost of all materials, machinery, labour etc., complete with
initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
Particulars
UNIT :
Unit
cum
Quantity
15.75
Description
Unit
Nill
Quantity
0.00
0.00
Description
Unit
Quantity
15.00 cum
Rate
in Rs.
560.00
0.00
Rs:
Amount
in Rs.
8820.00
0.00
8820.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
Amount
in Rs.
262
1
2
work inspector
mazdoor
Day
Day
0.25
4.00
400.00
310.00
Rs:
100.00
1240.00
1340.00
Rs:
Rs:
Rs:
Rs:
8820.00
0.00
1340.00
10160.00
1383.28
11543.28
769.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
IRR-CCDW-4
Total
13.615% Rs:
15.00 cum
Rs:
(A+B+C+D)/15.0
Rs.
MASONRY WORKS :
IRR-CCDW-4-1 Providing and constructing un-coursed rubble stone masonry with approved stones in
CM 1 : 4 proportion for sub-structure portions of return walls / abutments etc., including
cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging
stone chips, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,
Stone Chips : 0.15 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
Cement
Rubble stones
Stone chips
Sand (Screened)
UNIT :
Unit
Quantity
kg
cum
cum
cum
1430.00
8.50
1.50
4.00
Description
Unit
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Quantity
1.00
1.00
0.50
0.50
Quantity
1.00
0.50
1.00
1.00
2.00
10.00 cum
Rate
in Rs.
6.30
330.00
360.00
760.00
Rs:
Amount
in Rs.
9009.00
2805.00
540.00
3040.00
15394.00
Rate
in Rs.
402.50
307.20
10.20
81.30
Rs:
Amount
in Rs.
402.50
307.20
5.10
40.65
755.45
Rate
in Rs.
165.80
103.60
400.00
415.00
370.00
Amount
in Rs.
165.80
51.80
400.00
415.00
740.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
1240.00
620.00
310.00
930.00
310.00
1240.00
6422.60
Rs:
Rs:
Rs:
Rs:
15394.00
755.45
6422.60
22572.05
4.00
2.00
1.00
3.00
1.00
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
263
10.00 cum
(A+B+C+D)/10.0
13.615% Rs:
Rs:
Rs.
3073.18
25645.23
2564.50
IRR-CCDW-4-2 Providing and constructing un-coursed rubble stone masonry with approved stones in
CM 1 : 4 proportion for super-structure portions of return walls / abutments etc., including
cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging
stone chips, curing etc., complete with initial lead upto 50 m and all lifts.
(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,
Stone Chips : 0.15 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
Particulars
Cement
Rubble stones
Stone chips
Sand (Screened)
UNIT :
Unit
Quantity
kg
cum
cum
cum
1430.00
8.50
1.50
4.00
TOTAL
2.5%
Description
Unit
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
Description
Unit
Quantity
1.00
1.00
0.50
0.50
Quantity
Hour
Hour
Day
Day
Day
1.00
0.50
1.00
1.00
2.00
Day
Day
Day
Day
Day
Day
4.00
2.00
1.00
3.00
1.00
4.00
TOTAL
2.5%
10.00 cum
Rate
in Rs.
6.30
330.00
360.00
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
9009.00
2805.00
540.00
3040.00
15394.00
384.85
15778.85
Rate
in Rs.
402.50
307.20
10.20
81.30
Rs:
Amount
in Rs.
402.50
307.20
5.10
40.65
755.45
Rate
in Rs.
165.80
103.60
400.00
415.00
370.00
Amount
in Rs.
165.80
51.80
400.00
415.00
740.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
Rs:
Rs:
1240.00
620.00
310.00
930.00
310.00
1240.00
6422.60
160.57
6583.17
Rs:
Rs:
Rs:
Rs:
15778.85
755.45
6583.17
23117.47
3147.44
26264.91
2626.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-4-3 Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion with
stones from approved source including cost of all materials, machinery, labour, scaffolding,
ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with
initial lead upto 50 m and initial lift upto 3m.
264
(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,
Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones
25 x 25x 45 cm : 60 Nos)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
UNIT :
Particulars
Unit
Cement
Header stones 25x25x45 cm
Khandki stones 25x25x30 cm
Rubble stones
Stone chips
Sand (Screened)
kg
Nos
Nos
cum
cum
cum
Quantity
1330.00
60.00
180.00
4.50
1.50
3.50
TOTAL
2.5%
Description
Unit
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
7
Description
Unit
Quantity
1.00
1.00
0.50
0.50
Quantity
Hour
Hour
Day
Day
Day
Day
1.00
0.50
1.00
3.00
1.00
2.00
Day
Day
Day
Day
Day
Day
4.00
3.00
1.00
3.00
1.00
2.00
TOTAL
2.5%
10.00 cum
Rate
in Rs.
6.30
39.00
16.00
330.00
360.00
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
8379.00
2340.00
2880.00
1485.00
540.00
2660.00
18284.00
457.10
18741.10
Rate
in Rs.
402.50
307.20
10.20
81.30
Rs:
Amount
in Rs.
402.50
307.20
5.10
40.65
755.45
Rate
in Rs.
165.80
103.60
400.00
370.00
415.00
370.00
Amount
in Rs.
165.80
51.80
400.00
1110.00
415.00
740.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
Rs:
Rs:
1240.00
930.00
310.00
930.00
310.00
620.00
7222.60
180.57
7403.17
Rs:
Rs:
Rs:
Rs:
18741.10
755.45
7403.17
26899.72
3662.4
30562.12
3056.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-4-4 Providing and constructing coursed rubble masonry first sort in CM 1:4 proportion with
stones from approved source including cost of all materials, machinery, labour, scaffolding,
ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with
initial lead upto 50 m and initial lift upto 3 m.
(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,
Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones
25 x 25x 45 cm : 60 Nos)
DATA:
RATE ANALYSIS
UNIT :
10.00 cum
A. MATERIALS:
265
Sl No
1
2
3
4
5
6
Particulars
Unit
Cement
Header stones 25x25x45 cm
Khandki stones 25x25x30 cm
Rubble stones
Stone chips
Sand (Screened)
kg
Nos
Nos
cum
cum
cum
Quantity
1330.00
60.00
180.00
4.50
1.50
3.50
TOTAL
2.5%
Description
Unit
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Unit
Quantity
1.00
1.00
0.50
0.50
Quantity
Hour
Hour
Day
Day
Day
Day
1.00
0.50
1.00
6.00
1.00
2.00
Day
Day
Day
Day
Day
Day
4.00
3.00
1.00
3.00
1.00
2.00
TOTAL
2.5%
Rate
in Rs.
6.30
39.00
16.00
330.00
360.00
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
8379.00
2340.00
2880.00
1485.00
540.00
2660.00
18284.00
457.10
18741.10
Rate
in Rs.
402.50
307.20
10.20
81.30
Rs:
Amount
in Rs.
402.50
307.20
5.10
40.65
755.45
Rate
in Rs.
165.80
103.60
400.00
370.00
415.00
370.00
Amount
in Rs.
165.80
51.80
400.00
2220.00
415.00
740.00
310.00
310.00
310.00
310.00
310.00
310.00
Rs:
Rs:
Rs:
1240.00
930.00
310.00
930.00
310.00
620.00
8332.60
208.32
8540.92
Rs:
Rs:
Rs:
Rs:
18741.10
755.45
8540.92
28037.47
3817.3
31854.77
3185.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-4-5 Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 2
proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement
mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
Cement
Sand (Screened)
Add for scaffolding / ramps etc @
Total cost of Materials
UNIT :
Unit
kg
cum
Quantity
456.00
0.75
TOTAL
2.5%
100.00 sqm
Rate
in Rs.
6.30
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
2872.80
570.00
3442.80
86.07
3528.87
266
B. MACHINERY:
Sl No
1
Description
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- I
work inspector
mazdoor
Quantity
Day
Day
Day
10.00
1.00
10.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
415.00
400.00
310.00
Rs:
Amount
in Rs.
4150.00
400.00
3100.00
7650.00
Rs:
Rs:
Rs:
Rs:
3528.87
0.00
7650.00
11178.87
1522
12700.87
127.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Total
13.615% Rs:
100.00 sqm
Rs:
(A+B+C+D)/100.0
Rs.
IRR-CCDW-4-6 Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 3
proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement
mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with
initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
Cement
Sand (Screened)
UNIT :
Unit
Quantity
kg
cum
322.00
0.75
TOTAL
2.5%
Description
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
Mason Cl- I
work inspector
mazdoor
0.00
0.00
Unit
Quantity
Day
Day
Day
10.00
1.00
10.00
100.00 sqm
Rate
in Rs.
6.30
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
2028.60
570.00
2598.60
64.97
2663.57
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
415.00
400.00
310.00
Rs:
Amount
in Rs.
4150.00
400.00
3100.00
7650.00
Rs:
Rs:
Rs:
Rs:
2663.57
0.00
7650.00
10313.57
1404.19
11717.76
117.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Total
13.615% Rs:
100.00 sqm
Rs:
(A+B+C+D)/100.0
Rs.
267
IRR-CCDW-4-7 Providing 12 mm thick plastering in cement mortar 1:3 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
UNIT :
Unit
Cement
Sand (Screened)
Quantity
kg
cum
629.00
1.32
TOTAL
2.5%
Description
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- I
work inspector
mazdoor
Quantity
Day
Day
Day
10.00
1.00
20.00
100.00 sqm
Rate
in Rs.
6.30
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
3962.70
1003.20
4965.90
124.15
5090.05
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
415.00
400.00
310.00
Rs:
Amount
in Rs.
4150.00
400.00
6200.00
10750.00
Rs:
Rs:
Rs:
Rs:
5090.05
0.00
10750.00
15840.05
2156.62
17996.67
180.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Total
13.615% Rs:
100.00 sqm
Rs:
(A+B+C+D)/100.0
Rs.
IRR-CCDW-4-8 Providing 12 mm thick plastering in cement mortar 1:4 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
Cement
Sand (Screened)
UNIT :
Unit
kg
cum
C. LABOUR:
Sl No
Description
Unit
Nil
( Manual mixing)
Total hire charges of Machinery
Description
Quantity
472.00
1.32
TOTAL
2.5%
Quantity
0.00
0.00
Unit
Quantity
100.00 sqm
Rate
in Rs.
6.30
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
2973.60
1003.20
3976.80
99.42
4076.22
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
Amount
in Rs.
268
1
2
3
Mason Cl- I
work inspector
mazdoor
Day
Day
Day
10.00
1.00
20.00
415.00
400.00
310.00
Rs:
4150.00
400.00
6200.00
10750.00
Rs:
Rs:
Rs:
Rs:
4076.22
0.00
10750.00
14826.22
2018.59
16844.81
168.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Total
13.615% Rs:
100.00 sqm
Rs:
(A+B+C+D)/100.0
Rs.
IRR-CCDW-4-9 Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
UNIT :
Unit
Cement
Sand (Screened)
Quantity
kg
cum
1050.00
2.20
TOTAL
2.5%
Description
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- I
work inspector
mazdoor
Quantity
Day
Day
Day
15.00
1.00
25.00
100.00 sqm
Rate
in Rs.
6.30
760.00
Rs:
Rs:
Rs:
Amount
in Rs.
6615.00
1672.00
8287.00
207.18
8494.18
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
415.00
400.00
310.00
Rs:
Amount
in Rs.
6225.00
400.00
7750.00
14375.00
Rs:
Rs:
Rs:
Rs:
8494.18
0.00
14375.00
22869.18
3113.64
25982.82
259.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Total
13.615% Rs:
100.00 sqm
Rs:
(A+B+C+D)/100.0
Rs.
IRR-CCDW-4-10 Providing 20 mm thick plastering in cement mortar 1:4 proportion by volume including cost
of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,
complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
UNIT :
Unit
Quantity
100.00 sqm
Rate
in Rs.
Amount
in Rs.
269
1
2
Cement
Sand (Screened)
kg
cum
788.00
2.20
TOTAL
2.5%
Description
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- I
work inspector
mazdoor
Quantity
Day
Day
Day
15.00
1.00
25.00
6.30
760.00
Rs:
Rs:
Rs:
4964.40
1672.00
6636.40
165.91
6802.31
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
415.00
400.00
310.00
Rs:
Amount
in Rs.
6225.00
400.00
7750.00
14375.00
Rs:
Rs:
Rs:
Rs:
6802.31
0.00
14375.00
21177.31
2883.29
24060.6
240.60
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
IRR-CCDW-5
Total
13.615% Rs:
100.00 sqm
Rs:
(A+B+C+D)/100.0
Rs.
IRR-CCDW-5-1 Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping set in
CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including
cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm,
Burnt stone slab 10 cm thick 1.05 sqm/ sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
Unit
Cement
Sand (Screened)
Burnt stone slab 10 cm thick
Total cost of Materials
kg
cum
sqm
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
75.00
0.30
10.50
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
UNIT :
Description
Mason Cl- II
Stone chiseller Cl- II
work inspector
mazdoor
0.00
0.00
Unit
Quantity
Day
Day
Day
Day
1.00
1.00
0.50
2.00
10.00 sqm
Rate
in Rs.
6.30
760.00
310.00
Rs:
Amount
in Rs.
472.50
228.00
3255.00
3955.50
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
370.00
400.00
310.00
Rs:
Amount
in Rs.
370.00
370.00
200.00
620.00
1560.00
270
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Rs:
Rs:
Rs:
Rs:
Total
13.615% Rs:
10.00 sqm
Rs:
(A+B+C+D)/10.0
Rs.
3955.50
0.00
1560.00
5515.50
750.94
6266.44
626.60
IRR-CCDW-5-2 Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping set in
CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including
cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm
thick 1.05 sqm/ sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
Unit
Cement
Sand (Screened)
Burnt stone slab 10 cm thick
Total cost of Materials
kg
cum
sqm
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
75.00
0.30
10.50
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
UNIT :
Description
0.00
0.00
Unit
Mason Cl- II
Stone chiseller Cl- I
work inspector
mazdoor
Quantity
Day
Day
Day
Day
1.00
4.00
0.50
2.00
10.00 sqm
Rate
in Rs.
6.30
760.00
310.00
Rs:
Amount
in Rs.
472.50
228.00
3255.00
3955.50
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
415.00
400.00
310.00
Rs:
Amount
in Rs.
370.00
1660.00
200.00
620.00
2850.00
Rs:
Rs:
Rs:
Rs:
3955.50
0.00
2850.00
6805.50
926.57
7732.07
773.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Total
13.615% Rs:
10.00 sqm
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-5-3 Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping set in
CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including
cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm
thick 1.05 sqm/ sqm)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
UNIT :
Particulars
Unit
Cement
Sand (Screened)
Burnt stone slab 10 cm thick
Total cost of Materials
kg
cum
sqm
Quantity
75.00
0.30
10.50
10.00 sqm
Rate
in Rs.
6.30
760.00
310.00
Rs:
Amount
in Rs.
472.50
228.00
3255.00
3955.50
271
B. MACHINERY:
Sl No
1
Description
Quantity
Nil
( Manual mixing)
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
Unit
Description
0.00
0.00
Unit
Mason Cl- II
Stone chiseller Cl-I
work inspector
mazdoor
Quantity
Day
Day
Day
Day
1.00
8.00
0.50
2.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
415.00
400.00
310.00
Rs:
Amount
in Rs.
370.00
3320.00
200.00
620.00
4510.00
Rs:
Rs:
Rs:
Rs:
3955.50
0.00
4510.00
8465.50
1152.58
9618.08
961.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per sqm
Total
13.615% Rs:
10.00 sqm
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-5-4 Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N /
sqmm ) grade cement concrete using 20 mm down size approved clean, hard, graded
aggregates for coping slab including cost of all materials, machinery, labour, formwork,
cleaning surface, batching, mixing, placing in position, levelling, compacting, finishing, curing
etc., complete with initial lead upto 50 m and initial lift upto 3 m.
(Cement content: 300 kg / cum with use of super plasticiser(0.4% by wt. of cement),
CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
Particulars
Unit
kg
kg
cum
cum
cum
kg
sqm
sqm
B. MACHINERY:
Sl No
1
2
3
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
C. LABOUR:
Sl No
1
2
3
UNIT :
Description
Unit
Hour
Hour
Hour
Quantity
4401.00
73.35
7.63
4.11
6.60
17.60
80.69
1.00
Quantity
8.00
8.00
0.50
0.50
1.00
1.00
Quantity
8.00
0.50
1.00
14.67 cum
Rate
in Rs.
6.30
6.30
1210.00
875.00
560.00
95.00
225.53
20.00
Rs:
Amount
in Rs.
27726.30
462.11
9230.36
3594.15
3696.84
1672.38
18196.81
20.00
64598.95
Rate
in Rs.
53.50
81.30
10.20
81.30
402.50
307.20
Rs:
Amount
in Rs.
428.00
650.40
5.10
40.65
402.50
307.20
1833.85
Rate
in Rs.
204.10
103.60
165.80
Amount
in Rs.
1632.80
51.80
165.80
272
4
5
6
Mason Class-I
Day
1.00
work inspector
Day
1.00
mazdoor
for batching materials
Day
11.00
for loading mortar pans
Day
4.00
for laying and tamping
Day
3.00
for conveying concrete
Day
14.67
for cleaning/ washing/ curing
Day
1.00
7
Labour cost for shuttering/scaffolding
sqm
80.69
Total cost of Labour
labour component/unit qty
1332.10
Add contractor's profit and overhead charges
13.615% 181.40
labour component/unit qty (including contractor's profit)
1513.50
415.00
400.00
415.00
400.00
310.00
310.00
310.00
310.00
310.00
79.80
Rs:
3410.00
1240.00
930.00
4547.70
310.00
6438.66
19541.76
Rs:
Rs:
Rs:
Rs:
64598.95
1833.85
19541.76
85974.56
11705.44
97680.00
6658.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
14.67 cum
Rs:
(A+B+C+D)/14.67
Rs.
IRR-CCDW-5-5 Providing and constructing protective railing consisting of in-situ railing posts of size 15 x
15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre to centre in M-20 grade
concrete using 20 mm down size graded aggregates and with each post reinforced by 4 Nos.
of 8 mm dia main bars embedded in kerb concrete for a depth of 40 cm and 5 Nos. of 6 mm
dia. stirrups including fixing 3 rows of 40 mm dia. GI pipes with one coat of red oxide primer
and two coats of synthetic enamel paint, cost of all materials, machinery, labour, formwork,
finishing, curing etc., complete with lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
UNIT :
Particulars
Unit
Cement
20-10 mm coarse aggregate
10-4.75 mm coarse aggregate
Fine aggregate (Un-Screened)
Reinforcement steel
40 mm dia GI pipes B class
Use rate of shuttering
Sundries ( paints/ binding wire etc )
Total cost of Materials
kg
cum
cum
cum
kg
Rm
sqm
LS
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
30.00
0.04
0.02
0.04
16.39
30.00
3.00
4.00
Quantity
Nill
0.00
0.00
Mason Class I
Bar bender
work inspector
mazdoor
Painter Cl- II
Fitter shuttering
Description
Unit
Quantity
Day
Day
Day
Day
Day
Day
0.50
0.50
0.50
1.50
0.50
0.50
10.00 Rm
Rate
in Rs.
6.30
1210.00
875.00
560.00
40.00
290.00
225.53
20.00
Rs:
Amount
in Rs.
189.00
48.40
17.50
22.40
655.60
8700.00
676.59
80.00
10389.49
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
415.00
490.00
400.00
310.00
370.00
370.00
Rs:
Amount
in Rs.
207.50
245.00
200.00
465.00
185.00
185.00
1487.50
Rs:
10389.49
273
Rs:
Rs:
Rs:
Total
13.615% Rs:
10.00 Rm
Rs:
(A+B+C+D)/10.0
Rs.
0.00
1487.50
11876.99
1617.05
13494.04
1349.40
IRR-CCDW-6-1 Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
UNIT :
Unit
Cement
Sand (Screened)
Hemp yarn
Quantity
kg
cum
kg
99.00
0.10
0.91
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- II
work inspector
mazdoor
Quantity
Day
Day
Day
2.00
1.00
3.00
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Rs:
Amount
in Rs.
623.70
76.00
65.52
765.22
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
740.00
400.00
930.00
2070.00
Rs:
Rs:
Rs:
Rs:
765.22
0.00
2070.00
2835.22
386.02
3221.24
322.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per joint
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-2 Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Cement
Sand (Screened)
Particulars
UNIT :
Unit
kg
cum
Quantity
174.00
0.22
10.00 Joints
Rate
in Rs.
6.30
760.00
Amount
in Rs.
1096.20
167.20
274
Hemp yarn
kg
1.27
72.00
Rs:
91.44
1354.84
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
740.00
400.00
930.00
2070.00
Rs:
Rs:
Rs:
Rs:
1354.84
0.00
2070.00
3424.84
466.29
3891.13
389.10
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- II
work inspector
mazdoor
Quantity
Day
Day
Day
2.00
1.00
3.00
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-3 Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
Cement
Sand (Screened)
Hemp yarn
UNIT :
Unit
Quantity
kg
cum
kg
248.00
0.25
2.20
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Mason Cl- II
work inspector
mazdoor
Description
0.00
0.00
Unit
Quantity
Day
Day
Day
2.50
1.00
4.00
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Rs:
Amount
in Rs.
1562.40
190.00
158.40
1910.80
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
925.00
400.00
1240.00
2565.00
Rs:
Rs:
1910.80
0.00
275
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per joint
Rs:
Rs:
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
2565.00
4475.80
609.38
5085.18
508.50
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-4 Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 32.1 kg / joint, FA : 0.031cum/joint, Hemp Yarn : 0.25kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
UNIT :
Unit
Cement
Sand (Screened)
Hemp yarn
Quantity
kg
cum
kg
321.00
0.31
2.50
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- II
work inspector
mazdoor
Quantity
Day
Day
Day
2.50
1.00
4.00
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Rs:
Amount
in Rs.
2022.30
235.60
180.00
2437.90
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
925.00
400.00
1240.00
2565.00
Rs:
Rs:
Rs:
Rs:
2437.90
0.00
2565.00
5002.90
681.14
5684.04
568.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per joint
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-5 Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Cement
Sand (Screened)
Hemp yarn
Particulars
UNIT :
Unit
kg
cum
kg
Quantity
396.00
0.39
3.10
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Amount
in Rs.
2494.80
296.40
223.20
276
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- II
work inspector
mazdoor
Quantity
Day
Day
Day
3.00
1.00
5.00
Rs:
3014.40
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
1110.00
400.00
1550.00
3060.00
Rs:
Rs:
Rs:
Rs:
3014.40
0.00
3060.00
6074.40
827.03
6901.43
690.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per joint
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-6 Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
Cement
Sand (Screened)
Hemp yarn
UNIT :
Unit
Quantity
kg
cum
kg
446.00
0.45
3.40
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Mason Cl- II
work inspector
mazdoor
Description
0.00
0.00
Unit
Quantity
Day
Day
Day
3.00
1.00
5.00
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Rs:
Amount
in Rs.
2809.80
342.00
244.80
3396.60
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
1110.00
400.00
1550.00
3060.00
Rs:
Rs:
Rs:
3396.60
0.00
3060.00
277
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
Rs:
6456.60
879.07
7335.67
733.60
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-7 Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
UNIT :
Unit
Cement
Sand (Screened)
Hemp yarn
Quantity
kg
cum
kg
495.00
0.50
3.77
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- II
work inspector
mazdoor
Quantity
Day
Day
Day
3.00
1.00
6.00
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Rs:
Amount
in Rs.
3118.50
380.00
271.44
3769.94
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
1110.00
400.00
1860.00
3370.00
Rs:
Rs:
Rs:
Rs:
3769.94
0.00
3370.00
7139.94
972.1
8112.04
811.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per joint
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-8 Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
Cement
Sand (Screened)
Hemp yarn
UNIT :
Unit
kg
cum
kg
Quantity
569.00
0.58
4.15
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Rs:
Amount
in Rs.
3584.70
440.80
298.80
4324.30
278
B. MACHINERY:
Sl No
1
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
Mason Cl- II
work inspector
mazdoor
Quantity
Day
Day
Day
3.00
1.00
6.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
1110.00
400.00
1860.00
3370.00
Rs:
Rs:
Rs:
Rs:
4324.30
0.00
3370.00
7694.30
1047.58
8741.88
874.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per joint
Total
13.615% Rs:
10.00 Joints
Rs:
(A+B+C+D)/10.0
Rs.
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-6-9 Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2
proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,
labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto
50 m and all lifts.
(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
Particulars
Cement
Sand (Screened)
Hemp yarn
UNIT :
Unit
Quantity
kg
cum
kg
668.00
0.69
4.53
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Mason Cl- II
work inspector
mazdoor
Description
0.00
0.00
Unit
Quantity
Day
Day
Day
4.00
1.00
7.00
10.00 Joints
Rate
in Rs.
6.30
760.00
72.00
Rs:
Amount
in Rs.
4208.40
524.40
326.16
5058.96
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
Rs:
Amount
in Rs.
1480.00
400.00
2170.00
4050.00
Rs:
Rs:
Rs:
Rs:
5058.96
0.00
4050.00
9108.96
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
279
10.00 Joints
(A+B+C+D)/10.0
13.615% Rs:
Rs:
Rs.
1240.18
10349.14
1034.90
(1) For NP3 Class - 10% extra over the rates of NP2 Class
(2) For NP4 Class - 20% extra over the rates of NP2 Class
Note:
IRR-CCDW-7
IRR-CCDW-7-1 Providing rubble / boulder and sand filling behind abutment and return walls in layers
including cost of all materials, machinery, labour, watering, ramming etc., complete with initial
lead upto 50 m and initial lift upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
Particulars
UNIT :
Unit
Rubble / Boulder
Sand for filling
Quantity
cum
cum
10.00
4.00
Description
Quantity
Nill
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Unit
Description
0.00
0.00
Unit
work inspector
Mason Cl II
mazdoor
Quantity
Day
Day
Day
0.50
1.00
4.00
10.00 cum
Rate
in Rs.
330.00
560.00
Rs:
Amount
in Rs.
3300.00
2240.00
5540.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
200.00
370.00
1240.00
1810.00
Rs:
Rs:
Rs:
Rs:
5540.00
0.00
1810.00
7350.00
1000.7
8350.7
835.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-7-2 Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes
including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth
masters to achieve density control of not less than 95 percent etc., complete with lead
upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
Particulars
Murum
UNIT :
Unit
cum
Quantity
12.00
0.00
Description
Nill
Total hire charges of Machinery
Unit
Quantity
0.00
0.00
10.00 cum
Rate
in Rs.
115.00
0.00
Rs:
Amount
in Rs.
1380.00
0.00
1380.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
280
C. LABOUR:
Sl No
Description
Unit
Quantity
1
2
3
0.50
0.50
6.00
Rate
in Rs.
425.00
400.00
310.00
Rs:
Amount
in Rs.
212.50
200.00
1860.00
2272.50
Rs:
Rs:
Rs:
Rs:
1380.00
0.00
2272.50
3652.50
497.29
4149.79
415.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-7-3 Providing and filling murum / gravely soil ( CNS soil ) for foundation or above pipes
including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power
roller to achieve density control of not less than 98 percent etc., complete with lead upto
50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
Particulars
Murum
UNIT :
Unit
Quantity
cum
12.00
0.00
Description
Unit
Hour
Hour
C. LABOUR:
Sl No
Description
1
2
3
4
Unit
Quantity
0.17
0.17
Quantity
0.17
0.50
0.50
1.50
10.00 cum
Rate
in Rs.
115.00
0.00
Rs:
Amount
in Rs.
1380.00
0.00
1380.00
Rate
in Rs.
197.20
731.40
Rs:
Amount
in Rs.
33.65
124.81
158.46
Rate
in Rs.
195.90
425.00
400.00
310.00
Rs:
Amount
in Rs.
33.43
212.50
200.00
465.00
910.93
Rs:
Rs:
Rs:
Rs:
1380.00
158.46
910.93
2449.39
333.49
2782.88
278.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per cum
Total
13.615% Rs:
10.00 cum
Rs:
(A+B+C+D)/10.0
Rs.
IRR-CCDW-7-4 Providing and fixing one line dressed 111x35x25 cm thick IRC standard kilometre stone in
cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of
size 70x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic
enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost
of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
281
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
Particulars
Unit
No.
cum
cum
cum
cum
kg
ltr
LS
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
4.00
0.20
0.15
0.10
0.20
100.00
1.00
4.00
Quantity
NIL
( Manual mixing )
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
UNIT :
Description
0.00
0.00
Unit
Mason Cl- II
work inspector
mazdoor
Painter Cl- I
Quantity
Day
Day
Day
Day
1.00
1.00
1.00
1.00
4 Nos.
Rate
in Rs.
470.00
1145.00
1210.00
875.00
560.00
6.30
240.00
20.00
Rs:
Amount
in Rs.
1880.00
229.00
181.50
87.50
112.00
630.00
240.00
80.00
3440.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
400.00
310.00
480.00
Rs:
Amount
in Rs.
370.00
400.00
310.00
480.00
1560.00
Rs:
Rs:
Rs:
Rs:
3440.00
0.00
1560.00
5000.00
680.75
5680.75
1420.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for
Rate per No.
Total
13.615% Rs:
4.00 Nos.
Rs:
(A+B+C+D)/4.0
Rs.
IRR-CCDW-7-5 Providing and fixing one line dressed 65x15x10 cm thick IRC standard hectometre stone in
cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of
size 50x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic
enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost
of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
Particulars
1
2
3
4
5
6
7
8
NIL
( Manual mixing )
Total hire charges of Machinery
UNIT :
Unit
No.
cum
cum
cum
cum
kg
ltr
LS
Unit
Quantity
4.00
0.20
0.15
0.10
0.20
100.00
0.40
1.00
Quantity
0.00
0.00
4 Nos.
Rate
in Rs.
260.00
1145.00
1210.00
875.00
560.00
6.30
240.00
20.00
Rs:
Amount
in Rs.
1040.00
229.00
181.50
87.50
112.00
630.00
96.00
20.00
2396.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
C. LABOUR:
282
Sl No
1
2
3
4
Description
Mason Cl- II
work inspector
mazdoor
Painter Cl- I
Unit
Quantity
Day
Day
Day
Day
1.00
1.00
1.00
0.50
Rate
in Rs.
370.00
400.00
310.00
480.00
Rs:
Amount
in Rs.
370.00
400.00
310.00
240.00
1320.00
Rs:
Rs:
Rs:
Rs:
2396.00
0.00
1320.00
3716.00
505.93
4221.93
1055.50
Total
13.615% Rs:
4.00 Nos.
Rs:
(A+B+C+D)/4.0
Rs.
283
CHAPTER-V
HYDRAULIC GATES AND ALLIED EQUIPMENT - Standard Data
2015-16
All materials / bought out components for embedded parts, gates, hoists and allied works
shall conform to relevant Indian standards / technical specifications and approved drawings.
The basic rates are EXCLUSIVEof preparation of designs / drawings / material schedules etc.,
as per specifications and other technical data including revisions.
If designs &drawings are to be done by private agency 2% of estimated cost be added
The basic rates are inclusive of cost of all materials, machinery, labour, fabrication, erection,
commissioning and testing of gates, hoists and other related components as per technical
specifications.
The basic rates are inclusive of finishing, wastage of materials , incidental works, temperary
supports, all enabling works, profit, overheads, small tools / plants, hidden cost
on labour etc.
The basic rates are inclusive of taxes, duties (excise ), levies and all other incidental charges including
turn over tax/sales tax on works contract. Separate provision shall be made in the estimate towards such
tax on works contract at the rate prevailing at the time of preparation of estimate.
The basic rates are inclusive of all leads and lifts including rehandling.
The basic rates are inclusive of preparatory works such as rectification of damages, repairing
shop painting, cleaning, positioning and anchoring first stage embedments,
The basic rates are not inclusive of painting with or without sand blasting,and are to be added to the rate as
perschedule rates formulated in the same chapter as per applicability and specifications
10
The basic rates are exclusive of cost of river diversion arrangements, dewatering, desilting ,secondary concreting
of EM parts etc., which form part of civil works.
11
12
Add AREA ALLOWANCES AS APPLICABLE ON LABOUR COMPONENT ONLY ( SHOWN UNDER EACH ITEM)
13
14
Painting Charges added extra to the data items as per applicability wherver necessary
15
HOIST EQUIPMENT1.-where sand blasting is not possible, hand and power tool cleaning be
adopted - Guidance may be taken from Mechanical workshop in this regard
2. Machined surfaces should not be painted
3. for maintenance unless sand blasting is essential hand and power tool cleaning be adopted
Painting of Hoast Gates is to be done as per IS 14177:1994
16
TYPES OF GATES:
IRR-GAW-1
A. SPILLWAY RADIAL GATES
IRR-GAW-1-1 E.M Parts and anchorages
fabrication, supply, erection, testing and commissioning of Embedded parts for radial gate
consists of sill beam, wall plates, anchor girders , yoke girders, tie flats, trunnion supports etc., including
cost of all materials, machinery, labour, welding, finishing, with leads and lifts &all accessories
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
285
DATA:
RATE ANALYSIS
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
A. MATERIALS:
particulars
Str steel angle / beam / channel / bars
Structural steel plate / flats
Stainless steel plate / flats
MS bolts and nuts
Oxygen gas
Acetyline gas
Welding electrodes
Welding electrodes ( LH )
Welding electrodes ( stainless steel )
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
8
9
10
11
Welding transformer
Fuel / Energy charges
Tower crane/heavy duty tyre
mounted crane
Fuel / Energy charges
Plate shearing machine
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile crane 16 Tonnes
Fuel / Energy charges
Stationery derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Planing machine
Fuel / Energy charges
Bending Machine
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Description
Description
Unit
UNIT :
Quantity
kg
3467.00
kg
11261.00
kg
515.00
kg
48.00
cum
158.00
cum
53.00
Nos
11520.00
Nos
2880.00
Nos
1160.00
Hour
1945.00
Hour
158.00
LS
100.00
Total cost of Materials
Unit
Quantity
Hour
Hour
1945.00
1945.00
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
16.00
16.00
16.00
16.00
76.00
76.00
22.00
22.00
64.00
64.00
30.00
30.00
30.00
30.00
100.00
100.00
30.00
30.00
100.00
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
16.00
22.00
16.00
100.00
30.00
30.00
30.00
Day
15.00
Day
75.00
Day
20.00
Day
212.00
Day
48.00
Day
345.00
Day
255.00
Day
5.00
Total cost of Labour
15.300 tonne
Rate
in Rs.
40.00
40.00
275.00
90.00
45.00
330.00
11.00
18.00
27.00
7.65
2.08
20.00
Rs:
Amount
in Rs.
138680.00
450440.00
141625.00
4320.00
7110.00
17490.00
126720.00
51840.00
31320.00
14879.25
329.17
2000.00
986753.42
Rate
in Rs.
16.00
92.40
Amount
in Rs.
31120.00
179718.00
867.10
200.20
41.90
154.00
6.40
3.80
2278.10
75.00
86.10
0.00
22.50
38.50
22.50
38.50
117.80
115.50
42.60
115.50
20.00
Rs:
13873.60
3203.20
670.40
2464.00
486.40
288.80
50118.20
1650.00
5510.40
0.00
675.00
1155.00
675.00
1155.00
11780.00
11550.00
1278.00
3465.00
2000.00
322836.00
Rate
in Rs.
176.80
489.20
132.60
195.90
187.20
187.20
122.50
480.00
480.00
415.00
415.00
480.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
2828.80
10762.40
2121.60
19590.00
5616.00
5616.00
3675.00
7200.00
36000.00
8300.00
87980.00
23040.00
143175.00
94350.00
2400.00
452654.80
286
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
135796.44
588451.24
13.615%
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
986753.42
322836.00
588451.24
1898040.66
0.00
1898040.66
56941.22
1954981.88
Rs:
266170.78
578.34
2028.78
Rs:
2223759.78
Rs:
145343.80
15.300 tonne
Rate per tonne
RADIAL GATES
A-2
Gates
IRR-GAW-1-2 fabrication, supply, erection, testing and commissioning of radial gate consisting
of skin plate, stiffeners, horizontal girders, radial arms, trunnion assemblies, tie beam, pulley
supports, bracings, rubber seals, clamps etc., with all accessories for spillway/canals including cost
of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under itemsinthis chapter and add as applicable separately)
Drawing no. MD/CDO/VRSP/170-172/85-86(Vengalaraya Sagar - Gomukhi Project)
Vent Size: 12 X 6.6 Mtr
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
3
4
5
6
7
8
9
10
11
12
13
Structural steel :
Angles / beams / channels / bars
Plates / flats
Cast steel components :
Trunnion hubs / Guide rollers
Alluminium / Bronze alloy
components :
Bush for Trunnion / Guide roller
Bolt / Nut / Washer :
GI bolts / nuts / washers
Zinc/Babbit Metal
Rubber seals :
Bottom seal
Side seals ( Z - type )
Oxygen gas
Acetyline gas
Welding electrodes ( std )
Welding electrodes ( LH )
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
1
particulars
Description
Welding transformer
Fuel / Energy charges
UNIT :
Unit
Quantity
29.000 tonne
Rate
in Rs.
Amount
in Rs.
kg
kg
9700.00
16850.00
40.00
40.00
388000.00
674000.00
kg
2100.00
180.00
378000.00
kg
350.00
920.00
322000.00
kg
kg
250.00
50.00
120.00
180.00
30000.00
9000.00
Rm
12.00
Rm
14.00
cum
228.00
cum
76.00
Nos
1000.00
Nos
250.00
Hour
156.00
Hour
228.00
LS
500.00
Total cost of Materials
780.00
1600.00
45.00
330.00
11.00
18.00
7.65
2.08
20.00
Rs:
9360.00
22400.00
10260.00
25080.00
11000.00
4500.00
1193.40
475.00
10000.00
1895268.40
Rate
in Rs.
16.00
92.40
Amount
in Rs.
2496.00
14414.40
Unit
Hour
Hour
Quantity
156.00
156.00
287
2
3
4
5
6
7
8
9
10
11
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
Description
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
29.00
29.00
114.00
114.00
116.00
116.00
29.00
29.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
58.00
100.00
100.00
500.00
Quantity
Hour
100.00
Hour
29.00
Hour
116.00
Hour
58.00
Hour
58.00
Day
29.00
Day
145.00
Day
29.00
Day
17.00
Day
5.00
Day
493.00
Day
667.00
Day
15.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
41.90
154.00
6.40
3.80
42.60
115.50
867.10
200.20
519.70
307.20
86.10
0.00
22.50
38.50
22.50
38.50
3096.80
118.80
20.00
Rs:
1215.10
4466.00
729.60
433.20
4941.60
13398.00
25145.90
5805.80
30142.60
17817.60
4993.80
0.00
1305.00
2233.00
1305.00
2233.00
309680.00
11880.00
10000.00
464635.60
Rate
in Rs.
489.20
176.80
122.50
187.20
187.20
480.00
480.00
415.00
415.00
480.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
48920.00
5127.20
14210.00
10857.60
10857.60
13920.00
69600.00
12035.00
7055.00
2400.00
204595.00
246790.00
7200.00
653567.40
196070.22
849637.62
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
1895268.40
464635.60
849637.62
3209541.62
0.00
3209541.62
96286.25
3305827.87
Rs:
450088.46
13.615%
Rs.
29.000 tonne
Rate per
tonne
1096.2
3845.4
Rs:
3760857.93
Rs.
129684.80
288
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under itemsinthis chapter and add as applicable separately)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
2
3
4
5
6
7
6
7
Description
Welding transformer
Fuel / Energy charges
Tower crane 5 t capacity
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
Unit
Quantity
Structural steel
Angles / beams / channels / bars
kg
2571.00
Plates / flats
kg
3632.00
Cast steel components :
Rope drums 2 Nos / Gears 4 Nos
kg
3680.00
Pinions
kg
218.00
Pulleys 720 PCD 6 Nos
kg
1080.00
Plummer blocks / Hubs
kg
322.00
Alloy steel components
Shafts
kg
557.00
Pins
kg
546.00
Bronze alloy components :
Bronze bearings / bush
kg
144.00
Wire rope 36 mm dia 6/37
construction
kg
448.00
MS Bolt / Nut / Washer
kg
85.00
Worm reducers
No.
1.00
Electric motor 20 hp
No.
1.00
Floating shaft 300 mm dia
kg
1000.00
Manual operating system
No.
1.00
Gate position indicator
No.
1.00
Ele-magnetic brake
No.
1.00
Electric cable / switch / control panel
etc
LS
1.00
Oxygen gas
cum
213.00
Acetyline gas
cum
71.00
Welding electrodes
Nos
530.00
Welding electrodes ( LH )
Nos
4776.00
Grease
kg
50.00
Use rate welding holder set
Hour
566.00
Use rate gas cutting torch set
Hour
90.00
Sundries ( hand rail /staircase / gate etc ) LS
200.00
Total cost of Materials
B. MACHINERY:
Sl No
1
particulars
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
566.00
353.00
4.00
4.00
53.00
53.00
50.00
50.00
8.00
8.00
16.00
16.00
100.00
Quantity
15.440 tonne wt
90.00 t capacity
Rate
Amount
in Rs.
in Rs.
40.00
40.00
102840.00
145280.00
220.00
210.00
180.00
180.00
809600.00
45780.00
194400.00
57960.00
230.00
420.00
128110.00
229320.00
920.00
132480.00
200.00
90.00
224400.00
121000.00
180.00
28820.00
195800.00
35200.00
89600.00
7650.00
224400.00
121000.00
180000.00
28820.00
195800.00
35200.00
50380.00
45.00
330.00
11.00
18.00
260.00
7.65
2.08
20.00
Rs:
50380.00
9585.00
23430.00
5830.00
85968.00
13000.00
4329.90
187.50
4000.00
2924950.40
Rate
in Rs.
16.00
92.40
867.10
200.20
6.40
3.80
519.70
307.20
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
9056.00
32617.20
3468.40
800.80
339.20
201.40
25985.00
15360.00
180.00
308.00
360.00
616.00
2000.00
91292.00
Amount
in Rs.
8290.00
707.20
2995.20
1497.60
16800.00
27840.00
7470.00
Hour
Hour
Hour
Hour
Day
50.00
4.00
16.00
8.00
35.00
Rate
in Rs.
165.80
176.80
187.20
187.20
480.00
Day
Day
58.00
18.00
480.00
415.00
289
8
9
10
11
Welder ( General )
Khalasi
Helper fabrication / erection
Electrician
Day
53.00
Day
20.00
Day
175.00
Day
3.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
415.00
415.00
370.00
480.00
Rs:
21995.00
8300.00
64750.00
1440.00
162085.00
48625.50
210710.50
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
2924950.40
91292.00
210710.50
3226952.90
0.00
3226952.90
96808.59
3323761.49
Rs:
452530.13
13.615%
Rs.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
Structural steel
Angles / beams / channels / bars
Plates / flats
Chequered plates
MS bolts / nuts / washers
Oxygen gas
Acetyline gas
Welding electrodes
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
1
2
3
4
5
particulars
Description
Welding transformer
Fuel / Energy charges
Tower crane
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile CRANE 16T
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
UNIT :
Unit
Quantity
kg
4258.00
kg
98.00
kg
856.00
kg
8.00
cum
51.00
cum
17.00
Nos
1195.00
Hour
150.00
Hour
30.00
LS
10.00
Total cost of Materials
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
150.00
150.00
6.00
6.00
12.00
12.00
8.00
8.00
12.00
12.00
5.22 MT
Rate
in Rs.
Amount
in Rs.
40.00
40.00
63.00
90.00
45.00
330.00
11.00
7.65
2.08
20.00
Rs:
170320.00
3920.00
53928.00
720.00
2295.00
5610.00
13145.00
1147.50
62.50
200.00
251348.00
Rate
in Rs.
16.00
92.40
867.10
200.20
6.40
3.80
2278.10
75.00
22.50
38.50
Amount
in Rs.
2400.00
13860.00
5202.60
1201.20
76.80
45.60
18224.80
600.00
270.00
462.00
290
6
7
8
Drilling machines
Fuel / Energy charges
Bending Machine
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
Description
Hour
Hour
Hour
Hour
LS
Unit
12.00
12.00
10.00
10.00
10.00
Quantity
Hour
10.00
Hour
6.00
Hour
12.00
Hour
12.00
Hour
10.00
Day
6.00
Day
25.00
Day
5.00
Day
20.00
Day
200.00
Day
2.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
22.50
38.50
42.60
115.50
20.00
Rs:
270.00
462.00
426.00
1155.00
200.00
44856.00
Rate
in Rs.
489.20
176.80
187.20
187.20
122.50
480.00
480.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
4892.00
1060.80
2246.40
2246.40
1225.00
2880.00
12000.00
2075.00
8300.00
74000.00
960.00
111885.60
33565.68
145451.28
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
251348.00
44856.00
145451.28
441655.28
0.00
441655.28
13249.66
454904.94
Rs:
61935.31
13.615%
Rs.
5.22 MT
Rate per MT
197.316
692.172
Rs:
517729.73
Rs:
99181.90
IRR-GAW-2
VERTICAL LIFT GATES-EM PARTS
IRR-GAW-2-1 Design, fabrication, supply, erection and commissioning of embedded parts consisting of
sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elements
etc., with all accessories for spillway stop log gates and other vertical lift elements including cost of all materials,
machinery, labour, etc., complete as per specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under items in this chapter and add as applicable separately)
Drawing No. MD/CDO/GNCP/HR/1759,1760/94 (GNSS Project)
Vent Size:
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
9
particulars
UNIT :
Unit
kg
kg
kg
kg
cum
cum
Nos
Nos
Nos
Quantity
1885.00
3890.00
271.00
50.00
225.00
75.00
1410.00
350.00
1320.00
Amount
in Rs.
75400.00
155600.00
74525.00
4500.00
10125.00
24750.00
15510.00
6300.00
35640.00
291
10
11
12
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
8
9
10
Welding transformer
Fuel / Energy charges
Plate shearing machine
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Planing machine
Fuel / Energy charges
Mobile Crane 16 T
Fuel / Energy charges
Stationery derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Bending Machine
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
Description
Description
Hour
385.00
Hour
225.00
LS
40.00
Total cost of Materials
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
385.00
385.00
8.00
8.00
110.00
110.00
270.00
270.00
24.00
24.00
14.00
14.00
14.00
14.00
21.00
21.00
14.00
14.00
40.00
Quantity
Hour
24.00
Hour
270.00
Hour
21.00
Hour
14.00
Hour
14.00
Day
32.00
Day
35.00
Day
9.00
Day
46.00
Day
6.00
Day
240.00
Day
4.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
7.65
2.08
20.00
Rs:
2945.25
468.75
800.00
406564.00
Rate
in Rs.
16.00
92.40
41.90
154.00
6.40
3.80
117.80
115.50
2278.10
75.00
86.10
0.00
22.50
38.50
22.50
38.50
42.60
115.50
20.00
Rs:
Amount
in Rs.
6160.00
35574.00
335.20
1232.00
704.00
418.00
31806.00
31185.00
54674.40
1800.00
1205.40
0.00
315.00
539.00
472.50
808.50
596.40
1617.00
800.00
170242.40
Rate
in Rs.
489.20
195.90
187.20
187.20
122.50
480.00
480.00
415.00
415.00
480.00
370.00
480.00
Rs:
Amount
in Rs.
11740.80
52893.00
3931.20
2620.80
1715.00
15360.00
16800.00
3735.00
19090.00
2880.00
88800.00
1920.00
221485.80
66445.74
287931.54
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
406564.00
170242.40
287931.54
864737.94
0.00
864737.94
25942.14
890680.08
Rs:
121266.09
13.615%
Rs.
6.30 tonne
Rate per tonne
238.14
835.38
Rs:
1013019.69
Rs:
160796.80
vertical lift gates and stop log gate elements ( SLIDING GATES)
292
IRR-GAW-2-2 Design, fabrication, supply, erection, testing and commissioning of vertical lift gates and
stoplog gate elements, consisting of skin plate,
horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks/bearings, guide shoes,
rubber seals, clamps etc., with all accessories including cost of all materials,
machinery, labour, seal fixing etc.,complete as per specifications and approved drawings
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under items in this chapter and add as applicable separately)
Drawing NO. CE/CDO/CL3/MRP/783/2002 (Spillway Stop log gate Elements of Madduvalasa Project)
Vent Size: 12.624 X 0.50 M 16 Elements
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
Structural steel
Angles / beams / channels / bars
Plates / flats
Alloy steel components
Lifting pins
Bolt / Nut / Washer
GI bolts / nuts / washers
Rubber seals
Bottom seal
Side seals
Oxygen gas
Acetyline gas
Welding electrodes
Welding electrodes ( LH )
Use rate welding holder set
Use rate gas cutting torch set
Sundries
2
3
4
5
6
7
8
9
10
11
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
8
Description
Welding transformer
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile crane 16 T
Fuel / Energy charges
Stationery derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Bending Machine
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
particulars
Description
UNIT :
119.000 tonne
Unit
Quantity
kg
kg
5280.00
112880.00
40.00
40.00
211200.00
4515200.00
kg
520.00
420.00
218400.00
kg
600.00
120.00
72000.00
Rm
210.00
Rm
18.00
cum
2714.00
cum
905.00
Nos
86554.00
Nos
16486.00
Hour
12880.00
Hour
2714.00
LS
400.00
Total cost of Materials
780.00
1210.00
45.00
330.00
11.00
18.00
7.65
2.08
20.00
Rs:
163800.00
21780.00
122130.00
298650.00
952094.00
296748.00
98532.00
5654.17
8000.00
6984188.17
Rate
in Rs.
16.00
92.40
6.40
3.80
2278.10
75.00
86.10
0.00
22.50
38.50
22.50
38.50
42.60
115.50
20.00
Rs:
Amount
in Rs.
206080.00
1190112.00
41216.00
24472.00
820116.00
27000.00
20491.80
0.00
5355.00
9163.00
8032.50
13744.50
10224.00
27720.00
3600.00
2407326.80
Rate
in Rs.
489.20
187.20
187.20
122.50
480.00
480.00
415.00
415.00
480.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
176112.00
66830.40
44553.60
29400.00
57600.00
93600.00
41500.00
598430.00
132000.00
839545.00
1008990.00
4800.00
3093361.00
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
12880.00
12880.00
6440.00
6440.00
360.00
360.00
238.00
238.00
238.00
238.00
357.00
357.00
240.00
240.00
180.00
Quantity
Hour
360.00
Hour
357.00
Hour
238.00
Hour
240.00
Day
120.00
Day
195.00
Day
100.00
Day
1442.00
Day
275.00
Day
2023.00
Day
2727.00
Day
10.00
Total cost of Labour
Rate
in Rs.
Amount
in Rs.
293
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
928008.30
4021369.30
IRR-GAW-2-3
13.615%
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
6984188.17
2407326.80
4021369.30
13412884.27
0.00
13412884.27
402386.53
13815270.79
Rs:
1880949.12
4498.200
15779.4
Rs:
15716497.51
Rs:
132071.40
119.00 tonne
Rate per tonne
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
Structural steel
Angles / beams / channels / bars
Plates / flats
Alloy steel components
Lifting pins
Bronze alloy components :
Bronze bush
Forged steel components :
Lifting hooks
MS pipe 100 mm dia
Bolt / Nut / Washer
MS bolts / nuts / washers
Oxygen gas
Acetyline gas
Welding electrodes
Welding electrodes ( LH )
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
1
2
3
4
5
particulars
Description
Welding transformer
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile derric crane
Fuel / Energy charges
Stationery derric crane
Fuel / Energy charges
Grinding machine
UNIT :
Unit
Quantity
3.528 tonne
Rate
in Rs.
Amount
in Rs.
kg
kg
13.00
3389.00
40.00
40.00
520.00
135560.00
kg
101.00
420.00
42420.00
kg
5.00
920.00
4600.00
kg
kg
103.00
11.00
260.00
175.00
26780.00
1925.00
kg
3.00
cum
126.00
cum
42.00
Nos
175.00
Nos
1575.00
Hour
187.00
Hour
24.00
LS
25.00
Total cost of Materials
90.00
45.00
330.00
11.00
18.00
7.65
2.08
20.00
Rs:
270.00
5670.00
13860.00
1925.00
28350.00
1430.55
50.00
500.00
263860.55
Rate
in Rs.
16.00
92.40
6.40
3.80
519.70
307.20
86.10
0.00
22.50
Amount
in Rs.
2992.00
10810.80
384.00
228.00
2078.80
1228.80
688.80
0.00
45.00
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
187.00
117.00
60.00
60.00
4.00
4.00
8.00
8.00
2.00
294
6
7
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
Description
Hour
Hour
Hour
LS
Unit
2.00
2.00
2.00
10.00
Quantity
Hour
4.00
Hour
2.00
Hour
2.00
Day
10.00
Day
18.00
Day
10.00
Day
18.00
Day
52.00
Day
1.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
38.50
22.50
38.50
20.00
Rs:
77.00
45.00
77.00
200.00
18855.20
Rate
in Rs.
165.80
187.20
187.20
480.00
480.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
663.20
374.40
374.40
4800.00
8640.00
4150.00
7470.00
19240.00
480.00
46192.00
13857.60
60049.60
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
263860.55
18855.20
60049.60
342765.35
0.00
342765.35
10282.96
353048.31
Rs:
48067.53
IRR-GAW-2-4
13.615%
Rs.
3.528 tonne
Rate per tonne
133.358
467.812
Rs:
401717.01
Rs:
113865.40
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
Structural steel
Angles / beams / channels / bars
Plates / flats
Chequered plates
Cast steel components :
Rope drums 2 Nos/Gears
pinions
Wheels / Pulleys
Plummer blocks / Couplings
Forged steel components
UNIT :
Unit
Quantity
30.856 tonne
25 t capacity
Rate
Amount
in Rs.
in Rs.
kg
kg
kg
1743.00
19700.00
820.00
40.00
40.00
63.00
69720.00
788000.00
51660.00
kg
kg
kg
kg
1320.00
1165.00
2255.00
817.00
220.00
210.00
180.00
180.00
290400.00
244650.00
405900.00
147060.00
295
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Hook / Shackle
kg
127.00
Alloy steel components
Shafts
kg
556.00
Pins
kg
524.00
Bronze alloy components :
Bronze bearings / bush
kg
181.00
Wire rope 28 mm dia 6/37 construction
kg
406.00
MS Bolt / Nut / Washer
kg
63.00
MS pipe 32 mm dia for railing
Rm
50.00
Worm reducers
Nos.
4.00
Electric motor 17.5 hp
No.
1.00
Electric motor 5 hp
Nos.
2.00
Electric motor 3 hp
No.
1.00
Ele-magnetic / Thruster brakes
Nos.
4.00
Electric cable / switch / control panel
etc
LS
3.00
Oxygen gas
cum
579.00
Acetyline gas
cum
193.00
Welding electrodes
Nos
1123.00
Welding electrodes ( LH )
Nos
10110.00
Grease
kg
50.00
Use rate welding holder set
Hour
1197.00
Use rate gas cutting torch set
Hour
150.00
Sundries
LS
200.00
Total cost of Materials
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
Welding transformer
Fuel / Energy charges
Tower crane 5 t capacity
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
Description
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
1197.00
748.00
6.00
6.00
235.00
235.00
100.00
100.00
32.00
32.00
16.00
16.00
500.00
Quantity
Hour
100.00
Hour
6.00
Hour
16.00
Hour
32.00
Day
74.00
Day
124.00
Day
48.00
Day
112.00
Day
20.00
Day
350.00
Day
10.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
260.00
33020.00
230.00
420.00
127880.00
220080.00
920.00
200.00
90.00
185.00
224400.00
85800.00
33000.00
23100.00
35200.00
166520.00
81200.00
5670.00
9250.00
897600.00
85800.00
66000.00
23100.00
140800.00
50380.00
45.00
330.00
11.00
18.00
260.00
7.65
2.08
20.00
Rs:
151140.00
26055.00
63690.00
12353.00
181980.00
13000.00
9157.05
312.50
4000.00
4315997.55
Rate
in Rs.
16.00
92.40
867.10
200.20
6.40
3.80
519.70
307.20
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
19152.00
69115.20
5202.60
1201.20
1504.00
893.00
51970.00
30720.00
720.00
1232.00
360.00
616.00
10000.00
192686.00
Rate
in Rs.
165.80
176.80
187.20
187.20
480.00
480.00
415.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
16580.00
1060.80
2995.20
5990.40
35520.00
59520.00
19920.00
46480.00
8300.00
129500.00
4800.00
330666.40
99199.92
429866.32
Rs:
Rs:
Rs:
Rs:
4315997.55
192686.00
429866.32
4938549.87
296
0.00%
Total
3%
Total
13.615%
Rs.
30.856 tonne
25.000 t capacity
Rate per tonne
Rate per
tonne capacity
Rs:
Rs:
Rs:
Rs:
0.00
4938549.87
148156.50
5086706.37
Rs:
692555.07
1166.356
4091.506
Rs:
5784519.30
Rs:
Rs:
187468.20
Rs:
231380.80
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
9
10
B. MACHINERY:
Sl No
1
2
3
4
5
Description
Welding transformer
Fuel / Energy charges
Mobile derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
particulars
Description
UNIT :
Unit
Quantity
kg
1570.00
kg
975.00
kg
18450.00
kg
246.00
cum
201.00
cum
67.00
Nos
1805.00
Hour
193.00
Hour
133.00
LS
10.00
Total cost of Materials
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
193.00
121.00
4.00
4.00
8.00
8.00
50.00
50.00
10.00
Quantity
Hour
4.00
Hour
50.00
Hour
8.00
Day
8.00
Day
32.00
Day
17.00
Day
18.00
Day
52.00
Day
1.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
labour component/unit qty
200.000 Rm
Rate
in Rs.
Amount
in Rs.
40.00
40.00
52.53
90.00
45.00
330.00
11.00
7.65
2.08
20.00
Rs:
62800.00
39000.00
969178.50
22140.00
9045.00
22110.00
19855.00
1476.45
277.08
200.00
1146082.03
Rate
in Rs.
16.00
92.40
519.70
307.20
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
3088.00
11180.40
2078.80
1228.80
180.00
308.00
1125.00
1925.00
200.00
21314.00
Rate
in Rs.
165.80
187.20
187.20
480.00
480.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
663.20
9360.00
1497.60
3840.00
15360.00
7055.00
7470.00
19240.00
480.00
64965.80
19489.74
84455.54
422.30
297
13.615%
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
1146082.03
21314.00
84455.54
1251851.57
0.00
1251851.57
37555.55
1289407.12
Rs:
175552.78
783.292
2747.738
Rs:
1468490.93
Rs:
7342.50
200.000 Rm
Rate per Rm
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
7
8
9
10
11
12
13
Structural steel
Plates / flats
Beams/Channels
Alloy steel components
Wheel axles / Pins
Cast steel components
Wheels / Guide rollers
Alluminium / Bronze alloy
components
Bearings
Bolt / Nut / Washer
GI bolts / nuts / washers
MS bolts / nuts / washers
Rubber seals
Bottom seal ( flat uncladed )
Side seals ( bulb teflon claded )
Top seal ( bulb teflon claded )
Corner seals ( bulb teflon claded )
Oxygen gas
Acetyline gas
Welding electrodes
Welding electrodes ( LH )
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
1
2
particulars
Description
Welding transformer
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
UNIT :
Unit
Quantity
10.000 tonne
Rate
in Rs.
Amount
in Rs.
kg
kg
7103.00
2727.00
40.00
40.00
284120.00
109080.00
kg
108.00
420.00
45360.00
kg
504.00
180.00
90720.00
kg
12.00
920.00
11040.00
kg
kg
36.00
6.00
106.00
90.00
3816.00
540.00
Rm
3.72
Rm
12.30
Rm
3.72
Nos
2.00
cum
170.00
cum
56.00
Nos
3200.00
Nos
800.00
Hour
500.00
Hour
40.00
LS
60.00
Total cost of Materials
780.00
1670.00
1670.00
1630.00
45.00
330.00
11.00
18.00
7.65
2.08
20.00
Rs:
2901.60
20541.00
6212.40
3260.00
7650.00
18480.00
35200.00
14400.00
3825.00
83.33
1200.00
658429.33
Rate
in Rs.
16.00
92.40
6.40
3.80
Amount
in Rs.
8000.00
46200.00
544.00
323.00
Unit
Hour
Hour
Hour
Hour
Quantity
500.00
500.00
85.00
85.00
298
3
4
5
6
7
8
9
Tower crane
Fuel / Energy charges
Mobile crane 16 T
Fuel / Energy charges
Stationery derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Bending machine
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
Description
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
10.00
10.00
30.00
30.00
20.00
20.00
10.00
10.00
30.00
30.00
10.00
10.00
50.00
Quantity
Hour
30.00
Hour
10.00
Hour
30.00
Hour
10.00
Hour
10.00
Day
16.00
Day
50.00
Day
8.00
Day
52.00
Day
14.00
Day
170.00
Day
230.00
Day
4.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
867.10
200.20
2278.10
75.00
86.10
0.00
22.50
38.50
22.50
38.50
42.60
115.50
20.00
Rs:
8671.00
2002.00
68343.00
2250.00
1722.00
0.00
225.00
385.00
675.00
1155.00
426.00
1155.00
1000.00
143076.00
Rate
in Rs.
489.20
176.80
187.20
187.20
122.50
480.00
480.00
415.00
415.00
480.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
14676.00
1768.00
5616.00
1872.00
1225.00
7680.00
24000.00
3320.00
21580.00
6720.00
70550.00
85100.00
1920.00
246027.00
73808.10
319835.10
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
658429.33
143076.00
319835.10
1121340.43
0.00
1121340.43
33640.21
1154980.65
Rs:
157250.61
13.615%
Rs.
10.000 tonne
Rate per tonne
378
1326
Rs:
1313935.26
Rs:
131393.50
VERTICAL LIFT GATES-ROPE DRUM HOIST UPTO 30 TON CAP. POWER OPERATED
IRR-GAW-2-7 Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope
drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electromagnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc.,
with all accessories for operating river sluice / canal sluice service gate including cost of
all materials, machinery, labour, , complete as per specifications and drawings with all leads and lifts
(without painting on sand-blasted or mechanical cleaning surfaces which are added extra
as perscedule of rates under items in this chapter and add as applicable separately)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
6.243 tonne wt
25 t capacity
Rate
Amount
in Rs.
in Rs.
299
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Structural steel
Angles / beams / channels / bars
Plates / flats
Chequered plate
Cast steel components :
Rope drums 2 Nos / Gears
Pinions
Pulleys 3 Nos / Couplings 2 Nos
Plummer blocks / Hubs
Alloy steel components
Shafts
Pins
Bronze alloy components :
Bronze bearings / bush
Wire rope 28 mm dia 6/37
construction
MS Bolt / Nut / Washer
Worm reducers
Electric motor 5 hp
Manual operating system
Gate position indicator
Ele-magnetic brake
Electric cable / switch / control panel
etc
Oxygen gas
Acetyline gas
Welding electrodes
Welding electrodes ( LH )
Grease
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
Welding transformer
Fuel / Energy charges
Tower crane 5 t capacity
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
Description
Description
kg
kg
kg
1487.00
402.00
290.00
40.00
40.00
63.00
59480.00
16080.00
18270.00
kg
kg
kg
kg
1926.00
79.00
306.00
72.00
220.00
210.00
180.00
180.00
423720.00
16590.00
55080.00
12960.00
kg
kg
346.00
73.00
230.00
420.00
79580.00
30660.00
kg
57.00
920.00
52440.00
kg
kg
No.
No.
No.
No.
No.
325.00
32.00
1.00
1.00
1.00
1.00
1.00
200.00
90.00
224400.00
33000.00
28820.00
195800.00
35200.00
65000.00
2880.00
224400.00
33000.00
28820.00
195800.00
35200.00
LS
1.00
cum
45.00
cum
15.00
Nos
80.00
Nos
720.00
kg
50.00
Hour
85.00
Hour
16.00
LS
25.00
Total cost of Materials
50380.00
45.00
330.00
11.00
18.00
260.00
7.65
2.08
20.00
Rs:
50380.00
2025.00
4950.00
880.00
12960.00
13000.00
650.25
33.33
500.00
1435338.58
Rate
in Rs.
16.00
92.40
867.10
200.20
6.40
3.80
519.70
307.20
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
1360.00
4897.20
1734.20
400.40
96.00
57.00
5197.00
3072.00
45.00
77.00
45.00
77.00
500.00
17557.80
Rate
in Rs.
165.80
176.80
187.20
187.20
480.00
480.00
415.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
1658.00
353.60
374.40
374.40
7200.00
9120.00
1660.00
3320.00
1660.00
16280.00
960.00
42960.40
12888.12
55848.52
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
85.00
53.00
2.00
2.00
15.00
15.00
10.00
10.00
2.00
2.00
2.00
2.00
25.00
Quantity
Hour
10.00
Hour
2.00
Hour
2.00
Hour
2.00
Day
15.00
Day
19.00
Day
4.00
Day
8.00
Day
4.00
Day
44.00
Day
2.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
labour component/unit qty
2233.90
300
13.615%
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
1435338.58
17557.80
55848.52
1508744.90
0.00
1508744.90
45262.35
1554007.25
Rs:
211578.09
235.986
827.822
Rs:
1766649.15
Rs:
Rs:
282980.80
Rs:
70666.00
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
2
3
4
5
6
7
8
9
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
8
particulars
Description
Welding transformer
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile crane 30 T
Fuel / Energy charges
Stationery derric crane
Fuel / Energy charges
Drilling machine
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Tower Crane
Fuel / Energy charges
Sundries
Total hire charges of Machinery
UNIT :
Unit
Quantity
kg
1494.00
kg
6564.00
kg
2442.00
Rm
60.00
kg
18.00
cum
105.00
cum
35.00
Nos
3150.00
Hour
394.00
Hour
105.00
LS
50.00
Total cost of Materials
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Quantity
394.00
394.00
52.00
52.00
30.00
30.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
50.00
Amount
in Rs.
40.00
40.00
63.00
150.00
90.00
45.00
330.00
11.00
7.65
2.08
20.00
Rs:
59760.00
262560.00
153846.00
9000.00
1620.00
4725.00
11550.00
34650.00
3014.10
218.75
1000.00
541943.85
Rate
in Rs.
16.00
92.40
6.40
3.80
3096.80
118.80
86.10
0.00
22.50
38.50
22.50
38.50
867.10
200.20
20.00
Rs:
Amount
in Rs.
6304.00
36405.60
332.80
197.60
92904.00
3564.00
1722.00
0.00
450.00
770.00
450.00
770.00
17342.00
4004.00
1000.00
166216.00
301
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
Description
Unit
Quantity
Hour
30.00
Hour
20.00
Hour
20.00
Hour
20.00
Day
10.00
Day
50.00
Day
14.00
Day
53.00
Day
400.00
Day
6.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
Rate
in Rs.
489.20
187.20
187.20
176.80
480.00
480.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
14676.00
3744.00
3744.00
3536.00
4800.00
24000.00
5810.00
21995.00
148000.00
2880.00
233185.00
69955.50
303140.50
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
541943.85
166216.00
303140.50
1011300.35
0.00
1011300.35
30339.01
1041639.36
Rs:
141819.20
13.615%
Rs.
10.500 tonne
Rate per tonne
396.9
1392.3
Rs:
1185247.76
Rs:
112880.70
RATE ANALYSIS
A. MATERIALS:
Sl No
1
5
6
7
particulars
Structural steel
Angles / beams / channels / bars
Plates / flats
Cast steel components :
Rope drums 2 Nos / Gears
Pinions
Pulleys 3 Nos / Couplings 2 Nos
Plummer blocks / Hubs
Alloy steel components
Shafts / Keys
Pins
Bronze alloy components :
Bronze bearings / bush
Wire rope 28 mm dia 6/37
construction
MS Bolt / Nut / Washer
Worm reducers
UNIT :
Unit
Quantity
5.069 tonne wt
50.00 t capacity
Rate
Amount
in Rs.
in Rs.
kg
kg
420.00
225.00
40.00
40.00
16800.00
9000.00
kg
kg
kg
kg
1290.00
98.00
650.00
250.00
220.00
210.00
180.00
180.00
283800.00
20580.00
117000.00
45000.00
kg
kg
350.00
96.00
230.00
420.00
80500.00
40320.00
kg
100.00
920.00
92000.00
kg
kg
No.
435.00
26.00
1.00
200.00
90.00
224400.00
87000.00
2340.00
224400.00
302
8
9
10
11
12
13
14
15
16
17
18
19
20
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
Welding transformer
Fuel / Energy charges
Tower crane 5 t capacity
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Mobile derric crane
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
9
10
11
Description
Description
No.
No.
No.
No.
1.00
1.00
1.00
1.00
72600.00
28820.00
195800.00
35200.00
72600.00
28820.00
195800.00
35200.00
LS
1.00
cum
30.00
cum
10.00
Nos
44.00
Nos
392.00
kg
50.00
Hour
47.00
Hour
12.00
LS
25.00
Total cost of Materials
50380.00
45.00
330.00
11.00
18.00
260.00
7.65
2.08
20.00
Rs:
50380.00
1350.00
3300.00
484.00
7056.00
13000.00
359.55
25.00
500.00
1427614.55
Rate
in Rs.
16.00
92.40
867.10
200.20
6.40
3.80
519.70
307.20
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
752.00
4342.80
1734.20
400.40
57.60
34.20
5197.00
3072.00
45.00
77.00
45.00
77.00
500.00
16334.20
Rate
in Rs.
165.80
176.80
187.20
187.20
480.00
480.00
415.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
1658.00
353.60
374.40
374.40
6240.00
8160.00
1245.00
2075.00
1660.00
13320.00
960.00
36420.40
10926.12
47346.52
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
1427614.55
16334.20
47346.52
1491295.27
0.00
1491295.27
44738.86
1536034.13
Rs:
209131.05
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
47.00
47.00
2.00
2.00
9.00
9.00
10.00
10.00
2.00
2.00
2.00
2.00
25.00
Quantity
Hour
10.00
Hour
2.00
Hour
2.00
Hour
2.00
Day
13.00
Day
17.00
Day
3.00
Day
5.00
Day
4.00
Day
36.00
Day
2.00
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
labour component/unit qty
946.90
Add contractor's profit and overhead charges
13.615% 128.90
labour component/unit qty (including contractor's profit)
1075.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.00%
Total
3%
13.615%
Rs.
191.608
672.15
Rs:
1746028.93
303
50.000 t capacity
Rate per tonne wt
Rate per tonne capacity of hoist
Rs:
Rs:
Rs:
344452.30
34920.60
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
Structural steel
Angles / beams / channels / bars
Plates / flats
Chequered plate
Cast iron components :
Hoist body / Lock nut / Main nut
Alloy steel components
Hoist stem
Bronze alloy components :
Thrust bearings
MS Bolt / Nut / Washer
Oxygen gas
Acetyline gas
Welding electrodes
Welding electrodes ( LH )
Grease
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
1
2
3
4
Description
Welding transformer
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Drilling machines
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
particulars
Description
UNIT :
Unit
Quantity
0.871 tonne
3.00 t capacity
Rate
Amount
in Rs.
in Rs.
kg
kg
kg
402.00
145.00
176.00
40.00
40.00
63.00
16080.00
5800.00
11088.00
kg
55.00
220.00
12100.00
kg
75.00
230.00
17250.00
kg
4.00
kg
8.00
cum
18.00
cum
6.00
Nos
7.00
Nos
66.00
kg
2.00
Hour
8.00
Hour
11.00
LS
2.00
Total cost of Materials
920.00
90.00
45.00
330.00
11.00
18.00
260.00
7.65
2.08
20.00
Rs:
3680.00
720.00
810.00
1980.00
77.00
1188.00
520.00
61.20
22.92
40.00
71417.12
Rate
in Rs.
16.00
92.40
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
128.00
462.00
45.00
77.00
45.00
77.00
40.00
874.00
Rate
in Rs.
187.20
187.20
480.00
480.00
415.00
415.00
370.00
480.00
Rs:
Amount
in Rs.
374.40
374.40
1920.00
2400.00
830.00
415.00
3330.00
240.00
9883.80
2965.14
12848.94
Unit
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
8.00
5.00
2.00
2.00
2.00
2.00
2.00
Quantity
Hour
2.00
Hour
2.00
Day
4.00
Day
5.00
Day
2.00
Day
1.00
Day
9.00
Day
0.50
Total cost of Labour
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
labour component/unit qty
4283.00
Add contractor's profit and overhead charges
13.615% 583.10
labour component/unit qty (including contractor's profit)
4866.10
304
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.00%
Total
3%
13.615%
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
71417.12
874.00
12848.94
85140.06
0.00
85140.06
2554.20
87694.26
Rs:
11939.57
32.924
115.494
Rs:
99782.25
Rs:
Rs:
114560.60
Rs:
33260.70
0.871 tonne
3.000 t capacity
Rate per tonne
Rate per tonne capacity
RATE ANALYSIS
UNIT :
A. MATERIALS:
Sl No
particulars
1
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Structural steel
Angles / beams / channels / bars
Plates / flats
Chequered plate
Cast steel components :
Rope drums 2 Nos / Gears
Pinions
Pulleys 6 Nos
Plummer blocks / Couplings
Alloy steel components
Shafts
Pins
Bronze alloy components :
Bronze bearings / bush
Wire rope 12 mm dia 6/36
construction
MS Bolt / Nut / Washer
Worm reducers
Manual operating system
Brake
Wire rope sockets
Oxygen gas
Acetyline gas
Welding electrodes
Welding electrodes ( LH )
Grease
Use rate welding holder set
Use rate gas cutting torch set
Sundries
B. MACHINERY:
Sl No
Description
1
2
Welding transformer
Fuel / Energy charges
Pug cutting machine
2.804
10.00
Rate
in Rs.
tonne
t capacity
Amount
in Rs.
Unit
Quantity
kg
kg
kg
1229.00
453.00
195.00
40.00
40.00
63.00
49160.00
18120.00
12285.00
kg
kg
kg
kg
384.00
14.00
108.00
47.00
220.00
210.00
180.00
180.00
84480.00
2940.00
19440.00
8460.00
kg
kg
75.00
24.00
230.00
420.00
17250.00
10080.00
kg
11.00
920.00
10120.00
kg
42.00
kg
64.00
No.
1.00
No.
1.00
No.
1.00
No
2.00
cum
75.00
cum
25.00
Nos
69.00
Nos
622.00
kg
10.00
Hour
73.00
Hour
42.00
LS
25.00
Total cost of Materials
200.00
90.00
224400.00
28820.00
35200.00
4620.00
45.00
330.00
11.00
18.00
260.00
7.65
2.08
20.00
Rs:
8400.00
5760.00
224400.00
28820.00
35200.00
9240.00
3375.00
8250.00
759.00
11196.00
2600.00
558.45
87.50
500.00
571480.95
Unit
Hour
Hour
Hour
Quantity
73.00
46.00
8.00
Rate Amount
in Rs. in Rs.
16.00
1168.00
92.40
4250.40
6.40
51.20
305
3
4
5
6
7
C. LABOUR:
Sl No
Description
1
2
3
4
5
6
7
8
9
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
8.00
4.00
4.00
8.00
8.00
8.00
8.00
16.00
16.00
25.00
Quantity
3.80
519.70
307.20
86.10
0.00
22.50
38.50
22.50
38.50
20.00
Rs:
Rate
in Rs.
Hour
4.00
Hour
16.00
Hour
8.00
Day
14.00
Day
20.00
Day
6.00
Day
7.00
Day
44.00
Day
2.00
Total cost of Labour
Rs:
Add towards highly skilled labour charges @ 30% on total cost of labour
Total Cost of Labour
30.40
2078.80
1228.80
688.80
0.00
180.00
308.00
360.00
616.00
500.00
11460.40
Amount
in Rs.
165.80
187.20
187.20
480.00
480.00
415.00
415.00
370.00
480.00
663.20
2995.20
1497.60
6720.00
9600.00
2490.00
2905.00
16280.00
960.00
44111.00
13233.30
57344.30
Rs:
Rs:
Rs:
Total
0.00%
Total
3%
IRR-GAW-212
New Item
2014-15-2
13.615%
Rs.
2.804 tonne
10.000 t capacity
tonne
Rate per
tonne
capacity of hoist
Rs:
Rs:
Rs:
Rs:
Rs:
571480.95
11460.40
57344.30
640285.65
0.00
640285.65
19208.57
659494.22
Rs:
89790.14
105.992
371.81
Rs:
749762.16
Rs:
Rs:
267390.20
74976.20
OT SLUICE SHUTTERS Screw Gear Hoist Including Platform for below 5 Tons Capacity (Small Gates)
As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for
Krishna Delta System
Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure,
platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of all
materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete
as per Specification and approved drawings
(without painting on mechanical cleaning surfaces which are added extra as per schedule of rates
under items in this chapter and add as applicable separately)
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
0.869 tonne
Rate
in Rs.
Amount
in Rs.
306
1
2
3
4
5
6
7
8
9
10
11
12
13
B. MACHINERY:
Sl No
1
2
3
4
5
6
Welding transformer
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Drilling machine
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Lathe machine (Screw Rod M/C)
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Description
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
30.00
30.00
12.00
12.00
8.00
8.00
36.00
36.00
16.00
10.00
Quantity
Hour
8.00
Hour
36.00
Day
2.00
Day
10.00
Day
4.00
Day
4.00
Day
6.00
Day
6.00
Total cost of Labour
labour component/unit qty
21396.80
Add contractor's profit and overhead charges
13.615% 2913.20
labour component/unit qty (including contractor's profit)
24310.00
40.00
40.00
63.00
17831.20
1120.00
9122.40
220.00
18260.00
920.00
90.00
45.00
330.00
11.00
18.00
7.65
2.08
20.00
Rs:
2760.00
1440.00
945.00
2310.00
2200.00
720.00
550.80
75.00
400.00
57734.40
Rate
in Rs.
16.00
92.40
6.40
3.80
22.50
38.50
22.50
38.50
300.00
20.00
Rs:
Amount
in Rs.
480.00
2772.00
76.80
45.60
180.00
308.00
810.00
1386.00
4800.00
200.00
11058.40
Rate
in Rs.
187.20
187.20
480.00
480.00
415.00
415.00
310.00
370.00
Rs:
Amount
in Rs.
1497.60
6739.20
960.00
4800.00
1660.00
1660.00
1860.00
2220.00
21396.80
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
57734.40
11058.40
21396.80
90189.60
0.00
90189.60
2705.69
92895.29
Rs:
12647.69
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.00%
Total
3%
IRR-GAW-213
New Item
2014-15-3
13.615%
Rs.
0.869 tonne
Rate per tonne
32.848
115.23
Rs:
105691.06
Rs:
121623.80
307
Gate Size:
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
9
10
2
3
4
5
Description
Welding transformer
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Drilling machine
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
UNIT :
Unit
Quantity
B. MACHINERY:
Sl No
1
particulars
Description
0.99 X 0.875 M
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
30.00
30.00
20.00
20.00
4.00
4.00
20.00
20.00
3.00
Quantity
Hour
4.00
Hour
20.00
Day
8.00
Day
6.00
Day
2.00
Day
4.00
Day
4.00
Day
8.00
Total cost of Labour
labour component/unit qty
17902.80
Add contractor's profit and overhead charges
13.615% 2437.50
labour component/unit qty (including contractor's profit)
20340.30
1.334 tonne
Rate
in Rs.
40.00
40.00
275.00
45.00
330.00
11.00
27.00
7.65
2.08
20.00
Rs:
Amount
in Rs.
17622.80
34760.00
6908.00
540.00
1320.00
2310.00
810.00
474.30
66.67
60.00
64871.77
Rate
in Rs.
16.00
92.40
6.40
3.80
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
480.00
2772.00
128.00
76.00
90.00
154.00
450.00
770.00
60.00
4980.00
Rate
in Rs.
187.20
187.20
480.00
480.00
415.00
415.00
310.00
370.00
Rs:
Amount
in Rs.
748.80
3744.00
3840.00
2880.00
830.00
1660.00
1240.00
2960.00
17902.80
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
64871.77
4980.00
17902.80
87754.57
0.00
87754.57
2632.64
90387.20
Rs:
12306.22
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.00%
Total
3%
13.615%
Rs.
50.426
176.888
308
IRR-GAW-214
New Item
2014-15 -4
1.334 tonne
Rate per tonne
Rs:
Rs:
102920.74
77152.00
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
8
9
10
11
2
3
4
5
Description
Welding transformer
Fuel / Energy charges
Pug cutting machine
Fuel / Energy charges
Drilling machine
Fuel / Energy charges
Grinding machine
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Unit
Quantity
B. MACHINERY:
Sl No
1
particulars
UNIT :
Description
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
Quantity
14.00
14.00
4.00
4.00
2.00
2.00
4.00
4.00
3.00
Quantity
Hour
2.00
Hour
4.00
Day
2.00
Day
3.00
Day
1.00
Day
4.00
Day
4.00
Day
6.00
Total cost of Labour
labour component/unit qty
9058.20
Add contractor's profit and overhead charges
13.615% 1233.30
labour component/unit qty (including contractor's profit)
10291.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.161 tonne
Rate
in Rs.
40.00
40.00
120.00
Amount
in Rs.
2548.80
3860.00
2400.00
780.00
1210.00
45.00
330.00
11.00
7.65
2.08
20.00
Rs:
639.60
2117.50
675.00
1650.00
1210.00
229.50
25.00
60.00
15415.40
Rate
in Rs.
16.00
92.40
6.40
3.80
22.50
38.50
22.50
38.50
20.00
Rs:
Amount
in Rs.
224.00
1293.60
25.60
15.20
45.00
77.00
90.00
154.00
60.00
1984.40
Rate
in Rs.
187.20
187.20
480.00
480.00
415.00
415.00
310.00
370.00
Rs:
Amount
in Rs.
374.40
748.80
960.00
1440.00
415.00
1660.00
1240.00
2220.00
9058.20
Rs:
Rs:
Rs:
Rs:
15415.40
1984.40
9058.20
26458.00
309
0.00%
Total
3%
Total
IRR-GAW-3
13.615%
Rs.
Rs:
Rs:
Rs:
Rs:
0.00
26458.00
793.74
27251.74
Rs:
3710.32
0.161 tonne
Rate per tonne
6.086
21.348
Rs:
Rs:
30989.50
192481.40
IRR-GAW-3-1 Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface
for painting by sand blasting method as per specifications including cost of all materials, l
abour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
particulars
UNIT : 100
Unit
Quantity
cum
30.00
Hour
8.00
Hour
8.00
LS
5.00
Total
Add 10% towards scaffolding/laddor @
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
1
2
Sand (Screened)
Use rate of air hose
Use rate of sand blast gun nozzle
Sundries( Rust inhibitive, seive etc )
C. LABOUR:
Sl No
1
2
3
Description
Rate
in Rs.
760.00
18.63
3.50
20.00
0.10
Rate
in Rs.
Hour
8.00
241.30
Hour
8.00
731.40
Hour
8.00
110.10
Hour
8.00
0.00
Total hire charges of Machinery
Unit
Quantity
Hour
8.00
Hour
8.00
Day
15.00
Total cost of Labour
labour component/unit qty
78.50
Add contractor's profit and overhead charges
13.615% 10.70
labour component/unit qty (including contractor's profit)
89.20
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.00%
Total
3%
Total
sqm
13.615%
100.00 sqm
Rate per sqm
Amount
in Rs.
22800.00
149.00
28.00
100.00
23077.00
2307.70
25384.70
Amount
in Rs.
1930.40
5851.20
880.80
0.00
8662.40
Rate
in Rs.
195.90
204.10
310.00
Amount
in Rs.
1567.20
1632.80
4650.00
7850.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
25384.70
8662.40
7850.00
41897.10
0.00
41897.10
1256.91
43154.01
Rs:
Rs:
Rs:
5875.42
49029.43
490.30
IRR-GAW-3-2 painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted
surfaces with one coat of inorganic zinc silicate (airless spray preferred)70+/- 5
and two super coats with a total thickness of 300 microns
(each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns)
cost of all materials, labour, scaffolding etc., complete with all leads and
all lifts
310
(Upstream surface of gates portion may be painted with solventless coaltar epoxy brown paint
instead of solventless coaltar black. The rate for coaltar epoxy brown shall be adopted in data
for Upstream side painting)
DATA:
17.50 Sqm/Hr
5.71
Hr
6
Hr
Say
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
1
2
3
UNIT :
particulars
Unit
Quantity
ltr
ltr
ltr
ltr
12.00
1.20
40.00
4.00
B. MACHINERY:
Sl No
Description
Sqm/Hr
3.00
Total cost of Materials
Unit
Quantity
Hr
Hr
Hr
100 sqm
Rate
in Rs.
550.00
140.00
250.00
140.00
20.00
Rs:
1
2
3
Description
Unit
6.00
Amount
in Rs.
728.40
6.00
6.00
241.30
731.40
1447.80
4388.40
Quantity
Day
6.00
Day
20.00
Day
20.00
Total cost of Labour
labour component/unit qty
169.80
Add contractor's profit and overhead charges
13.615% 23.10
labour component/unit qty (including contractor's profit)
192.90
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for excise duty
(on 75 percent cost excluding cost of materials)
E. Add for transportation upto work site @
F. Add for contractor's profit and overheads on
(A+B+C+D+E)
13.615%
Total cost for
100.00 sqm
Rate per sqm
60
17388.00
Rate
in Rs.
121.40
Amount
in Rs.
6600
168
10000
560
Total
0
Total
0.03
Total
Rs:
6564.60
Rs:
Amount
in Rs.
1175.40
9600.00
6200.00
16975.40
Rate
in Rs.
195.90
480.00
310.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
17388.00
6564.60
16975.40
40928.00
0.00
40928.00
1227.84
42155.84
Rs:
Rs:
Rs:
5739.52
47895.36
479.00
IRR-GAW-3-3
painting of Lifting beams,cat walks and other similar structures-painting hoist machinery,
on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred)
40microns/coat and twocoats of alkyd based micaccous iron oxide paint , 65 microns/coat
cost of all materials, labour, scaffolding etc., complete with all leads and
all lifts
DATA:
311
17.50 Sqm/Hr
5.71
Hr
6
Hr
Say
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
UNIT :
particulars
B. MACHINERY:
Sl No
28.00
2.80
Amount
in Rs.
5600
392
20.00
2.00
185.00
140.00
3700
280
3.00
Total cost of Materials
20.00
Description
Unit
Quantity
ltr
ltr
ltr
ltr
100 sqm
Rate
in Rs.
200.00
140.00
Sqm/Hr
Unit
Quantity
Hr
Hr
Hr
Unit
Rs:
6.00
Rate
in Rs.
121.40
Amount
in Rs.
728.40
6.00
6.00
241.30
731.40
RS:
1447.80
4388.40
6564.60
Rs:
Amount
in Rs.
1175.40
7200.00
4650.00
13025.40
Quantity
Day
6.00
Day
15.00
Day
15.00
Total cost of Labour
labour component/unit qty
130.30
Add contractor's profit and overhead charges
13.615% 17.70
labour component/unit qty (including contractor's profit)
148.00
Rate
in Rs.
195.90
480.00
310.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0
Total
0.03
Total
IRR-GAW-3-4
.
DATA:
60
10032.00
13.615%
100.00 sqm
Rate per sqm
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
10032.00
6564.60
13025.40
29622.00
0.00
29622.00
888.66
30510.66
Rs:
Rs:
Rs:
4154.03
34664.69
346.60
Sqm/Hr
17.50 Sqm/Hr
5.71
Hr
6
Hr
312
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
particulars
Unit
Quantity
ltr
ltr
ltr
ltr
ltr
ltr
B. MACHINERY:
Sl No
1
2
3
100 sqm
28.00
2.80
Rate
in Rs.
200.00
140.00
Amount
in Rs.
5600
392
15.00
1.50
17.00
1.70
185.00
140.00
240.00
140.00
2775
210
4080
238
3.00
Total cost of Materials
20.00
Description
C. LABOUR:
Sl No
1
2
3
UNIT :
Unit
Quantity
Hr
6.00
Hr
6.00
Hr
6.00
Total cost of Machinery
Description
Unit
Quantity
Day
6.00
Day
20.00
Day
20.00
Total cost of Labour
labour component/unit qty
169.80
Add contractor's profit and overhead charges
13.615% 23.10
labour component/unit qty (including contractor's profit)
192.90
Rs:
Rate
in Rs.
121.40
Amount
in Rs.
728.40
241.30
731.40
Rs:
1447.80
4388.40
6564.60
Rs:
Amount
in Rs.
1175.40
9600.00
6200.00
16975.40
Rate
in Rs.
195.90
480.00
310.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0
Total
0.03
Total
IRR-GAW-3-5
DATA:
60
13355.00
13.615%
100.00 sqm
Rate per sqm
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
13355.00
6564.60
16975.40
36895.00
0.00
36895.00
1106.85
38001.85
Rs:
Rs:
Rs:
5173.95
43175.80
431.80
17.50 Sqm/Hr
5.71
Hr
6
Hr
Say
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
Sqm/Hr
UNIT :
Unit
Quantity
ltr
ltr
14.00
1.40
100 sqm
Rate
in Rs.
200.00
140.00
Amount
in Rs.
2800
196
313
3
4
5
B. MACHINERY:
Sl No
1
2
3
1
2
3
26.00
2.60
240.00
140.00
6240
364
3.00
Total cost of Materials
20.00
Rs:
60
9660.00
Rate
in Rs.
121.40
Amount
in Rs.
728.40
241.30
731.40
1447.80
4388.40
6564.60
Rate
in Rs.
195.90
480.00
310.00
Amount
in Rs.
1175.40
9600.00
6200.00
16975.40
Description
C. LABOUR:
Sl No
ltr
ltr
Unit
Quantity
Hr
6.00
Hr
6.00
Hr
6.00
Total cost of Machinery
Description
Unit
Quantity
Day
6.00
Day
20.00
Day
20.00
Total cost of Labour
labour component/unit qty
169.80
Add contractor's profit and overhead charges
13.615% 23.10
labour component/unit qty (including contractor's profit)
192.90
Rs:
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0
Total
0.03
Total
IRR-GAW-4
13.615%
100.00 sqm
Rate per sqm
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
9660.00
6564.60
16975.40
33200.00
0.00
33200.00
996.00
34196.00
Rs:
Rs:
Rs:
4655.79
38851.79
388.50
17.50 Sqm/Hr
5.71
Hr
6
Hr
Say
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
particulars
Sqm/Hr
UNIT :
Unit
ltr
ltr
ltr
ltr
ltr
Nos
LS
Quantity
13
25
2.5
40.00
4
2
3.00
100.000 Sq.m
Rate
in Rs.
140
483
140.00
250.00
140.00
41.00
20.00
Amount
in Rs.
1820.00
12075.00
350.00
10000.00
560.00
82.00
60.00
314
C. LABOUR:
Sl No
1
2
3
Description
Description
Unit
Quantity
Hr
Rs:
6.00
Rate
in Rs.
121.40
Amount
in Rs.
728.40
Hr
Hr
6.00
6.00
241.30
731.40
1447.80
4388.40
6564.60
Unit
Quantity
Rate
in Rs.
195.90
480.00
310.00
Amount
in Rs.
1175.40
9600.00
6200.00
16975.40
Day
6.00
Day
20.00
Day
20.00
Total cost of Labour
labour component/unit qty
169.80
Add contractor's profit and overhead charges
13.615% 23.10
labour component/unit qty (including contractor's profit)
192.90
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.00%
Total
3%
Total
24947.00
13.615%
100.00 sqm
Rate per sq.meter
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
24947.00
6564.60
16975.40
48487.00
0.00
48487.00
1454.61
49941.61
Rs:
Rs:
Rs:
6799.55
56741.16
567.40
17.50 Sqm/Hr
5.71
Hr
6
Hr
Say
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
particulars
Sqm/Hr
UNIT :
Unit
Quantity
ltr
13
ltr
28
ltr
2.8
ltr
17.00
ltr
1.7
Nos
2
LS
3.00
Total cost of Materials
100.000 Sq.m
Rate
in Rs.
140
175
140.00
240.00
140.00
41.00
20.00
Amount
in Rs.
1820.00
4900.00
392.00
4080.00
238.00
82.00
60.00
11572.00
315
B. MACHINERY:
Sl No
1
2
3
C. LABOUR
Sl No
1
2
3
Description
Unit
Quantity
Hr
6.00
Hr
6.00
Hr
6.00
Total cost of Machinery
Description
Unit
Quantity
Day
6.00
Day
20.00
Day
20.00
Total cost of Labour
labour component/unit qty
169.80
Add contractor's profit and overhead charges
13.615% 23.10
labour component/unit qty (including contractor's profit)
192.90
Rate
in Rs.
121.40
Amount
in Rs.
728.40
241.30
731.40
1447.80
4388.40
6564.60
Rate
in Rs.
195.90
480.00
310.00
Amount
in Rs.
1175.40
9600.00
6200.00
16975.40
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs.
Rs.
Rs.
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Total
0.00%
Total
3%
Total
11572.00
6564.60
16975.40
35112.00
0.00
35112.00
1053.36
36165.36
4923.91
41089.27
410.90
17.50 Sqm/Hr
5.71
Hr
6
Hr
Say
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
7
B. MACHINERY:
Sl No
1
2
3
particulars
Description
Sqm/Hr
UNIT :
Unit
Quantity
ltr
13
ltr
14
ltr
1.4
ltr
40
ltr
4
Nos
2
LS
3
Total cost of Materials
Unit
Quantity
Hr
Hr
Hr
100.000 Sq.m
Rate
in Rs.
140
700
140.00
250
140.00
41
20
Rs:
Amount
in Rs.
1820.00
9800.00
196.00
10000.00
560.00
82.00
60.00
22518.00
6.00
Rate
in Rs.
121.40
Amount
in Rs.
728.40
6.00
6.00
241.30
731.40
1447.80
4388.40
316
Description
Unit
Quantity
Day
6.00
Day
13.00
Day
13.00
Total cost of Labour
labour component/unit qty
114.50
Add contractor's profit and overhead charges
13.615% 15.60
labour component/unit qty (including contractor's profit)
130.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
D. Add for excise duty
(on 75 percent cost excluding cost of materials)
E. Add for transportation upto work site @
Total
0.00%
Total
3%
Total
Rs:
6564.60
Rs:
Amount
in Rs.
1175.40
6240.00
4030.00
11445.40
Rate
in Rs.
195.90
480.00
310.00
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
Rs:
22518.00
6564.60
11445.40
40528.00
0.00
40528.00
1215.84
41743.84
5683.42
47427.26
474.30
317
CHAPTER-VI
3. The Leads for Steel and Cement shall be from the nearest market place to the Project area
4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead
charges are to be added as follows:
Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included
in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.
(same as above)
Example:
Total lead for earth from approved borrow area :
15 Km
Initial lead included in the basic rate in the SR :
1 Km
Additional lead charges :
Lead charges
Rs. for 5 km
83.60
Lead charges for next 10Rs.
km
125
Total lead charges for 15Rs.
km /cum
208.60
Less 1 km initial lead charges
Rs. /cum
31.30 (-)
Net additional lead charges
Rs./ cum
177.30
5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area.
For conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the
data without deducting the 50 m initial lead charges
JUNGLE CLEARANCE :
Clearing thin jungle growth ( more than 50 percent open space ) including bushes
upto 30 cm / parthenium and other weeds including burning or disposing off the same
as directed etc., complete.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
1000 sqm
Rate
in Rs.
Amount
in Rs.
318
NIL
0.00
0.00
0.00
0.00
Rs:
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
200.00
930.00
1130.00
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
1.10
Add contractor's profit and overhead charges
13.615% 0.10
labour component/unit qty (including contractor's profit)
1.20
0.50
3.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
1000.00 sqm
Rs:
Rate per
sqm
(A+B+C+D)/1000.0
Rs.
IRR-PMW-1-2
0.00
0.00
1130.00
1130.00
153.85
1283.85
1.30
Clearing thick jungle growth ( less than 50 percent open space ) including bushes
upto 30 cm / parthenium and other weeds including burning or disposing off the same as
directed etc., complete.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
1000 sqm
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
200.00
1550.00
1750.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
1.80
Add contractor's profit and overhead charges
13.615% 0.20
labour component/unit qty (including contractor's profit)
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Quantity
0.50
5.00
Rs:
Rs:
Rs:
Rs:
Rate
in Rs.
0.00
0.00
1750.00
1750.00
319
IRR-PMW-1-3
238.26
1988.26
2.00
Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girth
including excavation, stacking the materials neatly and levelling the surface etc., complete with
initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
18 Nos.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
100.00
620.00
720.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
40.00
Add contractor's profit and overhead charges
13.615% 5.40
labour component/unit qty (including contractor's profit)
45.40
0.25
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
18.00 Nos.
Rs:
Rate per each
(A+B+C+D)/18.0
Rs.
IRR-PMW-1-4
0.00
0.00
720.00
720.00
98.028
818.03
45.40
Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 1.50 m
and upto 3.0 m including excavation, stacking the materials neatly and levelling the area etc.,
complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Quantity
NIL
8 Nos.
Rate
in Rs.
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
NIL
Description
0.00
0.00
Unit
Quantity
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
Amount
320
1
2
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
90.00
Add contractor's profit and overhead charges
13.615% 12.25
labour component/unit qty (including contractor's profit)
102.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
8.00 Nos.
Rs:
Rate per each
(A+B+C+D)/8.0
Rs.
IRR-PMW-1-5
0.25
2.00
in Rs.
400.00
310.00
Rs:
Rs:
Rs:
Rs:
Rs:
0.00
0.00
720.00
720.00
98.03
818.00
102.30
Removing stumps, tree roots, roots of bamboo cluster etc., with girth
above 3.0 m and upto 5.0 m including excavation, stacking the materials neatly and levelling
the area etc., complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
5 Nos.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
200.00
1240.00
1440.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
Day
Day
Total cost of Labour
labour component/unit qty
288.00
Add contractor's profit and overhead charges
13.615% 39.20
labour component/unit qty (including contractor's profit)
327.20
work inspector
mazdoor
0.50
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
5.00 Nos.
Rs:
Rate per each
(A+B+C+D)/5.0
Rs.
IRR-PMW-1-6
in Rs.
100.00
620.00
720.00
Rs:
Rs:
Rs:
Rs:
0.00
0.00
1440.00
1440.00
196.06
1636.06
327.20
Additional rate for every 0.5 m increase in girth of tree stump / stumps of bamboo cluster
beyond 5 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
7 Nos.
Rate
Amount
321
in Rs.
NIL
0.00
0.00
Rs:
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
88.00
271.25
359.25
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
51.30
Add contractor's profit and overhead charges
13.615% 7.00
labour component/unit qty (including contractor's profit)
58.30
0.22
0.88
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
0.00
0.00
359.25
359.25
IRR-PMW-1-7
48.91
408.16
58.30
Cutting and stacking bamboos excluding removing stumps and roots etc., complete with
initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
150 Nos.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
200.00
1550.00
1750.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
11.67
Add contractor's profit and overhead charges
13.615% 1.59
labour component/unit qty (including contractor's profit)
13.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
Quantity
0.50
5.00
Rs:
Rs:
Rs:
Rs:
Rate
in Rs.
0.00
0.00
1750.00
1750.00
322
IRR-PMW-1-8
238.26
1988.26
13.30
Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and
including burning or disposing off the materials as directed with initial lead upto 50 m and all
lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
100 Nos.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
200.00
930.00
1130.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
11.30
Add contractor's profit and overhead charges
13.615% 1.50
labour component/unit qty (including contractor's profit)
12.80
0.50
3.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
100.00 Nos
Rs:
Rate per each
(A+B+C+D)/100.0
Rs.
IRR-PMW-1-9
0.00
0.00
1130.00
1130.00
153.85
1283.85
12.80
Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth excluding
removal of stumps and including burning or disposing off the materials as directed
with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Quantity
NIL
50 Nos
Rate
in Rs.
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
NIL
Description
0.00
0.00
Unit
Quantity
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
Amount
323
1
2
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
22.60
Add contractor's profit and overhead charges
13.615% 3.10
labour component/unit qty (including contractor's profit)
25.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
0.50
3.00
in Rs.
400.00
310.00
Rs:
Rs:
Rs:
Rs:
Rs:
0.00
0.00
1130.00
1130.00
IRR-PMW-1-10
153.85
1283.85
25.70
Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
UNIT :
particulars
Unit
Quantity
LS
0.25
0.00
Description
Unit
Quantity
NIL
14 Nos.
Rate
in Rs.
150.00
0.00
Rs:
Amount
in Rs.
37.50
0.00
37.50
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
100.00
930.00
1030.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
Day
Day
Total cost of Labour
labour component/unit qty
73.60
Add contractor's profit and overhead charges
13.615% 10.00
labour component/unit qty (including contractor's profit)
83.60
work inspector
mazdoor
0.25
3.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
14.00 Nos.
Rs:
Rate per each
(A+B+C+D)/14.0
Rs.
IRR-PMW-1-11
in Rs.
200.00
930.00
1130.00
Rs:
Rs:
Rs:
Rs:
37.50
0.00
1030.00
1067.50
145.34
1212.84
86.60
Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
UNIT :
particulars
Unit
LS
Quantity
0.25
4 Nos.
Rate
in Rs.
150.00
Amount
in Rs.
37.50
324
0.00
0.00
Rs:
0.00
37.50
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
100.00
930.00
1030.00
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
257.50
Add contractor's profit and overhead charges
13.615% 35.10
labour component/unit qty (including contractor's profit)
292.60
0.25
3.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
4.00 Nos.
Rs:
Rate per each
(A+B+C+D)/4.0
Rs.
IRR-PMW-1-12
37.50
0.00
1030.00
1067.50
145.34
1212.84
303.20
Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
UNIT :
particulars
Unit
Quantity
LS
0.25
0.00
Description
Unit
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
515.00
Add contractor's profit and overhead charges
13.615% 70.10
labour component/unit qty (including contractor's profit)
585.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
2.00 Nos.
Rs:
Rate per each
(A+B+C+D)/2.0
Rs.
0.25
3.00
Rs:
Rs:
Rs:
Rs:
2 Nos.
Rate
in Rs.
150.00
0.00
Rs:
Amount
in Rs.
37.50
0.00
37.50
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
100.00
930.00
1030.00
37.50
0.00
1030.00
1067.50
145.34
1212.84
606.40
325
IRR-PMW-1-13
Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
UNIT :
particulars
Unit
Quantity
LS
0.25
0.00
Description
Unit
Quantity
NIL
1 No.
Rate
in Rs.
150.00
0.00
Rs:
Amount
in Rs.
37.50
0.00
37.50
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
100.00
930.00
1030.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
1030.00
Add contractor's profit and overhead charges
13.615% 140.20
labour component/unit qty (including contractor's profit)
1170.20
0.25
3.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
1.00 No.
Rs:
Rate per each
(A+B+C+D)/1.0
Rs.
IRR-PMW-1-14
37.50
0.00
1030.00
1067.50
145.34
1212.84
1212.80
Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps and including
stacking the materials neatly as directed with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
UNIT :
particulars
Unit
Quantity
LS
0.50
0.00
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
work inspector
mazdoor
Unit
Day
Day
Quantity
0.25
5.00
1 Nos.
Rate
in Rs.
150.00
0.00
Rs:
Amount
in Rs.
75.00
0.00
75.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Amount
in Rs.
100.00
1550.00
326
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
1.00 Nos.
Rs:
Rate per each
(A+B+C+D)/1.0
Rs.
IRR-PMW-1-15
75.00
0.00
1650.00
1725.00
234.86
1959.86
1959.90
Additional rate for cutting tree for every 0.5 m increase in girth of tree beyond 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
UNIT :
particulars
Unit
Quantity
LS
0.15
0.00
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
1 No
Rate
in Rs.
150.00
0.00
Rs:
Amount
in Rs.
22.50
0.00
22.50
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
40.00
542.50
582.50
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
Day
Day
Total cost of Labour
labour component/unit qty
582.50
Add contractor's profit and overhead charges
13.615% 79.30
labour component/unit qty (including contractor's profit)
661.80
work inspector
mazdoor
0.10
1.75
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
1.00 No
Rs:
Rate per each
(A+B+C+D)/1.0
Rs.
IRR-PMW-1-16
1650.00
Rs:
Rs:
Rs:
Rs:
22.50
0.00
582.50
605.00
82.37
687.37
687.40
Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with
initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
NIL
Quantity
0.00
0.00
1000 sqm
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
327
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
3720.00
4120.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
4.10
Add contractor's profit and overhead charges
13.615% 0.60
labour component/unit qty (including contractor's profit)
4.70
1.00
12.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
1000.00 sqm
Rs:
Rate per sqm
(A+B+C+D)/1000.0
Rs.
IRR-PMW-2
IRR-PMW-2-1
0.00
0.00
4120.00
4120.00
560.94
4680.94
4.70
PRELIMINARY WORKS :
Earthwork excavation for trial pits / borrow pits and other investigation works in all kinds of
soil including boulders upto 30 cm dia and disposing off excavated soil as directed with lead
upto 10 m and lift upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
10 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
200.00
1860.00
2060.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
206.00
Add contractor's profit and overhead charges
13.615% 28.05
labour component/unit qty (including contractor's profit)
234.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
10.00 cum
Rs:
Rate per cum
(A+B+C+D)/100.0
Rs.
0.50
6.00
Rs:
Rs:
Rs:
Rs:
Rate
in Rs.
0.00
0.00
2060.00
2060.00
280.47
2340.47
234.00
328
IRR-PMW-2-2
Earthwork excavation for trial pits / borrow pits and other investigation works in soft
rock including disposing off the excavated rock as directed with lead upto 10 m and lift
upto 3 m.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
10 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
200.00
370.00
2325.00
2895.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
Unit
Quantity
work inspector
Crowbarman
mazdoor
Day
Day
Day
Total cost of Labour
labour component/unit qty
289.50
Add contractor's profit and overhead charges
13.615% 39.40
labour component/unit qty (including contractor's profit)
328.90
0.50
1.00
7.50
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
10.00 cum
Rs:
Rate per cum
(A+B+C+D)/10.0
Rs.
IRR-PMW-2-3
0.00
0.00
2895.00
2895.00
394.15
3289.15
328.90
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Quantity
5.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
1
C. LABOUR:
Sl No
1
2
Description
Description
Geophysist / Geologist
Graduate Engineer
Unit
Quantity
Hour
8.00
20%
Total hire charges of Machinery
Unit
Day
Day
Quantity
2.00
1.00
20 Stages
Rate
in Rs.
20.00
0.00
Rs:
Amount
in Rs.
100.00
0.00
100.00
Rate
in Rs.
99.00
Rs:
Amount
in Rs.
792.00
158.40
950.40
Rate
in Rs.
790.00
790.00
Amount
in Rs.
1580.00
790.00
329
3
4
Lab Assistant
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
204.50
Add contractor's profit and overhead charges
13.615% 27.80
labour component/unit qty (including contractor's profit)
232.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
20.00 Stages
Rs:
Rate per stage
(A+B+C+D)/20.0
Rs.
IRR-PMW-2-4
480.00
310.00
Rs:
Rs:
Rs:
Rs:
Rs:
100.00
950.40
4090.00
5140.40
480.00
1240.00
4090.00
699.87
5840.27
292.00
Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or inclined
upto 10 degrees to vertical as directed including cost of all materials, machinery, labour, water
charges, reaming, collection of wash samples at suitable intervals, logging and lebelling,
supplying honne wood core box, fixing casing pipes ( excluding cost of casing pipes ) etc.,
complete for depth upto 30 m from surface.
Note: 1. For drilling through over-burden beyond 30 m from surface increase the basic rate per
Rm by 10 percent.
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
1
2
3
Description
C. LABOUR:
Sl No
1
2
3
particulars
UNIT :
Unit
Quantity
B. MACHINERY:
Sl No
Description
Unit
3.00
3.00
3.00
3.00
Quantity
Hour
Hour
Hour
Hour
LS
Total hire charges of Machinery
Unit
1.00
1.00
2.00
2.00
2.00
Quantity
Hour
Hour
Day
Total cost of Labour
labour component/unit qty
364.10
Add contractor's profit and overhead charges
13.615% 49.60
labour component/unit qty (including contractor's profit)
413.70
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
3.00 Rm
Rs:
Rate per Rm
(A+B+C+D)/3.0
Rs.
IRR-PMW-2-5
1.00
4.00
1.00
2.00
2.00
Rs:
Rs:
Rs:
Rs:
3.00 Rm
Rate
in Rs.
116.67
28.61
1.84
259.88
Rs:
Amount
in Rs.
350.00
85.83
5.51
779.63
1220.97
Rate
in Rs.
319.00
243.80
10.20
81.30
20.00
Rs:
Amount
in Rs.
319.00
243.80
20.40
162.60
40.00
785.80
Rate
in Rs.
265.20
103.60
310.00
Rs:
Amount
in Rs.
265.20
207.20
620.00
1092.40
1220.97
785.80
1092.40
3099.17
421.95
3521.12
1173.70
Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit vertical / inclined
upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water
330
charges, collection of core samples, logging and lebelling, supplying honne wood core box
and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
2
3
Description
C. LABOUR:
Sl No
1
2
3
Unit
Quantity
B. MACHINERY:
Sl No
1
particulars
UNIT :
Description
Unit
3.00
3.00
3.00
3.00
3.00
Quantity
Hour
8.00
Hour
8.00
Hour
16.00
Hour
16.00
LS
5.00
Total hire charges of Machinery
Unit
Quantity
Hour
Hour
Day
Total cost of Labour
labour component/unit qty
1466.40
Add contractor's profit and overhead charges
13.615% 199.70
labour component/unit qty (including contractor's profit)
1666.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
3.00 Rm
Rs:
Rate per Rm
(A+B+C+D)/3.0
Rs.
NOTE:
8.00
16.00
2.00
Rs:
Rs:
Rs:
Rs:
3.00 Rm
Rate
in Rs.
848.00
85.83
228.40
24.49
584.72
Rs:
Amount
in Rs.
2544.00
257.50
685.20
73.46
1754.16
5314.31
Rate
in Rs.
319.00
243.80
10.20
81.30
20.00
Rs:
Amount
in Rs.
2552.00
1950.40
163.20
1300.80
100.00
6066.40
Rate
in Rs.
265.20
103.60
310.00
Rs:
Amount
in Rs.
2121.60
1657.60
620.00
4399.20
5314.31
6066.40
4399.20
15779.91
2148.44
17928.35
5976.10
1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the basic
rate per Rm by 25 percent.
2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the basic
rate per Rm by 40 percent.
IRR-PMW-2-5-A
New Item 2014-155
Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including
Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical /
inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour,
water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m from
surface for Primary and Secondary Holes
Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Har
DATA:
For drilling upto 30 m from surface the rate of drilling is assumed at 3 m per day for analysis.
For rate analysis combination of diamond bit and reamer shell is assumed.
500 m long 25 mm dia GI pipe line and 50 m long 25 mm dia water hose are assumed.
For 30 m drilling average 16.5 m extension rods with coupling sleeves required.
Use rate of materials :
Cost of NX diamond core bit @
Rs:
12720.00 / Each
Life of diamond core bit in all types of rock (other than hard rock)
:
Use rate of diamond core bit per m drilling
( cost / life )
Cost of reamer shell @
Rs:
5150.00 / Each
Rs:
10.57
Rs:
Rs:
12720.00
m
1203.41
5150.00
331
Life of reamer shell in all types of rock (other than hard rock)
Use rate of reamer shell per m drilling
( cost / life )
Cost of 16.5 m extension rod @
Rs:
2226.00 / Rm
Life of extension rods
Use rate of 16.5 m length extension rods
( cost / life )
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
4
2
3
Description
C. LABOUR:
Sl No
1
2
3
UNIT :
Unit
Quantity
B. MACHINERY:
Sl No
1
particulars
Description
Unit
3.00
3.00
3.00
Quantity
Hour
Hour
Hour
Hour
LS
Total hire charges of Machinery
Unit
4.78
4.78
9.55
9.55
2.99
Quantity
Hour
Hour
Day
Total cost of Labour
labour component/unit qty
875.00
Add contractor's profit and overhead charges
13.615% 119.10
labour component/unit qty (including contractor's profit)
994.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
13.615% Rs:
Total cost for
3.00 Rm
Rs:
Rate per Rm
(A+B+C+D)/3.0
Rs.
NOTE:
100
Rs:
Rs:
2500
Rs:
4.78
9.55
1.19
Rs:
Rs:
Rs:
Rs:
m
51.50
36729.00
m
14.69
3.00 Rm
Rate
in Rs.
1203.41
51.50
14.69
Rs:
Amount
in Rs.
3610.22
154.50
44.07
3808.79
Rate
in Rs.
319.00
243.80
10.20
81.30
20.00
Rs:
Amount
in Rs.
1523.54
1164.39
97.43
776.58
59.80
3621.74
Rate
in Rs.
265.20
103.60
310.00
Rs:
Amount
in Rs.
1266.60
989.38
368.90
2624.88
3808.79
3621.74
2624.88
10055.41
1369.04
11424.45
3808.20
1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m
upto 60 m from surface increase the basic rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from
surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.
IRR-PMW-2-5-B
New Item 2014-156
Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including
Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical /
inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour,
water charges, collection of core samples, logging and lebelling, supplying honne wood core box
and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface
for Test Holes
DATA:
For drilling upto 30 m from surface the rate of drilling is assumed at 3 m per day for analysis.
For rate analysis combination of diamond bit and reamer shell is assumed.
500 m long 25 mm dia GI pipe line and 50 m long 25 mm dia water hose are assumed.
For 30 m drilling average 16.5 m extension rods with coupling sleeves required.
Use rate of materials :
Cost of NX diamond core bit @
Rs:
12720.00 / Each
Life of diamond core bit in all types of rock (other than hard rock)
:
Use rate of diamond core bit per m drilling
( cost / life )
Cost of reamer shell @
Rs:
5150.00 / Each
Life of reamer shell in all types of rock (other than hard rock)
:
Rs:
10.57
Rs:
Rs:
100
12720.00
m
1203.41
5150.00
m
332
( cost / life )
13704.00 / Each
:
( cost / life )
2226.00 / Rm
:
( cost / life )
56700.00 / cum
10%
15%
4 m samples
1
2
3
4
5
2
3
Description
C. LABOUR:
Sl No
1
2
3
UNIT :
Unit
Quantity
B. MACHINERY:
Sl No
1
particulars
Description
Unit
3.00
3.00
3.00
3.00
3.00
Quantity
Hour
Hour
Hour
Hour
LS
Total hire charges of Machinery
Unit
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
13.615% Rs:
Total cost for
3.00 Rm
Rs:
Rate per Rm
(A+B+C+D)/3.0
Rs.
IRR-PMW-2-6
4.78
4.78
9.55
9.55
2.99
Quantity
Hour
Hour
Day
Total cost of Labour
labour component/unit qty
875.40
Add contractor's profit and overhead charges
13.615% 119.20
labour component/unit qty (including contractor's profit)
994.60
NOTE:
51.50
13704.00
m
137.04
36729.00
m
14.69
Rs:
Rs:
Rs:
Rs:
Rs:
RATE ANALYSIS
A. MATERIALS:
Sl No
Rs:
Rs:
100
Rs:
Rs:
2500
Rs:
4.78
9.55
1.19
Rs:
Rs:
Rs:
Rs:
1871.10
187.11
280.67
2338.88
584.72
3.00 Rm
Rate
in Rs.
1203.41
51.50
137.04
14.69
584.72
Rs:
Amount
in Rs.
3610.22
154.50
411.12
44.07
1754.16
5974.07
Rate
in Rs.
319.00
243.80
10.20
81.30
20.00
Rs:
Amount
in Rs.
1523.54
1164.39
97.43
776.58
59.80
3621.74
Rate
in Rs.
265.20
103.60
310.00
Rs:
Amount
in Rs.
1266.60
989.59
370.14
2626.32
5974.07
3621.74
2626.32
12222.13
1664.04
13886.18
4628.70
1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m
upto 60 m from surface increase the basic rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from
surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.
Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical / inclined
upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water
charges,collection of core samples,logging, lebelling, supplying honne wood core box
and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.
Data:
RATE ANALYSIS
UNIT :
3.00 Rm
A. MATERIALS:
333
Sl No
1
2
3
4
5
particulars
2
3
Description
C. LABOUR:
Sl No
1
2
3
Quantity
B. MACHINERY:
Sl No
1
Unit
Description
Unit
3.00
3.00
3.00
3.00
3.00
Quantity
Hour
8.00
Hour
8.00
Hour
16.00
Hour
16.00
LS
5.00
Total hire charges of Machinery
Unit
Quantity
Hour
Hour
Day
Total cost of Labour
labour component/unit qty
1466.40
Add contractor's profit and overhead charges
13.615% 199.70
labour component/unit qty (including contractor's profit)
1666.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
8.00
16.00
2.00
Rate
in Rs.
706.67
85.83
228.40
24.49
584.72
Rs:
Amount
in Rs.
2120.00
257.50
685.20
73.46
1754.16
4890.31
Rate
in Rs.
319.00
243.80
10.20
81.30
20.00
Rs:
Amount
in Rs.
2552.00
1950.40
163.20
1300.80
100.00
6066.40
Rate
in Rs.
265.20
103.60
310.00
Rs:
Amount
in Rs.
2121.60
1657.60
620.00
4399.20
Rs:
Rs:
Rs:
Rs:
4890.31
6066.40
4399.20
15355.91
2090.71
17446.62
5815.50
1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the
basic rate for drilling upto 30 m from surface by 25 percent per Rm.
2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the basic
rate for drilling upto 30 m from surface by 40 percent per Rm.
IRR-PMW-2-6-A
New Item 2014-157
Drilling 47 mm (BX )dia core hole in all types of rocks (other than Hard Rock) including
Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical /
inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour,
water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m
DATA:
Data:
For drilling upto 30 m from surface the rate of drilling is assumed at 3 m per day for analysis.
For rate analysis combination of diamond bit and reamer shell is assumed.
500 m long 25 mm dia GI pipe line and 50 m long 25 mm dia water hose are assumed.
For 30 m drilling average 16.5 m extension rods with coupling sleeves required.
Use rate of materials :
Cost of BX diamond core bit @
Rs:
10600.00 / Each
Life of diamond core bit in all types of rock (other than hard rock)
:
Use rate of diamond core bit per m drilling
( cost / life )
Cost of reamer shell @
Rs:
5150.00 / Each
Life of reamer shell in all types of rock (other than hard rock)
:
Use rate of reamer shell per m drilling
( cost / life )
Cost of 16.5 m extension rod @
Rs:
2226.00 / Rm
Life of extension rods
:
Use rate of 16.5 m length extension rods
( cost / life )
RATE ANALYSIS
UNIT :
Rs:
10.57
Rs:
Rs:
100
Rs:
Rs:
2500
Rs:
10600.00
m
1002.84
5150.00
m
51.50
36729.00
m
14.69
3.00 Rm
334
A. MATERIALS:
Sl No
1
2
4
2
3
Description
C. LABOUR:
Sl No
1
2
3
Unit
Quantity
B. MACHINERY:
Sl No
1
particulars
Description
Unit
3.00
3.00
3.00
Quantity
Hour
Hour
Hour
Hour
LS
Total hire charges of Machinery
Unit
Quantity
Hour
Hour
Day
Total cost of Labour
labour component/unit qty
875.00
Add contractor's profit and overhead charges
13.615% 119.10
labour component/unit qty (including contractor's profit)
994.10
4.78
9.55
1.19
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
13.615% Rs:
Total cost for
3.00 Rm
Rs:
Rate per Rm
(A+B+C+D)/3.0
Rs.
NOTE:
IRR-PMW-2-7
4.78
4.78
9.55
9.55
2.99
Rate
in Rs.
1002.84
51.50
14.69
Rs:
Amount
in Rs.
3008.51
154.50
44.07
3207.09
Rate
in Rs.
319.00
243.80
10.20
81.30
20.00
Rs:
Amount
in Rs.
1523.54
1164.39
97.43
776.58
59.80
3621.74
Rate
in Rs.
265.20
103.60
310.00
Rs:
Amount
in Rs.
1266.60
989.38
368.90
2624.88
3207.09
3621.74
2624.88
9453.71
1287.12
10740.83
3580.30
1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m
upto 60 m from surface increase the basic rate per Rm by 25 percent.
2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from
surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
B. MACHINERY:
Sl No
1
Description
UNIT :
Unit
Each
cum
Total cost of Materials
Unit
Quantity
18.00
1.00
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
work inspector
Stone chiseller Cl- I
mazdoor
Unit
Day
Day
Day
Quantity
1.00
1.00
3.00
18 Nos.
Rate
in Rs.
23.00
115.00
Rs:
Amount
in Rs.
414.00
115.00
529.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
415.00
310.00
Amount
in Rs.
400.00
415.00
930.00
335
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
18.00 Nos.
Rs:
Rate per each
(A+B+C+D)/18.0
Rs.
IRR-PMW-2-8
529.00
0.00
1745.00
2274.00
309.61
2583.61
143.50
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
particulars
B. MACHINERY:
Sl No
1
Description
UNIT :
Unit
Each
kg
cum
cum
cum
cum
Total cost of Materials
Unit
Quantity
10.00
91.00
0.25
0.15
0.10
0.25
Quantity
NIL
10 Nos.
Rate
in Rs.
23.00
6.30
1145.00
1210.00
875.00
560.00
Rs:
Amount
in Rs.
230.00
573.30
286.25
181.50
87.50
140.00
1498.55
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
415.00
310.00
Rs:
Amount
in Rs.
400.00
1245.00
1240.00
2885.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
work inspector
Stone chiseller Cl- I
mazdoor
Unit
Day
Day
Day
Total cost of Labour
labour component/unit qty
288.50
Add contractor's profit and overhead charges
13.615% 39.30
labour component/unit qty (including contractor's profit)
327.80
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Quantity
1.00
3.00
4.00
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
10.00 Nos.
Rs:
Rate per each
(A+B+C+D)/10.0
Rs.
NOTE: For providing 30 cm thick compacted murum bed in B.C soil area including
additional excavation for thickness of murum bedding add per
Each
IRR-PMW-2-9
1745.00
1498.55
0.00
2885.00
4383.55
596.82
4980.37
498.00
Rs:
4.00
336
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
particulars
B. MACHINERY:
Sl No
Description
UNIT :
Unit
Quantity
Each
kg
cum
cum
cum
cum
cum
cum
Total cost of Materials
Unit
1.00
262.00
0.50
0.30
0.20
0.25
0.04
0.60
Quantity
NIL
1 No.
Rate
in Rs.
23.00
6.30
1145.00
1210.00
875.00
330.00
360.00
560.00
Rs:
Amount
in Rs.
23.00
1650.60
572.50
363.00
175.00
82.50
14.40
336.00
3217.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
415.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
207.50
370.00
1550.00
2527.50
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
4
Description
Unit
Quantity
work inspector
Stone chiseller Cl- I
Mason Cl- II
mazdoor
Day
Day
Day
Day
Total cost of Labour
labour component/unit qty
2527.50
Add contractor's profit and overhead charges
13.615% 344.10
labour component/unit qty (including contractor's profit)
2871.60
1.00
0.50
1.00
5.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
1.00 No.
Rs:
Rate per each
(A+B+C+D)/1.0
Rs.
IRR-PMW-3
IRR-PMW-3-1
3217.00
0.00
2527.50
5744.50
782.11
6526.61
6526.60
MAINTENANCE WORKS :
Removing dry stone rock-toe / rivetment and filter layers below rock-toe/ rivetment
including stacking all materials separately as directed with initial lead upto 50 m and all lifts.
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
105 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Amount
in Rs.
400.00
2220.00
14880.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
work inspector
Mason Cl- II
mazdoor
Unit
Day
Day
Day
Quantity
1.00
6.00
48.00
Rate
in Rs.
337
Rs:
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
105.00 cum
Rs:
Rate per cum
(A+B+C+D)/105.0
Rs.
IRR-PMW-3-2
0.00
0.00
17500.00
17500.00
2382.63
19882.63
189.40
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
6
particulars
UNIT :
Unit
Quantity
B. MACHINERY:
Sl No
Description
Unit
15.30
15.30
15.30
9.00
57.60
44.00
Quantity
NIL
100 sqm
Rate
in Rs.
560.00
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
8568.00
0.00
0.00
0.00
0.00
0.00
8568.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
1850.00
10230.00
12480.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
Unit
Quantity
Day
Day
Day
Total cost of Labour
labour component/unit qty
124.80
Add contractor's profit and overhead charges
13.615% 17.00
labour component/unit qty (including contractor's profit)
141.80
work inspector
Mason Cl- II
mazdoor
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
100.00 sqm
Rs:
Rate per sqm
(A+B+C+D)/100.0
Rs.
IRR-PMW-3-3
17500.00
1.00
5.00
33.00
Rs:
Rs:
Rs:
Rs:
8568.00
0.00
12480.00
21048.00
2865.69
23913.69
239.10
Re-constructing dry rubble rock-toe and filter media for rock-toe consisting of
sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm
thick each using sand from approved quarry and stones and filter aggregates obtained from
rock-toe removed for re-construction including cost of all machinery, labour, laying filter and
338
stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto
50 m and all lifts.
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
5
particulars
UNIT :
Unit
Quantity
Rubble ( available )
cum
Stone chips ( available )
cum
80-20 mm filter ( available )
cum
20 mm down filter ( available )
cum
Sand (Un-Screened) ( fresh from quarry )
cum
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
100 cum
Rate
in Rs.
58.20
8.70
19.40
12.10
9.80
Quantity
NIL
0.00
0.00
0.00
0.00
560.00
Rs:
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
2590.00
14880.00
17870.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
Unit
Quantity
work inspector
Mason Cl- II
mazdoor
Day
Day
Day
Total cost of Labour
labour component/unit qty
178.70
Add contractor's profit and overhead charges
13.615% 24.30
labour component/unit qty (including contractor's profit)
203.00
1.00
7.00
48.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
100.00 cum
Rs:
Rate per cum
(A+B+C+D)/100.0
Rs.
IRR-PMW-3-4
Amount
in Rs.
0.00
0.00
0.00
0.00
5488.00
5488.00
5488.00
0.00
17870.00
23358.00
3180.19
26538.19
265.40
Removing and resetting disturbed Yarguntla / Shahabad / Talikot / PCC / Other types
of slab lining set in CM 1 : 3 including flush cement mortar pointing in CM 1 : 3 with
lead upto 50 m and all lifts.
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
particulars
Cement 43 Gr
Sand (Screened )
B. MACHINERY:
Sl No
Description
UNIT :
Unit
kg
cum
Total cost of Materials
Unit
Quantity
101.00
0.21
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
work inspector
Mason Class I
mazdoor
Unit
Day
Day
Day
Quantity
1.00
4.00
6.00
100 sqm
Rate
in Rs.
6.30
760.00
Rs:
Rate
in Rs.
Amount
in Rs.
636.30
159.60
795.90
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
415.00
310.00
Amount
in Rs.
400.00
1660.00
1860.00
339
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
100.00 sqm
Rs:
Rate per sqm
(A+B+C+D)/100.0
Rs.
IRR-PMW-3-5
1.00
425.00
Rs:
Rs:
Rs:
Rs:
Rs:
795.90
0.00
4345.00
5140.90
699.93
5840.83
58.40
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
100 sqm
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
370.00
310.00
Rs:
Amount
in Rs.
400.00
2220.00
1860.00
4480.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
3
Description
Unit
Quantity
Day
Day
Day
Total cost of Labour
labour component/unit qty
44.80
Add contractor's profit and overhead charges
13.615% 6.10
labour component/unit qty (including contractor's profit)
50.90
work inspector
Mason Class II
mazdoor
1.00
6.00
6.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
100.00 sqm
Rs:
Rate per sqm
(A+B+C+D)/100.0
Rs.
IRR-PMW-3-6
425.00
4345.00
Rs:
Rs:
Rs:
Rs:
0.00
0.00
4480.00
4480.00
609.95
5089.95
50.90
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
NIL
Quantity
0.00
0.00
18 Nos.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
340
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
620.00
1020.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
56.67
Add contractor's profit and overhead charges
13.615% 7.72
labour component/unit qty (including contractor's profit)
64.40
1.00
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
18.00 Nos.
Rs:
Rate per each
(A+B+C+D)/18.0
Rs.
IRR-PMW-3-7
0.00
0.00
1020.00
1020.00
138.87
1158.87
64.40
Removing and refixing disturbed km stone / sign board / hecto-metre stone etc., including
excavation, back filling with available stuff after refixing, forming base platform of size 90 x 90 x
7.5 cm including watering, ramming etc complete with all leads and lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
8 Nos.
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
620.00
1020.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
127.50
Add contractor's profit and overhead charges
13.615% 17.36
labour component/unit qty (including contractor's profit)
144.90
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
8.00 Nos.
Rs:
Rate per each
(A+B+C+D)/18.0
Rs.
IRR-PMW-3-8
1.00
2.00
Rs:
Rs:
Rs:
Rs:
0.00
0.00
1020.00
1020.00
138.87
1158.87
144.90
341
cost of all materials, machinery, labour, all operations such as collection of soil, sorting out,
spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each
layer to density control of not less than 98 percent or as stipulated by rolling or
by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Quantity
NIL
480 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
8577.50
3126.50
8024.80
3900.80
14294.40
9830.40
20.40
162.60
1610.00
1228.80
8053.20
6338.40
40.00
65207.80
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
884.00
1768.00
5305.60
310.80
829.00
1469.40
800.00
1240.00
12606.80
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
1
2
3
4
5
6
7
Angle dozer
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 4 Nos.
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory pad foot roller 8 tonne
Fuel / Energy charges
Sundries
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Description
Unit
Quantity
Hour
5.00
Hour
5.00
Hour
8.00
Hour
8.00
Hour
32.00
Hour
32.00
Hour
2.00
Hour
2.00
Hour
4.00
Hour
4.00
Hour
6.00
Hour
6.00
LS
2.00
Total hire charges of Machinery
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Total cost of Labour
labour component/unit qty
26.30
Add contractor's profit and overhead charges
13.615% 3.60
labour component/unit qty (including contractor's profit)
29.90
4.00
8.00
32.00
3.00
5.00
6.00
2.00
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
480.00 cum
Rs:
Rate per cum
(A+B+C+D)/480.0
Rs.
IRR-PMW-3-9
Rs:
Rs:
Rs:
Rs:
0.00
65207.80
12606.80
77814.60
10594.46
88409.06
184.20
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
325 cum
Rate
in Rs.
Amount
in Rs.
342
NIL
0.00
0.00
0.00
0.00
Rs:
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs.
6004.25
2188.55
8024.80
3900.80
10720.80
7372.80
15.30
121.95
1207.50
921.60
5368.80
4225.60
40.00
50112.75
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
773.50
1768.00
3979.20
155.40
497.40
979.60
800.00
1240.00
10193.10
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 3 Nos.
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory pad foot roller 8 tonne
Fuel / Energy charges
Sundries
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Description
Unit
Quantity
Hour
3.50
Hour
3.50
Hour
8.00
Hour
8.00
Hour
24.00
Hour
24.00
Hour
1.50
Hour
1.50
Hour
3.00
Hour
3.00
Hour
4.00
Hour
4.00
LS
2.00
Total hire charges of Machinery
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Total cost of Labour
labour component/unit qty
31.40
Add contractor's profit and overhead charges
13.615% 4.30
labour component/unit qty (including contractor's profit)
35.70
3.50
8.00
24.00
1.50
3.00
4.00
2.00
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
325.00 cum
Rs:
Rate per cum
(A+B+C+D)/325.0
Rs.
IRR-PMW-3-10
0.00
50112.75
10193.10
60305.85
8210.64
68516.49
210.80
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
NIL
Quantity
0.00
0.00
Description
Angle dozer
Fuel / Energy charges
Unit
Hour
Hour
Quantity
4.00
4.00
612 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
Amount
in Rs.
6862.00
2501.20
343
2
3
4
5
6
7
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Hour
8.00
Hour
8.00
Hour
40.00
Hour
40.00
Hour
4.00
Hour
4.00
Hour
7.00
Hour
7.00
Hour
7.50
Hour
7.50
LS
2.00
Total hire charges of Machinery
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Total cost of Labour
labour component/unit qty
25.10
Add contractor's profit and overhead charges
13.615% 3.40
labour component/unit qty (including contractor's profit)
28.50
4.00
8.00
40.00
4.00
7.00
7.50
2.00
6.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
612.00 cum
Rs:
Rate per cum
(A+B+C+D)/612.0
Rs.
IRR-PMW-3-11
Rs:
Rs:
Rs:
Rs:
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
1056.40
20.00
Rs:
8024.80
3900.80
17868.00
12288.00
40.80
325.20
2817.50
2150.40
10066.50
7923.00
40.00
74808.20
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
884.00
1768.00
6632.00
414.40
1160.60
1836.75
800.00
1860.00
15355.75
0.00
74808.20
15355.75
90163.95
12275.82
102439.77
167.40
Data:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
NIL
Quantity
0.00
0.00
Description
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.50 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 4 Nos.
Fuel / Energy charges
Pump 5 hp ( diesel )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory pad foot roller 8 tonne
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Quantity
3.00
3.00
8.00
8.00
32.00
32.00
3.00
3.00
6.00
6.00
5.50
440 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1003.10
487.60
446.70
307.20
10.20
81.30
402.50
307.20
1342.20
Amount
in Rs.
5146.50
1875.90
8024.80
3900.80
14294.40
9830.40
30.60
243.90
2415.00
1843.20
7382.10
344
C. LABOUR:
Sl No
1
2
3
4
5
6
7
8
Description
Hour
5.50
LS
2.00
Total hire charges of Machinery
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Day
Day
Total cost of Labour
labour component/unit qty
29.70
Add contractor's profit and overhead charges
13.615% 4.00
labour component/unit qty (including contractor's profit)
33.70
3.00
8.00
32.00
3.00
6.00
5.50
2.00
6.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
440.00 cum
Rs:
Rate per cum
(A+B+C+D)/440.0
Rs.
IRR-PMW-3-12
1056.40
20.00
Rs:
5810.20
40.00
60837.80
Rate
in Rs.
221.00
221.00
165.80
103.60
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs.
663.00
1768.00
5305.60
310.80
994.80
1346.95
800.00
1860.00
13049.15
0.00
60837.80
13049.15
73886.95
10059.71
83946.66
190.80
Repairing rain cuts / resectioning canal slopes to required lines and grades as directed
using available soil including dressing, clod breaking, packing, tamping etc., complete with
all leads and lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
particulars
UNIT :
Unit
Quantity
NIL
1000 sqm
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
400.00
310.00
Rs:
Amount
in Rs.
400.00
2480.00
2880.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
Description
Unit
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
work inspector
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
2.88
Add contractor's profit and overhead charges
13.615% 0.39
labour component/unit qty (including contractor's profit)
3.30
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
1000.00 sqm
Rs:
Rate per sqm
(A+B+C+D)/1000.0
Rs.
1.00
8.00
Rs:
Rs:
Rs:
Rs:
Rate
in Rs.
0.00
0.00
2880.00
2880.00
392.11
3272.11
3.30
345
IRR-PMW-3-13
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
particulars
Wire brush
Coir brush
Sundries ( brooms, gloves etc )
B. MACHINERY:
Sl No
Description
UNIT :
Unit
Quantity
Each
Each
LS
Total cost of Materials
Unit
5.00
10.00
2.00
Quantity
NIL
100 Rm
Rate
in Rs.
41.00
40.00
20.00
Rs:
Amount
in Rs.
205.00
400.00
40.00
645.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
370.00
310.00
Rs:
Amount
in Rs.
740.00
1860.00
2600.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
2
Description
Unit
Quantity
Chiseller Cl II
mazdoor
Day
Day
Total cost of Labour
labour component/unit qty
26.00
Add contractor's profit and overhead charges
13.615% 3.50
labour component/unit qty (including contractor's profit)
29.50
2.00
6.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
100.00 Rm
Rs:
Rate per Rm
(A+B+C+D)/100.0
Rs.
IRR-PMW-3-14
645.00
0.00
2600.00
3245.00
441.81
3686.81
36.90
Cleaning dam parapet inner face and top using oxalic acid and water by scrubbing /
brushing and washing to remove all surface coatings etc., complete .
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
2
3
4
particulars
Oxalic acid
Wire brush
Coir brush
Sundries ( brooms, gloves etc )
B. MACHINERY:
Sl No
1
Description
UNIT :
Unit
ltr
Each
Each
LS
Total cost of Materials
Unit
Quantity
5.00
5.00
10.00
2.00
Quantity
NIL
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
mazdoor
Description
Unit
Day
Total cost of Labour
Quantity
6.00
100 Rm
Rate
in Rs.
80.00
41.00
40.00
20.00
Rs:
Amount
in Rs.
400.00
205.00
400.00
40.00
1045.00
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1860.00
1860.00
346
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Rs:
Rs:
Rs:
Rs:
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
100.00 Rm
Rs:
Rate per Rm
(A+B+C+D)/100.0
Rs.
IRR-PMW-3-20
1045.00
0.00
1860.00
2905.00
395.52
3300.52
33.00
Excavation and removal of silt and silt mixed with sand from canal bed in dry condition
including disposing off the same in spoil bank or on the canal embankment in layers as
directed etc., complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
Quantity
NIL
10 cum
Rate
in Rs.
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
0.00
0.00
Rs:
Amount
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1240.00
1240.00
0.00
0.00
Total cost of Materials
B. MACHINERY:
Sl No
1
Description
Unit
Quantity
NIL
Rate
in Rs.
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
Description
Unit
Quantity
mazdoor
Day
Total cost of Labour
labour component/unit qty
124.00
Add contractor's profit and overhead charges
13.615% 16.90
labour component/unit qty (including contractor's profit)
140.90
4.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
10.00 cum
Rs:
Rate per cum
(A+B+C+D)/10.0
Rs.
IRR-PMW-3-21
Rs:
Rs:
Rs:
Rs:
0.00
0.00
1240.00
1240.00
168.83
1408.83
140.90
Excavation and removal of silt or silt mixed with sand in slussy condition from canal bed
including disposing off the same in spoil bank or on the canal embankment in layers as
directed etc., complete with initial lead upto 50 m and all lifts.
DATA:
RATE ANALYSIS
A. MATERIALS:
Sl No
1
particulars
UNIT :
Unit
NIL
Quantity
12 cum
Rate
in Rs.
0.00
0.00
0.00
0.00
Rs:
Description
Unit
Quantity
Rate
Amount
in Rs.
0.00
0.00
0.00
Amount
347
in Rs.
NIL
0.00
0.00
Rs:
in Rs.
0.00
0.00
0.00
Rate
in Rs.
310.00
Rs:
Amount
in Rs.
1860.00
1860.00
0.00
0.00
Total hire charges of Machinery
C. LABOUR:
Sl No
1
Description
Unit
Quantity
mazdoor
Day
Total cost of Labour
labour component/unit qty
155.00
Add contractor's profit and overhead charges
13.615% 21.10
labour component/unit qty (including contractor's profit)
176.10
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D. Add for contractor's profit and overheads on
(A+B+C)
13.615% Rs:
Total cost for
12.00 cum
Rs:
Rate per cum
(A+B+C+D)/12.0
Rs.
6.00
Rs:
Rs:
Rs:
Rs:
0.00
0.00
1860.00
1860.00
253.24
2113.24
176.10
A. MATERIALS:
Sl No
Particulars
1
NIL
RATE ANALYSIS
Unit:
Unit
Quantity
Angle dozer 90 hp
Fuel / Energy charges
Shovel 0.85 cum capacity
Fuel / Energy charges
Tippers 5.00 cum capacity 5 Nos.
Fuel / Energy charges
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
0.00
0.00
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Unit
Quantity
2.70
2.70
8.00
8.00
40.00
40.00
Quantity
1
2
3
4
5
807.00
Rate
in Rs.
0.00
0.00
Rs:
cum
Amount
in Rs
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
1706.60
893.90
446.70
307.20
Rs:
Amount
in Rs
4631.85
1688.31
13652.80
7151.20
17868.00
12288.00
57280.16
Rate
in Rs.
221.00
221.00
165.80
400.00
310.00
Rs:
Amount
in Rs
596.70
1768.00
6632.00
400.00
620.00
10016.70
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
0.00
57280.16
10016.70
67296.86
9162.47
76459.33
94.70
348
A. MATERIALS:
Sl No
Particulars
1
NIL
RATE ANALYSIS
UNIT :
Unit
Quantity
Angle dozer 90 hp
Fuel / Energy charges
Pump 5 hp ( ele )
Fuel / Energy charges
Water tanker 8000 ltr
Fuel / Energy charges
Vibratory pad foot roller 8 tonne
Fuel / Energy charges
Sundries
Total hire charges of Machinery
C. LABOUR:
Sl No
Description
0.00
0.00
Unit
Quantity
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
LS
Unit
1
4
5
6
7
8
2.70
2.70
4.00
4.00
8.00
8.00
6.40
6.40
2.00
Quantity
2.70
4.00
8.00
6.40
1.00
2.00
ABSTRACT:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on (A+B+C)
13.615%
Total cost
for
807.00 cum
Rate per cum
(A+B+C+D)/807
IRR-PMW-3-24
807.00
Rate
in Rs.
0.00
0.00
Rs:
cum
Amount
in Rs
0.00
0.00
0.00
Rate
in Rs.
1715.50
625.30
3.00
38.50
402.50
307.20
1342.20
1056.40
20.00
Rs:
Amount
in Rs
4631.85
1688.31
12.00
154.00
3220.00
2457.60
8590.08
6760.96
40.00
27554.80
Rate
in Rs.
221.00
77.70
165.80
244.90
400.00
310.00
Rs:
Amount
in Rs
596.70
310.80
1326.40
1567.36
400.00
620.00
4821.26
Rs:
Rs:
Rs:
Rs:
Rs.
0.00
27554.80
4821.26
32376.06
4408
Rs: 36784.06
Rs: 45.60
New Item 7 - 2010-11 area in layers of 25 to 30 cm before compaction including cost of all
A. MATERIALS:
Sl No
Particulars
1
NIL
RATE ANALYSIS
UNIT :
807.00 cum
Unit
Quantity
Rate
Amount
in Rs.
in Rs
0.00
0.00 0.00
0.00
0.00 0.00
Rs: 0.00
Unit
Hour
LS
Quantity
10.00
2.00
Rate
Amount
in Rs.
in Rs
345.00 3450.00
20.00 40.00
Rs: 3490.00
349
C. LABOUR:
Sl No
Description
Unit
Quantity
Rate
Amount
in Rs.
in Rs
400.00 200.00
310.00 620.00
Rs: 820.00
1
2
work inspector
Day
0.50
mazdoor
Day
2.00
Total cost of Labour
labour component/unit qty
1.00
Add contractor's profit and overhead charges
13.615% 0.10
labour component/unit qty (including contractor's profit)
1.10
ABSTRAC
T:
A. Cost of Materials
B. Hire charges of Machinery
C. Cost of Labour
Total
D.Add for contractor's profit and overheads on
13.615%
Total cost for
807.00 cum
Rate per cum
(A+B+C+D)/807
IRR-PMW-3-25
Rs:
Rs:
Rs:
Rs:
Rs.
Rs:
Rs:
0.00
3490.00
820.00
4310.00
586.8065
4896.81
6.10
2000 Sqm
A. MATERIALS
Sl. No.
1
Particulars
NIL
Unit
Quantity
0
Description
Unit
NIL
Total hire charges of Machinery
Quantity
Description
Unit
Work Inspector
Day
Mazdoor
Day
Total Cost of Labour
C. LABOUR
Sl. No.
1
2
ABSTRACT:
A.COST OF MATERIALS
B.COST OF MACHINERY
C.COST OF LABOUR
Rs.
Rs.
Rs.
0.00
0.00
10080.00
10080.00
1372.39
11452.39
5.7
Total
D. Add for Contractor's Profit and overheads
Total Cost for removal weed in the extent of
Rate per Sqm
13.615%
2000 Sqm
(A+B+C+D)/2000
2000 Sqm
A. MATERIALS
Sl. No.
1
Particulars
NIL
Unit
Quantity
0
B. MACHINERY
Sl. No.
1
Description
NIL
Unit
Quantity
0
350
Rs.
0.00
C. LABOUR
Sl. No.
1
2
Description
Unit
Work Inspector
Day
Mazdoor
Day
Total Cost of Labour
Quantity
5
38
ABSTRACT:
A.COST OF MATERIALS
B.COST OF MACHINERY
C.COST OF LABOUR
Rs.
Rs.
Rs.
0.00
0.00
13780.00
13780.00
1876.15
15656.15
7.8
Total
D. Add for Contractor's Profit and overheads
Total Cost for removal weed in the extent of
Rate per Sqm
IRR-PMW-3-25(c)
13.615%
2000 Sqm
(A+B+C+D)/2000
2000 Sqm
A. MATERIALS
Sl. No.
1
Particulars
NIL
Unit
Quantity
0
3
26
Description
Unit
NIL
Total hire charges of Machinery
Quantity
Description
Unit
Work Inspector
Day
Mazdoor
Day
Total Cost of Labour
Quantity
C. LABOUR
Sl. No.
1
2
ABSTRACT:
A.COST OF MATERIALS
B.COST OF MACHINERY
C.COST OF LABOUR
Rs.
Rs.
Rs.
0.00
0.00
9260.00
9260.00
1260.75
10520.75
5.3
Total
D. Add for Contractor's Profit and overheads
Total Cost for removal weed in the extent of
Rate per Sqm
13.615%
2000 Sqm
(A+B+C+D)/2000
2000 Sqm
A. MATERIALS
Sl. No.
1
Particulars
NIL
Unit
Quantity
0
Description
Unit
NIL
Total hire charges of Machinery
Quantity
Description
Work Inspector
C. LABOUR
Sl. No.
1
Unit
Day
351
Mazdoor
Day
22
310.00
Rs.
ABSTRACT:
A.COST OF MATERIALS
B.COST OF MACHINERY
C.COST OF LABOUR
Rs.
Rs.
Rs.
0.00
0.00
7820.00
7820.00
1064.69
8884.69
4.4
Total
D. Add for Contractor's Profit and overheads
Total Cost for removal weed in the extent of
Rate per Sqm
6820
7820.00
13.615%
2000 Sqm
(A+B+C+D)/2000
2000 Sqm
A. MATERIALS
Sl. No.
1
Particulars
NIL
Unit
Quantity
0
3
26
Description
Unit
NIL
Total hire charges of Machinery
Quantity
Description
Unit
Work Inspector
Day
Mazdoor
Day
Total Cost of Labour
Quantity
C. LABOUR
Sl. No.
1
2
ABSTRACT:
A.COST OF MATERIALS
B.COST OF MACHINERY
C.COST OF LABOUR
Rs.
Rs.
Rs.
0.00
0.00
9260.00
9260.00
1260.75
10520.75
5.3
Total
D. Add for Contractor's Profit and overheads
Total Cost for removal weed in the extent of
Rate per Sqm
IRR-PMW-3-25(f)
13.615%
2000 Sqm
(A+B+C+D)/2000
2000 Sqm
A. MATERIALS
Sl. No.
1
Particulars
NIL
Unit
Quantity
0
Description
Unit
NIL
Total hire charges of Machinery
Quantity
Description
Unit
Work Inspector
Day
Mazdoor
Day
Total Cost of Labour
C. LABOUR
Sl. No.
1
2
ABSTRACT:
A.COST OF MATERIALS
B.COST OF MACHINERY
Rs.
Rs.
0.00
0.00
352
C.COST OF LABOUR
Rs.
2960.00
2960.00
403.00
3363.00
1.7
Total
D. Add for Contractor's Profit and overheads
Total Cost for removal weed in the extent of
Rate per Sqm
13.615%
2000 Sqm
(A+B+C+D)/2000
IRR-PMW-3-26
New Item 2014-158
PAINTING OF SLUICES FOR MAINTENANCE WORKS
Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners
and removing dust. After cleaniong, applying primary coat with one coat of Zinc rich
epoxy primer to a thickness of 100 microns, followed by finishing coats 2 coats with
Coal tar epoxy with material, labour, and all accessories with all leads and lifts.
Data:
A. Materials
Rate Analysis
Sl. No.
1
2
3
4
5
6
7
Particulars
Rust Cleaner/ Inhibitor
Zinc rich epoxy primer
Thinner@10%
Coal Tar epoxy paint
Thinner@10%
Wire Brush
Sundries (brushes, Ladders,
platforms)
Unit:
Unit
ltr
ltr
ltr
ltr
ltr
ltr
Quantity
13
14
1.4
40
4
2
LS
3
Total Cost of Materials
100 Sqm
Rate in Rs. Amount in Rs.
140.00
1820
700.00
9800
140.00
196
220
8800
140.00
560
41
82
20
60
21318
B. Machinery
Sl. No.
Particulars
Unit
Quantity
NIL
Total Cost of Machinery
C. Labour
Sl. No.
1
2
Particulars
Painter Class-II
Helper
Unit
Quantity Rate in Rs. Amount in Rs.
Day
20
370.00
7400
Day
20
310.00
6200
Total Cost of Machinery
13600
Labour Component/ Unit Qty.
136
Add Contractor's Profit and and Overhead Charges @
13.615%
18.52
Labour Component/ Unit Qty (including contractor' profit)
154.52
ABSTRACT:
A. Cost of Materials:
B. Hire Charges of Machinery
C. Cost of Labour
Total
D. Add for Excise Duty on 75% cost excluding cost of materials)
0%
Total
E. Add for transportation Charges upto worksite @
3%
Total
F. Add for Contractor's Profit and Overhead Charges @ 14% 13.615%
Total Cost per
100 Sqm
Rate per
Sqm
21318
0
13600
34918
0
34918
1047.54
35965.54
4896.71
40862.248
408.6
353
COM_MWRK-1
COM_MWRK-2
A. Manual Works
New extra items-- common item for all earth works using only manual labour
for all other works without involving contractors
(Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for
foundations of canal cross drainage and other appurtenant structures
and placing excavated stuff neatly in specified dump area or disposing
off the same as directed etc., complete with initial lead upto 10 m and per cum
initial lift upto 1.5 m. (WIthout involving the contractors for specified works )
With 3 Cum per day output
(Manual)Excavation in all kinds of soil/ HDR including boulders upto 0.30 m dia. for
foundations of canal cross drainage and other appurtenant structures
and placing excavated stuff neatly in specified dump area or disposing
off the same as directed etc., complete with initial lead upto 10 m and
per cum
initial lift upto 1.5 m. (WIthout involving the contractors for specified works )
With 2.5 Cum per day output
103.30
124.00
COM_MWRK-3
(Manual)Excavation in soft rock (including F&F) without blasting, including boulders upto 0.30 m dia.
for foundations of canal cross drainage and other appurtenant structures
and placing excavated stuff neatly in specified dump area or disposing
off the same as directed etc., complete with initial lead upto 10 m and
per cum
233.10
initial lift upto 1.5 m. (WIthout involving the contractors for specified works )
Soft rock 1.33 Cum/Day
COM_MWRK-4
462.70
355
COM-LDLFT-2015-16
COM-LDLFT
Chapter VII
LEAD/LIFT/LOADING & UNLOADING CHARGES
(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)
FOR THE YEAR : 2015-16
COM-LDLFT
COM-LDLFT-1
1. For total lead upto 150 m ( including initial lead ) lead charges by head load only shall be
adopted irrespective of mode of conveyance.
2. For total lead exceeding 150 m conveyance by mechanical means only shall be adopted
irrespective of mode of conveyance.
3. The rates for loading at quarry including idle hire charges of trucks and hire charges per for
each kilometer and upto 5 km are cumulative and inclusive of total charges for preceding lead.
4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones
are for loose volume and not for compacted or in-situ volume.
5. The rates for lift charges,lead charges, hire charges are cumulative and inclusive of
rates for preceding lift,lead and hire charges
6. Lift charges are not payable where conveyance of materials is by mechanical means to
final placing point.
7. Loading and unloading charges are not payable for conveyance by head load.
8. Loading charges are not payable for conveyance by mechanical means for disposal of
excavated materials beyond initial lead of 50 m wherever specified.
9. Loading and unloading charges are not payable for conveyance by mechanical means for
disposal of excavated materials beyond initial lead of 1 km wherever specified.
10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble,
size stone and cut stone are inclusive of stacking.
11. Hire charges are per 1KM for tippers and trucks for tranport of materials from work site to dump
yard and other places are cumulative& includes previous km upto 5 kms
12. The lead & lift charges are inclusive of contractor's profit and overhead charges of
14%
FOR THE YEAR: 2015-16
A. (Lead) Conveyance Charges for materials by head load
Earth / Sand
/Gravel / Murrum/ Cement /
Total distance
Lime/ Surki/ Size ReinforceSl No. ( Total lead includes initial stone / Cut stone ment steel
lead )
Rubble / Coarse Str steel
aggregate Rs/ Rs / tonne
Cum
1
2
3
4
Total lead upto 50 m
1
(covered by item rate)
initial lead
initial lead
2
Total lead upto 100 m
50.30
29.40
3
Total lead upto 150 m
100.60
58.70
Notes: 1. No loading or unloading charges are admissible for conveyance by head load.
2. For total lead exceeding 150 m conveyance charges by mechanical means only shall
be adopted irrespective of mode of conveyance.
3. The Lead Charges are inclusive of 13.615% Contractor Profit and Overhead charges
COM-LDLFT-2
B.( Lead) Conveyance charges for machinery per kilometer for transporting materials
by tippers and trucks excluding loading, unloading and idle hire charges of machinery.
FOR THE YEAR: 2015-16
( No loading and unloading charges allowed for machinery loading and unloading )
Sl No.
Distance
1
1
2
3
4
5
2
Lead upto 1 km
Lead upto 2 km
Lead upto 3 km
Lead upto 4 km
Lead upto 5 km
for Every km beyond 5 km
upto 30 km
(Lead)
charges for
(Lead) charges
(Lead) charges trucks and
for trucks and
(Lead) charges for
(Lead)
(Lead)
for trucks and
tippers for
tippers per
trucks and tippers for
charges charges
tippers for Earth Rubble/Size
cu.meter for
Cement/ Steel/ RCC
for per
for trucks
/ Sand /Gravel / stones/ Cut
PCC slabs/
poles/ AC & GI sheets/
cu.meter per 1000
Murrum/ Lime/
Stones/
Shahabad
Packed
for water/ Nos. of
Surki/ per
Coarse
slabs/ CC &
materials/tonne
1000 litres Bricks
cu.meter
aggregate
Laterite blocks/
per
Wood/ cum
cu.meter
3
31.30
43.90
58.50
71.10
83.60
4
30.20
42.30
58.50
71.10
83.60
5
18.90
26.50
36.60
44.40
52.20
6
44.50
62.30
86.10
104.50
122.90
7
18.70
26.10
34.80
42.30
49.70
8
50.40
70.60
94.10
114.20
134.40
12.50
12.50
7.80
18.40
7.50
20.20
15.40
6.20
16.80
7
for Every km beyond 30 km
10.50
10.50
6.50
Note: The Lead Charges are inclusive of 13.615% Contractor Profit and Overhead charges
356
COM-LDLFT-2015-16
COM-LDLFT-3
C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)
Rubble/ size
Earth / Sand
stone/ cut
/Gravel
stone/
brick work
steel in
Sl No.
Description of item
Murrum/ / Surki/
Coarse
cement in Rs/tonne
Rs/1000
Rs./tonne
aggregate,Li
No
Rs / cum
me in
Rs/cum
1
2
3
4
5
6
7
1
Loading
16.80
33.50
55.40
66.30
46.10
2
Unloading
8.40
16.75
55.40
66.30
46.10
Note: The Lead Charges are inclusive of 13.615% Contractor Profit and Overhead charges
COM-LDLFT-4
D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )
Rubble/ size
Earth / Sand
stone/ cut
/Gravel
stone/
steel in
Sl No.
Description of item
Murrum/ / Surki/
Coarse
cement in Rs/tonne
Rs./tonne
aggregate,Li
Rs / cum
me in
Rs/cum
1
2
3
4
5
6
1
Loading
108.40
125.20
156.10
167.10
2
Unloading
38.80
62.60
156.10
167.10
Note: The Lead Charges are inclusive of 13.615% Contractor Profit and Overhead charges
COM-LDLFT-5
brick work
Rs/1000
No
7
212.40
212.40
E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)
Rubble/ size
Earth / Sand
stone/ cut
/Gravel
stone/
Sl No.
Description of item
Murrum/ / Surki/
Coarse
aggregate,Li
Rs / cum
me in
Rs/cum
1
2
3
4
1
Loading
52.00
103.90
2
Unloading
15.80
15.80
Note: The Lead Charges are inclusive of 13.615% Contractor Profit and Overhead charges
F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD
COM-LDLFT-6
Sl No.
1
1
2
Earth / Sand
/Gravel
Murrum/ Lime/
Total lift
Surki/
( Total lift includes initial lift Size stone / Cut
)
stone
Rubble / Coarse
aggregate
Rs / cum
2
Total lift upto 3 m (covered
by item rate)
For Every 1.00 Lift beyond
initial lift of 3 meters
Cement /
Reinforcement steel
Str steel
Rs / tonne
PCC slab/
Shahbad
slab / CC
block/ BS
slab / Laterite
/ Wood
Rs / cum
Initial lift
5.90
Initial lift
4.20
Initial lift
7.80
DETAILED DATA
LEAD / LIFT / LOADING & UNLOADING CHARGES - DATA RATES
Note: The Lead Charges are inclusive of 13.615% Contractor Profit and Overhead charges
357
COM-LDLFT-2015-16
COM-DTL-LDLFT-1
Description
Mazdoor
Unit
Day
13.615%
7
Rate per
Sl No.
1
Description
Mazdoor
Unit
Day
13.615%
7
Rate per
Quantity
1
Total Rs:
25
60
m
m / minute
1
480
0.015
7
min
7
Rate
in Rs.
310
cum
cum
cum
Rs:
Rs:
50
Unit:
7
Rate
in Rs.
310
Quantity
2
Total Rs:
cum
cum
cum
cum
Amount in Rs.
310
310
42.21
352.21
50.30
cum
Amount in Rs.
620
620
84.41
704.41
100.60
Rs:
Rs:
Description
Cement /steel handling
Mazdoor
Unit
Day
25
30
m
m / minute
2
240
50
12
min
kg
tonne
12
Rate in Rs.
tonne
Amount in Rs.
310
310
310
42.21
352.21
29.40
Rs:
Rs:
50
Unit:
Quantity
12
Rate in Rs.
tonne
Amount in Rs.
2
Total Rs:
310
620
620
tonne
Rs:
Rs:
84.41
704.41
58.70
CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood
Lead: Upto 50 m :
This is initial lead and cost is covered under item basic rate.
Lead: Upto 100 m :
Average distance to be covered beyond initial lead of 50 m
Average speed of conveyance by head load
Round trip cycle time for 25 m considering 50 min/ hr working
( 2 x 25 x 60 / 50 / 40 )
25
40
m
m / minute
1.5
min
358
COM-LDLFT-2015-16
No. of trips per day for lead upto 100 m ( 8 x 60 / 1.5 )
Quantity of material by head load per load
Quantity of material by head load per day ( 320 x 0.017 ) say
Deploy one mazdoor for every 50 m additional lead beyond initial lead.
Unit:
Sl No.
Description
Unit
Quantity
1
Mazdoor
Day
1
Total Rs:
Contractor's profit and
overhead charges
13.615%
Total for materials under this Category 5.5
cum
Rate per
cum
Description
Mazdoor
Unit
Day
COM-DTL-LDLFT-2
5.5
Rate in Rs.
310
cum
cum
cum
Amount in Rs.
310
310
Rs:
Rs:
42.21
352.21
64.00
50
Unit:
Quantity
2
Total Rs:
5.5
Rate in Rs.
310
cum
Amount in Rs.
620
620
cum
cum
Rs:
Rs:
320
0.017
5.5
84.41
704.41
128.10
B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks
excluding loading, unloading and idle hire charges of machinery.
CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki /
For total lead upto 1 km
Sl No.
Description
1
Tipper hire charges
Fuel charges
2
Crew charges
Contractor's profit and
overhead charges
Total for
Rate per cum
For total lead more than 1 km upto 2 km
Sl No.
Description
1
Tipper hire charges
Fuel charges
2
Crew charges
Contractor's profit and
overhead charges
Total for
Rate per cum
Unit
Hour
Hour
Hour
13.615%
5
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
Unit:
Quantity
0.15
0.15
0.15
Total Rs:
5
Rate in Rs.
446.70
307.20
165.80
cum
Rs:
Unit:
Quantity
0.21
0.21
0.21
Total Rs:
5
Rate in Rs.
446.70
307.20
165.80
cum
Rs:
Unit:
Quantity
0.28
0.28
0.28
Total Rs:
Rate in Rs.
446.70
307.20
165.80
cum
Rs:
Unit:
5
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.34
0.34
0.34
Total Rs:
cum
Rs:
Unit:
5
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.4
0.4
0.4
Total Rs:
cum
Amount in Rs.
67.01
46.08
24.87
137.96
18.78
156.74
31.30
cum
Amount in Rs.
93.81
64.51
34.82
193.14
26.30
219.44
43.90
cum
Amount
in Rs.
125.08
86.02
46.42
257.52
35.06
292.58
58.50
cum
Amount
in Rs.
151.88
104.45
56.37
312.70
42.57
355.27
71.10
cum
Amount
in Rs.
178.68
122.88
66.32
367.88
359
COM-LDLFT-2015-16
Contractor's profit and
overhead charges
Total for
Rate per cum
13.615%
5
cum
Rs:
Unit:
Sl No.
1
Quantity
0.06
0.06
0.06
Total Rs:
5
Rate
in Rs.
446.70
307.20
165.80
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
cum
Rs:
Unit:
5
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.05
0.05
0.05
Total Rs:
cum
Rs:
50.09
417.97
83.60
cum
Amount
in Rs.
26.80
18.43
9.95
55.18
7.51
62.69
12.50
cum
Amount
in Rs.
22.34
15.36
8.29
45.99
6.26
52.25
10.50
Unit:
Description
Truck hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Truck hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
Quantity
0.15
0.15
0.15
Total Rs:
5
Rate
in Rs.
414.10
307.20
165.80
cum
Rs:
Unit:
5
Rate
in Rs.
414.10
307.20
165.80
Quantity
0.21
0.21
0.21
Total Rs:
cum
Rs:
Unit:
5
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.28
0.28
0.28
Total Rs:
cum
Rs:
Unit:
5
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.34
0.34
0.34
Total Rs:
cum
Amount
in Rs.
62.12
46.08
24.87
133.07
18.12
151.19
30.20
cum
Amount
in Rs.
86.96
64.51
34.82
186.29
25.36
211.65
42.30
cum
Amount
in Rs.
125.08
86.02
46.42
257.52
35.06
292.58
58.50
cum
Amount
in Rs.
151.88
104.45
56.37
312.70
cum
Rs:
42.57
355.27
71.10
Unit:
5
Rate
in Rs.
446.70
307.20
165.80
cum
Amount
in Rs.
178.68
122.88
66.32
Quantity
0.4
0.4
0.4
360
COM-LDLFT-2015-16
Total Rs:
0.00
367.88
cum
Rs:
50.09
417.97
83.60
Unit:
Sl No.
1
Quantity
0.06
0.06
0.06
Total Rs:
5
Rate
in Rs.
446.70
307.20
165.80
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
5
cum
Rs:
Unit:
5
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.05
0.05
0.05
Total Rs:
cum
Rs:
cum
Amount
in Rs.
26.80
18.43
9.95
55.18
7.51
62.69
12.50
cum
Amount
in Rs.
22.34
15.36
8.29
45.99
6.26
52.25
10.50
CATEGORY : Cement/ Steel/ Pipes/ RCC poles/ AC & GI sheets/ Packed materials
For total lead upto 1 km
Sl No.
1
2
Unit:
Description
Truck hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8
Description
Truck hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8
Description
Tipper hire charges
Fuel charges
Unit
Hour
Hour
Quantity
0.15
0.15
0.15
Total Rs:
8
Rate
in Rs.
414.10
307.20
165.80
tonne
Rs:
Unit:
8
Rate
in Rs.
414.10
307.20
165.80
Quantity
0.21
0.21
0.21
Total Rs:
tonne
Rs:
Unit:
8
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.28
0.28
0.28
Total Rs:
tonne
Rs:
Unit:
8
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.34
0.34
0.34
Total Rs:
tonne
Amount
in Rs.
62.12
46.08
24.87
133.07
18.12
151.19
18.90
tonne
Amount
in Rs.
86.96
64.51
34.82
186.29
25.36
211.65
26.50
tonne
Amount
in Rs.
125.08
86.02
46.42
257.52
35.06
292.58
36.60
tonne
Amount
in Rs.
151.88
104.45
56.37
312.70
tonne
Rs:
42.57
355.27
44.40
Unit:
8
Rate
in Rs.
446.70
307.20
tonne
Amount
in Rs.
178.68
122.88
Quantity
0.4
0.4
361
COM-LDLFT-2015-16
2
0.4
Total Rs:
165.80
tonne
Rs:
Unit:
Sl No.
1
Quantity
0.06
0.06
0.06
Total Rs:
8
Rate
in Rs.
446.70
307.20
165.80
Crew charges
Hour
13.615%
8
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8
tonne
Rs:
Unit:
8
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.05
0.05
0.05
Total Rs:
tonne
Rs:
66.32
367.88
50.09
417.97
52.20
tonne
Amount
in Rs.
26.80
18.43
9.95
55.18
7.51
62.69
7.80
tonne
Amount
in Rs.
22.34
15.36
8.29
45.99
6.26
52.25
6.50
CATEGORY : PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood
For total lead upto 1 km
Sl No.
1
2
Unit:
Description
Truck hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3.4
Description
Truck hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3.4
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3.4
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3.4
Description
Tipper hire charges
Unit
Hour
Quantity
0.15
0.15
0.15
Total Rs:
3.4
Rate
in Rs.
414.10
307.20
165.80
cum
Rs:
Unit:
3.4
Rate
in Rs.
414.10
307.20
165.80
Quantity
0.21
0.21
0.21
Total Rs:
cum
Rs:
Unit:
3.4
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.28
0.28
0.28
Total Rs:
cum
Rs:
Unit:
3.4
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.34
0.34
0.34
Total Rs:
cum
Amount
in Rs.
62.12
46.08
24.87
133.07
18.12
151.19
44.50
cum
Amount
in Rs.
86.96
64.51
34.82
186.29
25.36
211.65
62.30
cum
Amount
in Rs.
125.08
86.02
46.42
257.52
35.06
292.58
86.10
cum
Amount
in Rs.
151.88
104.45
56.37
312.70
cum
Rs:
42.57
355.27
104.50
Unit:
3.4
Rate
in Rs.
446.70
cum
Amount
in Rs.
178.68
Quantity
0.4
362
COM-LDLFT-2015-16
0.4
0.4
Total Rs:
307.20
165.80
cum
Rs:
Unit:
Sl No.
1
Quantity
0.06
0.06
0.06
Total Rs:
3.4
Rate
in Rs.
446.70
307.20
165.80
Fuel charges
Crew charges
Hour
Hour
13.615%
3.4
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3.4
Description
Tipper hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3.4
cum
Rs:
Unit:
3.4
Rate
in Rs.
446.70
307.20
165.80
Quantity
0.05
0.05
0.05
Total Rs:
cum
Rs:
Unit:
8000
Rate
in Rs.
402.50
307.20
165.80
122.88
66.32
367.88
50.09
417.97
122.90
cum
Amount
in Rs.
26.80
18.43
9.95
55.18
7.51
62.69
18.40
cum
Amount
in Rs.
22.34
15.36
8.29
45.99
6.26
52.25
15.40
CATEGORY : water
For total lead upto 1 km
Sl No.
1
2
Description
Water tanker hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8000
Description
Water tanker hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8000
Description
Water tanker hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8000
Description
Water tanker hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8000
Description
Unit
Quantity
0.15
0.15
0.15
Total Rs:
litres
Rs:
Unit:
8000
Rate
in Rs.
402.50
307.20
165.80
Quantity
0.21
0.21
0.21
Total Rs:
litres
Rs:
Unit:
8000
Rate
in Rs.
402.50
307.20
165.80
Quantity
0.28
0.28
0.28
Total Rs:
litres
Rs:
Unit:
8000
Rate
in Rs.
402.50
307.20
165.80
Quantity
0.34
0.34
0.34
Total Rs:
litres
Amount
in Rs.
60.38
46.08
24.87
131.33
17.88
149.21
18.70
litres
Amount
in Rs.
84.53
64.51
34.82
183.86
25.03
208.89
26.10
litres
Amount
in Rs.
112.70
86.02
46.42
245.14
33.38
278.52
34.80
litres
Amount
in Rs.
136.85
104.45
56.37
297.67
litres
Rs:
40.53
338.20
42.30
Unit:
8000
Rate
in Rs.
litres
Amount
in Rs.
Quantity
363
COM-LDLFT-2015-16
1
0.4
0.4
0.4
Total Rs:
402.50
307.20
165.80
litres
Rs:
Unit:
Sl No.
1
Quantity
0.06
0.06
0.06
Total Rs:
8000
Rate
in Rs.
402.50
307.20
165.80
Hour
Hour
Hour
13.615%
8000
Description
Water tanker hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8000
Description
Water tanker hire charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
8000
litres
Rs:
Unit:
8000
Rate
in Rs.
402.50
307.20
165.80
Quantity
0.05
0.05
0.05
Total Rs:
litres
Rs:
Unit:
3000
Rate
in Rs.
414.10
307.20
165.80
161.00
122.88
66.32
350.20
47.68
397.88
49.70
litres
Amount
in Rs.
24.15
18.43
9.95
52.53
7.15
59.68
7.50
litres
Amount
in Rs.
20.13
15.36
8.29
43.78
5.96
49.74
6.20
Description
Truck 10 T charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3000
Description
Truck 10 T charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3000
Description
Truck 10 T charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3000
Description
Truck 10 T charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3000
Quantity
0.15
0.15
0.15
Total Rs:
bricks
Rs:
Unit:
3000
Rate
in Rs.
414.10
307.20
165.80
Quantity
0.21
0.21
0.21
Total Rs:
bricks
Rs:
Unit:
3000
Rate
in Rs.
414.10
307.20
165.80
Quantity
0.28
0.28
0.28
Total Rs:
bricks
Rs:
Unit:
3000
Rate
in Rs.
414.10
307.20
165.80
Quantity
0.34
0.34
0.34
Total Rs:
bricks
Amount
in Rs.
62.12
46.08
24.87
133.07
18.12
151.19
50.40
bricks
Amount
in Rs.
86.96
64.51
34.82
186.29
25.36
211.65
70.60
bricks
Amount
in Rs.
115.95
86.02
46.42
248.39
33.82
282.21
94.10
bricks
Amount
in Rs.
140.79
104.45
56.37
301.61
bricks
Rs:
41.06
342.67
114.20
Unit:
3000
bricks
364
COM-LDLFT-2015-16
Sl No.
1
2
Description
Truck 10 T charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3000
Rate
in Rs.
414.10
307.20
165.80
bricks
Rs:
Unit:
Sl No.
1
Quantity
0.06
0.06
0.06
Total Rs:
3000
Rate
in Rs.
414.10
307.20
165.80
Description
Truck 10 T charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3000
COM-DTL-LDLFT-3
Quantity
0.4
0.4
0.4
Total Rs:
Description
Truck 10 T charges
Fuel charges
Crew charges
Unit
Hour
Hour
Hour
13.615%
3000
bricks
Rs:
Unit:
3000
Rate
in Rs.
414.10
307.20
165.80
Quantity
0.05
0.05
0.05
Total Rs:
bricks
Amount
in Rs.
165.64
122.88
66.32
354.84
48.31
403.15
134.40
bricks
Amount
in Rs.
24.85
18.43
9.95
53.23
7.25
60.48
20.20
bricks
Amount
in Rs.
20.71
15.36
8.29
44.36
6.04
50.40
16.80
Rs:
C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)
MORD -data
1
Loading of Lime, Aggregate, Stone Boulder,
a) Loading Brick Aggregate, Kankar, Building Rubbish,
Unit
Quantity
Rate Rs.
Building Rubbish, Crushed Slag, Stone for Masonry
Work by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
Labour
Head Mazdoor
day
0.02
370.00
Mazdoor
day
0.5
310
Total in Rs.
contractor's profit and
overhead charges
13.615%
Rate per cum =
Rs.
Amount Rs.
7.40
155.00
162.40
22.11
33.50
2
Loading of Earth, Sand, Moorum, Manure, Flyash Unit
a) Loading by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
Labour
Head Mazdoor
day
0.01
Mazdoor
day
0.25
Total in Rs.
contractor's profit and
overhead charges
13.615%
Rate per cum =
Quantity
Rate Rs.
370.00
310
Amount
Rs.
3.70
77.50
81.20
11.06
16.80
Rs.
Unit
day
day
Quantity
0.01
0.25
Rate Rs.
370.00
310
Amount Rs.
3.70
77.50
81.20
11.06
46.10
Rs.
46.10
Unit
Quantity
Rate Rs.
Amount Rs.
365
COM-LDLFT-2015-16
a) Loading including a lead upto 30 m
Unit = 1 t
Taking output = 10 t
a) Labour
Head mazdoor
Mazdoor
Cost for 10 t =
contractor's profit and
overhead charges
13.615%
Rate per 1 tonne =
day
day
0.06
1.5
370.00
310
22.20
465.00
487.20
66.33
55.40
Rs.
b) Unloading100%
+ stacking
of loading charges I.e.,55.40
Rs.
Loading of Structural Steel, Steel Bars by manual means
5
Unit
a) Loading including a lead upto 30 m
Unit = 1 t
Taking output = 10 t
a) Labour
head Mazdoor
day
Mazdoor
day
Cost for 10 t =
contractor's profit and
overhead charges
13.615%
Rate per 1 tonne =
100% of loading charges
b) UnloadingI.e.,
+ stacking
Rs.
COM-DTL-LDLFT-4
0.07
1.8
Rate Rs.
370.00
310
Amount Rs.
25.9
558.00
583.90
79.50
66.30
Rs.
66.30
6
Unit
Loading of Bricks - 1000 Nos (Regular sizes a) Loading 225x140x70 mm) by manual means including
Unit = 1000 Nos.
Taking output = 2000 Nos.
a) Labour
head Mazdoor
day
Mazdoor
day
Cost for 2000 Nos. =
contractor's profit and
overhead charges
13.615%
Rate per 1000 Nos. =
100% of loading charges
b) UnloadingI.e.,
+ stacking
Rs.
Quantity
Quantity
0.01
0.25
Rate Rs.
370.00
310.00
Amount Rs.
3.7
77.50
81.20
11.06
46.10
Rs.
46.10
D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )
1
Loading of Lime, Aggregate, Stone Boulder,
a) Loading Brick Aggregate, Kankar, Building Rubbish,
Building Rubbish, Crushed Slag, Stone for Masonry Unit
Work by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Head Mazdoor
day
Mazdoor
day
b) Machinery
Truck 10t
hour
Cost for 5.5 cum =
contractor's profit and
overhead charges
13.615%
Rate per cum =
b) Unloading50% of the loading charges i.e.,
Quantity
Rate Rs.
Amount Rs.
0.02
0.5
370.00
310
7.40
155.00
0.5
887.10
443.55
605.95
82.50
125.20
Rs.
62.6
2
Loading of Earth, Sand, Moorum, Manure, Flyash Unit
a) Loading by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
Labour
Head Mazdoor
day
Mazdoor
day
b) Machinery
Truck 10t
hour
Cost for 5.5 cum =
contractor's profit and
overhead charges
13.615%
Rate per cum =
b) UnloadingUnloading of Earth, Sand, Moorum, Manure, FlyashUnit
by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
day
Mazdoor(unskilled)
day
Quantity
Rate Rs.
Amount Rs.
0.01
0.25
370.00
310
3.70
77.50
0.5
887.10
443.55
524.75
71.44
108.40
Rs.
Quantity
0.005
0.125
Rate Rs.
370.00
310
Amount Rs.
1.85
38.75
366
COM-LDLFT-2015-16
b) Machinery
Truck 10t
Cost for 5.5 cum =
contractor's profit and
overhead charges
Rate per cum =
hour
0.166
887.10
13.615%
25.58
38.80
Rs.
Unit
Quantity
147.26
187.86
Rate Rs.
Total
day
day
0.01
0.25
370.00
310
3.70
77.50
hour
0.33
887.10
292.74
373.94
50.91
212.40
Rs.
b) Unloading100%
+ stacking
of loading charges i.e.,212.40
Rs.
Loading of Cement by manual means
4
a) Loading including a lead upto 30 m
Unit = 1 t
Taking output = 10 t
a) Labour
Mate
Mazdoor(unskilled)
b) Machinery
Truck 10t
Cost for 10 t =
contractor's profit and
overhead charges
13.615%
Rate per 1 tonne =
Unit
Quantity
Rate Rs.
Total
day
day
0.06
1.5
370.00
310
22.20
465.00
hour
887.10
887.10
1374.30
187.11
156.10
Rs.
b) Unloading100%
+ stacking
of loading charges i.e.,156.10
Rs.
Loading of Structural Steel, Steel Bars by manual means
5
Unit
a) Loading including a lead upto 30 m
Unit = 1 t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor(unskilled)
day
b) Machinery
Truck 10t
hour
Cost for 10 t =
contractor's profit and
overhead charges
13.615%
Rate per 1 tonne =
Quantity
Rate Rs.
Total
0.07
1.8
370.00
310
25.90
558.00
887.10
887.10
1471.00
200.28
167.10
Rs.
b) Unloading100%
+ stacking
of loading charges i.e.,167.10
Rs.
COM-DTL-LDLFT-5
E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)
COM-DTL-LDLFT-5-A
1
Loading of Lime, Aggregate, Stone Boulder,
a) Loading Brick Aggregate, Kankar, Building Rubbish,
Crushed Slag, Stone for Masonry work by
mechanical means including a lead upto 30 m
Placing tipper at loading point, loading with front end
loader excluding time for haulage and return trip.
Unit = cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point
ii) Loading by front end loader 1 cum bucket capacity
@ 45 / 25 cum per hour
iii) Manoevouring, reversing, dumping and turning
for return
iv) Waiting time, unforeseen contingencies, etc.
Total
a) Machinery
Tipper 10 t capacity
Front end-loader 1 cum bucket capacity @ 45 cum
per hour
Cost for 5.5 cum =
b) contractor's profit and
overhead charges
Rate per cum = (a+b)/5.5
Unit
Quantity
Min
Min
1
7.33
Min
Min
Min
2
10.33
hour
hour
0.17
0.12
Rate Rs.
919.70
2821.50
Total
158.34
344.69
503.03
13.615%
Rs.
68.49
103.90
367
COM-LDLFT-2015-16
COM-DTL-LDLFT-5-B
2
Loading of Earth, sand, Moorum, Manure, Flyash,
a) Loading by mechanical means including a lead upto 30 m
Placing tipper at loading point, loading with front
end loader excluding time for haulage and return trip.
Unit
Placing tipper at loading point, loading with front
end loader excluding time for haulage and return trip.
Unit = cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point
Min
ii) Loading by front end loader 1 cum bucket capacity
Min
@ 45 / 25 cum per hour
iii) Waiting time, unforeseen contingencies, etc.Min
Total
Min
a) Machinery
Tipper 10 t capacity
hour
Front end-loader 1 cum bucket capacity @ 45 cum
hour
per hour
Cost for 5.5 cum =
b) contractor's profit and
overhead charges
13.615%
Rate per cum = (a+b)/5.5
Quantity
COM-DTL-LDLFT-6
hour
Total
1
3.3
2
6.3
0.105
0.055
919.70 96.57
2821.50 155.18
251.75
34.28
52.00
Rs.
a) Machinery
Tipper 10 t capacity
Cost for 5.5 cum =
b) contractor's profit and
overhead charges
Rate per cum = (a+b)/5.5
Rate Rs.
Quantity
Rate Rs.
Total
1
2
2
5
0.08
919.70 76.64
76.64
13.615%
10.43
15.80
Description
2
Mazdoor
contractor's profit and
overhead charges
Unit
3
Day
Quantity
4
1.00
60 m/minute
0.12
4000
0.015
60
min
cum
cum
60
Rate
in Rs.
5
310.00
13.615%
Total Rs: for 60
cum
cum
Amount
in Rs.
6
310.00
42.21
352.21
5.90
Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT
For additional lift of 1m beyond initial lift of 3 m
one meter lift is taken equivalent to 6 meters lead
average speed of conveyance by head load
Round trip cycle time for 1.00 m considering 50 min/ hr working
25 m/minute
368
COM-LDLFT-2015-16
1 x6x 60 / 50 / 25 )
0.29
No. of trips per day foradditional lift 1.0 m above 3 m ( 8 x 60 / 0.29)
1655
Quantity of material by head load
50
Quantity of material by head load per day ( 1655x50x 0.015 )
83
Deploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoor
Lift : Upto 3.00 m for materials under this Category
Unit:
83
Sl No.
1
Description
2
Mazdoor
contractor's profit and
overhead charges
Unit
3
Day
Quantity
4
1.00
Rate
in Rs.
5
310.00
13.615%
Total Rs: for 83
Tonnes
min
kgs
tons
TONS
Amount
in Rs.
6
310.00
42.21
352.21
Rate per tonne
4.20
FOR CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood
Lift : Upto 3.00 m
This is the initial lift and forms integral part of the activities in the basic rate of work item.
Lift charges are admissible only lifting effort beyond initial lift specified in the work item.
Lift : ADDITIONAL LIFT CHARGES FOR EACH 1 METER LIFT BEYOND 3 M INITIAL LIFT
For additional lift of 1m beyond initial lift of 3 m
one meter lift is taken equivalent to 6 meters lead
average speed of conveyance by head load
40 m/minute
Round trip cycle time for 1.00 m considering 50 min/ hr working
1 x6x 60 / 50 / 40 )
0.18
No. of trips per day for lift 1.0 m ( 8 x 60 / 0.18 )
2667
Quantity of material by head load
0.017
Quantity of material by head load per day ( 1667x 0.018 )
45
Deploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoor
Lift : Upto 3.00 m for materials under Category
Sl No.
1
Description
2
Mazdoor
contractor's profit and
overhead charges
Unit:
Unit
3
Day
13.615%
Total Rs: for 45
cum
Quantity
4
1.00
45
Rate
in Rs.
5
310.00
min
cum
cum
cum
Amount
in Rs.
6
310.00
42.21
352.21
7.80
369
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Description of machinery
2
Agitator car / Transit mixer 2 cum
Air compressor 5 cmm ( electric )
Air compressor 7 cmm ( diesel )
Air compressor 7 cmm ( electric )
Air compressor 8.5 cmm ( diesel
Air compressor 8.5 cmm ( electric)
Air compressor 15 cmm ( electric)
Angle Dozer 90 hp
Batching plant 0.5 cum( 6 cum/hr)
Batching plant 2 x 1.00 cum(15 cum/hr)
Batching plant 2 x 1.50 cum(50 cum/hr)
Bending machine 3000 x 12 mm
Clamp shell and hoisting ropes
Concrete bucket 1.5 cum
Concrete hand mixer 45 / 30 ltr
Concrete mixer 300 / 200 ( diesel)
Concrete mixer 300 / 200 ltr ( electric)
Concrete mixer 600 / 400 ( diesel)
Concrete mixer 600 / 400 ltr ( electric
Concrete paver 100 sqm / hr
Convey mucker
Core drilling machine
Diesel generating set 30 KVA
Diesel generating set 50 KVA
Diesel Loco 45 hp
Dewatering pump 5 hp ( diesel )
Dewatering pump 5 hp ( electric )
Dewatering pump 10 hp ( diesel )
Dewatering pump 10 hp ( electric
Dewatering pump 20 hp ( diesel )
Dewatering pump 20 hp ( electric
Drifter
Drilling jumbo
Dumper 4.5 cum
Geophysical Electric resistivity meter
Grouting pump
Guniting / sand blast equipment
Ice plant & accessories 30 t / day
Jack hammer
Needle vibrator 40 mm ( petrol )
Needle vibrator 40 mm ( electric )
Needle vibrator 60 mm ( petrol )
Needle vibrator 60 mm ( electric )
Planing machine 4 m stroke
Plate shearing machine upto 12 mm
Pneumatic placer 0.5 cum
Pneumatic tamper
Pug cutting machine
Pusher leg
Road roller diesel 10 t
Shovel 0.50 cum 75 hp
Unit
3
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hire
charge in
Rs
4
758.40
108.30
241.30
131.90
275.60
170.80
138.80
1715.50
114.60
405.40
518.10
42.60
5.40
15.80
5.50
53.50
51.70
92.70
91.00
356.50
822.80
319.00
65.80
85.10
381.60
10.20
3.00
15.20
6.70
48.30
12.30
322.70
368.40
580.70
99.00
24.90
110.10
170.20
19.80
7.60
8.00
8.20
9.70
117.80
41.90
171.10
20.70
6.40
12.70
197.20
1003.10
Fuel
Crew
charge in Charge
Rs
in Rs.
5
893.90
259.80
731.40
346.40
914.20
433.10
962.30
625.30
115.50
346.40
423.40
115.50
0.00
0.00
0.00
81.30
38.50
162.50
77.00
0.00
267.90
243.80
650.10
975.20
548.50
81.30
38.50
162.50
77.00
325.10
154.00
0.00
43.90
409.60
0.00
38.50
0.00
1097.10
0.00
20.60
7.70
30.80
11.50
115.50
154.00
0.00
0.00
3.80
0.00
731.40
487.60
6
265.20
153.10
195.90
153.10
195.90
153.10
163.30
221.00
318.20
318.20
318.20
122.50
0.00
0.00
0.00
204.10
204.10
204.10
204.10
391.90
163.30
265.20
122.50
122.50
153.10
103.60
77.70
103.60
77.70
103.60
77.70
331.50
163.30
212.20
0.00
244.90
204.10
122.50
306.20
146.90
146.90
146.90
146.90
195.90
132.60
80.90
244.90
0.00
0.00
195.90
221.00
Total in Rs
7
1917.50
521.20
1168.60
631.40
1385.70
757.00
1264.40
2561.80
548.30
1070.00
1259.70
280.60
5.40
15.80
5.50
338.90
294.30
459.30
372.10
748.40
1254.00
828.00
838.40
1182.80
1083.20
195.10
119.20
281.30
161.40
477.00
244.00
654.20
575.60
1202.50
99.00
308.30
314.20
1389.80
326.00
175.10
162.60
185.90
168.10
429.20
328.50
252.00
265.60
10.20
12.70
1124.50
1711.70
370
1
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Description of machinery
2
Shovel 0.85 cum 110 hp
Stationery derric crane
Tipper 5 cum
Tipping tub 1.5 cum
Tower crane 5 tonne
Transformer 250 KVA
Truck 10 t
Truck mounted derric crane 5 t
Upright drilling machine/Grinder
Ventilation fan 20 hp
Vibratory pad foot roller 8 t
Wagon drill
Water tanker 8000 ltr
Welding set
Winch 35 hp ( electric )
Tractor with 2T roller
Hydraulic Truck Crane 30T
Hydraulic Truck Crane 16T
Heavy Duty Airless Spray Painting
Equipment
Unit
Hire
charge in
Rs
Fuel
Crew
charge in Charge
Rs
in Rs.
3
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
4
1706.60
86.10
446.70
64.20
867.10
5041.00
414.10
519.70
22.50
11.50
1342.20
188.50
402.50
16.00
129.40
5
893.90
0.00
307.20
0.00
200.20
0.00
307.20
307.20
38.50
154.00
1056.40
0.00
307.20
92.40
188.60
6
221.00
0.00
165.80
0.00
176.80
0.00
165.80
165.80
187.20
26.80
244.90
265.20
165.80
0.00
244.90
3096.80
2278.10
118.80
75.00
489.20
489.20
Hour
121.40
Total in Rs
7
2821.50
86.10
919.70
64.20
1244.10
5041.00
887.10
992.70
248.20
192.30
2643.50
453.70
875.50
108.40
562.90
345.00
3704.80
2842.30
121.40
371