CUADRO COMPARATIVO DE METAS EXPEDIENTE TECNICO DEFENSAS RI

EXPEDIENTE TECNICO, PRESUPUESTO Y METRADO


Part
1

DESCRIPCION

Construccin de Espigones @ 50mts

UNID. SUB TOTAL

RIO MANTARO
Construccin de Dique Longitudinal

RESUMEN DE D

1
ml

5,500.00

und

92.00

RIO ACHAMAYO

Construccin de Dique Longitudinal

ml

1,935.00

Construccin de Gaviones

ml

1,935.00

RIO SECO
Limpieza del Cauce

Part

3
ml

8,500.00

RATIVO DE METAS EXPEDIENTE TECNICO DEFENSAS RIBEREAS


RESUMEN DE DEFENSAS RIBEREAS A EJECUTARSE
DESCRIPCION

UNID.

SUB TOTAL

ml

4,511.00

und

92.00

Construccin de Dique Longitudinal

ml

2,145.00

Construccin de Gaviones

ml

2,145.00

ml

8,105.00

RIO MANTARO
Construccin de Dique Longitudinal
Construccin de Espigones

RIO ACHAMAYO

RIO SECO
Limpieza del Cauce

HOJA DE METRADOS
Proyecto

Instalacin de Defens
Ro Seco y Ro Acham

Lugar
Distrito
Provincia
Departamento
Regin
Fecha

:
:
:
:
:
:

Matahuasi
Matahuasi
Concepcin
Junn
Junn
Oct-15

1.00.00 TRABAJOS PRELIMINARES


Part

ESPECIFICACIONES

UNID. N VECES

1.01 CARTEL DE OBRA

Und

2.00

1.02 CAMPAMENTO Y CASETA DE GUARDIANIA

M2

2.00

1.03 TRAZO Y REPLANTEO DE OBRA

ML

1.00

Viaje

8.00

1.04 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA

02.00.00 MOVIMIENTO DE TIERRAS


Part

ESPECIFICACIONES

UNID. N VECES

2.01 EXCAVACION EN LECHO DEL RIO PARA CIMENTACION DE ESPIGONES

m3

2.02 CORTE DE MATERIAL EN LECHO DE RIO ( LIMPIEZA DE CAUCE )

m3

92.00

RIO MANTARO ( DE PLANILLA DE EXPLANACIONES 0+000 A 5+500 )


RIO ACHAMAYO ( DE PLANILLA DE EXPLANACIONES 0+000 A 1+935 )

8,105.00

RIO SECO ( DE PLANILLA DE EXPLANACIONES 0+000 A 8+500 )

2.03 RELLENO Y COMPACTADO DE MATERIAL DE LECHO DE RIO PARA CONFORMACION DIQUE

m3

( DE PLANILLA DE EXPLANACIONES 0+000 a 5+500 )

2.04 EXCAVACION DE TERRENO PARA CIMENTACION DE MURO GAVIONADO

m3

(DE PLANILLA DE EXPLANACIONES 0+000 a 1+935 )

2.05 RELLENO Y COMPACTADO DE MATERIAL DE LECHO DE RIO (Parte Trasera Gavin)


(DE PLANILLA DE EXPLANACIONES 0+000 a 1+935 )

m3

2.06 MEJORAMIENTO Y HABILITACION DE ACCESOS (DIQUE Y GAVIONES)

m3

2.00

03.00.00 ENCAUZAMIENTO DEL RIO


Part

ESPECIFICACIONES

UNID. N VECES

3.01 REFORZAMIENTO DE BORDE DE RIO (CORONA Y TALUDES DEL DIQUE)

ml

1.00

3.02 NIVELACION Y CONTROL DE OBRA (CONSTRUCCION DE ENROCADOS)

ml

1.00

3.03 NIVELACION Y CONTROL DE OBRA (CONSTRUCCION DE GAVIONES)

ml

1.00

04.00.00 CONSTRUCCION DE ESPIGONE


Part
4.01
4.02
4.03
4.04

ESPECIFICACIONES
VOLADURA DE ROCA EN CANTERA
SELECCIN, ACOPIO Y CARGUIO DE ROCA EN CANTERA
TRASLADO DE ROCA CON VOLQUETES

UNID. N VECES
m3

1.00

m3

1.00

m3

1.00

m3

E1 al E92

m3

92.00

E1 al E92

m3

92.00

ACOMODO DE ROCA EN CIMENTACION

Dentelln:

Cimentacin:

4.05

m3

ACOMODO DE ROCA DEL CUERPO

Cuerpo:
E1 al E92

m3

92.00

Morro:

6.00
((B-b)/2)=0.75
=1/2x((B-4)/2xhe)/2 x 4
E1 al E92

m3

92.00

= 1/4x1/3x 2 x(B-4)x1/2xhe
E1 al E92

m3

184.00

05.00.00 CONSTRUCCION DE GAVIONES


Part
5.01

UNID. N VECES
ESPECIFICACIONES
m2
MURO DE CONTENCION-ENCOFRADO Y DESENCOFRADO
4
Muros Longitudinales de Gaviones de 5x1x1
2
Muros Laterales de Gaviones de 5x1x1
1
Muros Longitudinales de Gaviones tipo colchn de 5x2x0.3
2
Muros Laterales de Gaviones tipo colchn de 5x2x0.3

5.02

SELECCIN Y ACOPIO DE PIEDRA SELECTA 6" A 12"

m3

Para Gaviones 5x1x1


Para Gaviones tipo colchn 5x2x0.3

1161
387

5.03

GAVIONES -SUMINISTRO E INSTALACION (5x1x1)

UND

1161

5.04

GAVIONES TIPO COLCHON -SUMINISTRO E INSTALACION (5x2x0.3)

UND

387

5.05

RELLENO DE PIEDRAS EN GAVIONES Y COLCHONES

m3

Para Gaviones 5x1x1


Para Gaviones tipo colchn 5x2x0.3

1161
387

6.01
6.02

06.00.00 MITIGACIN DE IMPACTO AMBIENTAL


Recuperacin ambiental en zona de Cantera
Ha
Reacondicionamiento de campamento y patio de mquinas
Ha

6.03

CAPACITACION

Curso

OJA DE METRADOS
Instalacin de Defensas Ribereas y encauzamiento de los Ros Mantaro,
Ro Seco y Ro Achamayo del Distrito de Matahuasi - Concepcin - Junn

Concepcin

00.00 TRABAJOS PRELIMINARES


LARGO

SUB TOTAL

TOTAL

2.00

2.00

48.00

48.00

8500.00

8500.00

8500.00

1.00

8.00

8.00

6.00

ANCHO

ALTO

4.00

.00.00 MOVIMIENTO DE TIERRAS


LARGO

ANCHO

ALTO

SUB TOTAL

TOTAL

5.00

1.50

10,695.00

10,695.00

15.80
15.50

217,472.00
4,505.00

155,000.00

1,935.00

28.00

0.40

21,672.0

8,500.00

6.00

0.80

40,800.0
80,750.00
80,750.0

3,096.00
1935.00

4.00

0.40

3096.00

11,610.00
1,935.00

3.00

2.00

11,610.0

7,435.00

4.00

0.20

11896.00

ANCHO

ALTO

SUB TOTAL

11,896.00

03.00.00 ENCAUZAMIENTO DEL RIO


LARGO

TOTAL

7,435.00

7,435.00

7,435.00

5500.00

5500.00

5,500.00

1935.00

1935.00

1935.00

04.00.00 CONSTRUCCION DE ESPIGONES


LARGO

ANCHO

ALTO

SUB TOTAL

TOTAL

17,626.15
17,626.15
17,626.15
8,556.00
1.50

5.00

1.50

menos 20% de vacios

14.00

5.00

1.50

menos 20% de vacios

1035.00

1035.00
828.00

9660.00

9660.00
7728.00

9,070.15
13.00

(5+4)x2
2

menos 20% de vacios

6.00

10,764.00

10764.00
8611.20

552.00

menos 20% de vacios


0.12

552.00
441.60
21.68

menos 20% de vacios

21.68
17.35
9070.15

.00.00 CONSTRUCCION DE GAVIONES


LARGO

ANCHO

ALTO

SUB TOTAL

TOTAL

8,327.70
1935

7,740.00

6.00

1935

0.3

580.50

0.3

1.20

6,966.00
5

5805

0.3

1161

1,161.00
387.00
6,966.00
5
5

1
2

1
0.3

5805
1161

.00 MITIGACIN DE IMPACTO AMBIENTAL

0.12
0.12
8.00

HOJA DE METRADOS

Proyecto

Instalacin de Defens
Ro Seco y Ro Acham

Lugar
Distrito
Provincia
Departamento
Regin
Fecha

:
:
:
:
:
:

Matahuasi
Matahuasi
Concepcin
Junn
Junn
Oct-15

1.00.00 TRABAJOS PRELIMINARES


Part

ESPECIFICACIONES

UNID. N VECES

1.01 CARTEL DE OBRA

Und

2.00

1.02 CAMPAMENTO Y CASETA DE GUARDIANIA

M2

2.00

1.03 TRAZO Y REPLANTEO DE OBRA

ML

1.00

Viaje

8.00

1.04 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA

02.00.00 MOVIMIENTO DE TIERRAS


Part

ESPECIFICACIONES

UNID. N VECES

2.01 EXCAVACION EN LECHO DEL RIO PARA CIMENTACION DE ESPIGONES

m3

2.02 CORTE DE MATERIAL EN LECHO DE RIO ( LIMPIEZA DE CAUCE )

m3

RIO MANTARO ( DE PLANILLA DE EXPLANACIONES 0+000 A 4+505 )


RIO ACHAMAYO ( DE PLANILLA DE EXPLANACIONES 0+000 A 1+935 )
RIO SECO ( DE PLANILLA DE EXPLANACIONES 0+000 A 8+500 )

2.03

RELLENO Y COMPACTADO DE MATERIAL DE LECHO DE RIO PARA


CONFORMACION DIQUE

m3

( DE PLANILLA DE EXPLANACIONES 0+000 a 4+505 )

2.04 EXCAVACION DE TERRENO PARA CIMENTACION DE MURO GAVIONADO

m3

(DE PLANILLA DE EXPLANACIONES 0+000 a 1+935 )

2.05 RELLENO Y COMPACTADO DE MATERIAL DE LECHO DE RIO (Parte Trasera Gavi m3


(DE PLANILLA DE EXPLANACIONES 0+000 a 1+935 )

92.00

2.06 MEJORAMIENTO Y HABILITACION DE ACCESOS (DIQUE Y GAVIONES)

m3

1.00

03.00.00 ENCAUZAMIENTO DEL RIO


Part

ESPECIFICACIONES

UNID. N VECES

3.01 REFORZAMIENTO DE BORDE DE RIO (CORONA Y TALUDES DEL DIQUE)

ml

1.00

3.02 NIVELACION Y CONTROL DE OBRA (CONSTRUCCION DE ENROCADOS)

ml

1.00

3.03 NIVELACION Y CONTROL DE OBRA (CONSTRUCCION DE GAVIONES)

ml

1.00

04.00.00 CONSTRUCCION DE
Part
4.01
4.02
4.03
4.04

ESPECIFICACIONES
VOLADURA DE ROCA EN CANTERA
SELECCIN, ACOPIO Y CARGUIO DE ROCA EN CANTERA
TRASLADO DE ROCA CON VOLQUETES
ACOMODO DE ROCA EN CIMENTACION
Dentelln:

UNID. N VECES
m3
1.00
m3
1.00
m3
1.00
m3
1
E1 al E92

m3

92.00

E1 al E92

m3

92.00

Cimentacin:

4.05

ACOMODO DE ROCA DEL CUERPO


Cuerpo:

m3
E1 al E92

m3

92.00

Morro:
6.00
((B-b)/2)=0.75
=1/2x((B-4)/2xhe)/2 x 4
E1 al E92

m3

92.00

= 1/4x1/3x 2 x(B-4)x1/2xhe
E1 al E92

m3

184.00

05.00.00 CONSTRUCCION DE GAVIONES


Part
5.01

ESPECIFICACIONES
UNID. N VECES
MURO DE CONTENCION-ENCOFRADO Y DESENCOFRADO
m2
Muros Longitudinales de Gaviones de 5x1x1
4
Muros Laterales de Gaviones de 5x1x1
2
Muros Longitudinales de Gaviones tipo colchn de 5x2x0.3
1

Muros Laterales de Gaviones tipo colchn de 5x2x0.3


5.02

SELECCIN Y ACOPIO DE PIEDRA SELECTA 6" A 12"

2
m3

Para Gaviones 5x1x1


Para Gaviones tipo colchn 5x2x0.3

1161
387

5.03

GAVIONES -SUMINISTRO E INSTALACION (5x1x1)

UND

1161

5.04

GAVIONES TIPO COLCHON -SUMINISTRO E INSTALACION (5x2x0.3)

UND

387

5.05

RELLENO DE PIEDRAS EN GAVIONES Y COLCHONES

m3

Para Gaviones 5x1x1


Para Gaviones tipo colchn 5x2x0.3

6.01
6.02

Recuperacin ambiental en zona de Cantera


Reacondicionamiento de campamento y patio de mquinas

6.03

CAPACITACION

1161
387

06.00.00 MITIGACIN DE IMPACTO AMBIENTAL


Ha
Ha
Curso

HOJA DE METRADOS
Instalacin de Defensas Ribereas y encauzamiento de los Ros Mantaro,
Ro Seco y Ro Achamayo del Distrito de Matahuasi - Concepcin - Junn

Concepcin

00.00 TRABAJOS PRELIMINARES


LARGO

SUB TOTAL

TOTAL

2.00

2.00

48.00

48.00

14,545.00

14,545.00

14545.00

1.00

8.00

8.00

TOTAL

6.00

ANCHO

ALTO

4.00

.00.00 MOVIMIENTO DE TIERRAS


LARGO

ANCHO

ALTO

SUB TOTAL

15.80

5.00

1.50

10,902.00

10,902.00

204,736.00
4,505.00

80.00

0.40

144,160.00

1,935.00

28.00

0.40

21,672.00

8,105.00

6.00

0.80

38,904.00

Area
4,505.00

11.00

148,665.00
3.00

148,665.00

22.50
3,096.00
1,935.00

4.00

0.40

3,096.00

Area
1,935.00

4.00

15,480.00
2.00

15,480.00

6,440.00

4.00

0.20

5,152.00

ANCHO

ALTO

SUB TOTAL

5,152.00

03.00.00 ENCAUZAMIENTO DEL RIO


LARGO

TOTAL

6,440.00

6,440.00

6,440.00

4,505.00

4,505.00

4,505.00

1,935.00

1,935.00

1935.00

04.00.00 CONSTRUCCION DE ESPIGONES


LARGO

ANCHO

ALTO

SUB TOTAL

1.80

5.00

1.50

1,242.00

menos 20% de vacios

15.80

5.00

1.50

menos 20% de vacios

TOTAL
19,447.75
19,447.75
19,447.75
9,715.20

1,242.00
993.60

10,902.00
10,902.00
8,721.60
9,732.55

Area
9.00

11,592.00

menos 20% de vacios

11,592.00
9,273.60

14.00

6.00

552.00

menos 20% de vacios


0.12

552.00
441.60
21.68

menos 20% de vacios

21.68
17.35
9,732.55

.00.00 CONSTRUCCION DE GAVIONES


LARGO
1,935.00
3.00
1,935.00

ANCHO

ALTO

SUB TOTAL

1
1
0.3

7,740.00
6.00
580.50

TOTAL
8,327.70

2.00

0.3

1.20

1
0.3

5,805.00
1,161.00

6,966.00
5.00
5.00

1
2

1,161.00
387.00
6,966.00
5.00
5.00

1
2

1
0.3

5,805.00
1,161.00

.00 MITIGACIN DE IMPACTO AMBIENTAL


0.12
0.12
8.00

CUADRO COMPARATIVO DE METAS EXPEDIENTE TECNICO DEFENSAS RI


EXPEDIENTE TECNICO, PRESUPUESTO Y METRADO
Part
1

DESCRIPCION
RIO MANTARO
Construccin de Dique Longitudinal
Construccin de Espigones @ 50mts

UNID. SUB TOTAL

1
ml

5,500.00

und

92.00

RIO ACHAMAYO

Construccin de Dique Longitudinal

ml

1,935.00

Construccin de Gaviones

ml

1,935.00

RIO SECO
Limpieza del Cauce

Part

3
ml

8,500.00

RATIVO DE METAS EXPEDIENTE TECNICO DEFENSAS RIBEREAS


PLANOS
DESCRIPCION

UNID.

SUB TOTAL

ml

4,505.00

und

92.00

Construccin de Dique Longitudinal

ml

1,935.00

Construccin de Gaviones

ml

1,935.00

ml

8,105.00

RIO MANTARO
Construccin de Dique Longitudinal
Construccin de Espigones

RIO ACHAMAYO

RIO SECO
Limpieza del Cauce

CALCULO DE CICLO DE RECORRIDO DE LOS VOLQUETES


TRASLADO DE ROCA
Considerando que se explotara la Cantera de:

"ACOLLA" y/o MUQUI

Capacidad de un volquete

13.0

m3

Distancia Media

28

Km

Tiempo de Carga

10

min

Tiempo de Descarga

min

Viaje de Ida

40
42

Volquete de 17 m3

kph (Velocidad de
Trabajo Cargado)

min

Viaje de Retorno

65

Tiempo total de un ciclo

25.8462
1.38

min
hr.

Eficiencia

80

N de Viajes

4.25

Volumen transportado
:
55
m3/dia
(*) Los 06 volquetes transportarn 330 m3/da

kph (Velocidad de
Trabajo Sin Carga)

Por volquete (*)

CALCULO DE CICLO DE RECORRIDO DE LOS VOLQUETES


RELLENO Y COMPACTADO DE DIQUE
Considerando que se explotara la Cantera de:

"RIBERA DEL RIO"

Capacidad de un volquete

15.0

m3

Distancia Media

Km

Tiempo de Carga

10

min

Tiempo de Descarga

min

Viaje de Ida

15
4

Volquete de 17 m3

kph (Velocidad de
Trabajo Cargado)

min

Viaje de Retorno

20

Tiempo total de un ciclo

3
0.37

min
hr.

Eficiencia

80

N de Viajes

17

Volumen transportado

255

m3/dia

kph (Velocidad de
Trabajo Sin Carga)

Por volquete

(*) Los 04 volquetes transportarn 1020 m3/da

ITEM

01.00.00

DESCRIPCION

UND

MET.

REND

Costo Parcial

UND

2.00

1.00

3,836.60

01.00.02 CAMPAMENTO Y CASETA DE GUARDIANIA

M2

48.00

40.00

3,042.72

01.00.03 TRAZO Y REPLANTEO DE OBRA

ML

8500.00

250.00

20,060.00

VJE

8.00

1.00

23,400.00

02.00.00

MOVILIZACION Y DESMOVILIZACION DE
MAQUINARIA

EXCAVACION EN LECHO DEL RIO PARA


CIMENTACION DEL ENROCADO

M3

10,695.00 1000.00

37,860.30

02.00.02

CORTE DE MATERIAL EN LECHO DEL RIO ( LIMPIEZA


DE CAUCE )

M3

217,472.00 1300.00

745,928.96

02.00.03

RELLENO Y COMPACTADO DE MATERIAL DE LECHO


DE RIO PARA LA CONFORM. DEL DIQUE

M3

80,750.00 1000.00

721,097.50

02.00.04

EXCAVACION DE TERRENO PARA CIMENTACION DE


MURO GAVIONADO

M3

3,096.00

715.00

14,489.28

02.00.05

RELLENO Y COMPACTADO DE MATERIAL DE LECHO


DE RIO ( PARTE TRASERA DEL GAVION )

M3

11,610.00

715.00

56,424.60

M3

11,896.00

825.00

94,216.32

02.00.06 MEJORAMIENTO Y HABILITACCION DE ACCESOS

REFORZAMIENTO DE BORDE DEL RIO(CORONA Y


TALUDES DEL DIQUE)

ML

7435.00

750.00

35,241.90

03.00.02

NIVELACION Y CONTROL DE OBRA


(CONSTRUCCION DE ENROCADOS)

ML

5500.00

80.00

44,880.00

03.00.03

NIVELACION Y CONTROL DE OBRA


(CONSTRUCCION DE MURO GAVIONADO)

ML

1935.00

80.00

15,789.60

1era SEM

2da SEM

3era SEM

3,836.60

0.00

0.00

0.00

0.00

0.00

0.00

3,042.72

0.00

0.00

0.00

0.00

0.00

0.00

1,180.00

3,540.00

3,540.00

3,540.00

3,540.00

3,540.00

1,180.00

8,775.00

0.00

0.00

0.00

5,850.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,572.06

7,572.06

0.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18,843.26

37,686.53

37,686.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

0.00

0.00

0.00

0.00

0.00

0.00

0.00

M3

17626.15

400.00

926,782.97

0.00

0.00

0.00

0.00

123,571.06

123,571.06

123,571.06

M3

17626.15

350.00

313,569.21

0.00

0.00

0.00

0.00

0.00

34,841.02

34,841.02

M3

17626.15

350.00

376,142.04

0.00

0.00

0.00

0.00

0.00

41,793.56

41,793.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10,574.40

10,574.40

CONSTRUCCION DE ESPIGONES

04.00.01 VOLADURA DE ROCA EN CANTERA


04.00.02

4ta SEM

ENCAUZAMIENTO DEL RIO

03.00.01

04.00.00

3era SEM

MOVIMIENTO DE TIERRAS

02.00.01

03.00.00

2do MES

2da SEM

TRABAJOS PRELIMINARES

01.00.01 CARTEL DE OBRA

01.00.04

1er MES
1era SEM

SELECCIN, ACOPIO Y CARGUIO DE ROCA EN


CANTERA

04.00.03 TRASLADO DE ROCA CON VOLQUETES.


04.00.04

ACOMODO DE ROCA EN CIMENTACION Y


DENTELLON DEL ESPIGON

M3

8556.00

160.00

189,087.60

04.00.05

ACOMODO DE ROCA EN CUERPO Y MORRO DEL


ESPIGON

M3

9070.15

140.00

229,111.99

05.00.00

CONSTRUCCION DE GAVIONES

05.00.01

MURO DE CONTENCION - ENCOFRADO Y


DESENCOFRADO

M3

8327.70

80.00

120,168.71

05.00.02

SELECCIN Y ACOPIO DE PIEDRA SELECTA DE 6" A


12"

M3

6966.00

50.00

522,867.96

M3

1161.00

15.00

718,693.83

05.00.03 GAVIONES-SUMINISTRO E INSTALACION (5X1X1)


05.00.04

GAVIONES TIPO COLCHON - SUMINISTRO E


INSTALACION (5X2X0.30)

M2

387.00

30.00

205,404.12

05.00.05

RELLENO DE PIEDRAS EN GAVIONES Y


COLCHONES

M3

6966.00

80.00

375,537.06

06.00.01 RECUPERACION AMBIENTAL DE ZONA DE CANTERA

HA

0.12

1.7096

481.67

REACONDICIONAMIENTO DE CAMPAMENTO Y PATIO


DE MAQUINAS

HA

0.12

1.7096

547.97

M3

8.00

1.00

25,082.32

06.00.00

06.00.02
07.00.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

MITIGACION DE IMPACTO AMBIENTAL

CAPACITACION

07.00.01 CAPACITACION

5,819,745.23

3,135.29
273,103.82

COSTO INDIRECTO

581,974.52

27,310.38

UTILIDAD

581,974.52

27,310.38

1,257,064.97

58,990.43

247,222.78

11,601.45

0.00
8,847,982.02

0.00

COSTO DIRECTO

I.G.V. ( 18 % )
SUPERVISION
EXPEDIENTE TECNICO ( * )
TOTAL PRESUPUESTO

398,316.46

% DE AVANCE FISICO

4.69

% DE AVANCE FISICO ACUMULADO

4.69

CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA


PROYECTO : INSTALACION DE DEFENSAS RIBEREAS Y ENCAUZAMIENTO DE LOS RIOS MANTARO, RIO SECO Y RIO ACHAMAYO DEL DISTRITO DE MATAHUASI - CONCEPCION- JUNIN

ES

3er MES

4to MES

5to MES

3era SEM

4ta SEM

1era SEM

2da SEM

3era SEM

4ta SEM

1era SEM

2da SEM

3era SEM

4ta SEM

1era SEM

2da SEM

3era SEM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,180.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,572.06

7,572.06

7,572.06

7,572.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18,027.44

54,082.31

54,082.31

54,082.31

54,082.31

0.00

0.00

14,489.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

0.00

0.00

809.72

809.72

809.72

809.72

809.72

809.72

809.72

809.72

809.72

809.72

809.72

123,571.06

123,571.06

123,571.06

123,571.06

123,571.06

61,785.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34,841.02

34,841.02

34,841.02

34,841.02

34,841.02

34,841.02

34,841.02

34,841.02

0.00

0.00

0.00

0.00

0.00

41,793.56

41,793.56

41,793.56

41,793.56

41,793.56

41,793.56

41,793.56

41,793.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

61,441.95

92,162.92

35,482.73

0.00

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

0.00

0.00

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

0.00

0.00

0.00

29,636.86

29,636.86

29,636.86

29,636.86

29,636.86

29,636.86

29,636.86

29,636.86

37,046.07

44,455.29

0.00

0.00

0.00

24,165.19

24,165.19

24,165.19

24,165.19

24,165.19

24,165.19

24,165.19

24,165.19

12,082.60

0.00

0.00

0.00

0.00

9,629.16

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,135.29
993,603.19

3,135.29
1,250,375.12

3,135.29
851,215.05

99,360.32

125,037.51

85,121.50

99,360.32

125,037.51

85,121.50

214,618.29

270,081.03

183,862.45

42,208.26

53,115.94

36,159.62

0.00

0.00

0.00

1,449,150.38

1,823,647.10

1,241,480.12

17.07

21.49

14.63

21.77

43.25

57.88

N- JUNIN

a SEM

6to MES

7mo MES

8vo MES

4ta SEM

1era SEM

2da SEM

3era SEM

4ta SEM

1era SEM

2da SEM

3era SEM

4ta SEM

1era SEM

2da SEM

3era SEM

4ta SEM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8,775.0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

27,627.00

0.00

0.00

0.00

0.00

082.31

54,082.31

54,082.31

54,082.31

54,082.31

54,082.31

54,082.31

54,082.31

54,082.31

54,082.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19,914.56

19,914.56

16,595.4

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21,145.14

14,096.76

0.00

0.00

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,565.58

1,043.72

0.00

0.00

09.72

809.72

809.72

809.72

809.72

809.72

809.72

809.72

809.72

404.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10,574.40

10,574.40

10,574.40

10,574.40

10,574.40

21,148.80

7,049.60

0.00

0.00

0.00

0.00

0.00

0.00

65.58

574.40

37.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

6,437.61

4,291.74

0.00

0.00

0.00

0.00

0.00

240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

20,240.05

16,866.71

0.00

0.00

0.00

0.00

0.00

455.29

44,455.29

44,455.29

44,455.29

44,455.29

44,455.29

44,455.29

44,455.29

44,455.29

44,455.29

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

19,258.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

481.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

547.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,135.2
126,4

0.00

258.31

0.00

3,135.29
885,002.18

3,135.29
743,336.39

3,135.29
696,635.45

88,500.22

74,333.64

69,663.54

12,6

88,500.22

74,333.64

69,663.54

12,6

191,160.47

160,560.66

150,473.26

27,3

37,594.89

31,576.93

29,593.07

5,3

0.00

0.00

0.00

1,290,757.97

1,084,141.25

1,016,028.88

15.21

12.77

11.97

73.08

85.86

97.83

184,4

10

8vo MES
4ta SEM

0.00
0.00
0.00
8,775.00

0.00
0.00
0.00
0.00
16,595.47
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

481.67
547.97

3,135.29
126,474.04
12,647.40
12,647.40
27,318.39
5,372.62
0.00
184,459.86

2.17
100.00

PRESUPUESTO DE OBRA
OBRA

: INSTALACION DE DEFENSAS RIBEREAS Y ENCAUZAMIENTO DE LOS RI

MES

: OCTUBRE 2015

RIO SECO Y RIO ACHAMAYO DEL DISTRITO DE MATAHUASI - CONCEPCIO


PLAZO DE EJECUCION

: 240 dias calendarios.

PRESUPUESTO

PART.

DESCRIPCION

UND

METRADO

1.00.00 TRABAJOS PRELIMINARES


1.00.01 Cartel de Obra

UND

2.0000

1.00.02 Campamento y caseta de guardiana

M2

48.0000

1.00.03 Trazo y Replanteo de Obra

ML

8500.0000

1.00.04 Movilizacin y Desmovilizacin de Maquinaria

VJE

8.0000

2.00.01 Excavacin en lecho del ro para cimentacin del enrocado

M3

10695.0000

2.00.02 Corte de material en lecho del Ro ( Limpieza de Cauce )

M3

217472.0000

2.00.03 Relleno y Compactado de Material de lecho de Ro para Conf. De

M3

80750.0000

2.00.04 Excavacin de terreno para cimentacin de Muro Gavionado

M3

3096.0000

2.00.05 Relleno y Compactado de Material de lecho de Ro (parte trasera

M3

11610.0000

2.00.06 Mejoramiento y Habilitacin de accesos(Dique y gaviones)

M3

11896.0000

3.00.01 Reforzamiento del borde del Ro ( Corona y Taludes del dique )

ML

7435.0000

3.00.02 Nivelacin y Control de Obra ( Construccin de Enrocado )

ML

5500.0000

3.00.03 Nivelacin y Control de Obra ( Muro Gavionado )

ML

1935.0000

4.00.01 Voladura de Roca en Cantera

M3

17626.15

4.00.02 Seleccin, Acopio y Carguo de Roca en cantera

M3

17626.15

4.00.03 Traslado de roca con volquetes

M3

17626.15

4.00.04 Acomodo de roca en cimentacin y dentelln del espign

M3

8556.00

4.00.05 Acomodo de roca en el cuerpo y morro del espign

M3

9070.15

5.00.01 Muro de contencin-Encofrado y desencofrado

M2

8327.7000

5.00.02 Seleccin y Acopio de Piedra selecta 6" a 12"

M3

6966.0000

5.00.03 Gaviones-suministro e instalacin(5x1x1)

UND

1161.0000

5.00.04 Gaviones tipo colchn -suministro e instalacin(5x2x0.3)

UND

2.00.00 MOVIMIENTOS DE TIERRAS

3.00.00 ENCAUZAMIENTO DEL RIO

4.00.00 CONSTRUCCION DE ESPIGONES

5.00.00 CONSTRUCCION DE GAVIONES

387.0000

M3

6966.0000

6.00.01 Recuperacin ambiental de zona de cantera

Ha

0.1200

6.00.02 Reacondicionamiento de campamento y patio de mquinas

Ha

0.1200

5.00.05 Relleno de piedras en Gaviones y Colchones


6.00.00 MITIGACION DE IMPACTO AMBIENTAL

7.00.00 CAPACITACION
7.00.01 Capacitacin

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD (10%)
SUB TOTAL
I.G.V. (18 %)
EXPEDIENTE TECNICO
SUPERVISION
COSTO TOTAL

Curso

8.0000

Pavimentacin Prlg.Piura

PRESUPUESTO DE OBRA

N DE DEFENSAS RIBEREAS Y ENCAUZAMIENTO DE LOS RIOS MANTARO,

RIO ACHAMAYO DEL DISTRITO DE MATAHUASI - CONCEPCION - JUNIN

PRESUPUESTO S/.

SALDO

PRECIO UNITARIO (S/.)

PRESUPUESTO (S/.)

A PRECIO PRIVADO

A PRECIO PRIVADO

VALORIZADO

50,339.32
1,918.30

3,836.60
###

63.39

3,042.72
#

2.36

20,060.00
#

2,925.00

23,400.00
###
1,670,016.96

3.54

37,860.30

3.43

745,928.96

8.93

721,097.50

4.68

14,489.28

4.86

56,424.60

7.92

94,216.32
95,911.50

4.74

35,241.90
#

8.16

44,880.00

8.16

15,789.60
#
2,034,693.81

52.58

926,782.97
#

17.79

313,569.21
#

21.34

376,142.04

22.10

189,087.60
#

25.26

229,111.99
#
1,942,671.68

14.43

120,168.71

75.06

522,867.96

619.03

718,693.83

530.76

205,404.12

53.91

375,537.06
1,029.64

4,013.90

481.67

4,566.44

547.97

25,082.32
3,135.29

25,082.32

5,819,745.23
###
581,974.52
###
581,974.52
6,983,694.27
1,257,064.97
0.00
247,222.78
8,487,982.02
Pavimentacin Prlg.Piura

Pavimentacin Prlg.Piura

Pavimentacin Prlg.Piura

PRESUPUESTO ANALITICO DEL COSTO DIRECTO


PROYECTO

: Instalacin de Defensas Ribereas y encauzamiento de los Ros Mantaro, Ro Seco y Ro Achamayo


del Distrito de Matahuasi - Concepcion - Junn

DISTRITO : MATAHUASI
PROV. : CONCEPCION
DEPART. : JUNIN
FECHA : 30/10/15

MOD. EJECUCION : Por contrato


ESPECIFICACION DEL GASTO

UND

PRESUPUESTO

CANTIDAD
UNIT

PARCIAL

PERSONAL OBRERO EVENTUAL


TOPOGRAFO INCLUIDO EQUIPO

hh

1,015.5000

25.00

25,387.50

OPERARIO
OFICIAL

hh

5,359.8203

19.23

hh

13,467.5405

15.94

PEON

hh

71,773.4870

GUARDIAN

hh

4,772.4207

TOTAL
1,428,578.49

PRESUPUESTO DISGREGADO
APORTE GR - JUNIN
APORTE BENEFICIARIOS
CANT
PARCIAL
TOTAL
CANT
PARCIAL TOTAL
1,428,578.49
1,015.5000

25,387.50

103,069.34

5,359.8203

103,069.34

214,672.60

13,467.5405

214,672.60

14.33

1,028,514.07

71,773.4870

1,028,514.07

11.93

56,934.98

4,772.4207

56,934.98

MATERIALES DE CONSTRUCCION

1,546,904.68

1,546,904.68

CLAVOS PARA MADERA C/C 3"

kg

900.5656

5.80

5,223.28

900.5656

5,223.28

ALAMBRE NEGRO N16

kg

12.0000

5.80

69.60

12.0000

69.60

ALAMBRE NEGRO N8

kg

888.5656

5.80

5,153.68

888.5656

5,153.68

ROCA VOLADA EN CANTERA DIAMETRO 1.0 M

m3

17,626.1500

36.80

648,642.32

17,626.1500

648,642.32

PIEDRA GRANDE SELECCIONADA DE 6"A 12"

m3

6,966.0000

2.50

17,415.00

6,966.0000

17,415.00

CEMENTO PORTLAND TIPO I

BOL

6.0000

20.50

123.00

6.0000

123.00

CARTEL DE OBRA

und

2.0000

1,500.00

3,000.00

2.0000

3,000.00

CAPACITACION

GLB

8.0000

3,135.29

25,082.32

8.0000

25,082.32

PILAS PARA LINTERNA

pza

288.0000

1.30

374.40

288.0000

374.40

MADERA NACIONAL P/ENCOFRADO-CARP

p2

288.0000

4.00

1,152.00

288.0000

1,152.00

MADERA NACIONAL PARA ENCOFRADO

p2

8,327.7000

4.00

33,310.80

8,327.7000

33,310.80

MADERA NACIONAL 3"x3"x10"

p2

4,163.8500

4.00

16,655.40

4,163.8500

16,655.40

ESTACA DE MADERA

p2

106.2500

2.70

286.88

106.2500

286.88

GAVION CAJA DE 5x1x1 (ZINC + ALUM)+PVC

und

1,161.0000

520.00

603,720.00

1,161.0000

603,720.00

GAVION TIPO COLCHON DE 5x2x0.30 (ZINC + ALUM)+PVC

und

387.0000

480.00

185,760.00

387.0000

185,760.00

CALAMINA

pza

48.0000

19.50

936.00

48.0000

936.00

EQUIPOS Y HERRAMIENTAS
HERRAMIENTAS MANUALES

2,840,941.98
%MO

45,558.84

2,840,941.98

45,558.84

45,558.84

WINCHA DE 50 m

HE

6.8000

50.00

340.00

6.8000

340.00

CAMION PLATAFORMA PARA MAQUINARIA PESADA

hm

12.0000

1,950.00

23,400.00

12.0000

23,400.00

CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3

hm

1.1230

185.00

207.76

1.1230

207.76

TRACTOR DE ORUGAS DE 180-220 HP

hm

1.1230

260.00

291.98

1.1230

291.98

EXCAVADORA 230-280 HP

hm

3,707.2923

360.00

1,334,625.23

3,707.2923

1,334,625.23

BULLDOZER 300-330 HP

hm

1,617.9313

385.00

622,903.55

1,617.9313

622,903.55

VOLQUETE 17 M3 - ROQUERO

hm

5,811.5330

140.00

813,614.62

5,811.5330

813,614.62

SUB TOTAL

5,816,425.15

5,816,425.15

PRESUPUESTO ANALITICO DEL COSTO INDIRECTO ( GASTOS GENERALES )


PROYECTO

: INSTALACION DE DEFENSAS RIBEREAS Y ENCAUZAMIENTO DE LOS RIOS MANTARO, RIO SECO Y RIO ACHAMAYO DEL
DISTRITO DE MATAHUASI - CONCEPCION - JUNIN

Distrito
Provincia
Departament
Regin
Fecha

MATAHUASI
CONCEPCION
JUNIN
JUNIN
Jun-14
APORTE GR-JUNIN

PART
2.1.1.1.1.3

2.3.1.2

2.3.1.3.1.1

DESCRIPCION

9.00

4,000.00

36,000.00

mes

8.00

5,000.00

40,000.00

Almacenero

mes

8.00

3,000.00

24,000.00

Asistente Administrativo

mes

8.00

4,000.00

32,000.00

Residente de Obra

mes

9.00

9,000.00

81,000.00

D.TECNICA

GAST.ADM.

36,000.00

24,000.00
32,000.00
81,000.00

UND

120.00

17.00

2,040.00

2,040.00

CAPOTINES

UND

120.00

30.00

3,600.00

3,600.00

GUANTES

PAR

120.00

16.05

1,925.96

1,925.96

BOTAS DE JEBE

PAR

120.00

36.05

4,326.00

4,326.00

LENTES DE SEGURIDAD

UND

120.00

15.69

1,882.56

1,882.56
44,400.00

COMBUSTIBLE Y CARBURANTES

Gln

2,400.00

18.50

44,400.00

44,400.00
24,000.00

VIATICOS Y ASIG. COM.DE SERVICIOS

Und

8.00

3,000.00

24,000.00

24,000.00
20,000.00

MATERIALES Y UTILES DE OFICINA

Mes

8.00

2,500.00

20,000.00

20,000.00
2,250.00

SERVICIO DE SUMINISTRO ELECTRICO

Mes

9.00

250.00

2,250.00

2,250.00
2,250.00

SERVICIO DE TELEFONIA INTERNET

Mes

9.00

250.00

2,250.00

2,250.00
2,400.00

CORREO Y SERVICIO DE MENSAJERIA

Mes

8.00

300.00

2,400.00

2,400.00
259,900.00

SERVICIOS DIRECTOS
Servicio de alquiler de Equipo de Cmputo (4)

mes

9.00

3,100.00

27,900.00

Servicio de Alquiler de Equipo de Oficina (Moviliario

mes

9.00

2,000.00

18,000.00

Expediente de Liquidacion

und

1.00

35,000.00

35,000.00

Copias, revelados y espiraladdos

mes

8.00

2,000.00

16,000.00

Servicio de Digitacin y Secretariado (2)

Mes

8.00

3,500.00

28,000.00

28,000.00

Servicio de Alquiler de camioneta(2)

Mes

9.00

15,000.00

135,000.00

135,000.00

COSTO INDIRECTO TOTAL

S/.

RESUMEN
8,487,982.02

COSTO TOTAL DE LA OBRA

5,819,745.23

COSTO DIRECTO
COSTO INDIRECTO

0.10

581,974.52

Gastos Administrativos

0.04

393,974.52

Direccin Tcnica

0.02

153,000.00

0.004

35,000.00

UTILIDAD

0.10

581,974.52

I.G.V. ( 18 % )

0.18

1,257,064.97

EXPEDIENTE TECNICO

0.00

0.00

SUPERVISION

0.04

247,222.78

Expediente Liquidacion

OTROS

40,000.00

CASCOS

Gastos por serv de correo y mensajeria


2.3.2.7.11.99

EXP. LIQUID.

13,774.52

VESTUARIO Y TEXTILES

Servicio de telefona Fija


2.3.2.2.3.1

P. TOTAL

213,000.00
mes

Prestacin de serv. De luz


2.3.2.2.2

P. PARCIAL

Asistente de Obra

materiales varios de escritorio


2.3.2.2.1.1

P. UNIT.

Administrador de Obra

Viticos Movilidad
2.3.1.5.1

CANTID.

PERSONAL CON CONTRATO A PLAZO FIJO

Petrleo
2.3.2.1.2.2

UND

27,900.00
18,000.00
35,000.00
16,000.00

581,974.52

35,000.00

153,000.00

393,974.52

0.00

-35,000.00

0.00

0.00

#REF!

Cuadro N : COSTO DISGREGADO DE CAPACITACIN


UNIDAD: Evento de capacitacin de 01 da con 50 participantes.
ITEM
1. BIENES
A
B

D
E
2 SERVICIOS
F
G
H
I

Descripcin
Alimentacin + refrigerio (1 da, 50 personas/da)
Materiales de escritorio
Papel Bond A4 de 75 gr.
Cuaderno de 50 hojas
Lapiceros
Folder manila A4
Cinta masking tape de 1"
Materiales de enseanza
Papelgrafos
Plumones Nro. 47 diferentres colores
Cartulina
Combustible:
Gasolina de 90 Oct.
Materiales de Enseanza
Preparacin de materiales de capacitacin

Unidad

Precio Unit.
S/.

PARA 01 MES
Cant.
Total S/.
1,595.29
50.00
750.00

personas

15.00

Millar
Unid.
Unid.
Unid.
Unid.

23.10
1.20
0.45
0.50
2.50

1.00
50.00
50.00
50.00
6.00

23.10
60.00
22.50
25.00
15.00

Unid.
Unid.
Unid.

0.34
4.50
0.80

20.00
10.00
13.00

6.79
45.00
10.40

Gl

15.50

25.00

387.50

Separata

5.00

50.00

Pago de ponente (Facilitador / metodlogo)


Hon.
850.00
Movilidad local
Pasaje
14.00
Fotocopias
Millar
50.00
Material de difusin (afiches, folleto, indumentaria)
Unid.
500.00
TOTAL :
RESUMEN COSTO TOTAL DE 8 EVENTOS DE CAPACITACIN S/.

1.00
10.00
1.00
1.00

250.00
1,540.00
850.00
140.00
50.00
500.00
3,135.29

25,000.00

PRESUPUESTO ANALITICO DE GASTOS DE SUPERVISION


PROYECTO

: INSTALACION DE DEFENSAS RIBEREAS Y ENCAUZAMIENTO DE LOS RIOS MANTARO, RIO SECO Y R


DISTRITO DE MATAHUASI - CONCEPCION - JUNIN

Distrito
Provincia
Departamento
Regin
Fecha

MATAHUASI
CONCEPCION
JUNIN
JUNIN
Oct-14

PART
2.3.3.7.2.1

2.3.2.7.11.99

DESCRIPCION

UND

CANTID.

P. UNIT.

P. PARCIAL

EXP. LIQUID.

199,222.78

CONSULTORIAS
Ing. Jefe de Supervisin

Mes

8.00

9,000

Topografo

Mes

2.00

4,000

8,000.00

Alquiler de computadoras(2)

Mes

8.00

3,450

27,600.00

Pruebas de laboratorio, cantera y concreto

Mes

8.00

3,450

27,600.00

Alquiler de camioneta

Mes

8.00

6,000

48,000.00

Utiles de escritorio

72,000.00

Mes

8.00

2,003

16,022.78

mes

8.00

6,000

48,000.00

48,000.00

SERVICIOS DIVERSOS
Asistente de Supervision

P. TOTAL

COSTO INDIRECTO TOTAL

S/.

RESUMEN
8,487,982.02

COSTO TOTAL DE LA OBRA

5,819,745.23

COSTO DIRECTO
COSTO INDIRECTO

0.10

581,974.52

UTILIDAD

0.10

581,974.52

I.G.V. ( 18 % )

0.18

1,257,064.97

Expediente Tcnico

0.00

0.00

GASTOS DE SUPERVISION

0.03

247,222.78

(*) Aporte de los beneficiarios

247,222.78

0.00

334,751.75

#REF!

TICO DE GASTOS DE SUPERVISION

CAUZAMIENTO DE LOS RIOS MANTARO, RIO SECO Y RIO ACHAMAYO DEL


I - CONCEPCION - JUNIN

APORTE GR-JUNIN
D.TECNICA

GAST.ADM.

EXP. TECNICO

72,000.00
8,000.00
27,600.00
27,600.00
48,000.00
16,022.78
48,000.00
80,000.00

167,222.78

0.00

#REF!

80,000.00

#REF!

RESUMEN DE APORTES DEL PRESUPUESTO TOTAL

INSTALACION DE DEFENSAS RIBEREAS Y ENCAUZAMIENTO DE LOS RIOS MANTARO, RIO


SECO Y RIO ACHAMAYO DEL DISTRITO DE MATAHUASI - CONCEPCION - JUNIN

TOTAL COSTO DIRECTO

5,819,745.23

TOTAL COSTO INDIRECTO

581,974.52

TOTAL COSTO UTILIDAD

581,974.52

TOTAL I.G.V.

TOTAL COSTO SUPERVISION


EXPEDIENTE TECNICO

TOTAL PRESUPUESTADO

1,257,064.97

247,222.78
0.00
8,487,982.02