Northwest Samar State University - Main Campus

Calbayog City
College of Engineering and Industrial Technology

Project:

DA RC SPACE FRAME

Subject:

Exterior Footing

Column Mark:

Calculated By:

Checked By:

Date:

Location:

8/1/2016

DESIGN OF ISOLATED SQUARE FOOTING


Soil bearing capacity,
Steel strength,
Concrete strength,
Unit weight soil,
Unit weight concrete,
Dead load force,
Live load force,
Dead load moment,
Live load moment,
Earthquake moment,,
Embedment of footing,
Concrete cover
Size of main bars
Limitation of footing width
Column size :

qa
fy
f'c
conc
soil
PDL
PLL
MDL
MLL
M EL
z

Breadth
Width

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

190
275
20.7
16
24
238.74
179.06
14.425
8.655
5.77
1.2
75
16
1.6
300
300

kPa
MPa
MPa
kN/cu.m.
kN/cu.m.
kN
kN
kN.m.
kN.m.
kN.m.
m.
mm.
mm.
m.
mm.
mm.

P=
P LL =

417.80
75

kN
%P DL

M=
M DL =
M LL =
M EL =

L
L

Load Factored:
P DL =
P LL =

1.2
1.6

Assume thickness of footing (t) =

M DL =
M LL =
M EL =
350

1.508
1.0
1.4

mm.

Solve for L using calculator, 3rd degree equation


a = 168.00
b=0
c = -417.8
d = -173.10
L=
say Length =

1.69
1.70

qe

Pn
WL

6Mn
WL2

168.00

417.80
A

173.1
A

Aftg

2.84

(From Calculator)
Aftg = WL

m.
m.

Design of footing is :

DESIGN SUMMARY
Footing Size:
Width =
Length =
Thickness =
Embedment =

1.7
1.7
350
1.2

m.
m.
mm.
m.

Steel Requirements
Along direction 1 =
Along direction 2 =

11
11

Minimum development length =

16
16
264.00 mm.

mm. RSB spaced @


mm. RSB spaced @

SAFE!

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

SOLUTION:
Effective depth of footing:
(d) =
say
Dimension of footing:
P TOTAL =
M TOTAL =

251
251

mm.
mm.

417.8
28.85

kN
Kn.m.

Effective soil bearing capacity:


qe = 168.00
kPa

Ultimate soil pressure (qu):


Pu = 572.982857 kN
Mu = 38.4859 kN

Solve for L using calculator, 3rd degree equation


a = 168
b=0
c = -417.8
d = -173.1
L=
say Length =

1.6852299546
1.7

qu max =
qu min =

-245.3
-151.26

kPa
kPa

(compression)
(compression)

m.
m.

Soil pressures are all in tension


No need to compute for new length.
e=
a=

0.069
2P
qe b

m.

L/2 = e + a/3
L^2 - 2eL - (4P/3qe) = 0
a=
1
b = -0.1381043562
c = -3.3158730159

Use Length
L=
1.7

m.

Length 1 =
Length 2 =

1.891
-1.753

m.
m.

Use Length=
say Length =

1.891
1.9

m.
m.

qu max =
qu min =

-245.26
-151.26

kPa
kPa

qu max =

-245.26

Use ultimate soil pressure


kPa
qu min =

-151.26

INVESTIGATE THE ADEQUACY OF ASSUMED d


based on wide-beam shear:
Assumed d =

0.3
251

mm.

y=

69.174

kPa

z=

220.44

kPa

0.251

151.26
Vu = 177.7352400818 kN

0.449

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Vc =

275.027100918 kN
Vc

1.251
>

Vu

(OK)

1.7

Based on punching shear

0.551
0.3

y1 =
z1 =

31.77
183.03

kPa
kPa

y2 =
z2 =

62.23
213.50

kPa
kPa

0.57

Vu = 512.7897192842 kPa
Vc = 713.1290946157 kPa
151.2630688
Vc

>

Vu

(OK)
0.57
1.13
1.7

STEEL REQUIREMENTS
d=
b=
y=
z=

251
1700
55.295
206.56

mm.
mm.
kPa
kPa

0.3

Mu = 96.7790451252 kN.m.
Mu
f'c b d^2

0.59w -w +
f'c b d^2 =

0.7
=0

2.00E+09

0.59w -w + 4.85E-02

=0

151.2630688

w 1 = 1.6449
w 2 = 0.0500

1.00

use w = 0.0500

1.7

= 0.0037619079
min = 0.0050909091
max = 0.0279691948
use = 0.0050909091
As = 2172.2909090909 mm^2

Number of bars using


# bars =
10.80
Say
11

16
bars
Bars

mm. RSB

Spacing of bars
s=
say

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Development length:
Ld 1 =
243.1
mm.
Ld 2 =
264
mm.
Use Ld =

264.0

mm.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
F1
Page

28.85
50
30
20

kN.m.
%M
%M
%M

m
SAFE!

153
153

mm. o.c.
mm. o.c.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

kPa

94.00
245.26

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

94.00
245.26

94.00
245.26

Spacing of bars
153.4
153

mm.
mm. o.c.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

Project:
Location:

COMMERCIAL BUILDING

Subject:

Interior Footing

Column Mark:

Calculated By:

Checked By:

Date:

Rosales, Pangasinan

8/1/2016

DESIGN OF ISOLATED SQUARE FOOTING


Soil bearing capacity,
Steel strength,
Concrete strength,
Unit weight soil,
Unit weight concrete,
Dead load force,
Live load force,
Dead load moment,
Live load moment,
Earthquake moment,,
Embedment of footing,
Concrete cover
Size of main bars
Limitation of footing width
Column size :

qa
fy
f'c
conc
soil
PDL
PLL
MDL
MLL
M EL
z

Breadth
Width

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

190
275
20.7
16
24
255.89
191.91
28.53
17.118
11.412
1.5
75
20
2
400
400

kPa
MPa
MPa
kN/cu.m.
kN/cu.m.
kN
kN
kN.m.
kN.m.
kN.m.
m.
mm.
mm.
m.
mm.
mm.

P=
P LL =

447.80
75

kN
%P DL

M=
M DL =
M LL =
M EL =

L
L

Load Factored:
P DL =
P LL =

1.2
1.6

Assume thickness of footing (t) =

M DL =
M LL =
M EL =
355

1.508
1.0
1.4

mm.

Solve for L using calculator, 3rd degree equation


a = 163.16
b=0
c = -447.8
d = -342.36
L=
say Length =

1.84
1.9

qe

Pn
WL

6Mn
WL2

163.16

447.80
A

342.36
A

3.368

(From Calculator)

m.
m.

Design of footing is :

DESIGN SUMMARY
Footing Size:
Width =
Length =
Thickness =
Embedment =

1.9
1.9
355
1.5

m.
m.
mm.
m.

Steel Requirements
Along direction 1 =
Along direction 2 =

8
8

Minimum development length =

20
20
379.78 mm.

mm. RSB spaced @


mm. RSB spaced @

SAFE!

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

SOLUTION:
Effective depth of footing:
(d) =
say
Dimension of footing:
P TOTAL =
M TOTAL =

250
250

mm.
mm.

447.8
57.06

kN
Kn.m.

Effective soil bearing capacity:


qe = 163.16
kPa

Ultimate soil pressure (qu):


Pu = 614.125714 kN
Mu = 76.11804 kN

Solve for L using calculator, 3rd degree equation


a = 163.16
b=0
c = -447.8
d = -342.36
L=
say Length =

1.8352111595
1.9

qu max =
qu min =

-236.7
-103.53

kPa
kPa

(compression)
(compression)

m.
m.

Soil pressures are all in tension


No need to compute for new length.
e=
a=

0.127
2P
qe b

m.

L/2 = e + a/3
L^2 - 2eL - (4P/3qe) = 0
a=
1
b = -0.2548459134
c = -3.6593936422

Use Length
L=
1.9

m.

Length 1 =
Length 2 =

2.045
-1.790

m.
m.

Use Length=
say Length =

2.045
2.1

m.
m.

qu max =
qu min =

-236.70
-103.53

kPa
kPa

qu max =

-236.70

Use ultimate soil pressure


kPa
qu min =

-103.53

INVESTIGATE THE ADEQUACY OF ASSUMED d


based on wide-beam shear:
Assumed d =

0.4
250

mm.

y=

98.126

kPa

z=

201.66

kPa

0.25

103.53
Vu = 208.2217061213 kN

0.5

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Vc = 306.1585960536 kN
Vc

1.400
>

Vu

(OK)

1.9

Based on punching shear

0.65
0.4

y1 =
z1 =

43.81
147.34

kPa
kPa

y2 =
z2 =

89.36
192.90

kPa
kPa

0.63

Vu = 542.2508903839 kPa
Vc = 837.9077365677 kPa
103.5326749
Vc

>

Vu

(OK)
0.63
1.28
1.9

STEEL REQUIREMENTS
d=
b=
y=
z=

250
1900
80.603
184.14

mm.
mm.
kPa
kPa

0.4

Mu = 117.1247096932 kN.m.
Mu
f'c b d^2

0.59w -w +
f'c b d^2 =

0.75
=0

2.21E+09

0.59w -w + 5.29E-02

=0

103.5326749

w 1 = 1.6402
w 2 = 0.0547

1.15

use w = 0.0547

1.9

= 0.004118025
min = 0.0050909091
max = 0.0279691948
use = 0.0050909091
As = 2418.1818181818 mm^2

Number of bars using


# bars =
7.70
Say
8

20
bars
Bars

mm. RSB

Spacing of bars
s=
say

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Development length:
Ld 1 =
379.8
mm.
Ld 2 =
330
mm.
Use Ld =

379.8

mm.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
F2
Page

57.06
50
30
20

kN.m.
%M
%M
%M

A = WL

m
SAFE!

247
247

mm. o.c.
mm. o.c.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

kPa

133.17
236.70

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

133.17
236.70

133.17
236.70

Spacing of bars
247.142857143 mm.
247
mm. o.c.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Project:

DA RC SPACE FRAME

Subject:

Combined Footing

Footing Mark:

Calculated By:

Checked By:

Date:

Location:

8/1/2016

DESIGN OF COMBINED FOOTING

Soil bearing capacity,


Steel strength,
main
Steel strength,
secondary
Concrete strength,
Unit weight soil,
Unit weight concrete,
Dead load force,
Live load force,
Dead load moment,
Live load moment,
Earthquake moment,,
Dead load force,
Live load force,
Dead load moment,
Live load moment,
Earthquake moment,,
Embedment of footing,
Concrete cover
Size of main bars
Temperature bars
Breadth
Column 1 size :
Width
Breadth
Column 2 size :
Width
Space between columns
Extension of footing from column 1

qa
fy
fy
f'c
conc
soil
PDL 1
PLL 1
MDL 1
MLL 1
M EL 1
PDL 2
PLL 2
MDL 2
MLL 2
M EL 2
z

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

190
kPa
275
MPa
275
Mpa
20.7
MPa
16
kN/cu.m.
24
kN/cu.m.
35.81714286 kN
26.9
kN
9.435
kN.m.
5.661
kN.m.
3.774
kN.m.
20.83428571 kN
15.62571429 kN
7.48
kN.m.
4.488
kN.m.
2.992
kN.m.
1.5
m.
75
mm.
16
mm.
16
mm.
300
mm.
300
mm.
300
mm.
300
mm.
1.65
m.
0.4
m.

C1
P=
M=

18.87

kN
kN.m.

75

%P DL

62.68

P LL =

P=

99.1

Xg

0.40

1.65
2.05

Load Factored:
P DL =
P LL =

1.2
1.6

Assume thickness of footing (t)

M DL =
M LL =
M EL =
=

350

1.2
1.0
1.4
Design of footing is :

mm.

SUMMARY

Footing Size:
Width =
Length =
Thickness =
Embedment =

Steel Requirements
1.6
2.8
350
1.5

m.
m.
mm.
m.

Top bars (Long direction) =


Bottom bars(long direction)=
Bars (short direction) =
Temperature bars =
Minimum development length

4
3
4
4

16
16
16

16
161.86

mm.

mm. RSB spaced @


mm. RSB spaced @
mm. RSB spaced @
mm. RSB spaced @
(Hook is needed)

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

SOLUTION:

Effective depth of footing:


(d) =
267
say
267
Dimension of footing:
P1 TOTAL =
M1 TOTAL =
P1 TOTAL =
M1 TOTAL =
P total =

62.7
18.87
36.46
14.96
99.14

Effective soil bearing capacity:


qe = 163.20
kPa

mm.
mm.

Ultimate soil pressure (qu):


Pu 1 = 85.9611429 kN
Pu 2 = 50.0022857 kN

kN
Kn.m.
kN
Kn.m.

qu =

161.86

Area required
Lw = 0.6074754902 m^2
Locate the centroid of footing:
Xg =
1.35
m.
say Xg =
1.4
m.

kPa

Size:
2.8
m.
0.22
m.
0.3
m.

L = 2 Xg =
w=
say

INVESTIGATE THE ADEQUACY OF ASSUMED d

Based on punching shear


2.8
1.35

0.3

0.567

0.3

0.567

2.77555756156289E-017
0.3
2.77555756156289E-017

0.3

0.25

0.567

0.267

Column 1:
bo =
=

2.268
2268

m
mm

Vu =

33.925

kN

0.567

0.267

0.267

Column 2:
bo =
=

2.268
2268

m.
mm.

Vu = -2.03431749 kN

0.267

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Vc = 780.61547281 kN
Vc
>
Vu

Vc = 780.615473 kN
Vc
>
Vu

(OK)

based on wide-beam shear:


Vu 1 = -46.288956735 kN
=
46.289
kN
Vu 2 = -6.6653289796 kN
=
6.665
kN
Vu 3 =
-16.170
kN
=
16.170
kN

Max Vu = 46.288956735 kN
Vc =
51.6
kN
Vc
>
Vu

(OK)

(OK)

STEEL REQUIREMENTS

286.54
166.67
48.56

2.8

V0=
Va =
Vb =
Vd =
Ve =
Vend =

0
12.14
-59.25
6.30
-29.14
0

x1 =
x2 =
x3 =
x4 =
x5 =
x6 =

0.0510112375
0.2489887625
1.2202642727
0.1297357273
0.0533353606
0.2466646394

Ma =
Mb =
Mc =
Md =
Me =

1.5174489796
-5.5497183673
-40.1850639
12.165795918
8.7405061224

kN/m
kN/m
kN/m

0.3

0.25

2.77555756156289E-017
2.77555756156289E-017

Along long direction:


w1 =
w2 =
wu =

0.3

1.35

0.3

286.54

kN/m

166.67

0.25

x1

1.35

x2

x3

x6
x4

min = 0.0050909091
max = 0.0279691948
Section
Mu

d
b
f'c
fy

0.3

Mu
f'c b d^2

a
1.52
0.90
267.00
300.00
20.70
275.00

b
-5.55
0.90
267.00
300.00
20.70
275.00

c
-40.19
0.90
267.00
300.00
20.70
275.00

d
12.17
0.90
267.00
300.00
20.70
275.00

e
8.74
0.90
267.00
300.00
20.70
275.00

0.00381

0.01393

0.10086

0.03053

0.02194

0.00382
0.00029

0.01405
0.00106

0.10770
0.00811

0.03110
0.00234

0.02223
0.00167

x5

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Use =
As = bd

0.0050909091
407.78
2.03
3
67
Bottom

Number bars
16

Use N =
Spacing
Location

0.00509
407.78
2.03
3
67
Top

0.00811
649.37
3.23
4
45
Top

0.00509
407.78
2.03
3
67
Bottom

0.00509
407.78
2.03
3
67
Bottom

Along shortdirection:

85.96

2.775558E-017

0.3

3E-017

kN

50.0023 kN

2.77555756156289E-017

300 2.7755575615629E-

0.3
Column 1
d=
b1 =
wu
Mu =
Section
Mu

d
b
f'c
fy
Mu
f'c b d^2
w

Use =
As = bd
Number bars
16
Use N =
Spacing
Location

251
500.25
80.97
0.00

mm.
mm.
kN/m
Kn.m

a
0.00
0.90
251.00
500.25
20.70
275.00

b
0.0
0.9
251
500.3
20.7
275

0.00000

0.0000

0.00000
0.00000
0.00509
639.23

0.0000
0.0000
0.0051
639.2

3.18

3.18

4
95
Bottom

4
95
Bottom

0.3
Column 2
d=
b2 =
wu
Mu =

251
500
80.97
0.00

Development length:
Ld 1 = 243.1
Ld 2 =
264
Use Ld =

264.00

mm.
mm.
kN/m
Kn.m

mm.
mm.
mm.

Min Ld furnished =

-75

Shrinkage and temperature bars:


using b =
1000
mm.
Ast =
700
mm.^2
N bars =
say N =

3.48
4

bars
bars

Spacing of Bars
s=
262

mm.

<

264.00
(Hook

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Footing Mark:

F2

Date:

Page

8/1/2016

C2
P=
M=
M DL =
M LL =
M EL =

14.96

kN
kN.m.

50
30
20

%M
%M
%M

36.46

99.1

. RSB spaced @
. RSB spaced @
. RSB spaced @
. RSB spaced @
(Hook is needed)

SAFE

44
67
95
262

mm.o.c
mm.o.c
mm.o.c
mm.o.c

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

0.267

2.77555756156289E-017
0.3
2.77555756156289E-017

0.567

0.6

0.6

2.77555756156289E-017
2.77555756156289E-017

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

0.3

kN/m
0.6

w = 48.56

kN/m

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

2.7755575615629E-017

264.00
(NOT OK)
(Hook is needed)

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Project:

COMMERCIAL BUILDING

Location:

Subject:

Combined Footing

Footing Mark:

Calculated By:

Checked By:

Date:

Rosales, Pangasinan

8/1/2016

DESIGN OF COMBINED FOOTING

Soil bearing capacity,


Steel strength,
main
Steel strength,
secondary
Concrete strength,
Unit weight soil,
Unit weight concrete,
Dead load force,
Live load force,
Dead load moment,
Live load moment,
Earthquake moment,,
Dead load force,
Live load force,
Dead load moment,
Live load moment,
Earthquake moment,,
Embedment of footing,
Concrete cover
Size of main bars
Temperature bars
Breadth
Column 1 size :
Width
Breadth
Column 2 size :
Width
Space between columns
Extension of footing from column 1

qa
fy
fy
f'c
conc
soil
PDL 1
PLL 1
MDL 1
MLL 1
M EL 1
PDL 2
PLL 2
MDL 2
MLL 2
M EL 2
z

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

190
kPa
275
MPa
275
Mpa
20.7
MPa
16
kN/cu.m.
24
kN/cu.m.
153.4228571 kN
115.1
kN
5.295
kN.m.
3.177
kN.m.
2.118
kN.m.
301.7142857 kN
226.2857143 kN
47.575 kN.m.
28.545 kN.m.
19.03
kN.m.
1.5
m.
75
mm.
20
mm.
16
mm.
400
mm.
200
mm.
400
mm.
400
mm.
1.75
m.
0.5
m.

C1
P=
M=
P LL =

10.59

kN
kN.m.

75

%P DL

268.49

P=

796.5

Xg

0.50

1.75
2.25

Load Factored:
P DL =
P LL =

1.2
1.6

Assume thickness of footing (t)

M DL =
M LL =
M EL =
=

400

1.508
1.0
1.4
Design of footing is :

mm.

SUMMARY

Footing Size:
Width =
Length =
Thickness =

Steel Requirements
1.4
3.6
400

m.
m.
mm.

Top bars (Long direction) =


Bottom bars(long direction)=
Bars (short direction) =

8
10
4

20
20
20

mm. RSB spaced @


mm. RSB spaced @
mm. RSB spaced @

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Embedment =

1.5

m.

Temperature bars =
Minimum development length

16
216.73

mm.

mm. RSB spaced @


(Hook is not needed

SOLUTION:

Effective depth of footing:


(d) =
315
say
315
Dimension of footing:
P1 TOTAL =
M1 TOTAL =
P1 TOTAL =
M1 TOTAL =
P total =

268.5
10.59
528
95.15
796.49

Effective soil bearing capacity:


qe = 162.80
kPa

mm.
mm.

Ultimate soil pressure (qu):


Pu 1 = 368.214857 kN
Pu 2 = 724.114286 kN

kN
Kn.m.
kN
Kn.m.

qu =

216.73

Area required
Lw = 4.8924447174 m^2
Locate the centroid of footing:
Xg =
1.79
m.
say Xg =
1.8
m.

kPa

Size:
3.6
m.
1.36
m.
1.4
m.

L = 2 Xg =
w=
say

INVESTIGATE THE ADEQUACY OF ASSUMED d

Based on punching shear


3.6
0.4

1.35

0.4

0.715

0.715

0.4

1.4

0.5

0.3

0.715

0.5

0.715

0.315
Column 1:
bo =
=

2.86
2860

m
mm

0.315
Column 2:
bo =
=

0.315

2.860
2860

m.
mm.

0.315

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Vu =
257.416
kN
Vc = 1161.3401229 kN
Vc
>
Vu

based on wide-beam shear:


Vu 1 = -60.23872381
=
60.239
Vu 2 = 158.22710476
=
158.227
Vu 3 = -253.360
=
253.360

Vu = 613.315483 kN
Vc = 1161.34012 kN
Vc
>
Vu

(OK)

kN
kN
kN
kN
kN
kN

Max Vu = 253.35967619 kN
Vc =
284.2
kN
Vc
>
Vu

(OK)

(OK)

STEEL REQUIREMENTS

V0=
Va =
Vb =
Vd =
Ve =
Vend =

0
91.03
-155.82
253.81
-348.94
0

kN/m
kN/m
kN/m

0.30

1.4

0.1475054324
0.2524945676
0.5135293601
0.8364706399
0.1684335269
0.2315664731

920.54

0.4

kN/m

1810.29

0.30

0
min = 0.0050909091
max = 0.0279691948

Mu
f'c b d^2

1.35

0.4

Ma = 13.6541142857
Mb = 0.6960952381
Mc = -25.658227121
Md = 219.6661381
Me = 200.63962381

Section
Mu

d
b
f'c
fy

0.4

0.5

920.54
1810.29
303.42

x1 =
x2 =
x3 =
x4 =
x5 =
x6 =

3.6

0.5

Along long direction:


w1 =
w2 =
wu =

x1

1.35

x2

x6

x3
x4

a
13.65
0.90
315.00
1400.00
20.70
275.00

b
0.70
0.90
315.00
1400.00
20.70
275.00

c
-25.66
0.90
315.00
1400.00
20.70
275.00

d
219.67
0.90
315.00
1400.00
20.70
275.00

e
200.64
0.90
315.00
1400.00
20.70
275.00

0.00528

0.00027

0.00991

0.08488

0.07753

x5

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
w

Use =
As = bd

0.00529
0.00040
0.0050909091
2245.09
7.15
8
176
Bottom

Number bars
20

Use N =
Spacing
Location

0.00027
0.00002
0.00509
2245.09
7.15
8
176
Bottom

0.00997
0.00075
0.00509
2245.09
7.15
8
176
Top

0.08962
0.00675
0.00675
2974.88
9.47
10
137
Bottom

0.08144
0.00613
0.00613
2703.44
8.61
9
154
Bottom

Along shortdirection:

368.21

0.5

0.2

0.5

kN

724.114 kN

0.5

400

1.4
Column 1
d=
b1 =
wu
Mu =
Section
Mu

d
b
f'c
fy
Mu
f'c b d^2
w

Use =
As = bd
Number bars
20
Use N =
Spacing
Location

295
636.25
137.90
17.24

mm.
mm.
kN/m
Kn.m

a
17.24
0.90
295.00
636.25
20.70
275.00

b
17.2
0.9
295
636.3
20.7
275

0.01671

0.0167

0.01688
0.00127
0.00509
955.53

0.0169
0.0013
0.0051
955.5

3.04

3.04

4
135
Bottom

4
135
Bottom

0.5

1.4
Column 2
d=
b2 =
wu
Mu =

295
636
137.90
17.24

Development length:
Ld 1 = 379.8
Ld 2 =
330
Use Ld =

379.78

mm.
mm.
kN/m
Kn.m

mm.
mm.
mm.

Min Ld furnished =

425

Shrinkage and temperature bars:


using b =
1000
mm.
Ast =
800
mm.^2
N bars =
say N =

3.98
4

bars
bars

>

379.78
(Hook i

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Spacing of Bars
s=
262

mm.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Footing Mark:

F4

Date:

Page

8/1/2016

C2
P=
M=
M DL =
M LL =
M EL =

95.15

kN
kN.m.

50
30
20

%M
%M
%M

528.00

796.5

. RSB spaced @
. RSB spaced @
. RSB spaced @

SAFE

175
136
135

mm.o.c
mm.o.c
mm.o.c

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

. RSB spaced @
(Hook is not needed)

262

mm.o.c

0.4
0.5

0.715

0.5

1.15

0.315

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

0.5

1.15

0.5

0.4

kN/m
1.15

w = 303.42

kN/m

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

0.5

379.78
(OK)
(Hook is not needed)

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

DESIGN OF FOOTING 4 (RECTANGULAR)

FRAME H
SUPPORT NO. 1
Designer: RAYMOND JAMES G. DELABAJAN

DESIGN VALUES
Soil bearing capacity,
qa
Steel strength,
fy
Concrete strength,
f'c
Unit weight soil,
conc
Unit weight concrete,
soil
Dead load force,
PDL
Live load force,
PLL
Dead load moment,
MDL
Live load moment,
MLL
Earthquake moment,,
M EL
Embedment of footing,
z
Concrete cover
Size of main bars
Limitation of footing width
Breadth
Column size :
Width

=
=
=
=
=
=
=
=
=

200
345
27.5
16
24
268
201
79.5
47.7
31.8
2
75
16
2
400
400

=
=
=
=
=
=

kPa
MPa
MPa
kN/cu.m.
kN/cu.m.
kN
kN
kN.m.
kN.m.
kN.m.
m.
mm.
mm.
m.
mm.
mm.

P=
P LL =

468.47

75

kN
%P DL

LOAD FACTOR:
P DL =
P LL =

Assume depth of footing (t)

1.4
1.7

M DL =
M LL =
M EL =

1.1
1.3
1.1

400 mm.

2 m.

SAFE

Design of footing is :

SUMMARY
Footing Size:
Width
Length
Thickness
Embedment

=
2
m.
= 2.6 m.
= 400 mm.
=
2
m.

Steel Requirements:
# Bars along long direction =
# Bars along short direction =

14
17

16
16

mm. RSB spaced @


mm. RSB spaced @

# Bars at center band =


# Bars along outer strip =

15
1

16
16

mm. RSB spaced @


mm. RSB spaced @

125
152

mm. o.c
mm. o.c

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
Minimum development length =

331.20

mm.

SOLUTION:
Effective depth of footing:
(d) =
301
mm.
say
301
mm.

Effective soil bearing capacity:


qe =
164.8
kPa

Dimension of footing:
Width (b) =
2
P TOTAL =
468.47
M TOTAL =
159

Ultimate soil pressure (qu):


Pu = 716.08986 kN
Mu = 184.44 kN

m.
kN
Kn.m.

Length 1 =
Length 2 =

2.554
-1.133

m.
m.

Use Length=
say

2.554
2.6

m.
m.

qu max = -219.5617 kPa


qu min = -55.85752 kPa

(compression)
(compression)

INVESTIGATE THE ADEQUACY OF ASSUMED d


based on wide-beam shear:
Assumed d =

301

mm.

y=

113.397

kPa

z=

169.25

kPa

0.4
0.301

55.86

Vu = 310.663805 kN
Vc = 447.229573 kN
1.801

Vc

>

Vu

(OK)
2.6

Based on punching shear


0.701
0.4

y1 =
z1 =

59.78
115.64

kPa
kPa

y2 =
z2 =

103.92
159.78

kPa
kPa

Vu = 648.419228 kPa
Vc = 1254.03172 kPa

0.95

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
55.85752

Vc

>

Vu

(OK)
0.95
1.65
2.6

STEEL REQUIREMENTS
Along long direction:
d=
301
y=
94.445

mm.
kPa

b = 2000 mm.
z = 150.3 kPa

0.4

Mu = 237.734965 kN.m.
Mu
f'c b d^2

0.59w -w +
f'c b d^2 =

1.1
=0

4.48E+09

0.59w -w + 5.30E-02

55.85752

w 1 = 1.6401
w 2 = 0.0548
use w = 0.0548

1.50
2.6

min
max
use

= 0.00436653
= 0.00405797
= 0.02742409
= 0.0043665

Number of bars using


# bars =
13.07
Say
14

As = 2628.6534 mm^2

Along shortdirection:
d=
317
b=
2600.0
Fu =
Mu =
0.59w -w +

286.44
114.57

mm.
mm.
kN
kN.m.

Mu
f'c b d^2

2.6 m.

=0

0.59w -w + 1.77E-02
w 1 = 1.6770
w 2 = 0.0179
use w = 0.0179

219.6 m.

f'c b d^2 = 6.47E+09

16
bars
Bars

mm.

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

min
max
use

= 0.0014274
= 0.00405797
= 0.02742409
= 0.00405797

0.8 m.

Number of bars us
16
mm. RSB
# = 16.634575
Say
17
bars

As = 3344.57971 mm^2

Distribution of Bars:

Development length:

= 1.300

Ld 1 = 264.6 mm.
Ld 2 = 331.2 mm.

# center band = 14.78 bars


say 15 bars
bars across
outer strip

bar

Use Ld = 331.2 mm.


Furnished Ld =

725

>

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

R)

M=
M DL =
M LL =
M EL =

159.00
50
30
20

kN.m.
%M
%M
%M

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

(compression)
(compression)

UMED d

163.7

0.799

219.56

0.95

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology
163.70
219.56

1.1

163.70
219.56

Spacing of bars
s = 125.07692 mm.
say
125
mm.

2 m.

55.858

Northwest Samar State University - Main Campus


Calbayog City
College of Engineering and Industrial Technology

Spacing of bars
s = 152.125
say
152

331.2 (OK)

mm.