Sei sulla pagina 1di 2

KAEFER (M) SDN. BHD.

PRR2 PROJECT (GPP3)


KERTEH, KEMAMAN, TERENGGANU

EQUIPMENT / PIPING INSULATION INSTALLATION PROGRESS REPORT


Item

W. P. No.

Area

Progress (LMT)
Equipment / Line No.

Sht

Detail

Class

Size

Thk

Lagging

Layer
Till Yesterday

Work Start :

From :

Down Time :

Item
1

To :
Description

Daily

Cladding
Cum.

Till Yesterday

Manpower :
Time

From :

To :

From :

To :

Daily

Supervisor
Tinsmith
Insulator
Total

*Attached Highlighted Isometric Drawing; Submit 5:00PM daily.

Supervisor (KMSB)

Superintendent (KMSB)

Project Engineer

Date :
Day :
Progress (LMT)
Cladding

Remarks
Cum.

Supervisor

Total

Project Engineer (KMSB)