Sei sulla pagina 1di 80

NEW SAN JOSE BUILDERS, INC.

TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


LOWER GROUND FLOOR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )
ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VS2-04-377

JULY. 22, 2015

JULY. 29, 2015

VSTS2-05-11

OCT. 22, 2015

OCT. 29, 2015

VSTS2-06-450

OCT. 28, 2015

NOV. 4, 2015

DIVISION 4 - MASONRY
1

FINISHES

DIVISION 5 - METALS
3

BASEBOARD

DIVISION 6 - CARPENTRY
2

CEILING FINISHES

DIVISION 8 - DOORS & WINDOWS


1

METAL DOOR

FACADE

VS2-08-431

JUN. 08, 2015

JUN. 25, 2015

VSTS2-08-446

OCT. 30, 2015

NOV. 10, 2015

JUN. 30, 2015

DIVISION 9 - FINISHES
1

POLISHED NATURAL STONE COUNTERTOP

VS2-09-403

JUN. 03, 2015

CERAMIC, PORCELAIN NAD MARBLE

VS2-09-402

JUN. 03, 2015

JUN. 20, 2015

FLOOR FINISHES

VS2-09-416

OCT. 22, 2015

OCT. 29, 2015

FINISHES

VS2-09-001

OCT. 28, 2015

NOV. 09, 2015

FLOOR FINISHES

VS2-09-004

OCT. 28, 2015

NOV. 09, 2015

DIVISION 15 - MECHANICAL WORKS


4

THREAD SEAL TAPE

VSTS2-15-476

JUN.29, 2015

JULY. 13, 2015

GLOSSY RED QUICK DRY ENAMEL

VSTS2-15-475

JUN. 29, 2015

JULY. 13, 2015

LAVATORY

VSTS2-15-477

JULY. 9, 2015

JULY. 23, 2015

10

WATER CLOSET, LAVATORY

VSTS2-15-478

JULY. 9, 2015

JULY. 23, 2015

12

AIR COOLED CONDENSING UNIT

VSTS2-15-550

OCT. 27, 2015

NOV. 14, 2015

PAGE 1 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


LOWER GROUND FLOOR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )
ITEM
13

PARTICULARS
FAN COIL UNIT

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VSTS2-15-551

OCT. 27, 2015

NOV. 14, 2015

PAGE 2 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


LOWER GROUND FLOOR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )
ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED
NOV. 04, 2015

15

FLOO DRAIN, SLOP SINK, HAND DRYER

VSTS2-15-362

OCT. 21, 2015

23

FAN COIL UNIT

VSTS2-15-557

OCT. 27, 2015

DEC. 1, 2015

24

VANITY BASIN

VSTS2-15-540

OCT. 21, 2015

NOV. 04, 2015

25

URINAL

VSTS2-15-541

OCT. 21, 2015

NOV. 04, 2015

26

FLOOR DRAIN

VSTS2-15-542

OCT. 21, 2015

NOV. 04, 2015

27

WATER CLOSET

VSTS2-15-543

OCT. 21, 2015

NOV. 4, 2015

DIVISION 16 - ELECTRICAL WORKS


9

PANEL BOARD

VSTS2-16-459

NOV. 4, 2015

NOV. 11, 2015

10

CONVENIENCE OUTLET

VSTS2-16-458

NOV. 5, 2015

NOV. 11, 2015

11

PVC PIPE , SOLVENT CEMENT

VSTS2-16-457

NOV. 5, 2015

NOV. 11, 2015

12

PANEL BOARD

VSTS2-16-462

NOV. 6, 2015

NOV. 20, 2015

13

SWITCHES AND OULET

VSTS2-16-461

NOV. 6, 2015

NOV. 20, 2015

14

LIGHTING FIXTURES

VSTS2-16-460a

NOV. 6, 2015

NOV. 20, 2015

15

LIGHTING FIXTURES

VSTS2-16-460b

NOV. 6, 2015

NOV. 20, 2015

16

LIGHTING FIXTURES

VSTS2-16-460c

NOV. 6, 2015

NOV. 20, 2015

17

POWER & AUXILLIARY

VST2-16-454

21-Oct-15

28-Oct-15

18

LED - DIMMABLE 9.6 W/M - LED STRIP

VSTS2-16-503

2/4/2016

2/11/2016

19
- - - NOTHING FOLLOWS - - PREPARED BY:

NOTED BY:

PAGE 3 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


LOWER GROUND FLOOR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )
ITEM

PARTICULARS

MPR REFERENCE CODE

JENELYN B. TIMAJO

DATE REQUESTED

DATE REQURIED
ENGR. PEDRO R. DE LEON JR.

PAGE 4 OF 80

ERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
STATUS

REMARKS

date received
by purchasing

LG: BACKFILLING FOR RAISED FLOORING

SUBMITTED TO PURCHASING

LG: STAINLESS BASEBOARD

SUBMITTED TO PURCHASING

LG: CEILING FINISHES @ SHOOTING RANGE

PARTIAL P.O # 12635

LG: METAL DOOR

P.O 13802

FAADE . INVISBLE CURTAIN WALL

P.O # 12587

SUBMITTED TO PURCHASING
FLOOR FINISHES @ FIRING RANGE AREA INCLUDING TOILET 1 & 2 & WALL TILES

SUBMITTED TO PURCHASING

LG: FLOOR FINISHES TILES @ SHOOTING RANGE

SUBMITTED TO PURCHASING

LG: FINISHES

SUBMITTED TO PURCHASING

LG: FLOOR FINISHES @ SHOOTING RANGE

SUBMITTED TO PURCHASING

SEAL TAPE FOR THREADED PIPE OF MECHANICAL WORKS

P.O # 12449

FOR FIRE PROTECTION PAINTING @ LOWER GROUND

SUBMITTED TO PURCHASING

FIXTURE FOR TOILET 1

SUBMITTED TO PURCHASING

FIXTURES FOR TOILET 2

SUBMITTED TO PURCHASING

AIR CONDITIONING UNITS FOR LOWER GROUND FLR

P.O 13290

PAGE 5 OF 80

ERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
STATUS

REMARKS

date received
by purchasing

AIR CONDITIONING UNITS FOR LOWER GROUND FLR

SUBMITTED TO PURCHASING

PAGE 6 OF 80

ERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
STATUS

REMARKS

date received
by purchasing

PLUMBING & SANITARY FIXTURES FOR TOILET @ LOWER GROUND

SUBMITTED TO PURCHASING

AIR CONDITIONING UNITS FOR LOWER GROUND FLR

P.O #13290

PLUMBING & SANITARY FIXTURES FOR TOILET

SUBMITTED TO PURCHASING

PLUMBING AND SANITARY FIXTURES

SUBMITTED TO PURCHASING

PLUMBING AND SANITARY FOR TOILET

SUBMITTED TO PURCHASING

PLUMBING AND SANITARY FIXTURES

SUBMITTED TO PURCHASING

FOR AIRCON SUPPLY @ UPPER / LOWER GROUND FLR

P.O # 13822,13821

DEVICES FOR UPPER GF/LOWER GF

P.O # 13370

ROUGH IN @LOWER GF LOBBY

P.O # 12813,12808,12715 12812 SERVED @ 12714

PANEL BOARD FOR LOWER / UPPER GROUND

P.O #13585

DEVICES FOR UPPER GF/LOWER GF

SUBMITTED TO PURCHASING

LIGHTING FIXTURES FOR LG, & UP

SUBMITTED TO PURCHASING

LIGHTING FIXTURES FOR LG, & UP

SUBMITTED TO PURCHASING

LIGHTING FIXTURES FOR LG, & UP

SUBMITTED TO PURCHASING

B4-LG HANGER AND SUPPORT FOR FEEDERS LINES

SUBMITTED TO PURCHASING

LIGHTING ON LG ( SHOOTING RANGE )

SUBMITTED TO PURCHASING

- - - NOTHING FOLLOWS - - -

PAGE 7 OF 80

ERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
STATUS

REMARKS

date received
by purchasing

O R. DE LEON JR.

PAGE 8 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


UPPER GROUND FLOOR

MATERIALS REQUISITIO

( AS OF FEBRUA
ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VS2-08-371

MAR. 09, 2015

MAR. 20, 2015

DIVISION 5 - METALS
1

METAL DOORS W/ SINGLE RABBET JAMB

STAINLESS STEEL TUBULAR HANDRILL

VS2-05-15

OCT. 24, 2015

NOV. 03, 2015

STAINLESS INSERT

VSTS2-05-12

OCT. 28, 2015

NOV. 06, 2015

STAINLESS INSERT

VS2-09-012

OCT. 28, 2015

NOV. 9, 2015

DIVISION 6 - CARPENTRY
8

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-445

OCT. 27, 2015

NOV. 04, 2015

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-448

OCT. 27, 2015

NOV. 04, 2015

11

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-447

OCT. 27, 2015

NOV. 04, 2015

13

PLYBOARD

VTS2-06-451

OCT. 30, 2015

NOV. 05, 2015

14

S4S 2" X 2" X 10'

VSTS2-06-467

11/17/2015

11/22/2015

18

MARINE PLYWOOD

VSTS2-06-484

12/10/2015

12/15/2015

20

GYPSUM BD 4' x 8' x 1/2"

VSTS2-06-493

12/28/2015

1/4/2015

21

MARINE PLYWOOD

VSTS2-06-484

12/10/2015

12/15/2015

25

THERMAFIBER INSULATION 4' x 8'

VSTS2-06-494

1/13/2016

1/20/2016

27

ANTIQUE GLOSS 3904-G ( LP - 3 )

VSTS2-06-501

1/12/2016

1/15/2016

28

ANTIQUE GLOSS 3904-G ( LP - 3 )

VTS2-06-504

1/21/2016

1/28/2016

29

CEILING COVER ( WC - 2 )

VSTS2-06-505

1/23/2016

1/28/2016

30

PLYWOOD x 4' x 8' X 12MM

VSTS2-06-508

2/1/2015

2/6/2016

31

MARINE PLYWOOD 4' x 8' x " THK.

VSTS2-06-50

2/5/2016

2/10/2016

32

ACP - 1 ( ALUMINUM COMPOSTE PANEL

VSTS2-06-512

2/9/2016

2/15/2016

33

ANGLE BAR 40MM X 40MM x 6 M

VSTS2-06-511

2/5/2016

2/10/2016

VSTS2-07-001

2/22/2016

2/29/2016

DIVISION 7 -WATERPORRFING
1

ALUMINUM DUCT TAPE 150ML x 3" w

Page 9 of 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


UPPER GROUND FLOOR

MATERIALS REQUISITIO

( AS OF FEBRUA
ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

DIVISION 8 - DOORS AND WINDOWS


4

12MM FRAMELESS TEMPERED CLEAR GLASS

VS2-08-376A

MAR. 10, 2015

APR. 10, 2015

GLASS WALL AND DOORS

VS2-08-326B

MAR. 10. 2015

APR. 10, 2015

SOLID WOOD DOOR JAMB & 6MM THK. CLEAR GLASS

VS2-08-449

SEPT. 23, 2015

SEPT. 30, 2015

SOLID WOOD SWIG - OUT

VS2-08-443

OCT. 22, 2015

OCT. 29,2015

GLASS - CURTAIN WALL

VS2-08-446

OCT. 30, 2015

NOV. 10, 2015

11

TEMPERED GLASS RAILNG 10MM TKH. ( 1.11m X 0.43m )

VSTS2-08-449

DEC. 2, 2015

DEC. 09, 2015

13

PANEL DOOR , METAL DOOR & FLSUH DOOR

VSTS2-08-452

1/23/2016

1/29/2016

14

TEMPERED GLASS - ( GL - 2 )

VSTS2-08-454

2/12/2016

2/20/2016

15
DIVISION 9 - FINISHES
4

MARBLE TILES , WOODFLANKS , GRANITE TILES & CERAMIC TILES

VS2-09-372-A

MAR. 10, 2015

MAR. 26, 2015

GRANITE TILES

VS2-09-372-B

MAR. 10, 2015

MAR. 26, 2015

SLATTED METAL CEILING

VS2-09-399

MAR. 16, 2015

ARPIL. 11, 2015

MARBLE TILES

VS2-09-372A

MAY. 6, 2015

MAY. 15, 2015

MARBLE TILES & PRCELAIN TILES

VS2-09-400

JUN. 03, 2015

JUN. 15, 2015

10

CARPET FLOORNG

VS2-09-412

SEPT. 23, 2015

SEPT. 30, 2015

11

ACCENT TILES

VS2-09-415

OCT. 16, 2015

OCT. 30, 2015

13

TRAVENTINE

VS2-09-418

OCT. 24, 2015

NOV.03, 2015

17

MARBLE TILES

VS2-09-422

OCT. 28, 2015

NOV. 06, 2015

19

MARBLE TILES

VS2-09-422

OCT. 28, 2015

NOV. 06, 2015

20

UPHOLSTERY

VS2-09-002

OCT. 28, 2015

NOV. 9, 2015

21

MARBLE TILES

VS2-09-005

OCT. 28, 2015

NOV. 9, 2015

Page 10 of 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


UPPER GROUND FLOOR

MATERIALS REQUISITIO

( AS OF FEBRUA
ITEM
22

PARTICULARS
MARBLE TILES

Page 11 of 80

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VS2-09-006

OCT. 28, 2015

NOV. 9, 2015

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


UPPER GROUND FLOOR

MATERIALS REQUISITIO

( AS OF FEBRUA
ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

27

ACRYLIC RODS W/ AIR BUBBLES ( SP-1 )

VS2-09-435

11/20/2015

11/25/2015

29

MARBLE TILES

VSTS2-09-436

11/20/2015

11/25/2015

30

TAIWAN POWDER

VSTS2-04-391

11/12/2015

11/20/2015

32

6MM THK. BACKPAINTED GLASS

VSTS2-09-437

11/23/2015

11/27/2015

33

GREY TRAVERTINE

VSTS2-09-447

12/2/2015

12/9/2015

34

GRANITE TILES -DARK GRAY

VSTS2-09-449

12/2/2015

12/9/2015

39

STAINLESS STEEL - ( MT - 1 )

VSTS2-09-455

12/11/2015

12/18/2015

40

MT - 2 ( BRUSHED TITANIUM )

VSTS2-09-470

12/19/2015

12/23/2015

41

MARBLE - ( ST - 1 )

VSTS2-09-469

12/18/2015

12/19/2015

44

ACRYLIC ROD W/ AIR ( SP-1 )

VSTS2-09-460

14-Jan-15

21-Jan-15

46

LAMITAK - LP-1

VSTS2-09-489

8-Jan-16

15-Jan-16

47

WALL FINISHES - WOOD ( WD - 03)

VSTS2-09-497

1/21/2016

1/28/2016

48

WALL FINISHES - ( UP -06 )

VSTS2-09-496

1/21/2016

1/28/2016

49

WALL FINISHES - ( ST- 01 )

VSTS2-09-495

1/21/2016

1/28/2016

50

WALL CLADDING FINISHES -( ST - 5 )

VSTS2-09-504

2/4/2016

2/11/2016

51

WALL CLADDING FINISHES -( CT - 5 ) : ALTERNATIVE : HUEWA RENA

VSTS2-09-502

2/4/2016

2/11/2016

52

TILE ADHESIVE

VSTS2-09-503

2/4/2016

2/11/2016

53

PORCELAIN TILES ( CT-4 )

VSTS2-09-506

2/4/2016

2/11/2016

54

EPOXY CONCRETE & MARINE PLYWOOD

VSTS2-09-506.A

2/6/2016

2/13/2016

55

LAMINATED WALL SHEET ( LP-2 )

VSTS2-09-505

2/5/2016

2/12/2016

56

STONE TILES ( ST - 6 ) : ALTERNATIVE LATINA ONOA

VSTS2-09-510

2/12/2016

2/20/2016

57

UPHOLSTERY ( UP -6 )

VSTS2-09-509

2/10/2016

2/17/2016

58

VINYL / WALL PAPER ( WC -1 , WC - 3 , WC - 4 )

VSTS2-09-508

2/10/2016

2/17/2016

59

TERESA MARBLE ( ST - 2 )

VSTS2-09-507A

2/15/2016

2/21/2016

VS2-15-256

MAR. 02, 2015

MAR. 24, 2015

DIVISION 15 - MECHANICAL
1

B.I. PIPE & FITTINGS

Page 12 of 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


UPPER GROUND FLOOR

MATERIALS REQUISITIO

( AS OF FEBRUA
ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

G.I CLEVIS HANGER, LOOP HANGER ETC.

VS2-15-370

MAR. 07, 2015

MAR. 23, 2015

WATER CLOSET, LAVATORY AND URINAL. ETC.

VST2-15-464

MAY. 27, 2015

JUN.10, 2015

12

PVC PIPE & FITTINGS

VS2-15-438

APR. 15, 2105

APR. 29, 2015

15

PTFE THREAD SEAL TYPE

VSTS2-15-470

JUN. 16, 2015

JUN. 30, 2015

16

CEILING CASSETE & AIR COOLED CONDENSING UNIT

VSTS2-15-462

JUN.18, 2015

JUL. 18, 2015

17

CEILING CASSETE & AIR COOLED CONDENSING UNIT

VSTS2-15-461

JUN.18, 2015

JUL. 18, 2015

18

FAN COIL UNIT WITH AIR COLLED CONDENSING UNIT DX TYPE

VSTS2-15-519

SEPT. 22, 2015

OCT. 06, 2015

19

FAN COIL UNIT

VSTS2-15-524

OCT. 03, 2015

OCT. 17, 2015

22

B.I. END CAP

VSTS2-15-544

OCT. 26, 2015

NOV. 08, 2015

23

FAN COIL UNIT

VSTS2-15-552

OCT. 30, 2015

DEC.01, 2015

24

WATER CLOSET

VSTS2-15-553

OCT. 30, 2015

NOV. 12, 2015

25

AIRCONDITIONING

VS2 -15-552

OCT.30, 2015

DEC. 01, 2015

27

CONCEALED PENDENT SPRINKLER

VSTS2-15-554

11/4/2015

11/11/2015

28

FLOOR CLEAN OUTCLEAN

VSTS2-15-556

11/5/2015

11/19/2015

30

MS PLATE - 10MM THK x 1.2m x 2.4m )

VSTS2-15-584

12/12/2015

12/28/2015

31

CONCEALED TYPE SPRINKLER HEAD

VSTS2-15-598

1/6/2016

1/20/2016

32

WATER CLOSET

VSTS2-15-615

1/29/2016

3/14/2016

33

AIRCON GRILLES

VSTS2-15-573

12/5/2015

12/19/2015

34

H-FRAME ,CROS BRACE, JOINT PIN & STEEL PLATFORM

VSTS2-15-628

2/17/2016

3/2/2016

35

H-FRAME ,CROS BRACE, JOINT PIN & STEEL PLATFORM

VSTS2-15-629

2/17/2016

3/2/2016

36

KITCHEN EXHAUST BLOWER

VSTS2-15-627

2/12/2016

2/26/2016

37
DIVISION 16 - ELECTRICAL
8

OUTLET

VS2-16-235

FEB. 11, 2015

FEB.24, 2015

UTP DTA CABLE CAT- 6 , 4 PAIRS @ 150M

VS2-16-236

FEB.11, 2015

FEB. 20, 2015

Page 13 of 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


UPPER GROUND FLOOR

MATERIALS REQUISITIO

( AS OF FEBRUA
ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

10

PINLOGHT/ DOWNLIGHT, LED STRIP LIGHT

VS2-16-391

MAR. 13, 2015

MAR.27, 2015

12

DOWNLIGHT , T5 , & PINLIGHT

VS2-16-414-B

MAR. 26, 2015

APR. 17, 2015

13

FLUORESCENT BULB

VS2-16-414-A

MAR. 26, 2015

APR. 17, 2015

14

PVC PIPE & FITTINGS

VS2-TG-257

JUN.01, 2015

JUN. 08, 2015

15

30 KWHR METER, DIGITL 230V . 3 - WIRE, 60HZ. W/ METER BASE

VS2-46-267

JULY. 04, 2015

AUG. 03, 2015

16

CIRCUIT BREAKER GUTTER & BUS BAR GUTTER

VS2-16-258

JULY. 04, 2015

AUG. 03, 2015

17

JUNCTION BOX

VSTS-16-150

OCT. 08, 2015

OCT. 15, 2015

18

FLOURESCENT FIXTURES

VSTS-16-149

OCT. 07, 2015

OCT. 14, 2015

18

PANEL BOARD

VSTS2-16-459

11/4/2015

11/11/2015

19

CONVENIENCE OUTLET

VSTS2-16-458

11/5/2015

11/11/2015

21

PANEL BOARD

VSTS2-16-462

NOV. 6, 2015

NOV. 20, 2015

22

LED ROP LIGHT

VSTS2-16-470

11/26/2015

12/5/2015

23

LED LIGHTS

VSTS2-16-481

12/16/2015

12/16/2015

24

PP PANEL - OUTDOOR NEMA 3R ENCLOSURE

VSTS2-16-479

12/10/2015

12/15/2015

25

ROUGH - IN ( ADDNL )

VSTS2-16-484

12/29/2015

1/6/2016

26

DIAMABLE ADJISUTMENT RECESSED IP20LED

VSTS2-16-496

29-Jan-16

5-Feb-16

27

LED - DIMMABLE 9.6 W./M LED FLEXIBLE

VSTS2-16-197

29-Jan-16

5-Feb-16

28

HIGH-BAY LIGHT ( RECESSED TYPE )

VSTS2-16-500

1-Feb-16

8-Feb-16

29
30
31

- - - NOTHING FO
PREPARED BY:

NOTED BY:

Page 14 of 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


UPPER GROUND FLOOR

MATERIALS REQUISITIO

( AS OF FEBRUA
ITEM

PARTICULARS

MPR REFERENCE CODE

JENELYN B. TIMAJO

DATE REQUESTED

DATE REQURIED

ENGR. PEDRO R. DE LEON JR.

Page 15 of 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
REMARKS

FOR UPPER GROUND


STAINLESS TUBULAR HANDRILL @ FAADE
FLOORING INSERT , RESIDENTIAL LOBBY
FLOORING INSERT MAIN LOBBY , RESIDENTIAL LOBBY AND BOARD ROOM

CEILING WORKS @ RESIDENTIAL LOBBY AND BOARD ROOM


CEILING WORKS @ BUSINESS LOUNGE
CEILING WORKS @ MAIN LOBBY
CEILING WORKS @ CLUB LOUNGE
CEILNG WORKS @ UPPER GROUND
CEILING WOKRS @ UPPER GROUND FLR - MAIN LOBBY
CEILING FINISHES @ UPPER GROUND FLR - FUNCTION ROOM 4
CEILING WORKS @ UPPER GROUND FLR - MAIN LOBBY
THERMAL INSULATION FOR DRYWALL
CEILING FINISHES @ UPPER GROUND FLR MAIN LOBBY
CEILING FINISHES @ UPPER GROUND FLR MAIN LOBBY
CEILING COVER @ CLUB LOUNGE - UPPER GROUND
CEILING WORKS FOR BACKING @ UG, 5TH & 6TH FLR
CARPENTRY @ UPPER GROUND FLR - FAADE AREA
CEILING FINISHES @ DROP- OFF, HIGH CEILING , PARAPHET AND ACCENT WALL
CARPENTRY WORKS @ UPPER GROUND FLR PODIUM AREA

ISNT. OF DRYWALL @ UFG

Page 16 of 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
REMARKS

GLASS WALL PARTITION


GLASS WALL PARTITION
SOLID WOOD DOOR FOR PABY ROOM
DOORS @ PABX ROOM
GLASS WALL @ PODIUM
GLASS FINISHES @ DROP OFF STAIR
TOILET 2 - DOOR SCHEDULE @ UPPER GROUND FLR
GLASS CURTAIN - WALL - COLUMN CLADDING @ UFG

FLOORING FINISHES @ CLUB LOUNGE & BUSINESS CENTER


WALL FINISHES @ CLUB LOUNGE TOILET & PUBLIC TOILETS
SPECIAL ARCHITECTURAL CEILING
FLOOR FINISH OF CLUB LOUNGE AND RECEPTION AREA
FLOOR FINISHES
FLOOR FINISH OR PABX ROOM
ACCENT TILES FOR DROP - OFF
TILES WORKS @ FRONT ELEV. - FAADE AREA
FLOOR FINISHES @ BUSINESS LOUNGE
FLOOR FINISHES @ BUSINESS LOUNGE
WALL @ BUSINESS LOUNGE
FLOORING @ RESIDENTIAL LOBBY AND BOARD ROOM , CLUB LOUNGE

Page 17 of 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
REMARKS
FLOORING @ CLUB LOUNGE ( ACCENT AND FIELD TILES )

Page 18 of 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
REMARKS
WALL FINISH @ UG CLUB LOUNGE
WALL FINISHES @ CLUB LOUNGE
MASONRY WOKRS
WALL FINISHES @ UPPER GROUND MAIN LOBBY
WALL FINSIHES @ PLANT BOX
FLOOR FINISHES @ STAIR
WALL FINISHES @ UPPER GROUND - MAIN LOBBY
WALL FINISHES @ UPPER GROUND - CLUB LOUNGE
FLOOR FINISHES @ UPPER GRPUND FLR - CLUB LOUNGE
WALL FINISHES @ CLUB LOUNGE
WALL FINISHES @ CLUB LOUNGE
WALL FINIHSES @ FUNCTION ROOM 4
WALL FINISHES @ FUNCTION RROM 4
WALL FINISHES @ UPPER GROUND FLR - FUNCTION ROOM 4
WALL FINISHES -ACCENT WALL FINISH @ UPPER GROUND LOBBY
WALL FINISHES - ACCENT WALL FINISH @ UPPER GROUND LOBBY
FINISHES : ADHESIVE MATERIALS FOR WALL TILES @ UG LOBBY
WALL FINISHES - ACCENT WALL @ CLUB LOUNGE
FINISHES - BONDING ADHESIVE FOR FAADE EXT. WALL
FINISHES - WALL ACCENT @ BUSINESS LOUNGE & CLUB LOUNGE - LP2
FINISHES - ACCENT WALL TILES @ RESIDENTIAL LOBBY
FINISHES -WALL COVERING @ PRESENTATION & BOARD ROOM
FINISHES : WALL COVERING @ RESIDENTIAL , BUSINESS LOUNGE & CLUB LOUNGE
WALL FINSIHES @ UPPER GROUND - CLUB LOUNGE WALL ACCENTS

PIPING FOR UPPER GROUND

Page 19 of 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
REMARKS
PLUMBING AND SANITARY HANGER FOR COMMON TOILET
ADDN'L FIXTURE FOR COMMON TOILET 2 ( PUBLIC CLUB LOUNGE )
PIPES AND FITTINGS FOR ADDN'L PERPORATED PIPES AND DRAINS FOR PLANTS BOXES
SEAL TAPES FOR THREADED PIPES OF MECHANICAL WORKS
AIR-CONDITIONING WORKS ( DX TYPE OF UNITS )
AIR-CONDITIONING WORKS ( VRF/VRV TYPE OF UNITS )
AIR CONDITIONING UNIT FOR DABX ROOM
FAN COIL UNIT ( VRFTYPE )
FOR FIRE PROTECTION
AIRCONDITIONING ( DX TYPE )
PLUMBING FIXTURES FOR TOILET
CEILING CASSETTE , AIR COOLED CONDENSING UNIT
SPRINKLER HEADS FOR FIRE PROTECTION @LG LEVEL
FOR TOILETS @ UG LEVEL
FOR FIRE PROTECTION & PLUMBING WORKS - RISER
ADDNL SPINKLER HEAD FOR FIRE PROTECTION @ FUNCTION ROOM 3&4
ADDITIONAL PLUMBING FIXTURES FOR LG GROUND
AIRCON GRILLES FOR LUB LOUNGE @ UG FLR
SCAFFOLDING FOR PASSENGER ELEVATOR 9,10 & 11 ( PE 9, 10 & 11 )
SCAFFOLDING FOR PASSENGER ELEVATOR 9,10 & 11 ( PE 9, 10 & 11 )
FORKITCHEN ( RED CRAB ) VENTILATION BLOWERS

INST. OF POWER AND AUXILLARY DEVICES


WIRING OF TELEPHONE AND DATA SYSTEM

Page 20 of 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
REMARKS
FOR LIGHTING FIXTURES @ CLUB LOUNGE TOILET & PUBLIC TOILET
FOR LIGHTING IFXTURES
FOR LIGHTING IFXTURES
FOR FEEDER ( ROUGH - IN ) AT COMMERCIAL UNITS ( UG. 5HT , 6TH , 7TH & 8TH )
FOR SUBMETER ( METER CENTER ) @ COMMERCIAL AREA @ UG- 8TH FLR
FOR COMMERCIAL MTER CENTER
FOR REPLACEMENT / FOR PAINTING OF BOX, PIPE AND SUPPORT
TEMPORARY LIGHTS @ RESIDENTIAL HALLWAY TA & TB
FOR AIRCON SUPPLY @ UPPER / LOWER GROUND FLR
DEVICES FOR UPPER GF/LOWER GF
PANEL BOARD FOR LOWER / UPPER GROUND
FOR CLUB LOUNGE ( COVE LIGHT )
FOR UGF FUNCTION ROOM / MAIN ENTRANCE LOBBY
FOR POWER SUPPLY OF CONDENSER @ UPPER GROUND
ROUGH IN ( ADDITIONAL ) FOR UPPER GROUND FLR - FUNCTION ROOM / PRESENTATION RM )
UPPER GROUND LIGHTING ( FUNCTION ROOM EXTENSION )
LIGHTING FOR UPPER GROUND ( LED STRIP )
LIGHTING FIXTURES FOR DROP -OFF AREA

- - - NOTHING FOLLOWS - - -

Page 21 of 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )
REMARKS

ENGR. PEDRO R. DE LEON JR.

Page 22 of 80

STATUS

P.O # 13081 / CITY SHUTTER


SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

PARTIAL SERVED @ BLACK SCREW - P.O 12802,12271,12799,12817,12804,12803


PARTIAL SERVED @ BLACK SCREW - P.O 12802,12271,12799,12817
PARTIAL SERVED @ BLACK SCREW - P.O 12802,12271,12799,12817
P.O # 12656/12657
P.O # 12959 / GLORY LUMBER
P.O 13599
PARTIAL SERVED @ P.O # 13816, 13817,13818,13819
PARTILA SERVED @ P.O # 13599
SUBMITTED TO PURCHASING
IN - HOUSE - 308480
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

SUBMITTED TO PURCHASING

Page 23 of 80

STATUS

SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 12837
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
PARTIAL SERVED - P.O # 12951,12760
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
W / P.O
P.O # 12651
P.O # 12651
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

Page 24 of 80

STATUS
PARTIAL SERVED - P.O #12699 / 12698

Page 25 of 80

STATUS
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 13165
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE ( SUPERCEED MPR VS2-09-419 )
SUBMITTED TO PURCHASING / IN HOUSE ( SUPERCEED MPR VS2-09-419 )
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

P.O # 7790/7701-7702/7704-7707 PARTIAL SERVED

Page 26 of 80

STATUS
9351/9457/8054
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O #12451
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 13290
P.0 # 12662
P.O # 13211
P.O # 13290
PARTIAL SERVED @ P.O # 13396
P.O # 13290
P.O # 12950
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

SUBMITTED TO PURCHASING
P.O.# 7473

Page 27 of 80

STATUS
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 12506
P.O # 12674
P.O 12438
P.O # 13822,13821
P.O # 12506 ,13370
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 13874 PARTIAL SERVED , 13873
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

Page 28 of 80

STATUS

Page 29 of 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


2ND FLR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

DIVISION 3 - REINFORCED CONCRETE


1

RMC 9000 psi - 28 DAYS

VSTS2-03-500

12-Nov-15

12-Nov-15

RMC 9000 psi - 28 DAYS

VSTS2-03-501

12-Nov-15

12-Nov-15

RMC 7000 psi - 28 DAYS

VSTS2-03-502

12-Nov-15

12-Nov-15

10-Nov-15

4
DIVISION 15 - MECHANICAL
1

AIR COOLED CONDENSING UNIT

VSTS2-15-566

26-Nov-15

STEEL CAHNNEL

VSTS2-15-569

12/2/2015

12/9/2015

B.I PIPE & FITTINGS

VSTS-15-589

6-Jan-16

22-Jan-16

G.I MALE PLUG "

VSTS2-15-594

6-Jan-16

22-Jan-16

WELDING ROD

VSTS2-15-593

6-Jan-16

22-Jan-16

U BOLT & HEXAGON BOLT

VSTS2-15-590

6-Jan-16

22-Jan-16

ANGLE BAR ( " THK. X 2" x 2" x 6m )

VSTS2-15-591

6-Jan-16

22-Jan-16

G.I HANGER

VSTS2-15-591

6-Jan-16

22-Jan-16

PIPE THREAD SEAL TYPE

VSTS2-15-596

6-Jan-16

22-Jan-16

DIVISION 16 - ELECTRICAL
1

SQUARE DOWNLIGHT FIXTURES

VST2-16-467

14-Nov-15

21-Nov-15

INSULATION TESTER

VSTS2-16-471

27-Nov-15

5-Dec-15

MOLDED CASE CIRCUIT BREAKER

VSTS2-16-

2/2/2016

2/9/2016

- - - NOTHING FOLLOWS - - -

PAGE 30 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


2ND FLR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )

ITEM

PARTICULARS

MPR REFERENCE CODE

PREPARED BY:

DATE REQUESTED

DATE REQURIED

NOTED BY:

ENGR. PEDRO R. DE LEON JR.

JENELYN B. TIMAJO

PAGE 31 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

ADDNL AIRCON UNIT FOR LIBRARY @ MLQ

SUBMITTED TO PURCHASING

CHANNEL FOR PLUMBING & FIRE PROTECTION RISER

SUBMITTED TO PURCHASING

B.I PIPE & FITTINGS FOR FIRE PROTECTION @ 10TH FLR - TOWER B

SUBMITTED TO PURCHASING

G.I PLUG FOR MECHANICAL WORKS @ 10TH FLR - TOWER B

SUBMITTED TO PURCHASING

FOR FIRE PROTETION @ 10TH FLR - TOWER B

SUBMITTED TO PURCHASING

BOLTS FOR PIPE SUPPORT @ 10TH FLR - TOWER B

SUBMITTED TO PURCHASING

BRACES & BRAKETS FOR SUPPORT TO CROSSMAIN OF FIRE PROTECTION@ 10THFLR - TOWER B

SUBMITTED TO PURCHASING

G.I HANGERS FOR FIRE PROTECTION @ 10TH FLR - TOWER B

SUBMITTED TO PURCHASING

PIPE THREAD SEAL TYPE

SUBMITTED TO PURCHASING

REPLACEMENT FOR HALLWAY @ MLQU

P.O # 13330 SERVED/ 13288

FORELECTRICIAN MAINTENANCE / SUB-METER FOR MLQU

SERVED

CB, RE: SUPPLY FOR MLQU / MAINTENACE

SUBMITTED TO PURCHASING

- - - NOTHING FOLLOWS - - -

PAGE 32 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

PEDRO R. DE LEON JR.

PAGE 33 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


3RD FLOOR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VSTS2-09-501

1-Feb-16

6-Feb-16

DIVISION 9 - FINISHES
1

THERMAFIBER INSULATION 4'x 8'

DIVISION 15 - MECHANICAL
1

STEEL CHANNEL

VSTS2-15-569

12/3/2015

DEC. 17, 2015

AIR COOLED CONDESING UNIT

VSTS2-15-625

9-Feb-15

23-Feb-15

VSTS2-15-611

19-Jan-16

2-Feb-16

3
4
DIVISION 16 - ELECTRICAL
2

FLUSH VALVE

- - - NOTHING FOLLOWS - - -

PREPARED BY:

NOTED BY:

ENGR. PEDRO R. DE LEON JR.

JENELYN B. TIMAJO

PAGE 34 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

THERMAL INSULATION FOR DRYWALL @ 3RD FLR MLQU

SUBMITTED TO PURCHASING

CHANNEL FOR PLUMBING & FIRE PROTECTION RISER

SUBMITTED TO PURCHASING

ADDNL AIR - CONDITIONING UNIT @ 3RD FLR MLQU

SUBMITTED TO PURCHASING

PLUMBING FIXTUIRE FOR TOILET @ 3RD FLR (MLQU )

SUBMITTED TO PURCHASING

- - - NOTHING FOLLOWS - - -

ENGR. PEDRO R. DE LEON JR.

PAGE 35 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


4TH FLOOR
MATERIALS REQUISITION STATUS REPORT
( AS OF FEBRUARY 26, 2016 )

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VSTS2-15-571

12/3/2015

DEC. 17, 2015

DIVISION 15 - MECHANICAL
1

STEEL CHANNEL

- - - NOTHING FOLLOWS - - -

PREPARED BY:

NOTED BY:

ENGR. PEDRO R. DE LEON JR.

JENELYN B. TIMAJO

PAGE 36 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

CHANNEL FOR PLUMBING & FIRE PROTECTION RISER

SUBMITTED TO PURCHASING

- - - NOTHING FOLLOWS - - -

ENGR. PEDRO R. DE LEON JR.

PAGE 37 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

DIVISION 6 - CARPENTRY
1

GYPSUM BOARD ETC.

VSTS2-06-451

31-Oct-15

GYPSUM BOARD ETC.

VSTS2-06-452

31-Oct-15

GYPSUM BOARD ETC.

VSTS2-06-453

10/31/2015

GYPSUM BOARD ETC.

VSTS2-06-454

11/3/2015

GYPSUM BOARD ETC.

VSTS2-06-455

11/3/2015

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-469

11/20/2015

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-468

11/20/2015

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-466

11/12/2015

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-465

11/12/2015

10

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-464

11/12/2015

11

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-463

11/12/2015

12

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-462

11/12/2015

13

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-461

11/12/2015

14

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-460

11/12/2015

15

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-459

11/12/2015

PAGE 38 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

16

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-475

12/4/2015

17

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-476

12/4/2015

18

ACP -1 ( CEILING )

VSTS2-06-477

12/4/2015

19

SQUARE GROOVE PANEL SERIES - ACP

VSTS2-06-474

12/4/2015

20

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-479

12/7/2015

21

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-480

12/7/2015

22

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-482

12/7/2015

23

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-478

12/7/2015

24

BLIND RIVETS - 1 /8 " x "

VSTS2-06-483

12/9/2015

25

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-481

12/7/2015

26

CEILING WORKS - GYPSUM & ACCESSORIES

VSTS2-06-492

12/17/2015

27

PLYBOARD

VSTS2-06-494

1/4/2016

28

PLYBOARD & ACESSORIES

VSTS2-06-499

1/11/2016

29

ANTIQUE GLOSS .904-G ( LP-3 )

VSTS2-06-498

1/9/2016

30

S4S 2' x 2" x 10'

VSTS2-06-503

1/21/2016

31

PLYWOOD " x 4' x 8'

VSTS2-06-507

1/29/2016

32

PLYWOOD x 4' x 8' X 12mm

VSTS2-06-508

2/1/2015

PAGE 39 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

33

ACP-01 ( ALUMINUM COMPOSITE PANEL )

VSTS2-06-513

2/9/2016

35

VINYL TILES ( VT-2 , VT-2.1 , VT - 2.2 )

VSTS2-06-516

2/12/2016

36

S4S 2' x 2" x 10'

VSTS2-06-515

2/12/2016

37

ROCKWOL 0.6m X 5.0m

VSTS2-06-514

2/10/2016

38

ALUMNINUM METAL INSERT - ( MT-1 )

VSTS2-05-19

2/18/2016

PAGE 40 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

DIVISION 8 - DOORS & WINDOWS


1

GLASS WALL PARTITIONS

VS2-08-393

14-Mar-15

DOORS

VS2-08-417

27-Mar-15

TEMPERED GLASS ( AW -102 TO AW-110)

VSTS2-08-453

5-Feb-16

PARTITION W/ TOP MECHANISM & COMPLETE ACCESSORIES


5

METAL DOOR JAMBS & PANELS GA#18 W/ COMPLETE HARDWARE & ACCESSORIES

VSTS2-08-455

28-Feb-16

WOOD DOOR JAMBS & PANELS W/ COMPLETE HARDWARE & ACCESSORIES

VSTS2-08-456

28-Feb-16

FROSTED GLASS W/ COMPLETE HARDWARE & ACCESSORIES

VSTS2-08-457

28-Feb-16

DIVISION 9 - FINISHES
1

FINISHES

VS2-09-008

28-Oct-15

FINISHES

VS2-09-009

28-Oct-15

FINISHES

VS2-09-003

28-Oct-15

RUBBER FLOORING ( FF-01 )

VS2-09-425

14-Nov-15

RUBBER FLOORING ( FF-01 )

VS2-09-425

14-Nov-15

PAGE 41 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

RUBBER FLOORING ( FF-02 )

VS2-09-426

14-Nov-15

RUBBER FLOORING ( FF-03 )

VS2-09-427

14-Nov-15

RUBBER FLOORING ( FF-04 )

VS2-09-428

14-Nov-15

HUELVA AVORIO ( FF-05 )

VS2-09-429

14-Nov-15

10

SANDSTONE LIGHT GREY ( FF-5-06 )

VS2-09-430

14-Nov-15

11

LATINA GREY ( FF-5-08 )

VS2-09-431

14-Nov-15

12

MARBLE TILES- ST-04

VSTS2-09-445

27-Nov-15

13

CLEAR MIRROR 0.80 m X 1.95 m - FACE MIRROR

VSTS2-09-440

27-Nov-15

14

FROSTED GLASS 0.60 m X 1.70m

VSTS2-09-441

27-Nov-15

15

FROSTED GLASS 0.60 m X 1.70m

VSTS2-09-441

27-Nov-15

16

CLEAR MIRROR GL -10 - FACE MIRROR

VSTS2-09-439

27-Nov-15

17

NOBLE OAK 4287 -WL

VSTS2-09-444

27-Nov-15

18

MARBLE TILES- ST-04

VSTS2-09-446

27-Nov-15

19

STAINLESS STEEL HAIRLINE ( MT - 1 )

VSTS2-09-456

12-Dec-15

20

POLISHED MARBLE ( ST- 8 )

VSTS2-09-459

14-Dec-15

21

POLISHED MARBLE ( ST - 8 )

VSTS2-09-458

14-Dec-15

22

PINE WOOD ( WD - 4 )

VSTS2-09-463

16-Dec-15

PAGE 42 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

23

AURORA BONE MATT - ( CT - 10 ) - MALE CHANGING RM.

VSTS2-09-461

16-Dec-15

24

AURORA BONE MATT - ( CT - 10 ) - FEMALE CHANGING RM.

VSTS2-09-462

16-Dec-15

25

STAINLESS STEEL HAIRLINE ( MT - 1 )

VSTS2-09-457

12-Dec-15

26

ADCRETE SP TYPE W / SPECKLES

VSTS2-09-467

18-Dec-15

27

POLISHED STONE ( ST-12 )

VSTS2-09-464

18-Dec-15

28

HONED STONE ( ST-12 )

VSTS2-09-465

18-Dec-15

29

NOBLE OAK4287-WL ( LP - 4 )

VSTS2-09-490

14-Dec-15

30

FICEM BOARD & ACCESSROIES

VSTS2-09-471

12/19/2015

31

PORCELAIN TILES

VSTS2-09-472

1/4/2016

32

PORCELAIN TILE - ( CT - 02 )

VSTS2-09-474

5-Jan-16

33

VINYL TILES - ( VT - 2 )

VSTS2-09-473

5-Jan-16

PAGE 43 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

34

VINYL TILES - ( VT - 2.1 )

VSTS2-09-476

6-Jan-16

35

VINYL TILES - ( VT - 2.2 )

VSTS2-09-475

6-Jan-16

36

PORCELAIN TILES ( CT - 6 )

VSTS2-09-477

6-Jan-16

37

NOBLE OAK4287-WL ( LP - 4 )

VSTS2-06-490

14-Dec-15

38

NOBLE OAK4287-WL ( LP - 5 ) - LOCKER & TOILET DEVIDER

VSTS2-06-489

14-Dec-15

39

MARBLE TILES ( ST- 09 ) : ALTERNATIVE : LATINA GREY

VSTS2-09-500

2/1/2016

40

TILE ADHESIVE

VSTS2-09-502

2/3/2016

52

PORCELAIN TILES ( CT - 2 ) : ALTERNATIVE : M.FAMA BEIGE

VSTS2-09-505

2/1/2016

53

PORCELAIN TILES ( CT - 6 )

VSTS2-09-506

2/1/2016

54

TERESA BEIGE

VSTS2-09-511

2/22/2016

55

POLISHED TILES

VSTS2-09-512

56

FAWNTAN

VSTS2-09-513

2/22/2016

57

ADCRETE SP TYPE W/ SPECKLES - A984

VSTS2-09-514

2/23/2016

58

CLEAR MIRROR ( GL -10 )

VSTS2-09-515

2/26/2016

59

SINTRA BOARD

VSTS2-09-516

2/27/2016

60

CLEAR MIRROR ( GL -10 )

VSTS2-09-517

2/27/2016

61

UPHOSTERY ( UP - 04 )

VSTS2-09-526

3/2/2016

PAGE 44 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


5TH FLOOR

MATERIALS RE

( AS

ITEM

MPR REFERENCE
DATE REQUESTED
CODE

PARTICULARS

62

GRAPHIC WALL ( SP - 04 )

VSTS2-09-528

3/4/2016

63

STAINLESS STEEL HAIRLINE ( MT - 1 )

VSTS2-09-529

3/4/2016

64

FROSTED GLASS STICKER ( SP - 07 )

VSTS2-09-531

3/4/2016

65

CLEAR MIRROR ( GL -10 )

VSTS2-09-532

3/4/2016

66

WALLCOVER

VSTS2-09-535

3/14/2016

PAGE 45 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

9-Nov-15

CEILING FINISHES @ 5TH FLR SELECTORIZED STRENGHT

9-Nov-15

CEILING FINISHES @ 5TH FLR TRX AREA & PAVIGYM

11/9/2015

CEILING FINISHES @ 5TH FLR ANTI GRAVITY YOGA STUDIO

11/10/2015

CEILING FINISHES @ 5TH FLR STRETCHING & WARM UP AREA

11/10/2015

CEILING FINISHES @ 5TH FLR THREADMILL AREA

11/25/2015

CEILING @ MALE CHANGING ROOM

11/25/2015

CEILING @ FEMALE CHANGING ROOM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 8 - PRIVATE GYM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 7 - PRIVATR GYM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 6 - PRIVATE GYM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 5 - PRIVATE GYM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 4 - PRIVATE GYM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 3 - PRIVATE GYM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 2 - PRIVATE GYM

11/19/2015

CEILING FINISHES @ 5TH FLR PRIVATE GYM 1 - PRIVATE GYM


PAGE 46 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

12/11/2015

CEILING FINISHES @ 5TH FLR BOXING & MARTIAL ARTS AREA

12/11/2015

CEILING FINSIHES @ 5TH FLR TREADMILL AREA - COMMON GYM

12/11/2015

CEILING FINISHES @ 5TH

12/11/2015

CEILING FINISHES @ 5TH FLR BOXING ARTS AREA - COMMON GYM

12/14/2015

CEILING FINISHES @ 5THFLR GROUP CYCLING - COMMON GYM

12/14/2015

CEILING FINISHES @ 5TH FLR FREEWEIGHTS & PLAT LOADED & OFFICE

12/14/2015

CEILING FINISHES @ 5T HFLR POLE DANCING ZUMBA STUDIO

12/12/2015

CEILING FINISHES @ 5TH FLR HALLWAY

12/16/2015

CEILING FINISHES @ 5TH FLR

12/14/2015

CEILING FINISHES @ 5TH FLR COACHES & CONSULTATION AREA

12/24/2015

CEILING FINISHES @5TH FLR LOBBY RECEPTION AND FLOW SPACE

1/6/2016

FLR TRADMILL - COMMON GYM

CEILING FINSHES @ 5TH FLR - ( COMMON & PRIVATE GYM )

1/12/2016

CEILING FINISHES @ 5TH FLR COMMON GYM

1/16/2016

CEILING FINISHES @ 5TH FLR - PRIVATE GYM

1/28/2016

CEILING @ PRIVATE GYM @ 5TH FLR

2/5/2016

CEILING FINISHES @ 5TH FLR

2/6/2016

CEILING WORKS FOR BACKING @ UG, 5TH & 6TH FLR

PAGE 47 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

2/15/2016

CEILING FINISHES @ COMMON GYM - 5TH FLR

2/19/2016

FLOOR FINISHES @ 5TH FLR - PRIVATE GYM

2/19/2016

CEILING @ FIFTH FLR - PRIVATE GYM

2/17/2016

CARPENTRY WORKS @ 5TH FLR - PRIVATE GYM

2/25/2016

CEILING FINISHESS @ 5TH FLR ( LOOBY RECEPTION & FLOW SPACE )

PAGE 48 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

11-Apr-15

5TH: GLASS WALL PARTITIONS

11-Apr-15

5TH: DOORS

17-Feb-16

GLASS WALL & DOORS @ 5TH FLR - COMMON GYM

10-Mar-16

SCHEDULE OF METAL DOORS AND PANEL @ 5TH FLOOR

10-Mar-16

SCHEDULE OF WOOD DOORS AND PANEL @ 5TH FLOOR

14-Mar-16

SCHEDULE OF FROSTED GLASS @ 5TH FLOOR

9-Nov-15

5TH: FLOOR FINISHES @ COMMON GYM

9-Nov-15

5TH: FLOOR FINISHES @ COMMON GYM

9-Nov-15

5TH: FLOOR FINISHES @ COMMON GYM

17-Nov-15

ADDNL FOR MPR VS2-09-003

17-Nov-15

ADDNL FOR MPR VS2-09-003


PAGE 49 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

17-Nov-15

ADDNL FOR MPR VS2-09-003

17-Nov-15

ADDNL FOR MPR VS2-09-003

17-Nov-15

ADDNL FOR MPR VS2-09-003

17-Nov-15

ADDNL FOR MPR VS2-09-008

17-Nov-15

ADDNL FOR MPR VS2-09-008

17-Nov-15

ADDNL FOR MPR VS2-09-009

3-Dec-15

WALL FINISHES FOR MALE CHANGING ROOM

3-Dec-15

WALL FINISHES @ 5TH FLR MALE CHANGING ROOM

3-Dec-15

WALL FINISHS @ 5T FLR FEMALE CHANGING ROOM

3-Dec-15

WALL FINISHS @ 5T FLR MALE CHANGING ROOM

3-Dec-15

WALL FINISHES @ 5TH FL FEMALE CHANGING ROOM

3-Dec-15

WALL FINISHES @ 5TH FLR FEMALE CHANGING ROOM

3-Dec-15

WALL FINISHES @ 5TH FLR FEMALE CHANGING ROOM

18-Dec-15

FLOOR FINISHES @ 5TH FLR MALE CHANGING ROOM

21-Dec-15

TILE WORKS @ 5TH FLR MALE CHANGING ROOM

21-Dec-15

TILW WORKS @ 5THDLR FEMALE CHANGING ROOM

23-Dec-15

FLOOR FINISHES @ FEMALE CHANGING ROOM

PAGE 50 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

23-Dec-15

FLOOR FINISHES @ 5TH FLR MALE CHANGING ROOM

23-Dec-15

FLOOR FINISHES @ 5TH FLR FEMALE CHANGING ROOM

18-Dec-15

FLOOR FINISHES @ 5TH FLR FEMALE CHANGING ROOM

23-Dec-15

FLOOR FINISHES @ 5TH FLR LOOBBY RECEPTION AND FLOW SPACE

23-Dec-15

FLOOR FINISHES @ 5TH FLR LOBBY RECEPTION AND FLOW CASE

23-Dec-15

FLOOR FINISHES @ 5TH FLR LOBBY RECEPTION AND FLOW CASE

21-Dec-15

FINISHES @ 5TH FLR MALE CHANGING ROOM

12/23/2015

WALL FINSIHES @ 5TH FLR PRIVATE GYM

1/11/2016

FLOOR FINISHES @ 5TH FLR PRIVATE GYM

12-Jan-16

FLOOR FINIHES @ 5TH FLR - PRIVATE GYM

12-Jan-16

FLOOR FINISHES @ 5TH FLR PRIVATE GYM

PAGE 51 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

12-Jan-16

FLOOR FINISHES @ 5TH FLR PRIVATE GYM

12-Jan-16

FLOOR FINISHES @ 5TH FLR PRIVATE GYM

12-Jan-16

FLOOR FINISHES @ 5TH FLR PRIVATE GYM

21-Dec-15

FINISHES @ 5TH FLR MALE CHANGING ROOM

21-Dec-15

FINISHES @ 5TH FLR FEMALE CHANGING ROOM

2/6/2016

FLOOR FINISHES @ 5TH FLR LOBBY RECEPTION & FLOW CASE

2/10/2016

TILE WORKS @ UPPER GROUND & 5TH FLR

2/6/2016

FLOOR FINISHES @ 5TH FLR - PRIVATE GYM

2/6/2016

FLOOR FINISHES @ 5TH FLR - PRIVATE GYM

2/29/2016

TILE WORKS @ 5TH FLR - RECEPTION LOBBY & FLOW SPACE


WALL FINISHES @ 5TH FLR - FEMALE & MALE CHANGING RM, POWDER RM

2/29/2016

TILE WORKS @ 5TH FLR - RECEPTION LOBBY & FLOW SPACE

3/1/2016

TILE WORKS @ 5TH FLR - RECEPTION LOBBY & FLOW SPACE

3/4/2016

WALL FINISHES @ 5TH FLR - COMMON GYM

3/5/2016

WALL FINISHES @ 5TH FLR - COMMON GYM

3/5/2016

WALL FINISHES @ 5TH FLR - COMMON GYM

3/8/2016

WALL FINISHES @ 5TH FLR - PRIVATE GYM

PAGE 52 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF MARCH 23, 2016 )

DATE REQURIED

REMARKS

3/11/2016

WALL FINISHES @ 5TH FLR - PRIVATE GYM

3/11/2016

WALL FINISHES @ 5TH FLR - RECEPTION LOBBY HALLWAY

3/11/2016

WALL FINISHES @ 5TH FLR - RECEPTION LOBBY HALLWAY

3/11/2016

WALL FINISHES @ 5TH FLR - RECEPTION LOBBY HALLWAY

3/21/2016

WALL FINISHES @ 5TH FLR - RECEPTION LOBBY HALLWAY

PAGE 53 OF 80

STATUS

P.O # 12836
P.O # 12736
P.O # 12833
P.O # 12732
P.O # 12729
P.O # 13338, 13335, 13334, 13336
P.O # 13338, 13335, 13334, 13336
P.O # 13064 (PARTIAL), 13065, 13068, 13069, 13846
P.O # 13064 (PARTIAL), 13065, 13068, 13069, 13846
P.O # 13064 (PARTIAL), 13065, 13067, 13068, 13069, 13846
P.O # 13064 (PARTIAL), 13065, 13068, 13069, 13846
P.O # 13064 (PARTIAL), 13065, 13067, 13068, 13069, 13846
P.O # 13064 (PARTIAL), 13065, 13068, 13069, 13846
P.O # 13064 (PARTIAL), 13065, 13067, 13068, 13069, 13846
P.O # 13064 (PARTIAL), 13065, 13068, 13069, 13846

PAGE 54 OF 80

STATUS
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 13645, 13646, 13647, 13648, 13649, 13846
P.O # 13645, 13646, 13647, 13648, 13649, 13846
P.O # 13645,13646,13647,13648,13649
P.O # 13846
P.O # 13845,13646,13647,13648,13649
P.O# 13853,13854,13855,13856/ PARTIAL SERVED
SERVED
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING/ IN HOUSE
SUBMITTED TO PURCHASING
SERVED
P.O # 14406 (PARTIALLY DELIVERED)

PAGE 55 OF 80

STATUS
SUBMITTED TO PURCHASING
P.O # 308529
SERVED
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING

PAGE 56 OF 80

STATUS

SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
PO# 15180
P.O # 308550 (PARTIALLY DELIVERED)
SUBMITTED TO PURCHASING

P.O # 12763
SUBMITTED TO PURCHASING
P.O # 308439
SERVED
SERVED
PAGE 57 OF 80

STATUS
SERVED
SERVED
SERVED
SERVED
SERVED
SERVED
SUBMITTED TO PURCHASING/ IN HOUSE
P.O # 14608
CANCEL - GL-03 REPLACE TO MODULAR AS PER ID
CANCEL - GL-03 REPLACE TO MODULAR AS PER ID
P.O # 14607
CANCEL - SUPRCEED @ VSTS2-06-489
SUBMITTED TO PURCHASING/ IN HOUSE
SUBMITTED TO PURCHASING/ IN HOUSE
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING/ IN HOUSE
SUBMITTED TO PURCHASING/ IN HOUSE

PAGE 58 OF 80

STATUS
P.O # 14549
P.O # 14548 (PARTIALLY DELIVERED)
SUBMITTED TO PURCHASING/ IN HOUSE
SUBMITTED TO PURCHASING/ IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE
P.O # 14275,14274,14270,13836 (PARTIAL DILEVERED)
P.O # 308545
SERVED
CANCEL - SUPRCEED MPR VSTS2-06-516

PAGE 59 OF 80

STATUS
CANCEL - SUPRCEED MPR VSTS2-06-516
CANCEL - SUPRCEED MPR VSTS2-06-516
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING / IN HOUSE
SUBMITTED TO PURCHASING
SERVED
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 14920 ( PARTIALLY DELIVERED)
P.O # 308531
P.O # 14922
SUBMITTED TO PURCHASING
P.O # 308566
SUBMITTED TO PURCHASING
P.O # 308568
SUBMITTED TO PURCHASING

PAGE 60 OF 80

STATUS
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
SUBMITTED TO PURCHASING
P.O # 308565
SUBMITTED TO PURCHASING

PAGE 61 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


6TH FLOOR

MATERIALS REQUISITION STATUS REPO


( AS OF FEBRUARY 26, 2016 )

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

DIVISION 6 - CARPENTRY
2

DRYWALL & DROPWALL

6
10

GYPSUM BOARD ETC.


ALUMINUM COMPOSITE PANELS ( ACP )

VS2-06-437

7-Sep-15

14-Sep-15

VSTS2-06-486
VSTS-06-517

12/11/2015
2/20/2016

12/18/2015
2/25/2016

VS2-03-198

9-Jan-15

17-Jan-15

11-Apr-15

DIVISION 7 - THERMAL & MOISTURE PROTECTION


1

WATER PROOFING

DIVISION 8 - DOORS & WINDOWS


1

GLASS WALL

VS2-08-394A

14-Mar-15

METAL DOOR

VS2-08-418

27-Mar-15

11-Apr-15

GLASS WALL

VS2-08-443

17-Oct-15

26-Oct-15

GLASS DOOR

VS2-08-445

7-Sep-15

21-Sep-15

TEMPERED GLASS ( AW -102 TO AW-110)

VSTS2-08-453

5-Feb-16

17-Feb-16

8
9
10
DIVISION 9 - FINISHES
3

WALL FINISH

VS2-09-411

21-Sep-15

28-Sep-15

TILING WORKS

VS2-09-011

28-Oct-15

2-Nov-15

VSTS2-15-526

3-Oct-15

17-Oct-15

DIVISION 15 - MECHANICAL
1

AIR CONDITIONING

PAGE 62 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


6TH FLOOR

MATERIALS REQUISITION STATUS REPO


( AS OF FEBRUARY 26, 2016 )

ITEM
2

PARTICULARS
AIR CONDITIONING

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VSTS2-15-525

3-Oct-15

17-Oct-15

PAGE 63 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


6TH FLOOR

MATERIALS REQUISITION STATUS REPO


( AS OF FEBRUARY 26, 2016 )

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

FLOOR CLEAN OUT

VSTS2-15-557

5-Nov-15

19-Nov-15

AIRCONDITIONING FOR ADMIN OFFICE

VSTS2-15-526

3-Oct-15

17-Oct-15

PPR PIPE & FITTINGS

VSTS2-15-539

12-Oct-15

26-Oct-15

G.I HANGER

VSTS2-15-578

12-Dec-15

28-Dec-15

PVC PIPE & FITTINGS

VSTS2-15-577

12-Dec-15

28-Dec-15

WELDING ROD

VSTS2-15-582

12-Dec-15

28-Dec-15

10

U BOLT W / NUT WASHER

VSTS2-15-853

12-Dec-15

28-Dec-15

11

THREAD SEAL TAPE

VSTS2-15-580

12-Dec-15

28-Dec-15

12

G.I HEXAGON BOLT & NUT

VSTS2-15-579

12-Dec-15

28-Dec-15

13

PVC PIPES & FITTINGS

VSTS2-15-77

12-Dec-15

28-Dec-15

14

B.I PIPES & FITTINGS

VSTS2-15-576

11-Dec-15

28-Dec-15

15

FLANGE & THREADED ENDCAP, RECUCER

VSTS2-15-576

11-Dec-15

28-Dec-15

16

B.T THREADED FITTINGS

VSTS2-15-576

11-Dec-15

28-Dec-15

17

DIAMOND CORE BIT

VSTS2-15-618

1-Feb-16

15-Feb-16

18

STANDARD SAUNA ROOM SET

VSTS2-15-623

5-Feb-16

19-Feb-16

19

STANDARD SAUNA ROOM SET - 4028RL

VSTS2-15-623

5-Feb-16

19-Feb-16

20

STAINLESS STEEL STEAMBATH GENERATOR

VSTS2-15-622

5-Feb-16

19-Feb-16

DIVISION 16 - ELECTRICAL
1

METER CENTER

VS2-16-262

4-Jul-15

3-Aug-15

METER CENTER

VS2-16-261

4-Jul-15

3-Aug-15

ELECTRICAL WORKS

VS2-16-442

7-Sep-15

21-Sep-15

LIGHTING FIXTURES

VSTS2-16-449b

13-Oct-15

20-Oct-15

DEVICES

VSTS2-16-449a

13-Oct-15

20-Oct-15

ELECTRICAL WORKS

VSTS-16-453

15-Oct-15

22-Oct-15

PAGE 64 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT

PROJECT NAME: VICTORIA SPORT TOWER STATION 2


6TH FLOOR

MATERIALS REQUISITION STATUS REPO


( AS OF FEBRUARY 26, 2016 )

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED
27-Nov-15

ARCRYLIC WHITE SHEET

VSTS-16-468

20-Nov-15

FLOURESCENT LIGHT

VSTS2-16-477

3-Dec-15

9-Dec-15

10

G.I MALE PLUG

VSTS2-15-575

11-Dec-15

28-Dec-15

11
12
13

- - - NOTHING FOLLOWS - - PREPARED BY:

NOTED BY:

JENELYN B. TIMAJO

ENGR. PEDRO R. DE LEON JR.

PAGE 65 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

6TH: DRYWALL & DROPWALL ADMIN OFFICE

P.O # 11867

CEILING FINISHES @ 6TH FLR BASETBALL COURT


CEILING FINISHES @ GYMNASTIC,SWIMMING POOL ,TENNIS COURT & BADMINTON COURT

P.O # 13853,13854,13855,13856 PARTIAL SERVED


SUBMITTED TO PURCHASING

6TH: SWIMMING POOL

SUBMITTED TO PURCHASING

6TH: GLASS WALL PARTITIONS

SUBMITTED TO PURCHASING

6TH: DOORS

SUBMITTED TO PURCHASING

6TH: GLASS WALL ADMIN OFFICE RECEPTION

SUBMITTED TO PURCHASING

6TH: TEMP. CLEAR GLASS W/ FROSTED GLASS STICKER FOR ADMIN OFFICE W/ TEMP. CLEAR GLASS DOOR

P.O #11900

6TH: WALLFINISH FOR RECEPTION AREA @ ADMIN OFFICE

SUBMITTED TO PURCHASING

LG, UG, 5TH, & 6TH: TILING WORKS

SUBMITTED TO PURCHASING

6TH: AIR CONDITIONING UNIT FOR ADMIN OFFICE

SUBMITTED TO PURCHASING

PAGE 66 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

6TH: AIR CONDITIONING UNIT FOR ADMIN OFFICE

SUBMITTED TO PURCHASING

PAGE 67 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

CLEAN OUT FOR TOILETS @ 6TH FLR (ADMIN OFFICE

P.O # 13444

ARICONDITIONING FOR ADMIN OFFICE

SUBMITTED TO PURCHASING

FOR PLUBING WORKS @ ADMIN OFFICE

SUBMITTED TO PURCHASING

G.I HANGER FOR FIRE PROTECTION

SUBMITTED TO PURCHASING

PVC PIPE & FITTINGS FOR SANITARY WORKS @ 6TH FLR

SERVED P.O # 13884, 13878, / PARTIAL P.O # 13883

FOR FIRE PROTECTION & OTHER MECHANICAL WORKS @ 6TH FLR

SERVED P.O # 13847

FOR PLUMBING & FIRE PROTECTION @ 6TH FLR

SUBMITTED TO PURCHASING

SEAL TAPES FOR THREADED PIPES OF MECHANICAL WORKS @ 6TH FLR

P.O # 13839

HANGERS FOR PLUMBING & FIRE PROTECTION @ 6TH FLR

SUBMITTED TO PURCHASING

FOR PIPES & FITTINGS FOR SANITARY WORKS @ 6TH FLR

SUBMITTED TO PURCHASING

B.I PIPES & FITTINGS FOR FIRE PROTECTION @ 6TH FLR

P.O # 13902 SERVED / 13896,13895 SERVED / 13894

B.I PIPE & FITTINGS FOR FIRE PROTECTION @ 6TH FLR

P.O # 13898, 13897

B.I PIPES & FITTINGS PROTECTION @ 6TH FLR

P.O # 13885

DIAMOND CORE BIT FOR CORING WORKS @ 6TH FLR

SUBMITTED TO PURCHASING

INDOOR MALE SAUNA ROOM COMPLETE WITH HEATER AND ACCESSORIES @ 6TH FL

SUBMITTED TO PURCHASING

INDOOR FEMALE SAUNA ROOM COMPLETE WITH HEATER AND ACCESSORIES @ 6TH FL

SUBMITTED TO PURCHASING

STEAM GENERATOR MACHINE FOR MALE & FEMALE SAUNA @ 6TH FLR

SUBMITTED TO PURCHASING

6TH: COMMERCIAL METER CENTER (EE RM B2)

W/ P.O 12502 / 12503 SERVED

6TH: COMMERCIAL METER CENTER (EE RM A2)

P.O # 12504 PARTIAL SERVED

6TH: ROUGH-IN FOR ADMIN OFFICE

P.O # 12676,12625,12321 / P.O # 12623 SERVED

6TH: LIGHTING FIXTURES @ ADMIN OFFCE

P.O # 12437 / PARTIAL SERVED / 12781

6TH: DEVICES @ ADMIN OFFICE

P.O.#: 12437

6TH: ADMIN OFFICE PANEL BOARD & CIRCUIT BREAKER

P.O # 13610 PARTIAL SERVED

PAGE 68 OF 80

MATERIALS REQUISITION STATUS REPORT


( AS OF FEBRUARY 26, 2016 )

REMARKS

STATUS

FORADMIN @ 6THFLR

SUBMITTED TO PURCHASING

FOR ADMIN OFFICE

P.O # 13427

G.I PLUG FOR MECHANICAL WORKS @ 6TH FLR

SUBMITTED TO PURCHASING

- - - NOTHING FOLLOWS - - -

GR. PEDRO R. DE LEON JR.

PAGE 69 OF 80

NEW SAN JOSE BUILDERS, INC.


TECHNICAL SERVICES GROUP / CONSTRUCTION DEPARTMENT
PROJECT NAME: VICTORIA SPORT TOWER STATION 2
MATERIALS REQUISITION STATUS REPORT

( AS OF FEBRUARY 26, 2016 )


ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

VSTS2-01-273

12/15/2015

1/5/2016

DIVISION 1 - GENERAL REQUIREMENTS


1

JACK PALLETE

DIVISION 2 - SITE WORK


1

MS PLATE, JBOLT

CHANNEL BAR

VSTS2-02-473

NOV. 4, 2015

NOV. 11, 2015

VS2-02-343

APR. 15, 2015

APR. 30, 2015

3
4

CD-ROM

VSTS2-01-272

10/27/2015

11/30/2015

CAUTION TAPE

VSTS2-02-476

11/11/2015

WIRE MESH

11/18/2015

VSTS2-477

12/1/2005

12/7/2015

6
7

CROSS LINER LASER

VSTS2-02-484

1/23/2016

1/27/2016

G.I CORRUGATED SHEET

VSTS2-02-485

1/25/2016

2/1/2016

WIRE ROPE

VSTS2-02-486

2/5/2016

2/11/2016

WIRE ROPE

VSTS2-02-487

2/6/2016

2/11/2016

10

SAFETY HAIRNESS

VSTS2-02-488

2/9/2016

2/16/2016

11

WIRE ROPE

VSTS2-02-486A

2/19/2016

2/26/2016

12

DIVISIO 3 - REINFORCE CONCRETE


1

RSB

VSTS2-03-507

1/20/2016

1/27/2016

G.I TIE WIRE

VSTS2-03-506

1/19/2016

1/26/2016

RSB
RMC 9000 psi - 28 DAYS

VSTS2-03-505

1/19/2016
11/30/2015

1/26/2016
11/30/2015

RMC 7000 psi - 28 DAYS

VSTS2-03-03C

11/8/2015

11/8/2015

RMC 7000 psi - 28 DAYS

VSTS2-03-503

11/12/2015

11/12/2015

RMC CONCRETE
RMC 7000 psi - 28 DAYS

VSTS2-03-472

VSTS2-03-504

6/11/2015
11/12/2015

6/12/2015
11/12/2015

RMC 7000 psi - 28 DAYS

VSTS2-03-502

11/12/2015

11/12/2015

VSTS2-03-510

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

10

RMC 7000 psi - 28 DAYS

VSTS2-03-504

11/12/2015

11/12/2015

11

RMC 9000 psi - 28 DAYS

VSTS2-03-497

10/14/2015

10/15/2015

12

RMC 9000 psi - 28 DAYS

VSTS2-03-499

10/14/2015

10/15/2015

13

RMC COCNRETE

VSTS2-03-02A

9/30/2015

11/30/2015

14

RMC COCNRETE

VSTS2-03-493

9/29/2015

9/30/2015

15

RSB 36MM

VSTS2-03-494

11/17/2015

11/27/2015

16

TIE WIRE

17

RSB 10MM

18

RMC COCNRETE

VST2-03-495

11/20/2015

11/27/2015

VSTS2-03-494

11/17/2015

11/27/2015

VSTS2-03

10/8/2015

10/9/2015

19

RMC 900 psi - 28 days

VSTS2-03-498

10/7/2015

10/8/2015

20

TAC - ADDNL FORMWORKS

VSTS2-03-488

10/2/2015

10/14/2015

21

RMC 9000 psi - 28 DAYS

VSTS2-03-515

12/15/2015

12/16/2015

22

RMC 7000 psi - 28 DAYS

VSTS2-03-514

12/30/2015

12/30/2015

23

RMC 7000 psi - 28 DAYS

VSTS2-03-513

12/21/2015

12/21/2015

24

RMC 7000 psi - 28 DAYS

VSTS2-03-518

12/18/2015

12/19/2015

25

RMC 7000 psi - 28 DAYS

VSTS2-03-517

12/18/2015

12/19/2015

26

RMC 7000 psi - 28 DAYS

VSTS2-03-516

1/29/2016

1/19/2016

27

LDFE SHHET & PPS TUBING SHEET 2.O MM X 90 MM

VSTS2-03-519

2/13/2016

2/20/2016

28

ANGLE BAR

VSTS2-03-512

2/10/2016

2/17/2016

29

RMC 9000 psi - 28 DAYS

VSTS2-03-522

12/29/2015

12/30/2016

30

RMC 9000 psi - 28 DAYS

VSTS2-03-520

1/12/2016

1/12/2016

31

RMC 9000 psi - 28 DAYS

VSTS2-03-521

1/5/2016

1/6/2016

32

RMC 9000 psi - 28 DAYS

VSTS2-03-523

12/11/2015

12/11/2015

33

RMC 7000 psi - 28 DAYS

VSTS1-03-524

12/18/2015

12/18/2015

34

RMC 7000 psi - 28 DAYS

VSTS2-03-525

12/11/2015

12/11/2015

35
36
37
38
39
40
41
42
43

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

DIVISIO 4 - MASONRY WORKS


1

VIBRO SAND

VSTS2-04-392

11/17/2015

11/22/2015

CONCRETE BAGGY & JACK PALLETE

VSTS2-04-397

1/22/2016

1/29/2016

PHENOLIC BOARD ,BR CHIPS

VS2-16-01

1/11/2016

1/18/2016

VIBRO SAND

VSTS2-04-400

2/11/2016

2/15/2016

VIBRO SAND

VSTS2-04-400

2/1/2016

2/5/2016

STRUCTURAL EPOXY

VSTS2-04-398

2/9/2016

2/22/2016

CONCRETE BAGGY

VSTS2-01274

2/10/2016

2/17/2016

CONCRETE VIBRATOR

VSTS2-04

2/15/2016

2/22/2016

ANLE BAR 2" x 2 " X 6.0m

VSTS2-04-399

2/8/2016

2/18/2016

VS2-02-477

11/25/2015

12/8/2015

VSTS-16-464

11/9/2015

11/16/2015

VS2-09-013

11/16/2015

11/30/2015

VSTS2-02-475

11/11/2015

11/18/2015

VS2-02-482

1/4/2016

1/11/2016

10

DIVISION 5 - METALS
1

G.I DHEET GAUGE 24

DIVISION 8 - DOORS & WINDOWS


1

FULL LOUVER DOOR

DIVISION 10- SPECIAL CONSTRCUTION


1

ALUMNIMUN COMPOSITE PANLE (ACP )

2
DIVISION 11 - EQUIPMENT
1

LIFTING CABLE

GREASE & LUBRICANT

LINE PUMPCRETE

VSTS2-11-275

2/4/2016

2/20/2016

CONCRETE VIBRATOR - 5HP

VSTS2-11-276

2/9/2016

2/16/2016

VS2-15-381a

MAR. 12, 2015

MAY. 25, 2015

5
DIVISION 15 - MECHANICAL WOKRS
1

TURBO

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

EXHAUST AIR DUCT RISER

VS2-15-380

MAR. 14 , 2015

MAR. 11, 2015

EXHAUST AIR BLOWER

VSTS2-15-559

NOV. 5, 2015

NOV. 19, 2015

EXHAUST AIR DUCT RISER

VSTS2-15-558

NOV. 5, 2015

NOV. 19, 2015

EXHAUST FAN ( CEILING TYPE )

VSTS2-15-610

1/19/2016

2/2/2016

FLUSH VALVE

VSTS2-15-611

1/19/2016

2/2/2016

ANGLE GRINDER & ROTARY HAMMER

VSTS2-015-520

2/3/2016

2/6/2016

SUBMERSIBLE PUMP ( 7.5HP )

VSTS2-15-602

1/9/2016

1/23/2016

PVC PIPE & FITTINGS

VSTS2-15-599

1/11/2016

1/25/2016

G.I CLEVY HANGER

VSTS2-15-600

1/11/2016

1/25/2016

10

SOLVENT CEMENT

VSTS2-15-601

1/11/2016

1/25/2016

11

PPR FUSION MACHINE

VSTS2-15-621

2/4/2016

2/18/2016

12

MS PLATE ( 10mm thk. X 1.2m X 2.4M )

VSTS2-15-587

12/12/2015

12/28/2015

13

AIR COOLED CONDENSING UNIT

VSTS2-15-574

12/7/2015

12/21/2015

14

MS PLATE ( 10mm thk. X 1.2m X 2.4M )

VSTS2-15-586

12/12/2015

12/28/2015

15

MS PLATE ( 10mm thk. X 1.2m X 2.4M )

VSTS2-15-585

12/12/2015

12/28/2015

16

MS PLATE ( 10mm thk. X 1.2m X 2.4M )

VSTS2-15-588

12/12/2015

12/28/2015

17

STEEL CHANNEL

VSTS2-15-568

12/3/2015

DEC. 17, 2015

18

SUBMERSIBLE PUMP ( 7.5 HP )

VSTS2-15-626

2/9/2016

2/23/2016

19

BUSDUCT ELBOW & MCB A PANEL BOARD

VSTS2-16-507

2/12/2016

5/26/2016

20
21
22
DIVISION 16 - ELECTRICAL WOKRS
1

PVC PIPE & FITTINGS

VSTS2-16-463

NOV. 6, 2015

NOV. 20, 2015

PVC PIPE

VST2-16-466

11/10/2015

11/17/2015

FULL LOUVER DOOR

VSTS-16-464

11/9/2015

11/16/2015

RECESSED WALL LIGHT

VSTS2-16-475

DEC.2, 2015

DEC. 2015

ROUGH IN FOR ELECATRICAL WORKS

VSTS2-16-476

DEC. 03, 2015

12/10/2015

EXHAUST FAN

VSTS2-16-469

11/25/2015

12/2/2015

HAULING , UNLOADING & POSITIONING OF NEW GRNERATOR

VSTS2-16-480

12/14/2015

12/21/2015

DEMOLITION HAMMER

VSTS2-16-492

1/18/2016

1/25/2016

BOLT - EYE : GALVANIZED STEEL @ LEAST 10,000 KG.

VSTS2-16-495

1/29/2016

2/5/2016

10

3.50mm THHN ELECTRICAL WIRE

VSTS2-16-494

1/20/2016

2/2/2016

11

METAL DOOR

VSTS2-16-489

1/7/2016

1/14/2016

12

I - BEAM

VSTS2-16-478

12/7/2015

12/14/2015

13

ELETRICAL PVC PIPE & ACCESSORIES

VSTS2-15-506

2/9/2016

2/23/2016

ITEM

PARTICULARS

MPR REFERENCE CODE

DATE REQUESTED

DATE REQURIED

14

- - - NOTHING FOLLOWS - - -

PREPARED BY:

JENELYN B. TIMAJO

NOTED BY:

ENGR. PEDRO R. DE LEON JR.

ITION STATUS REPORT

RUARY 26, 2016 )


REMARKS

STATUS

GEN. REQUIREMENTS

SUBMITTED TO PURCHASING

FOR RELOCATION OF ARC @ EDSA SIDE

SUBMITTED TO PURCHASING

TEMPRARY MAT. - LANDING PALTFROM & GONDUL PLATFORMS

SUBMITTED TO PURCHASING

MAINTENACE OF PROJECT SITE COMPUTER UNITS

SUBMITTED TO PURCHASING

FOR SAFETY PURPOSE

SUBMITTED TO PURCHASING

FOR CATCH PAN @ 16TH FLR PERIMETER

SUBMITTED TO PURCHASING

SELF -LEVELING ALL PURPOSE ( SURVEYING INSTRUMENT )

SUBMITTED TO PURCHASING

MR. YAO MAIN HOUSE ROOFING

SUBMITTED TO PURCHASING

FOR ALFA TOWER CRANE

SUBMITTED TO PURCHASING

FOR BPR TOWER CRANE

SUBMITTED TO PURCHASING

FOR SAFETY PROTECTION DURING EXT. PLASTERING

SUBMITTED TO PURCHASING

FOR ALFA TOWER CRANE

SUBMITTED TO PURCHASING

REBARS @ TOWER A - 17TH - 18TH FLR

SUBMITTED TO PURCHASING

G.I TIE WIRE # 28KG/ ROLL

SUBMITTED TO PURCHASING

REBARSD @ TOWER B ( 24TH & 25TH FLR )


19TH FLOOR - COLUMN & SW

SUBMITTED TO PURCHASING

REINFORCED CONCRETE SLAB & BEAMS GRID LINE A-C /1-4 - 18TH FLR

SUBMITTED TO PURCHASING

17TH FLKR COL. , SW , SLAB & BEAMS

SUBMITTED TO PURCHASING

6TH FLR COLUMN & SW , 7TH FLR SLAB & BEAMS


12TH FLR & SW ., 14TH FLR SLAB & BEAMS

SUBMITTED TO PURCHASING

12TH FLR , SLABS & BEAMS

SUBMITTED TO PURCHASING

SUBMITTED TO PURCHASING

SUBMITTED TO PURCHASING

REMARKS

STATUS

12TH FLR & SW ., 14TH FLR SLAB & BEAMS

SUBMITTED TO PURCHASING

COL. & SW @ 14TH FLR

SUBMITTED TO PURCHASING

COL. & SW @ 14TH FLR

SUBMITTED TO PURCHASING

RMC SLAB & BEAMS @ 15TH FLR GRID 1-6/A-C


FOR SLAB & BEAMS

SERVED
SERVED

FOR 15TH FLR TOWER A & B

SUBMITTED TO PURCHASING

FOR STRUCTURAL WORKS

SUBMITTED TO PURCHASING

FOR 15TH FLR TOWER A & B

SUBMITTED TO PURCHASING

FOR 15TH FLOOR

SUBMITTED TO PURCHASING

16TH FLR - COLUMN & SW

SUBMITTED TO PURCHASING

ADDNL FORMWORKS - TOWER A

SUBMITTED TO PURCHASING

20TH FLR COLUMN

SUBMITTED TO PURCHASING

15TH FLR SLAB & BEAM

SUBMITTED TO PURCHASING

21ST FLR SLAB & BEAM

SUBMITTED TO PURCHASING

21ST FLR SLAB & BEAM

SUBMITTED TO PURCHASING

21ST FLR SLAB & BEAM

SUBMITTED TO PURCHASING

21ST FLR SLAB & BEAM

SUBMITTED TO PURCHASING

INST. FOR TAC SYSTEM ACCESSORIES - 17TH TO 23RD FLR

SUBMITTED TO PURCHASING

FOR RESIDENTIAL T&B DROP SIDING & BLOCK OUT FOR ACU ACESS

SUBMITTED TO PURCHASING

14TH -15TH COLUMN - TOWER A

SUBMITTED TO PURCHASING

21ST -22ND COLUMN - TOWER B

SUBMITTED TO PURCHASING

COLUMN,SW ,STAIR ,WALL @ 15TH - 16TH FLR - TOWER A

SUBMITTED TO PURCHASING

14TH -15TH FLOOR COLUMN - TOWER A

SUBMITTED TO PURCHASING

21ST FLOOR SLAB & BEAMS

SUBMITTED TO PURCHASING

15TH FLR SLAB & BEAM

SUBMITTED TO PURCHASING

REMARKS

STATUS

FOR INT, & EXT PALSTERING

SUBMITTED TO PURCHASING

FOR EXT. PRECAST FABIRCATION @ RESIDENTIAL

SUBMITTED TO PURCHASING

FOR FABRICATION OF PRECAST CASTNG BASE

SUBMITTED TO PURCHASING

PLASTERING @ EXT . WALL RIGHT & LEFT SIDE ELEV.

SUBMITTED TO PURCHASING

PLASTERING @ EXT . WALL RIGHT & LEFT SIDE ELEV.

SUBMITTED TO PURCHASING

MASONRY WORKS @ RESIDENTIAL A & B - 10 - 12 FLR LEVELS

SUBMITTED TO PURCHASING

MASONRY WORKS FOR SAMAR MAINTENACNCE - HAULING OF DEBRIS

SUBMITTED TO PURCHASING

FOR FABRICATION OF PRECAST ( EXT. PRECAST )

SUBMITTED TO PURCHASING

FOR PRECAST FABIRCATION CASTING BASED

SUBMITTED TO PURCHASING

FOR REPLACEMENT OF ROOFING OF ALBERTO YAOS RESIDENC

SUBMITTED TO PURCHASING

FOR VAULT ROOM

SUBMITTED TO PURCHASING

FAADE @ FRONT ELEVATION ( 1ST - 5TH FLR )

SUBMITTED TO PURCHASING

FOR TOWER CRANE

SUBMITTED TO PURCHASING

TOWER CRANE MAINTENANCE

SUBMITTED TO PURCHASING

FOR TOWER A UP TO 45TH FLR

SUBMITTED TO PURCHASING

FOR STRUCTURAL CONCRET POURING

SUBMITTED TO PURCHASING

BASEMENT LEVEL VENTILATION

SUBMITTED TO PURCHASING

REMARKS

STATUS

BASEMENT LEVEL VENTILATION

SUBMITTED TO PURCHASING

BASEMENT LEVEL VENTILATION

SUBMITTED TO PURCHASING

BASEMENT LEVEL VENTILATION ( DUCTING WORKS )

SUBMITTED TO PURCHASING

EXHAUST FAN FOR 5TH FLR ( GYM AREAS )

SUBMITTED TO PURCHASING

PLUMBING FIXTURES FOR TOILET @ 3RD FLR ( MLQU )

SUBMITTED TO PURCHASING

TOOLS FOR MECHANICAL , PLUMBING & FIRE PORTECTION WORKS

SUBMITTED TO PURCHASING

FOR DEWATERING OF STP AND SUMPIT @ BM4

SUBMITTED TO PURCHASING

PVC PIPES & FITTINGS FOR SEWER & DRAIN PIPE WORKS @ 10THFLR - TOWER B

SUBMITTED TO PURCHASING

HANGER FOR PLUBING WORKS @ 10TH LR - TOWER B

SUBMITTED TO PURCHASING

SOLVENT FOR PVC PIPES * FITTINGS FOR PLUMBING @ 10THFLR - TOWER B

SUBMITTED TO PURCHASING

REPLACEMENT & ADDNL TOOL FOR BACK UP

SUBMITTED TO PURCHASING

FOR FIRE PROTECTION & PLUBING RISER @ 3RD FLR

SUBMITTED TO PURCHASING

AIR -CONDITIONING UNIT FOR 3RD FLR - DX TYPE

SUBMITTED TO PURCHASING

FOR FIE PROTECTION & PLUBING RISER @ 2ND FLR

SUBMITTED TO PURCHASING

FOR FIE PROTECTION & PLUBING RISER @ 1ST FLR

SUBMITTED TO PURCHASING

FOR FIE PROTECTION & PLUBING RISER @ 4TH FLR

SUBMITTED TO PURCHASING

CHANNEL FOR PLUMBING & FIRE PROTECTION RISER

SUBMITTED TO PURCHASING

FOR DE-WATERING WORKS @ STP & SUMP FIT @ BM4

SUBMITTED TO PURCHASING

BUSDUCT FOR RESIDENTIAL AREA

SUBMITTED TO PURCHASING

FOR CONCRETE PEDESTAL / VAULT ROOM PERMANENT PIPING

SUBMITTED TO PURCHASING

FOR RISER OF COMMERCIAL UNITS

SUBMITTED TO PURCHASING

FOR VAULT ROOM

SUBMITTED TO PURCHASING

FOR DROP -OFF STAIR LIGHT

SUBMITTED TO PURCHASING

FOR ROUHG-IN @ 15TH - 20TH FLR- TOWER A

SUBMITTED TO PURCHASING

FOR EXHAUST SYSTEM TRANSFORMER VAULT ROOM

SUBMITTED TO PURCHASING

FOR POSITIONING OF GENSET ON BM1

SUBMITTED TO PURCHASING

FOR CHIPPING OF CONCRETE SLAB & VAULT ROOM B, ( FOR TRENCH )

SUBMITTED TO PURCHASING

FOR VAULT ROOM

SUBMITTED TO PURCHASING

WIRING OF COMMON GYM AREA @ RESIDENTIAL

SUBMITTED TO PURCHASING

STEEL DORR FOR EE ROOM / BUSDUCT ROOM

SUBMITTED TO PURCHASING

SUPPORT UNDERSLAB ON VAULT RM & BM1

SUBMITTED TO PURCHASING

FOR ROUGH - IN @ 16TH - 20TH FLR - RESIDENTIAL

SUBMITTED TO PURCHASING

G FOLLOWS - - -

GR. PEDRO R. DE LEON JR.

REMARKS

STATUS

PROJECT : VICTORIA STATION II