Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TIMOR-LESTE
ITEM NO
9
10
11
-
IV
1
2
3
4
5
6
7
8
9
10
11
12
13
V
1
VI
1
2
C.4.2
I
1
2
3
4
II
1
2
3
4
5
IV
V
1
VI
1
C.5.3
I
1
2
3
4
II
1
2
3
4
5
III
3
4
5
6
7
8
-
IV
1
2
3
4
5
6
7
8
9
10
11
12
13
V
1
VI
1
C.5.4
I
1
2
3
4
II
1
2
IV
2
3
4
5
6
-
V
1
VI
1
2
C.5.5
1
2
L OF QUANTITY
TRAFFIC CONTROL TOWER
CHITECTURE WORKS
ITEM DESCRIPTION
Gypsum board ceilling with metal frame suspended concealed (3)
Lobby & Brieefing
Meeting room
Calsium silicat ceiling with metal frame metal furing system (4)
Toilet 1
Pantry
Storage
Concrete exposed cement paint finish (2)
Terace
Tower control
Stair
SUB TOTAL III
SANITARY WORKS
GENERAL
Water Closet + Shower Spray
Lavatory
Water tap
Washlet shower spray (WS)
Head shower (SH)
Floor drain
Double robe hook
Hand dryer (HD)
Mirror 600x1500
Soap dispenser (SD)
Paper holder (PH)
Table top grantle finisht
Zink stainless steel
SUB TOTAL IV
PAINTING WORKS
Painting exterior wall column acrilic emulsion paint
1 layer alkali resistant sealer
1 layer primer
2 layer colour paint standard
Painting interior wall with column acrilic emulsion paint
1 layer alkali resistant sealer
1 layer primer
Stair
Concrete exposed cement paint finish (2)
Stair
SUB TOTAL IV
PAINTING WORKS
Painting exterior wall column acrilic emulsion paint
1 layer alkali resistant sealer
1 layer primer
2 layer colour paint standard
Painting interior wall with column acrilic emulsion paint
1 layer alkali resistant sealer
1 layer primer
2 layer colour paint standard
Painting ceiling gypsum board acrilic emulsion paint (3)
1 layer alkali resistant sealer
1 layer primer
2 layer colour paint standard
SUB TOTAL V
OTHERS
Stainless steel railing star
TOTAL ARCHITECTURAL 2ND TO 5 TH FLOOR
6 TH FLOOR
MASONRY
Waterproof bricklaying with lintel beam and column
Ordinary bricklaying with lintel beam and column
Waterproof plastering
Ordinary plastering
SUB TOTAL I
DOOR, WINDOW FRAME, PARTITION AND HARDWARES
Included bracket steel galvanized, sealant, painting finish and
accessories
Door PA2 type
Door PA5 type
Door PB type
Door PS1 type
Window J4 type
SUB TOTAL II
FLOOR, WALL AND CEILING WORKS
Included screed mortar AM,NU,anchor and asesoris
FLOOR
OTHERS
Stainless steel railing star
SUB TOTAL VI
TOTAL ARCHITECTURAL 6 TH FLOOR
7 TH FLOOR
MASONRY
Waterproof bricklaying with lintel beam and column
Ordinary bricklaying with lintel beam and column
Waterproof plastering
Ordinary plastering
SUB TOTAL I
DOOR, WINDOW FRAME, PARTITION AND HARDWARES
Included bracket steel galvanized, sealant, painting finish and
accessories
Door PK2 type
Curtain wall glass CW1 type
SUB TOTAL II
FLOOR, WALL AND CEILING WORKS
Included screed mortar AM,NU,anchor and asesoris
FLOOR
Raised floor (AF)
Control room
Stair
Stair
Concrete exposed cement paint finish (2)
Stair
Skirting
Gypsum tile board ceiling with metal frame suspended conceated (8)
Control room
Gypsum board ceiling with metal frame suspended conceated (3)
Control room
Calsium silicat ceiling with metal frame metal furing system (4)
Control room
SUB TOTAL IV
PAINTING WORKS
Painting exterior wall column acrilic emulsion paint
1 layer alkali resistant sealer
1 layer primer
2 layer colour paint standard
Painting interior wall with column acrilic emulsion paint
UNIT
QTY
sq.m
47.8
sq.m
sq.m
sq.m
24.5
4
4
sq.m
sq.m
sq.m
109.75
33.4
18.9
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
2
2
1
2
0
3
2
1
2
0
2
1.2
1
m2
602.28
m2
665.73
RATE
AMOUNT
m2
72.3
m2
29.6
m2
162.05
m'
m'
12
2.1
sqm
sqm
sqm
sqm
112.8
780.2
225.6
1560.4
unit
unit
unit
unit
unit
4
4
4
4
8
sqm
sqm
45
40
sqm
105.48
sqm
60.48
m2
648
m2
1138
m2
60.48
m'
48
sqm
sqm
sqm
sqm
30.54
244.32
61.08
488.64
unit
unit
unit
unit
unit
1
1
1
2
7
sqm
sqm
sqm
57.25
10
26.37
sqm
sqm
m'
18
50.9
sqm
67.25
sqm
sqm
15.12
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1
1
0
1
1
1
1
1
1
1
1
2.4
1
m2
194.4
m2
355.32
m2
15.12
m'
12
sqm
sqm
sqm
sqm
30.54
193.42
61.08
386.84
unit
unit
1
4
sqm
sqm
sqm
67.25
26.37
sqm
m'
15.12
38.4
sqm
28.26
sqm
50.54
sqm
64.57
m2
138.16
m2
309.76
m2
78.5
m2
64.57
m2
15.12
m'
m'
42.39
10
sqm
m'
143.07
28.26
BILL OF QUANTITY
OFFICE & METEOROLOGY BUILDING
ARCHITECTURAL WORKS
NEW DEVELOPMENT OF OE-CUSSE AIRPORT PROJECT
TIMOR-LESTE
ITEM NO
C.
C.5
C.5.1
I
1
2
3
4
II
1
2
3
4
5
5
7
8
9
10
11
12
13
14
15
16
17
18
19
20
III
1
2
6
7
8
9
10
IV
BILL OF QUANTITY
OFFICE & METEOROLOGY BUILDING
RCHITECTURAL WORKS
IMOR-LESTE
ITEM DESCRIPTION
ARCHITECTURAL WORKS
OFFICE BUILDING
GROUND FLOOR
MASONRY
Waterproof bricklayiing with lintel beam and coiumn
Ordinary briciaying with lintel beam and column
Waterproof plastering
Ordinary platering
SUB TOTAL I
UNIT
Sqm
Sqm
Sqm
Sqm
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
QTY
RATE
146.4
814.9
292.8
1.629 80
2
1
1
4
5
2
2
2
4
2
2
1
1
12
3
1
1
2
1
2
AMOUNT
956.95
208.7
45.36
10
18
63
12
137.7
88
448
208 70
10
18 00
955.95
18
88 00
45.36
TIMOR-LESTE
ITEM NO
D.4
D.1
D.1.1
D.1.2
D.1.3
D.1.4
D.1.5
D.2
D.2.1.
D.3
D.3.1.
D.4
D.4.1.
D.5
D.5.1
D.5.2
D.5.3
D.5.4
ITEM DESCRIPTION
AIR TRAFFIC CONTROL TOWER BUILDING
ELECTRICAL
LIGHTING AND ELECTRICAL PLUGS INSTALLATION
FEEDER CABLE WORKS
CABLE TRAY/CABLE LADDER WORK
ELECTRIC PANELS WORK
LIGHTING AND SUPPLIER EARTHING WORKS
SUB TOTAL D.1
VENTILATION AND AIR CONDITIONER WORKS
VENTILATION AND AIR CONDITIONER WORKS
SUB TOTAL D.2
FIRE FIGTHING WORKS
PROCUREMENT AND INSTALLATION FIRE EXTINGIUSHER
SUB TOTAL D.3
PLUMBING SCOPE WORK
PLUMBING WORK
SUB TOTAL D.4
ELECTRONIC WORKS ATC
FIRE ALARM WORKS
ACCESS CONTROL WORK
CCTV WORK
IT NETWORK
SUB TOTAL D.5
AMOUNT (USD)
BILL OF QUANTITY
AIR TRAFFIC CONTROL TOWER
MECHANICAL, ELECTRICAL & ELECTRONICA WORKS
NEW DEVELOPMENT OF OE-CUSSE AIRPORT PROJECT
TIMOR-LESTE
ITEM NO
ITEM DESCRIPTION
D.4
D.1
D.1.1
I
TOWER
V SHAPE TL 2 x 36 watt
Balk TL 1 x 36 watt
Balk TL 1 x 36 watt + battery
Down light PL 1 x 18 watt
Down light PL 1 x 18 watt + battery
Stop contact 10A 1P
Single Switch
Double Switch
Single Switch (Hotel)
Sub Total 1
2
-
3
-
4
-
5
-
6
-
7
-
8
-
Sub Total 8
Sub Total I
II
1
-
ELECTRICAL INSTALLATION
1st Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 1
2
-
2nd Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 2
3
-
3rd Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 3
4
-
4th Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 4
5
-
5th Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 5
6
-
6th Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 6
7
-
7th Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 7
8
-
8th Floor
Ligthing and electrical plugs installation with cable NYY 3 x 2.5 mm2 (o) PVC
Lighting
Stop contact 10A 1P
Sub Total 8
Sub Total II
III
D.1.2
I
1
-
2
-
2ND FLOOR
NYFGBY 4 x 35 mm2 + BC from SDP-ATC to PP-OUTDOOR OP & ATC
NYY 4 x 16 mm2 + BC from SDP-ATC to P-UPS BY PASS
NYY 4 x 4 mm2 + BC from SDP-ATC to PP-S.K UPS.COM
Sub Total 2
3
-
7TH FLOOR
NYY 4 x 4 mm2 + BC from SDP-ATC to PP-AC.ATC
FRC 4 x 1 x 4 mm2 + BC from SDP-ATC to PP - LIFT.ATC
NYY 4 x 4 mm2 + BC from SDP-ATC to PP-EF.ATC.7
Sub Total 3
D.1.3
1
-
D.1.4
A
I
1
2
3
4
5
6
7
II
1
2
3
2ND FLOOR
PP-OUTDOOR OP & ATC
P-UPS BY PASS
PP-S.K UPS.COM
Sub Total II
III
1
2
3
7TH FLOOR
PP-AC.ATC
PP-LIFT.ATC
PP-EF.ATC.7
Sub Total III
IV
D.1.5
1
2
3
4
5
6
D.2
I
1
1.1
a
HVAC WORK
Operation Building
AIR CONDITIONER VARIABLE SPLIT WORK
Procurement and installation of the air cooled variable split - ( R-410 A)
complete with control cable, thermostat, accessories and auxiliary equipmen
1st. Floor
IU-1.1
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU-1.2
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU-1.3
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU-1.4
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU - 1.5, 1.6 & 1.7
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU - 1.8
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
a
b
4
a
b
c
d
e
5
a
6
a
b
7
1.1
a
Tower Building
AIR CONDITIONER VARIABLE SPLIT WORK
Procurement and installation of the air cooled variable split - (R-410A)
complete with control cable, thermostat, accessories and auxiliary equipmen
2nd Floor
IU-T/2.1 & 2.2
Service
Total capacity
Sensible
1.2
a
Air volume
Input power
Indoor type
Liquid & Gas pipe
OUTDOOR UNIT
OU-1.1
Service
Total capacity
Air volume
Input power
Indoor type
Liquid & Gas pipe
OU-1.2
Service
Total capacity
Air volume
Input power
Indoor type
Liquid & Gas pipe
OU-T.1
Service
Total capacity
Air volume
Input power
Indoor type
Liquid & Gas pipe
OU-T.2
Service
Total capacity
Air volume
Input power
Indoor type
Liquid & Gas pipe
3rd Floor
IU-T/3.1 & 3.2
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
1.3
a
1.4
a
1.5
a
1.7
a
4th Floor
IU-T/4.1 & 4.2
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
5th Floor
IU-T/5.1 & 5.2
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
6th Floor
IU-T/6.1 & 6.2
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
7th Floor
IU-T/7.1 & 7.2
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU-T/7.3 & 7.4
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU-T/7.5
1.8
a
1.9
a
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
8th Floor
IU-T/8.1 & T/8.5
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU-T/8.2
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
IU-T/8.3 & T/8.4
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
9th Floor
IU-T/9.1, T/9.2, T/9.3, T/9.4 & T/9.5
Service
Total capacity
Sensible
Air volume
Input power
Indoor type
Liquid & Gas pipe
a
b
-
4
a
b
c
d
e
f
5
a
6
a
III
IV
D.3
D.3.1
1
3ST FLOOR
FE Kap : 4,5 Kg ABC
FE Kap : 4,5 Kg CO2
Sub Total (3)
4ST FLOOR
FE Kap : 4,5 Kg
FE Kap : 4,5 Kg
Sub Total (4)
5ST FLOOR
FE Kap : 4,5 Kg
FE Kap : 4,5 Kg
Sub Total (5)
ABC
CO2
ABC
CO2
5ST FLOOR
FE Kap : 4,5 Kg ABC
FE Kap : 4,5 Kg CO2
Sub Total (6)
5ST FLOOR
FE Kap : 4,5 Kg ABC
8TH FLOOR
FE Kap : 4,5 Kg ABC
FE Kap : 4,5 Kg CO2
Sub Total (8)
TOTAL PROCUREMENT AND INSTALLATION FIRE EXTINGUISHER (D.3.1)
TOTAL FIRE FIGHTING WORK (D.3.1)
D.4
1
a
Capacity : 45 metre
Head : 1,5 KW
Power : 2900 rpm
Speed
There are 2 unit pump complete with installation cable, control
panel and accessories
SUB TOTAL (1)
2
a
b
pressure Switch
c
c.1
c.2
c.3
c.4
c.5
c.6
c.7
Support material
SUB TOTAL (2)
3
a
c
c.1
d
4
a
5
a
RISER INSTALLATION
Procurement and installation GIP Medium Class Pipe &
Fitting (Clean Water Pipe) mm
dia. 20 mm
dia. 50
Procurement and installation PVC Class 10kg Pipe (AW) & Fitting
(Sewage Pipe, Waste Water Pipe, Ve mm (rain water pipe)
dia. 100
Support material
SUB TOTAL (4)
INSTALLATION 1st FLOOR
Procurement and installation GIP Medium Class Pipe &
Fitting (Clean Water Pipe) mm
dia. 15 mm
dia. 20 mm
dia. 25 mm
dia. 32 mm
dia. 40 mm
dia. 50 mm
dia. 65
Procurement and installation PVC Class 10kg Pipe (AW) & Fitting
(Sewage Pipe, Waste Water Pipe, Ve mm (vent water pipe)
dia. 25 mm (vent pipe)
dia. 50 mm (waste water pipe)
c
c.1
c.2
c.3
c
c.1
c.2
c.3
c.4
d
7
a
c
c.1
c.2
c.3
c.4
d
8
a
dia. 100
Clean Out
mm
dia. 50 mm
dia. 80 mm
dia. 100
Roof Drain
dia. 100
Support material
SUB TOTAL (6)
INSTALLATION 7th FLOOR
Procurement and installation GIP Medium Class Pipe &
Fitting (Clean Water Pipe) mm
dia. 15 mm
dia. 20 mm
dia. 25 mm
dia. 32 mm
dia. 40 mm
dia. 50 mm
dia. 65
Procurement and installation PVC Class 10kg Pipe (AW) & Fitting
(Sewage Pipe, Waste Water Pipe, Ve mm (vent pipe)
dia. 25 mm (vent pipe)
dia. 50 mm (waste water pipe)
dia. 50 mm (sewage water pipe)
dia. 50 mm (waste water pipe)
dia. 80 mm (waste water pipe)
dia. 100 mm (rain water pipe)
dia. 100
Accessoris
Floor Drain
mm
dia. 50
Floor Clean out mm
dia. 50 mm
dia. 100
Clean Out
mm
dia. 50 mm
dia. 80 mm
dia. 100
Roof Drain
dia. 100
Support material
SUB TOTAL (7)
INSTALLATION ROOF
Procurement and installation PVC Class 10kg Pipe (AW) & Fitting
b
b.1
9
a
10
mm
mm
STP
Procurement STP complete with blower, equipmet
and control : 4 m3/hour
Capacity : Biologycal Technology System
System
Sumpit : 100 liters/minute
Capacity : 20 metre
Head : 1,2 KW
Power : 2900 rpm
Speed
There are 2 unit pump complete with installation cable, control
panel and accessories
SUB TOTAL (9)
TESTING & COMMISIONING
PLUMBING SCOPE WORK TOTAL PRICE (D.4)
D.5
D.5.1
1
D.5.2
1.1
1.2
-Comunicator
Sub total 1.1
-Instalasi Access Control dengan kabel UTP CAT 5
dalam PVC Conduit dia. 20 mm
-Instalasi power dengan kabel NYM 3 x 2,5 mm2
dalam PVC Conduit dia .20mm
Sub Total 1.2
Sub Total 1
2.1
2.2
3.1
3.2
II
D.5.3
1
CCTV WORK
MAIN EQUIPMENT
32" LCD Monitor
Network Video recorder management C/W software
UPS 9KVA, Sealed Lead Acid battery, 30 min
Distribution Panel w/Hub 24 Channel
Rack CCTV
PC Computer , 512 MB, 500 GB, Lan Card, c/w 17" Monitor
D.5.4
I
1
IT NETWORK
MAIN EQUIPMENT
SERVER
Komputer Intel Core i7
- Processor Intel Quad Core 3.4 Ghz
- Mother Board Asus Socket LGA 1155
- Memory 2 Gb
- Vga Card 2 Gb
- casing ATX Tower Sinbada
- Lan Card PCI
- Modem Internal Prolink
- Monitor LCD 15"
2
3
II
1
III
1
2
3 RD - % Th FLOOR (TOWER)
Unit terminal
Outlet RJ 45 + Face Plate
Instalasi Kabel Data
Instalasi data dengan menggunakan kabel UTP Cat
6 cable 4 pair dalam pipa konduit 20 mm
Sistem Administrasi
Rack 19" tipe 12 U
Patchpanel 24P Cat 6, AMP
Wiring management
peralatan bantu termasuk patch cord, connector
coupling jumper dll
Patch cable Cat6
Sub total III
IV
1
B.5
I
1
2
3
4
5
6
10
11
12
13
Formwork
Slab Thickness 120mm
Concrete
Reinforcement 10
Formwork
Column K1
Concrete
Reinforcement 19
Reinforcement 12
Formwork
Column KP
Concrete
Reinforcement 19
Reinforcement 12
Formwork
Stair
Concrete
Reinforcement 19
Formwork
II
Formwork
Stair
Concrete
Reinforcement 019
Formwork
III
STRUCTURE LEVEL+8,20
IV
1
Reinforcement 012
Formwork
Beam B2
Concrete
Reinforcement 016
Reinforcement 012
Formwork
TOTAL STRUCTURE OFFICE
ONICA WORKS
ITEM DESCRIPTION
UNIT
QTY
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
24
6
8
18
0
0
47
6
2
20
0
12
3
8
13
0
0
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
2
0
1
1
1
6
0
3
1
WER BUILDING
L PLUGS INSTALLATION
on of armatur lamp ligthing, electrical plugs
with auxiliary equipment
d Mounted
d mounted + emergency battery
+ battery
+ battery
+ battery
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
2
0
2
3
1
4
0
2
2
+ battery
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
2
0
2
1
1
4
0
2
2
+ battery
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
2
0
2
3
1
4
0
2
2
pcs
pcs
pcs
2
0
2
pcs
pcs
pcs
pcs
pcs
pcs
1
1
4
0
2
2
+ battery
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
2
0
2
3
1
4
0
2
2
+ battery
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
0
0
1
9
6
4
3
4
2
+ battery
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
0
0
0
14
4
4
0
2
1
+ battery
119
41
point
point
8
4
point
point
6
4
point
point
8
4
point
point
6
4
point
point
8
4
16
4
point
point
18
4
lot
m
m
m
m
m
m
m
150
12
32
56
42
44
56
m
m
m
36
38
40
on of cable feeder
SDP-ATC to PP-AC.ATC
om SDP-ATC to PP - LIFT.ATC
SDP-ATC to PP-EF.ATC.7
m
m
m
88
90
92
lot
m
m
m
m
m
m
38
38
35
35
0
0
lot
unit
unit
unit
unit
unit
unit
unit
1
1
1
1
1
1
8
ER WORK
on of cable tray & cable ladder
00 m Power Cable
00 m Electronic cable
h = 100 m Power cable
h = 100 m Electronic cable
on of electrical panel
unit
unit
unit
1
1
1
unit
unit
unit
1
1
1
unit
unit
105
unit
unit
1
1
unit
lot
lot
unit
EARTHING WORKS
em (Early Streamer Emission) complete with a radius
high mast and auxiliary equipment
able 2x35 mm complete with clamps every 100 cm
LE SPLIT WORK
on of the air cooled variable split - ( R-410 A)
e, thermostat, accessories and auxiliary equipment
Lobby
24000 Btu/h
16300 Btu/h
600 CFM
0.075 kW(IU), 220/1/50 HZ
Ceiling cassete round/4 ways flow type c/w remote
Dia 9.5 & 15.9 mm
Briefing
9600 Btu/h
6500 Btu/h
300 CFM
0.025 kW(IU), 220/1/50 HZ
Wall mounted type c/w remote
Dia 6.4 & 12.7 mm
unit
PTO Briefing
22400 Btu/h
15300 Btu/h
560 CFM
0.075 kW(IU), 220/1/50 HZ
Ceiling cassete round/4 ways flow type c/w remote
Dia 9.5 & 15.9 mm
unit
R.Rapat
16800 Btu/h
11400 Btu/h
420 CFM
0.150 kw(IU), 220/1/50 HZ
Ceiling cassete double flow type c/w remote
Dia 6.4 & 12.7 mm
unit
unit
unit
unit
unit
m
m
m
3
5
9
m
m
m
9
12
17
pcs
pcs
pcs
pcs
pcs
4
1
1
7
pcs
m
m
m
m
m
m
m
m
21
53
21
30
36
11
0
1
m
m
m
m
0
39
0
27
m
m
m
m
242
0
66
36
m
m
tube
0
0
3
unit
R-410a (12kg/tabung)
LE SPLIT WORK
on of the air cooled variable split - (R-410A)
e, thermostat, accessories and auxiliary equipment
Battry Room
9000 Btu/h
6100 Btu/h
300 CFM
0.050 kW (IU), 220/1/50 HZ
Concealed Floor Standing type c/w remote
Dia 6.4 & 12.7 mm
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
Gudang
10500 Btu/h
7100 Btu/h
300 CFM
1.000 kW (IU), 220/1/50 HZ
Concealed Floor standing type c/w remote
Dia 6.4 & 12.7 mm
APP/IFR Room
16000 Btu/h
10800 Btu/h
430 CFM
0.025 kW (IU), 220/1/50 HZ
Wall mounted type c/w remote
Dia 6.4 & 12.7 mm
Lobby
6000 Btu/h
4000 Btu/h
250 CFM
0.025 kW (IU), 220/1/50 HZ
Wall mounted type c/w remote
Dia 6.4 & 12.7 mm
unit
unit
unit
unit
VFR Room
24000 Btu/h
16300 Btu/h
600 CFM
0.150 kW (IU), 220/1/50 HZ
Wall mounted type c/w remote
Dia 6.4 & 12.7 mm
unit
unit
unit
m
m
m
0
0
0
m
m
m
0
0
0
pcs
pcs
pcs
pcs
pcs
pcs
0
0
0
0
0
0
m
m
97
35
R.Pompa, R.Panel
500 cfm
2900 rpm/0.2 in.wg
0.25 kW (IU), 220/1/50 HZ
Propeller Wall mounted type c/w rainhood
Toilet & Pantry
300 cfm
2900 rpm/0.2 in.wg
0.50 kW (IU), 220/1/50 HZ
In-line fan c/w flexible joint, rainhood & wiremesh
R.Mesin lift
750 cfm
2900 rpm/0.4 in.wg
0.50 kW (IU), 220/1/50 HZ
In-line fan c/w flexible joint, rainhood & wiremesh
R-410a (12KG/tabung)
m
m
m
m
m
m
179
35
0
11
82
1
m
m
m
m
m
0
172
0
0
42
m
m
m
m
511
19
185
95
m
m
0
12
Tube
ls
pcs
pcs
3
2
pcs
pcs
1
0
pcs
pcs
1
0
pcs
pcs
1
0
pcs
pcs
1
0
pcs
pcs
1
0
pcs
pcs
pcs
pcs
Unit
Set
WORK (D.3.1)
oit
mtr
mtr
mtr
mtr
mtr
mtr
2
0
0
4
2
0
pcs
pcs
pcs
pcs
pcs
pcs
1
0
0
3
2
0
pcs
pcs
pcs
2
2
pcs
pcs
pcs
pcs
pcs
pcs
1
0
2
pcs
lot
mtr
mtr
mtr
mtr
0
0
4
0
mtr
mtr
13
8
pcs
lot
1
1
mtr
mtr
35
7
mtr
lot
153
1
mtr
mtr
mtr
mtr
mtr
mtr
mtr
30
9
2
2
0
0
0
mtr
22
7
HE BUILDING
on GIP Medium Class Pipe &
mtr
mtr
mtr
mtr
mtr
0
0
6
0
14
pcs
pcs
pcs
0
4
pcs
pcs
pcs
lot
0
0
0
1
mtr
mtr
mtr
mtr
mtr
mtr
mtr
0
7
0
33
0
0
0
mtr
mtr
mtr
mtr
mtr
mtr
mtr
0
0
0
0
0
0
5
pcs
pcs
pcs
pcs
pcs
pcs
0
0
0
pcs
lot
10
1
mtr
mtr
mtr
mtr
mtr
mtr
mtr
10
7
0
0
0
0
0
mtr
mtr
mtr
mtr
mtr
mtr
mtr
0
0
3
0
4
4
0
pcs
pcs
pcs
0
0
pcs
pcs
pcs
0
0
0
pcs
lot
10
1
mtr
15
pcs
lot
4
1
Set
Set
lot
unit
unit
unit
set
loops
1
1
1
1
1
ea
ea
ea
7
1
1
nology System
point
point
8
0
ea
ea
ea
point
point
10
10
0
ea
ea
ea
3
1
0
point
point
4
0
ea
ea
ea
2
0
0
point
point
2
0
lot
unit
100
unit
LARM WORKS
aeder (1.4mm)
unit
lot
lot
unit
unit
unit
unit
unit
unit
1
6
6
6
6
6
lot
lot
unit
unit
unit
unit
unit
unit
0
1
1
1
1
1
lot
lot
lot
e 3.4 Ghz
et LGA 1155
unit
unit
unit
unit
unit
unit
2
1
1
1
1
1
unit
unit
point
0
1
1
unit
unit
point
0
1
1
unit
unit
point
0
1
1
unit
unit
unit
lot
1
1
unit
point
unit
unit
unit
1
1
1
lot
unit
1
2
unit
point
unit
unit
unit
1
1
1
lot
unit
1
3
unit
point
unit
unit
unit
1
2
1
lot
unit
1
5
lot
m3
m3
m3
m3
m3
251.06
121.34
129.72
153.06
76.53
m3
kg
kg
m2
4.20
241.32
235.57
0.70
m3
kg
kg
m2
18.00
1,105.53
1,136.90
48.00
m3
kg
m2
25.60
3,653.94
51.20
m3
kg
kg
41.33
1,239.89
2,002.13
m2
550.88
151.20
21,234.67
1,260.00
m3
kg
kg
m2
41.32
5,534.27
1,759.72
413.18
m3
kg
kg
m2
3.99
713.73
187.17
106.52
m3
kg
m2
3.59
737.96
26.71
m3
kg
m2
146.52
20.577.41
1,221.00
m3
kg
kg
m2
85.61
9,064.96
5046.23
718.32
m3
kg
kg
m2
3.92
573.67
414.62
53.07
m3
kg
kg
m2
16.06
3898.92
878.16
214.18
m3
kg
kg
1.66
302.3
79.65
m2
44.23
m3
kg
m2
3.59
737.96
26.71
m3
kg
m2
146.52
20.577.41
1221
m3
kg
kg
m2
69.6
7389.73
4128.54
584
m3
kg
kg
m2
4.93
720.16
517.69
66.8
m3
kg
kg
m2
16.06
3898.92
878.16
214.18
m3
kg
kg
m2
1.66
302.3
79.65
44.23
m3
kg
m2
3.59
737.96
26.71
m3
kg
m2
146.52
20.577.41
1221
m3
kg
69.6
7389.73
LEVEL +11.20
kg
m2
4128.54
584
m3
kg
kg
m2
4.93
720.16
517.69
66.8
RATE
AMOUNT
TIMOR-LESTE
ITEM NO
C.
C.5
C.5.1
C.5.2
C.5.3
C.5.4
ITEM DESCRIPTION
AIR TRAFFIC CONTROL TOWER BUILDING
ELECTRICAL
LIGHTING AND ELECTRICAL PLUGS INSTALLATION
FEEDER CABLE WORKS
CABLE TRAY/CABLE LADDER WORK
ELECTRIC PANELS WORK
TOTAL C.6 (OFFICE)
AMOUNT (USD)