S.No.
Department
01
Mechanical
4782000
9864993
02
Electrical
3182000
6453000
03
C&I
2715000
2400000
04
DM Plant
2721609
1465000
05
Operation
360000
06
Admin Expenses
160000
07
Statutory Requirements
Total
2550000
16470609
20182993
Department wise
M
S.No.
Indent No
01
02
03
04
05
06
07
08
Mech/16/2012, Dt 2-5-2012
09
10
11
Mech/15/2012, Dt 2-5-2012
12
13
14
15
16
17
18
19
Mech/86/2011, Dt 8-8-2011
MECH/20/2012, Dt 18-5-2012
Mech/20/2011, dt. 10-5.2011
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Mech-34, dt.20.6.15
34
35
Mech-50/2012,DT. 5.7.12
36
37
38
39
40
MANPOWER REQUIREMENT
1
2
3
4
5
6
ENGINEER
MILL-WRITE FITTER
PIPING FABRICATOR
GAS FITTER
ASSISTANT FITTER
HELPERS
Quantity
550000
Amount (Rs.)
420 Liters
100000
600000
550000
*Non-sparking Tools
200000
60000
R22 Refrigerant
110kg
15 Barrels
600000
10 Barrels
500000
250000
*HRSG-1A Guillitone Damper casing painting with high temperature alluminum paint
50000
225000
5 Barrels
150000
*DM water storage tank internal painting job including manpower charges
135000
30000
100000
110000
1 NO
1 NO
1 NO
4 NOS
2 NOS
3 NOS.
72000
500000
4782000
art-up
Requirement items for after Plant Startup
Quantity
Amount (Rs.)
DM Plant HCL bulk storage tanks (2 Nos.) damaged rubber lining to be replaced.
700000
450000
550000
3000000
SWAS Chiller Unit condenser tubes replacement (actual rate has increased)
100000
200000
Plantwide painting works including Civil, Mech. Elect, DM Plant & C&I
(CW inside paint procured at Rs. 4,87,764.00) (Rs. 30,00,000 - 4,87,764.00)
50000
300000
2512236
250000
3 Nos
1550000
45000
33757
12000
112000
9864993
Indent No
E23 / 11.1.14
E3 / 4.4.12
E32/ 22.01.14
E-28/22.7.15
E-17/30.6.15
E-23/19.7.15
E-21/9.7.15
E-16/23.6.15
E-14/19.6.15
E-21/19.7.15
E-22/9.7.15
WO: KGPL/Doc-70, (15-16)/O&M/13, dt. 3.7.15
WO: KGPL/Doc-23, (15-16)/O&M/06, dt. 29.5.15
E-4/27.5.15
E-12/19.6.15,
E-13/19.6.15 &
E-15/19.6.15
E-29/23.7.15
E-26, 11.7.15
E-25/9.7.15
E-6/1.6.15
E-09/9.6.15
E-20, 4.7.15
MANPOWER REQUIREMENT
1
2
Engineers
Electricians (Contract manpower)
Quantity
25 barrels
Amount (Rs.)
52000
450000
200000
50000
135000
525000
360000
*ISO VG 68 -Oil
Procurement of TCS Relays
*Tools procurement
60000
800000
20000
130000
3 Nos.
4 Nos
400000
3182000
Quantity
Amount (Rs.)
250000
120000
200000
2100000
1800000
750000
300000
180000
55000
85000
35000
2 Nos.
25000
13000
50000
90000
400000
TOTAL
6453000
C&I D
S.No.
Indent No
20/18.7.11
180/20.1.11
174/7.1.11
173/7.1.11
172/7.1.11
135/3.8.10
118/8.5.10
111/26.4.10
102/17.04.2010
103 / 17.04.10
61 / 12.09.09
109 / 22.04.10
13 / 11.01.2014
85 / 07.01.10
81 / 11.02.10
44 / 13.08.09
48/11.10.11
73 / 25.01.12
67 / 09.01.12
12,14,17,18/10.3.15
C&I-07,08,09,10&11
dt. 8.6.15
C&I-15,16&31,DT. 31.8.15
MANPOWER REQUIREMENT
1
As on date funds
required
75000
250000
*REL 054 Relay o/p module and USE 815 Power supply module for Epro
350000
120000
150000
150000
100000
550000
450000
400000
Calibration gasses
70000
3 Nos.
50000
2715000
up
Requirement items for after Plant Startup
*Dual Channel Vibration Monitor,Sensor,Power Supply Unit (C&I) for GT-1A &1B
Flow Transmitter for intake well
*Level Transmitter for DM Plant
Optional card (different Models)
Quantity
As on date funds
required
300000
50000
50000
150000
80000
10000
1000000
35000
100000
250000
25000
350000
TOTAL
2400000
DM Plant
S.No.
Indent No
Quantity
OPR/CHEM/MI-01(15.16)/18.5.15
OPR/CHEM/MI-08(13-14)/4.2.13
*Spectrophotometer
Synergy pack-1(UPW cartridge)
Intent to be raised
OPR/CHEM/MI-05(15.16)/5.6.15
Hydrochloric Acid - 25.0 MT
OPR/CHEM/MI-04(15.16)/5.6.15
Safety Items
Lab chemicals
TOTAL
MANPOWER REQUIREMENT
1
Chemist
1 No.
3 Nos
2 Nos
M Plant
Amount (Rs.)
Present Status
Quantity
As on date funds
required
1500000
*ORSAT Apparatus
1 No.
500 Kg
1 No.
1 No.
200 Ltrs.
200 Ltrs.
200 Ltrs.
30000
500000
40000
60000
25000
50000
200000
200000
200000
79805
285848
235956
Acid & Caustick unloading motors replacement
700000
30000
50000
2721609
1465000
Indent No
01
02
03
MANPOWER REQUIREMENT
1
2
3
4
4 Nos.
6 Nos
4 Nos.
11 Nos
Quantity
200 Ltrs
60 Nos
100 Nos.
Amount (Rs.)
Present Status
210000
150000
65000
to be filled by HO
360000
In progress
Indent No
TOTAL
Quantity
Amount (Rs.)
150000
10000
160000
Item Description
01
02
03
*Safety Audit of Tools & Tackles, Inspection of Pressure Vessels & Cranes Inspection
04
05
*CEIG Inspection
Amount (Rs.)
1200000
200000
400000
600000
150000
2550000