MINISTRY OF EDUCATION, MALAYSIA

VOCATIONAL COLLEGE STANDARD CURRICULUM


COURSE INFORMATION

PROGRAMME

ELECTRICAL TECHNOLOGY

COURSE NAME

LOW VOLTAGE INDUSTRIAL SWITCHBOARD

COURSE CODE

ETE 6014

YEAR / SEMESTER

1 SEMESTER 2

CREDIT UNIT

4.0

CONTACT HOUR

FACE TO FACE

: 7.0 HOUR/WEEK

NON FACE TO FACE

COURSE TYPE

VOCATIONAL

PREREQUISITE

ETE 5044 UNDERGROUND CABLE

CORE REQUISITE

Document Page

1/13

COURSE OUTCOMES
At the end of the course, students should be able to:1. Describe blueprint and the use of hand tool with standard format (C2, PLO1)
2. Comply with the standard procedure (A2, PLO3)
3. Explain sub switchboard, main switchboard, low voltage generator and voltage motor center according to standard procedure
(P2, PLO7)

COURSE DESCRIPTION
A continuation of Underground Cable. At the end of the course the student can install sub switchboard and main switch board, low voltage
electrical switch board and low voltage generator set using blueprint, sub board hand tools etc. so that it is mounted firmly according to
specification and regulations.

Document Page

2/13

CONTENT AND LEARNING STANDARDS

PROGRAMME

ELECTRICAL TECHNOLOGY

COURSE NAME

LOW VOLTAGE INDUSTRIAL SWITCHBOARD

COURSE CODE

ETE 6014

CONTACT
HOURS

CONTENT STANDARD

18 HOURS
(2 WEEKS)

1. INSTALL SUB-SWITCH
BOARD

LEARNING STANDARD
1.1 Obtain blue print.

1.2 Inspect of actual location.

1.3 Select sub switch board cable


size.

PERFORMANCE CRITERIA
1.1.1

Recite layout plan and schematic circuit diagram


according to electrical regulation 1994.

1.1.2

Interprete the blue print diagram according to


standard specification.

1.2.1

Determine blue print and building structure from


the drawing according to layout drawing.

1.2.2

Selecting and using technique on actual location


by visual check according to safety rules and
regulation.

1.2.3

Determine any obstacles according to safety


rules and regulation.

1.3.1

Identify type of SSB/ components according to


standard specification.

Document Page

3/13

1.4 Confirm SSB and cable size


(Sub Switch Board).

1.5Fix SSB and cable termination.

1.6 Apply safety workshop.

1.3.2

Install type and size of pole for sub switch board


according to safety rules and regulation.

1.4.1

Identify type/consumption of load according to


SSB location.

1.4.2

Apply SSB installation according to procedure


and techniques.

1.4.3

Measure calculation consumption of load


according to standard specification.

1.5.1

Utilize techniques of mounting according to SSB


and cable termination standard.

1.5.2

Identify type of connection and termination for


SSB according to IEE Regulation.

1.5.3

Assemble and connect the cable and terminated


according to IEE Regulation.

1.5.4

Carry out and mount the SSB to actual location


according to IEE Regulation.

1.6.1

Utilize suitable protective equipments and display


safety sign-board according to IEE Regulation.

1.6.2

Practice the safety requirement according to


standard safety procedure.

Document Page

4/13

CONTENT AND LEARNING STANDARDS

PROGRAMME

ELECTRICAL TECHNOLOGY

COURSE NAME

LOW VOLTAGE INDUSTRIAL SWITCHBOARD

COURSE CODE

ETE 6014

CONTACT
HOURS
27 HOURS
(3 WEEKS)

CONTENT STANDARD
2. INSTALL MAINSWITCH BOARD

LEARNING STANDARD
2.1 Obtain blue print.

PERFORMANCE CRITERIA
2.1.1

Recite layout plan/schematic circuit diagram


according to electrical regulation 1994.

2.1.2

Interprete the blue print diagram according to


electrical regulation 1994.

2.2.1

Determine blue print and building structure from


the drawing according to electrical regulation
1994.

2.2.2

Used an actual technique on the location by


visual check according to electrical regulation
1994.

2.2.3

Determine any obstacles according to safety


rules and regulation.

2.3.1

Select types of SSB/ components according to


standard specification.

2.2 Inspect of actual location.

2.3 Define sub switch board cable


size.

Document Page

5/13

2.4 Confirm SSB and cable size


(Sub
switch Board).

2.5 Fix SSB and cable


termination.

2.6 Apply safety workshop.

2.3.2

Install type and size of pole for sub switch board


according to electrical regulation 1994.

2.4.1

Identify type or consumption of load according to


SSB location.

2.4.2

Apply SSB installation according to procedure


and techniques.

2.4.3

Measure calculation consumption of load to


standard specification.

2.5.1

Utilize techniques of mounting according to SSB


and cable termination.

2.5.2

Identify type of connection and termination for


SSB according to SSB and cable termination
procedure.

2.5.3

Assemble and connect the cable and terminated


according to SSB and cable termination
procedure.

2.5.4

Carry out and mount the SSB to actual location


according to IEE Regulation.

2.6.1

Utilize suitable protective equipments and display


safety sign-board according to IEE Regulation.

2.6.2

Practice the safety requirement according to


standard safety procedure.

Document Page

6/13

CONTENT AND LEARNING STANDARDS

PROGRAMME

ELECTRICAL TECHNOLOGY

COURSE NAME

LOW VOLTAGE INDUSTRIAL SWITCHBOARD

COURSE CODE

ETE 6014

CONTACT
HOURS
27 HOURS
(3 WEEKS)

CONTENT STANDARD
3. INSTALL LOW
VOLTAGE
GENERATOR

LEARNING STANDARD
3.1 Obtain blueprint.

3.2 Inspect actual location.

PERFORMANCE CRITERIA
3.1.1

Identify layout plan/schematic circuit diagram


according to circuit diagram.

3.1.2

Interprete the blue print diagram according to


blueprint.

3.2.1

Interpret the blue print diagram according to


building structure.

3.2.2

Identify type of indoor or outdoor and survey


technique on actual location according to rules
and regulation.

3.2.3

Determine type of visual check at the location


according to rules and regulation.

Document Page

7/13

3.3 Select LV Generator set and


AMF Board (Automatic Main
Failure).

3.4 Confirm generator set/AMF


board.

3.2.4

Determine and identify any obstacle at


indoor/outdoor on location according to rules and
regulation.

3.3.1

Define various type and size generator set and


AMF board according to standard procedure.

3.3.2

Identify types and size of generator set and AMF


board according to standard procedure.

3.4.1

Identify type and consumption of load according


to gen-set/AMF board.

3.4.2

Apply gen-set/AMF board installation according


to
procedure/techniques.

3.4.3

Interpret load test report according to genset/AMF.

3.4.4

Analyze approval form according to standard


board procedure.

3.4.5

Measure and calculate gen-set capacity


according to gen-set/AMF board load test result.

3.4.6

Determine type and size of gen-set and AMF


board according to standard specification.

Document Page

8/13

3.5 Install generator set.

3.6 Apply safety workshop.

3.4.7

Identify load test report according to standard


test.

3.4.8

Apply approval from local authority according to


standard procedure.

3.5.1

Assemble gen-set according to size of


foundation.

3.5.2

Build mounting according to standard procedure


and techniques.

3.5.3

Identify and assemble type of connection and


termination according to standard procedure.

3.5.4

Carry out gen-set foundation according to


standard location procedure.

3.5.5

Assemble and mount the gen-set to actual


location according to standard procedure.

3.5.6

Identify mounting of battery, fuel tank, ventilation


device and earthling system on actual location
according to standard procedure.

3.6.1

Utilize suitable protective equipments and display


safety sign-board according to rules and
regulation.

3.6.2

Practice the safety requirement according to


standard safety procedure and housekeeping.

Document Page

9/13

CONTENT AND LEARNING STANDARDS


PROGRAMME

ELECTRICAL TECHNOLOGY

COURSE NAME

LOW VOLTAGE INDUSTRIAL SWITCHBOARD

COURSE CODE

ETE 6014

CONTACT
HOURS
27 HOURS
(3 WEEKS)

CONTENT STANDARD
4. INSTALL LOW
VOLTAGE MOTOR
CONTROL CENTRE

LEARNING STANDARD
4.1 Obtain blueprint.

4.2 Inspect actual location.

4.3 Select motor control centre.

PERFORMANCE CRITERIA
4.1.1

Determine layout plan and schematic circuit


diagram according to electrical regulation 1994.

4.1.2

Interprete the blue print diagram according to


electrical regulation 1994.

4.2.1

Identify blue print and building structure from the


drawing according to electrical regulation 1994.

4.2.2

Selecting and using an actual technique on the


location by visual check according to standard.

4.2.3

Determine any obstacles according to safety


rules.

4.3.1

Describe type of MCC and components


according to standard specification.

4.3.2

Differentiate type and size of pole according to


standard specification.

Document Page

10/13

4.4 Confirm motor control centre


and cable size.

4.5 Fix motor control centre and


cable termination.

4.6 Apply safety workshop.

4.4.1

Identify type and consumption of load according


to MCC location.

4.4.2

Construct motor control centre installation


according to standard procedure and techniques.

4.4.3

Measure and calculate consumption load


according to standard procedure and techniques.

4.5.1

Build mounting according to standard procedure


and techniques.

4.5.2

Identify and assemble type of connection and


termination according to standard procedure.

4.5.3

Install and connect the cable and terminated


according to standard procedure.

4.5.4

Assemble and mount the MCC to actual location


according to standard procedure.

4.5.5

Identify and assemble type of connection and


termination according to standard procedure.

4.6.1 Utilize suitable protective equipments and display


safety signboard according to standard
procedure.
4.6.2 Practice the safety requirement according to
standard safety procedure and housekeeping.

Document Page

11/13

CONTENT AND LEARNING STANDARDS


PROGRAMME

ELECTRICAL TECHNOLOGY

COURSE NAME

LOW VOLTAGE INDUSTRIAL SWITCHBOARD

COURSE CODE

ETE 6014

CONTACT
HOURS

CONTENT STANDARD

27 HOURS
(3 WEEKS)

5. TROUBLESHOOT LOW
VOLTAGE
UNDERGROUND
CABLE FAULT

LEARNING STANDARD

PERFORMANCE CRITERIA

5.1 Identify breakdown.

5.1.1

Acquire and determine type of fault according to


troubleshoot procedure.

5.2 Obtain blueprint schematic


diagram.

5.2.1

Recite and interpret blueprint and schematic


according to diagram.

5.3 Obtain proper tools &


equipment &
spare parts.

5.3.1

Selecting and use suitable type of tools &


equipments according to job requirement and
standard.

5.3.2

Assemble and determine type of parts to be


replaced according to troubleshoot procedure.

5.3.3

Utilize suitable protective equipments according


to standard procedure.

5.4.1

Identify spare parts according to spare parts list.

5.4.2

Acquire type of digging machinery according to


standard safety procedure.

5.4 Follow repair procedure.

Document Page

12/13

5.5 Testing and commissioning.

5.6 Apply safety workshop.

5.4.3

Determine and repair LV underground faults


according to troubleshoot procedure.

5.4.4

Identify faults and replace breakdown part using


LV underground faults repair according to
procedure.

5.4.5

Carry out excavating and digging work according


to rules and regulation.

5.5.1

Perform testing commissioning according to


testing procedure.

5.5.2

Acquire testing tools and equipment using testing


tools and equipment according to procedure.

5.5.3

Perform function testing according to procedure.

5.5.4

Recognize procedure test and commissioning


report using testing commissioning check list
according to rules and regulation.

5.6.1

Utilize suitable protective equipments and


display safety sign-board according to rules and
regulation.

5.6.2

Avoid digging other life cable according to rules


and regulation.

5.6.3

Practice the safety requirement according to


standard safety procedure.

Document Page

13/13