Sei sulla pagina 1di 60

Doc. No.

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

RFCC-G-101-CV-CS-001
Rev. No. :
Page No. :

2
1 of 43

CALCULATION SHEET
101-V-523 (LIGHT CYCLE OIL STRIPPER)
FOUNDATION

PROJECT

: CILACAP RESID FLUID CATALYTIC CRACKING


(RFCC) PROJECT

LOCATION

: PERTAMINA RU-IV, CILACAP, CENTRAL JAVA, INDONESIA

OWNER

: PT.PERTAMINA (PERSERO)

CONTRACT NO.

: 15/C00000/2011-S2

For Record

25 Oct 2012

Y.S.RYU

D.Y.LEE

I.Y.KIM

Issued for Approval

22 Jun 2012

Y.S.RYU

D.Y.LEE

I.Y.KIM

Issued for Approval

18 Apr 2012

Y.S.RYU

D.Y.LEE

I.Y.KIM

Rev.

Description

Date

Prepared
by

Reviewed
by

Approved
by

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :
Page No. :

2
2 of 43

FOUNDATION

REVISION HISTORICAL SHEET

Rev.

Page /
Paragraph

Item

Description of Change

5 of 43 / 1.3

References

Updated Revision No. of Specifications

7 of 43 / 1.7

Pile

D600 Capacity added

8 of 43 / 1.8.2

Velocity Pressure

Factor for construction period made 0.85

28 of 43 / 3

Check For "Ldh"

Added

43 of 43 / 7

Attachments

Updated

5 of 43 / 1.4

Ref. Annotations

Added Standard drawing

29 of 43 /4

Pile Group Effect

Added

34 of 43 /5

Pile Cap Calculation

Added

37 of 43 / 6

Check of Anchoring

Added

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :
Page No. :

2
3 of 43

FOUNDATION

TABLE OF CONTENT
1.

DESIGN CRITERIA... 5
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.
1.9.
1.10.
1.11.
1.12.

2.

LOAD CALCULATIONS...
2.1.
2.2.
2.3.
2.4.
2.5.

3.

Design Code ..............


Design Method.......
References........
Reference Annotations.........
Measuring System.
Materials..........
Pile.........
Wind Load.....
Earthquake Load.
Load Combinations....
Strength Reduction Factor.....
Friction Coefficients........

5
5
5
5
6
6
7
8
9
10
11
11
12

Equipment Data..... 12
Wind Load...... 13
Seismic Load...... 16
Design Load Summary....... 22
Load Combination................. 23

CHECK FOR DEVELOPMENT LENGTH "Ldh" IN TENSION.. 28


28
3.1. Design Criteria.....
3.2. Check for Development Length...... 28

4.

PILE GROUP EFFECT...

29

4.1. Minimum Spacing of Piles.... 29


4.2. Ultimate Capacity of Pile Groups...... 29
4.3. Allowable Pile Capacity Reflecting Grout Effect..... 33
5.

PILE CAP CALCULATION... 34


5.1. Pile Cap Design..... 34
5.2. Input Load...... 34
5.3. Check Pile Cap......35

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :
Page No. :

2
4 of 43

FOUNDATION

6.

CHECK OF ANCHORING TO CONCRETE... 37


6.1.
6.2.
6.3.
6.4.
6.5.

7.

37
Given Data.....
Design Requirements For Tensile Loading ...... 39
Design Requirements For Shear Loading ..... 41
Strength Summary ...... 41
Interaction Of Tensile And Shear Forces ..... 42

ATTACHMENTS..
Attachment-1
Attachment-2
Attachment-3

Equipment Drawing
Foundation Drawing
AFES Output

43

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

5 of 43

FOUNDATION
1.

DESIGN CRITERIA

1.1.

Design Code

1.1.1

ACI318M-02
(American Concrete Institute/Building Code Requirements for Structural Concrete with Commentary)

1.1.2

ASCE7-05
(American Society of Civil Engineers/Minimum Design Loads for Buildings and other Structures)

1.1.3

UBC-97
(International Conference of Building Officials/Uniform Building Code)

1.2.

Design Method
- Reinforced
R i f
dC
Concrete
t F
Foundations:
d ti
St
Strength
th D
Design
i M
Method
th d
- In Foundation Design, AFES (Commercial Foundation Design Software) has been utilized.

1.3.

References

1.3.1

Engineering Specification for Reinforced Concrete Structures (RFCC-C-CV-SP-003)

1.3.2

Engineering Specification for Concrete Foundation (RFCC-C-CV-SP-004)

1.3.3

Engineering Specification for Design Load (RFCC-C-CV-SP-001)

1.3.4

Geotechnical Investigation Report

1.3.5

Engineering Specification for Prestressed Pile (RFCC-C-CV-SP-009)

1.4.

Reference Annotations
The annotation numbers noted like 1) shown on this document means;
1) Engineering Specification
2) ASCE7-05
3) UBC-97
4) ACI318M-02
5) Wind loads and anchor bolt design for petrochemical facilities.
6) Geotechnical Investigation for Cilacap RFCC Project
7) SEI/ASCE 37-02
8) Standard Drawings

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

6 of 43

FOUNDATION
1.5.

Measuring System
MKS system is used as follows.
1) Length:

m,mm

2) Area:

m2,mm2

3) Volume:

m3,mm3

4) Force:

kg

5) Mass:

kg

6) Density:

kg/m3

7) Pressure

kg/cm2

1.6.

Materials

1.6.1

Concrete
1) Specified Design Compressive Strength at 28 days (Clause 2.1, RFCC-C-CV-SP-0031))

Design Compressive Strength(kg/cm2)

Scope

150

Lean Concrete

240

Foundations

2) Unit Weight for Reinforced Concrete


- Wc = 2,403 kg/m3 = 2,400 kg/m3 (used)

(Table-C3-22))

3) Modulus of Elasticity
- Ec =

15,000 x fc'

(kg/cm2)

= 15,000 x 240 = 232,379 (kg/cm2)

(Clause 8.5.14))
= 232,000 kg/cm2 (used)

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

7 of 43

FOUNDATION
1.6.2

(Clause 2.1 RFCC-C-CV-SP-0031))

Reinforced Bar,
JIS G 3112, SD 390
1) Specified Yield Strength, Fy = 4,000 kg/cm2

(JIS G 3112 Clause 5)

2) Modulus of Elasticity, Es(D22) = 2,090,000 kg/cm

1.6.3

Symbol

Unit Weight
(kg/m)

Dia.
(mm)

Area
(cm2)

D 10

0.56

9.53

0.71

D 13

1.00

12.70

1.27

D 16

1.56

15.90

1.99

D 19

2.25

19.10

2.87

D 22

3.04

22.20

3.87

D 25

3.98

25.40

5.07

D 29

5.04

28.60

6.42

D 32

6 23
6.23

31 80
31.80

7 94
7.94

Back Fill Soil


1) Unit Weight =

1,900 kg/cm3

1.7.

Pile

1.7.1

Precast Concrete Pile size =

1.7.2

Allowable Pile Capacity

Pile
Diameter(mm)

Pile Capacity

D 400

D 400 mm ,

D 500 mm ,

Vertical (ton/ea)

D 600 mm

Horizontal (ton/ea)

Compressive

Uplift

Long term

70.0

30.0

5.3

D 500

Long term

100.0

40.0

7.8

D 600

Long term

130.0

50.0

10.7

*Allowable pile Capacity based on Soil Investigation Report

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

8 of 43

FOUNDATION
1.8.

Wind Load

(ASCE7-05)

1.8.1

Governing Equation
F = qz x G x Cf x Af (Equation 6-282))

1.8.2

Velocity pressure
qz= 0.613 Kz Kzt Kd V2 I (N/m2) (Equation 6-152))
Where,
Kz : Velocity pressure exposure coefficient (Table 6-3 2))
* Exposure Category: C (Clause 1.2 RFCC-C-CV-SP-0011))
(Clause 6.5.7.2 2))

Kzt: Topographic factor, 1.0

Kd: Wind directionality factor (Table 6-4 2))


- Round Type (Pipes, Vessels and etc.) : 0.95
I: Importance factor,

1.15

for all structures

(Clause 1.2 RFCC-C-CV-SP-0011))

for all structures

during construction stage

(Clause 6.17))

V: Basic wind speed 3-second Gust in m/s, 126km/h (35m/s) at 10m height
(Clause 1.2 RFCC-C-CV-SP-0011))
Factor for basic wind speed for construction period
1.8.3

The Gust effect factor shall be taken as 0.85

Force coefficient (Cf)


Pipes, Vessels

1.8.5

(Clause 6.2.17))

Gust effect factor (G) (Clause 6.5.82))


- Rigid Structures:

1.8.4

0.85

: 0.7~0.9

(Fig 6.21 2))

: 0.5

(Clause 4.3.2.4 5))

Increase Factor for Equipment


The increase in shape factors for the projected width of equipment :
- D (Diameter of the vessel) + 0.46m

(Clause 4.3.2.25))

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

9 of 43

FOUNDATION
1.9.

Earthquake Load

(UBC-97)

1.9.1

Earthquake loads shall be defined as the horizontal and vertical forces equivalent in their
design effect to the loads induced by ground motion during an earthquake.

1.9.2.

Computed seismic loading is an ultimate limit by definition. The computed seismic load
magnitude shall be scaled by the relevant factors of ASCE 7 before inclusion in service
load combinations.

1.9.3

Earthquake Load for all plant equipment, foundations and structures: based on UBC97.
V= Cv xI x W
RT

(Equation 30-43))

Vmax = 2.5 x Ca x I x W
R

(Equation 30-53))

For Non Building Structures


Vmin. = 0.56x Ca x I x W

(Equation 34-23))

Vrigid = 0.7 x Ca x I x W

(Equation 34-13))

Where,
V: Shear at the base
Cv: Seismic Coefficient, refer to the table 16-R 3)
Ca: Seismic Coefficient, refer to the table 16-Q 3)
I: Importance factor :

I =1.25 (containing sufficient quantities of explosive substances)


(Table 16-K-Occupancy Category-Clause 23))

I =1.0 (others)
W: Self Weight

R: System Redundancy Factor, refer to the table 16-N & 16-P 3)


1) For rigid structures which structural period is less than 0.06 second, Vrigid should be
used for the seismic base shear force.
2) For flexible structures which structural period is more than 0.06 second, V should be
less than Vmax and more than Vmin.
3) Design parameters
- Seismic Zone 3, Z=0.3

(Clause 1.2, RFCC-C-CV-SP-0011))

- Soil Profile Type: SD

(As per soil report)

( According to Presentation Material as Response Spectrum Analysis with Shear Velocity (VS) )

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 10 of 43

FOUNDATION
1.10.

( ASCE7-05)

Load Combinations

1.10.1 L/C for Foundations and reinforced concrete design (LRFD)


1) Empty with Wind Load

0.9(Ds+Dtr+Ee+ Pe) + 1.6Wp

2) Empty with Seismic Load

0.9(Ds+Dtr+Ee+Pe)+1.0EQe

3) Normal Operation

1.2(Ds+Dtr+Eo+Po+Af+F)+1.6(L+V)

4) Operation with Dead Load

1.4(Ds+Dtr+Eo+Po+Af+F)

5) Operation with Wind Load

1.2(Ds+Dtr+Eo+Po+Af)+0.8W

6) Operation with Wind Load

0.9(Ds+Dtr+Eo+Po+Af)+1.6W

7) Operation with Wind and Live Load

1.2(Ds+Dtr+Eo+Po+Af)+1.0(L+V)+1.6W

8) Operation With Seismic Load

0.9(Ds+Dtr+Eo+Po+Af)+1.0EQo

9) Operation with seismic and Live Load

1.2(Ds+Dtr+Eo+Po+Af)+1.0(L+V)+1.0EQo

10) Operation with Live and Handling Load

1.2(Ds+Dtr+Eo+Po+Af+F)+1.6(L+V+lh)

11) Normal and Test Load

1.4(Ds+Dtr+Et+Pt)

12) Test
T t with
ith Wind
Wi d L
Load
d

1 2(D Dt Et Pt) 1 6W
1.2(Ds+Dtr+Et+Pt)+1.6Wp

13) Test with Wind and Live Load

1.2(Ds+Dtr+Et+Pt)+1.0L+1.6Wp

14) Maintenance Load

1.2(Ds+Dtr+Ee)+1.6B

1.10.2 L/C for Structural Steel, Foundation Stability & Other items not covered in section (ASD)
1) Empty with Wind Load

1.0(Ds+Dtr+Ee+Pe)+1.0Wp

(For Uplift)

2) Empty with Seismic Load

1.0(Ds+Dtr+Ee+Pe)+1/1.4EQe

(For Uplift)

3) Normal Operation Load

1.0(Ds+Dtr+Eo+Po+Af+F)+1.0(L+V)

4) Operation and Wind Load

1.0(Ds+Dtr+Eo+Po+Af)+1.0W

5) Operation and Wind Load

0.9(Ds+Dtr+Eo+Po+Af)+1.0W

6) Operation with Live and Wind Load

1.0(Ds+Dtr+Eo+Po+Af)+0.75(L+V)+0.75W

7) Operation with Seismic Load

1.0(Ds+Dtr+Eo+Po+Af)+1/1.4EQo

8) Operation with Seismic Load

0.9(Ds+Dtr+Eo+Po+Af)+1/1.4EQo

9) Operation with Live and Seismic Load

1.0(Ds+Dtr+Eo+Po+Af)+0.75(L+V)+0.75/1.4EQo

10) Operation with Live and Handling

1.0(Ds+Dtr+Eo+Po+Af+F)+1.0(L+V+lh)

11) Test with Live Load

0.83(1.0(Ds+Dtr+Et+Pt)+1.0L)

12) Test with Wind Load

0.83(1.0(Ds+Dtr+Et+Pt)+1.0Wp)

13) Test with Live and Wind

0.83(1.0(Ds+Dtr+Et+Pt)+0.75L+0.75Wp)

14) Maintenance

1.0(Ds+Dtr+Ee)+B

(For Uplift)

(For Uplift)

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 11 of 43

FOUNDATION
Note :
(1) Load Combinations follow ASCE 7-05.
(2) The most unfavorable load combination shall be taken into account.
(3) Where imposed loads (live loads) have a beneficial effect they shall be considered to be zero
loading.
(4) For load abbreviation, see 2.7.1.1 basic load conditions
1.11.

(Clause 9.3.14))

Strength Reduction Factors


Tension-controlled sections

0.9

Shear and torsion

0.75

For compression-controlled sections

1.12.

- members with spiral reinforcement

0.7

- other reinforced members

0.65

Friction Coefficients

( Clause 2.8,RFCC-C-CV-SP-0011))

Surface

Friction Coefficient

Steel-to-steel

0.3

Steel-to-concrete

0.4

Teflon-to-Teflon

0.05

Steel to Teflon

0.1

Concrete to Soil

0.5

Doc. No. :

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

RFCC-G-101-CV-CS-001
Rev. No. :

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Page No. : 12 of 43

FOUNDATION
2.

LOAD CALCLUATIONS

2.1

Equipment Data

( Attachment-1)

ITEM

Height
(H)

I.D

unit

mm

mm

1st Section (Skirt)

6,700

1,292

12

2nd Section

8,900

1,300

ts

Divided
Length

ea

mm

50

1,675

90

1,483

ti

mm mm

3rd Section
4th Section
Base Elevation
(Hp)
Total

300
15,900

B.C.D (mm)

14
1,475

Anchor Bolt Size

M42

Empty Weight

WE

20,350

kg

Operating Weight

WO

23,650

kg

Test Weight

WT

19,400

kg

Contingency Load Factor

1.10

H'

Here,
ID = Internal Diameter

(Contingency Load Factor : Incresing factor

ts = Shell thickness

of Equipment weight for attached pipes and insulation.)

ti = Insulation thickness
n = Divided number
B.C.D = Bolt Circle Diameter

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 13 of 43

FOUNDATION
- Assume Pedestal Size

2.2

1,900

mm

H'

1,700

mm

Wind Load
0.613Kz Kzt x Kd x V2 x I

qz

1.15

35 m/s

qz

863.56

Kz Kzt Kd

(N/m2)

Minimum wind Load = 0.48 kN/m2 = 48 kg/m2

(Clause 6.1.4.1 2))

Table of Wind Pressure along the height


h(m)

Kz

K zt

Kd

Cf

qz(kg/m
(k / 2 )

qzGxCf
(kg/m 2 )

4.6

0.85 1.00 0.95 0.81

71.13

0.85

49.24

6.1

0.90 1.00 0.95 0.82

75.31

0.85

52.50

7.6

0.94 1.00 0.95 0.82

78.66

0.85

54.84

9.1

0.98 1.00 0.95 0.82

82.01

0.85

57.17

12.2

1.04 1.00 0.95 0.82

87.03

0.85

60.67

15.2

1.09 1.00 0.95 0.82

91.21

0.85

63.59

18.0

1.13 1.00 0.95 0.82

94.56

0.85

65.92

21.3

1.17 1.00 0.95 0.82

97.90

0.85

68.25

24.4

1.21 1.00 0.95 0.82

101.25

0.85

70.59

27.4

1.24 1.00 0.95 0.82

103.76

0.85

72.34

30.5

1.26 1.00 0.95 0.82

105.44

0.85

73.50

36.6

1.31 1.00 0.95 0.82

109.62

0.85

76.42

42.7

1.36 1.00 0.95 0.82

113.80

0.85

79.34

48.8

1.39 1.00 0.95 0.82

116.31

0.85

81.09

54.9

1.43 1.00 0.95 0.82

119.66

0.85

83.42

61.0

1.46 1.00 0.95 0.82

122.17

0.85

85.17

76.2

1.53 1.00 0.95 0.82

128.03

0.85

89.25

91.4

1.59 1.00 0.95 0.82

133.05

0.85

92.75

Doc. No. :

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

RFCC-G-101-CV-CS-001
Rev. No. :

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Page No. : 14 of 43

FOUNDATION
Kd ; Wind Directionality Factor (Table 6-4 2))
Directionality Factor Kd

Structure Type
Buildings
Main Wind Force Resisting System

0.85

Components and Cladding

0.85
0.85

Arched Roofs
Chimneys,Tanks,and Similar Structure
Sqaure

0.90

Hexagonal

0.95

Round

0.95

Solid Signs

0.85

Open Signs and Lattice Framework

0.85

Trussed Towers
Triangular,square,rectangular

0.85

All other cross sections

0.95

Cf : Below Table( Figure 6-21 2))


Cross-Section

Type of Surface

Squre (wind normal to face)

25

All

1.3

1.4

2.0

Squre (wind along diagonal)

All

1.0

1.1

1.5

Hexagonal or Octagonal

All

1.0

1.2

1.4

Moderately smooth

0.5

0.6

0.7

Rough (D'/D=0.02)

0.7

0.8

0.9

Very rough
(D'/D=0.08)

0.8

1.0

1.2

All

0.7

0.8

1.2

Round (Dqz 2.5)


(Dqz 5.3, D in m, qz in N/)

2.2.1

h/D
1

Round (Dqz > 2.5)


(Dqz > 5.3, D in m, qz in N/)

Horizontal Load by Wind (W)


W = P x Area,
M =W x h
where,

h = height from pedestal top to uniform load centre by wind

Doc. No. :

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

RFCC-G-101-CV-CS-001
Rev. No. :

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Page No. : 15 of 43

FOUNDATION
(Clause 4.3.1.25))

Area = D + 1.52 (m)

15.90

Height of Vessel, H = (Height of Top Tangent Line) + O.L =


Uniform Load height

1.50 =

Area

kg/m2

4.6

49.24

4.60

14.86

2.15

6.1

52.50

1.50

4.84

5.05

7.6

54.84

0.90 0.60

2.91

9.1

57.17

12.2

Sec 1 Sec 2 Sec 3 Sec 4 Sec 1 Sec 2 Sec 3 Sec 4 Sec 1 Sec 2 Sec 3 Sec 4

m2

m2

m2

m2

1.99

6.25 7.00

1.50

4.98

8.05

60.67

3.10

10.28

10.35

15.2

63.59

3.00

9.95

13.40

18.0

65.92

2.20

7.29

16.00

21.3

68.25

24.4

70.59

27.4

72.34

30.5

73.50

36.6

76.42

42.7

79.34
W

Sec 1

Sec 2

Sec 3

Sec 4

Sec 1

Sec 2

Sec 3

Sec 4

ton

ton

ton

ton

tonm

tonm

tonm

tonm

4.6

0.73

1.57

6.1

0.25

1.28

7.6

0.16

0.11

1.00

0.76

9.1

0.28

2.29

12.2

0.62

6.46

15.2

0.63

8.48

18.0

0.48

7.68

21.3
24.4
27.4
30.5
36.6
43
Total

(m)

height for moment

17.40

3.28

29.53

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 16 of 43

FOUNDATION
Total Horizontal Force by Wind on
Pedestal Top

3,276

kg

2,057

kg

29,529

kg.m

18,544

kg.m ( Load during construction )

W =

Total Moment by Wind on Pedestal Top

M =

( Load during construction )

Note :
(Factor used for construction period
2.3

Seismic Load

2.3.1

Equipment Vertical Load

0.63 )

E t load
Empty
l d
20350

kg =

20.35

ton

x Load Factor =

22.39

ton

kg =

23.65

ton

x Load Factor =

26.02

ton

19.40

ton

x Load Factor =

21.34

ton

Operating load
23650

Test load (full of water)


19400

kg =

1.10

Contingency Load Factor =


2.3.2

Calculations
Soil Profile type
Cv :

SD

(As per soil report)


(Table 16-R 3))

0.54

R : Silo and Skirt-supported vertical vessel


I : Importance factor

1.25

Ca (seismic coefficient) :
2.3.2.1

2.9

(Table 16-P 3))

(Table 16-K-Occupancy Category-Clause 23))

0.36

(Table 16-Q 3))

Maxiumn Base Shear Force


V = [ ( 2.5 x Ca x I ) / R ] x W=

0.39 W

(Equation 30-53))

Doc. No. :

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

RFCC-G-101-CV-CS-001
Rev. No. :

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Page No. : 17 of 43

FOUNDATION
2.3.2.2

Minimum Base Shear Force

V = 0.56 x Ca x I x W
2.3.2.3

(Equation 34-23))

0.25 W

Rigid Structure
if, T < 0.06 sec
V rigid = 0.7 Ca I W

2.3.2.4

0.32 W

(Equation 34-13))

sec

(Equation 30-83))

Time Period calculation


a) Method "A"
T1 = Ct h3/4 =

0.389

where
0 0488
0.0488

Ct =

(E
(Equation
ti 20
20.8
83))

( ffor allll other


th b
buildings)
ildi
)

h : total height

15.90

b) Method "B"
L /Divided
Length Divid
No
ed
No.
cm
cm

D(Out)

d(inner)

I =/64(D 4 -d 4 )

cm

cm

cm 4

DIA. -S

670

168

132

129

1044987

DIA. -A

890

148

132

130

703055

DIA. -B
DIA. -C
E=

232,000

kg/cm2

- Operating Condition

Woper =

26,015

kg

- Empty Condition

Wemp =

22,385

kg

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 18 of 43

FOUNDATION

No

Length

Area

Volume

wi

hi

wi x hi

cm

cm2

m3

kg

cm

kg.cm

fi

10

10

148

130

1.97

2,487

1486

3,694,901

0.18

0.18

148

130

1.97

2,487

1338

3,326,032

0.16

0.34

26.93

148

130

1.97

2,487

1189

2,957,164

0.15

0.49

78.10

148

130

1.97

2,487

1041

2,588,295

0.13

0.62

150.82

148

130

1.97

2,487

893

2,219,427

0.11

0.73

242.40

148

130

1.97

2,487

744

1,850,559

0.09

0.82

350.16

168

129.2

2.20

2,774

586

1,626,035

0.08

0.90

471.41

168

129.2

2.20

2,774

419

1,161,454

0.06

0.95

621.70

168

129.2

2.20

2,774

251

696,872

0.03

0.99

781.56

168

129.2

2.20

2,774

84

232,291

0.01

1.00

947.14
1114.64

0
20.60

No

26,015

20,353,029

1.00

wi x di 2

fi x di

EI

M/EI

M/EI

ro

di

kg.cm2

1st

2nd

(rad)

cm

1.651E-10 3.158E-06

0.003382

0.028435

0.000614

1.65E-10

4.788E-10 3.145E-06

0.002914

0.021117

0.000476

1.63109E+11

4.79E-10

9.246E-10 3.098E-06

0.002451

0.014939

0.000356

1.63109E+11

9.25E-10

1.486E-09 2.994E-06

0.001999

0.009939

0.000254

1.63109E+11

1.49E-09

2.147E-09 2.815E-06

0.001568

0.006117

0.000171

1.63109E+11

2.15E-09

2.89E-09

2.545E-06

0.001171

0.003409

0.000106

2.42437E+11

1.94E-09

2.564E-09 2.172E-06

0.000821

0.00187

6.56E-05

2.42437E+11

2.56E-09

3.224E-09 1.794E-06

0.000489

0.000663

2.79E-05

2.42437E+11

3.22E-09

3.907E-09 1.309E-06

0.000229

0.000145

7.84E-06

2.42437E+11

3.91E-09

4.598E-09 7.122E-07

5.97E-05

9.87E-06

6.81E-07

0.086645

0.00208

10

1.63109E+11

1.63109E+11

T = 2{(wi x di2)/[g x (fi x di)] }1/2 =

1.295

sec

(Operating Condition)

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 19 of 43

FOUNDATION

No
10

Length

Area

Volume

wi

hi

wi x hi

cm

cm2

m3

kg

cm

kg.cm

fi

10

148

130

1.97

2,140

1486

3,179,333

0.18

0.18

148

130

1.97

2,140

1338

2,861,935

0.16

0.34

26.93

148

130

1.97

2,140

1189

2,544,536

0.15

0.49

78.10

148

130

1.97

2,140

1041

2,227,138

0.13

0.62

150.82

148

130

1.97

2,140

893

1,909,740

0.11

0.73

242.40

148

130

1.97

2,140

744

1,592,341

0.09

0.82

350.16

168

129.2

2.20

2,387

586

1,399,146

0.08

0.90

471.41

168

129.2

2.20

2,387

419

999,390

0.06

0.95

621.70

168

129.2

2.20

2,387

251

599,634

0.03

0.99

781.56

168

129.2

2.20

2,387

84

199,878

0.01

1.00

947.14
1114.64

0
20.60

No

22,385

17,513,072

1.00

wi x di 2

fi x di

EI

M/EI

M/EI

ro

di

kg.cm2

1st

2nd

(rad)

cm

1.651E-10 3.158E-06

0.003382

0.024468

0.000614

1.65E-10

4.788E-10 3.145E-06

0.002914

0.01817

0.000476

1.63109E+11

4.79E-10

9.246E-10 3.098E-06

0.002451

0.012855

0.000356

1.63109E+11

9.25E-10

1.486E-09 2.994E-06

0.001999

0.008553

0.000254

1.63109E+11

1.49E-09

2.147E-09 2.815E-06

0.001568

0.005264

0.000171

1.63109E+11

2.15E-09

2.89E-09

2.545E-06

0.001171

0.002934

0.000106

2.42437E+11

1.94E-09

2.564E-09 2.172E-06

0.000821

0.001609

6.56E-05

2.42437E+11

2.56E-09

3.224E-09 1.794E-06

0.000489

0.00057

2.79E-05

2.42437E+11

3.22E-09

3.907E-09 1.309E-06

0.000229

0.000125

7.84E-06

2.42437E+11

3.91E-09

4.598E-09 7.122E-07

5.97E-05

8.49E-06

6.81E-07

0.074555

0.00208

10

1.63109E+11

1.63109E+11

T = 2{(wi x di2)/[g x (fi x di)] }1/2 =

1.202

sec

(Empty Condition)

c) Decide Period
T (a)

T (b)

1.3
T (Design Period) in s
x T (a)

- Operating Condition

0.389

1.295

0.506

0.506

- Empty Condition

0.389

1.202

0.506

0.506

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 20 of 43

FOUNDATION
2.3.2.4

Total Equivalent Seismic Load(base shear), (Vs) for operating condition


V = ( Cv * I )*W / ( R*T ) =

0.46

W =

Vmax

0.39 W

10.09

ton

Vmin

0.25 W

6.56

ton

0.32

W =

V rigid = 0.7 x Ca x I x W

10.09

Decide Vs =

ton

11.97

ton

8.19

ton

10,092

kg

For empty condition


V = ( Cv * I )*W / ( R*T ) =

W =

Vmax

0.39 W

8.68

ton

Vmin

0.25 W

5.64

ton

0.32

W =

V rigid = 0.7 x Ca x I x W

=
8.68

Decide Vs =

2.3.2.5

0.46

ton

10.30

ton

7.05

ton

8,684

kg

Total Equivalent Seismic Load


Ft =

( T 0.7 sec)

Ft = 0.07 T V

( T > 0.7 sec)

(Equation 30-143))

T=

0.506

sec

<

0.7 sec

(Operating Condition)

T=

0.506

sec

<

0.7 sec

(Empty Condition)

Ft =

ton

Ft =

ton

Fx = V - Ft =

10.09

ton

(Operating Condition)

Fx = V - Ft =

8.68

ton

(Empty Condition)

2
.

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 21 of 43

FOUNDATION

No

Wi

Hi

Wi x Hi

Fi

Fi x Hi

ton

ton.m

ton

ton.m

10

10

2.49

14.86

36.95

1.83

27.22

2.49

13.38

33.26

1.65

22.06

2.49

11.89

29.57

1.47

17.44

2.49

10.41

25.88

1.28

13.36

2.49

8.93

22.19

1.10

9.82

2.49

7.44

18.51

0.92

6.83

2.77

5.86

16.26

0.81

4.73

2.77

4.19

11.61

0.58

2.41

2.77

2.51

6.97

0.35

0.87

2.77

0.84

2.32

0.12

0.10

26.02

203.53

10.09

104.83

M = Ft x H + Fi Hi =

No

104 83
104.83

tonm
ton
m

104 829
104,829

Wi

Hi

Wi x Hi

Fi

Fi x Hi

ton

ton.m

ton

ton.m

10

10

2.14

14.86

31.79

1.58

23.42

2.14

13.38

28.62

1.42

18.98

2.14

11.89

25.45

1.26

15.00

2.14

10.41

22.27

1.10

11.49

2.14

8.93

19.10

0.95

8.45

2.14

7.44

15.92

0.79

5.88

2.39

5.86

13.99

0.69

4.07

2.39

4.19

9.99

0.50

2.08

2.39

2.51

6.00

0.30

0.75

2.39

0.84

2.00

0.10

0.08

22.39

175.13

8.68

90.20

M = Ft x H + Fi Hi =

90.20

tonm

90,201

kg.m
kg
m
(Operating Condition)

kg.m
(Empty Condition)

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 22 of 43

FOUNDATION
2.4 .

Design Load Summary

2.4.1

The basic design force,which is to be applied on a pedestal, is as below;

Load Type

Fz

(kg)

(kg)

(kgm )

Remarks

Empty Load(Ee)

-22,385

Empty Weight (Ee)

Operating Load(Eo)

-26,015

Operating Load (Eo)

Test Load (Et)

-21,340

Test Load (Et)

Wind Load(Wp)

2,057

18,544 Wind load during construction time

Wind Load(W)

3,276

29,529 Wind load

Seis. Load(EQe)

8,684

90,201 Empty condition

Seis. Load(EQo)

10,092

104,829 Operating condition

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. : 23 of 43

FOUNDATION
2.5 Load Combination
2.5.1 Basic Load & Combinations
2.5.1.1 Basic Load Conditions
Description

Dead
(D)

Live
(L)
Thermal
(T)

Wind
(W)

Seismic
(EQ)

Ref.

Ds

Structural Dead Load

by program

Dtr

Cable Tray Dead Load

Pe

Pipe Empty Load

Po

Pipe Operating Load (including empty weight)

Pt

Pipe Test Load (including empty weight)

Ee

Equipment Empty Weight

2.1

Eo

Equipment Operating Load (including empty weight)

2.1

Et

E i
Equipment
tT
Testt L
Load
d (including
(i l di empty
t weight)
i ht)

21
2.1

Live Load

Ih

Load due to handling device

Maintenance load - Bundle Pulling

Af

Pipe Anchor Load

Pipe Friction Load

Wx

Wind Load

2.2

Wz

Wind Load

2.2

Wpz

Partial Wind Load during constrution stage

2.2

Wpz

Partial Wind Load during constrution stage

2.2

EQx

Seismic Load

2.3

EQz

Seismic Load

2.3

1
2
Ds Dtr
401 1.00 1.00
402 1.00 1.00

Erection

0.75
0.75
0.75
0.75

0.90
0.90
0.90
0.90
0.90
0.90
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

416
417
418
419
420
421
422
423
424
425
426
427
428
429

0.90
0.90
0.90
0.90
0.90
0.90
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.90

415 0.90 0.90

0.90
0.90
0.90
0.90
0.90
0.90
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.90

1.00
1.00
1.00
1.00
1.00

5
Eo

414 0.90 0.90

1.00
1.00
1.00
1.00
1.00
1.00 1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00

4
Ee
1.00
1.00

404
405
406
407
408
409
410
411
412
413

3
L

403 1.00 1.00

Condition

6
Et

1.00
1.00
1.00
1.00
1.00

1.00

7
Pe
1.00
1.00

0.90
0.90
0.90
0.90
0.90
0.90
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.90

0.90

1.00
1.00
1.00
1.00
1.00

8
Po

9
Pt

0.75
0.75
0.75
0.75

1.00

10
V

11
lh

12
B

14
F

15
Wx

0.90
0.90
0.90
0.90
0.90
0.90
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.90

0.90

1.00

Operation

-0.75
-0.71

0.71

-0.71

0.71

-0.71

0.71

-0.71

0.71

-0.71

0.71

-0.71

0.71

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

0.75

-1.00

1.00
-1.00

Rev. No. :

-0.75

0.75

-1.00

1.00

-1.00

16
17 18
19
20
Wzp
Wz Wxp
EQx EQz
1.00

1.00 1.00
1.00
1.00
1.00
-1.00
1.00
1.00
1.00
-1.00

13
Af

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
Doc. No. :
RFCC-G-101-CV-CS-001
2

FOUNDATION

Page No. : 24 of 43
.

2.5.1.2 Load Combination for Foundation Stability

1
2
3
Ds Dtr
L
430 1.00 1.00 0.75
431 1.00 1.00 0.75

Operation

Test

0.83
0.83
0.83

0.75
1.00
0.83

443 0.83 0.83 0.83

1.00
1.00
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83

1.00
1.00

1.00
1.00
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83

1.00

5
Eo
1.00
1.00

433
434
435
436
437
438
439
440
441
442

4
Ee

432 1.00 1.00 0.75

Condition

0.83

0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83

6
Et

7
Pe

1.00
1.00

1.00

8
Po
1.00
1.00

0.83

0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83

9
Pt

11
lh

0.75
1.00 1.00

0.75

10
V
0.75
0.75

12
B
14
F

1.00
1.00 1.00

1.00

13
Af
1.00
1.00

15
Wx

-0.62

0.62

-0.83

0.83

-0.62

0.62

-0.83

0.83

-0.54
-0.54

0.54

16
17 18
19
20
Wzp
Wz Wxp
EQx EQz
0.54

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION

Doc. No. :
RFCC-G-101-CV-CS-001

Rev. No. :
2

Page No. : 25 of 43
.

1
2
Ds Dtr
201 0.90 0.90
202 0.90 0.90

Erection

6
Et

0.90
0.90
0.90
0.90
0.90

0.90

7
Pe
0.90
0.90

0.90
0.90
0.90
1.20
1.20
1.20
1.20
0.90
0.90
0.90
0.90
1.20
1.20

0.90

1.20

1.20
1.40
1.20
1.20
1.20

8
Po

9
Pt

11
lh

12
B

14
F

15
Wx

0.90
0.90
0.90
1.20
1.20
1.20
1.20
0.90
0.90
0.90
0.90
1.20
1.20

0.90

1.20

-1.60

1.60

-1.60

1.60

Operation

-1.60

1.60

-1.60

1.60

-0.80

-1.60
-1.60

1.60

-1.00

1.00

-1.00

1.00

-1.00

1.00

-1.00

1.00

-1.00

1.00

16
17 18
19
20
Wzp
Wz Wxp
EQx EQz
1.60

1.20 1.20
1.40 1.40
1.20
0.80
1.20
-0.80
0.80
1.20

13
Af

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

1.00
1.00

1.00
1.00
1.00
1.00

1.60

10
V

Rev. No. :

1.00
1.00

1.00
1.00
1.00
1.00

0.90
0.90
0.90
1.20
1.20
1.20
1.20
0.90
0.90
0.90
0.90
1.20
1.20

216
217
218
219
220
221
222
223
224
225
226
227
228

0.90
0.90
0.90
1.20
1.20
1.20
1.20
0.90
0.90
0.90
0.90
1.20
1.20

0.90

215 0.90 0.90

0.90
0.90
0.90
1.20
1.20
1.20
1.20
0.90
0.90
0.90
0.90
1.20
1.20

1.20

1.20
1.40
1.20
1.20
1.20

5
Eo

214 1.20 1.20

0.90
0.90
0.90
0.90
0.90
1.20 1.60
1.40
1.20
1.20
1.20

0.90
0.90
0.90
0.90
0.90

204
205
206
207
208
209
210
211
212
213

0.90

4
Ee
0.90
0.90

0.90
0.90
0.90
0.90
0.90
1.20
1.40
1.20
1.20
1.20

3
L

203 0.90 0.90

Condition

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
Doc. No. :
RFCC-G-101-CV-CS-001
2

FOUNDATION

Page No. : 26 of 43
.

2.5.1.3 Load Combination for Foundation Design

3
1
2
L
Ds Dtr
229 1.20 1.20 1.00
230 1.20 1.20 1.00

Operation

232
233
234
235
236

1.40
1.20
1.20
1.20
1.20

1.40
1.20
1.20
1.20
1.20

231 1.20 1.20 1.60

Condition

4
Ee

1.20

5
Eo
1.20
1.20
1.40
1.20
1.20
1.20
1.20

6
Et

7
Pe

1.20

8
Po
1.20
1.20
1.40
1.20
1.20
1.20
1.20

9
Pt

11
lh

1.60 1.60

10
V
1.00
1.00

12
B

14
F

1.20 1.20

13
Af
1.20
1.20

15
Wx

-1.60

1.60

Test
-1.60

1.60

-1.00

16
17 18
19
20
Wzp
Wz Wxp
EQx EQz
1.00

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION

Doc. No. :
RFCC-G-101-CV-CS-001

Rev. No. :
2

Page No. : 27 of 43
.

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

28 of 43

FOUNDATION
3.

CHECK FOR DEVELOPMENT LENGTH "Ldh" IN TENSION

3.1

Design Criteria

PedestalBar,db

Fdn.Bardia.f2

ldh_actual

t
con'c
cover,c

Fdn.Bardia.f1

B
1) Development length, ldh
(Clause 12.5.24))

ldh = ( 0.24 x fy / fc' ) x db

fy =

392 N/mm2

4000 kg/cm2

f =
fc

2
23 5 N/mm
23.5
/

240 kkg/cm
/ 2

(Clause 12.5.34))

ldh shall be permitted to be multiplied by the following applicable factor

a) For No.36 bar and smaller hooks with side cover (normal to plane of hook)
not less than 60mm, and for 90 deg hook with cover on bar extension beyond
hook not less than 50mm .... 0.7
b) ~ d) are not applicable this foundation design
2) ldh_actual

= t - { c + ( f1 + f2) }

ldh_actual shall be greater than 0.7 ldh


3.2

Check for Development Length


(unit : mm)
FDN. Name

db

f1

f2

ldh_actual

0.7 ldh

Result

101-V-523

600

150

19

19

19

412

258

OK

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

29 of 43

FOUNDATION
4.

PILE GROUP EFFECT

4.1

Minimum Spacing of Piles


Minimum pile spacing between center to center of pile shall be minimum 2.5 times of the pile
diameter.

(Note 5., RFCC-C-000-CV-TD-003-A18))

Reduction in pile capacity incurred as a result of group effect shall be considered as below.
4.2

Ultimate Capacity of Pile Groups

4.2.1

Pile Group Efficiency


Piles are usually constructed in groups and tied together by a concrete cap at the ground surface.
Piles in closely spaced groups behave differently than single isolated piles because of pile-soil-pile
i t
interactions
ti
that
th t take
t k place
l
in
i the
th group.
It is generally recognized that deflections of a pile in a closely spaced group are greater than
the deflections of an individual pile at the same load because of these interaction effects.
The maximum bending moment in a group will also be larger than that for a single pile, because
the soil behaves as if it has less resistance, allowing the group to deflect more for the same load
per pile.
The most widely recognized standard for quantifying group interaction effects isthe group efficiency
factor, Ge , which is below Equation as the average capacity per pile in a group divided by
the capacity of a single pile (Prakash 1990).

Ge =

(Qu)g
n (Qu)s

Where (Qu)g is the ultimate load capacity of the group, n is the number of piles in the group,
and (Qu)s is the ultimate load capacity of a single pile.

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

30 of 43

FOUNDATION
4.2.2

Pile Group Efficiency for Axial Loading


The overall capacity of a pile group founded on rock(for end-bearing piles) can be taken as
the sum of the individual pile capacities.
Group efficiency factor for axial load, Gea =

4.2.3

1.00

Pile Group Efficiency for Lateral Loading


There are clearly differing views on the literature on the group reduction factor for a laterally
loaded pile group.
In practice, it is the group lateral deflection or the structural capacity of the pile section that
governs the design, with the possible exception of short rigid piles,
It is thererfore considered that the recommendations by Fleming et al (1992) can reasonably
b d
be
daopted
t d ffor pactical
ti l purposes, exceptt ffor short
h t rigid
i id piles,
il
where
h
reference
f
may b
be made
d tto
the findings by Poulos & Davis (1980).
Both Elson(1984) and Fleming et al(1992) suggested that a pragmatic approach may be
adopted and recommended that the group reduction factor may be taken as unity where
the center to center pile spacing is equal to or greater than three pile diameters along
directions parallel and perpendicular to the loading direction.
For a group of closely spaced piles (spcing /diameter less than 3), the group may be considered
as an equivalent single pile.

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

31 of 43

FOUNDATION
Fig 4.2.1 - Group efficiency versus pile spacing for piles in a box arrangement

design line
exceptshort
rigidpiles,
Fleminget

design linefor
shortrigidpiles

where,
Pile Center to Center Spacing, S

1600 mm

Pile Diameter, D

400 mm

Ratio of Pile Spacing per Diameter, S/D =

Group efficiency factor for lateral load, Gel = 1.00

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

32 of 43

FOUNDATION
4.2.4

Pile Group Efficiency for Uplift Loading


For piles in clays, results of model tests carried out by Meyerhof & Adamds (1968) indicate
that the group reduction factors for uplift are in reasonalble agreement with those reported
by Whitaker (1957) for piles under compression. The result shown in Figure 4.2.2 may therefore
be used for pile groups in clays under tension.
Fig 4.2.2 - Result of model tests on pile groups in clay

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

33 of 43

FOUNDATION
where,

4.3

Pile Center to Center Spacing, S

1600 mm

Pile Diameter, D

400 mm

Ratio of Pile Spacing per Diameter, S/D =

Group efficiency factor for uplift load, Geu =

0.78

Allowable Pile Capacity Reflecting Grout Effect


a) Allowable Pile Capacity of Single Pile
Vertical (ton/ea)

Pile
Diameter(mm)

Compressive

Uplift

D 400

70.0

30.0

Horizontal (ton/ea)

5.3

b) D
Design
i All
Allowable
bl Pil
Pile C
Capacity
it (i
(in a G
Group))
Vertical (ton/ea)

Pile
Diameter(mm)

Compressive

Uplift

D 400

70.0

23.4

Horizontal (ton/ea)

5.3

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

34 of 43

FOUNDATION
5.

PILE CAP CALCULATION

5.1

Pile Cap Design

sa= 2200 kg/cm2


h=

50

30

cm

cm
30

h' =
ck=

cm

30

cm

240 kg/cm2
=

BOTT OF FOOTING

D=

40

10 cm

cm
(RFCC-C-000-CV-TD-003 8))

5.2

Input Load

CASE

Critical Case

Vertical (ton)

Horizontal (ton)

Pmax

55.26

1.791

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

35 of 43

FOUNDATION
5.3

Check Pile Cap

5.3.1

Check Vertical Bearing Strength, cv

cv = Pmax / (D2/4)
Critical Case
cv

55.26

1000

43.97

kg/cm2

ca

<

40

4 )
kg/cm2

60.00

O.K

Check Vertical Shear Strength, s

5.3.2

= Pmax / (D + h) h

Critical Case

55.26
3 91
3.91

1000

kg/cm
/

sa

<

90

8 21
8.21

50

)
2

O.K
OK

kg/cm2

O.K

kg/cm
/

Check Horizontal Bearing Strength, ch

5.3.3
ch

= H / (D)

Critical Case
ch

=
=

1.791

1000

4.4775 kg/cm

40

(
ca

<

10

60

Check Horizontal Shear Strength , h

5.3.4

= H / h'(2 + D + 2h')

Critical Case

=
=

1.791
0.50

1000

kg/cm

/
<

30

sa

120
8.21

)
kg/cm2

O.K

Doc. No. :

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

RFCC-G-101-CV-CS-001

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)

Rev. No. :

Page No. :

36 of 43

FOUNDATION
Check Development Length of Re-bar, LO

5.3.5

= salAst / (oaU)

Loa

2200

54.33

cm

Loa(min)

35d =

Loa

56

cm

Lo

60

cm

35

1.986

1.6

16

(
=

56

Loa

>

5.03

cm

56

cm

O.K

where,
Nominal Cross Sectional Area of Deformed Bar, As
Allowable Bond Stress, oa =

16

= D 16

kg/cm2

N i lP
Nominal
Perimeter
i t off D
Deformed
f
dB
Bar, U =

5 03
5.03

cm

1 EA

1.986

cm2

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No :

Page No. :

37 of 43

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION
6.

CHECK OF ANCHORING TO CONCRETE

6.1

GIVEN DATA

6.1.1 Parameters of Pedestal and Anchors

* Approximate solution
Ca1 = Dp/2 - B.C.D/2
Calculate Dpe so that equivalent
circle has same area as octagon.
Dpe = 1.03Dp
Ca2 = (Dpe/2)2 - (B.C.D/2)2)

Pedestal diameter, Dp and Dpe


=
2
Pedestal area, Ap = 3E+06 mm

1900 mm

Anchor type
:
Cast-in anchor
Anchor bolt diameter, da
: M 42
Total number of anchors, na
= 12 ea

and

1957 mm

Head stud bolt

Number of anchors in the group, n


Tension = 6 ea
, Shear
= 2 ea
1475 mm
- B.C.D
=
Embedded
length,
h
1530 mm
= 1020 mm and 1.5 hef =
ef
- Distance from the center of an anchor to the edge of concrete in one direction, Ca1
482 mm
=
Distance from the center of an anchor to the edge of concrete in one direction, Ca2
= 1286.17 mm
381.76 mm
- Anchor spacing, s
=
1083 mm2
- Effective cross-sectional area, Ase
=
- Net bearing area of the head of stud, anchor bolt, Abrg
= 2418.2 mm2
1700 mm
- Thickness of member in which an anchor is located, ha
=

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No :

Page No. :

38 of 43

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION

6.1.2 Material Parameters


-

Specification for anchor bolt


:
ASTM A307 or Equivalent
Ductility
: Ductile steel element
Specified compressive strength for concrete, f'c
24 MPa
=
Specified yield strength for reinforcement, fy
= 400 MPa
Specified yield strength for anchor bolt, fya
= 252 MPa
Specified tensile strength for anchor bolt, futa
= 420 MPa

( futa 1.9fya )

6.1.3 Design Load


- Anchor-tightening sequence

- Load summary(Refer to Appendix VI - AFES Output data sheet)

Weight
Shear (kN)
Wind
Moment (kN-m)
Shear (kN)
Seismic
Moment (kN-m)

Empty
199.43
18.38
179.77
51.65
549.90

Operating
231.77
18.38
179.77
60.69
631.81

Test
190.12
-

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No :

Page No. :

39 of 43

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION

- Design load
Tension force, Nua (kN)
Case-1
Case-2
57.95
119.37
44.75
52.87
21.89
34.21
-4.51
8.69
-27.37
-16.82
-40.56
-35.49
-84.67
Single
119.37
Design value
Group
310.91

Row
No.
1
2
3
4
5
6
7

Shear force, Vua (kN)


5.06
5.06
5.06
5.06
5.06
5.06
5.06
Single
Group

5.06
10.12

* Required strength for steel(tension and shear) and pullout failure modes shall be calculated for the
most highly stressed anchor in the group.
62
6.2

DESIGN REQUIREMENTS FOR TENSILE LOADING

6.2.1 Steel Resistance of Anchor in Tension


Nsa = x n x Ase x futa
341.15 kN
=
Where,

n
futa
Ase

1 ea
420 MPa
=
1083 mm2
=
= 0.75 (ductile steel element)
=

- Failure Shape -

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No :

Page No. :

40 of 43

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION

6.2.2 Concrete Breakout Resistance of Anchor in Tension


Ncbg = x (AN/ ANO) x 1 x 2 x 3 x Nb
= 1133.57 kN
Where,

AN
ANO
2
3
Nb

=
=
=
=
=

1
e'N

=
=
=
=

7.80E+06 mm
( n x ANCO)
9.36E+06 mm (= 9hef)
- Failure Shape (if Ca,min < 1.5hef, 0.70 + 0.30 x Ca,min / (1.5hef))
0.79
1.25
(for Cast-in anchors)
1974.71 kN (= 3.9 x x f'c x hef5/3)
1.00
(Modification factor)
0.75 (condition A ; where supplementary reinforcement is present)
0.93
( = 1 / (1 + 2e'N / (3hef) 1.0)
123 mm

6.2.3 Pullout Resistance of Anchor in Tension


Npn = x 4 x Np
455.00 kN
=
Where,

4
Np
Abrg

1.40
(No cracking at service level load)
464.28 kN (= 8 x Abrg x f'c)
2418 mm2
=
= 0.70
=
=

- Failure Shape -

6.2.4 Concrete Side Face Blowout Resistance of a Headed Anchor in Tension


Ca1 =

482 mm

>

0.40 x

hef

408 mm

- If hef > 2.5Ca1 and anchor spacing less than 6Ca1


Nsbg

Where,

= ( 1 + s / (6 x Ca1 ) x Nsb
= 1281.58 kN
- Failure Shape Nsb = x 13 Ca1 x Abrg x x f'c
= 1132.14 kN
* Nsb is without modification for a perpendicular edge distance.

= 0.75 (condition A ; where supplementary reinforcement is present)

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No :

Page No. :

41 of 43

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION

6.3

DESIGN REQUIREMENTS FOR SHEAR LOADING

6.3.1 Steel Resistance of Anchor in Shear


Vsa = x n x 0.6 x Ase x futa
177.40 kN
=
Where,

n
Ase
futa

(for cast-in headed bolt)

1 ea
1083 mm2
=
420 MPa ( min(1.9fya, 860)
=
= 0.65 (ductile steel element)
=

- Failure Shape -

6.3.2 Concrete Breakout Resistance of Anchor in Shear


Vcb,g

Where,

= x (Avc,g / AVco) x 5 x 6 x 7 x Vb
446.07 kN
=
Avc,g
AVco
6
7
Vb
le

1.32E+06 mm
( n x AVCO)
1.05E+06 mm (= 4.5Ca1)
1.00 ( = Min(1.0, 0.7 + 0.3 x Ca2 / (1.5Ca1)))
1.40 (No cracking at service level load)
- Failure Shape 1.5
0.2
336.10 kN
( = 0.66(l e /da) x da x x f'c x Ca1 )
336 mm ( = min(hef, 8da) )
0.75
(condition A ; where supplementary reinforcement is present)
=
1.00 (not condisered eccentricity effect)
=
=
=
=
=
=
=

6.3.3 Concrete Pryout Resistance of an Anchor Shear


Vcp = x kcp x Ncbg
= 1586.99 kN
Where,

kcp

6.4

2.00
= 0.70
=

; Hef > 65mm


- Failure Shape -

STRENGTH SUMMARY

- Anchor in tension
- Steel strength, Nsag
- Embedment strength concrete breakout, Ncbg
- Embedment strength side-face blowout, Nsbg

=
=
=

2046.87 kN
1133.57 kN Control
N/A kN

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No :

Page No. :

42 of 43

CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION

- Anchor in shear
- Steel strength, Vsag
- Embedment strength concrete breakout, Vcbg
- Embedment strength pryout, Vcpg
6.5

=
=
=

354.79 kN Control
446.07 kN
1586.99 kN

INTERACTION OF TENSILE AND SHEAR FORCES

- If Vua 0.2Vn , then full strength in tension shall be permitted : Nn Nua


Vua
Nn

10.12 kN

<

1133.57 kN

>

0.2Vn
Nua

89.21 kN

310.91 kN

O.K !

- If Nua 0.2Nn , then full strength in tension shall be permitted : Vn Vua


Nua

310.91 kN

>

0.2Nn

226.71 kN

Vn

446.07 kN

>

Vua

10.12 kN

Interaction check
O.K !

- If Vua > 0.2Vn and Nua > 0.2Nn , then


Nua
Nn

Vua
Vn

310.91
1133.57

10.12
446.07

0.30

1.20

O.K !

Cilacap Resid Fluid Catalyic


Cracking(RFCC) Project
PT. PERTAMINA (Persero)
CALCULATION SHEET
101-V-523 (LI. CY. OIL STRIPPER)
FOUNDATION
7.

ATTACHMENTS

Attachment-1

Equipment Drawing

Attachment-2

Foundation Drawing

Attachment-3

AFES Output

Doc. No. :
RFCC-G-101-CV-CS-001
Rev. No. :

Page No. :

43 of 43

Attachment-1
Equipment Drawing

Attachment-2
Foundation Drawing

Drawing No. RFCC-G-101-CV-DR-505-A1

Attachment-3
AFES Output

1. Footing Design
2. Pier Design

1. Footing Design

CONTENTS

1. FOUNDATION DATA
1.1 FOOTING AND SECTION DATA

1. FOUNDATION DATA

( mm ) Ft. Name

1.1 FOOTING AND SECTION DATA


3400

1.2 LOAD CASE


1.3 LOAD COMBINATION

2. CHECK OF STABILITY

1900

2.1 CHECK OF PILE REACTION

3. DESIGN OF FOOTING
3.1 DESIGN MOMENT AND SHEAR FORCE

F1

Ft. Type

OCT

Area

9.577 m2

Ft. Thickness

600.00 mm

Ft. Volume

5.746 m3

Ft. Weight

13.790 tonf

Soil Height

1400.00 mm

Soil Volume

9.220 m3

Soil Weight

17.518 tonf

Buoyancy

Not Consider

Self Weight (except Pr.SW)

31.308 tonf

3.2 REQUIRED REINFORCEMENT


1400
1700

3.3 ONE WAY SHEAR FORCE


3.4 TWO WAY SHEAR FORCE
3.5 PILE PUNCHING SHEAR FORCE
600

The Origin coordinate


The Center of Gravity & Pile (0,0) mm

Section Data
( mm )

Ft.Name

Direction

Ft. Volume

Soil Volume

Pier Wt

F1

All Direct

5.746 m3

9.220 m3

12.202 tonf

Sec.Name

Section Area

Ft. Weight

Soil Weight

Total Weight

S1

9.577 m2

13.790 tonf

17.518 tonf

43.510 tonf

1.2 LOAD CASE


Fz
Fy

Mz

Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch)
are based on the right hand rule.

My
Fx
Mx

Index

Copyright (c) GS E&C. All Rights Reserved

Load Case Name

Load Case Description

SW

SELF WEIGHT

EQex

Earthquake Empty Load +X direction

Wxp

Wind load X

Wx

Wind Load X direction

Wzp

Wind load Z

Ee

Equipment Empty Load

Eo

Equipment Operating Load

Et

Equipment Test Load

Wz

Wind Load Z direction

Copyright (c) GS E&C. All Rights Reserved

10

EQez

Earthquake Empty Load +Z direction

435

0.000

0.000

-17.712

0.000

0.000

11

EQox

Earthquake Operating Load +X direction

436

1.707

0.000

-17.712

0.000

15.392

12

EQoz

Earthquake Operating Load +Z direction

438

0.000

1.707

-17.712

-15.392

0.000

440

1.282

0.000

-17.712

0.000

11.553

442

0.000

1.282

-17.712

-11.553

0.000

201

3.291

0.000

-20.146

0.000

29.670

Unit( tonf , tonf-m )

Ft.Name

Pr.Name

Load Case

F1

Fx

Fy

Fz

Mx

My

-12.2

203

0.000

3.291

-20.146

-29.670

0.000

8.68

90.2

205

8.684

0.000

-20.146

0.000

90.201

2.06

18.54

207

0.000

8.684

-20.146

-90.201

0.000

3.28

29.53

209

0.000

0.000

-31.218

0.000

0.000

2.06

-18.54

210

0.000

0.000

-36.421

0.000

0.000

-22.39

211

2.621

0.000

-31.218

0.000

23.623

-26.01

213

0.000

2.621

-31.218

-23.623

0.000

-21.34

215

5.242

0.000

-23.413

0.000

47.246

3.28

-29.53

217

0.000

5.242

-23.413

-47.246

0.000

10

8.68

-90.2

219

5.242

0.000

-31.218

0.000

47.246

11

10.09

104.83

221

0.000

5.242

-31.218

-47.246

0.000

12

10.09

-104.83

223

10.092

0.000

-23.413

0.000

104.829

0.000

0.000

-31.308

0.000

0.000

225

0.000

10.092

-23.413

-104.829

0.000

227

10.092

0.000

-31.218

0.000

104.829

229

0.000

10.092

-31.218

-104.829

0.000

232

0.000

0.000

-29.876

0.000

0.000

233

3.291

0.000

-25.608

0.000

29.670

235

0.000

3.291

-25.608

-29.670

0.000

Footing SW

1.3 LOAD COMBINATION


In Pier Top
without Self Weight

In Footing Bottom
In Footing Bottom Center
with Pier Self Weight,
with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

1.3.2 Load Combination in Footing Bottom (With Pier SW)


Ft.Name
F1

1.3.1 Load Combination in Pier Top (Without SW)


Ft.Name

Fy

Fz

Mx

My

401

2.057

0.000

-34.587

0.000

23.275

403

0.000

2.057

-34.587

-23.275

0.000

405

6.166

0.000

-34.587

0.000

78.224

407

0.000

6.166

-34.587

-78.224

0.000

409

0.000

0.000

-38.217

0.000

0.000

410

3.276

0.000

-38.217

0.000

37.064

412

0.000

3.276

-38.217

-37.064

0.000

Mx

My

414

3.276

0.000

-34.395

0.000

37.064

-22.385

0.000

18.544

416

0.000

3.276

-34.395

-37.064

0.000

-22.385

-18.544

0.000

418

7.165

0.000

-34.395

0.000

90.909

-22.385

0.000

64.043

420

0.000

7.165

-34.395

-90.909

0.000

-22.385

-64.043

0.000

422

2.457

0.000

-38.217

0.000

27.798

0.000

-26.015

0.000

0.000

424

0.000

2.457

-38.217

-27.798

0.000

0.000

-26.015

0.000

29.529

426

7.165

0.000

-38.217

0.000

90.909

0.000

3.276

-26.015

-29.529

0.000

428

0.000

7.165

-38.217

-90.909

0.000

3.276

0.000

-23.413

0.000

29.529

430

5.409

0.000

-38.217

0.000

68.630

416

0.000

3.276

-23.413

-29.529

0.000

432

0.000

5.409

-38.217

-68.630

0.000

418

7.165

0.000

-23.413

0.000

74.429

435

0.000

0.000

-27.840

0.000

0.000

420

0.000

7.165

-23.413

-74.429

0.000

436

1.707

0.000

-27.840

0.000

19.318

422

2.457

0.000

-26.015

0.000

22.147

438

0.000

1.707

-27.840

-19.318

0.000

424

0.000

2.457

-26.015

-22.147

0.000

440

1.282

0.000

-27.840

0.000

14.500

426

7.165

0.000

-26.015

0.000

74.429

442

0.000

1.282

-27.840

-14.500

0.000

428

0.000

7.165

-26.015

-74.429

0.000

201

3.291

0.000

-31.128

0.000

37.240

430

5.409

0.000

-26.015

0.000

56.188

203

0.000

3.291

-31.128

-37.240

0.000

432

0.000

5.409

-26.015

-56.188

0.000

205

8.684

0.000

-31.128

0.000

110.174

Unit( tonf , tonf-m )

Fx

Fy

Fz

401

2.057

0.000

403

0.000

2.057

405

6.166

0.000

407

0.000

6.166

409

0.000

410

3.276

412
414

Pr.Name L.Comb.

F1

Unit( tonf , tonf-m )

Fx

Pr.Name L.Comb.

Copyright (c) GS E&C. All Rights Reserved

Copyright (c) GS E&C. All Rights Reserved

207

0.000

8.684

-31.128

-110.174

0.000

Load Combination of Ultimate Condition

209

0.000

0.000

-45.860

0.000

0.000

210

0.000

0.000

-53.503

0.000

0.000

: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm

211

2.621

0.000

-45.860

0.000

29.651

213

0.000

2.621

-45.860

-29.651

0.000

215

5.242

0.000

-34.395

0.000

59.302

201

3.291

0.000

-59.306

0.000

37.240

1700.0 , 1700.0

217

0.000

5.242

-34.395

-59.302

0.000

203

0.000

3.291

-59.306

-37.240

0.000

1700.0 , 1700.0

219

5.242

0.000

-45.860

0.000

59.302

205

8.684

0.000

-59.306

0.000

110.174

1700.0 , 1700.0

221

0.000

5.242

-45.860

-59.302

0.000

223

10.092

0.000

-34.395

0.000

128.041

207

0.000

8.684

-59.306

-110.174

0.000

1700.0 , 1700.0

225

0.000

10.092

-34.395

-128.041

0.000

209

0.000

0.000

-83.430

0.000

0.000

1700.0 , 1700.0

227

10.092

0.000

-45.860

0.000

128.041

210

0.000

0.000

-97.335

0.000

0.000

1700.0 , 1700.0

229

0.000

10.092

-45.860

-128.041

0.000

211

2.621

0.000

-83.430

0.000

29.651

1700.0 , 1700.0

232

0.000

0.000

-46.958

0.000

0.000

213

0.000

2.621

-83.430

-29.651

0.000

1700.0 , 1700.0

233

3.291

0.000

-40.250

0.000

37.240

235

0.000

3.291

-40.250

-37.240

0.000

215

5.242

0.000

-62.573

0.000

59.302

1700.0 , 1700.0

217

0.000

5.242

-62.573

-59.302

0.000

1700.0 , 1700.0

219

5.242

0.000

-83.430

0.000

59.302

1700.0 , 1700.0

221

0.000

5.242

-83.430

-59.302

0.000

1700.0 , 1700.0

223

10.092

0.000

-62.573

0.000

128.041

1700.0 , 1700.0

225

0.000

10.092

-62.573

-128.041

0.000

1700.0 , 1700.0

227

10.092

0.000

-83.430

0.000

128.041

1700.0 , 1700.0

C.G. of Loads

229

0.000

10.092

-83.430

-128.041

0.000

1700.0 , 1700.0

Ft.Name

F1 p

1.3.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
p

Ft.Name

F1 p

L.Comb.

Fx

Unit( tonf , tonf-m )

Fy

Fz

Mx

My

Sec.Na

S1

L.Comb.

Fx

Unit( tonf , tonf-m )

Fy

Fz

Mx

My

C.G. of Loads

401

2.057

0.000

-65.895

0.000

23.275

1700.0 , 1700.0

232

0.000

0.000

-90.790

0.000

0.000

1700.0 , 1700.0

403

0.000

2.057

-65.895

-23.275

0.000

1700.0 , 1700.0

233

3.291

0.000

-77.820

0.000

37.240

1700.0 , 1700.0

405

6.166

0.000

-65.895

0.000

78.224

1700.0 , 1700.0

235

0.000

3.291

-77.820

-37.240

0.000

1700.0 , 1700.0

407

0.000

6.166

-65.895

-78.224

0.000

1700.0 , 1700.0

409

0.000

0.000

-69.525

0.000

0.000

1700.0 , 1700.0

410

3.276

0.000

-69.525

0.000

37.064

1700.0 , 1700.0

412

0.000

3.276

-69.525

-37.064

0.000

1700.0 , 1700.0

414

3.276

0.000

-62.573

0.000

37.064

1700.0 , 1700.0

416

0.000

3.276

-62.573

-37.064

0.000

1700.0 , 1700.0

418

7.165

0.000

-62.573

0.000

90.909

1700.0 , 1700.0

420

0.000

7.165

-62.573

-90.909

0.000

1700.0 , 1700.0

422

2.457

0.000

-69.525

0.000

27.798

1700.0 , 1700.0

424

0.000

2.457

-69.525

-27.798

0.000

1700.0 , 1700.0

426

7.165

0.000

-69.525

0.000

90.909

1700.0 , 1700.0

428

0.000

7.165

-69.525

-90.909

0.000

1700.0 , 1700.0

430

5.409

0.000

-69.525

0.000

68.630

1700.0 , 1700.0

432

0.000

5.409

-69.525

-68.630

0.000

1700.0 , 1700.0

435

0.000

0.000

-53.826

0.000

0.000

1700.0 , 1700.0

436

1.707

0.000

-53.826

0.000

19.318

1700.0 , 1700.0

438

0.000

1.707

-53.826

-19.318

0.000

1700.0 , 1700.0

440

1.282

0.000

-53.826

0.000

14.500

1700.0 , 1700.0

442

0.000

1.282

-53.826

-14.500

0.000

1700.0 , 1700.0

Copyright (c) GS E&C. All Rights Reserved

Copyright (c) GS E&C. All Rights Reserved

1.3.4 Pile Reaction Table

2. CHECK OF STABILITY

3400

2.1 CHECK OF PILE REACTION (Uni-Axial)

Footing Name

F1

Section Name

Pile Name

400-PC-PILE(1600)

Pile Shape

Circle

Pile Number

4 EA

Pile Diameter

400 mm

LC Type

Stability

2.1.1 Formula
if footing is checked in Buoyancy Fz means Fz - Fb
Fz
My X
Fz
, Ry =
- Uni Axial : Rx =
2
Np
Np
Xi
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va -> OK
Max(Hxi , Hyi)
< Ha -> OK
b. Horizontal - Hmax =
Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift

Origin Point (0,0) mm


The Center of Gravity & Pile (0,0) mm

2.1.2 Check of Vertical & Uplift Reaction

Ft.Name

Np(EA)

Fl (mm)

Fw (mm)

Xi (m )

Yi (m )

F1

3400

3400

2.88

2.88

Ft.Name

L.Comb.
428

LC : 428, ( 1.0 SW + 1.0 Eo + .71 EQoz )

Name

1
2

Unit( tonf )

Horizontal Critical LC : 418


Uplift Critical LC : 420
Vertical Critical LC : 428

No.

Mx Y
2
Yi

Pile Geometry

Unit (mm,tonf)

Uni-Axial (Ver)

Shear (Hor)

Ra

Ua

Ha

1.79

70

23.4

5.3

1.79

70

23.4

5.3

1.79

70

23.4

5.3

1.79

70

23.4

5.3

X-Dir.

Y-Dir.

X-Dir.

Y-Dir.

400-PC-

1200

17.38

55.26

400-PC-

-1200

17.38

17.38

400-PC-

-1200

17.38

-20.5

400-PC-

1200

17.38

17.38

Copyright (c) GS E&C. All Rights Reserved

Pile

R Min

400-PCPILE(1600)

X-Dir

17.381

17.381

Y-Dir

55.26

-20.497

400-PCPILE(1600)

X-Dir

15.643

15.643

Y-Dir

53.522

-22.236

F1
420

R Max

Ru

Uf

Ra

Ua

Result

55.26

-20.497

70

23.4

OK

53.522

-22.236

70

23.4

OK

2.1.3 Check Of Horizontal Reaction


Ft.Name

L.Comb.

Pile

Hmax (tonf)

Ha (tonf)

Result

F1

428

400-PCPILE(1600)

1.791

5.3

OK

Copyright (c) GS E&C. All Rights Reserved

3. DESIGN OF FOOTING
3.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name, Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction, L.Comb. : Load Combination Index, Fl or Fw : Footing Length or Footing Width, Sl or Sw : Strip X or Y width

3.1.1 Data
Ft.Name

Unit( mm , tonf , tonf-m )

Sec.Na

Dir.

S1

3400.00

3400.00

90.790

0.000

46.958

233

3400.00

3400.00

77.820

0.000

40.250

235

3400.00

3400.00

77.820

-37.240

40.250

3.1.2 Design Parameters


Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing

L.Comb.

Fl or Fw

Sl or Sw

Fz

201

3400.00

3400.00

59.306

37.24

31.128

203

3400.00

3400.00

59.306

0.00

31.128

205

3400.00

3400.00

59.306

110.17

31.128

(Flexure)

(Shear)

f'c

fy1

fy2

f_cl

f_clt

fp_clb

207

3400.00

3400.00

59.306

0.00

31.128

0.9

0.75

240.00

4000.00

4000.00

75.0

75.0

150.0

209

3400.00

3400.00

83.430

0.00

45.860

210

3400.00

3400.00

97.335

0.00

53.503

211

3400.00

3400.00

83.430

29.65

45.860

213

3400.00

3400.00

83.430

0.00

45.860

215

3400.00

3400.00

62.573

59.30

34.395

217

3400.00

3400.00

62.573

0.00

34.395

219

3400.00

3400.00

83.430

59.30

45.860

221

3400.00

3400.00

83.430

0.00

45.860

223

3400.00

3400.00

62.573

128.04

34.395

225

3400.00

3400.00

62.573

0.00

34.395

227

3400.00

3400.00

83.430

128.04

45.860

229

3400.00

3400.00

83.430

0.00

45.860

232

3400.00

3400.00

90.790

0.00

46.958

233

3400.00

3400.00

77.820

37.24

40.250

235

3400.00

3400.00

77.820

0.00

40.250

201

3400.00

3400.00

59.306

0.000

31.128

203

3400.00

3400.00

59.306

-37.240

31.128

205

3400.00

3400.00

59.306

0.000

31.128

207

3400.00

3400.00

59.306

-110.174

31.128

209

3400.00

3400.00

83.430

0.000

45.860

210

3400.00

3400.00

97.335

0.000

53.503

211

3400.00

3400.00

83.430

0.000

45.860

213

3400.00

3400.00

83.430

-29.651

45.860

215

3400.00

3400.00

62.573

0.000

34.395

217

3400.00

3400.00

62.573

-59.302

34.395

219

3400.00

3400.00

83.430

0.000

45.860

221

3400.00

3400.00

83.430

-59.302

45.860

223

3400.00

3400.00

62.573

0.000

34.395

225

3400.00

3400.00

62.573

-128.041

34.395

227

3400.00

3400.00

83.430

0.000

45.860

229

3400.00

3400.00

83.430

-128.041

45.860

F1 p

S1

232

Copyright (c) GS E&C. All Rights Reserved

Unit(kgf/cm2,mm)

3.2 REQUIRED REINFORCEMENT


3.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement
---- ACI CODE 7.12.2
, fac = following
As = fac b h
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used.................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
---- ACI Eq (10-3)
As As5 As4
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis
---- ACI CODE 10.5.3
As2 = .req b d
As3 = 1.333 .req b d
200
bd
As4 =
fy
3 fck
bd
As5 =
fy
Asmax = 0.75 b b d
fck
0.003 Es
b = 0.85 1 f
0.003 Es + fy
y
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
2Rn
, .req =
1- 1Rn =
2 , = 0.9
fy
0.85fck
bd

Copyright (c) GS E&C. All Rights Reserved

3.2.2 Check of Footing Reinforcement

3.3 ONE WAY SHEAR FORCE

Footing Name : F1
GroupType : Octagonal
- X direction (Unit Width)

Sec.Nam

L.Comb.

3.3.1 One-Way Shear Formula

Using Bar (mm)

Loc. (m)

Width b (m)

d (cm)

223

top

5 - D16 @ 200

0.836

1.000

51.705

9.928

227

botom

5 - D19 @ 200

2.565

1.000

44.045

14.326

S1

ACI 318-05 CODE 11.3.1.1


- For members subject to shear and flexure only.
(eq 11-3)
- Vc = 0.75 2 fck B'w d
- Vu <= Vc , then OK!!

As (cm )

3.3.2 Check of One-Way Shear


Sec.Nam
S1

Sec.Nam

L.Comb.
223

top

227

bottom

L.Comb.

Mu (tonf-m)

Rn

.Req

4.770

1.983

0.0005

4.126

7.203
2

Footing Name : F1

GroupType : Octagonal

Unit : mm

0.0010
2

PileType : True

3400

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

223

top

5.400

2.575

3.433

18.176

15.929

102.631

227

bottom

5.400

4.590

6.118

15.483

13.569

87.427

S1
2

L.Comb.

Using As(cm )

Select As(cm )

Result

223

top

9.928

5.400

OK

227

bottom

14.326

6.118

OK

S1

2986

Sec.Nam

- Y direction (Unit Width)

Sec.Nam
S1

Sec.Nam
S1

Sec.Nam

L.Comb.

Using Bar (mm)

Loc. (m)

Width b (m)

d (cm)

As (cm )

225

top

5 - D16 @ 200

0.836

1.000

49.795

9.928

229

botom

5 - D19 @ 200

2.565

1.000

42.135

14.326

Mu (tonf-m)

Rn

.Req

225

top

4.770

2.138

0.0005

229

bottom

7.203

4.508

0.0011

L.Comb.

L.Comb.

- X direction One-Way Shear (Unit Width)

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

225

top

5.400

2.675

3.566

17.505

15.341

98.840

229

bottom

5.400

4.802

6.402

14.812

12.981

83.635

S1

Sec.Nam
S1

3005

L.Comb.

Using As(cm )

Select As(cm )

Result

225

top

9.928

5.400

OK

229

bottom

14.326

6.402

OK

Copyright (c) GS E&C. All Rights Reserved

Sec.Nam

L.Comb.

S1

227

Loc. (mm)
3005

d (mm)

Bw (mm)

Vc (tonf)

Vu (tonf)

Result

440.45

1000

27.138

6.769

OK

d (mm)

Bw (mm)

Vc (tonf)

Vu (tonf)

Result

421.35

1000

25.962

8.116

OK

- Y direction One-Way Shear (Unit Width)

Sec.Nam

L.Comb.

S1

229

Loc. (mm)
2986

Copyright (c) GS E&C. All Rights Reserved

3.5.2 Check of Pile Punching Shear

3.4 TWO WAY SHEAR FORCE


3.4.1 Two-Way Shear Formula

Ft.Name

Vu = Fz Shade Ratio
(eq 11-33) <- Vc1
(a) Vc1 = 0.75 2 (1 + 2/ c) fck bo d
(b) Vc2 = 0.75 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
(eq 11-35) <- Vc3
(c) Vc3 = 0.75 4 fck bo d
ACI 318-05 CODE 11.12.2.1
Vc = Min( Vc1 , Vc2 , Vc3)

3400

Pile No.
Shape

Vu Vc , then OK
where
= ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

L.Comb.
4

Diameter
3

3400

F1 Punching Area

Pr.Name

1 Pile effect

2.383 / 4
631.424 tonf

210 Vc2

449.538 tonf

Pl

1900 mm Vc3

420.949 tonf

Pw

1900 mm Vc

420.949 tonf

L.Comb.

45378.800 cm2

Octagonal Vc1

Shape

bo / d

7755.57 / 440.45 mm Vu

c / s

1 / 40 Result

31.878 tonf

OK

3.5 PILE PUNCHING SHEAR FORCE


3.5.1 Pile Punching Shear Formula
Vu = Fz Shade Ratio
(eq 11-33) <- Vc1
(a) Vc1 = 0.75 2 (1 + 2/c) fck bo d
(b) Vc2 = 0.75 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) Vc3 = 0.75 4 fck bo d
Vc = Min( Vc1 , Vc2 , Vc3)
Vu Vc , then OK

(eq 11-35)

<- Vc3

ACI 318-05 CODE 11.12.2.1

where
= ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved

bo
d

3.4.2 Check of Two-WayShear


Ft.Name

PileName

Copyright (c) GS E&C. All Rights Reserved

F1 Punching Area
1 c / s

5547.709 cm2
1 / 40

Circle Vc1

214.966 tonf

229 Vc2

310.718 tonf

400-PC-PILE(1600) Vc3

143.310 tonf

400mm Vc
2640.35mm Vu
440.45mm Result

143.310 tonf
74.208 tonf

OK

2. Pier Design

CONTENTS

1. INPUT DATA
1.1 General

1. INPUT DATA

Design Code

American Concrete Institute (ACI 318) [Metric]

1.1 GENERAL

Input Unit

MKS

1.2 PIER DATA

Bending

Axial

1.3 LOADING DATA

2. TENSION DESIGN
2.1 FORMULA
2.2 TENSION DESIGN

3. ONE-WAY SHEAR

Output Unit
Sprial reinf.

0.9

0.9

MKS

Tied reinf.

0.7

Shear

0.65

0.75

f'c

fy (D10 ~ D16)

fy (D19 ~)

Ec

Es

Steel Db

Cover

240 kgf/cm2

4000 kgf/cm2

4000 kgf/cm2

232000 kgf/cm2

2090000 kgf/cm2

JIS G3112 (D)

75 mm

1.2 Pier Data


1900

75

3.1 FORMULA

Pier Name

Ver Bar

D19, 40 EA

Pier Shape

Octagonal

Tie Bar

D13 @ 200 mm

Width

1900 mm

f'c

240 kgf/cm2

Length

1900 mm

fy

4000 kgf/cm2

Height

1700 mm

Using As

114.61 cm2

dx

1802.75 mm

dy

1802.75 mm

3.2 ONE-WAY SHEAR

1.3 Loading Data


1.3.1 Load Case
Pier Name

Unit( tonf , tonf-m )

Name

Fx

Fy

Fz

Copyright (c) GS E&C. All Rights Reserved

My

SW

-12.202

EQex

8.684

90.201

Wxp

2.057

18.544

Wx

3.276

29.529

Wzp

2.057

-18.544

Ee

-22.385

Eo

-26.015

Et

-21.34

Wz

3.276

-29.529

EQez

8.684

-90.201

EQox

10.092

104.829

EQoz

10.092

-104.829

1.3.2 Load Combination List


Comb . ID

Mx

Load Combination for Reinforcement

201

.9 SW + .9 Ee + 1.6 Wxp

203

.9 SW + .9 Ee + 1.6 Wzp

205

.9 SW + .9 Ee + 1.0 EQex

207

.9 SW + .9 Ee + 1.0 EQez

209

1.2 SW + 1.2 Eo

210

1.4 SW + 1.4 Eo

211

1.2 SW + 1.2 Eo + .8 Wx

213

1.2 SW + 1.2 Eo + .8 Wz

215

.9 SW + .9 Eo + 1.6 Wx

Copyright (c) GS E&C. All Rights Reserved

217

.9 SW + .9 Eo + 1.6 Wz

217

5.242

-34.395

-56.157

219

1.2 SW + 1.2 Eo + 1.6 Wx

219

5.242

-45.86

56.157

221

1.2 SW + 1.2 Eo + 1.6 Wz

221

5.242

-45.86

-56.157

223

.9 SW + .9 Eo + 1.0 EQox

223

10.092

-34.395

121.985

225

.9 SW + .9 Eo + 1.0 EQoz

225

10.092

-34.395

-121.985

227

1.2 SW + 1.2 Eo + 1.0 EQox

227

10.092

-45.86

121.985

229

1.2 SW + 1.2 Eo + 1.0 EQoz

229

10.092

-45.86

-121.985

232

1.4 SW + 1.4 Et

232

-46.958

233

1.2 SW + 1.2 Et + 1.6 Wxp

233

3.291

-40.25

35.265

235

1.2 SW + 1.2 Et + 1.6 Wzp

235

3.291

-40.25

-35.265

Unit( tonf , tonf-m )

LC#

Fx

Fy

Fz

201
203

Mx

My

3.291

3.291

-20.146

29.67

-20.146

-29.67

205

8.684

-20.146

90.201

207

8.684

-20.146

-90.201

209

-31.218

210

-36.421

211

2.621

-31.218

23.623

213

2.621

-31.218

-23.623

215

5.242

-23.413

47.246

217

5.242

-23.413

-47.246

219

5.242

-31.218

47.246

221

5.242

-31.218

-47.246

223

10.092

-23.413

104.829

225

10.092

-23.413

-104.829

227

10.092

-31.218

104.829

229

10.092

-31.218

-104.829

232

-29.876

233

3.291

-25.608

29.67

235

3.291

-25.608

-29.67

LC#

2.1 FORMULA
D1

-For rectangular shape


A = 2(D1+D2) t = Nb As
t = A / (2 * (D1 + D2))
(D1 + t) * (D2 + t)3
(D1 - t) * (D2 - t)3
Ix =
12
12
(D2 + t) * (D1 + t)3
(D2 - t) * (D1 - t)3
Iy =
12
12
- Fz
Mux (D2 / 2)
+
) As
Tux = (
A
Ix
- Fz
Muy (D1 / 2)
Tuy = (
+
) As
A
Iy
Tu = Max(Tux, Tuy)
Tu
, = 0.9
Req.As =
fy
-For circular or octagonal shape
4 Mu
Fz
Tu = As fs =
Nb Dia
Nb

If Tu is negative that means Tu is in compression. That Case is N/A!!


Tu
, = 0.9
fy

Req.As =

Nb = number of bars
Dia = Diameter of Rebar arrangement
Fz = vertical load + Pier self weight

2.2 TENSION DESIGN

1.3.4 In Pier Bottom


P. Name

2. TENSION DESIGN

Dia

P. Name

D2

1.3.3 In Pier Top

Unit(mm , tonf,cm2)

Unit( tonf , tonf-m )

Fx

Fy

Fz

Mx

My

201

3.291

-31.128

35.265

203

3.291

-31.128

-35.265

205

8.684

-31.128

104.964

207

8.684

-31.128

-104.964

209

-45.86

210

-53.503

211

2.621

-45.86

28.079

213

2.621

-45.86

-28.079

215

5.242

-34.395

56.157

Copyright (c) GS E&C. All Rights Reserved

P. Name

LC#

Dia (D1/D2)

Tu

UsingAs/EA

Req.As/EA

Result

201

1705.5

1.29

2.87

0.36

OK

203

1705.5

1.29

2.87

0.36

OK

205

1705.5

5.38

2.87

1.49

OK

207

1705.5

5.38

2.87

1.49

OK

209

1705.5

-1.15

2.87

N/A

OK

210

1705.5

-1.34

2.87

N/A

OK

211

1705.5

0.5

2.87

0.14

OK

213

1705.5

0.5

2.87

0.14

OK

215

1705.5

2.43

2.87

0.68

OK

Copyright (c) GS E&C. All Rights Reserved

217

1705.5

2.43

2.87

0.68

OK

205

178.97

34.254

715.88

OK

219

1705.5

2.15

2.87

0.6

OK

207

178.97

34.254

715.88

8.684

OK

221

1705.5

2.15

2.87

0.6

OK

209

178.97

34.254

715.88

OK

223

1705.5

6.29

2.87

1.75

OK

210

178.97

34.254

715.88

OK

225

1705.5

6.29

2.87

1.75

OK

211

178.97

34.254

715.88

OK

227

1705.5

6.01

2.87

1.67

OK

213

178.97

34.254

715.88

2.621

OK

229

1705.5

6.01

2.87

1.67

OK

215

178.97

34.254

715.88

OK

232

1705.5

-1.17

2.87

N/A

OK

217

178.97

34.254

715.88

5.242

OK

233

1705.5

1.06

2.87

0.29

OK

219

178.97

34.254

715.88

OK

235

1705.5

1.06

2.87

0.29

OK

221

178.97

34.254

715.88

5.242

OK

223

178.97

34.254

715.88

OK

225

178.97

34.254

715.88

10.092

OK

227

178.97

34.254

715.88

OK

229

178.97

34.254

715.88

10.092

OK

232

178.97

34.254

715.88

OK

233

178.97

34.254

715.88

OK

235

178.97

34.254

715.88

3.291

OK

3. ONE-WAY SHEAR
3.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
(eq 11-3)
- Vc = 2 fck Bw d
Av fy d
- Vs =
(eq 11-15)
s
- Vu <= Vc + Vs , = 0.75 (eq 11-1)
- When, Value of Vs shall not exceed 8

fck Bw d (Vs max)

3.2 ONE-WAY SHEAR


P. Name

Dir.

X
1

Unit(tonf)

LC#

Vc

Vs

Vs max

Vu

Result

201

178.97

34.254

715.88

3.291

OK

203

178.97

34.254

715.88

OK

205

178.97

34.254

715.88

8.684

OK

207

178.97

34.254

715.88

OK

209

178.97

34.254

715.88

OK

210

178.97

34.254

715.88

OK

211

178.97

34.254

715.88

2.621

OK

213

178.97

34.254

715.88

OK

215

178.97

34.254

715.88

5.242

OK

217

178.97

34.254

715.88

OK

219

178.97

34.254

715.88

5.242

OK

221

178.97

34.254

715.88

OK

223

178.97

34.254

715.88

10.092

OK

225

178.97

34.254

715.88

OK

227

178.97

34.254

715.88

10.092

OK

229

178.97

34.254

715.88

OK

232

178.97

34.254

715.88

OK

233

178.97

34.254

715.88

3.291

OK

235

178.97

34.254

715.88

OK

201

178.97

34.254

715.88

OK

203

178.97

34.254

715.88

3.291

OK

Copyright (c) GS E&C. All Rights Reserved

Copyright (c) GS E&C. All Rights Reserved