Sei sulla pagina 1di 4

Week no:

WEEKLY REPORT- BUSINESS DEVELOPMENT (QATAR & KUWAIT)

Sr No.

1
2
3
4
5
6
7
8
9

Status on
Type of
Registration
Registration
s
Company Reg.

QP Reg

QG Reg

Licenses
Computer Card

Trading Lisc.

Tax Card

Not yet Started

Qatar Chambers of
Coommerce

Not yet Started

Contractors
Classification Cert.
(CIVIL)

Qatar Petrochem.
Co.

Not yet Started

Workmans
Compensation
policy

Qatar Steel

Not yet Started

Qatar Aluminium

Qatar Chem Co.

Qatar Foundation

Qatar Power

Ras Gas

11

Kahrama (Qatar
Gen Electricity &
Water)

14

Under Process

Prepaired By

Not yet Started

10

12
13

Done

Habtoor Leighton
Group

Not yet Started

Not yet Started

Not yet Started

Not yet Started

Under Process

Week Span:

Status on
Licences
Done

Done

Under Process

Under Process

Not yet Started

Statutory
Approvals
QSTec bid approval

NIL

NIL

NIL

NIL

Status on
Approval
Pending

NIL

NIL

NIL

NIL

Emraan Ali Khan

Major Developments

QSTec Enquiry Received, Attended the Pre Bid Meeting and Site Visit,BOQ prepaired by Mr.
Salauddin with reference to tentative rates shared by QSTec unofficially. Bid date is extended to
20th Dec 2015.

Rassem Eng Consultancy(Seemans Co.) sent us ITB for a building construction, which we
acknowledged with approval from Mr. Ravi., Docs of Tender will be collected on 14th dec 2015 as
requested by Rassem Er.

KLJ Organic Qatar floated Tender, on 21/Nov/15, have asked us to meet for pre bid meeting on
20/dec/15, for which quuestionaire has to be prepaired, will be foolowing up for the same with
estimation team.

Habtoor Leighton Group has sent us a PQ format, which we have to send them asap for Vendor reg.
but we do not have Workmen Compensation policy(Payment Awaited), HLG has a Water Pipeline
project in hand.

Kentz Qatar has 3 projects in hand, of which Zero Lekage Project (ZLD) RFQ will be given to us by
January. 2016
Trags is intrested in a project wise JV, and also interested in doing fabrication for us for our FATA
project, also they have been approched for HVAC contracting work for KLJ JOB in qatar, they are
positive and their details have been shared with the estimation team.

Under Process

Plan for Coming Week/Meetings Scheduled

Pre bid Meeting scheduled with KLJ on 20th Dec 15, at 10:30 am to 11:30 am, me and Mr. Vijay
Mohan will be attending the same, with the list of questionaire prepiared by the estimation team.
Contact Mr. Kasi Murugan again of Alghanim International for prefab, sandblasting & painting (other
than ss pipes),Erection of Pipe & Pipe supports and Equipment Erection works. Project: Sabiya
OCGT-024 Project.
Contact Mr. Naseer Abdul Baky of Alghanim Int. for Electrical. Telecom & Iinstrumentation
Instalation works :Project: Lower Fars Heavy Oil Development Prgrm(Phase-1)
Contact Mr. Hossam Eldin Helal for intallation of Sstructures, Equipments(Static & Rotary), Erection
of prefabricated spools Project: Lower FARS Heavy Oil Development programme.(Phase1)
Contact Trags for their interest in our company for JV, understand their willingness, also how they
can help us with HVAC job at KLJ.
Keep gathering market Intel of Related Projects in Qatar & Kuwait region.
Contact Mr. Manish for his willingness for JV with us for their Saudi based co. for their jobs in Saudi
and later Petrofac job in KSA, Also how they can help us in HVAC for KLJ job in Qatar.

Market Intel of Upcoming Projects


QATAR
Sr. No.

Name of the
Co.

Name of
Project

QSTec

1
2

Raseem Er.
Consultancy

Kentz Qatar WLL.

KUWAIT
Synopsis/Sow

Washing Station

MECH 20% CIVIL 80%, CEMENT PAD CONST,ELECTRICAL PIPING JOB,BLAST


PRROF WALL. CONST.

Building
Conts(g+2)

100% CIVIL JOB, CONST OF BUILDING FOR QATAR ARMY AT THEIR CAMP.

Shell GTL

UNDISCLOSED

3
Kentz Qatar WLL.

4
5

Kentz Qatar WLL.

KLJ ORGANIC Qatar


WLL

6
7
8
9
10
11
12

Waste Water
Recycle &
Reloading at
Raslafan
Zero Leakage
Discharge (ZLD)
project

200 TPD Caustic


Soda Plant
Expandable to 250
TPD.

AWARDED TO VALETH ER. CONTS. CO., THOUGH THERE CAN BE SCOPE FOR
E&I WORKS.

RFQ WILL BE FLOATED BY JAN,16 , MAINLY MECH AND ELECTRICAL AND


MAPNPOWER SUPPLY, VALVES, SUPPLY OF MATERIAL

Supply, Prefab & Installation of Metallic Tanks (37 no.s),HVAC, Tower

Name of the
Co.
ALGHANIM INT.

Name of
Project
200 Tpd caustic
soda plant
expandable to 250
tpd.

Synopsis/Sow
Pre-fab & Sandblasting and Painting (other than ss pipes),Erection of pipe &
pipe supports and equipment erection works.

ALGHANIM INT.

Sabiya OCGT-024
Project

Electrical,Telecom & Instrumentation works

ALGHANIM INT.

Lower Fars Heavy


Oil Development
Program(Phase-1)

Structural, Piping & Equipment Installation works

4
17/12/15-24/12/15

Emraan Ali Khan

d Site Visit,BOQ prepaired by Mr.


unofficially. Bid date is extended to

building construction, which we


ll be collected on 14th dec 2015 as

us to meet for pre bid meeting on


be foolowing up for the same with

e to send them asap for Vendor reg.


Awaited), HLG has a Water Pipeline

ect (ZLD) RFQ will be given to us by

oing fabrication for us for our FATA


work for KLJ JOB in qatar, they are
the estimation team.

duled

am to 11:30 am, me and Mr. Vijay


prepiared by the estimation team.

efab, sandblasting & painting (other


nt Erection works. Project: Sabiya

cal. Telecom & Iinstrumentation


elopment Prgrm(Phase-1)

quipments(Static & Rotary), Erection


elopment programme.(Phase1)

and their willingness, also how they


KLJ.

Qatar & Kuwait region.

audi based co. for their jobs in Saudi


in HVAC for KLJ job in Qatar.

/Sow

er than ss pipes),Erection of pipe &


ment erection works.

rumentation works

ent Installation works

Potrebbero piacerti anche