ROAD DEVELOPMENT AUTHORITY

PAYMENT VOUCHER

Voucher No.
Rs. Cent. Code
Account Code

Station
: Director (Works), RDA,Sethsiripaya
Date : 07.03.2016
Name of Project & Job No :
Rehabilitation & Improvements to Naula-Elahera-Laggala-Pallegama-Hettipola(B-312)
Road (From 33+500 to 44+000km & 57+000 to 59+000 km) & HasalakaHandungamuwa(B-484) Road (From 20+000 to 45+000km)
Debit to Account
Payable to
: Hovael Construction (Pvt) Ltd
Detailed description of service rendered, work excuted or to be supplied certificate of
Approving officer where necessary
Contract Name :

Rehabilitation & Improvements to Naula-Elahera-Laggala-PallegamaHettipola(B-312) Road (From 33+500 to 44+000km & 57+000 to
59+000km) And Hasalaka-Handungamuwa(B-484) Road (From 20+000 to
45+000km)

Contract No

RDA/DW/CP/GOSL/2012/233

Bill No

IPC-27

Interim Bill Amount (Ledger)

Rs.

112,071,404.68

80% of material at site (Balance)


(Total paid upto this IPC)
Add VAT
: 11%

Rs.

(6,267,938.67)

Prepared By :
Checked By :

Amount
Rs.
Cts.

105,803,466.02

11,207,140.47
22,117,227.51
-

33,324,367.98

Interest Claim
Deduction Retention Money
C.I.G.F.L
Mobilization Advance
1/3% of VAT

Rate

(Authority for payment and reference to file)


W.A.L. Jayashantha

Total

72,479,098.04

I CERTIFY from personal knowledge * / from the certificates in the relevant files/overleaf* that the above supplies*/services
*/works* were duly authorised and performed and that the payment of Rupees Seventy two million four hundred seventy
nine thousand neinety eight and cents four is in accordance with regulations*/Contract* fair and reasonable.

Date : .

.
Signature & Title of Officer Certifying Expenditure

Received This Day of .. 2016 in Payment of the above ..

Witness :

Signature of paying Officer and Date :


Note : Strike out what is not applicable, Instructions appear overleaf.

Affix

.
stamp
required Receiver
Signature of

INTERIM PAYMENT CERTIFICATE


Rehabilitation and Upgrading of Naula-Elahera-Laggala-Pallegama-Hettipola Road - B312 (33+500~44+000 km &
NAME OF THE PROJECT :
57+000~59+000 km) and Hasalaka-Handungamuwa Road - B484 (20+000~45+000 km)
CONTRACT NO
CERTIFICATE NO

: RDA/DW/CP/GOSL/2012/233
: 27

Valuation Period

: 01.01.2016 - 31.01.2016

Certificate Prepared

: Resident Engineer - CECB

Employer

: Road Development Authority

Engineer

: Central Engineering Consultancy Bureau

Contractor

: Hovael Construction (Pvt) Ltd

Employers Representative

: Project Director - LBFP

Amount of Advance Payment paid to the Contractor in accordance with Clause 14.1 of the Special
Conditions of Contract.

SLR.

500,902,859.91

02.

Value of Permanent Works executed to date and all other matters payable
but NOT including the items mentioned at 6 below

SLR.

1,498,953,185.32

03.

ADD / DEDUCT Contract Price Fluctuations as per clause 13.7 of the Particular Condition of
Contract

SLR.

23,908,644.62

04.

Value of Permanent works after application of Contract Price Fluctuation (2+ OF -3)

SLR.

1,522,861,829.94

05.

DEDUCT Retention money as per the Clause 14.3 ( c )

SLR.

152,286,182.99

06.

ADD 80% of value of goods and materials on Site

SLR.

39,937,363.74

07.

Value of Permanent Works and 80% of Material at Site

SLR.

1,562,799,193.68

08.

NET Valuation ( 7-5 )

SLR.

1,410,513,010.69

09.

DEDUCT GROSS AMOUNT of previous Engineer's Certificate including release of Retention


money.(If any)

SLR.

1,315,916,685.14

10.

Amount of this certificate ( 8-9 )

SLR.

94,596,325.55

11.

DEDUCT recovery of Advance Payment as per Clause 14.2

SLR.

22,117,227.51

12.

NET AMOUNT of this certificate ( 10-11 )

SLR.

72,479,098.04

13.

Deduct WHT 1% (This)

SLR.

14.

Deduct :CIGFL (1%)

SLR.

15.

Valuation after Deducting WHT & CIGFL

SLR.

16.

ADD Allowance for VAT 11% (12 x 0.11)

SLR.

17.

Net Amount of this Payment

SLR.

01.

72,479,098.04
-

72,479,098.04

I CERTIFY that the sum of Rupees Seventy two million four hundred seventy nine thousand neinety eight and cents four only. (In Figures Rs.
72,479,098.04) is now due to the Contractor in accordance with the terms of the Contract.

Eng. Indika Kumara

..

Resident Engineer
Central Engineering Consultancy Bureau
Date: 07th March 2016

Team Leader (LBFP)


Central Engineering Consultancy Bureau
Date:

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM &


57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233
The image part with relationship ID rId1 was not found in the file.

The image part with relationship ID rId1 was not found in the file.

CONTRACT DATA

EMPLOYER
THE DIRECTOR GENERAL,
ROAD DEVELOPMENT AUTHORITY,
1ST FLOOR, "SETHSIRIPAYA",
BATTARAMULLA.

= Rs.

3,223,310,033.55

II EFFECTIVE CONTRACT AMOUNT

= Rs.

2,558,712,852.38

III MOBILIZATION ADVANCE (EXCLUDING VAT)

= Rs.

500,902,859.91

IV ADVANACE PAYMENT RECEIVED (EXCLUDING VAT)

= Rs.

500,902,859.91

ADVANCE PAYMENT RECOVERED UP TO IPC


V
26(EXCLUDING VAT)

= Rs.

261,448,455.15

VI LIMIT OF RETENTION (5% OF CONTRACT PRICE)

= Rs.

161,165,501.68

CUMULATIVE AMOUNT PAYABLE AS PRICE


VII
ADJUSTMENT (SHALL NOT EXEED)

= Rs.

191,903,463.93

CONSULTANT
CENTRAL ENGINEERING CONSULTANCY
BUREAU

The image part with relationship ID rId1 was not found in the file.

CONTRACTOR
HOVAEL CONSTRUCTION (PVT) LTD,
NO.245/47, OLD AVISSAWELLA ROAD,
ORUGODAWATTE.

INITIAL CONTRACT PRICE (EXCLUDING VAT)

APPLICATION FOR INTERIM PAYMENT CERTIFICATE NO-27


FOR THE WORK EXECUTED UPTO 31ST - JANUARY - 2016
DESCRIPTION

ITEM NO.
1

AMOUNT (RS)

PRILIMINARY AND GENERAL

186,975,056.83

SITE CLEARING

15,012,034.70

EARTH WORKS

383,567,976.36

ROAD PAVEMENT

582,939,513.50

DRAINAGE

21,615,931.44

CULVERTS

82,132,906.39

INCIDENTAL

6,865,046.12
Labour

DAY WORKS

86,669.86

Equipment

222,489.12

Material

333,369.09

SUB TOTAL (01)

1,279,750,993.41

PROVISIONAL SUMS

10

PHYSICAL CONTINGENCIES

219,202,191.91
-

SUB TOTAL (02)


11
12

1,498,953,185.32

PRICE CONTINGENCIES

23,908,644.62

SUB TOTAL (03)

1,522,861,829.94

ADDITIONS
13

MOBILIZATION ADVANCE

14

MATERIAL AT SITE

15

RELEASE OF RETENTION

16
17

39,937,363.74
-

OTHER PAYMENT
SUB TOTAL(02) FOR ADDITIONS [ 13+14+15+16]

39,937,363.74

DEDUCTIONS
18

RETENTION [10% OF WORK EXECUTED UPTO THE LIMIT OF 5% OF CONTRACT AMOUNT)

19

RECOVERY OF ADVANCE PAYMENT

20

152,286,182.99
283,565,682.66

SUB TOTAL FOR DEDUCTIONS [ 18+19]

435,851,865.65

21

NET CUMULATIVE AMOUNT DUE [12+17+20 ]

1,126,947,328.03

22

DEDUCT: CUMULATIVE PREVIOUS PAYMENT CERTIFIED

1,054,468,229.99

23

NET AMOUNT DUE FOR THIS IPC [21-22 ]

24

ADD: VAT PROVISION (12%)

25

TOTAL STATEMENT AMOUNT [ 23+24 ]

72,479,098.04
72,479,098.04

TOTAL AMOUNT OF SRI LANKAN RUPEES SEVENTY TWO MILLION FOUR HUNDRED SEVENTY NINE THOUSAND NINETY
EIGHT AND CENTS FOUR ONLY.
PREPARED BY
(FOR THE CONTRACTOR)

CHECKED AND SUBMITTED BY THE


CONTRACTOR'S REPRESENTATIVE

CHECKED AND CONFIRMED BY


THE ENGINEER'S
REPRESENTATIVE

CERTIFIED BY THE ENGINEER

K.K.G.P.Siriwardane

Eng.D.M.Ranasinghe

Eng. W.A.L.Jayashantha

Eng. Indika Kumara

Quantity Surveyor

Project Manager

Site Engineer(S1)

Resident Engineer

HOVAEL Construction

HOVAEL Construction

C.E.C.B.

C.E.C.B.

SIGNATURE
NAME
DESIGNATION
ORGANIZATION
DATE & TIME

LOCAL BANK FUNDED PROJECT


EMPLOYER:
CONSULTANT:
CONTRACTOR:
Road Development Authority
Central Engineering Consultancy Bureau
Hovael Construction (Pvt) Ltd
Period Ending:
: RDA/DW/CP/GOSL/2012/233
Contract No
30.11.2015
Road Section : Rehabilitation and Upgrading of Naula-Elahera-Laggala-Pallegama-Hettipola Road - B312 (33+500~44+000 km &
57+000~59+000 km) and Hasalaka-Handungamuwa Road - B484 (20+000~45+000 km)
INTERIM VALUATION CERTIFICATE NO. 27
SUMMARY OF PAYMENTS RECOMMENDED WORK DONE UP TO END OF JANUARY 2016
ORIGINAL
DESCRIPTION OF BILL

BILL
NO:
1

Preliminary and General Items

CONTRACT
SUM (SL.Rs.)

VALUATION OF WORK COMPLETED


PREVIOUS
(SL.Rs.)

THIS PERIOD
(SL.Rs.)

TOTAL
(SL.Rs.)

250,276,333.44

184,805,255.80

2,169,801.03

186,975,056.83

Site Clearing

34,223,235.84

14,575,615.58

436,419.12

15,012,034.70

Earth Works

380,795,967.36

358,228,053.31

25,339,923.05

383,567,976.36

Road Pavement

1,678,776,611.28

502,650,071.26

80,289,442.24

582,939,513.50

Drainge

62,815,946.88

20,165,302.55

1,450,628.89

21,615,931.44

Culverts

73,998,395.52

65,796,614.13

16,336,292.26

82,132,906.39

Incidentals

72,816,541.44

6,369,425.24

495,620.88

6,865,046.12

275,822.40

74,768.74

11,901.12

86,669.86

Day Works - Equipment

1,662,888.00

222,489.12

Day Works - Materials

3,071,110.22

111,358.03

Day Works - Labour


8

222,011.06

222,489.12
333,369.09

Sub Total - A

2,558,712,852.38

1,152,998,953.76

126,752,039.65

1,279,750,993.41

Provisional Sums

216,822,432.00

208,812,120.95

10,390,070.96

219,202,191.91

10 Physical Contingencies

255,871,285.24

27,739,783.06

3,031,406,569.62

1,389,550,857.77

109,402,327.55

1,498,953,185.32

191,903,463.93

21,239,567.49

2,669,077.13

23,908,644.62

3,223,310,033.55

1,410,790,425.26

112,071,404.68

1,522,861,829.94

(27,739,783.06)
-

Sub Total - B
11 ADD/DDT: Price Escalation

Value of Work Done as per


Contract

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

Signature
Name

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

MATERIAL SUMMARY SHEET


INTERIM PAYEMENT CERTIFICATE NO : 27
MATERIAL AT SITE AS AT END OF JANUARY 2016
Item
No.
1

Description
Cement
Cement
Cement
Reinforcement steel
10 mm Dia
12 mm Dia
16 mm Dia
20 mm Dia
25 mm Dia
10 mm Dia
16mm Dia
Reinforcement steel
10 mm Dia
12 mm Dia
16 mm Dia
20 mm Dia
25 mm Dia
Sand

4,546.056
245.088
1,865.052
161.868
280.000

kg
kg
kg
kg
kg
kg
kg

112.00
112.00
112.00
112.00
112.00
112.00
112.00

509,158.27
27,449.86
208,885.82
18,129.22
31,360.00

10,221.222
6,990.336
94.680
14.796
4,022.532

kg
kg
kg
kg
kg

112.00
112.00
112.00
112.00
112.00

1,144,776.86
782,917.63
10,604.16
1,657.15
450,523.58

47.52

1,713.78

77.52

m3

1,713.78

28.30

1,713.78

48,499.97 Sec.03

EDC

Sec.03

81,438.83 Sec.01/02
132,852.23 Sec 02-ii EDC

2,400.00

3,642,408.00 Sec.01/02

2,400.00

4,184,688.00 Sec.01/02

12.5 mm Aggregate

3,150.24

2,400.00

7,560,576.00 Sec.01/02

20 mm Aggregate

409.64

2,784.00

1,140,437.76 Sec.01/02

20 mm Aggregate

m3

2,784.00

2,400.00
2,400.00

1,281.99
300.00

m
m3

Sec.03

3,076,776.00 Sec.01/02
720,000.00 Sec.03

10.00
5.00
2.00
1.00
1.00
2.00
3.00

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

5,800.00
2,900.00
8,000.00
4,250.00
17,400.00
8,700.00
5,200.00
3,300.00

58,000.00
14,500.00
16,000.00
4,250.00
8,700.00
10,400.00
9,900.00

4.00
2.00

Nos.
Nos.
Nos.

25,900.00
8,700.00
17,400.00

34,800.00 Sec.03
34,800.00

m3

1,640.64

1,744,098.76 Sec.01/02

Sec.01/02

Rubble -6"x9"

1,063.06

Rubble -6"x9"

84.90

1,640.64

139,290.34 Sec.02-EDC

Rubble -6"x9"

141.50

1,640.64

232,150.56 Sec.03

Embankment Type

3,834.65

253.24

Embankment Type

315.24

253.24

Embankment Type

2,300.00

m3

398.70

917,010.00 Sec.03

Sub Base

20,050.55

m3

558.00

11,188,206.90 Sec.01/02

Sub Base

2,800.00

558.30

1,563,240.00 Sec.02-EDC

500.00
33,430.00
14,700.00
2,000.00
5,895.00
400.00
340.00
46.00

m6
kg
ltr
ltr
ltr
ltr
ltr
ltr

466.43
88.00
115.00
115.00
88.00
88.00
89.00
89.00

233,215.00
2,941,840.00
1,690,500.00
230,000.00
518,760.00
35,200.00
30,260.00
-

No

66,892.72

4.00

No

23,300.00

11
12

Sub Base
Bitumen 60/70
Bitumen MC 30

13

Bitumen CRS-1

14

Bitumen CSS-1

15

Geo-grid TX 150
Rubber Water Strip

Cumulative Amount
80% OF Cumulative Amount Carring to Bill Summary

Previous Amount certified in I PC 26


Amount for this M onth-Jan'16
For Contractor

Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Quantity Surveyor
Hovael Constructions

D.M.Ranasinghe
Project Manager
Hovael Constructions

Signature

Date & Time

Sec.01/Sec.02

m3

Spun Pipe 4'x8'


Spun Pipe 3'x4'
Spun Pipe 3'x8'

Name
Designation
Organization

Remarks

91,532.50 Sec.01,02
3,895.00 Sec.02-EDC
176,833.00 Sec.03

1,517.67

Hume Pipes
Spun Pipe 1'x8'
Spun Pipe 1'x4'
Spun Pipe 1 1/2'x8'
Spun Pipe 1 1/2'x4'
Spun Pipe 3'x8'
Spun Pipe 3'x4'
Spun Pipe 3/4'x8'
Spun Pipe 1/2'x8'

16

Amount

779.00
779.00
779.00

1,743.62

10

Rate

0.6mm Aggregate

Aggregate base course

Unit
bags
bags
bags

117.50
5.00
227.00

6-10 mm Aggregate

Quantity

971,086.77 Sec.01/02
79,831.38 Sec 02-ii EDC

Sec.03
Sec.01/02
Sec.01/02
Sec.03
Sec.01/02
Sec.03
Sec.01/02
Sec.03

3,077,065.12 Sec.01/02
93,200.00 Sec.01/02
49,921,704.67
39,937,363.74

Rs
Rs

46,205,302.41 R s
(6,267,938.67) R s
For Engineer/Engineer's Representative

Checked by

Approved by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

MATERIAL RECORD - END OF JANUARY 2016


Unit

Balance from
Previous
Month

Bags
Bags
Bags

200.00
233.00

River Sand
River Sand
River Sand

m
m
m

157.89
77.52
159.01

Aggregate 0.6 mm
Aggregate 6-10mm
Aggregate 12.5mm
Aggregate 20mm
Aggregate 20mm
Aggregate 20mm

m
m
m
m
m
m

1,123.79
1,401.33
2,694.19
74.71
42.45

Reinforcement
Y10(6m length bar)
Y12(6m length bar)
Y16(6m length bar)
Y20(6m length bar)
Y25(6m length bar)

Kg
Kg
Kg
Kg
Kg

7,511.360
2,365.630
1,865.052
670.770

Y10(6m length bar)


Y16(6m length bar)

Kg
Kg

Y10(6m length bar)


Y12(6m length bar)

Kg
Kg

10,384.110
7,816.176

Y16(6m length bar)


Y16(12m length bar)
Y20(6m length bar)
Y20(12m length bar)
Y25(6m length bar)

Kg
Kg
Kg
Kg
Kg

94.680
113.616
73.980
4,022.532

ABC
ABC

m
m

2,436.90
1,000.00

Hume Pipes
Spun Pipe 1'x8'
Spun Pipe 1'x4'
Spun Pipe 1 1/2'x8'
Spun Pipe 1 1/2'x4'
Spun Pipe 3'x8'
Spun Pipe 3'x4'
Spun Pipe 3/4'x8'
Spun Pipe 1/2'x8'

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

11.00
3.00
2.00
1.00
3.00
3.00

Hume Pipes
Spun Pipe 3'x4'
Spun Pipe 3'x8'

Nos
Nos

4.00
2.00

Rubble - 6"x9"
Rubble - 6"x9"
Rubble - 6"x9"

m
m
m

986.65
84.90

Embankment Type
Embankment Type
Embankment Type

m
m
m

5,320.40
2,300.00

Sub Base
Sub Base
Sub Base

m
m3
m

21,111.80
3,627.00
1,500.00

Bitumen 60/70
Bitumen MC 30
Bitumen MC 30
Bitumen CRS-1
Bitumen CRS-1
Bitumen CSS-1
Bitumen CSS-1

kg
ltr
ltr
ltr
ltr
ltr
ltr

69,070.00
11,900.00
1,300.00
7,895.00
475.00
6,040.00
4,250.00

Geo-Grid -TX150
Rubber Water Strip

No
No

Type of Material

Cement
Cement
Cement

..
Store Keeper

Current Month
Delivered
Qty.
500.00
5.00
200.00

Transferred
Qty
200.00

Source
Ultratec
Ultratec
HOLCIM

Current Month
Usage
382.50

8.49

GTB STEEL
CORP.PVT)LTD.

130.71

47.52
77.52
28.30

47.52 Sec.01/02
77.52 Sec.02-iiEDC
28.30 Sec.03

406.12
457.71
543.95
265.07
50.94

1,517.67
1,743.62
3,150.24
409.64
-

1,517.67
1,743.62
3,150.24
409.64
-

2,965.304
2,120.542
-

4,546.056
245.088

4,546.056
245.088
1,865.052
161.868

206.00

2,869.62

162.888
825.840

10,221.222
6,990.336

10,221.222
6,990.336

113.616
59.184
-

94.680
14.796
4,022.532

94.680
14.796
4,022.532

3,569.62

1,281.99
300.00

1.00
1.00
-

10.00
5.00
2.00
1.00
1.00
2.00
3.00

10.00
5.00
2.00
1.00
0.00
1.00
2.00
3.00

Sec.01/02

4.00
2.00

4.00
2.00

Sec.03

SD&CC

300.00

223.59

449.97

393.37

500.00

1,800.00
5,800.00

Lankem Ceylon
Lankem Ceylon

Sec.03

1,281.99 Sec.01/02
300.00 Sec.03

1063.06 Sec.01/02
84.90 Sec.02-EDC
141.50 Sec.03

1,485.75
184.76

3,834.65
315.24
2,300.00

3,834.65 Sec.01/02
315.24 Sec 02-ii EDC
2,300.00 Sec.03

1,061.25
827.00

20,050.55
2,800.00
500.00

20,050.55 Sec.01/02
2,800.00 Sec.02-EDC
500.00 Sec.03

35,640.00
1,500.00
2,200.00
2,000.00
1,875.00
5,700.00
10,050.00

33,430.00
14,700.00
2,000.00
5,895.00
400.00
340.00
-

33,430.00
14,700.00
2,000.00
5,895.00
400.00
340.00
-

9.00
-

46.00
4.00

55.00
4.0
..
Quantity Surveyor

EDC

1,063.06
84.90
141.50

1,000.00
4,300.00
2,900.00

Sec.01/02

0.00
280.00

2.00
1.00

1,865.052
161.868

Sec.01/02
Sec.01/02
Sec.01/02
Sec.01/02
Sec.02-iiEDC
Sec.03

280.000

280.00

Remarks

117.50 Sec.01/02
5.00 Sec.02-iiEDC
227.00 Sec.03

508.902

GTB STEEL
CORP.PVT)LTD.

Stock for Next


Month

117.50
5.00
227.00

110.37

800.00
800.00
1,000.00
600.00

Approved
Balance
Quantity

Project Manager

Sec.01/02
Sec.01/02
Sec.03
Sec.01/02
Sec.03
Sec.01/02
Sec.03

46.00 Sec.02(30-45)
4.00 Sec.02(30-45)

..
Consultant's Representative

Contract :

ADVANCE RECOVERY FORM


Rehabilitation and Upgrading of Naula-Elahera-Laggala-Pallegama-Hettipola Road - B312 (33+500~44+000 km & 57+000~59+000
km) and Hasalaka-Handungamuwa Road - B484 (20+000~45+000 km)
31.01.2016

Period Ended :
Contractor :
Engineer :
Contract Sum :

Hovael Construction (Pvt) Ltd


Central Engineering Consultancy Bureau

IPC No .

Cumulative Work Done

15
16
17
18
19
20
21
22
23
24
25
26
27

LKR

3,223,310,033.55

620,577,095.18
676,712,833.54
745,260,867.87
792,912,242.72
857,667,550.94
942,021,070.68
1,018,320,668.86
1,112,448,335.55
1,182,493,145.84
1,243,816,272.41
1,331,300,392.30
1,410,790,425.26
1,522,861,829.94

Cumulative Advanced
Advance Recovery
Recovery of IPC
of IPC
Y =(X)xZ
(0.9 M)
97,338,912.92
16,800,719.94
109,056,613.65
11,717,700.73
123,396,911.15
14,340,297.49
131,061,614.48
7,664,703.33
144,565,611.93
13,503,997.45
162,572,442.11
18,006,830.18
178,760,315.88
16,187,873.77
198,843,383.07
20,083,067.19
213,350,536.52
14,507,153.45
226,269,993.92
12,919,457.40
244,452,867.71
18,182,873.79
261,448,455.15
16,995,587.44
283,565,682.66
22,117,227.51

Consultant Engineer

Where;
Y - Cumulative repayment
Z- Total Amount of Advance
M-Effective Contract Amount
X-( cumulative work done -Value of PS)

Advance to be
Recovered

403,563,946.99
391,846,246.26
377,505,948.76
369,841,245.43
356,337,247.98
338,330,417.80
322,142,544.03
302,059,476.84
287,552,323.39
274,632,865.99
256,449,992.20
239,454,404.76
217,337,177.25
..
Resident Engineer

283,565,682.66
500,902,859.91
2,558,712,852.38
1,201,978,304.31

Effective Contract Amount = Total Contract Amount - (Provisional Sums +Price Escallation +Physical Contigencies )

Remarks

Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91
Z=500,902,859.91

Rehabilitation and Upgrading of Naula-Elahera-Laggala-Pallegama-Hettipola Road - B312 (33+500~44+000 km & 57+000~59+000 km) and Hasalaka-Handungamuwa Road - B484 (20+000~45+000 km)
CONTRACT PACKAGE No. RDA/DW/CP/GOSL/2012/233
PRICE ADJUSTMENT - ( AS PER SUB-CLAUSE - 13.7 OF ICTAD/SBD/02 )
PRICE ADJUSTMENT SHEET FOR THE IPC N0 - 27 (Up to 31st January 2016)

FORMULA
F =
0.966( V - Vna )
100

Sl
No:

Px (Ixc - Ixb)

all
Ixb
inputs

P2

12.60
1.00
25.60
7.10
7.80
1.90
2.60
1.80
1.00
9.50

P3
M8

Fuel
Sand

18.10
1.00

M01
M30C
M45
M48
L1
L2
L3

V2 - Cum. value of work done in the current IPC

= 1,498,953,185.32
IPC NO: 27 (Up to 31st Jan 2016)

V - Vna = (V2 - Vna2) - (V1 - Vna1)


V - Vna = ( 1,498,953,185.32
406,819,776.81 )
V - Vna = 124,348,326.44

0.966( V - Vna )
100

F =0.966( V - Vna )
100

1,389,550,857.77 -

P1

Px ( Ixc - Ixb ) =
all
Ixb
inputs

Px ( Ixc -Ixb )
Ixb

NON ADJUSTABLE ELEMENTS

F = Price adjustment for the period

1. Preliminary and General !A

V = Valuation of work done during the period concerned

2. Day works - Labour

Vna = Valuation of non adjustable element

3. Day works - Equipment

Px = Percentage cost contribution of input X

4. Day works - Materials

Ixc = Current index for input X, as published by ICTAD

5. Provisional Sum

Ixb = Base index for input X, as published by ICTAD

6. Variations / Extra works

Previous Amount

Up to date Amount

-3.149
0.304

------------------------------------------------>

2.222

Total

IPC NO:15 ( Up to Dec,2014)


IPC NO:15 (Jan,2015)
IPC NO:16 (Feb,2015)
IPC NO:17 (Mar,2015)
IPC NO:18 (April,2015)

10,078,232.52
881,848.37
369,308.61
750,694.59
335,198.50

184,805,255.80
74,768.74

186,975,056.83
86,669.86

IPC NO:20 (June,2015)

222,489.12

222,489.12

IPC NO:21 (July,2015)

1,159,512.63

IPC NO:22 (August,2015)

1,272,647.01

111,358.03

333,369.09

208,812,120.95

219,202,191.91
-

27,739,783.06

On Current Price
421,765,775.70

IPC NO:19 (May,2015)

913,781.48
867,663.62

IPC NO:23 (September,2015)

947,781.60

IPC NO:24 (October,2015)


IPC NO:25 (November,2015)
IPC NO:26 (December,2015)
IPC NO:27 (January,2016)

827,808.30
1,466,394.98
1,368,695.28
2,669,077.13

406,819,776.81

Total carried to summary of IPC No - 27


CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

Px (Ixc-Ixb)
Ixb
2.016
0.024
-0.640
1.157
0.819
0.443
0.751
0.497
0.000
0.000

Price adjustment for

2,669,077.13

Description

Price Proposal Date: July, 2012

Ixb
Ixc
(Ixc-Ixb)
06/2012 01/2016
Ixb
320.70
371.90
0.160
574.10
587.90
0.024
546.50
532.90 -0.025
795.60
925.30
0.163
168.40
186.00
0.105
395.80
488.20
0.233
400.30
515.80
0.289
433.20
552.70
0.276
400.80
400.80
0.000
346.40
346.40
0.000
1123.80
928.30 -0.174
2060.50 2685.90
0.304

421,765,775.70 )

1,201,204.83

Px

Metal
Cement
Bitumen 60/70
Earth (Soil)
ABC Material
Skilled Labour
Semi s/k labour
Unskilled Labour
Small Equipment
Heavy Equipment

M07

V = V2-V1
V1 - Cum. value of work done up to the previous IPC
= 1,389,550,857.77
IPC NO: 26 (Up to 31st Dec 2015)

Description

23,908,644.62

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

45,511,200.00

31.75

1,517,040.00

PREVIOUSLY CLAIMED

AMOUNT

QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO. 1: PRELIMINARIES


1.1
1.2

103(1)

Traffic,Safety and Control

Month

30

119(2)

Allow for cost of performance security


(5% of Contract Sum)

LS

Item

16,272,000.00

Allow for cost of providing advance bonds (20% of Contract Sum


except P.Sum and Contingencies)

LS

Item

Allow for the cost of providing Insurances

LS

Item

1.3
1.4

119(1)

1.4

1,517,040.00

940,564.80

27.83

42,219,223.20

3.92

5,946,796.80

16,272,000.00

Item

16,272,000.00

Item

3,057,705.49

1.00

33,600,000.00

1.00

33,600,000.00

1.00

32,640,000.00

1.00

32,640,000.00

48,166,020.00

27.21

41,278,658.40

Item

19,329,705.49

Item

33,600,000.00

Item

33,600,000.00

32,640,000.00

Item

38,773,450.55

0.62

MOBILIZATION AND DEMOBILIZATION

6,133,450.55

Construction

25,800,000.00

1.4.1

108.3(1)

Mobilization of Contractor's Fascilities & Plant / Equipment

PS

1.4.2

108.3(2)

De-Mobilization of Contractor's Fascilities & Plant / Equipment

PS

1.4.3

108.3(4)

Maintain of Contractor all site Fascilities

Month

30.00

696,600.00

20,898,000.00

1.4.5

108.4(1)

Progress Photographs

Month

30.00

15,480.00

464,400.00

1.6

Other Payments

Construction
Other Payments

7,224,000.00

8,691,906.22

8,691,906.22

8,691,906.22

17,108,093.78

17,108,093.78

17,108,093.78

Item

7,224,000.00

7,224,000.00

34.33

696,600.00

23,914,278.00

30.33

21,127,878.00

1.00

696,600.00

31.33

21,824,478.00

3.00

2,089,800.00

25

15,480.00

387,000.00

21.00

325,080.00

1.00

15,480.00

22.00

340,560.00

3.00

46,440.00

PROJECT SIGN BOARDS AND PLAQUES

1.6.1

118(1)

1.6.2

108.7(2)

Provide and Maintain Project Sign Boards

Nos.

4.00

154,800.00

619,200.00

154,800.00

619,200.00

4.00

619,200.00

4.00

619,200.00

Provide and Maintain Project Plaques

Nos.

1.00

180,600.00

180,600.00

180,600.00

180,600.00

1.00

180,600.00

1.00

180,600.00

Settting-out,Cross Section Surveyor,Preparation of


Drawings at Construction stage & DCP test

1.7

1.7.1

117(1a)

Marking Center line

km

37.50

110,400.00

4,140,000.00

37.18

110,400.00

4,104,672.00

37.18

4,104,672.00

37.18

4,104,672.00

1.7.2

117(1b)

Surveying & Preparation of Cross Sections 10m intervals

Nos.

3,750.00

1,862.40

6,984,000.00

3701

1,862.40

6,892,742.40

3,701.00

6,892,742.40

3,701.00

6,892,742.40

DCP Test

Nos.

238.00

3,612.48

859,770.24

57

3,612.48

205,911.36

57.00

205,911.36

57.00

205,911.36

1.7.3

PROVISION OF OFFICE FOR THE ENGINEER AND


EMPLOYER

1.8
1.8.1

111.4(1)

Provide Main Office for the Engineer


(31 months x 125,000/=)

PS

3,720,000.00

1,403,450.00

1,357,450.00

1,357,450.00

46,000.00

2,431,721.04

2,431,721.04

1.8.2

111.4(2)

Provide Secondary Office for the Engineer


(30 months x 100,000/=)

PS

2,880,000.00

2,431,721.04

1.8.3

111.4(3)

Provide Office for the Employer


(31 months x 125,000/=)

PS

3,720,000.00

PROVISION FOR FURNITURE AND OFFICE EQUIPMENT THE ENGINEER AND EMPLOYER OFFICE

1.9
1.9.1

111.4(1)

Engineeer's Main Office

PS

3,360,000.00

414,480.00

414,479.21

414,479.21

0.79

1.9.2

111.4(2)

For the Secondary Office for the Engineer

PS

1,728,000.00

457,415.00

457,413.00

457,413.00

2.00

For the Employer's Office

PS

3,360,000.00

0.00

1.9.3

111.4(3)

MAINTAINANCE OF THE OFFICE OF ENGINEER AND EMPLOYER ELECTRICITY,WATER,WATCHER ETC.

1.10

1.10.1 111.5(1)

Maintain Main Office for the Engineer including Watcher


(31 months x 125,000/-)
(39 months x 125,000/-)

PS

3,720,000.00

2,849,588.43

2,446,599.04

35,422.77

2,482,021.81

367,566.62

1.10.2 111.5(2)

Maintain Secondary Office for the Engineer including Watcher


(30 months x 100,000/-)

PS

2,880,000.00

2,344,063.12

2,137,110.81

42,736.71

2,179,847.52

164,215.60

1.10.3 111.5(3)

Maintain Office for the Employer including Watcher


(31 months x 125,000/-)

PS

3,720,000.00

116,000.00

55,110.83

2,400.00

57,510.83

58,489.17

541,964.93

48,035.07

PROVIDE & MAINTAINANCE OF THE HOUSE OF ENGINEER & EMPLOYER

1.11
1.11.1

111.6(1)

Provide house for Engineer/Employer Type 1(2 Nos)


(31 months x 2 Nos. x 60,000/-)

PS

3,571,200.00

590,000.00

541,964.93

1.11.2

111.6(2)

Provide house for Engineer Type 2(2 Nos)


(31 months x 2 Nos. x 50,000/-)

PS

2,976,000.00

1,050,000.00

700,856.00

99,975.00

800,831.00

249,169.00

1.11.3

111.7(1)

Maintain house for Engineer/Employer Type 1 (Rate per 1 No.) and


Watcher
(31 months x 2 Nos. x 60,000/-)

PS

3,571,200.00

550,000.00

430,882.10

8,605.00

439,487.10

110,512.90

1.11.4

111.7(2)

Maintain house for Engineer Type 2 (Rate per Month) and Watcher
(31 months x 2 Nos. x 50,000/-)

PS

2,976,000.00

500,000.00

306,889.80

9,214.80

316,104.60

183,895.40

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

PREVIOUSLY CLAIMED

AMOUNT

QTY

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

PROVIDE & MAINTAINANCE OF THE VEHICLE OF ENGINEER & EMPLOYER

1.12
1.12.1

111.8(2)

Purchase,supply & maintain new vehicle (4D pick-up) for RDA


ownership - 02 Nos

PS

25,920,000.00

63,000,000.00

1.12.2

111.8(4)

Purchase,supply & maintain new vehicle (Car) for RDA ownership 01 Nos

PS

10,800,000.00

0.00

1.12.3

111.8(5)

Provide & Maintain Motor Cycle - (5 Nos x 30 months)

4,938,120.00

123.23

v/month

150.00

34,056.00

5,108,400.00

145

Month

30.00

43,200.00

1,296,000.00

34,056.00

57,174,730.20

1,029,971.08

58,204,701.28

4,196,720.88

5.00

170,280.00

128.23

4,367,000.88

4,795,298.72

16.77

571,119.12

PROVIDE & MAINTAINANCE LABORATARY & LABORATARY


EQUIPMENT

1.13
1.13.1

THIS PERIOD CLAIM

AMOUNT

109(1a)

1.13.1.A

Provide Laboratary(except furniture & lab equipment)


Construction of laboratary building for the Engineer

1.13.2

109(1b)

Provide Furniture & Lab Equipment for the laboratary

1.13.3

109(2)

Maintainance of Laboratary,including watcher

1.14

Maintainance of the existing road during the construction period

1.14.2 1102(6a)

Repairing of Pot-Holes at the time of possession of


site,Depth<20mm

1.14.3 1102(6b)
1.14.4 1102(6c)

1.15.1 111.10(1)
1.16

9,100,000.00

PS
Month

14,400,000.00
30.00

96,000.00

2,880,000.00

18,200,000.00
24

96,000.00

2,304,000.00

5,280,695.72

1,760,231.90

1,877,760.00

1.00

7,040,927.62

17,693,628.22
19.56

ROAD MAINTAINANCE

1.14.1 1109(2a)

1.15

PS

2,059,072.38

17,693,628.22

506,371.78

20.56

1,973,760.00

3.44

330,240.00

250,876.23

2,978.85

13,835,209.25

514.44

2,389,306.29

96,000.00
-

km/week

2,732.00

4,644.48

12,688,719.36

3493.29

4,644.48

16,224,515.54

2,924.83

13,584,333.02

54.02

222.00

1,920.00

426,240.00

30

1,920.00

57,600.00

25.83

49,593.60

25.83

49,593.60

4.17

8,006.40

Repairing of Pot -Holes at the time of possession of site


,20mm<Depth<75mm

3,315.00

2,352.96

7,800,062.40

2500

2,352.96

5,882,400.00

2,460.68

5,789,881.61

2,460.68

5,789,881.61

39.32

92,518.39

Repairing of Pot-Holes and patch repaires at the time of


possession of site deeper than 75mm

3,478.00

2,724.48

9,475,741.44

800

2,724.48

2,179,584.00

756.19

2,060,224.53

756.19

2,060,224.53

43.81

119,359.47

1,581,475.00

118,525.00

SURVEY EQUIPMENT

Survey Equipments

PS

3,648,000.00

1,700,000.00

1,581,475.00

PROVISION OF OTHER STAFF FOR ENGINEER & EMPLOYER

1.16.1 111.11(1)

Labourers(classified unskilled)
(2 x 30 months @ 30,000/-)

PS

1,728,000.00

2,450,000.00

2,029,859.05

83,604.00

2,113,463.05

336,536.95

1.16.2 111.11(2)

Survey Assistant (classified skilled)


(1 x 30 months @ 35,000/-)

PS

1,008,000.00

5,450,000.00

4,450,981.78

202,640.00

4,653,621.78

796,378.22

1.16.3 111.11(3)

Secretary
(2 x 31 months @ 48,000/-)

PS

2,856,960.00

1,200,000.00

980,833.14

44,783.00

1,025,616.14

174,383.86

1.16.4 111.11(4)

Administrator
(2 x 31 months @ 48,000/-)

PS

2,856,960.00

950,000.00

763,912.80

33,835.00

797,747.80

152,252.20

1.16.5 111.11(5)

Office Assistant
(2 x 31 months @ 30,000/-)

PS

1,785,600.00

750,000.00

573,434.50

573,434.50

176,565.50

1.16.6 111.11(6)

Cad Draughtperson
(2 x 31 months @ 38,000/-)

PS

2,261,760.00

2,500,000.00

1,974,410.68

97,916.00

2,072,326.68

427,673.32
9,283,072.38

TOTAL OF PROVISIONAL SUM ITEMS IN BILL NO 01 CARRIED Constructions


FORWARD TO BILL NO 09
Other Payments

33,024,000.00

25,015,906.22

13,972,601.94

1,760,231.90

15,732,833.84

109,447,680.00

126,014,811.37

115,611,835.91

1,691,103.36

117,302,939.27

8,711,872.10

TOTAL OF BILL NO.01 EXCEPT PS ITEMS CARRIED TO SUMMARY

201,844,333.44

207,759,799.34

184,805,255.80

186,975,056.83

20,784,742.51

2,169,801.03

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

AMOUNT

THIS PERIOD CLAIM


QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO. 2: SITE CLEARING


ITEM
NO.

PAY ITEM

QTY
2.1

2.1.1

RATE (RS)

PREVIOUSLY CLAIMED

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


AMOUNT

QTY

RATE (RS)

AMOUNT

QTY

AMOUNT

THIS PERIOD CLAIM


QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

CLEARING AND GRUBBING

201(1a)

Clearing & Grubbing (measured along slop length)

266,162.00

62.40

16,608,508.80

168117.00

62.40

10,490,500.80 134,077.58

8,366,440.99

2,330.05

145,395.12

136,407.63

8,511,836.11

31,709.37

1,978,664.69

Removal Trees
2.1.2

201(2)

Girth 300 - 600 mm

nr.

365.00

7,740.48

2,825,275.20

110.00

7,740.48

851,452.80

67.00

518,612.16

67.00

518,612.16

43.00

332,840.64

2.1.3

201(3)

Girth 600 - 1200 mm

nr.

283.00

12,900.48

3,650,835.84

150.00

12,900.48

1,935,072.00

119.50

1,541,607.36

119.50

1,541,607.36

30.50

393,464.64

2.1.4

201(4)

Girth 1200 - 2000 mm

nr.

61.00

16,718.40

1,019,822.40

76.00

16,718.40

1,270,598.40

65.00

1,086,696.00

10.00

167,184.00

75.00

1,253,880.00

1.00

16,718.40

2.1.5

201(5)

Girth over 2000mm

nr.

6.00

20,640.00

123,840.00

30.00

20,640.00

619,200.00

24.00

495,360.00

6.00

123,840.00

30.00

619,200.00

Removal Branches
2.1.6

201(10a)

Girth 300 - 600 mm

nr.

30.00

3,869.76

116,092.80

70.00

3,869.76

270,883.20

27.00

104,483.52

27.00

104,483.52

43.00

166,399.68

2.1.7

201(10b)

Girth 600 - 1200 mm

nr.

10.00

4,644.48

46,444.80

10.00

4,644.48

46,444.80

7.00

32,511.36

7.00

32,511.36

3.00

13,933.44

2.1.8

201(10c)

Girth 1200 - 2000 mm

nr.

1.00

5,160.00

5,160.00

10.00

5,160.00

51,600.00

2.00

10,320.00

2.00

10,320.00

8.00

41,280.00

Remove Stumps
2.1.9

201(6)

Girth 300 - 600 mm

nr.

119.00

10,320.00

1,228,080.00

120.00

10,320.00

1,238,400.00

94.00

970,080.00

94.00

970,080.00

26.00

268,320.00

2.1.10

201(7)

Girth 600 - 1200 mm

nr.

197.00

15,480.00

3,049,560.00

197.00

15,480.00

3,049,560.00

66.00

1,021,680.00

66.00

1,021,680.00

131.00

2,027,880.00

2.1.11

201(8)

Girth 1200 - 2000 mm

nr.

39.00

18,576.00

724,464.00

39.00

18,576.00

724,464.00

18.00

334,368.00

18.00

334,368.00

21.00

390,096.00

2.1.12

201(9)

Girth over 2000mm

nr.

10.00

24,768.00

247,680.00

10.00

24,768.00

247,680.00

1.00

24,768.00

1.00

24,768.00

9.00

222,912.00

REMOVAL OF STRUCTURES & OBSTRUCTIONS

2.2
2.2.1

202(1a)&
202(2a)

2.2.2

202(3)

Removal of Structures & Obstructions other than what is measured


under BOQ Item No.6.1,6.2, & 9.6

PS

3,240,000.00

1,240,000.00

26,220.19

26,220.19

1,213,779.81

Removing Fencing (over 300mm girth Trees & Stumps are


measured seperately)

PS

1,337,472.00

837,472.00

42,468.00

42,468.00

795,004.00

34,223,235.84

22,873,328.00

BILL NO.02 CARRIED TO SUMMARY

14,575,615.58

436,419.12

15,012,034.70

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

7,861,293.30

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO. 3: EARTH WORKS


ITEM
NO.

PAY ITEM
3.1

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

ROADWAY EXCAVATION

3.1.1

301(1)

Roadway excavation - classified soil suitable for fill

5,628.00

573.12

3,225,519.36

628.00

573.12

359,919.36

628.00

3.1.2

301(4)

Roadway excavation - soft rock (provisional quantity)

1,540.00

2,043.84

3,147,513.60

140.00

2,043.84

286,137.60

140.00

286,137.60

3.1.3

301(10)

Roadway excavation - hard rock (provisional quantity)

1,030.00

7,224.00

7,440,720.00

530.00

7,224.00

3,828,720.00

1,644,037.92

1,644,037.92

302.42

2,184,682.08

3.1.4

301(6)

Roadway excavation - boulders (provisional quantity)

312.00

3,395.52

1,059,402.24

212.00

3,395.52

719,850.24

72.90

247,533.41

72.90

247,533.41

139.10

472,316.83

3.1.5

301(11)

Roadway excavation - unsuitable soil

21,100.00

810.24

17,096,064.00

7705.00

810.24

6,242,899.20

4,890.73

3,962,665.08

64.00

51,855.36

4,954.73

4,014,520.44

2,750.27

2,228,378.76

3.1.6

301(12)

Roadway excavation, sub grade replacement


(Provisional Quantity)

706.00

2,167.68

1,530,382.08

856.00

2,167.68

1,855,534.08

708.01

1,534,739.12

708.01

1,534,739.12

147.99

320,794.96

227.58

227.58

359,919.36

3.1.7

301(12)

Excavation for road restrengthening & widening

31,253.00

1,392.96

43,534,178.88

25100.00

1,392.96

34,963,296.00

16,504.36

22,989,913.31

581.82

810,451.98

17,086.18

23,800,365.29

8,013.82

11,162,930.71

3.1.8

301(13)

Road Pavement Excavation

183.00

1,909.44

349,427.52

7716.00

1,909.44

14,733,239.04

3,240.41

6,187,368.47

1,532.34

2,925,911.29

4,772.75

9,113,279.76

2,943.25

5,619,959.28

3.1.9

301(16)

Prepare sub grade in cut areas (Trimming, levelling & compacting)

125,310.00

73.92

9,262,915.20

112716.00

73.92

8,331,966.72

66,106.83

4,886,616.87

4,895.64

361,885.71

71,002.47

5,248,502.58

41,713.53

3,083,464.14

1,620,178.56

150.00

1,921.92

288,288.00

23.84

45,818.57

58.74

112,893.58

82.58

158,712.15

67.42

129,575.85

3.2

EXCAVATION STRUCTURES & BUILT UP DRAINS (EXCEPT BRIDGES)

3.2.1

302(1)a

Excavation for structures and drain suitable for backfill (Backfilling


measured seperately)

843.00

1,921.92

3.2.2

302(2)

Excavation for structures and drains, soft rock

286.00

2,559.36

731,976.96

50.00

2,559.36

127,968.00

50.00

127,968.00

3.2.3

302(4)

Excavation for structures and drains, hard rock

169.00

7,422.72

1,254,439.68

25.00

7,422.72

185,568.00

25.00

185,568.00

3.2.4

302(3)

Excavation for structures and drains, Boulders

124.00

4,123.20

511,276.80

25.00

4,123.20

103,080.00

25.00

103,080.00

3.2.5

302(5)

Excavation for structures and drains, unsuitable soil

2,435.00

1,921.92

4,679,875.20

2435.00

1,921.92

4,679,875.20

1,324.78

2,546,121.18

2,546,121.18

1,110.22

2,133,754.02

3.2.6

302(6)

Backfilling with sand

600.00

5,144.64

3,086,784.00

100.00

5,144.64

514,464.00

100.00

514,464.00

302(7)

Backfilling with crush stone aggregate

225.00

5,470.08

1,230,768.00

150.00

5,470.08

820,512.00

27.55

150,700.70

150,700.70

122.45

669,811.30

3.2.7
3.3

27.55

EMBANKMENT / SUBGRADE CONSTRUCTION

3.3.1

304(3)

Trim, level and compact original ground

47,654.00

82.56

3,934,314.24

160723.00

82.56

3.3.2

304(2b)

Embankment construction, Type 1

27,015.00

1,920.00

51,868,800.00

75154.32

1,920.00

3.3.3

304(2)a

Embankment Construction, Type 2

123,500.00

1,713.60

211,629,600.00

86746.51

3.3.4

304(6)

Embankment - Rock Filling

450.00

4,520.64

2,034,288.00

26000.00

3.3.5

304(6)A

Filling voids with aggregate base course for rock fill area (Pile
Measurement)

110.00

5,470.08

601,708.80

3.3.6

Sand for voids in Rock Filling(Seepage Area)

3.3.7

Sand for Inclined Chimney Drain,Horizontal Drain (Seepage Area)

3.4
3.4.1

1,324.78

8,826,002.50

6,172.80

509,626.36

113,076.90

9,335,628.86

47,646.10

3,933,662.02

144,296,294.40

44,160.52

84,788,198.40

1,204.10

2,311,872.00

45,364.62

87,100,070.40

29,789.70

57,196,224.00

1,713.60

148,648,819.54

68,297.45

117,034,510.32

330.09

565,642.22

68,627.54

117,600,152.54

18,118.97

31,048,667.00

4,520.64

117,536,640.00

19,902.70

89,972,941.73

464.68

2,100,650.99

20,367.38

92,073,592.72

5,632.62

25,463,047.28

3200.00

5,470.08

17,504,256.00

2,451.68

13,410,885.73

116.19

635,568.60

2,567.87

14,046,454.33

632.13

3,457,801.67

2500.00

5,144.64

12,861,600.00

1,778.33

9,148,867.65

592.77

3,049,588.25

2,371.10

12,198,455.90

128.90

663,144.10

600.00

5,144.64

3,086,784.00

401.65

2,066,344.66

133.88

688,764.40

535.53

2,755,109.06

64.47

331,674.94

7,749.00

722.88

5,601,597.12

4000.00

722.88

2,891,520.00

4,000.00

2,891,520.00

13,269,290.88 106,904.10

CHANNEL EXCAVATION

301A(1), 301A(5) Channel excavation unclassified soil

3.4.2

301A(2)

Channel excavation, soft rock

594.00

2,559.36

1,520,259.84

100.00

2,559.36

255,936.00

100.00

255,936.00

3.4.3

301A(4)

Channel excavation, hard rock (Provisional Quantity)

344.00

7,422.72

2,553,415.68

50.00

7,422.72

371,136.00

50.00

371,136.00

3.4.4

301A(3)

Channel excavation, boulders (Provisional Quantity)

313.00

4,123.20

1,290,561.60

50.00

4,123.20

206,160.00

50.00

206,160.00

369,443,265.62

14,124,710.74

BILL NO. 3 CARRIED TO SUMMARY

380,795,967.36

538,969,754.26

383,567,976.36

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

155,401,777.90

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

QTY

RATE (RS)

PREVIOUSLY CLAIMED

AMOUNT

QTY

AMOUNT

QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO. 04 - ROAD PAVEMENT


ITEM
NO.

PAY ITEM
4.1
401(1)

Sub base as compaction in position

4.1.2

405(1)

4.1.3
4.2

4.3

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

35,464.00

1,920.00

68,090,880.00

41,795.58

1,920.00

80,247,521.28

16,911.73

32,470,521.60

Dense Graded Aggregate Base as compacted in position

60,382.00

5,470.08

Supplying & Laying of Geogrid

m2

156,539.00

2,805.99

5,387,500.80

19,717.72

37,858,022.40

330,294,370.56

64,676.11

5,470.08

353,783,495.79

33,259.41

18,600.00

558.00

10,378,800.00

3,952.50

52.80

8,265,259.20

7128.00

52.80

376,358.40

13,756.25

1,857.60

25,553,610.00

28607.00

1,857.60

298,192.00

186.24

5,439,022.08

22,077.86

42,389,498.88

181,931,633.45

4,080.66

22,321,536.66

37,340.07

2,205,495.00

1,317.50

735,165.00

5,270.00

204,253,170.11

27,336.04

149,530,325.68

2,940,660.00

13,330.00

7,438,140.00

Lightly Scarify existing surface layer before laying ABC (Extraover


item for BOQ item No 4.1.2)

109.30

5,771.04

109.30

5,771.04

7,018.70

370,587.36

53,140,363.20

1,129.38

2,097,936.29

339.54

630,729.50

1,468.92

2,728,665.79

27,138.08

50,411,697.41

SHOULDERS
409(1)

4.4

Earthen shoulder compacted in position


APPLICATION OF PRIME COAT

501(5)a

4.4.1

PREVIOUSLY CLAIMED

RECONSTRUCTION OF EXISTING PAVEMENT


408(2)a

4.3.1

AMOUNT

GRANULAR PAVEMENT

4.1.1

4.2.1

AS PER B.O.Q.

AS PER ORIGINAL BOQ

Bituminous Prime coat using Emulsion CSS-1,1Ltr/m2

Bituminous Prime coat using Emulsion MC30,1Ltr/m2

257511.99

186.24

47,959,033.02

118,739.61

22,114,064.97

15,929.50

2,966,710.08

134,669.11

25,080,775.05

122,842.88

22,878,257.97

501(5)b

Extra Over Blotting metirial for BOQ NO 4.4.1

m2

298,192.00

18.24

5,439,022.08

257208.23

18.24

4,691,478.12

774.78

14,131.99

774.78

14,131.99

256,433.45

4,677,346.13

4.5.1

502(2)

Bituminous Tack coat using Emulsion CSS-1 as per RDA


specification

596,384.00

93.12

55,535,278.08

494221.70

93.12

46,021,924.70

107,775.00

10,036,008.00

20,560.00

1,914,547.20

128,335.00

11,950,555.20

365,886.70

34,071,369.50

4.5.2

506(2a)

Asphalt Binder Course (60mm thick)

MT

44,076.00

15,097.92

665,455,921.92

37302.30

15,097.92

563,187,141.22

15,017.04

226,726,068.56

2,914.37

44,000,925.11

17,931.41

270,726,993.67

19,370.89

292,460,147.55

Asphalt Wearing Course (40mm thick)

298,192.00

1,558.08

464,606,991.36

241227.40

1,558.08

375,851,587.39

17,492.00

27,253,935.36

17,492.00

27,253,935.36

223,735.40

348,597,652.03

4.01

113,631.37

4.01

113,631.37

4.04

7,817.40

4.04

7,817.40

40.18

5,384.12

40.18

5,384.12

4.4.1. A
4.4.2
4.5

ASPHALT SURFACING

506(1)

4.5.3
4.6
4.6.1

901A(1)a

CONCRETE SURFACING (0.5% of Total Road)


Concrete Grade 30

28,337.00

4.6.2

Dowel bars

kg

228.00

228.00

4.6.3

Constuction joint inclusive of Joint sealent

lm

1,075.00

1,075.00

4.6.4

Formwork

4.6.5

Curring

4.6.6

Laying Polythene gauge 1000 (Extra over item for Item No. 4.6.1)

Rate Only

28,337.00

Rate Only

1,935.00

1,935.00

sqm/day

86.00

86.00

134.00

134.00

BILL NO. 04 CARRIED TO SUMMARY

1,628,680,355.28

1,535,637,703.11

504,855,566.26

78,083,947.24

Rate Only

582,939,513.50

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

952,825,022.51

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM
5.1

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

PREVIOUSLY CLAIMED

AMOUNT

QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

ROADSIDE AND LEAD AWAY SURFACE DRAINS


Concrete :

5.1.1

1001(2a)

Grade C 15

179.00

13,932.48

2,493,913.92

60

13,932.48

835,948.80

37.24

518,845.56

3.54

49,320.97

40.78

568,166.53

19.22

267,782.27

5.1.2

1001(2b)

Grade C 20

1,134.00

16,512.00

18,724,608.00

551.18

16,512.00

9,101,084.16

128.23

2,117,333.76

128.23

2,117,333.76

422.95

6,983,750.40

5.1.3

1001(2c)

Grade C 25

123.00

18,576.00

2,284,848.00

386.08

18,576.00

7,171,822.08

179.54

3,335,135.04

24.23

450,096.48

203.77

3,785,231.52

182.31

3,386,590.56

Precast concrete cover slab :

5.1.4

701(6a)

900 x 450 x 100mm Tk

nos

789.00

5,857.92

4,621,898.88

5.1.5

701(6b)

900 x450 x 150mm Tk

nos

695.00

7,914.24

5,500,396.80

5.1.5. A

650 x500 x 125mm Tk

nos

20.00

5,341.00

106,820.00

9.00

71,228.16

11.00

35,591.84

20.00

106,820.00

5.1.5. B

800 x500 x 125mm Tk

nos

740.00

6,919.00

5,120,060.00

484.00

3,830,492.16

89.00

615,791.00

573.00

3,964,587.00

167.00

1,155,473.00

5.1.5. C

900 x500 x 125mm Tk

nos

1950.00

7,768.00

15,147,600.00

1,950.00

15,147,600.00

5.1.5. D

1000 x500 x 125mm Tk

nos

65.00

8,618.00

560,170.00

45.00

356,140.80

45.00

387,810.00

20.00

172,360.00

5.1.5. E

1150 x500 x 125mm Tk

nos

30.00

9,468.00

284,040.00

14.00

110,799.36

14.00

132,552.00

16.00

151,488.00

3,830,492.16

5.1.6

706(1)

Weep hole, 75mm dia. PVC pipe (without metal packing)

347.00

980.16

340,115.52

698.90

980.16

685,033.82

69.76

68,375.96

8.62

8,448.98

78.38

76,824.94

620.52

608,208.88

5.1.7

1002(1)

Tor Steel/Mild Steel reinforcement (Extra over for Item 5.1.2 to


5.1.3)

MT

47.20

222,912.00

10,521,446.40

47.20

222,912.00

10,521,446.40

20.410

4,549,633.92

1.275

284,212.80

21.685

4,833,846.72

25.52

5,687,599.68

5.1.8

1006(1)

Random Rubble Masonry

172.00

9,073.92

1,560,714.24

100.00

9,073.92

907,392.00

100.00

907,392.00

5.1.9

1006(3)

Plastering, 1:3 cement sand mix, 16mm thick

392.00

624.00

244,608.00

200.00

624.00

124,800.00

200.00

124,800.00

5.1.10

1008(1)

Formwork smooth finish (Extra over for item 5.1.1, 5.1.2, 5.1.3)

4,164.00

1,556.16

6,479,850.24

3036.46

1,556.16

4,725,217.59

1,514.31

2,356,508.65

127.62

198,597.14

1,641.93

2,555,105.79

1,394.53

2,170,111.80

5.1.11

1008(2)

Formwork, rough finish ((Extra over for item 5.1.1, 5.1.2 & 5.1.3)

5,552.00

1,403.52

7,792,343.04

4144.00

1,403.52

5,816,186.88

2,028.06

2,846,422.77

168.75

236,844.00

2,196.81

3,083,266.77

1,947.19

2,732,920.11

5.1.12

1008(1)
1008(2)

Fomwork for earth protection wall (raising of one side drain wall
above the drain section)

533.00

1,568.64

836,085.12

533.00

1,568.64

836,085.12

533.00

836,085.12

5.1.13

302(8a)

Backfilling using type I embankment material (if required)

172.00

1,733.76

298,206.72

175.00

1,733.76

303,408.00

2.53

4,386.41

2.53

4,386.41

172.47

299,021.59

5.1.14

702(2)

Inlet to line drain PVC pipe (Type 600) 110mm dia.

Lm

20.00

1,300.80

26,016.00

20.00

1,300.80

26,016.00

20.00

26,016.00

37.5mm crushed stone filter with Geotextile protection for weep


holes

No.

2,300.00

433.92

998,016.00

2300.00

433.92

998,016.00

2,300.00

998,016.00

No.

6.00

15,480.00

92,880.00

15,480.00

6.00

5.1.15
5.2
5.2.1

MANHOLE,CATCHPITS AND INLETS


703(3)

Gully inlets (for inlet pipes)


BILL NO.05 CARRIED TO SUMMARY

62,815,946.88

92,880.00
63,364,026.86

23,995,794.71

1,878,903.21

21,615,931.44

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

92,880.00
41,748,095.41

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO.06 - CULVERTS & OTHER STRUCTURES ( Except Bridges)


6.1

202(1a)

Removal and disposal of existing culvert & cause ways required to


reconstruction

Nos.

12

77400

928800

40

77,400.00

3,096,000.00

25.50

1,973,700.00

25.50

1,973,700.00

14.50

1,122,300.00

6.2

202(1b)

Removal and disposal of part of existing culvert & causeway


required extensions, modification and any development

Nos.

56

30960

1733760

25

30,960.00

774,000.00

4.00

123,840.00

4.00

123,840.00

21.00

650,160.00

6.3

1001(2a)

3,098,179.51

Grade C 15 concrete

308

13932.48

4291203.84

1270

13,932.48

17,694,249.60

900.00

12,539,232.00

147.63

2,056,838.09

1,047.63

14,596,070.09

222.37

6.4

1001(2b)
707(1) Grade C 20 concrete

93

17028.48

1583648.64

850

17,028.48

14,474,208.00

400.00

6,811,392.00

40.27

685,736.89

440.27

7,497,128.89

409.73

6,977,079.11

6.5

1001(2c), 707(3) Grade C 25 concrete

414

19092.48

7904286.72

430

19,092.48

8,209,766.40

296.64

5,663,593.27

4.91

93,744.07

301.55

5,757,337.34

128.45

2,452,429.06

6.5. A
6.6

Grade 30/20 Concrete for Cross Drain Structures


1002(1),

6.7

707(5) Tor steel reinforcement(extra over for BOQ item No 6.3 to 6.5)

1011B(1)

25mm 1m long mild steel dowel to rock

935

21,013.86

19,647,959.10

473.40

9,038,380.03

157.80

4,225,568.40

631.20

13,263,948.43

303.80

6,384,010.67

MT

53.70

222,912.00

11,970,374.40

153.32

222,912.00

34,176,867.84

97.229

21,673,510.85

0.236

52,607.23

97.465

21,726,118.08

55.855

12,450,749.76

Nos.

220.00

2,374.08

522,297.60

100.00

2,374.08

237,408.00

24.00

56,977.92

24.00

56,977.92

76.00

180,430.08

6.8

1006(1)

Random rubble masonry

1,226.00

9,073.92

11,124,625.92

1226.00

9,073.92

11,124,625.92

1,226.00

11,124,625.92

6.9

1006(3)

Plastering 1:3 cement sand mix, 16mm thick

2,687.00

685.44

1,841,777.28

2687.00

685.44

1,841,777.28

2,687.00

1,841,777.28

6.10

1008(1)

Formwork smooth finish(extra over for BOQ item No 6.3 to 6.5)

682.00

1,556.16

1,061,301.12

3000.00

1,556.16

4,668,480.00

2,217.92

3,451,438.39

17.30

26,921.57

2,235.22

3,478,359.96

764.78

1,190,120.04

6.11

1008(2)

Formwork rough finish(extra over for BOQ item No 6.3 to 6.5)

1,023.00

1,496.64

1,531,062.72

6530.00

1,496.64

9,773,059.20

4,900.37

7,334,089.76

53.55

80,145.07

4,953.92

7,414,234.83

1,576.08

2,358,824.37

6.12

707(6a)

Laying 225mm dia concrete pipe (NP2)

40.00

12,000.00

480,000.00

60.00

12,000.00

720,000.00

36.65

439,800.00

6.00

72,000.00

42.65

511,800.00

17.35

208,200.00

6.13

707(6b)

Laying 300mm dia concrete pipe (NP2)

15.00

13,440.00

201,600.00

64.40

13,440.00

865,536.00

34.42

462,604.80

34.42

462,604.80

29.98

402,931.20

6.14

707(6c)

Laying 450mm dia concrete pipe(NP2)

15.00

15,840.00

237,600.00

10.00

15,840.00

158,400.00

4.84

76,665.60

4.84

76,665.60

5.16

81,734.40

6.15

707(6a)

Laying 600mm dia concrete pipe (NP2)

182.00

22,704.00

4,132,128.00

20.00

22,704.00

454,080.00

20.00

454,080.00

6.16

707(6b)

Laying 900mm dia concrete pipe (NP2)

430.00

31,207.68

13,419,302.40

72.00

31,207.68

2,246,952.96

60.50

1,888,064.64

60.50

1,888,064.64

11.50

358,888.32

6.17

707(6c)

Laying 1200mm dia concrete pipe(NP2)

50.00

49,536.00

2,476,800.00

55.00

49,536.00

2,724,480.00

52.71

2,611,042.56

52.71

2,611,042.56

2.29

113,437.44

6.18

706(1)

Weep hole 75mm dia. Pvc pipe (Type 600)

244.00

1,279.68

312,241.92

244.00

1,279.68

312,241.92

112.19

143,567.30

3.40

4,350.91

115.59

147,918.21

128.41

164,323.71

6.19

705(1)

Aggregate backfill (50-200mm dry stone)

54.00

5,461.44

294,917.76

225.00

5,461.44

1,228,824.00

5.85

31,949.42

5.85

31,949.42

219.15

1,196,874.58

6.20

705(2)

37.5mm maximum size crushed stone filter

18.00

5,520.96

99,377.28

60.00

5,520.96

331,257.60

9.65

53,277.26

9.65

53,277.26

50.35

277,980.34

6.21

705(3)

Imprevious layer 75mm thick

120.00

642.24

77,068.80

120.00

642.24

77,068.80

120.00

77,068.80

6.22

804(1a)

Rubble pitching with 1:3 cement sand mortar (225mm thick)

778.50

2,580.48

2,008,903.68

1000.00

2,580.48

2,580,480.00

1,000.00

2,580,480.00

6.23

808(5)

Guard stones

No

444.00

3,901.44

1,732,239.36

444.00

3,901.44

1,732,239.36

87.00

339,425.28

87.00

339,425.28

357.00

1,392,814.08

6.24

302(8a)

Backfilling structures using type I embankment material

1,670.00

1,733.76

2,895,379.20

1670

1,733.76

2,895,379.20

58.48

101,390.28

58.48

101,390.28

1,611.52

2,793,988.92

6.25

1303(1a)

Clearing, desilting & minor repairing of Pipe Culverts

No.

46.00

19,092.48

878,254.08

46

19,092.48

878,254.08

46.00

878,254.08

6.26

1303(1b)

Clearing, desilting & minor repairing of culverts except Pipe


Culverts

No.

9.00

19,608.00

176,472.00

19,608.00

176,472.00

9.00

176,472.00

6.27

1011(1)

25mm dia. 400mm long Mild Steel dowel

No.

134.00

619.20

82,972.80

50

619.20

30,960.00

34.00

21,052.80

34.00

21,052.80

16.00

9,907.20

BILL NO.06 CARRIED TO SUMMARY

73,998,395.52

143,131,027.26

74,834,994.16

7,297,912.23

82,132,906.39

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

60,998,120.86

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

PREVIOUSLY CLAIMED

AMOUNT

QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO.07 - INCIDENTAL CONSTRUCTION


7.1
7.1.1

TOP SOILING
801(1)

7.2
7.2.1

Furnish, spread and compact top soil

70,058.00

108.48

7,599,891.84

137345.00

108.48

14,899,185.60

10,717.87

1,162,674.54

10,717.87

1,162,674.54 126,627.13

13,736,511.06

70,058.00

340.80

23,875,766.40

137345.00

340.80

46,807,176.00

9086.35

3,096,628.08

190.54

64,936.03

9,276.89

3,161,564.11 128,068.11

43,645,611.89

GRASSING
802(4)

7.3

Grass sodding (provisional)


Planting Trees Shrubs Vines etc.

7.3.1

803(1)

Plants planed, nurtured and maintained during the establishment


period

No.

37.00

5,160.00

190,920.00

37.00

5,160.00

190,920.00

7.3.2

804(1)A

Dump rip rap protection

333.00

4,644.48

1,546,611.84

333.00

4,644.48

1,546,611.84

7.4

11.08

51,460.84

473.12

244,357.02

37.00

190,920.00

11.08

51,460.84

321.92

1,495,151.00

10.00

154,800.00

2,553.12

1,318,635.42

446.88

230,804.58

GABION WALLS

7.4.1

805(1)

Gabion Walls

148.00

15,480.00

2,291,040.00

10.00

15,480.00

154,800.00

7.4.2

805(2)

Filter fabric

592.00

516.48

305,756.16

3000.00

516.48

1,549,440.00

Granular bedding material ( crusher material)

107.00

5,144.64

550,476.48

8.00

5,144.64

41,157.12

8.00

41,157.12

526.00

2,594.88

1,364,906.88

25.00

2,594.88

64,872.00

25.00

64,872.00

129,744.00

7.4.3

805(4)
7.5

7.5.1

2080

1,074,278.40

Paved Side Walks & Center Mediun


806(4)

Precast concrete slab (450 x 450 x 50mm)


PRECAST CONCRETE KERBS,GUARD STONE AND GURD
RAIL

7.6
7.6.1

807(1)a

Standard kerb

436.00

2,594.88

1,131,367.68

50.00

2,594.88

129,744.00

50.00

7.6.2

807(1)b

Drop kerb

25.00

2,594.88

64,872.00

5.00

2,594.88

12,974.40

5.00

12,974.40

7.6.3

808(5)

Guard stones (Roadway)

No.

558.00

3,901.44

2,177,003.52

558.00

3,901.44

2,177,003.52

558.00

2,177,003.52

Pedestrian guard rail

24.00

15,480.00

371,520.00

24.00

15,480.00

371,520.00

24.00

371,520.00

2,748.00

1,728.00

4,748,544.00

2748

1,728.00

4,748,544.00

7.6.4

808(1)a
7.7

ROAD MARKING
Centre line

7.7.1

810(1)a

Continuous & intermittent


Edge line

2,748.00
-

4,748,544.00
-

7.7.2

810(1)b

Continuous

7,517.00

1,728.00

12,989,376.00

7517

1,728.00

12,989,376.00

7,517.00

12,989,376.00

7.7.3

810(1)c

Pedestrian Crossing

696.00

2,685.12

1,868,843.52

696

2,685.12

1,868,843.52

696.00

1,868,843.52

Road studs

Nr.

3,759.00

1,868.16

7,022,413.44

3759

1,868.16

7,022,413.44

3,759.00

7,022,413.44

7.7.4

810(3)
7.8

ROAD SIGNS
Reflective road sign

7.8.1

811(1)

Single Pole, sign area up to 0.5m

Nos.

98.00

16,512.00

1,618,176.00

309.0

16,512.00

5,102,208.00

1.0

16,512.00

1.00

16,512.00

308.00

5,085,696.00

7.8.2

811(1)a

Single Pole, multiple sign area 0.5m to 1.0m

Nos.

7.00

28,896.00

202,272.00

26.0

28,896.00

751,296.00

1.0

28,896.00

1.00

28,896.00

25.00

722,400.00

7.8.3

811(2)

Double Pole, sign area up to 2m

Nos.

4.00

53,664.00

214,656.00

7.8.4

811(3)

Cheveron Sign

Nos.

10.00

20,124.48

201,244.80

524.0

20,124.48

10,545,227.52

7.9
7.9.1
7.9.2

8.0

160,995.84

8.00

160,995.84

516.00

10,384,231.68

CONCRETE KERB INLETS

817(1a)

Kerb inlets

Nos.

37.00

8,462.40

313,108.80

5.0

8,462.40

42,312.00

5.00

42,312.00

701(6c)

800 x 500 x 75mm thick concrete slab for kerb inlet


(Extra over for Item No. 8.9.1)

Nos.

73.00

2,941.44

214,725.12

5.0

2,941.44

14,707.20

5.00

14,707.20

7.10

Service Ducts(500m c/c for 20% of road length)

7.10.1

302(5)

Excavation for trenching

101.00

1,548.48

156,396.48

101.00

1,548.48

156,396.48

37.28

57,727.33

8.40

13,007.23

45.68

70,734.57

55.32

85,661.91

7.10.2

302(6)

Backfilling with sand

31.00

5,144.64

159,483.84

31.00

5,144.64

159,483.84

21.78

112,050.26

4.92

25,311.63

26.70

137,361.89

4.30

22,121.95

7.10.3

Backfilling with soil(Type 1 sub base material)

70.00

2,270.40

158,928.00

70.00

2,270.40

158,928.00

13.38

30,377.95

2.40

5,448.96

15.78

35,826.91

54.22

123,101.09

7.10.4

Supply and placing 160 mm dia type 600 upvc pipe with end caps
for service duct

l.m

195.00

2,688.00

524,160.00

333.00

2,688.00

895,104.00

195.00

524,160.00

73.00

196,224.00

268.00

720,384.00

65.00

174,720.00

Marker post for identification of duct

Nos.

32.00

5,160.00

165,120.00

32.00

5,160.00

165,120.00

32.00

165,120.00

7.10.5
7.11

KILOMETRE POSTS

7.11.1

819(1)

Provide Install and paint new kilometre post

Nos.

38.00

13,248.00

503,424.00

38.0

13,248.00

503,424.00

38.00

503,424.00

7.11.2

819(2)

Reposition existing Kilometre post

Nos.

2.00

4,123.20

8,246.40

2.0

4,123.20

8,246.40

2.00

8,246.40

7.11.3

819(3)

Paint existing Kilometer post

Nos.

2.00

567.36

1,134.72

2.0

567.36

1,134.72

2.00

1,134.72

7.11.4

1303(3)

Painting culverts, bridges and kerb stone, guard stone, etc.

386.00

505.92

195,285.12

386.0

505.92

195,285.12

386.00

195,285.12

7.11.5

1303(3a)

Numbering Culvert / Bridge etc.

No.

270.00

299.52

80,870.40

270.0

299.52

270.00

BILL NO.07 CARRIED TO SUMMARY

72,816,541.44

80,870.40

113,354,325.12

6,315,761.24

549,284.87

6,865,046.12

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

80,870.40
106,489,279.01

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO.08-SCHEDULE OF DAY WORKS RATES


8.1

LABOUR DAY WORK

All Quantities are Provisional


1

Surveyor

hr.

20.00

310.08

6,201.60

20

310.08

6,201.60

20.00

6,201.60

Survey Assistant (skilled)

hr.

20.00

206.40

4,128.00

20

206.40

4,128.00

20.00

4,128.00

Laboratory Technician (skilled)

hr.

20.00

206.40

4,128.00

20

206.40

4,128.00

20.00

4,128.00

CAD Operator

hr.

25.00

258.24

6,456.00

25

258.24

6,456.00

25.00

6,456.00

Foreman

hr.

25.00

310.08

7,752.00

25

310.08

7,752.00

4.00

1,240.32

4.00

1,240.32

21.00

6,511.68

Operator, Heavy equipment

hr.

100.00

206.40

20,640.00

100

206.40

20,640.00

30.50

6,295.20

30.50

6,295.20

69.50

14,344.80

100.00

19,584.00

2.00

391.68

2.00

391.68

78.00

15,275.52

Operator, Light equipment

hr.

100.00

195.84

19,584.00

100

195.84

19,584.00

Driver, Heavy duty vehicle

hr.

80.00

195.84

15,667.20

80

195.84

15,667.20

Driver, Light duty vehicle

hr.

80.00

186.24

14,899.20

80

186.24

14,899.20

80.00

14,899.20

10

Mechanic

hr.

80.00

186.24

14,899.20

80

186.24

14,899.20

80.00

14,899.20
14,899.20

11

Welder

hr.

80.00

186.24

14,899.20

80

186.24

14,899.20

80.00

12

Electrician

hr.

50.00

186.24

9,312.00

50

186.24

9,312.00

50.00

9,312.00

13

Carpenter

hr.

80.00

206.40

16,512.00

80

206.40

16,512.00

8.00

1,651.20

8.00

1,651.20

72.00

14,860.80

20.00

4,128.00

20.00

4,128.00

130.00

26,832.00

75.00

15,480.00
13,241.66

14

Mason

hr.

150.00

206.40

30,960.00

150

206.40

30,960.00

15

Steel Fixer

hr.

75.00

206.40

15,480.00

75

206.40

15,480.00

16

Semi-skilled workman

hr.

150.00

186.24

27,936.00

150

186.24

27,936.00

78.90

14,694.34

78.90

14,694.34

71.10

17

Unskilled workman (labourer)

hr.

300.00

154.56

46,368.00

500

154.56

77,280.00

300.00

46,368.00

77.00

11,901.12

377.00

58,269.12

123.00

BILL NO. 8.1 LABOUR DAY WORKS CARRIED TO SUMMARY

275,822.40

306,734.40

74,768.74

11,901.12

86,669.86

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

19,010.88
220,064.54

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO.08-SCHEDULE OF DAY WORKS RATES


8.2

EQUIPMENT DAY WORKS

All Quantities are Provisional

Motor car, diesel, above 1,800 cc

Hr.

20.00

1,238.40

24,768.00

20

1,238.40

24,768.00

20.00

24,768.00

Double cabin Pickup 4WD, Diesel, above 1800 cc

Hr.

35.00

1,392.96

48,753.60

35

1,392.96

48,753.60

35.00

48,753.60

Lorry, 3 tonnes

Hr.

10.00

825.60

8,256.00

10

825.60

8,256.00

10.00

8,256.00

Lorry, 10 tonnes

Hr.

20.00

1,316.16

26,323.20

20

1,316.16

26,323.20

20.00

26,323.20

Lorry, 10 tonnes with crane self loading

Hr.

15.00

4,644.48

69,667.20

15

4,644.48

69,667.20

15.00

69,667.20

Low-loader, 20 to 40 tonnes

Hr.

20.00

6,965.76

139,315.20

20

6,965.76

139,315.20

20.00

139,315.20

Loader Backhoe

Hr.

100.00

2,786.88

278,688.00

100

2,786.88

278,688.00

56.50

157,458.72

56.50

157,458.72

43.50

121,229.28

Tipper truck, 5 tonnes

Hr.

50.00

1,238.40

61,920.00

50

1,238.40

61,920.00

4.00

4,953.60

4.00

4,953.60

46.00

56,966.40

8.50

16,670.88

8.50

Tipper truck, 10 tonnes

Hr.

50.00

1,961.28

98,064.00

50

1,961.28

98,064.00

16,670.88

41.50

81,393.12

10

Bowser, water, 6000 litres with Spray Bar

Hr.

50.00

2,064.00

103,200.00

50

2,064.00

103,200.00

50.00

103,200.00

11

Bowser, Diesel, 6000 litres

Hr.

40.00

2,064.00

82,560.00

40

2,064.00

82,560.00

40.00

82,560.00

12

Bowser, Bitumen, 6000 litres

Hr.

40.00

1,342.08

53,683.20

40

1,342.08

53,683.20

40.00

53,683.20

13

Bitumen Distributor, 4500 litres

Hr.

35.00

1,857.60

65,016.00

35

1,857.60

65,016.00

35.00

65,016.00

14

Bitumen Hand Sprayer

Hr.

50.00

412.80

20,640.00

50

412.80

20,640.00

50.00

20,640.00

15

Farm Tractor & broom over 2m width

Hr.

75.00

976.32

73,224.00

75

976.32

73,224.00

75.00

73,224.00

16

Farm Tractor with trailer minimum 3 tonne

Hr.

150.00

722.88

108,432.00

150

722.88

108,432.00

11.00

7,951.68

11.00

7,951.68

139.00

100,480.32

30.00

130,032.00

10.00

27,868.80

10.00

27,868.80

17

Buldozer, wheeled or Tracked 100 HP

Hr.

10.00

4,334.40

43,344.00

30

4,334.40

130,032.00

18

Backhoe tracked or wheled , 50 HP

Hr.

10.00

2,786.88

27,868.80

10

2,786.88

27,868.80

19

Front-end Loader, Tracked or wheeled (2.0 - 2.3m)

Hr.

10.00

3,612.48

36,124.80

10

3,612.48

36,124.80

10.00

36,124.80

20

Motor grader, 120 to 140 HP

Hr.

10.00

5,057.28

50,572.80

10

5,057.28

50,572.80

0.50

2,528.64

0.50

2,528.64

9.50

48,044.16

21

Steel-wheeled roller, static, 8 to 10 tonnes

Hr.

10.00

1,444.80

14,448.00

10

1,444.80

14,448.00

3.50

5,056.80

3.50

5,056.80

6.50

9,391.20

22

Steel-wheeled roller, vibratory, 10 tonnes

Hr.

10.00

3,302.40

33,024.00

10

3,302.40

33,024.00

23

Pneumatic-tyred roller, 8 to 10 tonnes

Hr.

10.00

3,302.40

33,024.00

10

3,302.40

33,024.00

10.00

33,024.00

10.00

33,024.00

24

Tandem roller, 6 to 7 tonnes, Vibrating

Hr.

10.00

3,096.00

30,960.00

10

3,096.00

30,960.00

10.00

30,960.00

25

Hand roller, vibratory, 1/2 - 1 tonne

Hr.

10.00

671.04

6,710.40

10

671.04

6,710.40

10.00

6,710.40

26

Plate Compactor, Vibratory, over 90 kg

Hr.

15.00

599.04

8,985.60

15

599.04

8,985.60

15.00

8,985.60

27

Rammer, mechanical, over 90 kg

Hr.

15.00

599.04

8,985.60

15

599.04

8,985.60

15.00

8,985.60

28

Rock drill, hand-held

Hr.

15.00

284.16

4,262.40

15

284.16

4,262.40

15.00

4,262.40

29

Air compressor 175 CFM

Hr.

15.00

1,342.08

20,131.20

15

1,342.08

20,131.20

15.00

20,131.20

30

Water pump with hoses, 100mm outlet

Hr.

15.00

619.20

9,288.00

15

619.20

9,288.00

15.00

9,288.00

31

Concrete mixer, with weigh batcher 14/10

Hr.

20.00

929.28

18,585.60

20

929.28

18,585.60

20.00

18,585.60
23,227.20

32

Generator, 50 KVA

Hr.

15.00

1,548.48

23,227.20

15

1,548.48

23,227.20

15.00

33

Welding set, electric, 300 - 400 amp

Hr.

15.00

541.44

8,121.60

15

541.44

8,121.60

15.00

8,121.60

34

Poker Vibrator, petrol driven

Hr.

20.00

516.48

10,329.60

20

516.48

10,329.60

20.00

10,329.60

35

Lane marker, Self propelled

Hr.

10.00

1,238.40

12,384.00

10

1,238.40

10.00

Bill No.8.2 CARRIED TO SUMMARY

1,662,888.00

12,384.00

1,749,576.00

222,489.12

222,489.12

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

12,384.00

1,527,086.88

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO.08-SCHEDULE OF DAY WORKS RATES


BILL NO. 8.3: MATERIAL DAY WORKS
All Quantities are Provisional
1

Aggregate base, dense grader (37.5mm)

10.00

2,400.00

24,000.00

10

2,400.00

24,000.00

9.90

23,760.00

9.90

Aggregate, 6.3mm down wards (crusher fines)

10.00

2,270.40

22,704.00

10

2,270.40

22,704.00

Aggregate 12mm

10.00

2,270.40

22,704.00

10

2,270.40

22,704.00

Aggregate 20mm

10.00

2,784.00

27,840.00

10

2,784.00

27,840.00

0.71

1,976.64

0.71

Aggregate 37.5mm

10.00

2,592.00

25,920.00

10

2,592.00

25,920.00

Asphalt concrete, cold mix

mt

5.00

10,939.20

54,696.00

30

10,939.20

328,176.00

5.00

54,696.00

16.50

180,496.80

Asphalt concrete, hot mix (wearing course)

mt

10.00

11,042.88

110,428.80

10

11,042.88

110,428.80

Asphalt concrete, binder

mt

10.00

10,939.20

109,392.00

10

10,939.20

109,392.00

Bitumen emulsions, (CRS1, CRS2, CSS1)

ltr

285.00

108.48

30,916.80

285

108.48

30,916.80

30.00

3,254.40

10

Bitumen prime coat, cutback MC 30

ltr

565.00

134.40

75,936.00

565

134.40

75,936.00

11

Bitumen, straight run, 60/70 penetration

ltr

565.00

128.64

72,681.60

565

128.64

72,681.60

12

Cement, ordinary portland

mt

5.00

17,544.00

87,720.00

17,544.00

87,720.00

0.25

4,386.00

13

Concrete pipe, reinforced 610mm diameter(NP 2)

9.76

5,676.48

55,402.44

9.76

5,676.48

55,402.44

14

Concrete pipe, reinforced 915mm diameter(NP 2)

12.20

8,772.48

107,024.26

12.2

8,772.48

107,024.26

21.50
-

23,760.00

0.10

240.00

10.00

22,704.00

10.00

22,704.00

1,976.64

9.29

25,863.36

10.00

25,920.00

235,192.80

8.50

92,983.20

10.00

110,428.80

10.00

109,392.00

3,254.40

255.00

27,662.40

565.00

75,936.00

565.00

72,681.60

0.25

4,386.00

4.75

83,334.00

9.76

55,402.44

12.20

107,024.26
163,675.20

30.00

15

Concrete pipe, reinforced 1220mm diameter(NP 2)

12.20

13,416.00

163,675.20

12.2

13,416.00

163,675.20

12.20

16

610mm reinforced concrete pipe collars

nr

5.00

1,548.48

7,742.40

1,548.48

7,742.40

5.00

7,742.40

17

915mm reinforced concrete pipe collars

nr

5.00

2,064.00

10,320.00

2,064.00

10,320.00

5.00

10,320.00

18

1220mm reinfroced concrete pipe collars

nr

3.00

2,580.48

7,741.44

2,580.48

7,741.44

3.00

7,741.44

19

Concrete, Grade C 15

9.00

10,800.00

97,200.00

10,800.00

97,200.00

9.00

97,200.00

20

Concrete, Grade C 20

9.00

11,352.00

102,168.00

11,352.00

102,168.00

9.00

102,168.00

21

Concrete, Grade C 25

9.00

12,177.60

109,598.40

12,177.60

109,598.40

9.00

109,598.40

22

Concrete, Grade C 30

9.00

12,900.48

116,104.32

12,900.48

116,104.32

9.00

116,104.32

23

Formwork, timber (rough)

59.00

1,277.76

75,387.84

59

1,277.76

75,387.84

59.00

75,387.84

24

Formwork, steel

10.00

2,837.76

28,377.60

10

2,837.76

28,377.60

10.00

28,377.60

25

Formwork, timber (smooth)

60.00

1,277.76

76,665.60

60

1,277.76

76,665.60

60.00

76,665.60

26

Pipe, PVC, 100mm diameter (Type 600)

14.00

1,372.80

19,219.20

14

1,372.80

19,219.20

14.00

19,219.20

27

Paint, emulsion

ltr

33.00

631.68

20,845.44

33

631.68

20,845.44

33.00

20,845.44

28

Paint, enamel

ltr

13.00

908.16

11,806.08

13

908.16

11,806.08

13.00

11,806.08

29

Pipe, PVC, 160mm diameter (Type 600)

10.00

2,466.24

24,662.40

10

2,466.24

24,662.40

10.00

24,662.40

30

Lime

kg

14.00

25.92

362.88

14

25.92

362.88

14.00

362.88

31

Reinforcement, high yield steel, Grade 460/425

kg

250.00

128.64

32,160.00

250

128.64

32,160.00

250.00

32,160.00

33.00

4,245.12

10.00

18,576.00

25.00

41,016.00

2,461.94

29.29

101,563.66

32

Reinforcement, mild steel, Grade 250

kg

33.00

128.64

4,245.12

33

128.64

4,245.12

33

100mm Aggregate

10.00

1,857.60

18,576.00

10

1,857.60

18,576.00

34

Rubble, 150-225mm

25.00

1,640.64

41,016.00

25

1,640.64

41,016.00

35

River sand

30.00

3,467.52

104,025.60

30

3,467.52

104,025.60

0.71

2,461.94

0.71

36

Gabion box (1.0 x 1.0 x 1.0m) without rubble

No.

34.00

7,224.00

245,616.00

34

7,224.00

245,616.00

34.00

245,616.00

37

Precast concrete standards Kerb, 250 x 125 x 900mm

18.00

980.16

17,642.88

18

980.16

17,642.88

18.00

17,642.88

38

Precast concrete Flat or Edge Kerb, 150 x 125 x 900mm

18.00

722.88

13,011.84

18

722.88

13,011.84

18.00

13,011.84

39

Precast concrete Drop Kerb, 250/150 x 125 x 900mm

9.00

980.16

8,821.44

980.16

8,821.44

9.00

8,821.44

40

Precast concrete Bridge Kerb, 280 x 280 x 900mm

9.00

1,703.04

15,327.36

1,703.04

15,327.36

9.00

15,327.36

41

Precast concrete Guard stone, 300 x 300 x 450mm

nr

9.00

2,064.00

18,576.00

2,064.00

18,576.00

9.00

18,576.00

43

Auto diesel

ltr

904.00

120.00

108,480.00

904

120.00

108,480.00

904.00

108,480.00

44

Petrol

ltr

452.00

155.52

70,295.04

452

155.52

70,295.04

452.00

70,295.04

45

Kerosene Oil

ltr

904.00

110.40

99,801.60

904

110.40

99,801.60

904.00

MATERIAL DAY WORKS


Percentage Markup Applicable to Materials in Bill No. 8.3

23%

BILL No. 8.3 MATERIAL DAY WORKS CARRIED TO SUMMARY

2,770,317.58

90,534.98

180,496.80

271,031.78

2,499,285.80

574,272.64

637,173.04

20,823.05

41,514.26

62,337.31

574,835.73

3,071,110.22

3,407,490.62

111,358.03

222,011.06

333,369.09

3,074,121.53

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

99,801.60

2,496,837.58

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


ITEM
NO.

PAY ITEM

DESCRIPTION

UNIT

AS PER APPROVED REVISED B.O.Q.(REV.01)

AS PER ORIGINAL BOQ


QTY

RATE (RS)

AMOUNT

QTY

RATE (RS)

AMOUNT

PREVIOUSLY CLAIMED
QTY

THIS PERIOD CLAIM

AMOUNT

QTY

CUMULATIVE CLAIMED

AMOUNT

QTY

BALANCE

AMOUNT

QTY

AMOUNT

BILL NO.09 - PROVISIONAL SUMS


Brought forward- PS items in Bill No 01 : Construction

PS

33,024,000.00

25,015,906.22

8,691,906.22

7,040,927.62

Brought forward- PS items in Bill No 01 : Other Payments

PS

109,447,680.00

126,014,811.37

115,611,835.91

1,691,103.36

103(2)

Temporary by-pass roads

PS

1,920,000.00

1,920,000.00

1,449,388.77

9.3

302(11)

Dewatering ,coffer Dam & Shorring for Culverts , Drains and other
structures

PS

11,520,000.00

500,000.00

9.4

111(1)

Allow for provision of standards/technical literature as required by


the Engineer

PS

672,000.00

672,000.00

11,967.85

9.5

113(2)

Repair damages of existing services

PS

2,880,000.00

2,880,000.00

5,149.32

113(3)

Demolition/Rebuilding of property and removal of part of causeway


for widening purpose

PS

7,680,000.00

5,000,000.00

9.1
9.2

9.6

113(4)

Relocation of public utilities

PS

43,200,000.00

60,000,000.00

56,279,444.26

113(5)

Provide stationary for the Engineer / Employer

PS

2,880,000.00

1,880,000.00

482,142.80

9,283,072.38

117,302,939.27

8,711,872.10

1,449,388.77

470,611.23
500,000.00

11,967.85

660,032.15
2,874,850.68

5,149.32

5,000,000.00

9.7

703(1)a

15,732,833.84

9.8
9.9

3,720,555.74

56,279,444.26
-

482,142.80

1,397,857.20
10,000.00

Grade adjusement of existing manholes

PS

960,000.00

10,000.00

Borehole & special tests

PS

1,920,000.00

1,500,000.00

993,820.00

993,820.00

Widening of 1 Nos. causeways in Hassalaka to Handungamuwa


Road as per RDA & Irrigation Department requirement and
approval,including excavation etc (same rates in BOQ items will be
applied)

PS

24,000,000.00

6,000,000.00

5,919,255.88

80,744.12

6,000,000.00

9.11 A

Construction of Boundry wall at RDA Unit office at Kaluganga

PS

1,000,000.00

1,000,000.00

9.11 B

Design & Construction supervision for irrigation Department

PS

2,940,000.00

2,940,000.00

9.11 C

Consultancy Supervision for the Engineer

PS

100,000,000.00

100,000,000.00

9.11 D

Repayment for 0.5% as management fee & 0.5% additional interest


charge required by the bank over disbursement of consultancy fee

PS

7,020,000.00

7,020,000.00

9.10

109(3),

9.11

9.12

1902(3)

Markup ( overhead and profit) for above provisional sum items


except BOQ Item No. 9.11
# Construction of any works - 20%
# services - 10%
# Work carried out through Nominated SubContractor - 10%
# Payment to other relevent Authority- 10%
Bill No. 09 Carried to Summary

25,150,752.00

26,071,862.38

19,367,209.94

1,577,295.86

20,944,505.80

6,834,638.46

265,254,432.00

368,424,579.97

208,812,120.95

10,390,070.96

219,202,191.91

150,288,726.29

CONSULTANT ENGINEER

RESIDENT ENGINEER

TEAM LEADER

W.A.L. JAYASHANTHA

INDIKA KUMARA

W.A. ARIYATHILAKA

SIGNATURE
NAME

506,180.00

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-26 ( FOR THE WORK EXECUTED UPTO 31-DECEMBER-2015 )

ITEM NO.

DESCRIPTION

UNIT

IPC 02

RATE (RS)
QTY

AMOUNT

IPC 03
QTY

AMOUNT

IPC 06

IPC 08

IPC 09-I

IPC 09-II

QTY

AMOUNT

QTY

AMOUNT

QTY

AMOUNT

QTY

AMOUNT

14.39

274,740.79

35.57

679,119.51

13.42

256,221.08

23.45

447,718.66

IPC 10
QTY

IPC 11

IPC 12

IPC 13

IPC 14

IPC 15-i

IPC 15-ii

IPC 16

IPC 17

IPC 18

AMOUNT

QTY

QTY

QTY

QTY

QTY

QTY

QTY

QTY

QTY

IPC 19 IPC 20

1,644,244.38

105.16

59.84

65.61

68.06

13.43

23.59

4.94

9.91

52.92

23.28

410.15

129.90

389.08

146.59

90.60

109.45

19.41

72.25

9.35

22.55

QTY

QTY

IPC 23

IPC 24

IPC 25

QTY

QTY

QTY

IPC 26
QTY

AMOUNT

CUMULATIVE WORKDONE
QTY

AMOUNT

BILL NO. -VARIATION


Var-01

Paper Advertisement

Var-02

Grade 30/20 concrete

Var-03

Construction laboratary building

PS

459,200.00

PS
3

(505,120.00)

45,920.00

19,092.48

2,235,087.65

1,735,734.81

955,476.85

86.12

1,045,541.76

m3

5,144.64

268.17

459,576.06

333.23

67.92

334.35

Var-04 ii Sand for Inclined Chimney Drain,Horizontal Drain

5144.64

136.31

233,605.48

212.45

52.99

50.94

m2

516.48

Geotextile

Var-06

Subsurface Drains

Var-07 i TriAx TX150 Geogrid - Testing

PS

Var-07 ii TriAx TX150 Geogrid - Laying

m2

Variation Carried to Summary

995.2

3,894.40

565.62

25.47
240

25.47
285.22

124

45,920.00

2,509,828.44

2,414,854.32

1,211,697.93

1,493,260.42

3,406,512.46

631.20

12,051,173.38

7,040,927.62

2,371.10

12,198,455.90

535.53

2,755,109.06

659.95

-2304.37

138

-138

1550
459,200.00

1,069,086.55

Var-04 i Sand for voids in Rock Filling

Var-05

31.51

3255

465

5,270.00

2,980,817.40
37,026,483.36

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

INTERIME VALUATION NO-27 ( FOR THE WORK EXECUTED UPTO 31-JANUARY-2016 )


BILL NO. -VARIATION ORDER
ITEM NO.

DESCRIPTION

UNIT

Var-01

Paper Advertisement

PS

Var-02

Grade 30/20 concrete

m3

Var-03

Construction laboratary building

PS

Sand for voids in Rock


Filling(Seepage Area)
Sand for Inclined Chimney
Var-04 ii Drain,Horizontal Drain(Seepage
Area)
Var-04 i

Var-07 ii Suppling & Laying of Geogrid

PREVIOUSLY CLAIMED
RATE (RS)

Workdone

AMOUNT

PREVIOUS PAYMENT
75 % of Qty

505,120.00
19,092.48

631.20

12,051,173.38

473.40

7,040,927.62

THIS PERIOD CLAIM

75 % of AMOUNT

Qty

CUMULATIVE CLAIM

AMOUNT

(505,120.00)

9,038,380.03

Workdone

AMOUNT

CUMULATIVE PAYMENT
75 % of Qty

505,120.00
-

5,280,695.72

631.20
-

12,051,173.38

473.40

7,040,927.62

BALANCE TO BE RECEIVED

75 % of AMOUNT

Qty
-

505,120.00

9,038,380.03

157.80

3,012,793.34

5,280,695.72

1,760,231.90

m3

5,144.64

2,371.10

12,198,455.90

1,778.33

9,148,867.65

2,371.10

12,198,455.90

1,778.33

9,148,867.65

592.77

3,049,588.25

m3

5144.64

535.53

2,755,109.06

401.65

2,066,344.66

535.53

2,755,109.06

401.65

2,066,344.66

133.88

688,764.40

m2

558.00

5,270.00

2,940,660.00

3,952.50

2,205,495.00

5,270.00

2,940,660.00

3,952.50

2,205,495.00

1,317.50

735,165.00

27,234,663.06

Variation Carried to Summary

37,491,445.96

37,491,445.96

27,739,783.06

QUANTITY SURVEYOR

PROJECT MANAGER

CONSULTANT ENGINEER

KKGP SIRIWARDANE

Eng. DM RANASINGHE

Eng.W.A.L. JAYASHANTHA

SIGNATURE
NAME

AMOUNT

9,751,662.89

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000
KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.

1.1

Item Description

Traffic,Safety and Control

IPC No.

27

Section No.

Weighting Percentage / %

Chainage

Flag men

Total Weighted
Length

10

19.9%

10

10

4.4%

10

20.5%

10

Road

From

to

B 484

20+880

30+000

40

20

10

B 312

57+000

59+000

40

20

Section 2

B 484

30+000

45+000

20

15

Section 3

B 312

33+500

44+000

35

10

Section 1

Barricading Provide Safety Equipment

Signboards

Lighting

Total Qty for IPC 27

17.2%

61.98%

Note: Weighting percentage for major categorized activities as per the 'Particular Specifications'
1. Baricading

40%

2. Provide Safety Equipment for Contractor's Staff and workers

30%

3. Signboards

10%

4. Lighting

10%

5. Flag men

10%

Therefore,
This Interime Valuation up to

01/01/2016 to
31/01/2016

Total no of months

1.0 months

0.62

Therefore,
Total quantity to be claimed

TOTAL QTY FOR THIS IPC (MONTHS)

FOR THE CONTRACTOR


PREPARED BY

CHECKED & ISSUED BY

SIGNATURE
NAME
DESIGNATION
ORGANIZATION
DATE

K.K.G.P.Siriwardane

Eng.D.M.Ranasinghe

Quantity Surveyor

Project Manager

HOVAEL

HOVAEL

0.62

FOR THE ENGINEER/ENGINEER'S REPRESENTITVE


CHECKED BY

CERTIFIED BY

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD
B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

1.4.3
Maintain of contractor all site facilities

IPC No

27

No.

Description

1. Main office for the contractor at 32km of B 484 road is established with all
fascilities in accordance to the construction programme.

Weighting
Percentage

Requirement
Fulfilment
Percentage

% Completed

30%

100%

30%

30%

100%

30%

30%

100%

30%

10%

100%

10%

Contractor's Main site Office(B484) facilities

Accommodation Fascilities
2

1. Contractor's all staff has fully accommodated with fully fascilitaded


complex of quarters at 32km of B 484 road
2.Staff for secondary site office are accommodated in fully fascilitated
houses which around the 38km at B 312 Road

Maintain of Workshops,Crusher Plants and Batching plants.


Transportation

1. The transport service is being properly arranged to staff and other


workforces, during the work time.

100%
NOTE - Sanitary facilities on site, First Aid,Drinking water facilities,Electrcity and Communication facilities are provided and
maintaining.
Project commencement date
This Interime Valuation up to

=
=

6/21/2013
1/1/2015
1/31/2015

Total no of months
Therefore,
Total quantity to be claimed

1.0

Checked & Issued by

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Q.S.

Project Manager

Organization

Hovael

Hovael

Signature

Date & Time

month

For Engineer / Engineers Representative

Prepared by

Name

month

= 1.0 x 100%
=
1.00

For Contractor

to

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKAHADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.4.5
Progress Photographs
27

Period/Month

Album Nos.

Jan-16

01

Total for this IPC 27 =

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Q.S.
HOVAEL

D.M.Ranasinghe
Project Manager
HOVAEL

Signature
Name
Designation
Organization
Date & Time

Remarks

1.00 Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


1.10.1
Maintain Main Office for the Engineer including watcher
27

BOQ Item No.


Item Description
IPC No

DESCRIPTION

PERIOD OF PAYMENT

Bill Amount

Jan-16

AMOUNT(Rs)

REMARKS

35,422.77

Therefore,
Total Amount for IPC 27 =

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Q.S.

Project Manager

Organization
Date & Time

Hovael Constructions

Hovael Constructions

Signature
Name

35,422.77 Rs.

For Engineer / Engineers Representative


Checked by

Certified by

BOQ Item No. : 1.10.1


Item Description : Maintain Main Office for the Engineer including Watcher
Serial
No.

Bill No.

0718

Drinking Water - 19L x 09Nos

1,485.00

1,485.00

0732

Drinking Water - 19L x 12Nos

1,980.00

1,980.00

0717

Drinking Water - 19L x 19Nos

3,135.00

3,135.00

4,386.00

4,386.00

5,800.00

5,800.00

Description

0033554089-0150 SLT Megaline Bill Payment - Dec '15

Electricity Bill Payment - Dec '15

35320

Amount(Rs.)

Courier Service

700.00

2113661

Paper Serviettes (01pkt)

110.00

2113660

First Aid Items

476.00

0921

Note Book - 02

40.00

10

2733-2735

Postal Cgargers

130.00

11

12

3650459

Paper Serviettes (02pkt)

13

3650459

Dongle Bill ( RE)- 0712659667 - sept ' 2015

Kaspersky Virus Guard

Bill Amount(Rs.)

3,426.00

1,750.00
220.00
1,450.00
8,450.00

14

Prepaid Mobile Facility for Staff - Jan '2016

7,000.00

15

1425

Postal Chargers

40.00

16

1521

Postal Chargers

40.00

17

4666409

18

1005

Envelope (Small) -10

19

35112

Courier Service

225.00

20

35124

Courier Service

250.00

21

27152

Courier Service

250.00

22

4666439

Mobile Bill SE-2-0777133307 -Des ' 2015

1,760.18

23

4667634

Mobile Bill SE-1-0718000299 - Des ' 2015

1,327.91

24

3382987A

25

667936

26

667964

Mobile Bill M.R.Sampath (Lab Assistant)


0777568783-Dec' 15

Mobile Bill M.R.V.S.Pothuvila (Lab Assistant)


0777139511-Dec ' 15
Mobile Bill M.R.Sirimanne (TO) 0777119743Dec' 15
Mobile Bill M.R.S.J.Asia (Lab Assistant)
0777131998-Dec ' 15

500.00
20.00

6,760.77

500.00
847.68
1,000.00

Total =

35,422.77

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.10.2
Maintain Secondary Office for the Engineer including watcher

27

DESCRIPTION

PERIOD OF PAYMENT

Bill Amount

Jan-16

AMOUNT(Rs)

REMARKS

42,736.71

Therefore,
Total Amount for IPC 27 =

For Contractor
Prepared by

For Engineer / Engineers Representative

Checked & Issued by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Q.S.

Project Manager

Organization

Hovael Constructions

Hovael Constructions

Date & Time

42,736.71 Rs.

Checked by

Certified by

BOQ Item No.

: 1.10.2

Item Description : Maintain Secondary Office for the Engineer including Watcher
Serial
No.
1
2
3
4
5
6
7
8
9

Bill No.
0711
A-2700683
0084-0087

123
124
A-2700872
A-2700873

0140-0144

10
11
12
13
14
15
16
17
18
19
20
21

073R-077R
B312/DWR/66

B312/DWR/67,68

Description
Drinking Water - 19L x 59Nos
Data sim bill/Dec'15 (0712659667-RE)
Registered post charges
Traveling epenses of Office Assistant Kaluganga
Registered post charges
Registered post charges
Mobil Bill / Nov'15 (0714413139-SE 3)
Mobil Bill / Dec'15 (0714413139-SE 3)
Registered post charges
60w Bulb ,01 no
Mobil Bill/Nove'15 (0712714955-TO)
Traveling expenses of Office Assistant
60w Bulb ,01 no
Registered post charges
Electricity Bill Payment - Dec '15
Clearing of secondary office for the Engineer
Mobil Bill/Oct'15 (0712714955-TO)
Mobil Bill/Jan'15 (0719419594-SEC)
Mobil Bill/Dec'15 (0768621921-TO)
Data sim bill/Jan'15 (0712068304-Secretary)
Clearing of secondary office for the Engineer

Amount(Rs.)
9,735.00
848.64
250.00
574.00
35.00
35.00
1,490.00
1,660.00
185.00
80.00
600.00
596.00
80.00
245.00
11,710.00
4,327.68
443.87
1,500.00
1,000.00
850.00
6,491.52

Total =

Bill Amount (Rs.)


9,735.00

5,077.64

1,601.00

11,710.00
4,327.68

3,793.87

6,491.52

42,736.71

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.10.3
Maintain Office for the Employer including watcher

27

DESCRIPTION

PERIOD OF PAYMENT

Bill Amount

Jan-16

AMOUNT(Rs)

REMARKS

2,400.00

Therefore,
Total Amount for IPC 27 =

For Contractor
Prepared by

For Engineer / Engineers Representative

Checked & Issued by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Q.S.

Project Manager

Organization

Hovael Constructions

Hovael Constructions

Date & Time

2,400.00 Rs.

Checked by

Certified by

BOQ Item No.

: 1.10.3

Item Description : Maintain Office for the Employer including watcher


Serial
No.
1

Bill No.

Description
Drinking Water - 40 Nos

Amount(Rs.)
2,400.00

Total =

Bill Amount (Rs.)


2,400.00

2,400.00

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.11.2
Provide house for Engineer/Employer type 2

27

DESCRIPTION

PERIOD OF PAYMENT

House rental

Dec '15 - May'16

AMOUNT(Rs)

REMARKS

99,975.00

Therefore,
Total Amount for IPC 27 =

For Engineer / Engineers Representative

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane

D.M.Ranasinghe

Signature
Name
Designation

Q.S.

Project Manager

Organization

Hovael Constructions

Hovael Constructions

Date & Time

99,975.00 Rs.

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


1.11.3
Maintain House for the Engineer , Type 1

BOQ Item No.


Item Description
IPC No

27

DESCRIPTION

PERIOD OF PAYMENT

Bill Amount

Jan-16

AMOUNT(Rs)

REMARKS

8,605.00

Therefore,
Total Amount for IPC 27 =

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Q.S.

Project Manager

Organization

Hovael Constructions

Hovael Constructions

Signature
Name

Date & Time

8,605.00 Rs.

For Engineer / Engineers Representative


Checked by

Certified by

BOQ Item No. : 1.11.3


Item Description : Maintain house for the Engineer Type 1
Serial
No.
1
2

Bill No.
11283

3
4
5
6
7

1
5
10832

Description

Amount(Rs.)

Bill Ammount(Rs.)

Water Bill - Dec'15

1,200.00

1,200.00

Electricity Bill Payment -Dec'15


Vim Soap,Hand Wash, Air
Wick,P/Serviette
Garbage bag
Gas Refill-12kg
Ekel Broom -01
Plumbing Item

3,100.00

3,100.00

2,320.00

2,320.00

350.00
1,400.00
130.00
105.00

1,985.00

Total =

8,605.00

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


1.11.4
Maintain house for the Engineer Type 2

BOQ Item No.


Item Description
IPC No

27

Description

PERIOD OF PAYMENT

Bill Amount

Jan-16

AMOUNT(Rs)

REMARKS

9,214.80

Therefor,
Total Amount for IPC 27 =

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Q.S.
Hovael Constructions

D.M.Ranasinghe
Project Manager
Hovael Constructions

Signature
Name
Designation
Organization
Date & Time

9,214.80 Rs.

For Engineer / Engineers Representative


Checked by

Certified by

BOQ Item No. : 1.11.4


Item Description : Maintain house for the Engineer Type 2
Serial
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Bill No.

Description
Electricity Bill Payment - Dec '15
Gas Refill-12.5kg

6070
2194

2250
25

Ekel Broom-01
Plastic Broom -01
Sunlight soap 1 p,Vim soap 5 pcs
Ant Killer stick, 2 pcs
Small pot, 1 no,Super Glue tube, 01 no
Panadol cards (2)
Polythene bags pkt -1
Water proof paint, 1L
Paper serviette packet -1 no
Litro Gas 12.5kg
CFl Bulbs 02,Mortin Spray can 1
Electricity Bill Payment - Dec '15

Amount(Rs.)

2,565.00
1,480.00
120.00
250.00
140.00
80.00
130.00
72.00
350.00
830.00
120.00
1,422.00
1,385.00
270.80
Total =

Bill Amount(Rs.)

2,565.00
1,480.00
370.00

4,529.00

270.80
9,214.80

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA
ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.12.1
Purchase,Supply and maintain new vehical
27

DESCRIPTION
Maintain of New Vehicles (4D pickup) 05 Nos.

341,085.00

Supply & Maintain of Hired Vehicles

723,561.08

TOTAL AMOUNT FOR IPC 27 (Rs.)

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Q.S.
Hovael Constructions

D.M.Ranasinghe
Project Manager
Hovael Constructions

Signature
Name
Designation
Organization
Date & Time

AMOUNT (Rs.)

1,064,646.08

For Engineer / Engineers Representative


Checked by

Certified by

Maintain of New Vehicles (4D pickup) 05 Nos.


Total Cost

Previous Payment

Balance Amount

Up to End of Dec-2015
378,165.00

378,165.00

8,407,353.11

8,407,353.11

Month of Jan-2015
Vehicle No.

Km

Fuel/l

Driver Salary-Jan

PF-5226

3008

262.63

36,880.00

PF-5227

4027

334.73

PF-5228

3578

318.39

PF-5229

2680

365.00

PF-5230

3755

419.73

Accessories/Parts

Services/Cleaning

24,950.00

2,800.00

11,550.00

36,880.00

31,800.00

1,350.00

36,880.00

30,260.00
34,675.00

36,880.00

Fuel Cost

39,880.00

Total Cost

Balance Amount

76,180.00

76,180.00

70,030.00

70,030.00

67,140.00

67,140.00

34,675.00

34,675.00

93,060.00

93,060.00

341,085.00

341,085.00

16,300.00

8,748,438.11
PREPARED FOR THE CONTRACTOR

CHECKED & ISSUED FOR THE CONTRACTOR

K.K.G.P.SIRIWARDANE

Eng.D.M.RANASINGHE

Signature
Name

Previous Payment

8,407,353.11

341,085.00

BOQ Item No.

: 1.12.1

Item Description : Purchase,Supply and maintain hired new vehical


Up to end of December - 2014

Total Cost
4,235,977.25

Previous Payment
4,235,977.25

Balance Payment

330,548.42

330,548.42

358,519.84

358,519.84

375,604.05

375,604.05

327,272.35

327,272.35

351,950.99

351,950.99

338,215.17

338,215.17

Month of Jan-2015
Month of Feb-2015
Month of Mar-2015
Month of April-2015
Month of May-2015
Month of June-2015
Month of July-2015
Vehicle No.
63-2919
PF-2217
GR-9626

Payment as Agreement
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km
Rs. 80,000 per month upto 3500 km
Rs. 25 per km extra milage over 3500km
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km

Km

Days

2848.0

28

Fuel/l

2902.0

28.0

322.86

2597.0

30.0

391.67

Hire Payment

273.14

43,720.00

Driver Salary

Deductions

72,258.00

25.00

40,000.00

Fuel Cost

Total Cost

Previous Payment

Balance Payment

49,582.00

25,950.00

119,252.00

119,252.00

49,480.00

30,671.70

152,384.70

80,151.70

49,432.00

37,208.65

126,640.65

126,640.65

398,277.35

326,044.35

281,204.35

281,204.35

358,642.50

358,642.50

72,233.00
72,233.00

Month of Aug-2015
Month of Sep-2015
Month of Oct-2015
Vehicle No.
63-2919
PF-1002
252-8752

Month of Nov-2015
Vehicle No.
63-2919
PF-1002
252-8752
Month of Dec-2015
Vehicle No.
63-2919
PF-1002
252-8752

Month of Dec-2015
Vehicle No.
63-2919
PF-1002
250-7884

Payment as Agreement
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km
Rs. 80,000 per month upto 3000 km
Rs. 40 per km extra milage over 3000km
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km

Payment as Agreement
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km
Rs. 80,000 per month upto 3000 km
Rs. 40 per km extra milage over 3000km
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km

Payment as Agreement
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km
Rs. 80,000 per month upto 3000 km
Rs. 40 per km extra milage over 3000km
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km

Payment as Agreement
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km
Rs. 80,000 per month upto 3000 km
Rs. 40 per km extra milage over 3000km
Rs. 40,000 per month upto 2600 km
Rs. 15 per km extra milage over 2600km

Km

Days

2997.0

27

3000.0

29.0

2005.0

29.0

Fuel/l
285.78
468.15
218.00

Km

Days

Fuel/l

3012.0

26

3002.0

30.0

249.29

2554.0

30.0

361.00

314.72

Km

Days

Fuel/l

3019.0

26

2998.0

26.0

430.05

654.0

11.0

97.00

253.13

Km

Days

Fuel/l

2950.0

27

3000.0

28.0

445.51

2438.0

24.0

338.60

298.91

Hire Payment
40,000.00
45,955.00
397.00 x 15
80,000.00
80,000.00
40,000.00

1538.46x 11

Hire Payment

46,285.00

25.00
25.00

40,000.00

Hire Payment
40,000.00
46,180.00
412.00 x 15
80,000.00
80,080.00
2.0 x 40.00
40,000.00
40,000.00

Hire Payment
40,000.00
419.0 x 15
80,000.00

Deductions

25.00

Deductions

12.50
12.50
12.50

Deductions

12.50

80,000.00

12.50

16,923.08

12.50

Deductions

Driver Salary

Fuel Cost

Total Cost

Balance Payment

27,150.00

109,960.00

64,030.00

45,930.00

36,880.00

44,474.25

161,329.25

81,354.25

79,975.00

36,880.00

20,710.00

97,565.00

57,590.00

39,975.00

368,854.25

202,974.25

165,880.00

Driver Salary

Fuel Cost

Total Cost

Previous Payment

Balance Payment

36,880.00

29,900.00

112,947.50

66,780.00

46,167.50

36,880.00

23,680.00

140,627.50

60,560.00

80,067.50

36,880.00

34,199.50

111,067.00

71,079.50

39,987.50

364,642.00

198,419.50

166,222.50

Driver Salary

Fuel Cost

Total Cost

Previous Payment

Balance Payment

36,880.00

24,050.00

107,202.50

60,930.00

46,272.50

36,880.00

40,860.00

157,727.50

77,740.00

79,987.50

9,215.00

26,125.58

9,215.00

16,910.58

291,055.58

147,885.00

143,170.58

Driver Salary

Fuel Cost

Total Cost

Previous Payment

Balance Payment

36,880.00

28,400.00

65,280.00

65,280.00

36,280.00

42,330.00

78,610.00

78,610.00

32,165.00

32,165.00

32,165.00

176,055.00

176,055.00
8,556,819.10

Total Amount
PREPARED FOR CONTRACTOR

CHECKED & ISSUED FOR CONTRACTOR

K.K.G.P.SIRIWARDANE

Eng.D.M.RANASINGHE

Signature
Name

Previous Payment

36,880.00

7,833,258.02

723,561.08

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.12.3
Provide & Maintain Motor Cycle

27

Model of the
Bicycle
Discover 100 CCBlackn Red
(002BAJ264BMD)
Discover 100 CCBlackn Red
(002BAJ264BMD)
Discover 100 CCBlackn Red
(002BAJ264BMD)
Discover 100 CCBlackn Red
(002BAJ264BMD)
Discover 100 CCBlackn Red
(002BAJ264BMD)

Registered
Number

Engine
Number

Chassis
Number

WP BAO-5965 JBZWDF23030

MD2A14AZ5 MF51110010100
DWF45794
01786

WP BAO-5945 JBZWDF25684

MD2A14AZ3 MF51110010100
DWF46443
01786

WP BAO-5958 JBZWDF23621

MD2A14AZ1 MF51110010100
DWF45775
01786

WP BAO-6702 JBZWDF23606

MD2A14AZ7 MF51110010100
DWF45778
01786

WP BAO-5953 JBZWDF25681

MD2A14AZX MF51110010100
DWF46455
01786

Quantity from IPC 27 Jan'16 =

5 x

31
31

5.00

V/month

For Contractor

For Engineer / Engineers Representative

Prepared by

Checked & Issued by

K.K.G.P.Siriwardane

D.M.Ranasinghe

Signature
Name
Designation

Q.S.

Project Manager

Organization

Hovael Constructions

Hovael Constructions

Date & Time

Policy Number

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA
ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


1.13.1 A
Construction of laboratary building for the Engineer

BOQ Item No.


Item Description
IPC No

27

Description
Widening of
Causeway 31 /3

Previous

This month

5,280,695.72

Cumilative(Rs.)

1,760,231.90

TOTAL AMOUNT

7,040,927.62

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Q.S.
Hovael Constructions

D.M.Ranasinghe
Project Manager
Hovael Constructions

Signature
Name
Designation
Organization
Date & Time

7,040,927.62

Remarks
The amount for this month is
the amount holded in IPC 25
untill grant the approval for the
Revised BOQ

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKAHADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.13.3
Maintainance of Laboratary,including watcher

27

Handing-over of Laboratary

Quantity from IPC 27 (Jan'16)

5th May 2014

x 100%

1.00 month

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Q.S.
Hovael Constructions

D.M.Ranasinghe
Project Manager
Hovael Constructions

Signature
Name
Designation
Organization
Date & Time

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKAHADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

No.
1

1.14.1
Maintenance of the existing Road during the construction Period

27

Week
From

To

From

to

2016.01.01

2016.01.31

20+880

30+000

18.15

30+000

45+000

11.62

57+000

59+000

33+500

44+000

24.25

54.02

Total Qty for IPC 27

For Contractor
Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Q.S.
Hovael Constructions

D.M.Ranasinghe
Project Manager
Hovael Constructions

Signature
Name
Designation
Organization
Date & Time

Length
km/week

Chainage

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

MEASUREMENT SHEET
BOQ Item No.
Item Description

1.14.1
Maintenance of the existing Road during the construction Period -SECTION 01-i
Week

Section No.
From

Chainage
To

Road

From

Length Maintenance / km
to

Carriageway

Drainage

Weeding LHS

Weeding RHS

Total
Weighted
Length

B 484
B 484

Section 1

B 484
B 484

Total Qty for IPC 27

Note: Weighting percentage for maintenance activities


1. Maintain Carriageway

45%

2. Maintain Drainage

25%

3. Maintain LHS Weeding

15%

4. Maintain RHS Weeding

15%
FOR CONTRACTOR

SIGNATURE
NAME / DESIGNATION

CONSULTANT ENGINEER (S1)

RESIDENT ENGINEER

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

MEASUREMENT SHEET
BOQ Item No.
Item Description

1.14.1
Maintenance of the existing Road during the construction Period -SECTION 01-ii
Week

Section No.
From

Chainage
To

Road

From

Length Maintenance / km
to

Carriageway

Drainage

Weeding LHS

Weeding RHS

Total
Weighted
Length

B 312
B 312

Section 1

B 312
B 312

Total Qty for IPC 27

Note: Weighting percentage for maintenance activities


1. Maintain Carriageway

45%

2. Maintain Drainage

25%

3. Maintain LHS Weeding

15%

4. Maintain RHS Weeding

15%
FOR CONTRACTOR

SIGNATURE
NAME / DESIGNATION

CONSULTANT ENGINEER (S1)

RESIDENT ENGINEER

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

MEASUREMENT SHEET
BOQ Item No.

1.14.1

Item Description

Maintenance of the existing Road during the construction Period - SECTION 02


Week

Section No.

From

Length Maintenance / km

Chainage

To

1/1/2016 31/01/2016

Road

From

to

B 484

30+000

45+000

Carriageway
1.50

Drainage

Weeding LHS

Weeding RHS

2.00

6.00

1.00

Total
Weighted
Length
11.625

B 484

Section 2

B 484
B 484

Total Qty for IPC 27

11.62

Note: Weighting percentage for maintenance activities


1. Maintain Carriageway

45%

2. Maintain Drainage

25%

3. Maintain LHS Weeding

15%

4. Maintain RHS Weeding

15%

FOR CONTRACTOR
SIGNATURE
NAME / DESIGNATION

CONSULTANT ENGINEER (S2)

RESIDENT ENGINEER

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

MEASUREMENT SHEET
BOQ Item No.

1.14.1

Item Description

Maintenance of the existing Road during the construction Period - SECTION 03


Week

Section No.

Section 3

From

Length Maintenance / km

Chainage

To

Road

From

to

Carriageway

Drainage

Weeding LHS

Weeding RHS

Total
Weighted
Length

1/1/2016

7/1/2016

B 312

33+500

44+000

0.45

2.625

1.20

1.20

5.475

8/1/2016

14/1/2016

B 312

33+500

44+000

0.45

2.625

1.20

1.20

5.475

15/1/2016

21/1/2016

B 312

33+500

44+000

0.45

2.625

1.20

1.20

5.475

29/1/2016

31/1/2016

B 312

33+500

44+000

0.45

2.625

1.20

1.20

5.475

Total Qty for IPC 27

24.246

Note: Weighting percentage for maintenance activities


1. Maintain Carriageway

45%

2. Maintain Drainage

25%

3. Maintain LHS Weeding

15%

4. Maintain RHS Weeding

15%

FOR CONTRACTOR
SIGNATURE
NAME / DESIGNATION

CONSULTANT ENGINEER (S2)

RESIDENT ENGINEER

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

1.16
Provision of other staff for Engineer & Employer
27

Nos.

BOQ ITEM
NO.

MONTH/PERIOD

Labourers
(classified unskilled)

1.16.1

Nov'15

83,604.00

Survey Assistant
(classified skilled)

1.16.2

Nov'15

202,640.00

Secretary

1.16.3

Nov'15

44,783.00

Administrator

1.16.4

Nov'15

33,835.00

Office Assistant

1.16.5

Nov'15

Cad Draughtperson

1.16.6

Nov'15

DESCRIPTION

Total Amount for IPC 27 =

For Contractor

REMARKS

97,916.00

462,778.00

For Engineer / Engineers Representative

Prepared by

Checked & Issued by

K.K.G.P.Siriwardane
Q.S.
Hovael Constructions

D.M.Ranasinghe
Project Manager
Hovael Constructions

Signature
Name
Designation
Organization
Date & Time

AMOUNT(Rs)

Checked by

Certified By

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.

1.16

Item Description

Provision of other staff for Engineer & Employer

IPC No

27

Jan'16
DESIGNATION

B.O.Q ITEM No.

Labourer (classified unskilled)

3823

1.16.1

24,738.00

2,700.00

405.00

25,843.00

27,868.00

27,868.00

Labourer (classified unskilled)

4211

1.16.1

24,738.00

2,700.00

405.00

25,843.00

27,868.00

27,868.00

Labourer (classified unskilled)

4224

1.16.1

24,738.00

2,700.00

405.00

25,843.00

27,868.00

27,868.00

Lab Assistant

3882

1.16.2

37,710.00

2,900.00

435.00

38,895.00

41,070.00

41,070.00

Lab Assistant

4146

1.16.2

37,710.00

2,900.00

435.00

38,895.00

41,070.00

41,070.00

Survey Assistant (classified skilled)

3944

1.16.2

37,710.00

2,900.00

435.00

38,895.00

41,070.00

41,070.00

Survey Assistant (classified skilled)

3945

1.16.2

37,710.00

2,900.00

435.00

38,895.00

41,070.00

41,070.00

Secretary

4144

1.16.3

41,365.00

2,950.00

443.00

42,570.00

44,783.00

44,783.00

Administrator

3901

1.16.4

30,475.00

2,900.00

435.00

31,660.00

33,835.00

33,835.00

Cad Draughtperson

3844

1.16.6

44,965.00

3,450.00

518.00

46,370.00

48,958.00

48,958.00

Cad Draughtperson

3977

1.16.6

44,965.00

3,450.00

518.00

46,370.00

48,958.00

48,958.00

462,778.00

462,778.00

Total Amount up to this IPC

NET SALARY

TOTAL EPF

TOTAL ETF

TOTAL FOR PAYEE

GROSS SALARY

PREVIOUS PAYMENT
IN IPC

EMP. No.

9,648,840.00

CURRENT CLAIM

8,606,936.00

462,778.00

Prepared By

Checked By

KKGP Siriwardane

Eng.W.A.L. Jayashantha

QS
HOVAEL

Site Engineer (S1)


CECB

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.1
Clearing & Grubbing

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous

Total Qty

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

This Month

36,255.75

Cumulative

1,915.67

38,171.42

6,602.65

6,602.65

47,082.14

380.98

47,463.12

44,137.04

33.40

44,170.44

134,077.58

For Contractor

Name

Quantity ( m)

2,330.05

136,407.63

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.2
Removal trees, Girth 300 - 600mm

IPC No

27

Quantity (nr.)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

10.00

10.00

Sec.02
30+000~ 45+000
(Design CS)

27.00

27.00

Sec.03
33+500~ 44+000
(Design CS)

30.00

Total Qty

67.00

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
21+000 ~ 25+000
(Design CS)

For Contractor

Name

This Month

30.00
-

67.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.3
Removal trees, Girth 600 - 1200mm

IPC No

27

Quantity (nr.)

Section

Previous
22.00

22.00

Section 01-ii
57+000 ~ 59+000
(Design CS)

2.00

2.00

Sec.02
30+000~ 45+000
(Design CS)

49.00

49.00

Sec.03
33+500~ 44+000
(Design CS)

46.50

46.50

Total Qty

119.50

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
21+000 ~ 25+000
(Design CS)

For Contractor

Name

This Month

119.50

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.4
Removal trees, Girth 1200 - 2000mm

IPC No

27

Quantity (nr.)

Section

Previous
11.00

11.00

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

27.00

Sec.03
33+500~ 44+000
(Design CS)

27.00

Total Qty

65.00

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
21+000 ~ 25+000
(Design CS)

For Contractor

Name

This Month

10.00

37.00

27.00
10.00

75.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.5
Removal trees, Girth over 2000mm

IPC No

27

Quantity (nr.)

Section

Previous
12.00

12.00

Section 01-ii
57+000 ~ 59+000
(Design CS)

1.00

1.00

Sec.02
30+000~ 45+000
(Design CS)

7.00

5.00

12.00

Sec.03
33+500~ 44+000
(Design CS)

4.00

1.00

5.00

Total Qty

24.00

6.00

30.00

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
20+880 ~ 30+000

For Contractor

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.6
Removing Fencing (over 300mm girth Trees & Stumps are measured seperately)

IPC No

25

Quantity (nr.)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

27.00

27.00

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

27.00

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000

For Contractor

Name

This Month

27.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.9
Remove Stumps, Girth 300 - 600 mm

IPC No

25

Quantity (nr.)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

80.00

80.00

Sec.02
30+000~ 45+000
(Design CS)

14.00

14.00

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

94.00

94.00

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
21+000 ~ 30+000
(Design CS)

For Contractor

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.10
Remove Stumps, Girth 600 - 1200 mm

IPC No

25

Quantity (nr.)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

49.00

49.00

Sec.02
30+000~ 45+000
(Design CS)

17.00

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

66.00

66.00

For Contractor
Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
21+000 ~ 30+000
(Design CS)

Prepared by

Name

This Month

17.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.11
Remove Stumps, Girth 1200 - 2000 mm

IPC No

25

Quantity (nr.)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

2.00

2.00

Sec.02
30+000~ 45+000
(Design CS)

15.00

15.00

Sec.03
33+500~ 44+000
(Design CS)

1.00

1.00

Total Qty

18.00

18.00

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
21+000 ~ 30+000
(Design CS)

For Contractor

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

2.1.12
Remove stumps, Girth over 2000mm

IPC No

25

Quantity (nr.)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

1.00

1.00

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

1.00

1.00

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
21+000 ~ 30+000
(Design CS)

For Contractor

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

2.2.1
Removal of Structures & Obstructions other than what is measured under BOQ Item
No.6.1,6.2, & 9.6
26

Description

Location

Side

Removal of Seel
structure Bus Halt

38+284

RHS

Section
Section 03
21+000 ~ 30+000

Amount(Rs.)
1,672.13

Total

For Contractor
Prepared by

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.1.4
Roadway excavation - boulders (provisional quantity)

IPC No

25

Quantity (nr.)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000

42.69

42.69

Sec.02
30+000~ 45+000

Sec.03
33+500~ 44+000

30.21

Total Qty

72.90

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
21+000 ~ 25+000

For Contractor

Name

This Month

30.21
-

72.90

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.1.5
Road Way Excavation Unsuitable Soil

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

76.10

76.10

Miscellaneous

102.34

102.34

Road Works

243.31

243.31

Miscellaneous

19.20

19.20

3,182.87

3,182.87

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Road Works

This Month

Cumulative

713.19

Road Works

515.70

64.00

579.70

Miscellaneous

38.02

38.02

713.19

4,890.73

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

Miscellaneous

Total Qty

Name

Quantity ( m3)

64.00

4,954.73

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.1.6
Roadway excavation, sub grade replacement (Provisional Quantity)

IPC No

25

Quantity (nr.)

Section

Previous
35.77

35.77

Section 01-ii
57+000 ~ 59+000

Sec.02
30+000~ 45+000

650.74

650.74

Sec.03
33+500~ 44+000

21.50

21.50

Total Qty

708.01

708.01

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
21+000 ~ 25+000

For Contractor

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.1.7
Excavation for Road re-strengthening & Widening

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

This Month

2,265.47

Cumulative

96.37

2,361.84

287.39

287.39

Road Works

987.49

987.49

Miscellaneous

Road Works
Miscellaneous
Road Works
Miscellaneous

5,841.73

54.35

539.84

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

5,896.08
539.84

5,929.34

431.10

653.10

6,360.44
653.10

16,504.36

For Contractor

Date

Previous

Miscellaneous

Total Qty

Name

Quantity ( m3)

581.82

17,086.18

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.1.8
Road Pavement Excavation

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

190.900

Miscellaneous

274.60

274.60

Road Works

774.17

774.17

Miscellaneous

Road Works

327.13

327.13

Miscellaneous

739.73

739.73

Road Works

849.28

1,219.20

2,068.48

Miscellaneous

84.60

313.14

397.74

3,240.41

1,532.34

4,772.75

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)
Total Qty

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Quantity ( m3)
Previous

This Month

Cumulative
-

190.90

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.1.8
Prepare sub grade in cut areas (Trimming, levelling & compacting)

IPC No

27

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

12,902.01

Miscellaneous

1,372.94

1,372.940

Road Works

5,262.83

5,262.83

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous

This Month

Miscellaneous

4,190.85

Road Works

14,357.85

Miscellaneous

589.46

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

13,491.47

251.83

27,880.00
4,190.850

4,054.35

392.18

18,412.20
392.18

66,106.83

Prepared by

Cumulative

27,628.17

For Contractor

Date

Previous

Road Works

Total Qty

Name

Quantity ( m)

Section

4,895.64

71,002.47

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

3.2.1
Excavation for structures and drain suitable for backfill (Backfilling measured seperately)
27

Quantity ( m3)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

23.84

58.74

82.58

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

23.84

58.74

82.58

For Contractor
Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Prepared by

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

3.2.1
Excavation for structures and drain suitable for backfill (Backfilling measured seperately)

IPC No

27

SECTION

Sec.02
30+000~ 45+000

QUANTITY ( MT)

LOCATION

SMS No.

41+100

IPC 27/B484/To/01

Total=

Total=

16.22 Total=

16.22

40+481.5

IPC 27/B484/To/02

Total=

Total=

10.33 Total=

10.33

41+698

IPC 27/B484/To/03

Total=

Total=

32.19 Total=

32.19

RHS

LHS

Both Sides

Sub Total (i)


Sec.03
33+500~ 44+000

58.74
Total=

Total=

Total=

Total=

Sub Total (ii)

For Contractor
Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Total Qty

Prepared by

Total=

58.74

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

3.2.5
Excavation for structures and drains, unsuitable soil
26

Quantity ( m3)

Section

Previous
11.63

11.63

Section 01-ii
57+000 ~ 59+000
(Design CS)

469.45

469.45

Sec.02
30+000~ 45+000
(Design CS)

477.42

477.42

Sec.03
33+500~ 44+000
(Design CS)

366.28

#REF!

#REF!

1,324.78

#REF!

#REF!

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Total Qty

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description
IPC No

3.2.7
Backfilling with crush stone aggregate
26

Quantity ( m3)

Section

Previous

Section 01-i
20+880 ~ 30+000
(Design CS)

This Month

Cumulative

4.33

4.33

Sec.02
30+000~ 45+000
(Design CS)

23.22

23.22

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

27.55

Section 01-ii
57+000 ~ 59+000
(Design CS)

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

27.55

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.3.1
Trim, level and compact original ground

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Quantity ( m3)
Previous
34,332.04

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

106,904.10

For Contractor

4,014.82

Total Qty

41,839.87

24,576.60

Road Works

231.25

Miscellaneous

6,386.84

41,608.62

Road Works

Miscellaneous

36,258.77

6,386.84

Road Works

Cumulative

1,926.73

Miscellaneous

Miscellaneous

This Month

6,172.80

28,591.42
.
113,076.90

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.3.2
Embankment construction, Type 1

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous

Total Qty

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

This Month

8,968.85

Cumulative

636.52

9,605.37

11.86

11.86

2,562.83

2,562.83

16,324.40

567.58

16,891.98

877.01

877.010

15,326.79

15,326.79

88.78

88.78

44,160.52

For Contractor

Name

Quantity ( m3)

1,204.10

45,364.62

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.3.3
Embankment construction, Type 2

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous

Total Qty

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

This Month

30,141.90

Cumulative

301.92

30,443.82
-

1,339.71

1,339.71

30,735.25

28.17

8.410

30,763.42
8.410

6,745.20

(673.02)

6,745.20
(673.020)

68,297.45

For Contractor

Name

Quantity ( m3)

330.09

68,627.54

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.3.4
Embankment - Rock Filling

IPC No

27

Section

Previous

Section 01-i
20+880 ~ 30+000
(Design CS)

3,353.27

Section 01-ii
57+000 ~ 59+000
(Design CS)

66.95

Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Road Works
Miscellaneous

52.06

10,652.30

3,405.33

66.95
10,652.30

26.17

99.48

125.65

4,189.70

4,189.70

Miscellaneous

1,476.58

313.14

1,789.720

Embankment

137.73

137.730

19,902.70

For Contractor
Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Road Works

Total Qty

Name

This Month

464.68

20,367.38

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

3.3.4
Embankment - Rock Filling

IPC No

27

SECTION

LOCATION

Section 01-i
20+880 ~ 30+000

QUANTITY ( m3)

SMS No.

LHS

20+865-20+880

B 484/S1/IPC 27/EW/EM/02

Total=

20+870-20+871

B 484/S1/IPC 27/EW/EM/05

Total=

26+630-26+660

B 484/S1/IPC 27/EW/EM/09

Total=

26+785-26+795

B 484/S1/IPC 27/EW/EM/07

Total=

RHS

Both Sides

Total=

1.60 Total=

1.60

1.86 Total=

Total=

1.86

Total=

45.00 Total=

45.00

Total=

3.60 Total=

3.60

Sub Total (i)


Sec.02
30+000~ 45+000

52.06

34+790-34+815

B484/S2/IPC 27/EMB/RF/02

Total=

Total=

21.66 Total=

21.66

34+830-34+920

B484/S2/IPC 27/EMB/RF/01

Total=

Total=

77.82 Total=

77.82

Sub Total (ii)


Sec.03
33+500~ 44+000

42+000~190

B312/BF/147

Total=

133.44 Total=

179.70 Total=

313.14

Sub Total (iii)

313.14

Total Qty

464.68

For Contractor
Prepared by

99.48

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

For Engineer / Engineers Representative


Checked by

Certified by

Date & Time

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.3.5
Filling voids with aggregate base course for rock fill area (Pile Measurement)

IPC No

27

Quantity ( m3)

Section

Previous
374.63

13.02

387.65

Section 01-ii
57+000 ~ 59+000
(Design CS)

13.76

13.76

Road Works

651.82

651.82

Miscellaneous

29.81

24.88

54.69

Sec.03
33+500~ 44+000
(Design CS)

Road Works

1,047.40

Miscellaneous

299.82

Embankment

34.44

Total Qty

78.29

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

1,047.40
378.11
34.44

2,451.68

For Contractor

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

Name

This Month

116.19

2,567.87

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

3.3.5
Filling voids with aggregate base course for rock fill area (Pile Measurement)

IPC No

27

SECTION

LOCATION

Section 01-i
20+880 ~ 30+000

QUANTITY ( m3)

SMS No.

LHS

20+865-20+880

B 484/S1/IPC 27/EW/EM/03

Total=

20+870-20+871

B 484/S1/IPC 27/EW/EM/06

Total=

26+630-26+660

B 484/S1/IPC 27/EW/EM/10

Total=

26+785-26+795

B 484/S1/IPC 27/EW/EM/08

Total=

RHS

Both Sides

Total=

0.40 Total=

0.40

0.47 Total=

Total=

0.47

Total=

11.25 Total=

11.25

Total=

0.90 Total=

0.90

Sub Total (i)


Sec.02
30+000~ 45+000

13.02

34+790-34+815

B484/S2/IPC 27/EMB/RF/01

Total=

Total=

5.42 Total=

5.42

34+830-34+920

B484/S2/IPC 27/EMB/RF/02

Total=

Total=

19.46 Total=

19.46

Sub Total (ii)


Sec.03
33+500~ 44+000

42+000~190

B312/BF/148

Total=

Total=

78.29

78.29

Total Qty

116.19

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Sub Total (iii)

For Contractor
Prepared by

24.88

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.3.6
Sand for voids in Rock Filling(Seepage Area)

IPC No

27

Quantity ( m3)

Description

Previous

This Month

Cumulative

Sand for voids in Rock Filling(Seepage Area)

1,778.33

592.77

2,371.10

Total Qty

1,778.33

592.77

2,371.10

NOTE-

** Quantity for this month claim is the quantity holded in IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

3.3.7
Sand for Inclined Chimney Drain,Horizontal Drain (Seepage Area)

IPC No

27

Quantity ( m3)

Description

Previous

This Month

Cumulative

Sand for Inclined Chimney Drain,Horizontal


Drain (Seepage Area)

401.65

133.88

535.53

Total Qty

401.65

133.88

535.53

NOTE-

** Quantity for this month claim is the quantity holded in IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.1.1
Sub base as compaction in position

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous

Total Qty

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Previous

This Month

2,616.83

Cumulative

652.67

3,269.50

113.57

113.57

1,249.57

1,249.57

7,048.88

2,153.32

9,202.20

727.25

727.25

5,029.90

5,029.90

125.73

125.73

16,911.73

For Contractor

Name

Quantity ( m3)

2,805.99

19,717.72

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.1.2
Dense Graded Aggregate Base as compacted in position

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous

Total Qty

For Contractor

This Month

4,763.42

Cumulative

1,946.80

6,710.22

320.78

320.78

3,621.84

3,621.84

5,276.11

739.66

311.33

18,624.98

1,394.20

340.95

4,080.66

6,015.77
311.33
20,019.18
340.95
37,340.07

For Engineer / Engineers Representative


Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

33,259.41

Prepared by

Name

Quantity ( m3)

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.1.3
Supplying & Laying of Geogrid

IPC No

27

Quantity ( m3)

Description

Previous

Supplying & Laying of Geogrid


Total Qty

This Month

Cumulative

3,952.50

1,317.50

5,270.00

3,952.50

1,317.50

5,270.00

NOTE-

** Quantity for this month claim is the quantity holded from IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.1.3
Supplying & Laying of Geogrid

IPC No

27

Quantity ( m3)

Section

Previous

This Month

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

3,952.50

Sec.03
33+500~ 44+000
(Design CS)

1,317.50

Total Qty

5,270.00

3,952.50

1,317.50

5,270.00

NOTE-

** Quantity for this month claim is the quantity holded from IPC 25.

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.2.1
Lightly Scarify existing surface layer before laying ABC

IPC No

26

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

109.30

109.30

Section 01-ii
57+000 ~ 59+000
(Design CS)

Road Works

Sec.02
30+000~ 45+000
(Design CS)

Road Works

Sec.03
33+500~ 44+000
(Design CS)

Road Works

109.30

Total Qty

For Contractor
Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

This Month

Cumulative

109.300

For Engineer / Engineers Representative

Prepared by

Name

Quantity ( m3)

Section

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.3.1
Earthen shoulder compacted in position

IPC No

27

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

103.68

Miscellaneous

Road Works

Miscellaneous

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Road Works

This Month

Road Works

898.17

Miscellaneous

17.26

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

103.68

144.79
-

322.28

1,220.45
-

1,129.38

Prepared by

Cumulative
-

127.530
-

For Contractor

Date

Previous

Miscellaneous

Total Qty

Name

Quantity ( m)

Section

339.54

1,468.92

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.4.1 A
Bituminous Prime coat using Emulsion MC30,1Ltr/m2

IPC No

27

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

13,090.60

Miscellaneous

1,336.780

1,336.780

Road Works

13,220.00

13,220.00

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous

This Month

Miscellaneous

1,197.470

Road Works

66,620.00

Miscellaneous

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

16,392.10

2,108.00
10,520.00

303.760

118,739.61

Prepared by

Cumulative

3,301.50

22,971.00

For Contractor

Date

Previous

Road Works

Total Qty

Name

Quantity ( m)

Section

15,929.50

25,079.00
1,197.470
77,140.00
303.760
134,669.11

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.4.2
Extra Over Blotting metirial for BOQ NO 4.4.1

IPC No

26

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Road Works

This Month
-

Road Works
Miscellaneous
Road Works

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

774.780

774.780

774.78

Checked By

Miscellaneous

Prepared by

Cumulative
-

Miscellaneous

For Contractor

Date

Previous

Miscellaneous

Total Qty

Name

Quantity ( m)

774.78

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.5.1
Bituminous Tack coat using Emulsion CSS-1 as per RDA specification

IPC No

26

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

Sec.03
33+500~ 44+000
(Design CS)

Binder

Miscellaneous
Binder

This Month

11,140.70

Cumulative
-

11,140.70

10.800

10.80

12,524.00

12,524.00

Wearing
Miscellaneous
Binder

21,529.50

21,529.50

Wearing
Miscellaneous

Binder

44,690.00

Wearing

17,880.00

Miscellaneous

20,560.00
-

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

65,250.00
17,880.00

107,775.00

For Contractor

Date

Previous

Wearing

Total Qty

Name

Quantity ( m)

20,560.00

128,335.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

4.5.1
Bituminous Tack coat using Emulsion CSS-1 as per RDA specification

IPC No

27

SECTION

Structure

Section 01
20+880 ~ 30+000

QUANTITY ( m2)

SMS No.

LHS

RHS

Both Sides

27+314 Turnout

B484/S1/IPC26/ST/11

Total=

Total=

1.80 Total=

27+371 Turnout

B484/S1/IPC26/ST/12

Total=

Total=

1.80 Total=

Total Qty

For Contractor
Prepared by

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.5.2
Asphalt Binder Course (60mm thick)

IPC No

27

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous
Road Works
Miscellaneous

Total Qty

Quantity ( MT)
Previous

This Month

1,876.27

Cumulative
-

1,876.27

1,935.97

1,935.97

3,235.23

3,235.23

7,969.56

2,914.38

10,883.94

15,017.03

2,914.38

17,931.41

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.5.3
Asphalt Wearing Course (40mm thick)

IPC No

26

Quantity (m2)

Section

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

Road Works

Miscellaneous

Road Works

Miscellaneous

Road Works

Miscellaneous

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Road Works
Miscellaneous

Total Qty

Previous

This Month

17,492.00

Cumulative

17,492.00

17,492.00

17,492.00

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.6.1
Concrete; Grade 30

IPC No

27

Quantity ( m3)

Section

Previous

This Month

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)
Section 01-ii
57+000 ~ 59+000
(Design CS)

4.01

4.01

Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Total Qty

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

4.01

4.01

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-4
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

4.6.1
Grade C 30 concrete

IPC No

27
QUANTITY ( m3)

SECTION

LOCATION

SMS No.

Section 01-ii
57+000 ~ 59+000
(Design CS)

57+397-57+400

IPC27/B312/SI-ii/By Road/004

Total=

57+282-57+285

IPC27/B312/SI-ii/By Road/001

Total=

LHS

RHS

2.600

Both Sides

Total=

Total=

2.60

Total=

1.41 Total=

1.41

Sub Total (ii)


Sec.03
33+500~ 44+000

Total=

Total=

Total Qty

4.01

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Sub Total (iii)

For Contractor
Prepared by

4.01

For Engineer / Engineers Representative


Checked by

Certified by

484

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.6.4
Formwork

IPC No

27

Quantity ( m2)

Section

Previous

This Month

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)
Section 01-ii
57+000 ~ 59+000
(Design CS)

4.04

4.04

Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Total Qty

4.04

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

4.04

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-4
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

4.6.4
Formwork

IPC No

27
QUANTITY ( m2)

SECTION

LOCATION

SMS No.

Section 01-ii
57+000 ~ 59+000
(Design CS)

57+397-57+400

IPC27/B312/SI-ii/By Road/005

Total=

57+282-57+285

IPC27/B312/SI-ii/By Road/002

Total=

LHS

RHS

2.720

Both Sides

Total=

Total=

2.72

Total=

1.32 Total=

1.32

Sub Total (ii)


Sec.03
33+500~ 44+000

Total=

Total=

Total Qty

4.04

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Sub Total (iii)

For Contractor
Prepared by

4.04

For Engineer / Engineers Representative


Checked by

Certified by

484

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

4.6.6
Laying Polithene gauge 1000 (Extra over item for Item No 4.6.1)

IPC No

27

Quantity ( m2)

Section

Previous

This Month

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)
Section 01-ii
57+000 ~ 59+000
(Design CS)

40.18

40.18

Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Total Qty

40.18

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

40.18

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-4
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

4.6.6
Laying Polithene gauge 1000 (Extra over item for Item No 4.6.1)

IPC No

27
QUANTITY ( m2)

SECTION

LOCATION

SMS No.

Section 01-ii
57+000 ~ 59+000
(Design CS)

57+397-57+400

IPC27/B312/SI-ii/By Road/005

Total=

57+282-57+285

IPC27/B312/SI-ii/By Road/002

Total=

LHS

RHS

26.03

Both Sides

Total=

Total=

26.03

Total=

14.15 Total=

14.15

Sub Total (ii)


Sec.03
33+500~ 44+000

Total=

Total=

Total Qty

40.18

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Sub Total (iii)

For Contractor
Prepared by

40.18

For Engineer / Engineers Representative


Checked by

Certified by

484

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.1
Concrete; Grade C 15

IPC No

27

Quantity ( m3)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

18.47

3.54

22.01

Sec.02
30+000~ 45+000
(Design CS)

14.61

Sec.03
33+500~ 44+000
(Design CS)

4.16

4.16

Total Qty

37.24

3.54

40.78

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

For Contractor

Name

This Month

14.61

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

5.1.1
Grade C 15 concrete

IPC No

27

SECTION

LOCATION
57+752-58+776

Sec.01-I
57+000~ 59+000

QUANTITY ( m3)

SMS No.

LHS

RHS

Both Sides

IPC27/B312/SI-ii/LD/015

Total=

Total=

0.79 Total=

0.79

56+998.5-57+004.5 IPC27/B312/SI-ii/LD/009

Total=

Total=

0.20 Total=

0.20

57+000-57+015

IPC27/B312/SI-ii/LD/026

Total=

Total=

0.52 Total=

0.52

57+284-57+333

IPC27/B312/SI-ii/LD/001

Total=

1.57 Total=

Total=

1.57

57+142-57+156

IPC27/B312/SI-ii/LD/020

Total=

Total=

0.46 Total=

0.46

Sub Total (i)


Sec.02
30+000~ 45+000

3.54
Total=

Total=

Total=

Total=

Total=

Total=

Sub Total (ii)


Sec.03
33+500~ 44+000

Total=

Total=

Sub Total (iii)

Total Qty

3.54

For Contractor
Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Prepared by

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.2
Concrete; Grade C 20

IPC No

26

Quantity ( m3)

Section

Previous

This Month

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Section 01-ii
57+000 ~ 59+000
(Design CS)

8.68

8.68

Sec.02
30+000~ 45+000
(Design CS)

119.55

119.55

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

128.23

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

128.23

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.3
Grade C 25

IPC No

27

Quantity ( m3)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

102.77

20.15

122.92

Sec.02
30+000~ 45+000
(Design CS)

20.34

20.34

Sec.03
33+500~ 44+000
(Design CS)

6.87

Precast Yard

49.56

4.08

53.64

Total Qty

179.54

24.23

203.77

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

For Contractor

Name

This Month

6.87

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

5.1.3
Grade C 25 concrete

IPC No

27

SECTION

LOCATION

56+998.5-57+004.5 IPC27/B312/SI-ii/LD/010

Sec.01-ii
57+000~ 59+000

QUANTITY ( m3)

SMS No.

LHS
Total=

57+000-57+015

IPC27/B312/SI-ii/LD/027

Total=

57+284-57+333

IPC27/B312/SI-ii/LD/002

Total=

58+752-58+776

IPC27/B312/SI-ii/LD/016

Total=

57+142-57+156

IPC27/B312/SI-ii/LD/020

Total=

RHS

Both Sides

1.13 Total=

Total=

1.13

Total=

3.06 Total=

3.06

8.83 Total=
-

8.83

Total=

4.52 Total=

4.52

Total=

2.61 Total=

2.61

Sub Total (i)


Sec.02
30+000~ 45+000

20.15
Total=

Total=

Total=

Sub Total (ii)


Sec.03
33+500~ 44+000
Pre Cast Access
Drain

Total=

Total=

Total=

3.050m Length

IPC27/Pre cast/UD/001

Total=

Total=

2.93 Total=

2.93

1.500m Length

IPC27/Pre cast/UD/002

Total=

Total=

1.15

1.15

Sub Total (iii)

4.08

Total Qty

24.23

For Contractor
Prepared by

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.5
Precast concrete cover slab (900x450x100mm tk)

IPC No

27

Description

Section 01-i
20+880 ~ 30+000
(Design CS)

800 mm Width

1000 mm Width

800 mm Width

1000 mm Width

800 mm Width

1000 mm Width

800 mm Width

1000 mm Width

650 mm Width

9.000

12.00

21.000

800 mm Width

484.00

89.00

573.00

1000 mm Width

45.00

45.000

1150 mm Width

14.000

14.000

Section 01-ii
57+000 ~ 59+000
(Design CS)
Sec.02
30+000~ 45+000
(Design CS)
Sec.03
33+500~ 44+000
(Design CS)

Precast Yard

Total Qty

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Previous

This Month

Cumulative
-

552.00

For Contractor

Name

Quantity ( Nos.)

Section

101.00

653.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.5
Precast concrete cover slab (650x500x125mm tk)

IPC No

27

Section

Description

Precast Yard
Sec 01/ 02/03

650 mm Width

Total Qty

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

Quantity ( Nos.)
Previous

This Month

Cumulative

9.000

12.00

21.000

9.00

12.00

21.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.5
Precast concrete cover slab (800x500x125mm tk)

IPC No

27

Section

Description

Precast Yard
Sec 01/ 02/03

800 mm Width

Total Qty

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

Quantity ( Nos.)
Previous

This Month

Cumulative

484.00

89.00

573.00

484.00

89.00

573.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.5
Precast concrete cover slab (1000x500x125mm tk)

IPC No

27

Section

Description

Precast Yard
Sec 01/ 02/03

1000 mm Width

Total Qty

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

This Month

Cumulative

45.00

45.000

45.00

For Contractor

Name

Quantity ( Nos.)

45.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.5
Precast concrete cover slab (1150x500x125mm tk)

IPC No

27

Section

Description

Precast Yard
Sec 01/ 02/03

1150 mm Width

Total Qty

Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Previous

This Month

Cumulative

14.000

14.000

14.00

For Contractor

Name

Quantity ( Nos.)

14.00

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.6
Weep hole,75mm dia.PVC Pipe

IPC No

27

Quantity ( m)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

2.30

5.10

7.40

Sec.02
30+000~ 45+000
(Design CS)

25.28

25.28

Precast Yard- Sec 01 & 02

39.68

3.52

43.20

2.50

2.50

Structures

Pre-Casts

Total Qty

69.76

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Sec.03
33+500~ 44+000
(Design CS)

Name

This Month

8.62

78.38

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

5.1.6
Grade C 25 concrete

IPC No

27

SECTION

Sec.01-I
57+000~ 59+000

LOCATION

QUANTITY ( m3)

SMS No.

LHS

RHS

Both Sides

57+000-57+015

IPC27/B312/SI-ii/LD/028

Total=

Total=

1.10 Total=

1.10

57+284-57+333

IPC27/B312/SI-ii/LD/003

Total=

3.40 Total=

Total=

3.40

57+142-57+156

IPC27/B312/SI-ii/LD/020

Total=

Total=

0.60 Total=

0.60

Sub Total (i)


Sec.02
30+000~ 45+000

5.10
Total=

Total=

Total=

Sub Total (ii)


Sec.03
33+500~ 44+000
Pre Cast Access
Drain

Total=

Total=

Total=

3.050m Length

IPC27/Pre cast/UD/001

Total=

Total=

2.24 Total=

2.24

1.500m Length

IPC27/Pre cast/UD/002

Total=

Total=

1.28 Total=

1.28

Sub Total (iii)

3.52

Total Qty

8.62

For Contractor
Prepared by

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.7
Tor steel Reinforcement

IPC No

27

Quantity (MT)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

6.237

1.053

7.290

Sec.02
30+000~ 45+000
(Design CS)

9.939

Sec.03
33+500~ 44+000
(Design CS)

0.328

0.328

Precast Yard

3.906

0.222

4.128

Total Qty

20.410

1.275

21.685

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

For Contractor

Name

This Month

9.939

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

5.1.7
Tor steel Reinforcement

IPC No

27

SECTION

LOCATION

56+998.5-57+004.5 IPC27/B312/SI-ii/LD/012

Section 1-I
57+000~59+000

QUANTITY ( MT)

SMS No.

LHS

RHS

Both Sides

Total=

0.061 Total=

Total=

0.061

57+000-57+015

IPC27/B312/SI-ii/LD/032

Total=

Total=

0.158 Total=

0.158

57+284-57+33

IPC27/B312/SI-ii/LD/005

Total=

Total=

0.450 Total=

0.450

58+752-58+776

IPC27/B312/SI-ii/LD/017

Total=

Total=

0.243 Total=

0.243

57+142-57+156

IPC27/B312/SI-ii/LD/020

Total=

Total=

0.141 Total=

0.141

Sub Total (i)


Pre Cast Access
Drain

3.050m Length

IPC27/Pre cast/UD/001

Total=

Total=

0.159 Total=

0.159

1.500m Length

IPC27/Pre cast/UD/002

Total=

Total=

0.063 Total=

0.063

Sub Total (ii)

0.222

Total Qty

1.275

For Contractor
Prepared by

For Engineer / Engineers Representative


Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

1.053

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.10
Formwork Smooth Finish

IPC No

27

Quantity ( m2)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

573.41

107.22

680.63

Sec.02
30+000~ 45+000
(Design CS)

541.24

Precast Yard Sec 01 & 02

373.09

20.40

393.49

26.57

26.57

Strutures

541.24

Pre Casts

Total Qty

1,514.31

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Sec.03
33+500~ 44+000
(Design CS)

Name

This Month

127.62

1,641.93

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

5.1.10
Formwork rough finish

IPC No

27

SECTION

LOCATION

56+998.5-57+004.5 IPC27/B312/SI-ii/LD/013

Sec.01-I
57+000~ 59+000

QUANTITY ( MT)

SMS No.

LHS

RHS

Both Sides

Total=

5.40 Total=

Total=

5.40

57+752-58+788

IPC27/B312/SI-ii/LD/018

Total=

Total=

21.60 Total=

21.60

57+000-57+015

IPC27/B312/SI-ii/LD/033

Total=

Total=

15.32 Total=

15.32

57+284-57+333

IPC27/B312/SI-ii/LD/006

Total=

39.43 Total=

Total=

39.43

57+142-57+156

IPC27/B312/SI-ii/LD/020

Total=

Total=

25.47 Total=

25.47

Sub Total (i)


Sec.02
30+000~ 45+000

107.22
Total=

Total=

Total=

Total=

- Total=
-

Total=

Sub Total (ii)


Pre Cast Access
Drain

3.050m Length

IPC27/Pre cast/UD/001

Total=

Total=

1.500m Length

IPC27/Pre cast/UD/002

Total=

Total=

14.64 Total=
5.76

5.76

Sub Total (iii)


Sec.03
33+500~ 44+000

20.40
Total=

Total=

Total=

Total=

Sub Total (iv)

Prepared by

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=
-

Total=

Total Qty

For Contractor

14.64

127.62

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

5.1.11
Formwork Rough Finish

IPC No

27

Quantity ( m2)

Section

Previous
-

Section 01-ii
57+000 ~ 59+000
(Design CS)

787.48

139.79

927.27

Sec.02
30+000~ 45+000
(Design CS)

682.44

Precast Yard Sec 01 & 02

523.94

682.44

28.96

552.90

Structures

34.20

34.20

Pre Casts

Total Qty

2,028.06

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Sec.03
33+500~ 44+000
(Design CS)

Name

This Month

168.75

2,196.81

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

5.1.11
Formwork rough finish

IPC No

27

SECTION

LOCATION

56+998.5-57+004.5 IPC27/B312/SI-ii/LD/014

Sec.01-I
57+000~ 59+000

QUANTITY ( MT)

SMS No.

LHS

RHS

Both Sides

Total=

8.25 Total=

Total=

8.25

57+752-58+788

IPC27/B312/SI-ii/LD/019

Total=

Total=

32.09 Total=

32.09

57+000-57+015

IPC27/B312/SI-ii/LD/034

Total=

Total=

21.28 Total=

21.28

57+284-57+333

IPC27/B312/SI-ii/LD/008

Total=

Total=

59.67 Total=

59.67

57+142-57+156

IPC27/B312/SI-ii/LD/020

Total=

Total=

18.50 Total=

18.50

Sub Total (i)


Sec.02
30+000~ 45+000

139.79
Total=

Total=

Total=

Total=

- Total=
-

Total=

Sub Total (ii)


Pre Cast Access
Drain

3.050m Length

IPC27/Pre cast/UD/001

Total=

Total=

20.22 Total=

20.22

1.500m Length

IPC27/Pre cast/UD/002

Total=

Total=

8.74 Total=

8.74

Sub Total (iii)


Sec.03
33+500~ 44+000

28.96
Total=

Total=

Total=

Total=

Sub Total (iv)

Prepared by

Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Total Qty

For Contractor

Total=

168.75

For Engineer / Engineers Representative


Checked by

Certified by

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.1 - Removal & disposal of existing culvert & cause ways required to
reconstruction

Unit :

LHS
Structure No

Description

RHS

Previouse
Progress Qty
Balance Qty
claimed Qty
(Nos)
(Nos)
(Nos)

Qty
(Nos)

Nos.

Qty
(Nos)

Previouse
Progress Qty
claimed Qty
(Nos)
(Nos)

Balance Qty
(Nos)

SECTI ON 01 - ii (57+000 km to 59+000 km B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

SECTI ON 02 (30+000k m to 45+000 k m B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

0.50

0.50

0.50

0.50

0.50

0.50

38/3A

37+521

Irri. Outlet Dia 0.600

0.50

0.50

0.50

0.50

0.50

0.50

39/1

38+053

Irri. Outlet Dia 0.300

0.50

0.50

39/2

38+566

Irri. Outlet Dia 0.300

0.50

0.50

SECTI ON 03 (33+500km to 44+000 km B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/4

37+400

Box Culvert (1.2*1.0)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
20.00

0.50
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.50
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

12.75

12.75

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
20.00

0.50
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.50
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

12.75

12.75

Total Design Quantity

40.00

Total Prog. Quantity

25.50

Previously Claimed Quantity

25.50

Balance Qty

For Contractor

For Engineer

Signature
Name

AD Wadugodapitiya

D.M Ranasinghe

Designation

Quantity Surveyor

Project Manager

Date

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km) AND
HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.2 - Removal and disposal of part of existing culvert & causeway


required extensions, modification and any development

Unit :

LHS
Structure No

Description

RHS

Previouse
Progress Qty
Balance Qty
claimed Qty
(Nos)
(Nos)
(Nos)

Qty
(Nos)

Nos.

Previouse
Progress Qty
claimed Qty
(Nos)
(Nos)

Qty
(Nos)

Balance Qty
(Nos)

SECTI ON 01 - i (20+880k m to 30+000k m B484)


23/2

22+513

Pipe culvert Dia 0.300

1.0

1.00

1.00

SECTI ON 01 - ii (57+000k m to 59+000 k m B 312)


58/8

57+965

Pipe culvert Dia 0.900

0.5

0.50

0.50

0.5

0.50

0.50

0.5
0.5
0.5
0.5

0.25
0.25
0.25
0.25

0.25
0.25
0.25
0.25

0.5
0.5
0.5
0.5

0.25
0.25
0.25
0.25

0.25
0.25
0.25
0.25

1.50

1.50

2.50

2.50

SECTI ON 03 (33+500km to 44+000 km B 312)


38/3

37+176

Double Pipe culvert Dia 0.900

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

41/4

40+789

Box culvert (1.5*1.0)

42/3

Box culvert (2.0*1.5)

Sub total

2.50

3.50

Total Design Quantity

6.00

Total Prog. Quantity

4.00

Previously Claimed Quantity

4.00

Balance Qty

For Contractor

For Engineer

Signature
Name

AD Wadugodapitiya

D.M Ranasinghe

Designation

Quantity Surveyor

Project Manager

Date

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.3 - Grade 15 concrete

Structure No

Unit :
Qty
(m3)

Description

Previouse claimed Qty


(m3)

Progress Qty
(m3)

Balance Qty
(m3)

SECTI ON 01-i (20+880k m to 30+000 B 484)


23/2A

22+183

Pipe culvert Dia 0.900

7.00

7.00

23/2

22+513

Pipe culvert Dia 0.300

6.33

6.33

26/1

25+089

Pipe culvert Dia 0.225

7.17

27/2

26+643

Pipe culvert Dia 0.225

8.18

8.18

28/2

27+314

Pipe culvert Dia 0.150

7.38

7.38
6.21

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

6.21

29/1

27+957

Pipe culvert Dia 0.225

7.17

7.17

29/2

28+537

Pipe culvert Dia 0.225

4.63

4.63

30/1

29+706

Pipe culvert Dia 0.300

6.29

6.29

31/1

29+988

Pipe culvert Dia 0.225

5.90

21+887

21+905

Toe wall / RHS

10.58

10.58

22+513

22+545

Irri. Drain

3.53

3.53

25+489

25+501

Toe wall / RHS

10.17

10.17

25+758

25+773

Retaining wall / RHS

40.99

40.99

25+879

25+885

Retaining wall / RHS

11.72

11.72

26+786

26+794.2

Toe wall / LHS

27.11

26.21

29+665

29+680

2.76

2.76

Retaining wall / LHS

7.17

5.90

0.90

SECTI ON 01 - ii (57+000k m to 59+000 B 312)


58/1

57+010

Box Culvert (1.0*1.0)

0.95

0.79

58/2

57+042

Box Culvert (1.0*1.0)

1.14

1.14

58/3

57+283

Box Culvert (1.0*1.0)

0.79

0.79

58/4

57+402

Box Culvert skew type(1.0*1.0)

0.82

0.82
1.67

58/6 A

57+625

Box Culvert (1.0*1.0)

1.67

58/7

57+846

Box Culvert skew type(1.0*1.2.)

0.57

0.57

58/8

57+965

Pipe culvert Dia 0.900

17.90

17.90

59/1

58+018

Box Culvert skew type(1.0*1.3)

0.82

0.82

60/1

59+030

Pipe culvert Dia 0.900

72.84

72.84

15.36

15.36

59/2 A

58+921

Pipe culvert Dia 0.900

57+630

57+634

Retaining wall / LHS

9.16

9.16

58+020

58+023

Retaining wall / RHS

7.20

7.20

58+510

58+541

Toe wall / RHS

44.02

44.02

58+656

58+890

Retaining wall / LHS

381.66

381.66

58+690

58+710

Retaining wall / RHS

33.81

33.81

58+862

58+885

Toe wall(RIP RAP) / RHS

2.45

2.45

0.16

SECTI ON 02 (30+000k m to 45+000 k m B 484)


31+381.5

Irri. Outlet Dia 0.150

6.98

6.98

34 / 1

33+262

Irri. Outlet Dia 0.300

8.46

8.46

38/2

37+217

Irri. Outlet Dia 0.600 x 2

2.15

2.15
1.69

32 /1

38/3A

37+521

Irri. Outlet Dia 0.600

1.69

39/1

38+053

Irri. Outlet Dia 0.300

4.83

4.83

39/2

38+566

Irri. Outlet Dia 0.300

9.31

9.31

41/2

40+481.5

Irri. Outlet Dia 0.150

6.59

6.59

42/1

41+698.5

Irri. Outlet Dia 0.450

19.72

19.72

42/2

41+100

8.34

8.34

32+578

32+605

Toe wall / LHS

72.36

72.36

Toe wall / LHS

11.22

11.22

35+112

MARAKA

32+682

Retaining wall / Byroad

34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

Sub total C/F

For Contractor

Designation
Date

0.98

69.77

69.77

10.13

10.13

996.81

982.68

For Engineer

Signature
Name

0.98

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

14.13

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.3 - Grade 15 concrete

Structure No

Unit :
Progress Qty
(m3)

Qty
(m3)

Description

Sub total B/F

Previouse claimed Qty


(m3)

996.81

982.68

Balance Qty
(m3)

14.13

SECTI ON 03 (33+500k m to 44+000k m B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

3.20

3.20

34/4

33+663

Box Culvert (1.5*1.0)

1.06

1.06

35/1

34+845

Box Culvert (1.5*1.0)

1.05

1.05

36/1

34+983

Box Culvert (1.2*1.0)

0.90

0.90

36/2

35+333

Box Culvert (1.3*1.0)

0.95

0.95

36/4

35+733

Box Culvert (1.2*1.0)

0.90

0.90

37/1

36+214

Box Culvert (1.5*1.0)

1.06

1.06

38/1

37+058

Box Culvert (1.5*1.0)

1.06

1.06

38/2

37+091

Box Culvert (2.5*2.5)

0.40

0.40

38/3

37+176

Double Pipe culvert Dia 0.900

1.08

1.08

38/4

37+400

Box Culvert (1.2*1.0)

0.90

0.90

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

7.33

7.33
0.90

38/6

37+720

Box Culvert (1.2*1.0)

0.90

38/7

37+788

Box Culvert (1.2*1.0)

0.90

0.90

39/1

38+209

Box Culvert (1.4*1.0)

1.00

1.00

39/2

38+691

Box Culvert (15*1.0)

1.06

1.06

40/1

39+042

Box Culvert (1.5*1.0)

1.06

1.06

40/2

39+176

Box Culvert (2.5*2.0)

1.62

1.62

40/3

39+467

Box Culvert (1.2*1.0)

0.89

0.89

40/4

39+766

Box culvert (2.0*1.0)

1.33

1.33

41/2

40+214

Box culvert (1.5*1.0)

1.06

1.06

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

0.96

0.96

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/3

41+491

Box culvert

14.51

14.51

42/4

41+823

Box culvert (1.5*1.0)

1.06

1.06

43/1

42+559

Box culvert (1.0*1.0)

0.29

0.29

44/1

43+024

Box culvert (1.5*1.0)

1.06

1.06
1.06

44/2

43+088

Box culvert (1.5*1.0)

1.06

44/3

43+283

Box culvert (2.5*2.0)

0.63

0.63

44/4

43+381

Box culvert (1.5*1.0)

0.39

0.39

Section 03 (33+500km to 44+000km B 312)- Hum e Pipe Ex tentions


41+122

Extention of 225mm Hume Pipe

0.23

0.23

40+130

Extention of 225mm Hume Pipe

0.24

0.24

40+660

Extention of 300mm Hume Pipe

0.22

0.22

40+785

Extention of 300mm Hume Pipe

0.30

0.30

40+902

Extention of 225mm Hume Pipe

0.16

0.16

1,047.63

1,033.50

Sub total

Total Design Quantity

14.13
-

Total Prog. Quantity

1,047.63

Previously Claimed Quantity

1,033.50

Balance Qty

14.13

Approved Qty for Payment


Quantity to be Paid From IPC 25 to IPC 27

900.00
147.63

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.4 - Grade 20 concrete

Structure No

Unit :
Qty
(m3)

Description

Progress Qty
(m3)

Previouse claimed Qty


(m3)

m3
Balance Qty
(m3)

SECTI ON 01 (20+880k m to 30+000k m B 484)


-

50.83

50.83

Toe wall / RHS

Retaining wall / RHS

25+885

Retaining wall / RHS

21+457

Irrigation Outlet

0.94

0.94

21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

25+758

25+773

25+879

22 /1

SECTI ON 01 - ii (57+000k m to 59+000 k m B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

6.38

6.38

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

57+630

57+634

58+020

58+023

58+510

58+541

15.31

15.31

Retaining wall / LHS

Retaining wall / RHS

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

SECTI ON 02 (30+000k m to 45+000 k m B 484)


34 / 1

33+262

Irri. Outlet Dia 0.300

1.13

1.13

38/2

37+217

Irri. Outlet Dia 0.600 x 2

1.94

1.94

38/3A

37+521

Irri. Outlet Dia 0.600

1.65

1.65

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

32+682

Retaining wall / Byroad

MARAKA

12.95

5.89

34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

7.06

SECTI ON 03 (33+500k m to 44+000k m B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

26.53

Sub total C/F

117.66

For Contractor

Designation
Date

110.60

For Engineer

Signature
Name

26.53

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

7.06

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.4 - Grade 20 concrete

Structure No

Unit :
Qty
(m3)

Description

Progress Qty
(m3)

Sub total B/F

Previouse claimed Qty


(m3)

117.66

110.60

m3
Balance Qty
(m3)

7.06

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

279.50

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

29.40

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

279.50

29.40

Section 03 (33+500km to 44+000km B 312)- Hum e Pipe Ex tentions


41+122

Extention of 225mm Hume Pipe

2.72

2.72

40+130

Extention of 225mm Hume Pipe

2.72

2.72

40+660

Extention of 300mm Hume Pipe

2.70

2.70

40+785

Extention of 300mm Hume Pipe

3.73

3.73

40+902

Extention of 225mm Hume Pipe

1.85

1.85

440.27

433.21

Sub total

Total Design Quantity

7.06
-

Total Prog. Quantity

440.27

Previously Claimed Quantity

433.21

Balance Qty

7.06

Approved Qty for Payment

400.00

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

6.4
Concrete C20

IPC No

27

Quantity ( m3)

Description

Previous

Grade 20 Concrete
Total Qty

This Month

Cumulative

400.00

40.27

440.27

400.00

40.27

440.27

NOTE-

** Quantity for this month claim is the quantity holded in IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.5 - Grade 25 concrete

Structure No

Unit :
Qty
(m3)

Description

Progress Qty
(m3)

Previouse claimed Qty


(m3)

m3
Balance Qty
(m3)

SECTI ON 01-i (20+880k m to 30+000k m B 484)


23/2A

22+183

Pipe culvert Dia 0.900

1.13

1.13

23/2

22+513

Pipe culvert Dia 0.300

0.98

0.98

1.20

26/1

25+089

Pipe culvert Dia 0.225

27/2

26+643

Pipe culvert Dia 0.225

1.13

1.13

28/2

27+314

Pipe culvert Dia 0.150

1.13

1.13

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

1.13

1.13

29/1

27+957

Pipe culvert Dia 0.225

1.13

1.13

29/2

28+537

Pipe culvert Dia 0.225

0.99

0.99

30/1

29+706

Pipe culvert Dia 0.300

1.24

1.24

31/1

29+988

Pipe culvert Dia 0.225

1.13

21+887

21+905

Toe wall / RHS

4.86

4.86

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

3.24

3.24

25+758

25+773

Retaining wall / RHS

9.00

9.00

25+879

25+885

Retaining wall / RHS

2.25

2.25

Toe wall / LHS

6.85

6.85

34.43

34.43

26+786

26+794.2

29+665

29+680

Retaining wall / RHS

1.20

1.13

SECTI ON 01 - ii (57+000k m to 59+000 k m B 312)


58/1

57+010

Box Culvert (1.0*1.0)

2.58

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

4.06

4.06

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

6.81

6.81

17.31

17.31

2.73

2.73

60/1

59+030

Pipe culvert Dia 0.900

57+630

57+634

Retaining wall / LHS

58+020

58+023

Retaining wall / RHS

1.39

1.39

58+510

58+541

Toe wall / RHS

11.36

11.36

58+656

58+890

Retaining wall / LHS

85.82

85.82

58+690

58+710

Retaining wall / RHS

7.50

7.50

2.58

SECTI ON 02 (30+000k m to 45+000k m B 484)


32 /1

31+381.5

Irri. Outlet Dia 0.150

1.50

1.50
8.61

38/2

37+217

Irri. Outlet Dia 0.600 x 2

8.61

38/3A

37+521

Irri. Outlet Dia 0.600

5.62

5.62

39/1

38+053

Irri. Outlet Dia 0.300

0.88

0.88

39/2

38+566

Irri. Outlet Dia 0.300

1.74

1.74

41/2

40+481.5

Irri. Outlet Dia 0.150

1.35

1.35

42/1

41+698.5

Irri. Outlet Dia 0.450

2.61

2.61

42/2

41+100

1.89

1.89

32+605

19.37

19.37

32+578

MARAKA

Toe wall / LHS

Retaining wall / Byroad

Sub total C/F

254.95

For Contractor

For Engineer

Signature
Name
Designation
Date

250.04

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

4.91

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.5 - Grade 25 concrete

Structure No

Unit :
Qty
(m3)

Description

Progress Qty
(m3)

Sub total B/F


34+590

34+620

35+112
38+875

38+890

Retaining wall / RHS

Previouse claimed Qty


(m3)

254.95

250.04

15.20

15.20

Toe wall / LHS

3.00

3.00

Toe wall / LHS

19.89

19.89

m3
Balance Qty
(m3)

4.91

SECTI ON 03 (33+500k m to 44+000k m B 312)


-

34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/3

41+491

Box culvert

8.51

8.51

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

301.550

296.640

Total Design Quantity

4.91
-

Total Prog. Quantity

301.55

Previously Claimed Quantity

296.64
4.91

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

6.5 A
Grade 30/20 Concrete for Cross Drain Structures

IPC No

27

Quantity ( m3)

Description

Previous

Grade 30/20 Concrete for Cross Drain


Structures
Total Qty

This Month

Cumulative

473.40

157.80

631.20

473.40

157.80

631.20

NOTE-

** Quantity for this month claim is the quantity holded in IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.6 - Tor Steel reinforcement

Structure No

Unit :
Qty
(MT)

Description

Progress Qty
(MT)

Previouse claimed Qty


(MT)

MT
Balance Qty
(MT)

SECTI ON 01-i (20+880k m to 30+000 B 484)


22 /1
23/2A

21+475.0

Pipe culvert

0.004

22+183

Pipe culvert Dia 0.900

0.023

0.004
0.023

0.029

0.029

23/2

22+513

Pipe culvert Dia 0.300

26/1

25+089

Pipe culvert Dia 0.225

0.025

27/2

26+643

Pipe culvert Dia 0.225

0.023

0.023

28/2

27+314

Pipe culvert Dia 0.150

0.023

0.023

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

0.023

0.023

29/1

27+957

Pipe culvert Dia 0.225

0.023

0.023

29/2

28+537

Pipe culvert Dia 0.225

0.022

0.022

0.026

0.026

30/1

29+706

Pipe culvert Dia 0.300

31/1

29+988

Pipe culvert Dia 0.225

0.024

21+887

21+905

Toe wall / RHS

0.111

0.111
2.464

22+513

22+545

Irri. Drain

2.464

25+489

25+501

Toe wall / RHS

0.075

0.075

25+758

25+773

Retaining wall / RHS

0.166

0.166

25+879

25+885

Retaining wall / RHS

0.051

0.051

26+786

26+794.2

29+665

29+680

Toe wall / LHS

0.157

0.157

Retaining wall / RHS

2.306

2.306

0.025

0.024

SECTI ON 01 - ii (57+000k m to 59+000k m B 312)


58/1

57+010

Box Culvert (1.0*1.0)

2.450

2.263

58/2

57+042

Box Culvert (1.0*1.0)

2.133

2.133

58/3

57+283

Box Culvert (1.0*1.0)

2.067

2.067
2.232
2.464

58/4

57+402

Box Culvert skew type(1.0*1.0)

2.232

58/6 A

57+625

Box Culvert (1.0*1.0)

2.464

58/7

57+846

Box Culvert skew type(1.0*1.2.)

3.396

3.396

58/8

57+965

Pipe culvert Dia 0.900

0.084

0.084

59/1

60 /1
59/2 A

58+018

Box Culvert skew type(1.0*1.3)

2.659

2.659

59+030

Pipe culvert Dia 0.900

0.041

0.041

58+921

Pipe culvert Dia 0.900

0.588

0.588

Retaining wall / LHS

0.063

0.063

57+630

57+634

58+020

58+023

Retaining wall / RHS

0.040

0.040

58+510

58+541

Toe wall / RHS

0.241

0.241

58+656

58+890

Retaining wall / LHS

1.741

1.741

58+690

58+710

Retaining wall / RHS

0.072

0.072

0.032

0.032

0.187

SECTI ON 02 (30+000k m to 45+000 B 484)


32 /1

31+381.5

Irri. Outlet Dia 0.200

34/1

33+262

Irri. Outlet Dia 0.300

0.029

0.029

38/2

37+217

Irri. Outlet Dia 0.600 x 2

0.815

0.815

38/3A

37+521

Irri. Outlet Dia 0.600

0.531

0.531

39/1

38+053

Irri. Outlet Dia 0.300

0.024

0.024

39/2

38+566

Irri. Outlet Dia 0.300

0.054

0.054

41/2

40+481.5

Irri. Outlet Dia 0.150

0.043

0.043

42/1

41+698.5

Irri. Outlet Dia 0.450

0.061

0.061

42/2

41+100

0.036

0.036

32+578

32+605

Toe wall / LHS

Sub total C/F

For Contractor

Designation
Date

0.405

27.876

27.640

For Engineer

Signature
Name

0.405

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

0.236

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.6 - Tor Steel reinforcement

Structure No

Unit :
Qty
(MT)

Description

Progress Qty
(MT)

Sub total B/F

Previouse claimed Qty


(MT)

27.876

27.640

MARAKA

32+682

Retaining wall / Byroad

0.677

0.677

34+590

34+620

Retaining wall / RHS

0.303

0.303

38+890

35+112
38+875

Toe wall / LHS

0.060

0.060

Toe wall / LHS

1.338

1.338

MT
Balance Qty
(MT)

0.236

SECTI ON 03 (33+500k m to 44+000 B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

7.318

7.318

34/4

33+663

Box Culvert (1.5*1.0)

2.635

2.635

35/1

34+845

Box Culvert (1.5*1.0)

2.495

2.495

36/1

34+983

Box Culvert (1.2*1.0)

2.441

2.441

36/2

35+333

Box Culvert (1.3*1.0)

2.474

2.474

36/4

35+733

Box Culvert (1.2*1.0)

2.195

2.195

37/1

36+214

Box Culvert (1.5*1.0)

2.343

2.343

38/1

37+058

Box Culvert (1.5*1.0)

2.526

2.526

38/2

37+091

Box Culvert (2.5*2.5)

1.607

1.607

38/3

37+176

Double Pipe culvert Dia 0.900

0.092

0.092

38/4

37+400

Box Culvert (1.2*1.0)

2.387

2.387

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

2.734

2.734

38/6

37+720

Box Culvert (1.2*1.0)

2.209

2.209

38/7

37+788

Box Culvert (1.2*1.0)

2.208

2.208

39/1

38+209

Box Culvert (1.4*1.0)

2.341

2.341

2.464

2.464

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

2.460

2.460

40/2

39+176

Box Culvert (2.5*2.0)

4.994

4.994

40/3

39+467

Box Culvert (1.2*1.0)

2.405

2.405

40/4

39+766

Box culvert (2.0*1.0)

3.185

3.185

41/2

40+214

Box culvert (1.5*1.0)

2.479

2.479

41/3

40+388

Box culvert (2.0*2.0)

0.078
-

41/4

40+789

Box culvert (1.5*1.0)

0.078

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/3

41+491

Box culvert

0.342

0.342

42/4

41+823

Box culvert (1.5*1.0)

2.453

2.453

43/1

42+559

Box culvert (1.0*1.0)

0.651

0.651

44/1

43+024

Box culvert (1.5*1.0)

2.414

2.414
2.416

44/2

43+088

Box culvert (1.5*1.0)

2.416

44/3

43+283

Box culvert (2.5*2.0)

1.985

1.985

44/4

43+381

Box culvert (1.5*1.0)

0.880

0.880

97.465

97.229

Sub total

Total Design Quantity

0.236
-

Total Prog. Quantity

97.465

Previously Claimed Quantity

97.229

Balance Qty

0.236

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.7 - 25mm 1m long mild steel dowel to rock

Structure No

Unit :

Qty
(Nos)

Description

Previouse claimed Qty


(Nos)

Progress Qty
(Nos)

Nos
Balance Qty
(Nos)

SECTI ON 01-i (20+880k m to 30+000k m B 484)


21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

25+758

25+773

Retaining wall / RHS

25+879

25+885

Retaining wall / RHS

SECTI ON 01 - ii (57+000k m to 59+000k m B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

57+630

57+634

Retaining wall / LHS

58+020

58+023

Retaining wall / RHS

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

SECTI ON 02 (30+000k m to 45+000k m B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

38/3A

37+521

Irri. Outlet Dia 0.600

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

Retaining wall / Byroad

MARAKA
34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

SECTI ON 03 (33+500k m to 44+000k m B 312)


7.00

34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

Sub total C/F

For Contractor

Designation
Date

7.00

For Engineer

Signature
Name

7.00

7.00

AD Wadugodapitiya

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.7 - 25mm 1m long mild steel dowel to rock

Structure No

Unit :

Qty
(Nos)

Description

Sub total B/F

Progress Qty
(Nos)

Previouse claimed Qty


(Nos)

7.00

7.00

Nos
Balance Qty
(Nos)

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

5.00

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

12.00

24.00

12.00

5.00

24.00

Total Design Quantity

Total Prog. Quantity

24.00

Previously Claimed Quantity

24.00

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

AD Wadugodapitiya

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.10 - Formwork smooth finish of culvert

Structure No

Unit :
Qty
(m2)

Description

Progress Qty
(m2)

Previouse claimed Qty


(m2)

m2
Balance Qty
(m2)

SECTI ON 01-i (20+880km to 30+000km B 484)


21+457

Pipe culvert Dia 0.900

3.15

3.15

23/2A

22+183

Pipe culvert Dia 0.900

6.050

6.05

23/2

22+513

Pipe culvert Dia 0.300

3.450

3.45

26/1

25+089

Pipe culvert Dia 0.225

5.720

27/2

26+643

Pipe culvert Dia 0.225

7.00

7.00
6.87

22 /1

28/2

27+314

Pipe culvert Dia 0.150

6.87

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

5.70

5.70

29/1

27+957

Pipe culvert Dia 0.225

6.07

6.07

29/2

28+537

Pipe culvert Dia 0.225

4.17

4.17

30/1

29+706

Pipe culvert Dia 0.300

5.57

5.57

Pipe culvert Dia 0.225

5.39

14.40

14.40

101.12

101.12

31/1

29+988

21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

12.05

12.05

25+758

25+773

Retaining wall / RHS

39.00

39.00

25+879

25+885

Retaining wall / RHS

12.00

12.00

26+786

26+794.2

Toe wall / LHS

22.14

22.14

29+665

29+680

47.700

47.70

Retaining wall / RHS

5.72

5.39

SECTI ON 01 - ii (57+000km to 59+000km B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58.15

51.96

58/2

57+042

Box Culvert (1.0*1.0)

63.73

63.73
63.33

58/3

57+283

Box Culvert (1.0*1.0)

63.33

58/4

57+402

Box Culvert skew type(1.0*1.0)

51.99

51.99

58/6 A

57+625

Box Culvert (1.0*1.0)

49.13

49.13

58/7

57+846

Box Culvert skew type(1.0*1.2.)

66.16

66.16

58/8

57+965

Pipe culvert Dia 0.900

23.79

23.79

59/1

58+018

Box Culvert skew type(1.0*1.3)

57.26

57.26

58+921

Pipe culvert Dia 0.900

41.33

41.33

59+030

Pipe culvert Dia 0.900

49.41

49.41

59/2 A

60 /1
57+630

57+634

Retaining wall / LHS

10.01

10.01

58+020

58+023

Retaining wall / RHS

10.21

10.21

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

51.08

51.08

482.78

482.78

58+690

58+710

Retaining wall / RHS

39.07

39.07

58+862

58+885

Toe wall(RIP RAP) / RHS

10.91

10.91

6.19

SECTI ON 02 (30+000km to 45+000km B 484)


31+381.5

Irri. Outlet Dia 0.200

6.61

6.61

34/1

33+262

Irri. Outlet Dia 0.300

10.27

10.27

32 /1
38/2

37+217

Irri. Outlet Dia 0.600 x 2

17.68

17.68

38/3A

37+521

Irri. Outlet Dia 0.600

11.96

11.96

39/1

38+053

Irri. Outlet Dia 0.300

7.79

7.79

39/2

38+566

Irri. Outlet Dia 0.300

9.28

9.28

41/2

40+481.5

Irri. Outlet Dia 0.150

5.95

5.95

42/1

41+698.5

Irri. Outlet Dia 0.450

24.83

24.83

42/2

41+100

8.64

8.64

32+605

Toe wall / LHS

64.40

64.40

32+578

Sub total C/F

For Contractor

Designation
Date

1,586.00

For Engineer

Signature
Name

1,603.30

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

17.30

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.10 - Formwork smooth finish of culvert

Structure No

Unit :
Qty
(m2)

Description

Progress Qty
(m2)

Sub total B/F

Previouse claimed Qty


(m2)

1,603.30

1,586.00
28.19
69.69

MARAKA

32+682

Retaining wall / Byroad

28.19

34+590

34+620

Retaining wall / RHS

69.69

38+890

35+112
38+875

Toe wall / LHS

15.14

15.14

Toe wall / LHS

31.35

31.35

m2
Balance Qty
(m2)

17.30

SECTI ON 03 (33+500km to 44+000km B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

28.66

28.66

34/4

33+663

Box Culvert (1.5*1.0)

9.27

9.27

35/1

34+845

Box Culvert (1.5*1.0)

9.07

9.07

36/1

34+983

Box Culvert (1.2*1.0)

8.20

8.20

36/2

35+333

Box Culvert (1.3*1.0)

8.55

8.55

36/4

35+733

Box Culvert (1.2*1.0)

8.59

8.59

37/1

36+214

Box Culvert (1.5*1.0)

9.05

9.05

38/1

37+058

Box Culvert (1.5*1.0)

9.16

9.16

38/2

37+091

Box Culvert (2.5*2.5)

7.26

7.26

38/3

37+176

Double Pipe culvert Dia 0.900

26.69

26.69

38/4

37+400

Box Culvert (1.2*1.0)

8.82

8.82

189.40

189.40

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

8.71

8.71

38/7

37+788

Box Culvert (1.2*1.0)

7.18

7.18

39/1

38+209

Box Culvert (1.4*1.0)

9.13

9.13

39/2

38+691

Box Culvert (15*1.0)

8.81

8.81

40/1

39+042

Box Culvert (1.5*1.0)

8.86

8.86

40/2

39+176

Box Culvert (2.5*2.0)

21.28

21.28

40/3

39+467

Box Culvert (1.2*1.0)

8.67

8.67

40/4

39+766

Box culvert (2.0*1.0)

10.88

10.88
9.01

41/2

40+214

Box culvert (1.5*1.0)

9.01

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

18.23

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/3

41+491

Box culvert

42/4

41+823

43/1

44/1

18.23

26.51

26.51

Box culvert (1.5*1.0)

9.10

9.10

42+559

Box culvert (1.0*1.0)

43+024

Box culvert (1.5*1.0)

4.53

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

10.05

44/4

43+381

Box culvert (1.5*1.0)

4.53
10.05

Section 03 (33+500k m to 44+000k m B 312)- Hum e Pipe Ex tentions


41+122

Extention of 225mm Hume Pipe

0.72

0.72

40+130

Extention of 225mm Hume Pipe

0.72

0.72

40+660

Extention of 300mm Hume Pipe

0.86

0.86

40+785

Extention of 300mm Hume Pipe

0.86

0.86

40+902

Extention of 225mm Hume Pipe

0.72

0.72

2,235.22

2,217.92

Sub total

Total Design Quantity

17.30
-

Total Prog. Quantity

2,235.22

Previously Claimed Quantity

2,217.92

Balance Qty

17.30

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.11 - Formwork rough finish of culvert

Structure No

Progress Qty
(m2)

Qty
(m2)

Description

m2

Unit :
Previouse claimed Qty
(m2)

Balance Qty
(m2)

SECTI ON 01-i (20+880km to 30+000 B 484)


22 /1

21+457

3.66

Pipe culvert Dia 0.900

3.66

23/2A

22+183

Pipe culvert Dia 0.900

18.67

15.07

23/2

22+513

Pipe culvert Dia 0.300

18.43

18.43

26/1

25+089

Pipe culvert Dia 0.225

19.630

27/2

26+643

Pipe culvert Dia 0.225

20.52

20.52

3.600
19.63

28/2

27+314

Pipe culvert Dia 0.150

18.30

18.30

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

14.05

14.05

29/1

27+957

Pipe culvert Dia 0.225

18.75

18.75

29/2

28+537

Pipe culvert Dia 0.225

14.31

14.31

30/1

29+706

Pipe culvert Dia 0.300

17.24

13.28

3.96

31/1

29+988

Pipe culvert Dia 0.225

16.790

16.79

21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

28.04

28.04

25+758

25+773

Retaining wall / RHS

71.91

71.91

25+879

25+885

Retaining wall / RHS

25.96

25.96

Toe wall / LHS

43.77

43.77

Retaining wall / RHS

68.41

68.41

Box Culvert (1.0*1.0)

59.12

49.55
64.97
41.49

26+786

26+794.2

29+665

29+680

31.50

31.50

127.63

127.63

SECTI ON 01 - ii (57+000km to 59+000 B 312)


58/1

57+010

58/2

57+042

Box Culvert (1.0*1.0)

64.97

58/3

57+283

Box Culvert (1.0*1.0)

41.49

58/4

57+402

Box Culvert skew type(1.0*1.0)

46.13

46.13

58/6 A

57+625

Box Culvert (1.0*1.0)

49.19

49.19
66.14

58/7

57+846

Box Culvert skew type(1.0*1.2.)

66.14

58/8

57+965

Pipe culvert Dia 0.900

46.75

46.75

59/1

58+018

Box Culvert skew type(1.0*1.3)

52.02

52.02

59/2 A

58+921

Pipe culvert Dia 0.900

64.65

64.65

59+030

Pipe culvert Dia 0.900

108.99

108.99

60 /1
57+630

57+634

Retaining wall / LHS

15.92

15.92

58+020

58+023

Retaining wall / RHS

16.24

16.24

58+510

58+541

Toe wall / RHS

77.31

77.31

58+656

58+890

Retaining wall / LHS

721.04

721.04

58+690

58+710

Retaining wall / RHS

67.26

67.26

58+862

58+885

Toe wall(RIP RAP) / RHS

11.44

11.44

Irri. Outlet Dia 0.200

18.76

18.76

17.00

17.00

9.57

SECTI ON 02 (30+000km to 45+000 B 484)


32 /1

31+381.5

34/1

33+262

Irri. Outlet Dia 0.300

38/2

37+217

Irri. Outlet Dia 0.600 x 2

44.15

44.15

38/3A

37+521

Irri. Outlet Dia 0.600

33.92

33.92

39/1

38+053

Irri. Outlet Dia 0.300

7.59

7.59

39/2

38+566

Irri. Outlet Dia 0.300

20.42

20.42
13.53

41/2

40+481.5

Irri. Outlet Dia 0.150

13.53

42/1

41+698.5

Irri. Outlet Dia 0.450

31.30

31.30

42/2

41+100

22.07

22.07

32+578

32+605

Toe wall / LHS

Sub total C/F

For Contractor

Designation
Date

121.91
2,363.33

For Engineer

Signature
Name

121.91
2,416.88

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

53.55

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.11 - Formwork rough finish of culvert

Structure No

Progress Qty
(m2)

Qty
(m2)

Description

Sub total B/F

2,363.33

44.77

44.77

105.46

105.46

Toe wall / LHS

24.70

24.70

Toe wall / LHS

53.90

53.90

32+682

Retaining wall / Byroad

34+590

34+620

Retaining wall / RHS

38+875

38+890

Previouse claimed Qty


(m2)

2,416.88

MARAKA
35+112

m2

Unit :

Balance Qty
(m2)

53.55

SECTI ON 03 (33+500km to 44+000 B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

210.58

210.58

34/4

33+663

Box Culvert (1.5*1.0)

73.16

73.16

35/1

34+845

Box Culvert (1.5*1.0)

72.60

72.60

36/1

34+983

Box Culvert (1.2*1.0)

69.11

69.11
70.80

36/2

35+333

Box Culvert (1.3*1.0)

70.80

36/4

35+733

Box Culvert (1.2*1.0)

73.10

73.10

37/1

36+214

Box Culvert (1.5*1.0)

73.42

73.42

38/1

37+058

Box Culvert (1.5*1.0)

70.07

70.07

38/2

37+091

Box Culvert (2.5*2.5)

35.37

35.37

Double Pipe culvert Dia 0.900

42.70

42.70

70.32

70.32

239.69

239.69

38/3

37+176

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

70.07

70.07

38/7

37+788

Box Culvert (1.2*1.0)

68.65

68.65
72.19

39/1

38+209

Box Culvert (1.4*1.0)

72.19

39/2

38+691

Box Culvert (15*1.0)

73.23

73.23

40/1

39+042

Box Culvert (1.5*1.0)

72.94

72.94
137.07

40/2

39+176

Box Culvert (2.5*2.0)

137.07

40/3

39+467

Box Culvert (1.2*1.0)

69.66

69.66

40/4

39+766

Box culvert (2.0*1.0)

81.84

81.84
72.36

41/2

40+214

Box culvert (1.5*1.0)

72.36

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

70.46

70.46

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/3

41+491

Box culvert

21.43

21.43

Box culvert (1.5*1.0)

73.31

73.31

42/4

41+823

43/1

42+559

Box culvert (1.0*1.0)

29.71

29.71

44/1

43+024

Box culvert (1.5*1.0)

77.92

77.92

44/2

43+088

Box culvert (1.5*1.0)

78.81

78.81

44/3

43+283

Box culvert (2.5*2.0)

53.98

53.98

44/4

43+381

Box culvert (1.5*1.0)

30.18

30.18

Section 03 (33+500k m to 44+000k m B 312)- Hum e Pipe Ex tentions


41+122

Extention of 225mm Hume Pipe

10.94

10.94

40+130

Extention of 225mm Hume Pipe

10.94

10.94

40+660

Extention of 300mm Hume Pipe

10.15

10.15

40+785

Extention of 300mm Hume Pipe

13.99

13.99

40+902

Extention of 225mm Hume Pipe

Sub total

7.46

7.46

4,953.92

4,900.37

Total Design Quantity

53.55
-

Total Prog. Quantity

4,953.92

Previously Claimed Quantity

4,900.37

Balance Qty

53.55

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km) AND
HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

Unit :

6.12 - Laying 225mm dia concrete pipe (NP2)


LHS

Structure No

Description

Qty
(Nos)

RHS

Previouse
Progress Qty
Balance Qty
claimed Qty
(Nos)
(Nos)
(Nos)

Qty
(Nos)

Progress Qty
(Nos)

Previouse
claimed Qty
(Nos)

Balance Qty
(Nos)

SECTI ON 01 - i (20+880k m to 30+000k m B484)


23/2A

22+183

Pipe culvert Dia 0.900

4.25

26/1

25+089

Pipe culvert Dia 0.225

2.40

27/2

26+643

Pipe culvert Dia 0.225

2.40

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

29/1

27+957

Pipe culvert Dia 0.225

4.25
2.40
2.40

2.40

2.40

3.60

3.60
2.40

29/2

28+537

Pipe culvert Dia 0.225

2.40

31/1

29+988

Pipe culvert Dia 0.225

3.60

3.60

SECTI ON 02 (30+000k m to 45+000k m B 484)


32 /1

31+381.5

Irrigation outlet

2.40

2.40

SECTI ON 03 (33+500k m to 44+000k m B 312)- Hum e Pipe Ex tentions


41+122

Extention of 225mm Hume Pipe

7.20

7.20

40+130

Extention of 225mm Hume Pipe

7.20

7.20

40+660

Extention of 300mm Hume Pipe

40+785

Extention of 300mm Hume Pipe

40+902

Extention of 225mm Hume Pipe

Sub total

4.80

4.80

42.65

36.65

Total Design Quantity

6.00
-

Total Prog. Quantity

42.65

Previously Claimed Quantity

36.65

Balance Qty

6.00

For Contractor

For Engineer

Signature
Name

KKGP Siriwardane

D.M Ranasinghe

Designation

Quantity Surveyor

Project Manager

Date

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.13 - Laying 300mm dia concrete pipe (NP2)

Structure No

Unit :

Qty
(m)

Description

Progress Qty
(m)

Previouse claimed Qty (m)

m
Balance Qty
(m)

SECTI ON 01-i (20+880k m to 30+000k m B 484)


23/2

22+513

Pipe culvert Dia 0.300

2.300

2.30

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

2.400

2.40

30/1

29+706

Pipe culvert Dia 0.300

2.40

2.40

SECTI ON 02 (30+000k m to 45+000k m B 484)


34/1

33+262

Irri. Outlet Dia 0.300

2.44

2.44

39/1

38+053

Irri. Outlet Dia 0.300

2.40

2.40

39/2

38+566

Irri. Outlet Dia 0.300

3.05

3.05

Irri. Outlet Dia 0.150

5.03

41/2

40+481.5

5.03

SECTI ON 03 (33+500k m to 44+000k m B 312)- Hum e P ipe Ex tentions


41+122

Extention of 225mm Hume Pipe

40+130

Extention of 225mm Hume Pipe

40+660

Extention of 300mm Hume Pipe

6.00

6.00

40+785

Extention of 300mm Hume Pipe

8.40

8.40

40+902

Extention of 225mm Hume Pipe

34.42

26.99

Sub total

Total Design Quantity


Total Prog. Quantity
Previously Claimed Quantity
Balance Qty

34.42
26.99
7.43

For Contractor

For Engineer

Signature
Name

KKGP Siriwardane

Designation

D.M Ranasinghe

Quantity Surveyor

Project Manager

Date

7.43

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.13 - Laying 450mm dia concrete pipe (NP2)

Structure No

Unit :

Qty
(m)

Description

Progress Qty
(m)

Previouse claimed Qty (m)

m
Balance Qty
(m)

SECTI ON 02 (30+000k m to 45+000k m B 484)


34+600

34+605

42/1

41+698.5

Access

2.40

2.40

Irri. Outlet Dia 0.450

2.44

2.44

Sub total

4.84

4.84

Total Design Quantity


Total Prog. Quantity
Previously Claimed Quantity
Balance Qty

4.84
4.84
-

For Contractor

For Engineer

Signature
Name
Designation
Date

AD Wadugodapitiya

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.16 - Laying 900 mm dia. Concrete pipe (NP2)

Structure No

Unit :

Qty
(m)

Description

Progress Qty
(m)

Previouse claimed Qty (m)

Balance Qty
(m)

SECTI ON 01-i (20+880k m to 30+000 B 484)


21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

25+758

25+773

Retaining wall / RHS

25+879

25+885

Retaining wall / RHS

SECTI ON 01 - ii (57+000k m to 59+000 B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

11.70

11.70

59+030

Pipe culvert Dia 0.900

2.40

2.40

60 /1

4.60

4.60

57+630

57+634

Retaining wall / LHS

58+020

58+023

Retaining wall / RHS

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

SECTI ON 02 (30+000k m to 45+000 B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

14.30

14.30

38/3A

37+521

Irri. Outlet Dia 0.600

12.20

12.20

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

Retaining wall / Byroad

MARAKA
34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

SECTI ON 03 (33+500k m to 44+000 B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

Sub total C/F

4.60
-

For Contractor

Designation
Date

49.80

For Engineer

Signature
Name

49.80

4.60

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.16 - Laying 900 mm dia. Concrete pipe (NP2)

Structure No

Unit :

Qty
(m)

Description

Progress Qty
(m)

Sub total B/F

Previouse claimed Qty (m)

49.80

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

10.70

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

60.50

49.80

m
Balance Qty
(m)

10.70

60.50

Total Design Quantity

Total Prog. Quantity

60.50

Previously Claimed Quantity

60.50

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.17 - Laying 1200 mm dia. Concrete pipe (NP2)

Structure No

Unit :

Qty
(m)

Description

Progress Qty
(m)

Previouse claimed Qty (m)

m
Balance Qty
(m)

SECTI ON 01-i (20+880k m to 30+000k m B 484)


21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

25+758

25+773

Retaining wall / RHS

25+879

25+885

Retaining wall / RHS

SECTI ON 01 - ii (57+000k m to 59+000k m B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

59/1

58+018

Box Culvert skew type(1.0*1.3)

5.45

59/2 A

58+921

Pipe culvert Dia 0.900

57+630

57+634

Retaining wall / LHS

58+020

58+023

Retaining wall / RHS

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

5.45

SECTI ON 02 (30+000k m to 45+000k m B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

38/3A

37+521

Irri. Outlet Dia 0.600

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

MARAKA

Retaining wall / Byroad

34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

SECTI ON 03 (33+500k m to 44+000k m B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

Sub total C/F

For Contractor

Designation
Date

5.45

For Engineer

Signature
Name

5.45

AD Wadugodapitiya

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.17 - Laying 1200 mm dia. Concrete pipe (NP2)

Structure No

Unit :

Qty
(m)

Description

Progress Qty
(m)

Sub total B/F

Previouse claimed Qty (m)

5.45

5.45

m
Balance Qty
(m)

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

47.26

52.71

47.26

52.71

Total Design Quantity

Total Prog. Quantity

52.71

Previously Claimed Quantity

52.71

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

AD Wadugodapitiya

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


SMS No. :
Bill Item :

6.18 - Weep hole 75mm dia. Pvc pipe (Type 600)

Structure No

Qty
(m)

Description

Unit :
Progress Qty
(m)

Previouse claimed Qty (m)

m
Balance Qty
(m)

SECTI ON 01-i (20+880k m to 30+000 B 484)


23/2A

22+183

Pipe culvert Dia 0.900

1.80

1.80
1.20

23/2

22+513

Pipe culvert Dia 0.300

1.20

26/1

25+089

Pipe culvert Dia 0.225

1.20

27/2

26+643

Pipe culvert Dia 0.225

3.60

3.60

28/2

27+314

Pipe culvert Dia 0.150

1.80

1.80

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

1.80

1.80

29/1

27+957

Pipe culvert Dia 0.225

1.20

1.20

29/2

28+537

Pipe culvert Dia 0.225

1.20

1.20

30/1

29+706

Pipe culvert Dia 0.300

1.20

1.20

31/1

29+988

Pipe culvert Dia 0.225

1.20

21+887

21+905

Toe wall / RHS

3.20

3.20

1.50

1.50

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

25+758

25+773

Retaining wall / RHS

25+879

25+885

26+786

26+794.2

Retaining wall / RHS


Toe wall / LHS

16.00

16.00

2.10

2.10

1.20

1.20

SECTI ON 01 - ii (57+000k m to 59+000 B 312)


58/1

57+010

Box Culvert (1.0*1.0)

1.00

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

60 /1

59+030

Pipe culvert Dia 0.900

8.70

8.70
4.20

57+630

57+634

Retaining wall / LHS

4.20

58+020

58+023

Retaining wall / RHS

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

59+032

59+047

Pipe culvert Dia 0.900

1.00

SECTI ON 02 (30+000k m to 45+000 B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

38/3A

37+521

Irri. Outlet Dia 0.600

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

11.90

11.90

MARAKA

32+682

Retaining wall / Byroad

34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

1.75

1.75

11.09

11.09

SECTI ON 03 (33+500k m to 44+000 B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

Sub total C/F

For Contractor

Designation
Date

74.24

For Engineer

Signature
Name

77.64

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

3.40

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


SMS No. :
Bill Item :

6.18 - Weep hole 75mm dia. Pvc pipe (Type 600)

Structure No

Qty
(m)

Description

Sub total B/F

Unit :
Progress Qty
(m)

Previouse claimed Qty (m)

77.64

74.24

m
Balance Qty
(m)

3.40

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

38/4

37+400

Box Culvert (1.2*1.0)

37.95

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/3

41+491

Box culvert

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

115.59

37.95

112.19

Total Design Quantity

3.40
-

Total Prog. Quantity

115.59

Previously Claimed Quantity

112.19

Balance Qty

3.40

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


SMS No. :
Bill Item :

6.19 - Aggregate backfill (50-200mm dry stone)

Structure No

Qty
(m)

Description

Unit :
Progress Qty
(m)

Previouse claimed Qty (m)

m3
Balance Qty
(m)

SECTI ON 01-i (20+880k m to 30+000 B 484)


22+545

Irri. Drain

0.27

0.27

28 /2

27+314

Irri. Outlet

2.79

2.79

28 /3

27+371

Irri. Outlet

2.79

2.79

5.85

5.85

22+513

Sub total

Total Design Quantity

Total Prog. Quantity

5.85

Previously Claimed Quantity

5.85

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


SMS No. :
Bill Item :

6.20 - 37.5mm maximum size crushed stone filter

Structure No

Qty
(m3)

Description

Unit :
Progress Qty
(m3)

Previouse claimed Qty


(m3)

m3
Balance Qty
(m3)

SECTI ON 01-i (20+880k m to 30+000 B 484)


23/2A

22+183

Pipe culvert Dia 0.900

23/2

22+513

Pipe culvert Dia 0.300

27/2

26+643

Pipe culvert Dia 0.225

28/2

27+314

Pipe culvert Dia 0.150

28/3

27+371

Pipe culvert Dia 0.300 & 0.225

29/1

27+957

Pipe culvert Dia 0.225

29/2

28+537

Pipe culvert Dia 0.225

30/1

29+706

Pipe culvert Dia 0.300

21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

25+758

25+773

Retaining wall / RHS

25+879

25+885

Retaining wall / RHS

26+786

26+794.2

Toe wall / LHS

SECTI ON 01 - ii (57+000k m to 59+000 B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

57+625

Box Culvert (1.0*1.0)

58/6 A

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

60 /1

59+030

Pipe culvert Dia 0.900

57+630

57+634

Retaining wall / LHS

58+020

58+023

Retaining wall / RHS

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

59+032

59+047

Pipe culvert Dia 0.900

57+480

57+510

Sub Surface Drain

2.10

2.10

0.84

57+785

Sub Surface Drain

0.84

57+964

57+880

Sub Surface Drain

5.87

5.87

57+910

57+915

Sub Surface Drain

0.84

0.84

9.65

57+780

SECTI ON 02 (30+000k m to 45+000 B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

38/3A

37+521

Irri. Outlet Dia 0.600

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

MARAKA

32+682

Retaining wall / Byroad

34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

Sub total C/F

For Contractor

For Engineer

Signature
Name
Designation
Date

9.65

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


SMS No. :
Bill Item :

6.20 - 37.5mm maximum size crushed stone filter

Structure No

Qty
(m3)

Description

Sub total B/F

Unit :
Progress Qty
(m3)

Previouse claimed Qty


(m3)

9.65

m3
Balance Qty
(m3)

9.65

SECTI ON 03 (33+500k m to 44+000 B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/3

41+491

Box culvert

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

9.65

Total Design Quantity

Total Prog. Quantity

9.65

Previously Claimed Quantity

Balance Qty

9.65

For Contractor

For Engineer

Signature
Name
Designation
Date

9.65

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.23 - Guard Stones

Structure No

Unit :
Qty
(Nos)

Description

Previouse claimed Qty


(Nos)

Progress Qty
(Nos)

Nos
Balance Qty
(Nos)

SECTI ON 01-i (20+880km to 30+000km B 484)


21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

25+758

25+773

Retaining wall / RHS

25+879

25+885

Retaining wall / RHS

SECTI ON 01 - ii (57+000km to 59+000km B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

4.000

4.000

57+630

57+634

Retaining wall / LHS

7.000

7.000

58+020

58+023

Retaining wall / RHS

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

76.000

76.000

SECTI ON 02 (30+000km to 45+000km B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

38/3A

37+521

Irri. Outlet Dia 0.600

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

MARAKA

Retaining wall / Byroad

34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

SECTI ON 03 (33+500km to 44+000km B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

Sub total C/F

87.00

For Contractor

87.00

For Engineer

Signature
Name
Designation
Date
Sub total B/F

AD Wadugodapitiya

D.M Ranasinghe

Quantity Surveyor

Project Manager
-

87.00

87.00

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.23 - Guard Stones

Structure No

Unit :
Qty
(Nos)

Description

Progress Qty
(Nos)

Previouse claimed Qty


(Nos)

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

44/4

43+381

Box culvert (1.5*1.0)

Sub total

87.000

87.000

Total Design Quantity

Nos
Balance Qty
(Nos)

Total Prog. Quantity

87.000

Previously Claimed Quantity

87.000

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

AD Wadugodapitiya

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.24 - Backfilling structures using type I embankment material

Structure No

Qty
(m3)

Description

Unit :
Progress Qty
(m3)

Previouse claimed Qty


(m3)

m3
Balance Qty
(m3)

SECTI ON 01 - ii (57+000km to 59+000 B 312)


58/1

57+010

Box Culvert (1.0*1.0)

58/2

57+042

Box Culvert (1.0*1.0)

58/3

57+283

Box Culvert (1.0*1.0)

58/4

57+402

Box Culvert skew type(1.0*1.0)

58/6 A

57+625

Box Culvert (1.0*1.0)

58/7

57+846

Box Culvert skew type(1.0*1.2.)

58/8

57+965

Pipe culvert Dia 0.900

59/1

58+018

Box Culvert skew type(1.0*1.3)

59/2 A

58+921

Pipe culvert Dia 0.900

57+630

57+634

Retaining wall / LHS

58+020

58+023

Retaining wall / RHS

58+510

58+541

Toe wall / RHS

58+656

58+890

Retaining wall / LHS

58+690

58+710

Retaining wall / RHS

0.89

0.89

SECTI ON 01-i (20+880km to 30+000 B 484)


21+887

21+905

Toe wall / RHS

22+513

22+545

Irri. Drain

25+489

25+501

Toe wall / RHS

25+758

25+773

Retaining wall / RHS

25+879

25+885

Retaining wall / RHS

SECTI ON 02 (30+000km to 45+000 B 484)


38/2

37+217

Irri. Outlet Dia 0.600 x 2

38/3A

37+521

Irri. Outlet Dia 0.600

39/1

38+053

Irri. Outlet Dia 0.300

39/2

38+566

Irri. Outlet Dia 0.300

32+578

32+605

Toe wall / LHS

MARAKA

Retaining wall / Byroad

34+590

34+620

Retaining wall / RHS

38+875

38+890

Toe wall / LHS

21.74

21.74

SECTI ON 03 (33+500km to 44+000 B 312)


34/3

33+527

Twin cell Box Culvert (2.5*2.0)

34/4

33+663

Box Culvert (1.5*1.0)

35/1

34+845

Box Culvert (1.5*1.0)

36/1

34+983

Box Culvert (1.2*1.0)

36/2

35+333

Box Culvert (1.3*1.0)

36/4

35+733

Box Culvert (1.2*1.0)

37/1

36+214

Box Culvert (1.5*1.0)

38/1

37+058

Box Culvert (1.5*1.0)

38/2

37+091

Box Culvert (2.5*2.5)

38/3

37+176

Double Pipe culvert Dia 0.900

Sub total C/F

For Contractor

Designation
Date

22.63

For Engineer

Signature
Name

22.63

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.24 - Backfilling structures using type I embankment material

Structure No

Qty
(m3)

Description

Sub total B/F

Unit :
Progress Qty
(m3)

Previouse claimed Qty


(m3)

22.63

38/4

37+400

Box Culvert (1.2*1.0)

38/5

37+490

Causeway (Hume pipe Dia 1.2 x 8)

38/6

37+720

Box Culvert (1.2*1.0)

38/7

37+788

Box Culvert (1.2*1.0)

39/1

38+209

Box Culvert (1.4*1.0)

39/2

38+691

Box Culvert (15*1.0)

40/1

39+042

Box Culvert (1.5*1.0)

40/2

39+176

Box Culvert (2.5*2.0)

40/3

39+467

Box Culvert (1.2*1.0)

40/4

39+766

Box culvert (2.0*1.0)

41/2

40+214

Box culvert (1.5*1.0)

41/3

40+388

Box culvert (2.0*2.0)

41/4

40+789

Box culvert (1.5*1.0)

42/1

41+055

Box culvert (1.2*1.0)

42/2

41+204

Box culvert (2.0*1.5)

42/4

41+823

Box culvert (1.5*1.0)

43/1

42+559

Box culvert (1.0*1.0)

44/1

43+024

Box culvert (1.5*1.0)

44/2

43+088

Box culvert (1.5*1.0)

44/3

43+283

Box culvert (2.5*2.0)

35.85

44/4

43+381

Box culvert (1.5*1.0)

Sub total

58.48

22.63

m3
Balance Qty
(m3)

35.85

58.48

Total Design Quantity

Total Prog. Quantity

58.48

Previously Claimed Quantity

58.48

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km) AND
HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

6.27 - 25mm dia. 400mm long Mild Steel dowel

Unit :
LHS

Structure No

Description

RHS

Previouse
Progress Qty
Balance Qty
claimed Qty
(Nos)
(Nos)
(Nos)

Qty
(Nos)

Nos.

Previouse
Progress Qty
claimed Qty
(Nos)
(Nos)

Qty
(Nos)

Balance Qty
(Nos)

SECTI ON 01 (20+880k m to 30+000k m B484)


22 /1

21+457

Irri. Outlet

18.00

18.00

6.0

6.00

6.00

SECTI ON 02 (30+000k m to 45+000k m B484)


38+875

38+880

Toe wall / LHS

18.0

SECTI ON 03 (33+500km to 44+000 km B 312)


40/1

39+042

Box Culvert (1.5*1.0)

42/3

41+491

Box culvert

Sub total

18.00

18.00

18.00

3.00
7.00

3.00
7.00

3.00
7.00

16.00

16.00

16.00

Total Design Quantity

34.00

Total Prog. Quantity

34.00

Previously Claimed Quantity

34.00

Balance Qty

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane
Quantity Surveyor

D.M Ranasinghe
Project Manager

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

7.1.1
Furnish, spread and compact top soil

IPC No

27

Quantity ( Nos.)

Section

Previous
9,014.55

9,014.55

Section 01-ii
57+000 ~ 59+000
(Design CS)

762.16

762.16

Sec.02
30+000~ 45+000
(Design CS)

941.16

941.16

Sec.03
33+500~ 44+000
(Design CS)

10,717.87

For Contractor
Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

Total Qty

Name

This Month

10,717.87

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

7.1.1
Furnish, spread and compact top soil

IPC No

27
SECTION

LOCATION

Sec.01-i
20+000~ 30+000

QUANTITY ( m2)

SMS No.

LHS

21+468 ~ 21+554.2

B484/S1/IPC26/7.1.1/01

Total=

21+832.3 ~ 21+866.5

B484/S1/IPC26/7.1.1/02

21+877 By road

RHS

Both Sides

Total=

Total=

Total=

Total=

Total=

B484/S1/IPC26/7.1.1/03

Total=

Total=

Total=

21+950 ~ 21+954 By
road

B484/S1/IPC26/7.1.1/04

Total=

Total=

Total=

21+954 ~ 21+972

B484/S1/IPC26/7.1.1/05

Total=

Total=

Total=

22+916 ~ 22+978

B484/S1/IPC26/7.1.1/06

Total=

Total=

Total=

22+985 ~ 22+026.5

B484/S1/IPC26/7.1.1/07

Total=

Total=

Total=

23+298 ~ 23+378

B484/S1/IPC26/7.1.1/08

Total=

Total=

Total=

23+385 ~ 23+411

B484/S1/IPC26/7.1.1/09

Total=

Total=

Total=

23+417 ~ 23+481

B484/S1/IPC26/7.1.1/10

Total=

Total=

Total=

23+490 ~ 23+564

B484/S1/IPC26/7.1.1/11

Total=

Total=

Total=

23+571 ~ 23+586

B484/S1/IPC26/7.1.1/12

Total=

Total=

Total=

23+972 ~ 24+045.5

B484/S1/IPC26/7.1.1/13

Total=

Total=

Total=

24+063 ~ 24+088

B484/S1/IPC26/7.1.1/14

Total=

Total=

Total=

Sub Total (i)


Sec.01-ii
57+000~ 59+000

Total=

Total=

Total=

Total=

Total=

Total=

Total=

Total=

Total

For Engineer / Engineers Representative


Checked by

Signature
Name

KKGP Siriwardane

DM Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Total=

Sub Total (ii)

For Contractor
Prepared by

Checked by

Certified by

535.365

444.275

535.365

444.275

K.K.G.P.Siriwardane
Quantity Surveyor

K.M.Premaratne
Project Manager (S1,S2)

Hovael Constructions.

Hovael Constructions.

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

7.2.1
Grass sodding (provisional)

IPC No

27

Quantity (m2)

Section

Previous

Section 01-i
20+880 ~ 30+000
(Design CS)

7,808.86

Section 01-ii
57+000 ~ 59+000
(Design CS)

571.62

Sec.02
30+000~ 45+000
(Design CS)

705.87

Sec.03
33+500~ 44+000
(Design CS)

Total Qty

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative
7,808.86

190.54

762.16

705.87

9,086.35

For Contractor

Name

This Month

190.54

9,276.89

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

7.2.1
Grass sodding (provisional)

IPC No

27
SECTION

LOCATION

QUANTITY ( m2)

SMS No.

LHS
Total=

Sec.01-i
20+000~ 30+000

Total=

RHS
-

Both Sides

Total=

Total=

Total=

Total=

Sub Total (i)

Sec.01-ii
57+000~ 59+000

58+530~ 58.689.5

B312/S1/IPC 27/7.2.1/01

Total=

Total=

47.78 Total=

47.78

58+709.5~ 58+857

B312/S1/IPC 27/7.2.1/02

Total=

Total=

118.94 Total=

118.94

58+890~ 58+922.7

B312/S1/IPC 27/7.2.1/03

Total=

Total=

23.82 Total=

23.82

Sub Total (ii)

190.54
190.54

Total

For Contractor
Prepared by

For Engineer / Engineers Representative


Checked by

Signature
Name

KKGP Siriwardane

DM Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

Checked by

Certified by

Engineer :

Contractor :
Central Engineering Consultancy Bureau

Hovael Construction (Pvt) Ltd

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 km & 57+000~59+000 km)
AND HASALAKA-HANDUNGAMUWA ROAD B-484 (20+000~45+000 km)

SUMMARY SHEET - ROAD WORKS


Bill Item :

7.3.2 - Dump Rip rap protection

Structure No

Unit :
Qty
(m3)

Description

Progress Qty
(m3)

Previouse claimed Qty


(m3)

m3
Balance Qty
(m3)

SECTI ON 01 - ii (57+000k m to 59+000 B 312)


58+862

58+885

Sub total

11.08

11.08

11.080

11.08

Total Design Quantity

Total Prog. Quantity

11.08

Previously Claimed Quantity

Balance Qty

11.08

For Contractor

For Engineer

Signature
Name
Designation
Date

KKGP Siriwardane

D.M Ranasinghe

Quantity Surveyor

Project Manager

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

7.4.2
Filter Fabric

IPC No

27

Quantity (m2)

Section

Previous

Section 01-i
20+880 ~ 30+000
(Design CS)

Strcture Backfill

15.60

Embankment

175.50

26.15

201.65

Section 01-ii
57+000 ~ 59+000
(Design CS)

Strcture Backfill

207.00

207.00

Embankment

Sec.02
30+000~ 45+000
(Design CS)

Strcture Backfill

Sec.03
33+500~ 44+000
(Design CS)

Strcture Backfill

Embankment

Embankment

1,588.87

1,588.87

540.00

540.00

2,526.97

26.15

2,553.12

Approved Qty

2080.00

Qty to be paid From IPC 26 to IPC 27

473.120

For Contractor
Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

15.60

Total

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

7.4.2
Filter Fabrc

IPC No

27
QUANTITY ( m2)

SECTION

LOCATION

SMS No.

Section 01-i
20+000 ~ 30+000

20+865-880

B484/S1/IPC27/EW/EM/01

Total=

20+870-871

B484/S1/IPC27/EW/EM/04

Total=

LHS

RHS
-

Total=

14.26 Total=

Both Sides
11.89 Total=

11.89

Total=

14.26

Sub Total (i)

Section 01-ii
57+000 ~ 59+000

26.15
Total=

Total=

Total=

Total=

Total=

Total=

Total=

Total=

Total=

Total=

Total=

Total=

Sub Total (ii)

Total(Sub total i+ii)

For Contractor
Prepared by

Checked by

Signature
Name

KKGP Siriwardane

DM Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

26.15

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

7.10.1
Excavation for trenching

IPC No

27

Quantity ( Nos.)

Section

Previous
3.68

3.68

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

Sec.03
33+500~ 44+000
(Design CS)

33.60

8.40

42.00

Total Qty

37.28

8.40

45.68

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

For Contractor

Name

This Month

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

7.10.1
Excavation for trenching

IPC No

27

SECTION

LOCATION

Sec.03
33+500~ 44+000

QUANTITY ( m3)

SMS No.

LHS

38+400

IPC 27/B312/IC/033

Total=

38+905

IPC 27/B312/IC/037

Total=

RHS
-

Total=

Both Sides
-

Total=

4.20

Total=

Total=

4.20

Total=

Total=

Total=

Total=

Total=

Total=

8.40
Total Qty for IPC 27

For Contractor
Prepared by

For Engineer / Engineers Representative


Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

8.40

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

7.10.2
Backfilling with sand

IPC No

27

Quantity ( m3)

Section

Previous

Section 01-i
20+880 ~ 30+000
(Design CS)

Service Ducts
Sand for voids in
Rock filling
Section 01-ii
Service Ducts
57+000 ~ 59+000
Sand for voids in
(Design CS)
Rock filling
Sec.02
Service Ducts
30+000~ 45+000
Sand for voids in
(Design CS)
Rock filling
Sec.03
Service Ducts
33+500~ 44+000
Sand for voids in
(Design CS)
Rock filling
Total Qty

For Contractor
Prepared by

Checked By

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Signature
Name

Date

This Month
2.10

Cumulative
-

2.10

19.68

4.92

24.60

21.78

4.92

26.70

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

7.10.2
Backfilling with sand

IPC No

27

SECTION

LOCATION

Sec.03
33+500~ 44+000

QUANTITY ( m3)

SMS No.

LHS

38+400

IPC 27/B312/IC/034

Total=

38+905

IPC 27/B312/IC/038

Total=

RHS
-

Total=

Both Sides
-

Total=

2.46

Total=

Total=

2.46

Total=

Total=

Total=

Total=

Total=

Total=

4.92
Total Qty for IPC 26

For Contractor
Prepared by

For Engineer / Engineers Representative


Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

4.92

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

7.10.3
Backfilling with soil (Type 1 sub base material)

IPC No

27

Quantity ( Nos.)

Section

Previous
1.38

Section 01-ii
57+000 ~ 59+000
(Design CS)

Sec.02
30+000~ 45+000
(Design CS)

Sec.03
33+500~ 44+000
(Design CS)

12.00

2.40

14.40

Total Qty

13.380

2.400

15.780

Prepared by

Checked By

Signature
K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

Section 01-i
20+880 ~ 30+000
(Design CS)

For Contractor

Name

This Month

1.38

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

7.10.3
Backfilling with soil (Type 1 sub base material)

IPC No

27

SECTION

LOCATION

Sec.03
33+500~ 44+000

QUANTITY ( m3)

SMS No.

LHS

38+400

IPC 27/B312/IC/035

Total=

38+905

IPC 27/B312/IC/039

Total=

RHS
-

Total=

Both Sides
-

Total=

1.20

Total=

Total=

1.20

Total=

Total=

Total=

Total=

Total=

Total=

2.40
Total Qty for IPC 27

For Contractor
Prepared by

For Engineer / Engineers Representative


Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

2.40

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

7.10.4
Supply and placing 160mm dia type 600 upvc pipe with end caps for service duct

IPC No

27

Quantity ( Nos.)

Section

Previous

This Month

Section 01-i
20+880 ~ 30+000
(Design CS)

10.00

10.00

Section 01-ii
57+000 ~ 59+000
(Design CS)

138.00

138.00

Sec.02
30+000~ 45+000
(Design CS)

Sec.03
33+500~ 44+000
(Design CS)

96.00

24.00

120.00

Total Qty

244.00

24.00

268.00

195.00
73.000

Approved Qty
Qty to be paid from IPC26 to IPC27

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

Cumulative

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.
Item Description

7.10.4
Supply and placing 160mm dia type 600 upvc pipe with end caps for service duct

IPC No

27

SECTION

LOCATION

Sec.03
33+500~ 44+000

LHS

38+400

IPC 27/B312/IC/036

Total=

38+905

IPC 27/B312/IC/040

Total=

Prepared by

RHS
-

Total=

Both Sides
-

Total=

12.00

Total=

Total=

12.00

Total=

Total=

Total=

Total=

Total=

Total=

Sub Total

24.00

Total Qty for IPC 27

24.00

For Contractor

For Engineer / Engineers Representative


Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

QUANTITY ( m3)

SMS No.

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

8
Shedule of Dayworks

IPC No

26

8.1

Semiskilled workman

hr

8.1.17

Unskilled workman
(labourer)

hr

33.00

30.00

4.00

B312/S1 i/IPC26/DW/04

B312/S1 i/IPC26/DW/03

B312/S1 i/IPC26/DW/02

B312/S1 i/IPC26/DW/01
-

9.00

3.60

25.20

3.60

67.00

3.00

Equipment Daywork
Loader Backhoe

hr

3.00

8.2.15

Tipper truck, 10 tonnes

hr

4.00

4.00

hr

13.00

4.00

17.00

hr

1.50

1.50

m3

8.49

8.49

MT

4.00

4.00

8.2.20
8.3
8.3.1
8.3.6

Remarks

41.40 SSD

8.2.6b

8.2.17

Backhoe tracked or
wheled , 50 HP
Steel-wheeled roller,
static, 8 to 10 tonnes
Material Daywork
Aggregate base, dense
grader (37.5mm)
Asphalt concrete, cold
mix

8.1.17
Approved total Qty

300

Payment for this IPC

18.00

For Contractor
Prepared by

Name

K.K.G.P.Siriwardane

Designation

Quantity Surveyor

Organization

Hovael Constructions.

8.2.17

8.3.6

10.000

5.000

0.70

For Engineer / Engineers Representative


Checked by

Signature

Date & Time

Total

Labour Daywork

8.1.16

8.2

B312/IPC26/DWR-066

UINT

B312/IPC26/DWR-065

DESCRIPTION

B312/IPC26/DWR-064

BOQ ITEM
NO.

B312/IPC26/DWR-062

Qty.

D.M.Ranasinghe
Project Manager
Hovael Constructions

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

8.1.17
Labour Day works- Unskilled Labour

IPC No

27

Quantity ( m3)

Description

Previous

Labour Day works- Unskilled Labour


Total Qty

This Month

Cumulative

300.00

77.00

377.00

300.00

77.00

377.00

NOTE-

** Quantity for this month claim is the quantity holded from IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

8.2.17
Equipment Day works- Backhoe- tracked or wheeled 50HP

IPC No

27

Quantity ( m3)

Description

Previous

This Month

Cumulative

Equipment Day works- Backhoe- tracked or


wheeled 50HP

9.30

17.00

26.30

Total Qty

9.30

17.00

26.30

NOTE-

** Quantity for this month claim is the quantity holded from IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET


BOQ Item No.
Item Description

8.3.6
Asphalt concrete, cold mix

IPC No

27

Quantity ( m3)

Description

Previous

Asphalt concrete, cold mix


Total Qty

This Month

Cumulative

5.00

16.50

21.50

5.00

16.50

21.50

NOTE-

** Quantity for this month claim is the quantity holded from IPC 25.

For Contractor
Prepared by

Checked By

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date

For Engineer / Engineers Representative


Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B484 (20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

MEASUREMENT SHEET
BOQ Item No.
Item Description
IPC No.

9.8
Provide stationary for the Engineer/ Employer

26

DESCRIPTION

PERIOD OF PAYMENT

Stationary Bills

Nov-15

AMOUNT(Rs)

REMARKS

Therefor,
Total Amount for this IPC 25 =

For Contractor
Prepared by

Checked & Issued by

Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation
Organization

Q.S.
Hovael Constructions

Project Manager
Hovael Constructions

Signature

Date & Time

Rs.

For Engineer / Engineers Representative


Checked by

Certified by

BOQ Item No.


Item Description
Serial
No.

: 9.8
: Provide stationary for the Engineer/Employer
Bill No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

8154

8155

Description
A4 papers,Double A brand 12 pkts
Atlas Blue pens - 24 nos
Sign pens - 4 nos
HP61 cartridge02 nos(01 Colour & 01 no
Black
Tipex 02 nos
Envelop 9x4 100 nos
Envelop A4 75 nos
Highlighter pen 06 nos
Permenant marker pens 02 nos
OHP pen 01 no
W/B Marker 02 nos
Fastner Pkt 01 no
Buldo clip 15mm 48 Pcs
Buldo clip 19mm 48 Pcs
Box File- 10 nos
Card board file 24 pcs
Field Note book -06 nos
CD pouch 01 no

Sub Total(i) =

Amount(Rs.)

Bill Amount(Rs.)

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


9.11
Widening of 8 Nos. causeways in Hassalaka to Handungamuwa Road as per RDA &
Irrigation Department requirement and approval,including excavation etc (same rates in
BOQ items will be applied)
27

BOQ Item No.


Item Description
IPC No

Description

Previous

Widening of
Causeway 31 /3

4,511,052.16

This month
2,129,891.49

TOTAL AMOUNT

For Engineer / Engineers Representative


Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

6,640,943.65
6,640,943.65 RS.

For Contractor
Prepared by

Cumilative

Checked by

Certified by

REHABILITATION AND UPGRADING OF NAULA-ELAHERA-PALLEGAMA-HETTIPOLA ROAD B-312 (33+500~44+000 KM & 57+000~59+000 KM) AND HASALAKA-HADUNGAMUWA ROAD B-484
(20+000~45+000 KM)
CONTRACT NO. : RDA/DW/CP/GOSL/2012/233

ITEM SUMMARY SHEET - MISCELLANEOUS


BOQ Item No.

9.11 B

Item Description

Design & Construction supervision for irrigation Department

IPC No

27

Description

Previous

Payments for Irrigation


Dept.

Cumilative

This month

1,408,203.72

TOTAL AMOUNT

1,408,203.72 RS.

For Contractor
Prepared by

For Engineer / Engineers Representative


Checked by

Signature
Name

K.K.G.P.Siriwardane

D.M.Ranasinghe

Designation

Quantity Surveyor

Project Manager

Organization

Hovael Constructions.

Hovael Constructions

Date & Time

1,408,203.72

Checked by

Certified by