Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Development Management
Quality Maintenance
Planned Maintenance
Focussed Improvement
Autonomous Maintenance
8 Pillars of TPM
Autonomous Maintenance
or
PRODUCTION
MAINTENANCE
DEVELOP
Responsible
What TO DO
Operator/Supervisor/
Officer/Manager
1. Initial Clean Up
2. Countermeasures for Contamination
Sources & Hard to do CLIT
3. Apply Tentative Standards
4. Carry Out General Inspection
5. Do General Process Inspection
6. Standardize the Activities
7. Improve & Maintain
HEINRICH TRIANGLE
Major Problem (1)
EQUIPMENT DETERIORATION
Natural Deterioration Accelerated Deterioration
Extend Life Time
Corrective Maintenance
Prevent errors by
improving operability
Improve Maintainability
& Repair Quality
Improve safety
& Reliability
Eliminate Causes
AUTONOMOUS MAINTENANCE
STOP ACCELERATED DETERIORATION
CLEAN THE EQUIPMENT
IDENTIFY PROBLEM AREAS AND RECTIFY
DEVELOP/IMPLEMENT STANDARDS
IMPROVE IT FURTHER
KNOW YOUR MACHINE WELL
INNOVATE AND IMPLEMENT NEW IDEAS
Preparation
5S
SEIRI
SORTING
SEITION
SYSTEMATISING
SEISO
SHINING (Cleaning)
SEIKETSU
STANDARDISING
SITSUKE
SELF-DESCIPLINE
SAMPLE
DELIVERY
VALVE
N. R .V
DELIVERY
VALVE
ICW LINE
V.T.
PUMP
F.W.PUMP DELIVERY HEADER
GREASE SPILLAGE
WATER LEAKAGE
OIL LEAKAGE
Problem description
Frequency
Present Status
Checking Standard (OK/ Not OK)
Target
Date
MONITORING OF OEE
OEE
Base Level
Current Avg.
Target
33.60
59.65
93.10
100
90.0
75
65.0
50
Nov
Sep
Jul
May
Mar
Jan
25
Quality Rate
Performance Rate
Availability
Base Level
Current Avg.
Target
60.00
80.75
95.00
Base Level
Current Avg.
Target
70.00
82.08
98.00
80.00
89.00
100.00
95.0
100
100
100.00
Base Level
Current Avg.
Target
90.0
81.0
75.00
75
70.0
75
50.00
50
50
25
25
Nov
Sep
Jul
May
Mar
Jan
Nov
Sep
Jul
May
Mar
Nov
Sep
Jul
May
Mar
Jan
0.00
Jan
25.00
Activitiy Board
Jishu Hozen summary of
abnormalities & analysis
Circle Name:
Loss Structure
Team Memebrs:
Equipment Schematic
Diagram
TPM Targets
Jishu Hozen and Planned
P, Q, C, D, S, M Base values, Maintenance immediate plan for
Benchmark & Targets
next 3-4 months
Master Plan
(next 3-4 Years)
Audit Results:
Jishu Hozen and Planned
Maintenance
Audit Dates planned:
C, L, I, & R standards
Summary of Why Why Analysis
(cause vs number of analysis) ,
matrix
3. Area-wise equipment weakness
4. Abnormality type wise stat
Members
Circle
Section and
Subsection Policies Goals and
Measures
Sub leader
Kobetsu-Kaizen
Themes !
Understand Present
status
Analysis
Troubleshooting and
Schedule
Accomplishment Indices
Overall Efficiency
*
Fuguai List
One-Point
Lesson
Availability
Performance
Rate
Effect
Prevention of
Recurrence,
Remaining problems
List of Doubts
Rework
Before
Defect
Minor
Stoppage
Speed
Failure
Acceptance
Photo
Number of Suggestions
Efu Attaching
and Removing
Actual Work
Meetings
Activities
Before
Sl. No.
Preparation Date
Basic Condition
Trouble Case
Improvement Case
Date Executed
Teacher
Student
TPM Circle :
PLTCM Welder
Team Details
Mr.
Mr.
Mr.
Mr.
Mr.
Mr.
A Chakraborti
A Behera
A Chadnani
K Kant
J Sinha
P Kumar
Circle Meeting
Facilitator
Leader
Member
Member
Member
Member
: Every Monday 3 PM
MASTERPLAN
TPM Circle : PLTCM WELDER (CRM)
sample
MONTH
1S/2S ACTIVITY & VISUAL MANAGEMENT
JISHU HOZEN
JH STEP ZERO
JH STEP ONE
JH STEP ONE AUDIT
JH STEP TWO
JH STEP TWO AUDIT
JH STEP THREE
JH STEP THREE AUDIT
Present Status
Completed
Completed
Completed
Under Progress
Under Progress *
Yes
Preparation
Month
`Name
Day 1
AA
BB
CC
Day 2
Day 3
Sub-Assemblies
Man-hour
needed
Members
Month:
1
Legend:
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Name of Members:
1.
Planning
2.
3.
Summerization
4.
5.
Implementing Countermeasures
6.
Shutdown Dates
Format: 3.2
Components
Members
30 31 1
Month: April
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
B. C. Sadhukhan
R. L. Dubey
B. Debraj
Gear Box
H. K. Chaturvedi
Gear Assembly
Hood & Trippe
plate
Daljeet Singh
Mohan Singh
M. M. Sridhar
Hydraulic system
G. S. Chatterjee
Legend:
Members:
Mohan Singh
Planning
B. C. Sadhukhan
R. L. Dubey
B. Debraj
H. K. Chaturvedi
Daljeet Singh
M. M. Sridhar
G. S. Chatterjee
Shutdown Dates
CLASSIFICATION OF FUGUAIS
Equipment Weakness
Human Weakness
1.Minor Flaws
5. Quality Defets
3. Leaving deterioration
unattended
4. Design Weakness
7.Unsafe places
5. Shortage of Skills
1.MINOR FLAWS
2. UNFULFILLED BASIC CONDITIONS
3. INACCESSIBLE PLACES
4. CONTAMINATION SOURCES
5. QUALITY DEFECT SOURCES
6. UNNECESSARY AND NON-URGENT ITEMS
7. UNSAFE PLACES
1.MINOR FLAWS :
Contamination Dust, Dirt, powder, oil, grease, rust, paint
Damage
Cracking, crushing, deformation, chipping,
bending,
Play
Shaking, falling out, tilting, eccentricity, wear,
distortion, corrosion,
Slackness
Belts, Chains
Abnormal
Phenomenon
Adhesion
3. INACCESSABLE PLACES
Cleaning
Checking
4. CONTAMINATION SOURCES
Product
Raw materials
Lubricants
Gases
Liquids
Scrap
Others
Moisture
Grain Size
Concentration
Viscosity
Measuring
instruments
Electrical
equipment
Jigs & Tools
7. UNSAFE PLACES
Floors
Steps
Lights
Rotating
machinery
Lifting
Devices
Others
Quality
Defects
Accelerated
Deterioration
Speed Losses
Washers
Fixing of
nuts &
bolts
Lubrication checkpoints
Lubricant
storage
Lubricant
inlets
Oil level
gauges
Are oil level gauges always kept clean, are oil levels easy to check
Is the correct oil level clearly marked
Is equipment free of oil leaks, and oil pipes& breathers
unobstructed
Auto Lub
Devices
Roller
chains
Shafts,
Is there any overheating, vibration, abnormal noise due to excessive
Bearings & play, or lack of greasing. Are any keys or set bolts loose or missing
Couplings Are any couplings misaligned or wobbling, Are any seals worn out
Gears
Hydraulic checkpoints
Hydraulic
Checkpoints
Is there correct quantity & level indicated for fluid in the reservoir
Is fluid of correct Temp. And is min & max for temp. indicated
Is fluid cloudy (indicating air entrapment
Are all fluid inlets & strainers clean, are any suction filters blocked
Are any fluid reservoir breather filters blocked
Are fluid pumps operating without any unusual noise or vibration
Are hydraulic pressure correct, and are operating ranges displayed
Heat
Exchangers
Hydraulic
Equipment
Piping and
Wiring
Pneumatic checkpoints
FRLs
Are FRLs clean? Is it easy to see inside of them? Are they fitted
right way around?
Is there sufficient oil. And are the drains are clear?
Is the oil dip rate correct ?(approx 1 drop for every 10 strokes)
Are the FRLs installed not more than 3 m from the equipment?
Are the pressure adjusted to the correct value and operating ranges
are clearly indicated?
Pneumatic
Equipment
Piping and
Wiring
Electrical Checkpoints
Control
Panels
Electrical
Equipment
Are all motors free of overheating, vibration, unusual noise & smell
Are al motor cooling fans and fins are clean?
Are any bolts loose? Are pedestals free of cracks and damages?
Sensors
Are all manual switches clean and free of damages & excessive play
Are all switches installed in the correct position
Are the interiors of limit switches is clean? Are any wires coiled or
trailing?
Are any limit switch dogs worn, deformed, or of the wrong shape?
Switches
Piping and Are any pipes, wires, or power leads loose or unsecured?
Wiring
Are any ground wires damaged or disconnected?
Are any pipes damaged or corroded? Are there any bare wires
or wires with damaged insulation?
Are any wires coiled on the floor or dangling overhead?
Classification
Non-fulfillment of
Basic Conditions
II
Non-observance of
Use Conditions
III
Leaving deterioration
unattended
IV
Inherent design
weaknesses
Shortage of
Skills
Description
EXAMPLE OF ABNORMALITY
( LOOSE FITTINGS )
EXAMPLE OF ABNORMALITY
( LEAKAGES )
Equipment Name
Equipment Name
Control No..
Control No..
Date of detection.
Date of detection.
Detected by..
Detected by..
..
..
Equipment Weakness
A';
Major Flaws
B:
Unfulfilled Basic conditions
C
Inaccesible Areas
D
Contamination sources
E
Quality Related Defects
F
Unnecessary & onourgent items
G
Unsafe palce
Human Weakness
I : Non-observance of basic conditions
II. Non-observance of Use Conditions
III. Leaving Deterioration unattended
IV. Inherenet Design Weakness
V : Shortage of Skills
Compliance Date
Target Date
Responsibility
Countermeasures
Urgency
(U/SD/MSD)
Causes of
Abnormality
Impact of
Abnormallity
Tag (R/W)
Eqpt Weakness
(A..G)
Human Weakness
(I..V)
Abonrmality
Description
Location
PERIOD:
Part of Equipment
Date of Detection
Sl. No.
TPM CIRCLE
IMPACT
1. Breakdowns
2. Readjustments
3. Quality
4. Safety & environment
5. Others
Sl. No.
Date of
Part of
Abonrmality
Location
Detection Equipment
Description
Tag
Red/
White
8/5/01
Filter is not
properly fixed
8/5/01
Piping not ok
III
8/5/01
ELC filter
Piping not ok
III
II
No
indication
II
Cellar
8/5/01
Cooler
Cellar
8/5/01
Illumination
Cellar
8/5/01
Electrical
wiring
Cellar
8/5/01
Lighting
Cellar
8/5/01
RC pump
Cellar
8/6/01
Cellar
Cellar
Temperature
gauge
mounting not
ok
Celler light not
ok
Wiring are not
ok
Tube light
wiring
defective
Wiring are not
ok
Illumination is
not sufficient
Envoironme
Design defect
nt
Hard to
Ignorance
access
Hard to
Design defect
access
***
Urgency TARGET Complian
U/SD/
DATE ce Date
MSD
Base to be
modified
SD
20-Aug-01 15-Aug-01
Accesibility
SD
20-Aug-01 20-Sep-01
Piping to
modify
SD
20-Aug-01 20-Aug-01
Loosness
To be tighten
20-Aug-01 20-Aug-01
Vissibility
Safety
To provide extra
SD
light
20-Aug-01 20-Aug-01
II
False
indication
Ignorance
To be set right
SD
20-Aug-01
II
5S
Ignorance
To be set right
20-Aug-01 20-Aug-01
II
Loose
Trippage of
connection motor
SD
20-Aug-01 20-Aug-01
Unsafe
condition
10-Aug-01
* Equipment Weakness
** Human Weakness
A';
Minor Flaws
I : Non-observance of basic conditions
B:
Unfulfilled Basic conditions
II. Non-observance of Use Conditions
C
Inaccesible Areas
III. Leaving Deterioration unattended
D
Contamination sources
IV. Inherenet Design Weakness
E
Quality Related Defects
V : Shortage of Skills
F
Unnecessary & nonourgent items
Bulb fused
New wiring to
be done
Provide
sufficient
illumunation
IMPACT
1. Breakdowns
2. Readjustments
3. Quality
4. Safety & environment
5. Others
8-Aug-01
*** URGENCY
U- Urgent
SD- Shutdown
MSD- Major Shutdown
SUMMARY OF ABNORMALITIES
A
Sl.
No
I
II
III
IV
Category
Non Observance of
Basic Conditions
Nonobervance of Use
Conditions
Leaving deteriorations
unattended
Internal Design
Weaknesses
Shortage of Skills
TOTAL
Major
Flaws
B
C
D
Unfulfilled Inaccessible Source of
Basic
areas
conditions
E
F
G
Source Unnecessary Unsafe
SUMMARY OF ABNORMALITY
TPM CIRCLE: - Compactor
Category
A
B
C
D
E
F
G
Sl.no
Equipment weakness Minor Flaws Unfulfilled Inaccessible Source of
Source Unnecessary Unsafe
Basic
areas
contamination Quality & non
places
Human weakness
conditions
Defects urgent items
I
19
11
12
Shortage of Skills
Total
12
Total
13
10
61
Format 3.4
Thorough Cleaning
(Touch and Clean every Corner)
Lists
List of
Defects
List of
Hard to Access Areas
List of
Sources of contamination
List of Questions
List of
Unnecessary & Nonurgent Items
Present Status
Completed
Done
Completed
Under Progress *
SAMPLE
250
No. of Abnormalities
200
150
100
50
0
Minor Flaws
Source of
Quality Defect
Contamination
Sources
Type of Abnormality
Unecessary
Items
Unsafe Places
Identified
Corrected
Audit
Item
1. Cleaning of
Equipment
Main Body
2. Cleaning of
subequipment
[Oil,
Pneumatic &
hydraulic
pressures;
Electrical
systems]
Self
JH Pillar
Committe
e
Section/
Team name
Equipment Name
Date
Point
Accepted
Rejected
Acceptable level =
Sum of(Item 1-5 level point) + Evaluation point (Item 6)
Audit Date
TPM Central Auditor
Group
Description
Leader
Self
More than 90 points
JH Pillar Committee
More than 85 points
Bad
Passable
Excellent
1 Point
Poor
2 Point
3 Point
Good
4 Point
5 Point
How Well are the dust, oil and grease, and chips removed? How about the
condition of work and tools? (Such areas as tools and jigs surfaces, chucks,
sliding portion, chute, frame, bed, piping and wiring etc.)
Free from loosening, chattering, vibration, exessive wear and heat buildup (in
areas as bolts, nuts, jigs, rotation portions, sliding portions and chute etc.)
Free from dust, oil and grease or any other foreign materials(cylinder, solenoid,
three point set, motor limit switch, belt, proximity switch, photoelectric tube,
inside & outside of control box, instruments, etc.)
Free from loosening, chattering, vibration, exessive wear and heat buildup
(motors, solenoid valve, limit switch installation board, relay, wiring, bolts and
nuts etc.)
Free from dust,dirt and oil stain (Lubricator, oil cups, measuring instruments, cap
of oil filter, oil supply piping, etc.)
3. Lubrication
Proper oil level and oil flow rate, free from loosening, chattering, and vibration.
(Check for contaminated oil, oil deterioration, loose piping joints, valve, speed
control, oil temperature etc.)
Cleaning condition of tools, measuring instruments and gauges and spare parts
Are the covers, name plate and label in good condition? Are the unnecessary
parts, products and replacements parts in good order?
4. Cleaning
around the
equipment and
Are the accepted products properly segregated from rejected products?
machine
Are the proper passages provided?
No flying dust from adjacent equipment?
5. Counter
measures for
the causes of
dirty
equipment and
improving hard
to access
areas
Has any list showing the sources of dust, dirt, oil leakage and the areas difficult
to keep clean been prepared?
And it there any future plan for cleaning?
Have the cover and houe keeping utensils been improved?
Is there any point you should check while performing the house keeping?
Has the responsibility for cleaning the areas been properly assigned to each
operator?
Evaluation point
Diagnosis
10 point
20 point
30 point
40 point
50 point
Preparation
Purpose of Step-2
Devising countermeasures
to Eliminate
Sources of Contamination
Reduce
need to
(Frequency)
Improved
Method of
C, L, I & R
approach
Improve Accessibility
SOURCES OF CONTAMINATION
TYPE OF CONTAMINATION
Product
Lubricants
Gases
Liquids
Scrap
Other
Date of Completion
Planned Date
Executor
Contents of
Countermeasures
Type of
Contamination
Source of
Contamination
Part of Equipment
Date of
Observation
Sl. No
Sl.No.
Date of
Part of
Source of
@Type of
Responsi Planned Date of
Countermeasures
Observation Equipment Contamination Contamination
bility
Date Complition
4/10/01
Surrounding
Gland leakage.
Seeping oil.
4/10/01
Pump tray.
Filter changing.
Spillage oil.
20/09/01
Ace Stand.
Leaking joints
Leaking oil.
20/09/01
Level/Pr.
Gauge.
Atmosphere dust
Dust
Gland seal to be
repaired every 2 year
To be cleaned just
after job is over
Pipe joints to be
checked once a year
To be cleaned on
every shutdown.
@ TYPE OF CONTAMINATION
Leaks,Spills,Spurts,Scatters,Overflow, dust
Spillage,Scattered on ground
Leaking,Silt,Seeping oils
Leaking Compressed Air/Gases etc.
Leaks,Spurts,Scatters,Oveflow
Flashes,Cutting,Papers etc.
By people,Forklift,Truck etc.
TPM
CIRCLE
S.K.Ojha
20/02/2002
20/02/2002
28/01/2002
4/2/02
S.K.Ojha
15/02/2002
15/02/2002
R.K.Purbe. 15/02/2002
15/02/2002
Before
After
Usage of
localized guards
After
Localised guards
The return oil flow from the feed drive gears splash and spread all around the
open space inside the machine there by getting contaminated. To avoid the
contamination, the return oil flow is channalised from the feed drive gears
directly to the lubrication tank
HARD-TO ACCESS-AREAS
WHILE DOING STEP 1, MANY AREAS MAY BE FOUND,
WHICH ARE DIFFICULT FOR CLEANING, INSPECTION
AND LUBRICATION. ACCESSIBILITY OF THESE AREAS
NEED TO BE IMPROVED THROUGH SUITABLE KAIZENS.
- PROVIDE INSPECTION POINTS FOR EASE OF
INSPECTION.
- PROVIDE PROPER INSPECTION WINDOWS FOR THE
PARTS LIKE V-BELTS
* Difficult state:
X- Less difficult
Y- Moderate difficult
Z- Very Difficult
** Tag
R- Red,
W- White
Date of Completion
Planned Date
Responsibility
Tag Classification **
Contents of
Countermeasures
Difficult State *
Difficult Portion
Categories C,L,I
Date of Observation
Sl. No.
Department : ________________
Sl No.
Date of
Categories
Observati Cleaning (C),
on
Lubrication (L),
Inspection (I)
4/11/01
25/12/01
5/1/02
Difficult
Portion
Acc. Stand.
(Height)
Aproch to
tank top
due to
loose hose
pipe
Cleaning
not
possible of
ELC & CJC
Base
* Difficult state:
X- Less difficult
Y- Moderate difficult
Z- Very Difficult
Difficult
State*
Countermeasures
Date of
Complition
V.K.Sinha 15/02/02
20/02/02
1/5/02
28/02/02
** Tag
R- Red,
W- White
DIFFICULT TO LUBRICATE
- EASY TO LUBRICATE
Before
Difficult to Lubricate the oil to
gear box
After
Easy to Lubricate the oil to
gear box
After
Question
Answer
WHY
ANSWER
ACTION
Due to
Action needed
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause
(1)
(2)
(3)
(4)
(5)
JH
PM
Design
E&T
Question
Answer
WHY
ANSWER
ACTION
Due to
Action needed
Why 1
Clean strainer
Why 2
Why 3
Why 4
Why 5
Root Cause
(1)
(2)
(3)
(4)
(5)
JH
PM
Design
E&T
IDEA :-
TPM CIRCLE :-
KAIZEN No.:
DATE:
BEFORE :-
AFTER :-
BENEFIT :-
ANALYSIS :-
RESULT :-
EQUIPMENT FAILURE
BY IMPROVING OIL
CLEANLINESS
CLEANING M/C
BEFORE:
PROPER FILTERATION
SYSTEMS WERE NOT
AVAILABLE TO
MAINTAIN OIL
CLEANLINESS LEVEL OF
NAS VALUE 6
TPM CIRCLE:
KAIZEN NO: 1
DATE:10.03.02
FILTERS
MODIFIED 5 MICRON
ELC M/C FOR TANK
FILTERS
OIL CLEANING
NOS
15
10
5
0
01-02
10
8
6
4
2
COMPLIANCE: IMPLEMENTED IN
ACTUAL
IDEAL
D
EC
V
N
O
C
T
O
SE
P
AU
G
JU
LY
JU
N
E
M
AY
AP
R
IL
M
AR
C
H
FE
B
0
JA
N
HORIZONTAL PLAN:
RESULTS:
12
NAS VALUE
ANALYSIS:
02-03
BOTH CASTERS
THEME:
KAIZEN
LOSS NO
MACHINE:
LOSS STRUCTURE:
To reduce Cleaning time
BENCH MARK
30 Sec
TARGET
5 Sec
8A
COUNTERMEASURE:
Before
Oi
lC
hu
Contaminated
material
te
KAIZEN START
TEAM:
IDEA:
To provide a polythene paper on the
magnet to collect contaminated material
PROBLEM:
13B5SL
S.Ravindharan
V.Mohan
P.Comarasen
K.Patchaiappan
15.03.2001
KAIZEN FINISH
16.03.2001
BENEFITS :
After
Oi
lC
hu
Contaminated
material
te
Polythene
Magnet
Paper
Magnet
= 533 min
= 6396 min
Effortless activity
Oil tank
Remove magnet &
cleaning by brush with
diesel then fix magnet
ANALYSIS:
WHY 1
Cleaning
the
magnet
takes
more
time
Oil tank
No cleaning remove
Polythene paper and fix
new polythene paper
HORIZONTAL DEPLOYMENT :
RESULT:
WHY 2
WHY 3
Iron
particles
not
coming
out
easily
from
magnet
Due to
magnetic
property
Sec
30
Before
After
30 Sec
BETTER
15
5 Sec
0
Area
Status
Socket
13
Hex
15
Special
13
THEME:
KAIZEN
LOSS NO.
BENCH MARK
8A
LOSS STRUCTURE:
Cleaning Time Reduction
CGR17H
TEAM: J. Srinivasan
KAIZEN START
03-06-2001
S.Jayaraman
3 min / shift
IDEA:
To provide gaurds in the product discharge chute &
providing conveyor
Zero
TARGET
MACHINE:
PROBLEM:
COUNTERMEASURE:
Before
Krishnamoorthy
D.Sivakumar
KAIZEN FINISH
21-06-2001
G. Devanathan
BENEFITS :
After
Gaurd
Time saving = 3 Min / Shift
Man hours saved per year = 15 hours
Other Benefits
No Spill Over of Products
Tray
Product
spillover
ANALYSIS:
WHY 1
Cleaning time
WHY 3
Products get
Basic design
is more in
spilled over
inside the
inside the
machine area
machine area
in rolling
machine
from chute
No oil leakage
Oil
S-Conveyor
Oil Pit
RESULT:
HORIZONTAL DEPLOYMENT :
mts
3 min / shift
3
Better
of chute
No of rolling machines
Identified
: 9 Nos.
Implemented : 6 Nos.
Zero
0
Before
After
Target Date
25-09-2001
THEME:
KAIZEN
LOSS NO.
LOSS STRUCTURE:
BENCH MARK
TARGET
MACHINE:
8A
2 sec / Day
PROBLEM:
COUNTERMEASURE:
Before
KAIZEN START
TEAM: J. Sriram
10.05.2001
Karunairaja
IDEA:
To bring the pressure gauge for K.O. system outside the
machine for easy inspection
30 sec / Day
10B3S
After
Franklin
KAIZEN FINISH
25.05.2001
Sivakumar
Ramalingam
BENEFITS :
Pressure
gauge
Inside the M/c
Difficult to
Inspect
ANALYSIS:
WHY 1
Inspection is
very difficult
and it is
taking
WHY 3
Pressure gauge
By machine
design
Pressure
gauge
Outside the M/c
Other Benefits
Inspection becomes easy
Easy to
Inspect
RESULT:
HORIZONTAL DEPLOYMENT :
Sec.
30 sec / change
30
Better
No of Areas
machine
Identified
15
: 5 Nos.
moretime in
pressure
gauge for
K.O. system
2 sec / Day
0
Before
After
Implemented : 5 Nos.
2. Red, Orange and Green zones on gauges, meters for Go, Take Corrective Action and No
Go Situations
3.
4.
Possible points of
Application
TPM Circle
Section/
Team name
Equipment Name
Date
Desired Audit
date
Point
Accepted
Points = Sum of Item 1-6 points
Rejected
Audit Date
TPM Circle
Item
Description
1. First Step
Maintenance State
2.
Countermeasures
for equipment main Are the hard to clean areas summarized into a list, and
are the state of contrivance and KAIZEN good?
body
(Are cleaning tool covers removed, put in orderliness
and tidiness?)
3.
Countermeasures
for sub-equipment
4. Cleaning around
the equipment and
machine
5. KAIZEN and
maintain
6. Activity State
Section Chief
Leader
JH Team
Bad
Passable
Excellent
2 Point
Poor
4 Point
6 Point
Good
8 Point
10 Point
Remarks
Preparation
Schedule/Frequency
Method
Standard/Level
Target Time
C, L, I, R Standards
Implementing Cleaning, Lubrication,
Inspection, & Retightening Standards
Gap with target time
Kaizen (Implement & Confirm)
Feedback
Audit
Passed
VISUAL CONTROLS
Activity
CLEAN
LUB
INSPECTION
Symbol
Tools
I
S
NOC
BEFORE STEP-3
7
6
5
3
Group: Comp
Leader: Sudip.Das
Tag:ME/Comp/202
(Inspection,Cleaning,Lubrication,Tightening)
Location:Compressor House
Equipment:Compressor-1
mast er ! A 1
Part
DESCRIPTION
STANDARD
METHOD
TOOL
Prepared : 1.10.2001
Revised : 4 times
ACTION If Time
Abnormal (min)
IN T E R V A L
RESP
DY
Alt
W M
I-1
OIL LEVEL IN
TANK
--
FILL TO
MARK
HH,NM
I-2
110A= loading
65A=Unloading
--
Inform
P.M
SD,AD
I-3
TANK OIL
No sediments
--
Replace
10
I-4
BLOW-DOWN
VALVE
NO JAMMING
--
I-5
NO JAMMING
IN
IN
IN
C-1
AFTER COOLER
NO DUST OR OIL
SPILLS
WIPE
NO DUST
WIPE
NO DUST
NO DUST OR OIL
SPILLS
WIPE
NO DUST
WIPE
Comp air
NO DIRT
WIPE
Comp air
Inform
P.M
Inform
P.M
Inform
P.M
Inform
P.M
Replace
Inform
P.M
Inform
P.M
Replace
NO DIRT
WIPE
Replace
NO DIRT
WIPE
Comp air
NO DIRT
WIPE
Comp air
NO DIRT
WIPE
Comp air
NO DIRT
WIPE
Comp air
NO DIRT OR OIL
SPILLS
WIPE
CRC,CTC
Inform
P.M
Inform
P.M
Inform
P.M
Inform
P.M
Inform
P.M
N
IN
@
@
C-3
SUCTION
STRAINER
AIR FILTER
C-4
C-2
C-5
C-6
C-7
C-8
C-9
C-10
MOISTURE
TRAPPER
MAIN OIL FILTER
BEARING OIL
FILTER
LOADING
SOLENOID
UN-LOADING
SOLENOID
ACTUATOR
OIL COOLER
INSIDE
CONTROL PANEL
C-12
INSIDE
FERULE JOINTS IN
T-1
PIPE
TYRE COUPLING
T-2
BOLTS
C-11
NO LEAKS
NO SLACKNESS
--
Comp air
WIPE
HH,AR
AK, NMu
10
AK,JLG
10
JLG, KM
SD,AK
DP,JLG
15
NMu, AR
BPB,AR
15
HH,NM
15
BPB,AR
15
SD,AD
15
SD,DP
15
AK,JLG
120
JLG, KM
120
AD,KB
Replace
10
DP,AK
Inform
P.M
15
SD,AK
Prepared 12/11
LEADER -D.BANDYOPADHYAY
Revised : nil
STA NDA RD
2.3
TERMINAL
& PANEL
BOX
3.
COUPLING
4.PULLEY
5. BELTS
6, VALVES
ACTION IF
ABNORMAL
TIME
(MIN)
INTERVAL
D
1.3 CASING
2.1 MOTOR NO VIB RA TION &
BASE
NOISE
2.2 MOTOR
BODY
METHOD TOOL
NO DIRT OR OIL
SP ILLS
I
I
@
NO OVERHEA TING
NO LEA KA GE
KNR,
SRC, KNR,
SA
INFORM TO
P/M
GCP, SC, RC
DB, GCP
10
GCP, GN,
KNR
INFORM TO
P/M
INFORM TO
P/M
INFORM TO
P/M
INFORM TO
P/M
ARD, SB,SA
NO ODOUR
RESP
INFORM TO
P/M
INFORM TO
P/M
INFORM TO
P/M
WIPE
NO LOOSENESS
NO
OVERHEA TING(>80
DEG C), NOISE
INFORM TO
P/M
INFORM TO
P/M
10
5
2
SB,ARD,SA
SB,ARD,SA
SB,ARD,SA
DB,ARD,SB
LUBRICATI
ON
LUBE
POINT
STA NDA RD
2.5 M OTOR
B RG. DE
2.6 M OTOR
B RG. NDE
LUB E
TYP E &
QTY
AP-2 &
20 gms
AP-2 &
20 gms
AP-2 &
20 gms
AP-2 &
20 gms
AP-2 &
20 gms
METHOD TOOL
TIME
INTERVAL
RESP
GCP, KNR,
SC
GCP, KNR,
SC
manual
manual
manual
A RD, SB ,TB
manual
A RD, SB ,TB
manual
A RD, SB ,TB
SRC,SA , DB
HOULIC 68manual
& 500 M L
Illustration
Tail stock
Classification
Inspection
No.
Place or section
Tailstock
Standards
Method
Visual
value range
Cleaning
Tailstock
Waste cloth
Inspection
Table Lubrication
Visual
value range
Inspection
Loader Pistion
No Damage
N
I
N
Remove the
3mm
Pistion block
Allenkey
sec (month)
Person
in
charge
OP
30
OP
OP
1200 1 M
OP
During
During
operation stoppage
b
b
b
b
Indication marks
for nuts & bolts
Indication for
valve controls
Initial Clean-up
( Cleaning is Inspection)
( Cleaning with meaning)
(Doing with purpose)
Taking countermeasure
for forced deterioration
and improving hard
to access area
Preparing tentative
standards for cleaning
and lubrication
TPM Circle
Item
1. Step 1 & 2
maintenace
condition
Item
Section/ Team
name
Equipment Name
Date
Equipment Name
Leader
Point
Accepted
Rejected
Team Name:
Audit Date
Auditor
Description
Audit Date:
TPM Circle
JH Team
Bad
Poor
Passable
Good
Excellent
3 Point
6 Point
9 Point
12 Point
15 Point
1 point
2 point
3 point
4 point
5 point
Remarks
2 point
4 point
6 point
8 point
10 point
Remarks
Remarks
(Cleaning Standard)
Is the standard made out according to the equipment
and location?
Are Cleaning section, location and assignment
specified?
2. Action standard Are methods and tools specified?
Are cleaning time and cycle properly specified and
for the basic
observed?
equipment
maintenance
Are contents clear and understandable by everybody?
(Cleaning,
(Lubrication Standard)
Lubrication,
Are kind of lubrication, amount, cycle, method and
retightening)
assignment specified?
requirements
Are proper labels applied to lubrication points?
Is the oil ready for lubrication all the time?
Is the storage location tidy?
(Retightening)
Are bolts and nuts loose?
Are there any nuts and bolts that have fallen out?
Item
Description
Are the items to be observed determined
autonomously.
3. Awareness of
one's own role in Is the maintenance observed in accordance to the
making the
standard.
standard
Are the improvement and new ideas for easy
inspection and visual inspection implemented actively?
Preparation
Purpose of Step-4
Bringing up equipment consciousness in the process of
measuring & restoring deterioration.
Lubrication system
Hydraulic System
Pneumatic System
Driving Systems
Electrical systems
Equipment Safety
Process Conditions