Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SITE ID
: RAP 406
SITE NAME
: SEI MERDEKA
TYPE TOWER
: SST-72
No
II
a
b
ITEM MATERIAL
Koefisien
BJ
Berat
PEKERJAAN SIPIL
PEKERJAAN PONDASI TOWER
Lantai Kerja 1:3 tebal 5 cm
1 Semen
Beton bertulang pondasi K 225/ Besi KS D 1
1 Semen
2 Batu Pecah
3 Besi Beton
Beton bertulang borepile (dia 40 cm)
1 Semen
3 Batu Pecah
4 Besi Beton
Pekerjaan Beton
III
a
Volume
Satuan
Sebelum
Konversi
6.73
4.60
m3
zak
m3
50.00
1,547.90
7.15
0.69
zak
m3
50.00
1,350.00
25,236.51
65,677.89
5,245.64
7.15
0.69
m3
zak
m3
50.00
1,350.00
18,181.29
47,316.73
5,831.66
169,037.62
70.61
5,245.64
50.87
5,831.66
Sub Total
5.98
0.75
0.22
m3
zak
m3
kg
m2
zak
50.00
1,350.00
497.09
1,690.76
222.50
50.00
122.39
No
ITEM MATERIAL
Volume
Koefisien
Satuan
Sebelum
Konversi
c
d
V
A
I
23.63
6.52
0.76
200.00
m3
zak
m3
zak
m3
kg
0.22
m2
zak
35.87
87.67
5.31
kg
kg
kg
30.00
m3
m3
6.52
0.76
m3
zak
m3
2.72
2.80
42.00
28.00
1.00
37.00
30.00
0.25
5.40
m3
BJ
Berat
Sub Total
2,532.74
50.00
3,213.68
50.00
1,350.00
912.80
2,881.20
560.00
50.00
463.09
1,004.36
87.67
196.47
1,350.00
40,500.00
50.00
1,350.00
Sub Total
81.50
257.25
50,158.02
No
II
VI
ITEM MATERIAL
Volume
0.35
Koefisien
1 Semen
2 Batu Pecah
Gravel 10 cm
1 Batu Pecah
Import Soil
1 Tanah Timbun
5.98
0.75
Satuan
Sebelum
Konversi
zak
m3
135.02
GRAND TOTAL VOLUME MATERIAL
BJ
Berat
50.00
1,350.00
1,614.60
5,491.80
m3
1,350.00
Sub Total
472.50
7,578.90
m3
1,500.00
202,530.00
431,837.28
Diperiksa Oleh
Togar Simbolon
Project Manager
Derry Efrizal
CME Field Officer
Medan,
Tower Bersama Group
Disetujui Oleh
M. Ramos Pangaribuan
Project Manager
Satuan
Konversi
Sumber Material
dan Jarak ke
lokasi
Remark
Lantai Kerja
kg
(6.73*4.60*50)
230.00 kg/m3
Sesuai dengan Job Mix Design
kg
kg
kg
(70.61*7.15*50)
(70.61*0.69*1350)
kg
kg
kg
(50.87*7.15*50)
(50.87*0.69*1350)
kg
kg
kg
(1.66*5.98*50)
(1.66*0.75*1350)
kg
(11.1*0.22*50)
357.41 kg/m3
930.15 kg/m3
Sesuai dengan APD
Sesuai dengan Job Mix Design
357.41 kg/m3
930.15 kg/m3
299.00 kg/m3
1,017.00 kg/m3
Sesuai dengan APD
11.03 kg/m2
Satuan
Konversi
Sumber Material
dan Jarak ke
lokasi
Remark
kg
kg
(23.63*2.72*50)
136.00 kg/m3
Mutu Beton K-175
kg
kg
kg
(2.80*6.52*50)
(2.80*0.76*1350)
kg
(42*0.22*50)
kg
kg
kg
(28*35.87)
(1*87.67)
(37*5.31)
kg
(30*1350)
kg
kg
kg
(0.25*50*50)
(0.25*0.76*1350)
326.00 kg/m3
1,029.00 kg/m3
11.03 kg/m2
326.00 kg/m3
1,029.00 kg/m3
Satuan
Konversi
Sumber Material
dan Jarak ke
lokasi
Remark
kg
kg
(5.4*5.98*50)
(5.4*0.75(1350)
kg
kg
(0.35*1350)
kg
kg
(135.02*1500)
299.00 kg/m3
1,017.00 kg/m3
Disetujui Oleh
M. Ramos Pangaribuan
Project Manager
M. Darman
Lead Project Manager