Sei sulla pagina 1di 23

WABAG

WABAG HOUSE, 17, 200 Feet Radial R


S.Kolathur, Chennai - 600117, India.

PURCHASE REQUISITION (PR)


PROJECT No.10P87

PR . REQ. No.

PROJECT

140 MLD, Sewage Treatment Plant

EQPT./ITEM

LOCATION

Dinapur, Varanasi.

DISCIPLINE

CLIENT

Uttar Pradesh Jal Nigam

PROJECT MANAGE

NJS Co. Ltd, AECOM India Pvt. ltd, TTI


CONSULTANT
Consulting Engineers pvt. Ltd.

INTERNAL. REF.N

INDEX
S.
No.

Description

Index

II

Data sheet for


1 Exhaust Waste Heat Recovery Unit

III

Shts

Docume

10P87-D0

10P87-D0

Contract Specifications
1 General Painting & Protection Requirements

11

10P87-T000

2 Project Specification for Design Life

10P87-T000

3 Project Specification for Spare parts & Packing

10P87-T000

4 Project Specification for Dispatch Clearance

10P87-T000

5 Project Specification for List Of Standards

10P87-T000

IV Other details
E-05 F / Rev . 0

a Vendor Data Requirement with offer

Annex

b Vendor Data Requirement after LOI

Annex

c Compliance statement

Annex

d Deviation format

Annex

e Proven Track record

Annex

Total No.of sheets

26

ISSUED FOR ENQUIRY

8/18/2015

SB

REV.

DESCRIPTION

DATE

PREP. BY

E-05 F / Rev . 0

WABAG
WABAG HOUSE, 17, 200 Feet Radial Road,
S.Kolathur, Chennai - 600117, India.

Format

PURCHASE REQUISITION (PR)

87

PR . REQ. No.

MBG-PR-

MLD, Sewage Treatment Plant

EQPT./ITEM

Exhaust Waste Heat Recover

pur, Varanasi.

DISCIPLINE

Mechanical

r Pradesh Jal Nigam

PROJECT MANAGEMr. C.R. Pradeep

Co. Ltd, AECOM India Pvt. ltd, TTI


ulting Engineers pvt. Ltd.

INTERNAL. REF.N 10P87-D0041-023 REV 0

escription

INDEX
Shts

Document no.

Rev

10P87-D0041-023

10P87-D0003-046

11

10P87-T0003-001/ PS1

ecification for Design Life

10P87-T0003-001/ TS1

ecification for Spare parts & Packing

10P87-T0003-001/ TS2

ecification for Dispatch Clearance

10P87-T0003-001/ TS3

ecification for List Of Standards

10P87-T0003-001/ TS4

or

Waste Heat Recovery Unit

ecifications

ainting & Protection Requirements

s
E-05 F / Rev . 0

ata Requirement with offer

Annexure 1

ata Requirement after LOI

Annexure 2

ce statement

Annexure 3

Annexure 4

Annexure 5

format

ack record
Total No.of sheets

26

ISSUED FOR ENQUIRY

8/18/2015

SB

SRK / RH

DESCRIPTION

DATE

PREP. BY

CHKD. BY

E-05 F / Rev . 0

WABAG DOC. NO. : 10P24-D0003-040-Rev2

MECHANICAL DATASHEET FOR EXHAUST WASTE H


Project No.
Project
Location
Client
Consultant

S.NO
I

:
:
:
:
:

10P87

140 MLD, Sewage Treatment Plan


Dinapur, Varanasi.
Uttar Pradesh Jal Nigam

NJS Co. Ltd, AECOM India Pvt. ltd,

DESCRIPTION

UOM

SITE DATA
Altitude ( above MSL)

Site Condition

II

Relative Humidity

Ambient Temp. (Max. / Min.)

PROCESS DATA
Equipment Tag. No.
Equipment Service
Installation
Operation
Quantity

Nos

Density of exhaust gas

Kg/Nm3

Average specific heat of exhaust gas

Kcal/Kg 0C

Maximum back pressure allowed on engine (By Gas Engine Vendor)

mbar

0
Total available heat energy from Gas genset exhaust gas cooled upto 200KW
C

III

Heat transfer capacity required / Heat Exchanger

KW

Total Heat transfer capacity required

KW

Heat transfer capacity provided / Heat Exchanger

KW

Temperature of exhaust gas @ HE inlet

Temperature of exhaust gas @ HE outlet

Temperature of cold water @ HE inlet

Temperature of cold water @ HE outlet

Required water flow in one heat exchanger

m3/hr.

MECHANICAL DETAILS
Make
Model no.
Heat exchanger type
Flow pattern
Page 5 of 23

WABAG DOC. NO. : 10P24-D0003-040-Rev2

Design Standard
Heat exchange area required / Provided

m2

Medium
Mass Flow rate

Kg/hr

Volume Flow rate

Nm3/hr.

Temperature @ inlet

Temperature @ outlet

Design Temperature

Design pressure

kg/cm2.g

Total Pressure drop

kg/cm2.g

Pipe size / Schedule (Diameter / Length)

NB/mm

Flange rating / drilling std / Facing


Test Pressure
IV

DIMENSIONS AND WEIGHT DETAILS


Over all dimensions (LxW/H)

mm

Static weight of heat exchanger assembly

kg

Operating weight of heat exchanger assembly

kg

MATERIAL OF CONSTRUCTION
Shell
Tube
Fitting/Bends-Inner
Fitting/Bends-Outer
End Connection
Flanges
Gasket / Sealing material

Page 6 of 23

WABAG DOC. NO. : 10P24-D0003-040-Rev2

Supports
Insulation details
Anchor Bolts and Fasterners

SCOPE OF WORK : Complete Heat Exchanger system with all accessories shall be considere
supply including all accessories and list of exclusions shall be furnished with price break-up al

PAINTING - As per manufacturers standard. Also Please refer attached "GENERAL PAINTING AN

INSPECTION AND TESTING : Shall be as per approved QAP, UPJN & Consultant officials (Refe

COMMISSIONING SPARE PARTS LIST : Vendor shall provide the list along with offer & supp
SPARE PARTS FOR 10Yr O&M : Vendor to furnish list with price details.

RECOMMENDED SPARES : Vendor to furnish list of spares and supply along with the equipme

MANDATORY SPARES : Vendor to list and supply mandatory spares, if any required for 1 yea
VI
1

GENERAL NOTES
# - marked details to be furnished by vendor.

Vendor to submit filled in datasheet along with the offer.

The hot gas required for heating water will be generated from the exhaust and HT circu
plant.

Design calculation of heat exchanger to be submitted along with offer for reference.

0
Rev.No.

Date

WABAG DOC NO.

Page 7 of 23

Sheets

Preperaed By

WABAG DOC. NO. : 10P24-D0003-040-Rev2

XHAUST WASTE HEAT RECOVERY UNIT

LD, Sewage Treatment Plant

o. Ltd, AECOM India Pvt. ltd, TTI Consulting Engineers Pvt. Ltd.

VALUES

77.6
Tropical
80
47 / 4

H-02 A/B/C
Exhaust Waste Heat Recovery Unit
Indoor
Continuous
4
1.27
0.265
60
379
300 kw
1200
395
497
150
60
80
300KW

TEPL
TE-WHRU-300
Waste Heat Recovery
NATURAL DRAFT
Page 8 of 23

WABAG DOC. NO. : 10P24-D0003-040-Rev2

TEPL
10.62/12.25
Shell

Tube

Flue Gas (Gas Engine Exhaust)


4567

13000

2357

13000

428

60

212.9

80

500

500

0.5

2 MM MILD STEEL

19.05/2.0/ 2000

EN 1092-1 PN16

EN 1092-1 PN16

3000 LENGTH 565 Weidth 975HEIGHT


1.2MT
1MT & 1.5MT

Carbon Steel
Carbon Steel, Seamless tubes with grilled elements
ASTM A 106 Gr.B
ASTM A 106 Gr.B
ASTM A 106 Gr.B
ASTM A 106 Gr.B
NBR HT

Page 9 of 23

WABAG DOC. NO. : 10P24-D0003-040-Rev2

MS, IS 2062
TEPL to furnish
Stainless Steel 304

ccessories shall be considered under vendors scope. List for detail scope of
nished with price break-up along with offer.

ached "GENERAL PAINTING AND PROTECTION REQUIREMENTS".

N & Consultant officials (Refer "Dispatch Clearance" attachment).

e list along with offer & supply along with Equipment.


details.

upply along with the equipment.

ares, if any required for 1 year of operation.

rom the exhaust and HT circuit available from the Gas Engine provided at

ng with offer for reference.

Checked By

Approved By

Page 10 of 23

WABAG
WABAG HOUSE, 17, 200 Feet Radial Road,
S.Kolathur, Chennai - 600117, India.
Yes

No

PRYes
REF. No
No.

PROJECT No.

10P87

PROJECT

140 MLD, Sewage Treatment Plant

PR DATE

CLIENT

Uttar Pradesh Jal Nigam

EQPT./ITEM

CONSULTANT

NJS Co. Ltd, AECOM india Pvt .Ltd, TTI Consulting


Engineers India Pvt. Ltd.

DISCIPLINE

LOCATION

Dinapur, Varanasi.

PROJECT MANAGER

VENDOR DATA REQUIREMENT (WITH OF


DOCUMENTS REQUIRED WITH THE OFFER:
Sr. no.

Technical Document

YES / NO

No. of offer copies to be submitted

Yes

No

Filled and stamped datasheet

Yes

No

Performance curves

P&I Diagram for the package

Yes

No

Design calculations

Yes

No

Compliance statement

Yes

No

Deviation list #

Yes

No

Technical specs duly signed & stamped

Yes

No

Enquiry Technical spe

Commissioning Spare parts

Yes

No

Vendor shall recomm

10

Mandatory Spare parts

Yes

No

if applicable

11

Recommended Spare parts

Yes

No

Vendor to recommen

12

Spare parts for O&M

Yes

No

Vendot to furnish spa

13

Quality assurance plan

Yes

No

14

Typ. General arrangement drawing

Yes

No

15

Catalogues and brochures

Yes

No

16

Reference list for similar models

Yes

No

17

Manufacturing programme

Yes

No

18

Mfg. Progress report

Yes

No

19

Control Philosophy

Yes

No

Yes

E-05 F / Rev. 0 Annexure 1

__3__ sets (Hard co

Please submit stamp

No

Stamped copy of data

Yes

No

20

Control Architect Drawing- PLC/DCS

21

Layout Diagram

22

Sizing Sheet Control valve / Orifice

Yes

No

23

Torque Switch details

Yes

No

24

Others (If any)

Yes

Yes

Yes

No

No

No

NOTES:

1. '' # ' - marked formats are enclosed with the enquiry.


2. Incase spares requirement is not specified in the above table, Vendor shall submit offer for recommended spar

E-05 F / Rev. 0 Annexure 1

Format Number E-05 F / Rev. 0 Annexure 1

PRYesREF. No
No.

MBG-PR-

18-Aug-15

EQPT./ITEM

Exhaust Waste Heat Recovery Unit

DISCIPLINE

Mechanical

PROJECT MANAGER

Mr. C.R Pradeep

REQUIREMENT (WITH OFFER)


Remarks

__3__ sets (Hard copies)


Please submit stamped & signed copy of datasheet

Stamped copy of datasheet and specification

Enquiry Technical specifications


Vendor shall recommend
if applicable
Vendor to recommend, if required
Vendot to furnish spare list for 10 Yrs O&M

E-05 F / Rev. 0 Annexure 1

all submit offer for recommended spares required for 2 years of normal operation.
Sheet 1 of 1

E-05 F / Rev. 0 Annexure 1

WABAG
WABAG HOUSE, 17, 200 Feet Radial Road,
S.Kolathur, Chennai - 600117, India.
PROJECT No.

10P87

PR REF. No.

PROJECT

140 MLD, Sewage Treatment Plant

PR DATE

CLIENT

Uttar Pradesh Jal Nigam

EQPT./ITEM

CONSULTANT

NJS Co. Ltd,


india
Pvt .Ltd,No
TTI Consulting
Yes
Yes AECOM
No
Engineers India Pvt. Ltd.

DISCIPLINE

Dinapur, Varanasi.
Yes
No

PROJECT MANAGER

LOCATION

Yes

No

Yes

Yes

No
No

Yes

No

Yes

Yes

No
No

VENDOR
DATA REQUIREMENT (After LO
Yes
No

DOCUMENTS REQUIRED AFTER PLACEMENT


OF
Yes
Yes LOI:No
No
S.No.

Yes

No

Yes
Ye

submitted s

No

Yes

No

No

Yes

No

Technical Document

No. of copies to be

Filled up datasheet

Performance curves

4
5

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

P&I Diagram for the package


Design calculations

Yes

No

Commissioning Spare parts list


Yes

No

Yes

No

Mandatory Spare parts

Yes

No

Yes

No

Yes

No

Yes

No

Yes
Recommended Spare parts list

No

Yes

No

Yes

No

Yes

No

No

Yes

No

No

Yes

No

Spare parts list for 10Yrs O&M


Yes

10

Quality assurance plan

11
12
13

Yes
Yes

No

Yes

No

General arrangement drawingYes

No

Yes

No

Yes

No

Yes

No

Cross Sectional drawings


Catalogues and brochures

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes
Ye
s
Yes

No

14

Yes
Reference list for similar models

15

Erection / Assembly drawings with detail BOQ

16

Detailed Manufacturing programme

17

Mgf. Progress report

18

Wiring & Schematic drawing

19

Speed - torque curve

Yes

No
No

Hard Copy

No
No

Yes

No Yes
Yes

E-05 F / Rev. 0 Annexure 2

No

Soft Copy

20

Motor curves

21

Inspection reports with release notes

22

Erection, O&M manual

23

Schedule

24

Asbuilt Drawing

25

Final Sizing Sheet Control Valve /Orifice

26

Control Architect Drawing- PLC/DCS

27

Terminal details / Panel Wiring Detail

28

Calibration and Test Certificates

29

Warranty certificate

30

Hazardous / Intrinsic safe approvals

31

Torque switch details

32

Others (If any)

NOTES:

1. All the inspection reports shall be complied starting from material identification, in-process inspection to final inspec

E-05 F / Rev. 0 Annexure 2

Format Number E-05 F / Rev. 0 Annexure 2

MBG-PR-

18-Aug-15

Exhaust Waste Heat Recovery Unit

Mechanical

Mr. C.R Pradeep

EQUIREMENT (After LOI)


Remarks

Within One week on receipt of LOI


Within One week on receipt of LOI

Within One week on receipt of LOI


Within One week on receipt of LOI

Within One week on receipt of LOI


Within One week on receipt of LOI
Within One week on receipt of LOI
Within One week on receipt of LOI
Within One week on receipt of LOI
Within One week on receipt of LOI
Within One week on receipt of LOI
2 Weeks before supply
Within One week on receipt of LOI
Within One week on receipt of LOI
Within One week on receipt of LOI

E-05 F / Rev. 0 Annexure 2

Refer Note 1
Within One week on receipt of LOI
Within One week on receipt of LOI
1 Weekbefore supply

Receipt of Material
Receipt of Material
Receipt of Material
Receipt of Material
Within One week on receipt of LOI

-process inspection to final inspection and release notes issued by client/consultant.


Sheet 1 of 1

E-05 F / Rev. 0 Annexure 2

WABAG
WABAG HOUSE, 17, 200 Feet Radial Road,
S.Kolathur, Chennai - 600117, India.
Format Number E-05 F / Rev. 0 Annexure 3

COMPLIANCE STATEMENT
(Typical - To be submitted in vendors letter head)
Project No.

10P87

Project

140 MLD, Sewage Treatment Plant

Equipment Name

As per Datasheet

Equipment Tag No.

As per Datasheet

We confirm that our offer no:_________________________________ dated :__________


is entirely in compliant to your enquiry ref: no.: ________________________ which comprises of
the following Data Sheets & Specifications
1

General Painting & Protection Requirements

Project Specification for Design Life

Project Specification for Spare parts & Packing

Project Specification for Dispatch Clearance

Project Specification for List Of Standards

We confirm that no deviation is taken from the above specification, Except points listed in the deviation list.
We are attaching herewith the backup papers for justifying the deviation/superiority from the specification.
We agree that the deviations are subject to client/consultant approval. If the deviation is not approved by the client,
we will adhere to the project specification / datasheet with no time and cost implication.

Name of the Company

Address for Communication

Authorized Signatory
Company name and seal

Sheet 1 of 1

E-05 F / Rev. 0 Annexure 3

WABAG
WABAG HOUSE, 17, 200 Feet Radial Road,
S.Kolathur, Chennai - 600117, India.

Format Number E-05 F / Rev.

PROJECT No.

10P87

PR REF. No.

PROJECT

140 MLD, Sewage Treatment Plant

PR DATE

CLIENT

Uttar Pradesh Jal Nigam

EQPT./ITEM

CONSULTANT

NJS Co. Ltd, AECOM India Pvt. ltd, TTI


Consulting Engineers pvt. Ltd.

DISCIPLINE

LOCATION

Dinapur, Varanasi.

PROJECT MANAGER

DEVIATION FORMAT
Sl. No.

REFERENCE CLAUSE OF
ENQUIRY

DESCRIPTION OF DEVIATION

E-05 F / Rev. 0 Annexure 4

REASON FOR DEVIATION

E-05 F / Rev. 0 Annexure 4

Format Number E-05 F / Rev. 0 Annexure 4


10P87-D0041-023 REV 0
8/18/2015
Exhaust Waste Heat Recovery Unit
Mechanical
Mr. C.R. Pradeep

TION FORMAT
REASON FOR DEVIATION

REMARKS

E-05 F / Rev. 0 Annexure 4

Sheet 1 of 1

E-05 F / Rev. 0 Annexure 4

Potrebbero piacerti anche