C 913
Date of Meeting :
04 June 2014
Recorded by :
Nwe Oo
Time of Meeting :
02:00 PM
Checked by :
Thayalan S
Place of Meeting:
Vetted by
Michael Hwang
Designation
Company
Stephen Foo
DPM
LTA
Lawrence Liu
DDM
LTA
Sebastian Swee
SPE
LTA
Sam Tan
PENO(A)
LTA
Norashikin Komari
SPE
LTA
Michael Hwang
SDM
GS E&C TSC JV
Subra
Archi Manager
GS E&C TSC JV
Thayalan S
Geotechnical Engr.
Nwe Oo
Structural Engr.
GS E&C TSC JV
GS E&C TSC JV
Sathiyawathy
Project Coordinator
Associate
AEDAS
Circulation:
All attendees
D : Ng Kee Nam
DD: Cheong Yew Seng
Page 1 of 6
Action
Minutes of C913 Design Meeting No 99
by
1.0
1.1
Nil
2.0
Design Development
2.1
Info
th
E&M Coordination
3.1
Nil
4.0
Mott
Mac
Info
Architecture Coordination
Summary of approved sub-contractors for non-APS scope of works are as follows:
Scope of Works
Approved Sub-Contractors
1
2
3
4
5
6
4.1
4.2
PSC/SMR:
Revised shop drawings submitted are returned with R status for CSW and HVW on 10-Oct-2013 & 18
Nov 2013 respectively. Re submission done are returned with AC status.
Artwork & Signages:
Matters relating art works & signage works are progressively in discussion in APS meetings. Information
w/reg to art works received for HVW & CSW station. Meeting with artist for CSW was arranged on the
11th Feb 2014 and was confirmed that the design intend has deviated from the original intend during APS
tender. JV are to advise cost implication (if any).
JV has received EI/009 (Changes to Signages for Station & Station Entrances at CSW & HVW).
4.3
Note
C913 has met with N-parks on 28 May 2014: N-parks has rejected roof projecting over the landscape at
Hillview Entrance 1.
Page 2 of 6
GS
E&C
TSC
JV
Note
Note
Action
Minutes of C913 Design Meeting No 99
by
5.2
GS
E&C
TSC JV
CSW
For Canal widening section C, the existing structure is only 75mm thk wall with BRC mesh at center. PUB
requested to replace whole canal of section C with new design. JV highlighted that whole replacement
needs longer construction period and JV cant achieve the completion of section C before TOP.
st
In an external meeting with LTA, N-Parks and PUB on 21 Jan 2014, N-Parks and PUB agreed to
exclude section C from station TOP. JV separated project reference number for section C from CSW
station.
Post meeting Note :
th
th
BCA has approved Canal Widening sec C RC design & ERSS design on 09 June 2014 & 19 June
2014 respectively.
Page 3 of 6
GS
E&C
TSC JV
Action
Minutes of C913 Design Meeting No 99
5.3
by
Option 3
For Chestnut canal, strengthening with slab over was proposed because the existing canal was built long
time ago as per old requirement and it is turned out that the current rebar and structural dimensions of the
existing canal couldnt take even the original loading condition according to the latest code. Permanent
structure strengthening design and ERSS design have been approved by BCA. JV is waiting for PUB
Sewers approval. CCTV inspection report has been submitted to PUB Sewer on 06.05.2014.
For Railmall compensation drain, additional cell similar with CSW canal widening will be provided. DBO
bus shelter of Railmall requires 3.6m wide clearance including 0.6m set back for ballard. But the site
condition could not accommodate. New bus shelter is to be replaced.
PUB instructed to make 2m expansion if there is no internal wall and 2.6m if internal wall in the meeting
th
on 19 Mar 2014. JV is checking constructability.
Finally 1m expansion was compromised. JV is preparing construction method for PUBs acceptance.
JV proposed the west staircase/ ramp of POB2 to shift out of road reserved line. Maximum distance is
around 2 m from RRL.
LTA architect commented to change east ramp from 3 tiers to 2 tiers and to show link way & foot path. JV
provided LTA with a proposal.
LTA architect retracted their comment because the minimum canal clearance cant be achieved.
6.0
Advance Works
6.1
Nil.
7.0
7.1
7.1.1
7.2
7.2.1
Nil.
Option 3 Design
Final Design & DDSS Submission
Lay by @ POB1 and bus stop relocation @ opposite of Chestnut have been pending. As LTA road
th
requested, JV provided LTA road with proposals of lay by and bus stop relocation on 28 Feb 2014.
JV await acceptance from LTA road.
Drain submission to PUB and tree planting submission to N-Park can also be linked to the above issues.
C913P advised that JV should proceed while they awaited acceptance on the proposal.
Regarding DDSS submission, drawings are being updated and will be submitted by next week followed
by Final design & tree planting plans.
Page 4 of 6
GS
E&C
TSC JV
Action
Minutes of C913 Design Meeting No 99
7.2.2
by
7.3
GS
E&C
TSC JV
Relief Wells
Analysis has been carried out relief wells plugging at HVW station. Relief wells can be plugged and the
water level should be monitored. As of now, all the relief wells and inlets to the sump pits have been
plugged and water table is getting recovered; current readings of the in-excavation piezometers are well
below the review levels.
Info
7.4
Slope cutting
A meeting with SLA, LTA and JV was held and SLA has agreed to cut further into their land even beyond
RRL to make the slope stable unless the cutting affects their Railway corridor. JV substantiated the slope
cutting does not reach to the Railway. JV awaits SLAs written email confirmation to proceed further
th
checking with URA and N-park. LTA Road said SLA will issue the official correspondence within 07 Feb
2014.
JV had submitted the response to comments with the revised report on 02
th
acceptance from LTA on 16 May 2014.
nd
GS
E&C
TSC JV
th
Also, JV has received ACs comments on 07 May 2014 and will reply soon. Since AC didnt accept the
soil parameters used in back analysis, JV is to proof by doing tri-axial tests. Two locations have been
suggested by QPD for the tests.
Further, since AC doesnt agree for backfilling, JV is seeking LTAs and SLAs approval for leaving the
land, without back filling again, after the temporary cut of the existing slope in between change
1620~1760.
8.0
8.1
8.2
8.3
Assumption School settlement current settlement is 15.3mm, showing fluctuating trend. Settlement rate is
(-)0.9 mm/month from 03/05/14 to 03/06/14.
Salvation Army building & canopy foundation settlement
Info
Info
Salvation Army settlement is 34.2mm, showing fluctuating trend. Settlement rate is (-)1.8 from 02/05/14 to
02/06/14.
Info
nd
JV has done the 10 jack-up on 22 November 2012; Linkage part has been checked on 22
2013 by JV together with QP(S) & QP(D), found good in condition.
8.4
nd
March
SC Bank settlement
Standard chartered bank settlement is 40.2mm, showing fluctuating trend. Settlement rate is
(-)0.4 mm/month from 02/05/14 to 02/06/14 (back and middle part of the bank are not settling; only the
front is). Recharge wells have again been activated to cease further settlement.
Page 5 of 6
Info
Action
Minutes of C913 Design Meeting No 99
9.0
Interface Meeting
9.1
9.1.1
9.2
by
Nil
C913/C915 Interface Coordination
9.2.1
Nil.
10.0
10.1
QPS said that based on a LTA document, IOPT test result report to be submitted electronically to BCA by
th
QP(D). QPD has submitted CSW IOPT to BCA on 5 May 2014
MM
PSD (C952) requested QPDs and ACs certificate before they start installation.
QPD requested C952s own PEs endorsed report in order for QPD to issue certificate.
11.0
Next Meeting
11.1
ALL
Description
ATTACHMENT 1
2.2
ATTACHMENT 2
5.0
ATTACHMENT 3
4.0
Archi Issue
ATTACHMENT 4
7.4
ATTACHMENT 5
10
8.0
Page 6 of 6
Submitted to
QPS
Received from
QPS
Submitted to
AC
Received from
AC
ST01,ST02,ST03,ST04,
ST05,ST06,ST07,
ST70,ST72
D Walls
ST41
Skin Wall
22.07.2013
30.08.2013
03.09.2013
10.10.2013
25.10.2013
02.12.2013
04.12.2013
ST12,ST24
Internal Walls
02.09.2013
05.11.2013
05.11.2013
02.12.2013
07.01.2014
22.01.2014
24.01.2014
ST11,ST71,ST75
Base
22.07.2013
30.08.2013
03.09.2013
08.10.2013
25.10.2013
02.12.2013
04.12.2013
ST40
Platform
22.07.2013
30.08.2014
03.09.2014
08.10.2013
25.10.2013
02.12.2013
04.12.2013
ST21
Concourse
22.07.2013
30.08.2013
03.09.2013
08.10.2013
25.10.2013
02.12.2013
04.12.2013
02.09.2013
25.10.2013
25.10.2013
ST31
Roof
Comments on
12.11.2013
10.01.2014
22.01.2014
24.01.2014
(Preparing for
Amendment
submission )
14.01.2014
22.01.2014
24.01.2014
(Preparing for
Amendment
submission )
Staircase
ST64
Canal Widening
(Section A&B)
ST09
Lift Frame
ST60,ST61,ST62
ST51,ST52
Submitted to BCA
Approved by
BCA
Description
ST42
Sent to MM
Received from
MM
ST No Package
15.11.2013
24.12.2013
24.12.2013
Accepted on
24.12.2013
17.12.2013
03.01.2014
04.01.2014
11.01.2014
BCA Approved
Set Submitted to
LTA/QPS
12.11.2013
BCA
Commented
(Re-comments on
18.03.14)
(Preparing for
Amendment
submission )
BCA
Commented
(Re-comment on
18.03.14)
BCA
Commented
(Re-comment on
18.03.14)
BCA
Commented
(Re-comment on
18.03.14)
Submitedto Approved
AC
byLTA
Send
ACtosend
Approved
Submitted
encryption
back
byAC
toBCA
toAC
encryption
STNo.Package
Description
ST12,ST24
Internal Walls
03.06.2014
03.06.2014
ST31
Roof
03.06.2014
03.06.2014
ST42
Staircase
ApprovedbyBCA
BCAApproved
SetSubmittedtoLTA/QPS
CSNo.Package
Description
SenttoMM
CS01
Dwall
CS02
Inner Wall
CS03
CS04, CS05
Internal Wall
CS06
Concourse
CS09
Roof
CS13
Platform
CS14,CS18,CS19
Staircase
CS15
Ventilation Shaft
CS17
Above ground
CS08
Lift Frame
CS07
Double Slab
Done
CS20
Done
Received
fromMM
Submitto
LTA
Approved
byLTA
29.01.2014
30.01.2014
24.02.2014
29.01.2014
30.01.2014
24.02.2014
Sent to MM
Received from
MM
Submitted to
QPS
Received from
QPS
Submitted to
AC
Received from
AC
ST No Package
Description
ST02,ST03,ST04,ST05,
ST06,ST07,ST14
D Walls (Partial)
ST03
D Walls (Partial)
ST05,ST06,ST14
D Walls (Partial)
ST05,ST06,ST14
D Walls (Partial)
ST02,ST03,ST04,ST05,
ST06,ST07,ST08,ST14
D Walls (Partial)
ST41,ST42
Skin Wall
ST15,ST24,ST25,ST26
Internal Walls
ST11,ST12,ST13 & ST 73
Base Slab
ST40
Platform
ST21,ST22,ST23
30.10.2013
24.10.2013
24.10.2013
06.11.2013
13.11.2013
16.12.2013
03.01.2014
BCA
Requested for
report
12.08.2013
30.08.2013
03.09.2013
16.12.2013
03.01.2014
01.11.2013
01.11.2013
Comments on
21.10.2013
Accepted on
01.11.2013
14.11.2013
25.10.2013
BCA
Requested for
report
31.08.2013
28.10.2013
30.10.2013
Comments on
07.11.2013
Accepted on
11.11.2013
14.11.2013
16.12.2013
03.01.2014
BCA
Requested for
report
04.02.2014
10.02.2014
18.02.2014
20.02.2014
30.08.2013
03.09.2013
Concourse
ST31
Roof
ST43
Staircase
ST60,ST61
ST51,ST53
11.11.2013
11.11.2013
11.11.2013
18.01.2014
29.01.2014
29.01.2014
14.11.2013
16.12.2013
03.01.2014
BCA
Requested for
report
Lift Frame
Retaining Wall
ST09
Canal Strengthening
03.10.2013
28.10.2013
25.10.2013
Retrieval Shaft
Approved by
BCA
Comments on
21.10.2013
Accepted on
01.11.2013
12.08.2013
Submitted to BCA
In Order (BCA)
13-Oct-2011
ES20111013-81939
ES20111017-83994
BCA Approved
Set Submitted to
LTA/QPS
CSNo.Package
Description
CS01
Dwall
CS02, CS19
Inner Wall
CS03,CS04,CS05
CS09,CS10,CS11,CS12
Internal Wall
CS07,CS08,CS18
Concourse
CS13
Roof
CS20
Platform
CS21
Staircase
CS16
Above ground
SenttoMM
Received
fromMM
Submitto
LTA
Approvedby
LTA
Lift Frame
CS14
Double Slab
18.01.2014
28.01.2014
29.01.2014
comment on
17. 02.14
CS22,CS23
CD Hinge Door
18.01.2014
28.01.2014
29.01.2014
comment on
26. 02.14
TUNNEL ( E3972-00007-2009 )
ST No Package
Description
Sent to MM
Received from
MM
Submitted to
QPS
Received from
QPS
Submitted to
AC
Received from
AC
ST01,ST02
Segment Design
31.08.2013
24.10.2013
26.10.2013
01.11.2013
07.11.2013
27.11.2013
ST03
17.12.2013
03.01.2014
04.01.2014
11.01.2014
14.01.2014
22.01.2014
24.01.2014
14.02.2014
31.08.2013
28.10.2013
30.10.2013
ST 11
Cross Passage
10.01.2014
22.01.2014
24.01.2014
14.02.2014
04.12.2013
03.01.2014
04.01.2014
Comments on
15.11.2013
Accepted on
06.01.2014
19.10.2013
28.10.2013
30.10.2013
10.01.2014
22.01.2014
24.01.2014
14.02.2014
04.12.2013
03.01.2014
04.01.2014
Comments on
15.11.2013
Accepted on
06.01.2014
ST12
Pump Sump
Submitted to BCA
Approved by
BCA
27.11.2013
Comments Received on 27.12.2013 21.01.2014
Responded on 03.01.2014
BCA Approved
Set Submitted to
LTA/QPS
ST No Package
Description
ST01
Permanent Canal
Sent to MM
Received from
MM
Submitted to
QPS
07.09.2013
25.10.2013
25.10.2013
03.12.2013
24.12.2013
24.12.2013
Received from
QPS
Submitted to
AC
Received from
AC
Submitted to BCA
Comments on
27.11.2013
Accepted on
24.12.2013
07.01.2014
22.01.2014
24.01.2014
Approved by
BCA
BCA Approved
Set Submitted to
LTA/QPS
Approved by
BCA
BCA Approved
Set Submitted to
LTA/QPS
ST No Package
Description
ST01
Canal Widening
(Section C)
Sent to MM
Received from
MM
Submitted to
QPS
Received from
QPS
Submitted to
AC
Received from
AC
Submitted to BCA
FLYOVER ( E3972-00016-2012 )
ST No Package
Description
ST01, ST07
Sub-Structure
(Piles & Pilecaps)
ST02
Super-Structure
ST03, ST04
Sent to MM
Submitted to BCA
Chestnut Slabover
Railmall Slabover
ST06,ST10
Hillview Permanent
Canal
Description
ST01, ST02
Status
(C3 form)
Description
ST01, ST02
Status
(C3 form)
Approved by BCA
BCA Approved
Set Submitted to
LTA/QPS
HVW STATION
Retaining
Wall
Design
Taxi/Bus
bay Roof
Extension
Design
Entrance 1
Micro pile
diameter
to 300mm
Submission to
LTA/AC
09-May-2014
23-May-2014
30-Apr-2014
Accepted by LTA
02-June-2014
15-May-2014
Accepted by AC
23-May-2014
05-May-2014
Send encryption
to AC
30-May-2014
08-May-2014
AC to send back
encryption
23-May-2014
Submission to
BCA
23-May-2014
Approved by
BCA
26-May-2014
CSW STATION
Taxi/Bus
bay Roof
Extension
Design
Canal Widening
Section C RC
Design
Canal
Widening
Section C
ERSS Design
Submission to
LTA/AC
30-Apr-2014
14-Feb-2014
07-Mar-2014
Accepted by LTA
comment 02June-2014
21-Apr-2014
21-Apr-2014
Accepted by AC
comment 16May-2014
17-Apr-2014
07-May-2014
Send encryption
to AC
25-Apr-2014
20-May-2014
AC to send back
encryption
25-Apr-2014
Submission to
BCA
28-Apr-2014
Approved by
BCA
WD on 14-May-2014
Replied on 23-May-2014
OPTION 3
Chestnut
Slabover
ERSS
Design (ST
71)
Railmall
Slabover
RC Design
(ST 12)
Railmall
Slabover
ERSS
Design (ST
72)
POB2
RC Design
(ST 01)
Linkway
from POB
to Bus
Stop (ST
05)
Submission to
LTA/AC
14-Feb-2014
TBA
TBA
19-Feb-2014
TBA
Accepted by
LTA
20-May-2014
Replied 20 Mar
Received
comments 25Apr
Accepted by
AC
03-Apr-2014
28-Apr-2014
Send
encryption to
AC
04-Apr-2014
07-May-2014
AC to send
back
encryption
08-Apr-2014
Done
Submission to
BCA
08-Apr-2014
19-May-2014
Approved by
BCA
23-Apr-2014
WD on 03-June2014
Test Locatons
Comments Codes:
1= Minor Importance
2= Moderate Importance
3= Major Importance
DOCUMENT REVIEW
DATE: 07/05/2014
BURO TRANSMITTAL- 913AC/Buro/May14/544
Transmittal No:
Subject:
913/GEO/0283/C
Transmittal Date:
Tech Note-Open Slope Cut between Chesnut Drive and Rail Mall
29/04/2014
Review Department
AC
02/05/2014
No.
Comments
Date Received
GS E&C-TS JV
Response
A back-analysis
has been
performed to
demonstrate that
friction angle of
33 and an
effective cohesion
of 3kPa on the fill
material is
adequate for the
purpose of a
The soil parameters used in Plaxis analyses are not localized slope
according to attached approved GIBR. Please revise design.
accordingly.
Our own calculation based on GIBR parameters shows
that the factor of safety is not adequate (see attachment).
Comments
GS E&C-TS JV
Response
Parameters obtained
from the back
analysis might not
as reliable as
laboratory testing. It
is commonly known
that slope
deteriorates with
time. We performed
sensitivity studies
and discovered that
anything less than
c=3kPa and =33
will not be able to
achieve a factor
safety of 1.5.
Attached with the
sensitivity studies
for your reference.
The sensitivity
study does not
match the material
parameters seen on
site; hence the
back analysis
provides an
optimum design
parameter which
would better
reflect on the
material in reality.
By reducing the
material
parameters (c)
from 3kPa to 0kPa,
were not
effectively
modelling the
slope on site.
Comments
We maintain our
earlier comments.
To verify the
difference in
calculations, we
recommend lab
testing to confirm
the design
parameters, i.e. if
there is any c in
the fill material.
Code
Parameters of
The top half of
the slope is cut to backfill materials
shall be verified.
reduce the
loading and
gradient of the
slope. The bottom
Cut and Fill case is not considered in Plaxis analysis.
half would be
Please include.
backfilled and
hence producing
additional passive
reaction force to
the existing slope;
therefore the
current PLAXIS
model (without
the cut and fill
case) presents a
more adverse
case.
3. Rejected
The above comments do not relieve the contractor of his contractual obligations. Please incorporating the above comments and resubmitted
for our approval.
AL = 109.58 mRL
WSL = 110.28 mRL
Salvation Army
-15
-25
5-Jun-14
16-May-14
26-Apr-14
6-Apr-14
17-Mar-14
25-Feb-14
5-Feb-14
16-Jan-14
27-Dec-13
7-Dec-13
17-Nov-13
28-Oct-13
8-Oct-13
18-Sep-13
29-Aug-13
9-Aug-13
20-Jul-13
30-Jun-13
10-Jun-13
21-May-13
1-May-13
11-Apr-13
22-Mar-13
2-Mar-13
10-Feb-13
Instrumentation plan
21-Jan-13
1-Jan-13
LB 4024
29-May-12
16-Jun-12
4-Jul-12
22-Jul-12
9-Aug-12
27-Aug-12
14-Sep-12
2-Oct-12
20-Oct-12
7-Nov-12
25-Nov-12
13-Dec-12
31-Dec-12
18-Jan-13
5-Feb-13
23-Feb-13
13-Mar-13
31-Mar-13
18-Apr-13
6-May-13
24-May-13
11-Jun-13
29-Jun-13
17-Jul-13
4-Aug-13
22-Aug-13
9-Sep-13
27-Sep-13
15-Oct-13
2-Nov-13
20-Nov-13
8-Dec-13
26-Dec-13
13-Jan-14
31-Jan-14
18-Feb-14
8-Mar-14
26-Mar-14
13-Apr-14
1-May-14
19-May-14
6-Jun-14
-20
-25
-30
-35
-40
LB
4023
LB
4024
LB
4025A
LB
4026
LB
4030
LB
4038
AL
GWV
4110 -45
WSL
GWV
4110-1
-5
GWV
4110-2
-10
GWV
4110-3
AL
-20
PDL
Prop criteria
- AL : 1/350 Prop design & installation
- WSL : 1/250 Prop with Jack-up
prop
LB4030
LB4029
LB4026
0.0045
0.0040
0.0035
0.0030
0.0025
0.0020
0.0015
AL
0.0010
0.0005
WSL
1/12/2012
22/12/2012
12/1/2013
2/2/2013
23/2/2013
16/3/2013
6/4/2013
27/4/2013
18/5/2013
8/6/2013
29/6/2013
20/7/2013
10/8/2013
31/8/2013
21/9/2013
12/10/2013
2/11/2013
23/11/2013
14/12/2013
4/1/2014
25/1/2014
15/2/2014
8/3/2014
29/3/2014
19/4/2014
10/5/2014
31/5/2014
0.0000
jack
5-Jun-14
4-May-14
2-Apr-14
1-Mar-14
28-Jan-14
27-Dec-13
25-Nov-13
24-Oct-13
22-Sep-13
21-Aug-13
20-Jul-13
18-Jun-13
17-May-13
-10
15-Apr-13
14-Mar-13
-5
10-Feb-13
Mitigation Measure
9-Jan-13
LB4113
8-Dec-12
SCB
1-Jul-12
28-Jul-12
24-Aug-12
20-Sep-12
17-Oct-12
13-Nov-12
10-Dec-12
6-Jan-13
2-Feb-13
1-Mar-13
28-Mar-13
24-Apr-13
21-May-13
17-Jun-13
14-Jul-13
10-Aug-13
6-Sep-13
3-Oct-13
30-Oct-13
26-Nov-13
23-Dec-13
19-Jan-14
15-Feb-14
14-Mar-14
10-Apr-14
7-May-14
3-Jun-14
LB4112
6-Nov-12
diversion
16
5-Oct-12
3-Sep-12
2-Aug-12
1-Jul-12
-5
0
LB
4108
-10
-15
LB
4112
-20
12
-25
LB
4113
-30
AL
-35
-40
WSL
-45
0
GWV
4103-1
GWV
4103-2
-15
AL
-20
PDL
-25