Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PM/PR/C/12-001
CHENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304
CDWA PLATFORM
PML/2014/CP2-029(A)
CONTRACT
PROJECT
PLATFORM
WOR NO
TABLE OF CONTENT
1
LINE LIST
LEGEND
ISOMETRIC DRAWING
PUNCH LIST
10
11
12
13
14
15
16
17
CHART RECORDER
18
LEGEND:
TLP
PG
PRESSURE GAUGE
PR
PRESSURE RECORDER
BLD<size X rating>
BLIND FLANGE
VO
VALVE OPEN
VC
VALVE CLOSE
FILLING POINT
VENT
SPADE BLIND
LINE LIST
TO
OPERATION
PRESSURE (psi g)
OPERATING
TEMP. (C)
DESIGN CONDITION
PRESSURE (psi g)
DESIGN CON.
MAX. TEMP. (C)
INSULATION
THICKNESS
(inch)
TP-20133
TP-20033
319
60-80
1189
105
4''-PH-01502-6SS0-PP-OFF-BRD-S2_HU
TP-20134
TP-20034
319
60-80
1189
105
4''-PH-01503-6SS0-PP-OFF-BRD-S2_HU
TP-20135
TP-20035
319
60-80
1189
105
PH
4''-PH-01504-6SS0-PP-OFF-BRD-S2_HU
TP-20136
TP-20036
319
60-80
1189
105
0100
PH
4''-PH-01505-6SS0-PP-OFF-BRD-S2_HU
TP-20137
TP-20037
319
60-80
1189
105
0100
PH
4''-PH-01506-6SS0-PP-OFF-BRD-S2_HU
TP-20138
TP-20038
319
60-80
1189
105
AB111
0100
PH
4''-PH-01507-6SS0-PP-OFF-BRD-S2_HU
TP-20139
TP-20039
319
60-80
1189
105
AB111
0100
PH
4''-PH-01508-6SS0-PP-OFF-BRD-S2_HU
TP-20140
TP-20040
319
60-80
1189
105
SUB SUB
SYSTEM
MEDIA
SIZE
(inch)
STATE
P&ID
LINE NO.
FROM
AB111
0100
PH
4''-PH-01501-6SS0-PP-OFF-BRD-S2_HU
AB111
0100
PH
AB111
0100
PH
AB111
0100
AB111
AB111
TEST MEDIUM
TREATED
WATER
TREATED
WATER
TREATED
WATER
TREATED
WATER
TREATED
WATER
TREATED
WATER
TREATED
WATER
TREATED
WATER
TEST PRESSURE
STRESS CATEGORY
(psi g)
1783.9
1783.9
1783.9
1783.9
1783.9
1783.9
1783.9
1783.9
REMARKS
PIPING &
INSTRUMENT
DIAGRAM
BLD AND
FILLING POINT
*ALL 8 SPOOLS
WILL CONNECT
TOGETHER
DURING
PERFOMING
HYDROTEST
PRESSURE GAUGE
CERTIFICATE
CHART RECORDER
NO
CLIENT:PETROFAC
P&ID NO
LINE NO
DESCRIPTION
STATUS
PBJV REP.
PML REP.
REMARKS
FIELD INSTRUMENT
ISOLATION
CHECKSHEET
NO
CLIENT:PETROFAC
P&ID NO
LINE NO
DESCRIPTION
STATUS
PBJV REP.
PML REP.
REMARKS
P&ID
Flange No.
Flange
Size
Flange
Rating
Flange
Type
Bolt
Material
Gasket
Type
Required
Torque
Value
Required
Hydraulic
Torque
Pressure
Required
Tension
Pressure
Tensioning
Coverage
Required
Joint
Broken
Date
Achieved
Achieved Hydraulic
Torque
Torque
Value
Pressure
Achieved
Tension
Pressure
Achieved
Joint
Tensioning Assembled
Coverage
Date
Joint
Checked
By
Joint
Completed
Date
HYDROSTATIC TEST
MATERIAL
CONTRACT
PROJECT
PLATFORM
WOR NO
TEST PACKAGE NO
TEST PRESSURE / MEDIA
NO
PM/PR/C/12-001
CHENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304
CDWA PLATFORM
PML/2014/CP2-029(A)
HTP-CDWA-AB111-PH-S2
1783.9 PSI / TREATED WATER
DESCRIPTION
CODE
QTY
REMARKS
HYDROTEST
1
BLD
2
3
18
224
HYDROTEST PUMP
PRESSURE GAUGE
CHECK VALVE
BLD
INSTALLATION
1
Gasket Spiral Wound 4" x 600# SS316 Graphite Filled SS316 Inner
Ring & CS Outer Ring
18
224