2. BUILDING
STRUCTURE
3. ACOUSTIC
Reinforced concrete frame structure preferred (for acoustic and fire performance)
4. AIR CONDITIONING
5. ENVIRONMENT
A site environmental survey must always be carried out BEFORE works start on site
Energy recovery must always be included on main heating/cooling/ventilation systems
Low energy lighting fittings must be used extensively throughout the hotel
Water flow regulators to basin taps (6l/mn) & showers (12l/mn) must be included.
6. ACCESSIBILITY
7. CONSTRUCTION
SITE
Page 1 of 1