CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE

CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

CHAPTER 1
INTRODUCTION
1.1. Project Background
The Government of Karnataka, Public works, ports and inland water transport department,
Bangalore has contemplated for "The Construction of 4 lane and 2 lane road in PWD,
Bangalore Circle, Bangalore" in Bangalore, Bangalore Rural, Kolar, Chikkaballapura,
Tumkur and Ramanagara Districts, in the state of Karnataka.
1.2. The Project Highway
The Government of Karnataka, Public works, ports and inland water transport department,
Bangalore has contemplated for Widening to 4 Lane (Road connecting District to District) of
SH-74, Nelamangala to Chikkaballapura via Doddaballapura in Bangalore Rural and
Chikkaballapura District. The total Length of the Project Road is 60.000 Km. A location map
of the project road is shown in the figure 1.1. The Alignment of the project road starts at
Nelamangala and runs through nearby villages namely

Hydalu, Kodipalya, Guttepalya,

Kannamangala, Kanasawadi, Chikkamadurai, Aralumallige, Doddaballapura, Timmasandra,


Sultanpet, Kondevara and ends at Chikkaballapura @ CH 60+000 Km of SH-74.
1.3. Objective of the Consultancy Services
The objective of this consultancy is to undertake feasibility studies and prepare a Detailed
Project Report of the Project Highway for the purpose of firming up the Authoritys
requirements in respect of development and construction of the Project Highway and Project
Facilities and enabling the prospective bidders to assess the Authoritys requirements in a
clear and predictable manner with a view to ensuring:
1. Enhanced safety and level of service for the road users

Public Works,Ports and Inland Water Transport Department, Bangalore


division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMENT

Figure 1- 1: Location map of the project Road


2

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

2. Superior operation and maintenance enabling enhanced operational efficiency of the


Project Highway
3. Minimal adverse impact on the local population and road users due to road construction
4. Minimal adverse impact on environment
5. Minimal additional acquisition of land
6. Phased development of the Project Highway for improving its financial viability
consistent with the need to minimise frequent inconvenience to traffic that may be
caused if additional works are undertaken within a period of seven years from the
commencement of construction of the Project Highway.
1.4. Scope of Consultancy Services
The scope of service shall comprise:
1. Traffic surveys and demand assessment
2. Engineering surveys and investigations
3. Location and layout of truck lay byes
4. Location and layout of bus bays and bus shelters
5. Preparation of designs for road, (Pavement/Geometric Design)
6. Preparation of designs for bridges for (Old and New, x number of Major/Minor bridges)
and bridge components.
7. Preparation of Land Plan Schedules and Utility Relocation Plans
8. Preparation of BOQ and Cost Estimates
9. Final Detailed Project Report and final drawings.
1.5. Progress Achieved
The Project Consultants Team members have visited the Projects road, carried out extensive
inventory and visual condition survey of existing road alignment, road pavement, shoulder,
major junctions, minor junctions, accident prone locations and collected other existing
features and other relevant secondary data. The team members were also visited the Office of
3

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

the Superintending engineer, Office of the Executive Engineer, Bangalore and interacted with
concerned Section Officers and Assistant Executive Engineers. The Team Leader has also
visited the project site and discussed the salient features of project road with the concerned
Executive Engineer, Public works, ports and inland water transport department, Kolar. The
team has made site visits along the project corridor to gather primary information on land use,
traffic characteristics, soil characteristics, pavement as well as structure conditions,
intersections and status of land availability along the same. We believe that, this knowledge
regarding project site will definitely help us in providing sufficient inputs for the
formulations of an engineering and sequential approach and methodology for the proposed
study. This will further enable us to address the problem in a rational and logical manner.
The following progress has been achieved so far.
i)

Road, Pavement and Shoulder Inventories and visual conditions survey - completed

ii) Major Junctions, Minor Junctions and other intersections survey - completed
iii) Identification of Traffic Survey locations - Completed
iv) CD Structures inventories and visual condition survey - Completed
v) Topo Survey and Level Survey - Completed
vi) Traffic Volume Count and TMC Survey - Completed
vii) Axle Load Survey - Completed
viii) Pavement Investigations - Trial Pits, recording of existing pavement layer crest
thicknesses, field Density, Field Moisture content, Soil Sampling - Completed
ix) Program of Inventory, Visual Condition Survey, Investigations and Reports preparation /
Submission - Completed
x) Inception Report - Submitted
The Present Submission is the Report on Alignment and First Traffic survey

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

CHAPTER 2

DESIGN STANDARDS AND ALIGNMENT


PROPOSALS
2.1 General
A highway system development involves huge irreversible investments, and requires rigorous
modelling and analysis before the implementation decision is made. Objectives of setting
design standards is to confirm the proposed road with the codes of practice, to give a clear
picture of how the proposed facility would look like once implemented and also to maintain
uniformity throughout the corridor to achieve the desired purpose of the facility and to ensure
safety and comfort for the road users. Non-uniform or inadequate design standards lead to
confusion for the drivers to adapt to the changing road characteristics and cause accidents.
For the present Project it is proposed to follow design standards given in Indian Roads
Congress (IRC) codes of practice, guidelines and special publications, as well as applicable
MoRT&H circulars and reports. Where the said standards are silent for any particular element
of design, other standards, like, American Association of State Highway and Transport
Officials (AASHTO) Standards and Any other National or International Standard as
considered suitable shall be referred to and the one considered the best and relevant adopted.
2.2 Geometric Design
2.2.1 Base Plan
Base plan of the existing project road showing all natural and manmade features has been
prepared using the topographical survey data collected through Total Station Survey. All the
features within a band width of 60m have been captured with a unique description code
during the topographical survey along with the details of existing carriageway centreline,
edge of pavement, edge of shoulder, toe line of the embankment etc. This data has been
downloaded into the software environment to prepare the base plan. The following activities
elucidate the preparation of base plans in more details:

Download the data into software


Define main corridor features by joining the points of centreline, edge of pavement,
embankment toe line

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

Join the points with same description codes for all physical features like rivers,
buildings, religious structures, shops, telephone poles, electric poles, cross roads etc

within the above specified limits


Establish break lines for features such as edge of the road, shoulder, nalas, top and

bottom of ditches, etc;


Insert the details of existing cross drainage structures such as bridge number, span

arrangement etc.
Insert details of underground utility services collected from secondary sources.
Cross check the so prepared base plans by walkover surveys
Update and finalize the base plans with additional survey data if necessary.

2.2.2 Geometric Design Standards

References
IRC: 38-1988

2.2.2.1 General
Planning and design of roads & CD structures, pedestrian

IRC: 86-1983
AASHTO-Green

facilities and street furniture are essentially based on IRC


standards

and

MoRT&H

specifications.

Whenever,

the

Book
IRC: SP-73-2007

codes/standards are silent on some of the aspects, the same will be planned/designed based on
sound engineering practices and consultants experience in similar projects. Design standards
relevant to the project road along with the broad list of design parameters and the relevant
IRC codes/specifications have been detailed in Table 2.1
The design standards corresponding to 80 - 100 kmph have been adopted in general for the
project road to ensure uniform and consistent design standards for safety reasons. Locations
of horizontal curves have been checked for the adequacy of radius for the set design speed.
Most of the curves satisfy the requirements of design standards for a design speed of
80 - 100 kmph.

Table 2- 1: Relevant IRC Codes / Specifications


6

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

Sl. No.

Design Parameters
Geometric Design Standards

REPORT ON
ALIGNMEN
T

Reference Code

Carriageway width

Shoulder

Footpath
1

As per
IRC: 38-1988, IRC: 73-1980,
IRC: 86-1983 & IRC:SP: 23-1983

Median

Camber

Super elevation

Horizontal Alignment

Vertical Alignment

Road Furniture
Road Markings
2

As per IRC:79-1981

Road Signs

As per IRC:35-1997

Road Delineators

As per IRC:67-2001
As per IRC:103-1988
As per IRC:64-1990

Pedestrian Facilities

4
5

Road Capacity
Traffic Forecast

Pavement Design

Overlay Design

Road Drainage

Culverts & Bridges

As per IRC:108-2015
As per IRC:37-2012
As per IRC:81-1997
As per IRC:SP:42-1994 & IRC:SP:50-1999
As per relevant IRC codes and MORT&H

Table 2- 2: Design Standards


Sl.
No.
1

Description

Standards

ROAD LAND WIDTH


a. Right of Way

30 - 60m

b. Set Back Between Building Line and Road Boundary

3m to 6m

Design Speed

Main carriageway
a. Traffic lane width
b. Paved Shoulder width
In rural areas
In urban/semi urban areas
c. Earthen Shoulder Width
In rural areas

Desirable 100 kmph


Minimum 80 kmph
3.5m
1.0m

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

Sl.
No.

REPORT ON
ALIGNMEN
T

Description

Standards

In urban/semi urban areas


d. Cross Slope
In Bituminous surface
In Hard shoulder
e. Super elevation
f. Rate of Change of Super elevation
Horizontal Curves
a. Requiring no super elevation (for 100kmph)
b. Requiring no super elevation (for 80kmph)
Super Elevation
a. Absolute minimum requiring 7% super elevation
(for 100kmph)
b. Absolute minimum requiring 7% super elevation
(for 80kmph)
Vertical curves
a. Minimum length of Vertical Curve

b. Maximum Grade Change not Requiring Vertical Curve


c. Minimum k value for summit curves
d. Minimum k value for valley curves
Gradient
a. Maximum
b. Minimum
In cut and kerbed sections
On un kerbed sections on embankment
Sight Distance
(Sight distance shall be in accordance with the intermediate
sight criterion preferably but in no case shall be less than the
stopping sight distance)
a. Desirable (intermediate)
b. Minimum (stopping)

2.50%
3.00%
Maximum 7.0%
1 in 150
2000m
1200m
360 m
240 m
50m
0.60%
73.6
41.5
3.30%
0.30%
0.50%
0.30%

360m
180m

2.3 Capacity Standards


IRC: 64-1990 is the main reference for determining capacity
standards for roads in India. The following Table summarises the
capacity standards and design service volumes for various categories

References
IRC: 64-1990
IRC: 106- 1990

of roads in plain areas for the peak hour traffic of 6-8% and design
service level corresponding to level of service-B (LoS B).
Table 2- 3: Capacity Standards

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

Type

REPORT ON
ALIGNMEN
T

Design Service Volume


PCUs/day

2- lane carriageway (Plain Terrain)


Without Paved Shoulders
With minimum 1.5m Paved Shoulders
4 Lane carriageway (Plain Terrain)

15,000
18,000
40,000

4 Lane Carriageway (Rolling terrain)

20,000

2.4 Transition Curves


As per IRC: 73-1980, Geometric Design Standards for Rural Highways, suggests that the
length of the transition curve should be the larger of the two values arrived at on the basis of
the following criteria:
i.

Rate of change of centrifugal acceleration; and

ii.

Rate of change of super elevation (not steeper than 1 in 150)


The values given in the IRC Geometric Design Standards for Rural Highways are obtained
from the criterion of rate of change of centrifugal acceleration, with a pavement width of
7.00m. The transition lengths so obtained for various radii are presented in table below.
Table 2- 4: Transition Lengths for different Design Speeds
Transition
Transition
Radius
Length
Length (m)
(m)
(m) 80
100 kmph
kmph
45
60
2.5 Design Standard
of Bridges, Culverts &
90
Structures
100
The Design Standards
and the loading to be
150
170
considered are generally
based
on
the
200
NA
requirements laid down
in the latest editions of
240
90
IRC/ IS codes of
practices & standard
300
NA
75
specifications,
and
guidelines of Ministry
360
130
60
600
80
35
Additional
technical
700
70
35
references would be
used
wherever
the
800
60
30
provisions of IRC/IS
codes
are
found
900
55
30
inadequate.
1000
50
30
1200
40
NR
1500
35
Public Works,Ports
Water Transport Department, Bangalore division.
9
1800 and Inland30
2000
NR
of Surface Transport.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

Following IRC/IS codes are proposed to be used in the design


For items not covered in the above specifications, provisions of following standards will be
followed in the given order of priority:
i.

Provisions of IS codes of practices; and

ii.

Relevant provisions of BS codes of practices


Sound Engineering Practice, Technical Literatures/ Papers & provision of relevant
codes of other nations.

10

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

CHAPTER 3

TRAFFIC SURVEY AND ANALYSIS


3.1 General
The Alignment of the project road starts @ Ch 0+000 of Nelamangala (SH-74) and runs
through nearby villages namely

Hydalu, Kodipalya, Guttepalya, Kannamangala,

Kanasawadi, Chikkamadurai, Aralumallige, Doddaballapura, Timmasandra, Sultanpet,


Kondevara and ends at Chikkaballapura @ CH 60+000 Km (SH-74).
The salient features of the Project Road are detailed below.
Table 3- 1: Salient Features of the Project Road
Sl.
No

Description

Name of the Road

2
3
4
5

Type of the Road


Start of the Project
End of the Project
Length of the Project Road
Proposed Length of the Project
Road after Re-alignment and
Curve improvements
Right Of Way (ROW)
Proposed Lane Configuration
Proposed Design Speed
CD Structures
Existing Structues
Pipe Culvert
Stone Culvert
Box slab Culvert
Minor Bridge
RCC Slab
Total
Junctions
Minor Junctions
Total
City/ Villages along the project
stretch

6
7
8
9

10

11
12

11

Details
Nelamangala to Chikkaballapura via
Doddaballapura (SH-74)
SH- 74
Ch: 0+000 Km
Ch: 60+000 Km
60.000 km
60.000 km
Varies From 5 m to 20 m
4 - Lane
80-100 Kmph
Two Lane
21
15
3
4
41
84
30
30 Nos.
Hydalu, Kodipalya, Guttepalya,
Kannamangala, Kanasawadi,
Chikkamadurai, Aralumallige,
Doddaballapura, Timmasandra, Sultanpet,

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

Sl.
No

Description

REPORT ON
ALIGNMEN
T

Details

Kondevara

It connects the NH 4, SH 39, NH 207, SH 9,


SH 104 and NH 7.

13

Major Connectivity

14

Road Marking, Sign Boards, Road Side


Project Safety Features - Proposed Safety Barriers and Safety During
Construction

15

Proposed Project Facilities

Pedestrian Footpath, Street Lighting, Truck


Lay Byes, Bus Shelters, Junction
improvements etc

3.2 Traffic Surveys


To assess the present day traffic characteristics, primary surveys are intended to understand
the existing traffic scenario on the project road. The following surveys were carried out:

Classified Volume counts


Turning Movement Volume Count (TMC) at Major junctions
Axle Load Surveys

The above all traffic surveys has been carried out according to the ToR mandate and analysed
as per IRC codes.
Table 3- 2: Details of Traffic Survey and Locations
Type of
survey

Survey dates
From
To
16/08/201 22/08/201
5
5
16/08/201 22/08/201
5
5
16/08/201 22/08/201
5
5

Chainag
e

Location

5+000

Hydalu

32+000

TB-Cross

57+900

Nandi

Turning
Volume
Counts

31+800

TB-Cross

19/08/2015

44+700

Heggadahalli

20/08/2015

Axle
Load
Survey

6+000

Gollahalli

31/08/2015

32+000

TB-Cross

29/08/2015

Classifie
d Volume
Counts

12

Duration

7 days X 24 Hours

8:00 AM to 12:00 PM
and
04:00 PM to 08:00 Pm
(8 Hours)
1 Day
(24 Hours)

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

REPORT ON
ALIGNMEN
T

3.3 Methodology for Traffic Surveys


3.3.1 Classified Traffic Volume Counts
Hourly Traffic Counts Were Conducted For Seven Day (24 Hours) simultaneously in both
directions at each survey Location to obtain data on The Magnitude of Traffic flow, Hourly
Variation and the Traffic Composition. The survey was carried out by manual vehicle
counting and classifying the vehicles passing the survey station in both directions, in 15
minutes intervals. The counts were made separately for motorized and non-motorized traffic
as per the vehicle classification system.
The volume count data was processed and compiled using Excel Spread Sheet software
packages to get hourly and direction-wise classified traffic data.
3.3.2

Intersection Turning Movement Count Survey (TMC)

The surveys were conducted for one day (8 hours) to obtain classified turning movement at
the identified junctions. The data was collected by deploying enumerators to record data for
each hour within fifteen minutes intervals. All the surveys were conducted through trained
enumerators and were supervised by traffic engineers.
3.4

PCU factors Adopted For the Study as Per IRC: 64 1990

Since most of the length of project corridor falls in the rural are, the PCUs applicable for
rural section has been adopted. PCU values adopted for the present study are as per IRC: 64
1990 Guidelines for the Capacity of Rural Roads recommended for rural roads.
Table 3- 3: PCU factors adopted for the study as per IRC: 64 - 1990
Sl.
No.
Vehicle Type
PCU
1
Two wheeler
0.5
2
Car
1
3
Auto
1
4
Bus
3
5
LCV
1.5
6
2 Axle Truck
3
7
3 Axle Truck
3
8
MAV
4.5
9
Cycle
0.5
10
Tractor
4.5

13

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE, BANGALORE.

3.5

REPORT ON
ALIGNMEN
T

Data Analysis

3.5.1

Classified Volume Count Characteristics

Classified traffic volume count data has been analysed with respect to traffic intensity, hourly
variation of traffic and composition.
3.5.1.1

Average Daily Traffic

Classified traffic volume counts data has been analyzed with respect to traffic intensity,
hourly variation of traffic and composition. The details are shown in Table 3.4.
1. The total volume of vehicular traffic is observed near Hydalu (CH: 5+000 Km)
Direction:

Nelamangala

to Chikkaballapura is

4,264 (4,462 PCUs) and

Chikkaballapura to Nelamangala is 4,374 (4,536 PCUs) and total vehicles observed


were 8,638 (8,998 PCUs).
2. The total volume of vehicular traffic is observed near TB-cross (CH: 32+000 Km)
Direction:

Nelamangala

to Chikkaballapura is

5,144 (4,432 PCUs) and

Chikkaballapura to Nelamangala is 5,219 (4,507 PCUs) and total vehicles observed


were 10,362 (8,939 PCUs).
3. The total volume of vehicular traffic is observed near Nandi (CH: 57+900 Km)
Direction:

Nelamangala

to Chikkaballapura is

4,399 (3,868 PCUs) and

Chikkaballapura to Nelamangala is 4,074 (3,643 PCUs) and total vehicles observed


were 8,743 (7,511 PCUs).

14

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE
CIRCLE, BANGALORE.

REPORT
ON
ALIGNME
NT

Table 3- 4: Average Traffic Volume count


a) Near Hydalu (CH: 5+000 Km)
Truck
Direction

LCV

Buses

Minibu
s / Van /
Tempo

Govt
Buses

Other

Cars /
Jeeps

Motor
Cycle

Auto

Tractor
s

Cycles

Cart
s

Volume

PCU'
s

2-Axle

3-Axle

Multi
-Axle

Nelamangala to
Chikkaballapura

244

86

30

234

62

89

52

952

2268

202

23

13

4,264

4,462

Chikkaballapura
to Nelamangala

231

104

36

239

49

87

54

929

2396

199

27

15

4,374

4,536

Average Daily
Traffic (ADT)

475

191

66

474

111

176

106

1881

4664

401

50

28

16

8,638

8,998

LCV

Minibu
s / Van /
Tempo

Govt
Buses

Other
Buses

Cars /
Jeeps

Motor
Cycle

Auto

Tractor
s

Cycles

Cart
s

Volume

PCU'
s

Buses

b) Near TB-cross (CH: 32+000 Km)


Truck
Direction

Buses

2-Axle

3-Axle

Multi
-Axle

Nelamangala to
Chikkaballapura

87

67

15

186

81

44

48

560

3533

344

101

69

5,144

4,432

Chikkaballapura
to Nelamangala

80

74

183

103

51

37

504

3596

400

116

58

5,219

4,507

Average Daily
Traffic (ADT)

167

141

24

369

184

95

85

1063

7130

745

217

127

16

10,362

8,939

15

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE
CIRCLE, BANGALORE.

REPORT
ON
ALIGNME
NT

c) Near Nandi (CH: 57+900 Km)


Truck
Direction

LCV

Minibu
s / Van /
Tempo

Buses
Other
Buses

Motor
Cycle

Auto

Tractor
s

Cycles

Cart
s

Volume

PCU'
s

2-Axle

3-Axle

Nelamangala to
Chikkaballapura

93

63

23

169

48

41

60

601

2865

288

63

81

4,399

3,868

Chikkaballapura
to Nelamangala

87

76

20

222

29

36

60

474

2640

293

54

79

4,074

3,643

Average Daily
Traffic (ADT)

180

139

44

391

77

77

120

1075

5505

581

117

161

8,473

7,511

16

Govt
Buses

Cars /
Jeeps

Multi
-Axle

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNME
NT

3.6 Traffic Forecast


Forecasting the traffic is an important element for planning and design of infrastructure
facility, especially when it is proposed to be taken up on a commercial format. The present
traffic demand will increase primarily due to the growth in activities earmarked for industrial
development besides socio economic characteristics of the traffic in influencing regions.
Estimation of traffic growth rates is further needed for deciding suitable development strategy
and assessing the financial viability of the project.
3.6.1 Growth of Vehicle Population
The vehicle population in the state is showing an increasing trend. The average number of
vehicles registered in the state has been increasing every year. The future growth pattern is
likely to be affected by the following factors:

Recent economic changes taking place in the project influence region


Future modal shift among the vehicle types, in road traffic as well as between various
modes.
Development of vehicle technology
Development of Industries and production of Agricultural products
3.6.2 Suggested Traffic Growth rates for the project road
As per the IRC guidelines, Five percent growth is to be considered for the
Determination of lane requirements/ project preparation and for financial
viability of the project.

References
IRC: 37-2012

Applying the traffic growth rates of 5 % to AADT, traffic projections on the basis of average
traffic in two locations for a period of 20 years are presented

17

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

REPORT

ON

ALIGNMENT

Table 3- 5: Traffic Projections of location


a) Near Chikkanahalli (CH: 5+000 Km)

Truck
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035

2-Axle

3-Axle

475
499
524
550
578
607
637
669
702
737
774
813
854
896
941
988
1037
1089
1144
1201
1261

191
200
210
221
232
243
256
268
282
296
311
326
342
360
378
396
416
437
459
482
506

MultiAxle
66
69
73
77
80
84
89
93
98
103
108
113
119
125
131
138
144
152
159
167
175

LCV
474
497
522
548
576
604
635
666
700
735
771
810
850
893
938
985
1034
1085
1140
1197
1257

Minibu
s / Van /
Tempo
111
116
122
128
134
141
148
156
163
172
180
189
199
208
219
230
241
253
266
279
293

Buses
Govt
Other
Buses
Buses
176
106
184
111
194
117
203
122
213
128
224
135
235
142
247
149
259
156
272
164
286
172
300
181
315
190
331
199
348
209
365
220
383
231
402
242
423
254
444
267
466
280

Cars /
Jeeps

Motor
Cycle

Auto

Tractors

Cycles

Carts

Volume

PCU's

1881
1975
2074
2178
2287
2401
2521
2647
2780
2918
3064
3218
3379
3547
3725
3911
4107
4312
4528
4754
4992

4664
4897
5142
5399
5669
5953
6250
6563
6891
7236
7597
7977
8376
8795
9235
9696
10181
10690
11225
11786
12375

401
421
442
464
488
512
538
564
593
622
653
686
720
756
794
834
876
919
965
1014
1064

50
52
55
57
60
63
66
70
73
77
81
85
89
93
98
103
108
114
119
125
132

28
29
31
32
34
36
38
39
41
43
46
48
50
53
55
58
61
64
67
71
74

16
17
18
19
20
21
22
23
24
25
27
28
29
31
32
34
36
37
39
41
43

8638
9070
9523
10000
10500
11025
11576
12155
12762
13400
14070
14774
15513
16288
17103
17958
18856
19798
20788
21828
22919

8998
9447
9920
10416
10937
11483
12058
12660
13294
13958
14656
15389
16158
16966
17815
18705
19641
20623
21654
22736
23873

b) Near TB-cross (CH: 32+000 Km)

18

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

Truck

Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035

2-Axle

3-Axle

MultiAxle

167
176
185
194
204
214
224
236
247
260
273
286
301
316
331
348
365
384
403
423
444

141
148
156
164
172
180
189
199
209
219
230
242
254
266
280
294
308
324
340
357
375

24
25
26
27
29
30
32
33
35
37
38
40
42
44
47
49
51
54
57
60
63

Buses

LCV

Minibus /
Van /
Tempo

Govt
Buses

Other
Buses

369
388
407
427
449
471
495
519
545
573
601
631
663
696
731
767
806
846
888
933
979

184
193
203
213
224
235
247
259
272
285
300
315
330
347
364
383
402
422
443
465
488

95
100
105
110
115
121
127
134
140
147
155
162
171
179
188
197
207
218
229
240
252

85
89
94
98
103
108
114
120
126
132
138
145
153
160
168
177
186
195
205
215
226

LCV

Minibus /
Van /

REPORT

ON

ALIGNMENT

Cars /
Jeeps

Motor
Cycle

Auto

Tractors

Cycles

Carts

Volume

PCU's

1063
1116
1172
1231
1292
1357
1425
1496
1571
1650
1732
1819
1910
2005
2105
2210
2321
2437
2559
2687
2821

7130
7486
7861
8254
8666
9100
9554
10032
10534
11061
11614
12194
12804
13444
14116
14822
15563
16341
17159
18016
18917

745
782
821
862
905
951
998
1048
1100
1156
1213
1274
1338
1405
1475
1549
1626
1707
1793
1882
1976

217
227
239
251
263
276
290
305
320
336
353
370
389
408
429
450
473
496
521
547
575

127
133
140
147
154
162
170
178
187
197
206
217
228
239
251
263
277
290
305
320
336

16
17
17
18
19
20
21
22
23
24
26
27
28
30
31
33
34
36
38
40
42

10362
10880
11424
11996
12595
13225
13886
14581
15310
16075
16879
17723
18609
19540
20517
21542
22620
23751
24938
26185
27494

8939
9386
9855
10348
10865
11408
11979
12577
13206
13867
14560
15288
16052
16855
17698
18583
19512
20487
21512
22587
23717

Cars /
Jeeps

Motor
Cycle

Auto

Tractors

Cycles

Carts

Volume

PCU's

c) Near Nandi (CH: 57+900 Km)

Year
2-Axle

19

Truck
3-Axle

Multi-

Buses
Govt

Other

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

Axle

2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035

180
189
198
208
219
230
241
253
266
279
293
308
323
339
356
374
393
412
433
454
477

20

139
146
154
161
169
178
187
196
206
216
227
238
250
263
276
290
304
319
335
352
370

44
46
48
50
53
56
58
61
64
68
71
75
78
82
86
91
95
100
105
110
116

391
411
431
453
475
499
524
550
578
607
637
669
702
738
774
813
854
897
941
988
1038

Tempo

77
81
85
89
94
98
103
108
114
119
125
132
138
145
152
160
168
176
185
195
204

Buses

Buses

77
81
85
89
93
98
103
108
114
119
125
131
138
145
152
160
168
176
185
194
204

120
126
132
139
146
153
161
169
177
186
195
205
215
226
237
249
262
275
288
303
318

1075
1129
1185
1245
1307
1372
1441
1513
1588
1668
1751
1839
1931
2027
2129
2235
2347
2464
2587
2717
2853

5505
5781
6070
6373
6692
7026
7378
7747
8134
8541
8968
9416
9887
10381
10900
11445
12018
12619
13249
13912
14608

581
610
641
673
706
742
779
818
858
901
946
994
1043
1096
1150
1208
1268
1332
1398
1468
1542

117
123
129
135
142
149
157
164
173
181
190
200
210
220
231
243
255
268
281
295
310

161
169
177
186
195
205
215
226
237
249
262
275
288
303
318
334
351
368
386
406
426

REPORT

ON

ALIGNMENT

6
7
7
7
8
8
8
9
9
10
10
11
11
12
12
13
14
14
15
16
17

8473
8897
9341
9808
10299
10814
11354
11922
12518
13144
13801
14491
15216
15977
16776
17614
18495
19420
20391
21410
22481

Public Works,Ports and Inland Water Transport Department, Bangalore division.

7511
7887
8281
8695
9130
9586
10066
10569
11097
11652
12235
12847
13489
14163
14872
15615
16396
17216
18076
18980
19929

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNME
NT

CHAPTER 4

ALIGNMENT DESIGN AND PROPOSALS


4.1 General
Primary objective of highway design is to make improvements on the project road as per the
recommendations provided in the IRC guidelines and special publications of MORT&H.
These standards are required to establish the technical, economical, environmental, social,
and financial feasibility of the project. As discussed in the previous chapters, the project road
passes through plain terrain and hence the appropriate design speed for the respective terrain
classification is adopted for the design.
Highway design not only includes the geometric design of road sections, but also the design
of intersections, interchanges and provision of wayside amenities and facilities. Design of
road sections has been done according to the design standards set for the project and
improvements identified. This chapter describes the various features of the horizontal
alignment and highlights the design of alignment, intersections and other aspects related to
highway appurtenances.
4.2 Lane Configuration
As per our Scope of work Four Lane has been Proposed.
4.3 Geometric Design
4.3.1 Base Plan
Base plan of the existing project road showing all natural and manmade features has been
prepared using the topographical survey data collected through Total Station Survey. All the
features within a band width of 45m have been captured with a unique description code
during the topographical survey along with the details of existing carriageway centreline,
edge of pavement, edge of shoulder, toe line of the embankment etc. This data has been
downloaded into the software environment to prepare the base plan. The following activities
elucidate the preparation of base plans in more details:

21

Download the data into software


Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNME
NT

Define main corridor features by joining the points of centreline, edge of pavement,
embankment toe line
Join the points with same description codes for all physical features like rivers,
buildings, religious structures, shops, telephone poles, electric poles, cross roads etc

within the above specified limits


Establish break lines for features such as edge of the road, shoulder, nalas, top and

bottom of ditches, etc;


Insert the details of existing cross drainage structures such as bridge number, span

arrangement etc.
Insert details of underground utility services collected from secondary sources.
Cross check the prepared base plans by walkover surveys
Update and finalize the base plans with additional survey data if necessary

4.3.2 Horizontal Alignment Design


The horizontal alignment design for the project road is done using most sophisticated road
design software MX Roads. The design standards corresponding to a design speed of
80kmph - 100kmph. Extensive field checks to verify the feasibility of the proposed alignment
have been carried out and suitable modifications to the alignment have been done wherever
considered essential to safeguard sensitive elements. It can be observed from the base plan
that the existing alignment of the project corridor consists of many horizontal curves and few
steep vertical curves.
The main criterion that has been followed in finalizing the alignment includes:

22

Available ROW from the existing centreline;

Minimum land acquisition;

Location of utility lines;

Abutting land use;

Adjacent cultural properties;

Adjacent socially sensitive structures;

Geometric improvements necessary;

Location and type of trees required to be cut;

Transmission line towers; and

Waterlogged Areas / Ponds.

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNME
NT

4.3.3 Conceptual Design of Horizontal Alignment


The design standards corresponding to 80kmph and 100kmph have been adopted in general
for the project road to ensure uniform and consistent design standards for safety reasons.
Locations of horizontal curves have been checked for the adequacy of radius for the set
design speed.
The Alignment of the project road starts @ Ch 0+000 of Nelamangala (SH-74) and runs
through nearby villages namely

Hydalu, Kodipalya, Guttepalya, Kannamangala,

Kanasawadi, Chikkamadurai, Aralumallige, Doddaballapura, Timmasandra, Sultanpet,


Kondevara and ends at Chikkaballapura @ CH 60+000 Km (SH-74).
This alignment is designed for the speed of 80 - 100 Kmph throughout the project stretch
except in sharp curve portion.
Table 4- 1: Details of Existing Horizontal Curves
Sl No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

23

Existing Chainage (Km)


From
To
1.751
1.849
2.715
2.796
3.046
3.303
5.497
5.556
6.298
6.309
6.487
6.505
6.528
6.554
6.726
6.750
8.347
8.475
11.231
11.330
12.057
12.144
13.640
13.692
14.277
14.297
14.363
14.473
14.880
14.885
14.990
14.991
14.994
14.995
15.004
15.005
15.007
15.010
15.271
15.294
15.366
15.402
15.494
15.537
15.570
15.588
15.693
15.702

Existing Radius
of Curve (r)
315
300
900
120
70
15
20
30
300
293
450
300
20
150
20
50
30
20
30
90
100
60
20
30

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNME
NT

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65

24

15.766
15.776
16.515
18.299
19.192
23.076
25.730
25.840
25.955
26.145
26.876
27.408
27.596
27.808
27.815
28.988
29.714
31.025
31.135
31.599
32.501
34.625
34.710
34.739
35.971
36.138
36.335
37.809
37.878
38.027
38.221
38.264
38.302
38.341
38.420
38.884
45.430
46.316
47.964
48.109
49.002

15.770
15.778
16.693
18.384
19.354
23.325
25.782
25.872
25.971
26.241
26.942
27.461
27.639
27.809
27.816
29.234
29.794
31.054
31.146
31.727
32.550
34.670
34.725
34.759
36.024
36.176
36.396
37.850
37.894
38.075
38.249
38.283
38.323
38.364
38.483
38.996
45.543
46.662
48.027
48.201
49.069

10
20
303
150
281
824
102
50
10
115
65
128
117
19
22
300
120
40
36
427
70
150
20
45
82
120
90
94
30
150
81
55
60
60
75
442
252
854
100
200
120

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNME
NT

66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85

25

49.152
49.547
49.699
49.905
50.157
50.727
51.983
52.540
52.669
52.797
56.793
56.902
57.117
57.273
57.964
58.092
58.188
58.763
58.882
58.927

49.220
49.611
49.786
49.974
50.282
50.838
52.070
52.565
52.690
52.812
56.829
56.935
57.148
57.348
58.025
58.151
58.222
58.814
58.902
58.942

100
120
150
180
360
363
250
30
18
10
45
30
120
180
100
148
30
180
20
15

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

REPORT

ON

ALIGNMENT

Table 4- 2: Details of Proposed Horizontal Curves


Start Chainage of
Sl.
No

End Chainage of

Radius

Transition
Length, Ls

Transition

Curve

Curve

Transition

HIP
Chainage

Design
Speed, V

Lc

Dc

Es

Ts

Rotation
Angle

240

50

0+052

0+102

0+181

0+231

0+141

65

0.534

78.253

0.326

0.434

0.104

9.280

24.991

90.807

5%

62.369

240

0+259

0+306

0+283

35

0.195

46.841

0.195

0.000

0.000

1.147

0.000

23.495

NR

87.999

600

0+344

0+415

0+379

50

0.117

70.469

0.117

0.000

0.000

1.036

0.000

35.275

NR

96.819

500

0+464

0+467

0+465

50

0.005

2.731

0.005

0.000

0.000

0.002

0.000

1.366

NR

90.091

600

0+604

0+633

0+618

50

0.048

28.795

0.048

0.000

0.000

0.173

0.000

14.400

NR

90.403

500

25

0+728

0+790

0+759

65

0.175

62.413

0.125

0.052

0.025

1.969

12.500

56.322

4%

92.750

600

0+861

0+897

0+879

50

0.060

35.999

0.060

0.000

0.000

0.270

0.000

18.005

NR

83.607

500

25

0+914

0+939

0+983

1+008

0+961

65

0.137

43.703

0.087

0.052

0.025

1.235

12.500

46.909

4%

86.042

360

50

1+108

1+158

1+200

1+250

1+179

80

0.255

41.724

0.116

0.289

0.069

3.233

24.996

71.145

5%

78.216

10

600

20

1+303

1+323

1+396

1+416

1+360

65

0.155

72.702

0.121

0.028

0.017

1.823

10.000

56.446

3%

65.159

1+689

1+862

0+703

0+815

11

300

75

1+764

1+787

1+775

80

0.327

23.156

0.077

0.781

0.125

4.852

37.480

87.130

5%

72.226

12

2200

1+990

2+047

2+019

100

0.026

56.852

0.026

0.000

0.000

0.184

0.000

28.428

NR

55.284

13

2000

2+232

2+276

2+254

100

0.022

43.960

0.022

0.000

0.000

0.121

0.000

21.981

NR

55.689

14

2200

2+358

2+416

2+387

100

0.027

58.318

0.027

0.000

0.000

0.193

0.000

29.161

NR

56.948

15

250

50

2+738

65

0.415

53.716

0.215

0.417

0.100

5.902

24.992

77.694

5%

57.756

16

2000

2+990

100

0.006

12.795

0.006

0.000

0.000

0.010

0.000

6.398

NR

35.689

17

600

50

3+136

100

0.272

112.954

0.188

0.174

0.042

5.750

24.999

107.004

5%

35.527

18

2200

3+727

100

0.021

46.640

0.021

0.000

0.000

0.124

0.000

23.321

NR

49.596

19

300

40

3+809

65

0.150

5.024

0.017

0.222

0.067

1.069

19.997

42.568

5%

47.940

20

2200

4+095

100

0.019

42.798

0.019

0.000

0.000

0.104

0.000

21.400

NR

39.444

21

240

50

22

300

40

23

2000

24

150

80

25

2200

26

2+661

2+711

2+765

2+984

2+996

3+080

3+193

3+704

3+750

3+807

3+812

4+073

4+116

4+254

4+304

4+309

4+359

4+307

65

0.231

5.504

0.023

0.434

0.104

2.050

24.991

52.918

5%

38.556

4+750

4+790

4+803

4+843

4+797

65

0.175

12.536

0.042

0.222

0.067

1.377

19.997

46.352

5%

51.176

5+268

5+352

5+310

100

0.042

84.315

0.042

0.000

0.000

0.444

0.000

42.164

NR

61.147

5+494

5+512

5+503

65

0.657

18.587

0.124

1.778

0.267

10.359

39.905

91.660

5%

61.711

5+925

5+975

5+950

100

0.023

49.805

0.023

0.000

0.000

0.141

0.000

24.904

NR

95.311

3+030

3+767

5+414

2+815

3+243

3+852

5+592

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

REPORT

ON

ALIGNMENT

26

150

6+215

6+232

6+223

30

0.116

17.424

0.116

0.000

0.000

0.253

0.000

8.722

3%

27

20

6+251

6+297

6+274

20

2.344

46.877

2.344

0.000

0.000

31.496

0.000

47.454

5%

88.582

28

20

6+447

6+479

6+463

20

1.605

32.094

1.605

0.000

0.000

8.776

0.000

20.690

5%

134.289

29

20

6+489

6+520

6+505

20

1.551

31.012

1.551

0.000

0.000

8.003

0.000

19.600

5%

46.229

30

360

6+590

6+602

6+596

40

0.034

12.122

0.034

0.000

0.000

0.051

0.000

6.062

NR

135.070

31

20

6+695

6+713

6+704

20

0.856

17.128

0.856

0.000

0.000

1.985

0.000

9.129

5%

138.543

32

200

6+782

6+791

6+786

35

0.047

9.302

0.047

0.000

0.000

0.054

0.000

4.652

3%

89.476

33

800

7+285

7+343

7+314

65

0.073

58.434

0.073

0.000

0.000

0.534

0.000

29.230

NR

92.142

34

2200

8+066

8+085

8+076

100

0.008

18.420

0.008

0.000

0.000

0.019

0.000

9.210

NR

96.327

35

240

50

8+357

8+447

8+402

65

0.583

90.023

0.375

0.434

0.104

11.040

24.991

97.189

5%

94.714

36

500

9+060

9+085

9+072

50

0.049

24.596

0.049

0.000

0.000

0.151

0.000

12.300

NR

62.972

37

300

25

9+574

9+616

9+595

50

0.224

42.110

0.140

0.087

0.042

1.974

12.499

46.205

4%

59.735

38

2200

9+736

9+761

9+748

100

0.011

24.863

0.011

0.000

0.000

0.035

0.000

12.431

NR

71.959

10+08
4
10+54
2
10+73
5

10+08
6
10+56
2
10+79
4

10+085

65

0.217

2.113

0.009

0.434

0.104

1.858

24.991

51.198

5%

73.378

10+552

100

0.009

19.908

0.009

0.000

0.000

0.023

0.000

9.954

NR

85.279

10+829

10+765

80

0.157

58.986

0.098

0.085

0.029

1.930

17.500

64.596

5%

84.665

11+226

11+234

11+324

11+230

80

0.409

8.096

0.034

1.406

0.188

6.537

44.947

94.981

5%

75.376

11+541

11+581

11+561

100

0.018

39.228

0.018

0.000

0.000

0.087

0.000

19.615

NR

53.698

12+03
8
12+90
8
13+61
3
14+22
6
14+35
5
14+63
3
14+97
2
15+22
2

12+09
3
12+97
9
13+62
8
14+26
7
14+39
5
14+70
6
14+97
6
15+30
3

12+065

65

0.249

54.473

0.151

0.142

0.049

2.941

17.499

62.485

5%

53.400

12+944

100

0.036

71.490

0.036

0.000

0.000

0.319

0.000

35.749

NR

39.499

13+620

65

0.270

14.813

0.062

0.434

0.104

2.643

24.991

57.655

5%

37.115

14+246

20

1.007

40.284

1.007

0.000

0.000

5.669

0.000

22.037

4%

22.083

14+375

20

0.798

39.895

0.798

0.000

0.000

4.261

0.000

21.078

4%

79.557

14+670

40

0.363

72.571

0.363

0.000

0.000

3.337

0.000

36.689

4%

33.841

14+974

100

0.002

3.520

0.002

0.000

0.000

0.001

0.000

1.760

NR

13.051

15+262

30

0.539

80.904

0.539

0.000

0.000

5.625

0.000

41.462

3%

13.151

8+307

9+549

39

240

50

40

2200

41

600

35

10+700

42

240

90

11+136

43

2200

44

360

35

45

2000

46

240

50

47

40

48

50

49

200

50

2000

51

150

27

10+034

12+003

13+563

8+497

9+641

10+136

12+128

13+678

95.238

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

52

40

53

20

54

45

55

2000

56

150

45

57

2000

58

600

35

59

2000

60

150

80

61

2000

62

150

45

19+150

63

360

35

19+471

64

2000

65

2000

66

2000

67

240

90

23+079

68

500

20

23+452

69

360

35

23+856

70

400

20

24+152

71

600

72

2000

73

600

45

25+028

74

360

25

25+255

28

16+487

17+335

18+217

15+46
3
15+52
5
15+65
7
16+09
4
16+53
2
17+06
9
17+37
0
17+69
6
18+29
7
18+80
9
19+19
5
19+50
6
20+25
0
20+91
8
22+23
0
23+16
9
23+47
2
23+89
1
24+17
2
24+61
0
24+79
9
25+07
3
25+28
0

15+48
3
15+54
5
15+69
6

ON

ALIGNMENT

15+473

20

0.494

19.767

0.494

0.000

0.000

1.253

0.000

10.090

4%

162.248

15+535

20

1.013

20.259

1.013

0.000

0.000

2.871

0.000

11.095

5%

133.935

15+676

20

0.869

39.109

0.869

0.000

0.000

4.611

0.000

20.886

4%

11.972

16+102

100

0.008

16.803

0.008

0.000

0.000

0.018

0.000

8.401

NR

61.767

16+555

50

0.612

46.874

0.312

0.563

0.150

7.910

22.483

70.090

5%

60.555

17+096

100

0.027

54.065

0.027

0.000

0.000

0.183

0.000

27.035

NR

26.804

17+387

80

0.116

34.843

0.058

0.085

0.029

1.103

17.500

52.466

5%

27.908

17+806

100

0.111

221.258

0.111

0.000

0.000

3.064

0.000

110.742

NR

34.295

18+297

65

0.544

1.535

0.010

1.778

0.267

7.561

39.905

82.203

5%

39.900

18+822

100

0.013

26.840

0.013

0.000

0.000

0.045

0.000

13.420

NR

10.401

19+308

19+229

50

0.749

67.329

0.449

0.563

0.150

11.771

22.483

81.649

5%

9.873

19+641

19+556

65

0.377

100.629

0.280

0.142

0.049

6.627

17.499

86.154

5%

50.984

20+265

100

0.015

29.984

0.015

0.000

0.000

0.056

0.000

14.992

NR

73.084

20+923

100

0.006

11.301

0.006

0.000

0.000

0.008

0.000

5.650

NR

74.188

22+237

100

0.008

15.646

0.008

0.000

0.000

0.015

0.000

7.823

NR

74.512

23+263

23+171

80

0.392

4.064

0.017

1.406

0.188

6.117

44.947

92.870

5%

73.696

23+536

23+494

65

0.128

43.892

0.088

0.033

0.020

1.056

10.000

41.992

4%

52.569

23+941

23+898

65

0.137

14.413

0.040

0.142

0.049

0.992

17.499

42.254

5%

44.237

24+212

24+182

50

0.101

20.327

0.051

0.042

0.025

0.550

10.000

30.183

3%

36.522

24+629

50

0.064

38.698

0.064

0.000

0.000

0.312

0.000

19.356

NR

30.699

24+834

100

0.035

70.679

0.035

0.000

0.000

0.312

0.000

35.344

NR

34.340

25+143

25+085

100

0.117

25.152

0.042

0.141

0.038

1.168

22.499

57.623

5%

36.130

25+388

25+321

65

0.300

83.121

0.231

0.072

0.035

4.171

12.499

66.981

5%

30.338

16+111
16+57
9
17+12
3
17+40
5
17+91
7
18+29
8
18+83
6
19+26
3
19+60
6
20+28
0
20+92
9
22+24
5
23+17
3
23+51
6
23+90
6
24+19
2
24+64
9
24+86
9
25+09
8
25+36
3

REPORT

16+624

17+440

18+378

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

75

240

76

105

77

80

78

20

79

50

80

50

25+52
8
25+60
3
25+78
4
25+90
5
26+00
6
26+118

81

110

82

400

30

83

2000

84

90

50

85

360

86

240

30

27+147

87

240

25

27+330

88

200

20

27+790

89

150

25

28+149

90

2200

91

240

50

28+616

92

200

20

28+952

93

360

94

3000

95

240

50

96

3000

97

240

50

29

26+417

26+793

29+590

30+564

26+17
7
26+44
7
26+54
5
26+84
3
26+99
0
27+17
7
27+35
5
27+81
0
28+17
4
28+47
3
28+66
6
28+97
2
29+15
8
29+41
2
29+64
0
30+16
5
30+61
4

25+54
9
25+78
1
25+84
8
25+94
2
26+00
8
26+14
8
26+22
1
26+48
7
26+76
9
26+90
0
27+05
4
27+20
8
27+54
1
27+82
2
28+23
9
28+51
0
28+76
2
29+111
29+21
2
29+44
1
29+76
2
30+26
0
30+61
7

REPORT

ON

ALIGNMENT

25+539

40

0.089

21.241

0.089

0.000

0.000

0.235

0.000

10.627

3%

46.417

25+692

30

1.691

177.590

1.691

0.000

0.000

53.315

0.000

118.485

4%

52.959

25+816

30

0.795

63.564

0.795

0.000

0.000

6.757

0.000

33.567

5%

136.053

25+923

20

1.818

36.353

1.818

0.000

0.000

12.538

0.000

25.665

5%

1.577

26+007

20

0.040

1.975

0.040

0.000

0.000

0.010

0.000

0.988

4%

105.721

26+133

20

0.596

29.785

0.596

0.000

0.000

2.303

0.000

15.349

4%

107.984

26+199

25

0.398

43.732

0.398

0.000

0.000

2.210

0.000

22.159

3%

73.853

26+467

65

0.177

40.858

0.102

0.094

0.038

1.668

14.999

50.530

5%

50.831

26+657

100

0.112

224.361

0.112

0.000

0.000

3.150

0.000

112.299

NR

41.269

26+871

40

1.187

56.805

0.631

1.157

0.278

19.952

24.936

86.416

5%

43.967

27+022

50

0.177

63.813

0.177

0.000

0.000

1.419

0.000

31.990

3%

164.161

27+238

27+192

30

0.253

30.653

0.128

0.156

0.063

2.086

14.998

45.507

NR

141.077

27+566

27+448

35

0.877

185.369

0.772

0.109

0.052

25.170

12.499

125.030

NR

132.296

27+842

27+816

30

0.162

12.355

0.062

0.083

0.050

0.740

9.999

26.219

NR

5.400

28+264

28+207

30

0.600

65.014

0.433

0.174

0.083

7.197

12.497

58.959

3%

1.861

28+492

100

0.017

36.525

0.017

0.000

0.000

0.076

0.000

18.263

NR

20.486

28+812

28+714

65

0.606

95.390

0.397

0.434

0.104

11.901

24.991

100.130

5%

19.535

29+131

29+041

35

0.794

138.886

0.694

0.083

0.050

16.977

9.999

93.937

3%

46.862

29+185

50

0.151

54.228

0.151

0.000

0.000

1.023

0.000

27.165

3%

86.649

29+426

100

0.009

28.227

0.009

0.000

0.000

0.033

0.000

14.114

NR

95.280

29+701

65

0.720

122.917

0.512

0.434

0.104

16.926

24.991

115.558

5%

95.819

30+213

100

0.032

94.809

0.032

0.000

0.000

0.375

0.000

47.408

NR

60.606

30+615

65

0.219

2.465

0.010

0.434

0.104

1.877

24.991

51.376

5%

62.152

26+517

26+950

29+812

30+667

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

98

500

99

35

50

100

20

30+948

101

200

102

360

60

31+570

103

360

35

31+794

104

600

105

50

106

2200

107

2000

108

2200

109

2000

110

1200

40

111

2000

112

2000

113

360

60

35+810

114

150

80

36+216

115

2200

116

50

117

50

118

240

20

119

50

120

60

20

30

34+574

37+945

38+198

30+85
1
30+99
8
31+07
4
31+25
9
31+63
0
31+82
9
31+97
0
32+43
7
32+81
8
33+23
5
33+73
6
34+37
7
34+61
4
35+01
4
35+67
0
35+87
0
36+29
6
36+90
2
37+77
0
37+81
9
37+96
5
38+07
1
38+21
8

30+88
8
30+99
8

ON

ALIGNMENT

30+870

50

0.074

37.206

0.074

0.000

0.000

0.346

0.000

18.612

NR

50.312

30+998

20

1.443

0.508

0.015

2.976

0.714

15.582

24.581

57.992

5%

48.858

31+093

20

1.857

37.145

1.857

0.000

0.000

13.393

0.000

26.741

5%

173.631

31+278

30

0.193

38.518

0.193

0.000

0.000

0.931

0.000

19.319

NR

98.349

31+715

31+642

65

0.235

24.723

0.069

0.417

0.083

2.926

29.993

72.600

5%

87.738

31+890

31+842

65

0.168

25.575

0.071

0.142

0.049

1.420

17.499

47.870

5%

100.366

32+094

65

0.412

247.440

0.412

0.000

0.000

12.985

0.000

125.504

3%

110.171

32+463

20

1.018

50.893

1.018

0.000

0.000

7.256

0.000

27.898

4%

86.811

32+829

100

0.010

22.257

0.010

0.000

0.000

0.028

0.000

11.129

NR

28.493

33+338

100

0.103

206.507

0.103

0.000

0.000

2.668

0.000

103.346

NR

29.072

33+743

100

0.006

14.246

0.006

0.000

0.000

0.012

0.000

7.123

NR

23.156

34+456

100

0.078

156.525

0.078

0.000

0.000

1.532

0.000

78.303

NR

23.527

34+670

100

0.127

111.802

0.093

0.056

0.017

2.460

20.000

96.006

4%

27.703

35+061

100

0.047

94.971

0.047

0.000

0.000

0.564

0.000

47.494

NR

20.932

35+717

100

0.046

92.810

0.046

0.000

0.000

0.538

0.000

46.413

NR

23.484

36+201

36+005

80

0.917

270.283

0.751

0.417

0.083

41.974

29.993

207.990

5%

23.527

36+410

36+313

65

0.760

34.013

0.227

1.778

0.267

13.439

39.905

100.535

5%

158.161

36+905

100

0.003

6.814

0.003

0.000

0.000

0.003

0.000

3.407

NR

16.005

37+776

20

0.260

12.989

0.260

0.000

0.000

0.425

0.000

6.531

4%

16.949

37+835

20

0.639

31.961

0.639

0.000

0.000

2.667

0.000

16.548

4%

31.833

37+996

40

0.338

61.115

0.255

0.069

0.042

3.539

9.999

50.959

3%

175.208

38+081

20

0.375

18.745

0.375

0.000

0.000

0.891

0.000

9.484

4%

157.700

38+223

20

0.497

9.810

0.164

0.278

0.167

2.187

9.991

25.281

3%

178.407

31+048

31+111
31+29
7
31+65
5
31+85
5
32+21
7
32+48
8
32+84
1
33+44
2
33+75
0
34+53
4
34+72
6
35+10
9
35+76
3
36+14
1
36+33
0
36+90
8
37+78
3
37+85
1
38+02
6
38+09
0
38+22
8

REPORT

34+766

38+046

38+248

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

121

60

122

2200

123

200

124

360

40

125

2000

126

400

30

40+045

127

600

20

40+416

128

3000

129

2000

130

2000

131

2200

132

2200

133

2200

134

3000

135

800

60

136

2200

137

2000

138

2000

139

2200

140

240

90

45+344

141

800

30

45+575

142

1200

143

2000

31

39+321

43+634

38+35
6
38+70
2
38+86
9
39+36
1
39+64
2
40+07
5
40+43
6
40+80
2
41+44
5
41+67
7
42+27
1
42+42
2
42+62
0
43+22
5
43+69
4
43+94
0
44+39
6
44+69
8
45+02
7
45+43
4
45+60
5
45+79
0
45+96
6

38+42
6
38+74
8
38+93
9
39+36
7
39+74
1
40+09
1
40+48
8
40+82
7
41+48
3
41+70
4
42+30
3
42+47
2
42+64
6
43+24
0
43+75
8
43+95
4
44+40
7
44+74
1
45+04
8
45+44
5
45+66
4
45+80
7
46+01
5

REPORT

ON

ALIGNMENT

38+391

20

1.169

70.153

1.169

0.000

0.000

11.949

0.000

39.707

3%

151.354

38+725

100

0.021

45.488

0.021

0.000

0.000

0.118

0.000

22.744

NR

37.706

38+904

30

0.350

69.974

0.350

0.000

0.000

3.100

0.000

35.348

NR

36.521

39+364

65

0.127

5.628

0.016

0.185

0.056

0.910

19.998

42.854

5%

16.587

39+692

100

0.049

98.558

0.049

0.000

0.000

0.607

0.000

49.289

NR

23.581

40+121

40+083

65

0.114

15.780

0.039

0.094

0.038

0.750

14.999

37.920

5%

26.659

40+508

40+462

65

0.120

51.947

0.087

0.028

0.017

1.108

10.000

46.018

3%

33.099

40+814

100

0.008

24.699

0.008

0.000

0.000

0.025

0.000

12.350

NR

39.900

41+464

100

0.019

37.481

0.019

0.000

0.000

0.088

0.000

18.741

NR

40.461

41+690

100

0.013

26.838

0.013

0.000

0.000

0.045

0.000

13.419

NR

39.387

42+287

100

0.014

31.631

0.014

0.000

0.000

0.057

0.000

15.816

NR

38.618

42+447

100

0.023

50.931

0.023

0.000

0.000

0.147

0.000

25.466

NR

37.794

42+633

100

0.012

25.434

0.012

0.000

0.000

0.037

0.000

12.717

NR

39.121

43+233

100

0.005

15.028

0.005

0.000

0.000

0.009

0.000

7.514

NR

38.458

43+726

100

0.154

63.226

0.079

0.188

0.038

2.567

29.999

91.748

5%

37.946

43+947

100

0.006

14.116

0.006

0.000

0.000

0.011

0.000

7.058

NR

29.849

44+402

100

0.006

11.172

0.006

0.000

0.000

0.008

0.000

5.586

NR

29.714

44+720

100

0.021

42.993

0.021

0.000

0.000

0.116

0.000

21.498

NR

29.394

45+038

100

0.010

21.214

0.010

0.000

0.000

0.026

0.000

10.607

NR

28.162

45+535

45+439

80

0.422

11.345

0.047

1.406

0.188

6.889

44.947

96.688

5%

27.763

45+694

45+634

80

0.111

59.161

0.074

0.047

0.019

1.291

15.000

59.629

4%

6.700

45+799

80

0.014

16.662

0.014

0.000

0.000

0.029

0.000

8.331

NR

10.647

45+990

100

0.024

48.297

0.024

0.000

0.000

0.146

0.000

24.149

NR

11.701

39+407

43+818

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

144

400

55

46+212

145

400

55

46+466

146

800

60

47+001

147

300

25

47+201

148

300

75

47+689

149

90

150

100

45

151

600

152

240

153

90

154

60

48+053

49+112

155

300

156

100

20

157

100

158

300

10

49+786

159

400

10

50+077

160

200

161

360

30

50+401

162

240

50

50+662

163

2000

164

360

60

51+537

165

400

20

51+737

166

300

30

51+892

32

46+26
7
46+52
1
47+06
1
47+22
6
47+76
4
47+89
1
48+09
8
48+56
2
48+73
5
48+95
1

49+479

49+22
2
49+49
9
49+63
3
49+79
6
50+08
7
50+32
1
50+43
1
50+71
2
51+08
9
51+59
7
51+75
7
51+92
2

46+33
2
46+59
7
47+18
1
47+26
2
47+80
9
47+91
8
48+10
1
48+62
7
48+76
2
49+02
1
49+15
9
49+24
2
49+52
5
49+68
4
50+05
2
50+29
0
50+33
6
50+47
8
50+74
6
51+33
3
51+63
8
51+83
3
52+01
6

REPORT

ON

ALIGNMENT

46+387

46+299

80

0.301

65.540

0.164

0.315

0.069

4.903

27.496

88.274

5%

10.970

46+652

46+559

80

0.327

75.743

0.189

0.315

0.069

5.721

27.496

93.507

5%

27.662

47+241

47+121

100

0.226

120.744

0.151

0.188

0.038

5.320

29.999

120.778

5%

45.609

47+287

47+244

65

0.202

35.570

0.119

0.087

0.042

1.622

12.499

42.897

5%

35.515

47+884

47+786

80

0.402

45.693

0.152

0.781

0.125

6.971

37.480

98.814

5%

45.278

47+904

20

0.298

26.776

0.298

0.000

0.000

1.005

0.000

13.488

NR

30.239

48+099

45

0.475

2.546

0.025

0.844

0.225

3.762

22.462

46.898

5%

65.408

48+595

50

0.109

65.242

0.109

0.000

0.000

0.888

0.000

32.653

NR

44.338

48+749

35

0.113

27.033

0.113

0.000

0.000

0.381

0.000

13.531

NR

37.687

48+986

20

0.781

70.271

0.781

0.000

0.000

7.323

0.000

37.036

NR

45.431

49+135

20

0.783

46.979

0.783

0.000

0.000

4.911

0.000

24.768

3%

0.695

49+232

40

0.066

19.938

0.066

0.000

0.000

0.166

0.000

9.973

NR

45.556

49+512

30

0.459

25.889

0.259

0.167

0.100

2.862

9.997

33.391

4%

41.347

49+659

20

0.513

51.254

0.513

0.000

0.000

3.376

0.000

26.203

NR

16.222

50+062

49+924

40

0.887

256.058

0.854

0.014

0.017

32.136

5.000

147.500

NR

60.784

50+300

50+189

45

0.531

202.465

0.506

0.010

0.013

14.544

5.000

113.806

NR

14.376

50+328

30

0.070

14.080

0.070

0.000

0.000

0.124

0.000

7.043

NR

43.003

50+508

50+455

65

0.212

46.475

0.129

0.104

0.042

2.145

14.999

53.392

5%

38.878

50+796

50+729

65

0.350

33.899

0.141

0.434

0.104

4.154

24.991

67.450

5%

24.970

51+211

100

0.122

244.322

0.122

0.000

0.000

3.737

0.000

122.313

NR

5.335

51+698

51+617

80

0.282

41.530

0.115

0.417

0.083

4.030

29.993

81.156

5%

178.398

51+853

51+795

50

0.241

76.481

0.191

0.042

0.025

2.969

10.000

58.480

3%

12.619

52+046

51+969

50

0.415

94.538

0.315

0.125

0.050

6.708

14.999

78.204

4%

179.974

48+146

49+545

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

167

400

20

168

2200

169

60

170

20

600

172

20

173

600

35

174

2000

175

600

80

176

2200

177

900

30

53+713

178

900

30

53+960

179

2200

180

2000

181

2200

182

2000

183

2200

184

600

80

185

2200

186

2000

187

35

188

30

189

100

40

33

52+220

52+839

53+204

55+853

57+037

52+24
0
52+32
3
52+46
7
52+60
8
52+65
2
52+73
2
52+87
4
53+05
0
53+28
4
53+50
8
53+74
3
53+99
0
54+23
2
54+40
3
54+53
4
55+19
7
55+52
9
55+93
3
56+15
1
56+36
5
56+73
4
56+83
3
57+07
7

52+27
3
52+39
1
52+53
3
52+64
3
52+69
5
52+76
4
52+96
3
53+16
8
53+36
3
53+53
3
53+77
6
54+09
8
54+30
3
54+46
3
54+59
0
55+21
4
55+55
5
55+98
2
56+19
7
56+40
5
56+77
1
56+89
0
57+07
7

52+293

REPORT

ON

ALIGNMENT

52+256

50

0.131

32.443

0.081

0.042

0.025

0.903

10.000

36.262

3%

24.141

52+357

100

0.031

68.139

0.031

0.000

0.000

0.264

0.000

34.072

NR

33.020

52+500

20

1.106

66.347

1.106

0.000

0.000

10.504

0.000

37.025

3%

31.572

52+625

20

1.727

34.547

1.727

0.000

0.000

10.786

0.000

23.405

5%

94.928

52+674

20

0.071

42.805

0.071

0.000

0.000

0.382

0.000

21.412

NR

175.958

52+748

20

1.568

31.359

1.568

0.000

0.000

8.244

0.000

19.943

5%

171.870

52+919

80

0.208

89.526

0.149

0.085

0.029

3.331

17.500

79.996

5%

81.166

53+109

100

0.059

117.801

0.059

0.000

0.000

0.868

0.000

58.917

NR

70.311

53+324

100

0.265

79.224

0.132

0.444

0.067

5.769

39.994

120.136

5%

65.262

53+521

100

0.011

24.218

0.011

0.000

0.000

0.033

0.000

12.109

NR

52.521

53+806

53+760

100

0.071

33.835

0.038

0.042

0.017

0.608

15.000

46.932

5%

51.758

54+128

54+044

100

0.153

107.285

0.119

0.042

0.017

2.666

15.000

83.779

5%

48.106

54+267

100

0.032

71.482

0.032

0.000

0.000

0.290

0.000

35.744

NR

56.270

54+433

100

0.030

59.936

0.030

0.000

0.000

0.225

0.000

29.970

NR

54.680

54+562

100

0.025

55.790

0.025

0.000

0.000

0.177

0.000

27.896

NR

52.963

55+206

100

0.009

17.574

0.009

0.000

0.000

0.019

0.000

8.787

NR

51.510

55+542

100

0.012

25.755

0.012

0.000

0.000

0.038

0.000

12.878

NR

51.007

55+958

100

0.215

49.090

0.082

0.444

0.067

3.936

39.994

104.838

5%

50.807

56+174

100

0.021

46.922

0.021

0.000

0.000

0.125

0.000

23.462

NR

61.759

56+385

100

0.020

39.455

0.020

0.000

0.000

0.097

0.000

19.729

NR

61.441

56+753

20

1.079

37.781

1.079

0.000

0.000

5.800

0.000

20.967

5%

62.571

56+861

20

1.910

57.294

1.910

0.000

0.000

21.931

0.000

42.389

5%

0.723

57+077

40

0.400

0.029

0.000

0.667

0.200

2.717

19.973

40.395

5%

109.481

52+998

53+443

56+062

57+117

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD,
BANGALORE CIRCLE, BANGALORE.

190

240

191

150

80

192

600

193

600

194

600

195

2200

196

50

197

150

198

50

199

360

200

2000

201

600

202

150

30

203

30

204

20

205

1200

34

57+198

58+712

57+13
9
57+27
8
57+40
2
57+43
4
57+67
0
57+73
4
57+92
3
58+00
9
58+13
1
58+30
0
58+55
8
58+64
6
58+74
2
58+82
8
58+87
7
58+911

57+15
8
57+31
2
57+42
8
57+56
6
57+68
0

57+392

57+811
57+96
0
58+09
6
58+19
1
58+31
8
58+60
5
58+70
1
58+75
6
58+86
5
58+90
1
58+93
3

58+786

REPORT

ON

ALIGNMENT

57+149

40

0.078

18.687

0.078

0.000

0.000

0.182

0.000

9.348

3%

89.342

57+295

65

0.759

33.792

0.225

1.778

0.267

13.391

39.905

100.405

5%

88.027

57+415

65

0.043

25.566

0.043

0.000

0.000

0.136

0.000

12.785

3%

64.378

57+500

65

0.220

132.210

0.220

0.000

0.000

3.660

0.000

66.374

3%

61.937

57+675

65

0.016

9.573

0.016

0.000

0.000

0.019

0.000

4.787

3%

74.562

57+773

100

0.035

76.768

0.035

0.000

0.000

0.335

0.000

38.388

NR

75.476

57+942

20

0.721

36.070

0.721

0.000

0.000

3.439

0.000

18.860

4%

77.475

58+052

20

0.577

86.561

0.577

0.000

0.000

6.468

0.000

44.523

NR

36.143

58+161

20

1.198

59.896

1.198

0.000

0.000

10.538

0.000

34.131

4%

69.207

58+309

40

0.049

17.776

0.049

0.000

0.000

0.110

0.000

8.890

NR

0.570

58+581

100

0.023

46.809

0.023

0.000

0.000

0.137

0.000

23.406

NR

177.741

58+674

50

0.092

55.135

0.092

0.000

0.000

0.634

0.000

27.587

NR

179.082

58+749

40

0.290

13.557

0.090

0.250

0.100

1.848

14.995

36.964

5%

3.069

58+847

20

1.235

37.050

1.235

0.000

0.000

6.795

0.000

21.304

5%

168.666

58+889

20

1.193

23.852

1.193

0.000

0.000

4.172

0.000

13.574

5%

58.469

58+922

80

0.018

21.277

0.018

0.000

0.000

0.047

0.000

10.639

NR

170.141

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNMEN
T

4.4 Right of Way


As per IRC standards, the RoW should normally be 45m, but can vary in the range of 30m to
60m. The land width requirement for the Project road shall be assessed depending upon the
extent of the existing RoW and the proposed improvements. The minimum berm width
required between the Toe of embankment to RoW boundary is 5m keeping in view the width
of longitudinal drain at the outer end of RoW as 2m. This is required to accommodate tree
plantation and for the vehicle driver to bring the vehicle under control in the event of swerving
off and leaving the roadway.
Table 4- 3: Existing ROW details (as per Inventory)
Sl
No

35

Chainage (km)
From

To

Length
(Km)

Row (m)
(Approx)

Remarks

0.000

1.000

1.000

15.0

Nelamangala

1.000

2.000

1.000

15.0

2.000

3.000

1.000

18.0

3.000

4.000

1.000

15.0

4.000

5.000

1.000

15.0

Hydalu

5.000

6.000

1.000

15.0

Kodipalya

6.000

7.000

1.000

15.0

7.000

8.000

1.000

15.0

8.000

9.000

1.000

15.0

10

9.000

10.000

1.000

15.0

11

10.000

11.000

1.000

12.0

Guttepalya
Uddichikkanahall
i
Putanibhag

12

11.000

12.000

1.000

12.0

Kannamangala

13

12.000

13.000

1.000

15.0

14

13.000

14.000

1.000

15.0

Kanasawadi

15

14.000

15.000

1.000

10.0

Chikkamadurai

16

15.000

16.000

1.000

10.0

17

16.000

17.000

1.000

18.0

18

17.000

18.000

1.000

18.0

19

18.000

19.000

1.000

20.0

20

19.000

20.000

1.000

18.0

21

20.000

21.000

1.000

18.0

22

21.000

22.000

1.000

18.0

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNMEN
T

36

23

22.000

23.000

1.000

18.0

24

23.000

24.000

1.000

18.0

25

24.000

25.000

1.000

15.0

26

25.000

26.000

1.000

15.0

27

26.000

26.000

1.000

15.0

Aralumallige

28

27.000

28.000

1.000

15.0

29

28.000

29.000

1.000

15.0

Alahalli

30

29.000

30.000

1.000

15.0

Doddaballapura

31

30.000

31.000

1.000

15.0

32

31.000

32.000

1.000

15.0

33

32.000

33.000

1.000

20.0

34

33.000

34.000

1.000

20.0

35

34.000

35.000

1.000

20.0

36

35.000

36.000

1.000

18.0

37

36.000

37.000

1.000

18.0

Timmasandra

38

37.000

38.000

1.000

9.0

39

38.000

39.000

1.000

17.0

40

39.000

40.000

1.000

17.0

41

40.000

41.000

1.000

17.0

42

41.000

42.000

1.000

17.0

43

42.000

43.000

1.000

18.0

44

43.000

44.000

1.000

15.0

45

44.000

45.000

1.000

15.0

46

45.000

46.000

1.000

18.0

47

46.000

47.000

1.000

18.0

48

47.000

48.000

1.000

15.0

49

48.000

49.000

1.000

15.0

50

49.000

50.000

1.000

15.0

51

50.000

51.000

1.000

5.0

52

51.000

52.000

1.000

8.0

Sultanpet

53

52.000

53.000

1.000

12.0

54

53.000

54.000

1.000

12.0

55

54.000

55.000

1.000

12.0

Public Works,Ports and Inland Water Transport Department, Bangalore division.

REPORT

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

ON
ALIGNMEN
T

56

55.000

56.000

1.000

15.0

57

56.000

57.000

1.000

12.0

58

57.000

58.000

1.000

15.0

59

58.000

59.000

1.000

9.0

Kondevara

60

59.000

60.000

1.000

9.0

Chikkaballapura

61

60.000

60.700

0.700

8.0

Chikkaballapura

4.5 Existing Intersections


There are many intersections along with cross roads having bituminous surfacing and falling
into the different categories of Rural roads, ODR, MDR and SH, most of them being rural
roads. The project road provides direct access to many villages.
Based on turning moments, detailed designs shall be carried during Detailed Project Report
preparation, keeping in view the guidelines given in IRC: SP-41-1994 and MoRT&H Designs
for Intersections. In this stage of project, all these intersections are divided into two categories
as major and minor, depending on their importance, and the necessary improvements have
been proposed accordingly.
Table 4- 4: Details of Existing Junctions
Sl
N
o
1
2

37

Chainag
e (Km)

Junctio
n Type

0.90
2.20

Minor
Minor

Junction
Configuratio
n
3 Arm
3 Arm

2.80

Minor

3 Arm

4
5
6
7
8
9

3.40
5.58
6.80
7.20
12.30
13.30

Minor
Minor
Minor
Minor
Minor
Minor

3 Arm
3 Arm
3 Arm
3 Arm
3 Arm
3 Arm

10

13.90

Minor

3 Arm

11

16.20

Minor

3 Arm

12

16.90

Minor

3 Arm

Direction
LHS
Basavanahalli

RHS
-

Syadamipalya

Byraweshwara
nagar
Mylanahalli

Doddabelavangela
,
Aaroodi
Goravanahalli
Rana
Channadevi
agrahaara

Kodu road
Hesarghatta
Bettahalli
Ramadevanahalli
Marasandra

Public Works,Ports and Inland Water Transport Department, Bangalore division.

REPORT

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

ON
ALIGNMEN
T

13
14
15

18.40
21.40
34.95

Minor
Minor
Minor

3 Arm
4 Arm
3 Arm

Mallavalli
Madagondanahalli
Thogarigatta

Marasandra

16

35.10

Minor

3 Arm

Pindakoora ,
Timmanahalli

17
18
19
20
21
22
23
24

36.40
36.70
37.60
41.20
41.50
42.00
43.20
44.50

Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor

3 Arm
3 Arm
3 Arm
3 Arm
3 Arm
4 Arm
3 Arm
3 Arm

Timmasandra
Gaddambachchalli
Aladenahalli
Linganahalli
Gandrajpura
Beedikere
Mukkenahalli

25

45.60

Minor

3 Arm

26
27
28

46.90
48.60
55.30

Minor
Minor
Minor

3 Arm
3 Arm
3 Arm

Seegahalli

29

56.30

Minor

3 Arm

30

56.80

Minor

3 Arm

Modakuhosalli
Bairnayakanahalli
Thirnahalli,
Muddenahalli
Jadalathimmnahall
i

Ancharalli

Udanahalli
Machagondanahall
i

4.6 Land Acquisition


The proposed project road is widened symmetrically by retaining the existing centreline for
most part. At the locations where the curves are improved and re-alignment is proposed, the
proposed alignment will deviate from the existing centreline. Land should be acquired at those
locations where the proposed alignment goes beyond the available RoW. Following table
shows the area to be acquired at re-alignment locations.
Table 4- 5: Tentative Land Acquisition Details
Sl No
1
2
3
4
5
6
7
8
9
10
11

38

Chainage (km)
From
To
0.000
1.000
1.000
2.000
2.000
3.000
3.000
4.000
4.000
5.000
5.000
6.000
6.000
7.000
7.000
8.000
8.000
9.000
9.000
10.000
10.000
11.000

Area
(sq m)
30000
30000
27000
30000
30000
30000
30000
30000
30000
30000
33000

Area
(Hectares)
3.0
3.0
2.7
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.3

Public Works,Ports and Inland Water Transport Department, Bangalore division.

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

REPORT
ON
ALIGNMEN
T

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

39

11.000
12.000
13.000
14.000
15.000
16.000
17.000
18.000
19.000
20.000
21.000
22.000
23.000
24.000
25.000
26.000
27.000
28.000
29.000
30.000
31.000
32.000
33.000
34.000
35.000
36.000
37.000
38.000
39.000
40.000
41.000
42.000
43.000
44.000
45.000
46.000
47.000
48.000
49.000
50.000
51.000
52.000
53.000
54.000
55.000
56.000
57.000
58.000
59.000

12.000
13.000
14.000
15.000
16.000
17.000
18.000
19.000
20.000
21.000
22.000
23.000
24.000
25.000
26.000
26.000
28.000
29.000
30.000
31.000
32.000
33.000
34.000
35.000
36.000
37.000
38.000
39.000
40.000
41.000
42.000
43.000
44.000
45.000
46.000
47.000
48.000
49.000
50.000
51.000
52.000
53.000
54.000
55.000
56.000
57.000
58.000
59.000
60.000

33000
30000
30000
35000
35000
27000
27000
25000
27000
27000
27000
27000
27000
30000
30000
30000
30000
30000
30000
30000
30000
25000
25000
25000
27000
27000
36000
28000
28000
28000
28000
27000
30000
30000
27000
27000
30000
30000
30000
40000
37000
33000
33000
33000
30000
33000
30000
36000
36000
Total

3.3
3.0
3.0
3.5
3.5
2.7
2.7
2.5
2.7
2.7
2.7
2.7
2.7
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
2.5
2.5
2.5
2.7
2.7
3.6
2.8
2.8
2.8
2.8
2.7
3.0
3.0
2.7
2.7
3.0
3.0
3.0
4.0
3.7
3.3
3.3
3.3
3.0
3.3
3.0
3.6
3.6
179.60

Public Works,Ports and Inland Water Transport Department, Bangalore division.

REPORT

CONSULTING SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR


THE CONSTRUCTION OF 4 LANE AND 2 LANE ROAD IN PWD, BANGALORE CIRCLE,
BANGALORE.

ON
ALIGNMEN
T

4.7 Existing CD StructuresThere are 23 CD Structures are located all along the Project Road. The details of CD structures are as
follows.

Table 4- 6: Details of Existing CD Structures


Type of CD structures

Sl.
No

District

Name of the Road

Bangalore
Rural
&
Chikkaballapur
a

Nelamangala to
Chikkaballapura via
Doddaballapura (SH-96)

Box
slab
culvert

Minor
Bridge
s

Pipe
Culvert
s

Stone
Culvert
s

RC
C

21

15

41

TOTAL

40

- 84 Nos.

Public Works,Ports and Inland Water Transport Department, Bangalore division.