BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant

Activity ID
Activity Name

BI-10-02186 Khafji tto Tanajib Sour Gas Handling Compression at Tanajib Plant
Project Milestones
CMXXX000
CMXXX010
CMXXX020

Design Contract Start


Kick-Off Meeting
MR Submission for Long Lead Items

General Requirements
Requireme
CGXXX005
CGXXX010
CGXXX070
CGXXX020
CGXXX030
CGXXX000
CGXXX70

Mobilization- Engineering
Project Management, Planning, Support
Project Quality Plan
Preliminary Deliverable Control List (DCL)
Level III Project Work Schedule (Engineering)
Kick Off Meeting
Deliverable Control List (DCL)- Updating

Detailed Design
Project Studies and B
Best Practices
Sub-Contracts
Geotechnical Study
Stud

DSSXX563
DSSXX564
DSSXX565

SOW preparation
Receive comments
SOW- Finalized

Topographic Survey
Surv

DSSXX493
DSSXX494
DSSXX495

SOW preparation
Receive comments
SOW- Finalized

Underground Radar
Rad Mapping

DSSXX574
DSSXX575
DSSXX576

SOW preparation
Receive comments
SOW- Finalized

Exploratory Excavation
Excav

DSSXX585
DSSXX586
DSSXX587

SOW preparation
Receive comments
SOW- Finalized

Building Risk Assesment


Ass

DSSXX596

Existing Report verifrication

Lessons Learn Im
Implementation

DSSXX618
DSSXX620
DSSXX619
DSSXX621
DSSXX622
DSSXX623
DSSXX624
DSSXX614
DSSXX615

SOW preparation
Bidding Period
Request for Quotation
Quotation Evaluation
PAF to SA
PAF approval by SA
Sub-Contract Award
Perform the Study
Preparation of Draft Report

Constructability

DSSXX322
DSSXX323
DSSXX324
DSSXX325
DSSXX326

SOW preparation
Request for Quotation
Bidding Period
Quotation Evaluation
PAF to SA

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

135d 14-Sep-15 A

24-Mar-16

29d 14-Sep-15 A

29-Oct-15

0d 14-Sep-15 A
0d
0d
135d 14-Sep-15 A

11-Oct-15 A
29-Oct-15
24-Mar-16

10d
134d
8d
4d
8d
0d
118d
124d

14-Sep-15 A
14-Sep-15 A
29-Sep-15 A
05-Oct-15 A
05-Oct-15 A
12-Oct-15 A
20-Sep-15 A

04-Oct-15 A
24-Mar-16
11-Oct-15 A
11-Oct-15 A
18-Oct-15
11-Oct-15 A
22-Mar-16
16-Mar-16

23d
23d
14d
7d
5d
2d
11d
4d
5d
2d
11d
5d
5d
2d
13d
6d
5d
2d
7d
7d
18d
2d
2d
2d
2d
2d
2d
3d
1d
5d
13d
3d
3d
3d
2d
2d

04-Oct-15 A
04-Oct-15 A
12-Oct-15 A
12-Oct-15 A
20-Oct-15
27-Oct-15
12-Oct-15 A
12-Oct-15 A
18-Oct-15
22-Oct-15
12-Oct-15 A
12-Oct-15 A
18-Oct-15
22-Oct-15
13-Oct-15 A
13-Oct-15 A
20-Oct-15
27-Oct-15
12-Oct-15 A
12-Oct-15 A
12-Oct-15 A
12-Oct-15 A
13-Oct-15 A
14-Oct-15 A
18-Oct-15
19-Oct-15
21-Oct-15
25-Oct-15
27-Oct-15
28-Oct-15
13-Oct-15 A
13-Oct-15 A
18-Oct-15
21-Oct-15
26-Oct-15
28-Oct-15

04-Nov-15
04-Nov-15
29-Oct-15
20-Oct-15
27-Oct-15
29-Oct-15
26-Oct-15
13-Oct-15 A
22-Oct-15
26-Oct-15
26-Oct-15
14-Oct-15 A
22-Oct-15
26-Oct-15
29-Oct-15
20-Oct-15
27-Oct-15
29-Oct-15
20-Oct-15
20-Oct-15
04-Nov-15
12-Oct-15 A
15-Oct-15 A
14-Oct-15 A
19-Oct-15
21-Oct-15
22-Oct-15
27-Oct-15
28-Oct-15
04-Nov-15
29-Oct-15
13-Oct-15 A
21-Oct-15
26-Oct-15
28-Oct-15
29-Oct-15

Page 1 of 12

20-Oct-15 08:51
2015
Sep

Oct

Nov

Dec

29-Oct-15, Project Milestones

04-Nov-15, Project Studies and Best Practices


04-Nov-15, Sub-Contracts
29-Oct-15, Geotechnical Study

26-Oct-15, Topographic Survey

26-Oct-15, Underground Radar Mapping

29-Oct-15, Exploratory Excavation

20-Oct-15, Building Risk Assesment


04-Nov-15, Lessons Learn Implementation

29-Oct-15, Constructability

Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name
Project Risk Mana
Management

DSSXX629
DSSXX630
DSSXX631
DSSXX632

SOW preparation
Request for Quotation
Bidding Period
Quotation Evaluation

Schedule Optimiz
Optimization

DSSXX607
DSSXX608
DSSXX609

SOW preparation
Request for Quotation
Bidding Period

Flare Study

DSSXX504

Update existing Flare Study Report

Hydraulic Calculation
Calcula

DSSXX636

Update existing Hydraulic Calculation Report

Corrosion Management
Manage

DSSXX641
DSSXX642
DSSXX643
DSSXX644
DSSXX645
DSSXX646
DSSXX647

SOW preparation
Request for Quotation
Bidding Period
Quotation Evaluation
PAF to SA
PAF approval by SA
Sub-Contract Award

Cathodic Protection
Protecti

DSSXX530
DSSXX531
DSSXX532
DSSXX533
DSSXX534
DSSXX535
DSSXX536

SOW preparation
Request for Quotation
Bidding Period
Quotation Evaluation
PAF to SA
PAF approval by SA
Sub-Contract Award

Non- Deliverable Works


Wor
Process

DED1L491
DNXXP060
DNXXP070
DNXXP080
DNXXP110
DNXXP090
DED1L501
DNXXP100

Verification of FEED Package


Input to Project Quality Plan
Design Criteria
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Verification of Process Steady State Simulation
Process inputs to other Disciplines / Vendor Coordination / Study Report

Piping

DED1L300
DNXXL070
DNXXL060
DNXXL080
DNXXL110
DNXXL090
DNXXL100

Verification of FEED Package


Design Criteria
Input to Project Quality Plan
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Mechanical

DED1L511
DNXXL111
DNXXL116

Verification of FEED Package


Design Criteria
Input to Project Quality Plan

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

13d
4d
3d
3d
2d
11d
4d
3d
3d
15d
15d
15d
15d
13d
3d
3d
3d
2d
2d
2d
2d
13d
3d
3d
3d
2d
2d
2d
2d
122d
122d
27d
8d
8d
5d
120d
84d
12d
109d
122d
27d
8d
8d
5d
120d
84d
109d
122d
27d
8d
8d

15-Oct-15 A
15-Oct-15 A
21-Oct-15
26-Oct-15
29-Oct-15
18-Oct-15
18-Oct-15
22-Oct-15
27-Oct-15
04-Oct-15 A
04-Oct-15 A
08-Oct-15 A
08-Oct-15 A
12-Oct-15 A
12-Oct-15 A
15-Oct-15 A
18-Oct-15
20-Oct-15
22-Oct-15
25-Oct-15
27-Oct-15
12-Oct-15 A
12-Oct-15 A
15-Oct-15 A
18-Oct-15
20-Oct-15
22-Oct-15
25-Oct-15
27-Oct-15
20-Sep-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
06-Oct-15 A
13-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A

Page 2 of 12

20-Oct-15 08:51
2015
Sep

Oct

02-Nov-15
21-Oct-15
26-Oct-15
29-Oct-15
02-Nov-15
01-Nov-15
22-Oct-15
27-Oct-15
01-Nov-15
25-Oct-15
25-Oct-15
29-Oct-15
29-Oct-15
29-Oct-15
12-Oct-15 A
15-Oct-15 A
20-Oct-15
22-Oct-15
25-Oct-15
27-Oct-15
29-Oct-15
29-Oct-15
12-Oct-15 A
15-Oct-15 A
20-Oct-15
22-Oct-15
25-Oct-15
27-Oct-15
29-Oct-15
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
01-Feb-16
29-Oct-15
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A

Nov

02-Nov-15, Project Risk Management

Dec

01-Nov-15, Schedule Optimization

25-Oct-15, Flare Study


29-Oct-15, Hydraulic Calculation
29-Oct-15, Corrosion Management

29-Oct-15, Cathodic Protection

Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

DNXXL112
DNXXL114
DNXXL113
DNXXL115

Data Collection/ Drawing Search


Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Instrument

DED1L512
DNXXL117
DNXXL122
DNXXL118
DNXXL120
DNXXL119
DNXXL121

Verification of FEED Package


Design Criteria
Input to Project Quality Plan
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Civil/ Structural

DED1L514
DNXXL129
DNXXL134
DNXXL130
DNXXL132
DNXXL131
DNXXL133

Verification of FEED Package


Design Criteria
Input to Project Quality Plan
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Electrical

DED1L513
DNXXL123
DNXXL128
DNXXL124
DNXXL126
DNXXL125
DNXXL127

Verification of FEED Package


Design Criteria
Input to Project Quality Plan
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Architectural

DED1L515
DNXXL135
DNXXL140
DNXXL136
DNXXL138
DNXXL137
DNXXL139

Verification of FEED Package


Design Criteria
Input to Project Quality Plan
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Fire Fighting

DED1L518
DNXXP118
DNXXP119
DNXXP120
DNXXP122
DNXXP121
DNXXP117

Verification of FEED Package


Input to Project Quality Plan
Design Criteria
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Plumbing

DED1L516
DNXXP112
DNXXP113
DNXXP114
DNXXP116
DNXXP115

Verification of FEED Package


Input to Project Quality Plan
Design Criteria
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

5d
120d
84d
109d
122d
27d
8d
8d
5d
120d
84d
109d
122d
27d
8d
8d
5d
120d
84d
109d
122d
27d
8d
8d
5d
120d
84d
109d
122d
27d
8d
8d
5d
120d
84d
109d
122d
27d
8d
8d
5d
120d
84d
109d
122d
27d
8d
8d
5d
120d
84d

29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A

Page 3 of 12

20-Oct-15 08:51
2015
Sep

Oct

Nov

Dec

06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

DNXXP111

Input to other Disciplines / Vendor Coordination / Study Report

HVAC

DNXXP134
DNXXP133

Meeting & Study Session


Site Visit

Telecommunications

DED1L520
DNXXP124
DNXXP125
DNXXP126
DNXXP128
DNXXP127
DNXXP123

Verification of FEED Package


Input to Project Quality Plan
Design Criteria
Data Collection/ Drawing Search
Meeting & Study Session
Site Visit
Input to other Disciplines / Vendor Coordination / Study Report

Engineering
50% Design Package
Common
Process

60PR44

P & IDs typical installatio n

Piping

60PI130
60PI129
60PI136
60PI137
60PI140

Over-All Site Plan


Piping Material Specifications
SIS
Valve Data Sheets
Tie-In Index

Mechanical

60ME23
60ME24
60ME22

Mechanical Design Basis


Mechanical Equipment List
Construction Scope of Work

Electrical

60EL219
60EL229
60EL218
60EL224
60EL225
60EL237
60EL222
60EL223
60EL230
60EL220

ETAP Calculations
Basis of Design for Electrical
Cathodic Protection
125V DC System Calcs
Low Voltage Cable Sizing Calcs
Electrical Area Classification
Lighting Calcs
UPS Sizing Calcs
Preliminary Cut-Over Plan
Medium Voltage Cable Sizing Calcs

Instrumentation

60IN171
60IN010
60IN151
60IN173
60IN147
60IN153

Functional Specification Documents (FSDs)


Functional Specifications- Fire Detection and Alarm Control System
System Architecture Diagrams
ISS
Control Philosophy
Instrument Layout Plan

Civil/ Structural

60CI12

General Notes/Legends/ Abbreviations- Steel Works

Telecommunications
Telecommunica

6OTE000
6OTE010
6OTE020

Trench Route Layouts


Schematic Diagrams
FOC Allocation Diagrams

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

109d
120d
120d
84d
122d
27d
8d
8d
5d
120d
84d
109d
41d
41d
34d
13d
13d
26d
15d
16d
20d
20d
20d
30d
14d
20d
16d
32d
22d
17d
20d
17d
20d
17d
20d
17d
20d
20d
30d
30d
20d
15d
14d
18d
15d
20d
20d
21d
10d
10d
10d

14-Oct-15 A
29-Sep-15 A
29-Sep-15 A
05-Oct-15 A
20-Sep-15 A
20-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
07-Oct-15 A
14-Oct-15 A
29-Sep-15 A
29-Sep-15 A
05-Oct-15 A
18-Oct-15
18-Oct-15
11-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
14-Oct-15 A
19-Oct-15
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
29-Oct-15
05-Oct-15 A
05-Oct-15 A
06-Oct-15 A
07-Oct-15 A
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
12-Oct-15 A
12-Oct-15 A
19-Oct-15
21-Oct-15
05-Oct-15 A
05-Oct-15 A
08-Oct-15 A
15-Oct-15 A
15-Oct-15 A
19-Oct-15
25-Oct-15
11-Oct-15 A
11-Oct-15 A
18-Oct-15
18-Oct-15
20-Oct-15
22-Oct-15

Page 4 of 12

20-Oct-15 08:51
2015
Sep

Oct

14-Mar-16
14-Mar-16
14-Mar-16
28-Jan-16
14-Mar-16
03-Nov-15
11-Oct-15 A
11-Oct-15 A
06-Oct-15 A
14-Mar-16
02-Feb-16
14-Mar-16
25-Nov-15
25-Nov-15
22-Nov-15
04-Nov-15
04-Nov-15
16-Nov-15
01-Nov-15
03-Nov-15
11-Nov-15
11-Nov-15
16-Nov-15
22-Nov-15
29-Oct-15
08-Nov-15
22-Nov-15
18-Nov-15
04-Nov-15
29-Oct-15
04-Nov-15
03-Nov-15
08-Nov-15
03-Nov-15
09-Nov-15
04-Nov-15
16-Nov-15
18-Nov-15
16-Nov-15
16-Nov-15
05-Nov-15
05-Nov-15
04-Nov-15
12-Nov-15
15-Nov-15
08-Nov-15
08-Nov-15
16-Nov-15
01-Nov-15
03-Nov-15
05-Nov-15

Nov

Dec

25-Nov-15, Engineering
25-Nov-15, 50% Design
22-Nov-15, Common
04-Nov-15, Process
16-Nov-15, Piping

22-Nov-15, Mechanical

18-Nov-15, Electrical

16-Nov-15, Instrumentation

08-Nov-15, Civil/ Structural


16-Nov-15, Telecommunications

Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

6OTE88
6OTE92
6OTE89
6OTE93
6OTE90
6OTE91

Cable Route Layout- CCTV


Cable Route Layout-PAS
Cable Schematic- CCTV
FOC Schematic-PAS
Equipment and Cable Layouts-CCTV
System Block Diagrams-CCTV

Plumbing

60PL2

General Drawing Layouts

PIB and Sub-Station


Sub-Stati
Area
PIB
Architectural

60AR6
60AR7
60AR8

Floor Plan
Roof Plan
Reflected Ceiling Plan

Civil/ Structural
Structu

60CI4

Foundation, Plan, and Sections- PIB

Electrical

60EL8
60EL238
60EL9
60EL240
60EL239

Electrical One Line Diagram


Lighting Layout
Panel Board Schedule
Grounding Layout
Cable Tray Layout

Instrumentation
Instrumenta

60IN177
60IN020
60IN178
60IN174

Instrument Layout Plan


Fire Alarm and Detection Layouts
Instrument Cable Conduit Plan
Fire Alarm Riser Diagrams

HVAC

60HV5
60HV11
60HV7
60HV6

HVAC Layouts
HVAC Calculations
HVAC Air Flow Diagrams
HVAC Equipment Schedules

Plumbing

60PL000 Water Supply Layouts


60PL0
Drainage and Vent Piping Layouts
60PL1
Roof Drain Layouts
Fire Figthing

60FF0

Fire Protection Layouts

Telecoms

6OTE030
6OTE40
6OTE040
6OTE46
6OTE42
6OTE102
6OTE44
6OTE45
6OTE41

Horizontal Cableway Plans- SCS


Horizontal Distribution Diagrams-SCS
Logical Diagram-Data System
Logical Diagrams- Telephony
Rack Face Elevation-SCS
TMGB Installation and Assignment Details-SCS
Block and Level Diagram-Data System
Block and Level Diagrams-Telephony
Cable Entrance Details-SCS

Sub-Station
Architectural

60AR0
60AR1

Floor Plan
Roof Plan

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

12d
12d
12d
12d
12d
12d
12d
12d
34d
32d
22d
12d
14d
14d
16d
16d
20d
16d
12d
14d
12d
12d
19d
12d
12d
12d
14d
19d
12d
14d
14d
14d
20d
14d
14d
16d
16d
16d
21d
10d
12d
12d
10d
14d
12d
12d
10d
16d
33d
22d
12d
14d

22-Oct-15
22-Oct-15
25-Oct-15
26-Oct-15
27-Oct-15
29-Oct-15
27-Oct-15
27-Oct-15
05-Oct-15 A
07-Oct-15 A
07-Oct-15 A
07-Oct-15 A
14-Oct-15 A
19-Oct-15
15-Oct-15 A
15-Oct-15 A
13-Oct-15 A
13-Oct-15 A
15-Oct-15 A
18-Oct-15
19-Oct-15
25-Oct-15
22-Oct-15
22-Oct-15
26-Oct-15
26-Oct-15
29-Oct-15
15-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
22-Oct-15
21-Oct-15
21-Oct-15
25-Oct-15
27-Oct-15
21-Oct-15
21-Oct-15
22-Oct-15
22-Oct-15
25-Oct-15
26-Oct-15
26-Oct-15
27-Oct-15
27-Oct-15
28-Oct-15
28-Oct-15
29-Oct-15
05-Oct-15 A
05-Oct-15 A
05-Oct-15 A
13-Oct-15 A

Page 5 of 12

20-Oct-15 08:51
2015
Sep

Oct

09-Nov-15
09-Nov-15
10-Nov-15
11-Nov-15
12-Nov-15
16-Nov-15
12-Nov-15
12-Nov-15
22-Nov-15
22-Nov-15
08-Nov-15
25-Oct-15
03-Nov-15
08-Nov-15
08-Nov-15
08-Nov-15
10-Nov-15
04-Nov-15
02-Nov-15
05-Nov-15
04-Nov-15
10-Nov-15
18-Nov-15
09-Nov-15
11-Nov-15
11-Nov-15
18-Nov-15
11-Nov-15
02-Nov-15
09-Nov-15
10-Nov-15
11-Nov-15
18-Nov-15
10-Nov-15
12-Nov-15
18-Nov-15
12-Nov-15
12-Nov-15
22-Nov-15
05-Nov-15
10-Nov-15
11-Nov-15
09-Nov-15
16-Nov-15
12-Nov-15
15-Nov-15
11-Nov-15
22-Nov-15
19-Nov-15
04-Nov-15
21-Oct-15
02-Nov-15

Nov

Dec

12-Nov-15, Plumbing
22-Nov-15, PIB and Sub-Sta
22-Nov-15, PIB
08-Nov-15, Architectural

08-Nov-15, Civil/ Structural


10-Nov-15, Electrical

18-Nov-15, Instrumentation

11-Nov-15, HVAC

18-Nov-15, Plumbing

12-Nov-15, Fire Figthing


22-Nov-15, Telecoms

19-Nov-15, Sub-Station
04-Nov-15, Architectural

Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

60AR2

Reflected Ceiling Plan

Civil/ Structural
Structu

60CI3

Foundation, Plan, and Sections- Substation Building

Electrical

60EL10
60EL12
60EL11
60EL13
60EL243
60EL242
60EL15
60EL241
60EL14
60EL244
60EL16

Over-All Electrical One Line Diagram- existing Switchegar Building


Electrical One Line Diagrams
Electrical One Line Diagrams-existing Switchegar Building
Lighting Layout
PSA Block Diagrams
Small Power Layout
Grounding Layout
Panel Board Schedule
Cable Tray Layout
Cable and Conduit Schedule
Data Schedule

Instrumentation
Instrumenta

60IN179
60IN180
60IN183
60IN182
60IN184

Fire Alarm and Detection Layouts


Fire Alarm Riser Diagrams
Instrument Layout Plan
Instrument Location Plan
Instrument Cable Conduit Plan

HVAC

60HV1
60HV3
60HV2
60HV12

HVAC Layouts
HVAC Air Flow Diagrams
HVAC Equipment Schedules
HVAC Calculations

Plumbing

60PL4
60PL5
60PL6

Water Supply Layouts


Drainage and Vent Piping Layouts
Roof Drain Layouts

Fire Fighting

60FF1

Fire Protection Layouts

Telecoms

6OTE94
6OTE96
6OTE95
6OTE101
6OTE98
6OTE99
6OTE100
6OTE43
6OTE97

Horizontal Cableway Plans- SCS


Horizontal Distribution Diagrams-SCS
Logical Diagram-Data System
Logical Diagrams- Telephony
Rack Face Elevation-SCS
Block and Level Diagram-Data System
Block and Level Diagrams-Telephony
TMGB Installation and Assignment Details-SCS
Cable Entrance Details-SCS

Shelter/ UPS Bu
Building
Architectural

60AR4

Floor, Roof Elevation, Section, Ceiling Plan

HVAC

60HV13
60HV14
60HV16
60HV15

HVAC Layouts
HVAC Air Flow Diagrams
HVAC Calculations
HVAC Equipment Schedules

Instrumentation
Instrumenta
Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

14d
24d
24d
27d
14d
14d
12d
12d
12d
12d
12d
12d
12d
12d
14d
23d
14d
14d
12d
12d
12d
23d
12d
14d
16d
12d
25d
12d
14d
16d
16d
16d
21d
10d
12d
12d
12d
14d
12d
12d
14d
16d
27d
20d
20d
23d
12d
14d
12d
16d
20d

15-Oct-15 A
11-Oct-15 A
11-Oct-15 A
12-Oct-15 A
12-Oct-15 A
15-Oct-15 A
19-Oct-15
19-Oct-15
19-Oct-15
22-Oct-15
25-Oct-15
25-Oct-15
27-Oct-15
27-Oct-15
29-Oct-15
14-Oct-15 A
14-Oct-15 A
21-Oct-15
21-Oct-15
26-Oct-15
29-Oct-15
12-Oct-15 A
12-Oct-15 A
15-Oct-15 A
21-Oct-15
26-Oct-15
13-Oct-15 A
13-Oct-15 A
21-Oct-15
26-Oct-15
15-Oct-15 A
15-Oct-15 A
21-Oct-15
21-Oct-15
22-Oct-15
25-Oct-15
25-Oct-15
26-Oct-15
27-Oct-15
27-Oct-15
28-Oct-15
28-Oct-15
13-Oct-15 A
13-Oct-15 A
13-Oct-15 A
19-Oct-15
19-Oct-15
22-Oct-15
22-Oct-15
28-Oct-15
19-Oct-15

Page 6 of 12

20-Oct-15 08:51
2015
Sep

Oct

04-Nov-15
12-Nov-15
12-Nov-15
18-Nov-15
01-Nov-15
04-Nov-15
04-Nov-15
04-Nov-15
04-Nov-15
09-Nov-15
10-Nov-15
10-Nov-15
12-Nov-15
12-Nov-15
18-Nov-15
16-Nov-15
03-Nov-15
10-Nov-15
08-Nov-15
11-Nov-15
16-Nov-15
12-Nov-15
28-Oct-15
04-Nov-15
12-Nov-15
11-Nov-15
17-Nov-15
29-Oct-15
10-Nov-15
17-Nov-15
08-Nov-15
08-Nov-15
19-Nov-15
04-Nov-15
09-Nov-15
10-Nov-15
10-Nov-15
15-Nov-15
12-Nov-15
12-Nov-15
17-Nov-15
19-Nov-15
19-Nov-15
10-Nov-15
10-Nov-15
19-Nov-15
04-Nov-15
11-Nov-15
09-Nov-15
19-Nov-15
16-Nov-15

Nov

Dec

12-Nov-15, Civil/ Structural


18-Nov-15, Electrical

16-Nov-15, Instrumentation

12-Nov-15, HVAC

17-Nov-15, Plumbing

08-Nov-15, Fire Fighting


19-Nov-15, Telecoms

19-Nov-15, Shelter/ UPS Buildin


10-Nov-15, Architectural
19-Nov-15, HVAC

16-Nov-15, Instrumentation
Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

60IN185
60IN186

Fire Alarm and Detection Layouts


Fire Alarm Riser Diagrams

Fire Fighting

60FF2

Fire Protection Layouts

Temporary Con
Construction Facilties
Architectural

60AR9

Floor, Roof Elevation, Section, Ceiling Plan

Gas Compression Area


Process

60PR36
60PR37

PFDs
P&IDs

Piping

60PI131
60PI132
60PI133
60PI134
60PI138
60PI139
60PI178

Plot Plans
Equipment Location Plan
Key Plan
Material Selection Diagram
Piping Drawing Index
Piping Plans
Demo Piping Plans

Mechanical/ Equipment
Eq

60ME25
60ME26
60ME32
60ME34
60ME33
60ME35

Equipment Data Sheets-Pumps


Equipment Technical Specifications- Pumps
Equipment Data Sheets- Gas Compression Static Equipment
Equipment Technical Specifications- Gas Compression Static Equipment
Equipment Data Sheets- HVAC
Equipment Technical Specifications- HVAC

Instrumentation

60IN146
60IN148
60IN150
60IN152
60IN154
60IN155

Functional Specification Documents (FSDs)


ISS
Instrument Block Diagrams
Instrument Location Plan
Instrument Cable Conduit Plan
H2S and Gas Detector Layout

Electrical

60EL152
60EL217
60EL153
60EL154
60EL228

Lighting Layout
Notes, Symbols, and Abbreviations
Cable Routing Layout
Grounding Layout
Data Schedule

Civil/ Structural

60CI13
60CI18
60CI32
60CI19

Framing Plan/ Elevation/ Sections- Pipe Rack


Foundation Layout- Pipe Rack
Foundation Plan and Section- Equipment
Foundation, Plan, and Sections- Pipe Rack

Telecoms

6OTE87

Equipment Layouts

Flare Area
Process

60PR42
60PR43

PFDs
P&IDs

Piping

60PI151

Plot Plans

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

12d
14d
16d
16d
18d
18d
18d
41d
29d
14d
26d
33d
18d
14d
16d
20d
18d
26d
20d
41d
40d
40d
39d
39d
24d
26d
29d
20d
28d
16d
18d
20d
18d
29d
18d
12d
20d
20d
20d
25d
22d
16d
16d
20d
14d
14d
41d
23d
12d
20d
29d
14d

19-Oct-15
27-Oct-15
21-Oct-15
21-Oct-15
13-Oct-15 A
13-Oct-15 A
13-Oct-15 A
29-Sep-15 A
11-Oct-15 A
11-Oct-15 A
14-Oct-15 A
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
14-Oct-15 A
15-Oct-15 A
20-Oct-15
25-Oct-15
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
01-Oct-15 A
01-Oct-15 A
11-Oct-15 A
11-Oct-15 A
13-Oct-15 A
13-Oct-15 A
13-Oct-15 A
13-Oct-15 A
22-Oct-15
26-Oct-15
28-Oct-15
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
13-Oct-15 A
15-Oct-15 A
22-Oct-15
21-Oct-15
21-Oct-15
25-Oct-15
27-Oct-15
28-Oct-15
22-Oct-15
22-Oct-15
29-Sep-15 A
13-Oct-15 A
13-Oct-15 A
18-Oct-15
13-Oct-15 A
13-Oct-15 A

Page 7 of 12

20-Oct-15 08:51
2015
Sep

Oct

04-Nov-15
16-Nov-15
12-Nov-15
12-Nov-15
08-Nov-15
08-Nov-15
08-Nov-15
25-Nov-15
19-Nov-15
29-Oct-15
19-Nov-15
25-Nov-15
04-Nov-15
29-Oct-15
02-Nov-15
11-Nov-15
10-Nov-15
25-Nov-15
22-Nov-15
25-Nov-15
24-Nov-15
24-Nov-15
25-Nov-15
25-Nov-15
12-Nov-15
16-Nov-15
23-Nov-15
10-Nov-15
22-Nov-15
04-Nov-15
17-Nov-15
23-Nov-15
23-Nov-15
19-Nov-15
04-Nov-15
27-Oct-15
10-Nov-15
12-Nov-15
19-Nov-15
25-Nov-15
22-Nov-15
16-Nov-15
18-Nov-15
25-Nov-15
11-Nov-15
11-Nov-15
25-Nov-15
15-Nov-15
29-Oct-15
15-Nov-15
23-Nov-15
02-Nov-15

Nov

Dec

12-Nov-15, Fire Fighting


08-Nov-15, Temporary Construction Facilties
08-Nov-15, Architectural
25-Nov-15, Gas Compres
19-Nov-15, Process

25-Nov-15, Piping

25-Nov-15, Mechanical/

23-Nov-15, Instrumentation

19-Nov-15, Electrical

25-Nov-15, Civil/ Structu

11-Nov-15, Telecoms
25-Nov-15, Flare Area
15-Nov-15, Process

23-Nov-15, Piping
Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

60PI154
60PI159
60PI168
60PI169

Material Selection Diagram


Piping Plans- Compression Area to Flare
Piping Plans- Flare K.O. Drum
Piping Plans- Flare Stack Area

Mechanical/ Equipment
Eq

60ME30
60ME37
60ME31
60ME36

Equipment Data Sheets- Static Equipment


Equipment Data Sheets- Pumps
Equipment Technical Specifications- Pumps
Equipment Technical Specs.- Static Equipment

Instrumentation

60IN163
60IN165
60IN167
60IN168
60IN169
60IN170

ISS
Instrument Block Diagrams
Instrument Location Plan
Instrument Layout Plan
Instrument Cable Conduit Plan
H2S and Gas Detector Layout

Electrical

60EL231
60EL236
60EL233
60EL232
60EL234
60EL235

Electrical One Line Diagrams


Notes, Symobols and Abbreviations
Lighting Layout
Panel Board Schedule
Cable Routing Layout
Grounding Layout

Civil/ Structural

60CI31
60CI33

Foundation, Plan, and Sections-Pipe Supports


Foundation, Plan, and Sections-Equipment

Site Development
Roads
Civil/ Structural
Structu

60CI8
60CI34

Site Development Plan


Site Demolition Plan

Oily Water System


Syst
Piping

60PI177

Site Non-Electrical Utilities Layout

Civil/ Structural
Structu

60CI35
60CI36

Site Grading and Drainage Plan


Site Non-Electrical Utilities Layout-OWS

Fire Water
Process

60PR45

P&IDs

Piping

60PI170
60PI172
60PI171
60PI174
60PI175
60PI176

Fire Network Layout


Layout Drawings- Deluge Water Spray System
Fire Water Coverage Layout
Fire Hazardous Area
Fire Protection Layout
Demo Piping Plans

Materials/ Procureme
Procurement Support

MR3681

Materials and Procurement Support

Long Lead Items


MR-001 Instrumen
Instrument Air Package

MR1010

Data Sheet. Drawings and Tech. Specs.-SDC

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

18d
24d
20d
18d
41d
40d
36d
36d
40d
27d
26d
16d
18d
18d
18d
16d
27d
14d
12d
18d
16d
18d
18d
24d
20d
20d
26d
23d
23d
16d
18d
22d
18d
18d
22d
20d
20d
26d
18d
18d
26d
20d
18d
18d
18d
18d
18d
122d
120d
31d
22d
1d

18-Oct-15
20-Oct-15
21-Oct-15
26-Oct-15
29-Sep-15 A
29-Sep-15 A
29-Sep-15 A
30-Sep-15 A
30-Sep-15 A
13-Oct-15 A
13-Oct-15 A
13-Oct-15 A
22-Oct-15
26-Oct-15
26-Oct-15
28-Oct-15
13-Oct-15 A
13-Oct-15 A
15-Oct-15 A
20-Oct-15
22-Oct-15
22-Oct-15
26-Oct-15
22-Oct-15
22-Oct-15
28-Oct-15
11-Oct-15 A
13-Oct-15 A
13-Oct-15 A
13-Oct-15 A
20-Oct-15
15-Oct-15 A
15-Oct-15 A
15-Oct-15 A
15-Oct-15 A
15-Oct-15 A
19-Oct-15
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
11-Oct-15 A
13-Oct-15 A
15-Oct-15 A
15-Oct-15 A
18-Oct-15
21-Oct-15
29-Sep-15 A
01-Oct-15 A
29-Sep-15 A
01-Oct-15 A
01-Oct-15 A

Page 8 of 12

20-Oct-15 08:51
2015
Sep

Oct

11-Nov-15
23-Nov-15
18-Nov-15
19-Nov-15
25-Nov-15
24-Nov-15
18-Nov-15
19-Nov-15
25-Nov-15
19-Nov-15
18-Nov-15
04-Nov-15
17-Nov-15
19-Nov-15
19-Nov-15
19-Nov-15
19-Nov-15
02-Nov-15
02-Nov-15
15-Nov-15
15-Nov-15
17-Nov-15
19-Nov-15
25-Nov-15
19-Nov-15
25-Nov-15
16-Nov-15
15-Nov-15
15-Nov-15
04-Nov-15
15-Nov-15
16-Nov-15
10-Nov-15
10-Nov-15
16-Nov-15
12-Nov-15
16-Nov-15
16-Nov-15
04-Nov-15
04-Nov-15
16-Nov-15
08-Nov-15
08-Nov-15
10-Nov-15
10-Nov-15
11-Nov-15
16-Nov-15
16-Mar-16
16-Mar-16
11-Nov-15
02-Nov-15
04-Oct-15 A

Nov

Dec

25-Nov-15, Mechanical/

19-Nov-15, Instrumentation

19-Nov-15, Electrical

25-Nov-15, Civil/ Structu

16-Nov-15, Site Development


15-Nov-15, Roads
15-Nov-15, Civil/ Structural

16-Nov-15, Oily Water System


10-Nov-15, Piping
16-Nov-15, Civil/ Structural

16-Nov-15, Fire Water


04-Nov-15, Process
16-Nov-15, Piping

11-Nov-15, Long Lead Items


02-Nov-15, MR-001 Instrument Air Package
Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

MR1020
MR1030
MR1040
MR1050
MR1060
MR1070
MR1080
MR1090

Data Sheet. Drawings and Tech. Specs.-IDC


Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-002 Air Cooled Heat Exchanger

MR2417
MR2418
MR2419
MR2420
MR2421
MR2422
MR2423
MR2424
MR2425

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-003 Sour Condensate


Con
Pumps

MR2449
MR2450
MR2451
MR2452
MR2453
MR2454
MR2455
MR2456
MR2457

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-004 Close Dra


Drain Pump

MR2401
MR2402
MR2403
MR2404
MR2405
MR2406
MR2407
MR2408
MR2409
MR2410

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid
Issue Technical Clarifications to Vendors thru Client

MR-005 Pressure Vessel


V
(Slug Catcher)

MR2465
MR2466
MR2467
MR2468
MR2469
MR2470
MR2471
MR2472
MR2473

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-006 Pressure Vessel


V
(KO Drums)

MR2481

Data Sheet. Drawings and Tech. Specs.-SDC

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

2d
1d
1d
2d
1d
3d
1d
10d
22d
1d
2d
1d
1d
2d
1d
3d
1d
10d
22d
1d
2d
1d
1d
2d
1d
3d
1d
10d
23d
1d
2d
1d
1d
1d
1d
3d
1d
10d
2d
22d
1d
2d
1d
1d
2d
1d
3d
1d
10d
22d
1d

04-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
01-Oct-15 A
01-Oct-15 A
04-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
01-Oct-15 A
01-Oct-15 A
04-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
29-Sep-15 A
29-Sep-15 A
30-Sep-15 A
04-Oct-15 A
05-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
13-Oct-15 A
14-Oct-15 A
28-Oct-15
01-Oct-15 A
01-Oct-15 A
04-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
04-Oct-15 A
04-Oct-15 A

Page 9 of 12

20-Oct-15 08:51
2015
Sep

Oct

06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
02-Nov-15
02-Nov-15
04-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
02-Nov-15
02-Nov-15
04-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
02-Nov-15
01-Nov-15
30-Sep-15 A
04-Oct-15 A
05-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
13-Oct-15 A
14-Oct-15 A
28-Oct-15
01-Nov-15
02-Nov-15
04-Oct-15 A
06-Oct-15 A
07-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
18-Oct-15
19-Oct-15
02-Nov-15
03-Nov-15
05-Oct-15 A

Nov

Dec

02-Nov-15, MR-002 Air Cooled Heat Exchanger

02-Nov-15, MR-003 Sour Condensate Pumps

01-Nov-15, MR-004 Close Drain Pump

02-Nov-15, MR-005 Pressure Vessel (Slug Catcher)

03-Nov-15, MR-006 Pressure Vessel (KO Drums)


Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

MR2482
MR2483
MR2484
MR2485
MR2486
MR2487
MR2488
MR2489

Data Sheet. Drawings and Tech. Specs.-IDC


Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-007 Flare Pack


Package

MR2497
MR2498
MR2499
MR2500
MR2501
MR2502
MR2503
MR2504
MR2505

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-008 Sour Condensate


Con
Filter

MR2513
MR2514
MR2515
MR2516
MR2517
MR2518
MR2519
MR2520
MR2521

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-009 PCS

MR2529
MR2530
MR2531
MR2532
MR2533
MR2534
MR2535
MR2536
MR2537

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-013 ZV

MR2545
MR2546
MR2547
MR2548
MR2549
MR2550
MR2551
MR2552
MR2553

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-014 Control Va
Valve

MR2561
MR2562

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

2d
1d
1d
2d
1d
3d
1d
10d
22d
1d
2d
1d
1d
2d
1d
3d
1d
10d
22d
1d
2d
1d
1d
2d
1d
3d
1d
10d
23d
2d
2d
1d
1d
2d
1d
3d
1d
10d
23d
2d
2d
1d
1d
2d
1d
3d
1d
10d
12d
2d
2d

05-Oct-15 A
07-Oct-15 A
08-Oct-15 A
11-Oct-15 A
13-Oct-15 A
14-Oct-15 A
19-Oct-15
20-Oct-15
11-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
18-Oct-15
20-Oct-15
21-Oct-15
26-Oct-15
27-Oct-15
12-Oct-15 A
12-Oct-15 A
13-Oct-15 A
15-Oct-15 A
18-Oct-15
19-Oct-15
21-Oct-15
22-Oct-15
27-Oct-15
28-Oct-15
06-Oct-15 A
06-Oct-15 A
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
14-Oct-15 A
18-Oct-15
19-Oct-15
22-Oct-15
25-Oct-15
07-Oct-15 A
07-Oct-15 A
11-Oct-15 A
13-Oct-15 A
14-Oct-15 A
15-Oct-15 A
19-Oct-15
20-Oct-15
25-Oct-15
26-Oct-15
18-Oct-15
18-Oct-15
20-Oct-15

Page 10 of 12

20-Oct-15 08:51
2015
Sep

Oct

07-Oct-15 A
08-Oct-15 A
11-Oct-15 A
13-Oct-15 A
14-Oct-15 A
19-Oct-15
20-Oct-15
03-Nov-15
10-Nov-15
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
18-Oct-15
20-Oct-15
21-Oct-15
26-Oct-15
27-Oct-15
10-Nov-15
11-Nov-15
13-Oct-15 A
15-Oct-15 A
18-Oct-15
19-Oct-15
21-Oct-15
22-Oct-15
27-Oct-15
28-Oct-15
11-Nov-15
08-Nov-15
08-Oct-15 A
12-Oct-15 A
13-Oct-15 A
14-Oct-15 A
18-Oct-15
19-Oct-15
22-Oct-15
25-Oct-15
08-Nov-15
09-Nov-15
11-Oct-15 A
13-Oct-15 A
14-Oct-15 A
15-Oct-15 A
19-Oct-15
20-Oct-15
25-Oct-15
26-Oct-15
09-Nov-15
03-Nov-15
20-Oct-15
22-Oct-15

Nov

Dec

10-Nov-15, MR-007 Flare Package

11-Nov-15, MR-008 Sour Condensate Filt

08-Nov-15, MR-009 PCS

09-Nov-15, MR-013 ZV

03-Nov-15, MR-014 Control Valve

Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

MR2563
MR2564
MR2565
MR2566
MR2567

Data Sheet. Drawings and Tech. Specs.- Final


MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client

MR-015 Ultrasonic Flow Meters

MR2577
MR2578
MR2579
MR2580
MR2581
MR2582
MR2583
MR2584
MR2585

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-048 13.8 kv Switchgear


Sw

MR2593
MR2594
MR2595
MR2596
MR2597
MR2598
MR2599
MR2600
MR2601

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-049 480V Swit


Switchgear

MR3249
MR3250
MR3251
MR3252
MR3253
MR3254
MR3255
MR3256
MR3257

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-056 Switchrack

MR2609
MR2610
MR2611
MR2612
MR2613
MR2614
MR2615
MR2616
MR2617

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC
MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR-058 HV Transf
Transformer

MR2625
MR2626
MR2627
MR2628
MR2629

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

1d
1d
2d
1d
3d
23d
2d
2d
1d
1d
2d
1d
3d
1d
10d
23d
2d
2d
1d
1d
2d
1d
3d
1d
10d
23d
2d
2d
1d
1d
2d
1d
3d
1d
10d
23d
2d
2d
1d
1d
2d
1d
3d
1d
10d
23d
2d
2d
1d
1d
2d

22-Oct-15
25-Oct-15
26-Oct-15
28-Oct-15
29-Oct-15
08-Oct-15 A
08-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
18-Oct-15
20-Oct-15
21-Oct-15
26-Oct-15
27-Oct-15
04-Oct-15 A
04-Oct-15 A
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
04-Oct-15 A
04-Oct-15 A
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
04-Oct-15 A
04-Oct-15 A
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
04-Oct-15 A
04-Oct-15 A
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A

Page 11 of 12

20-Oct-15 08:51
2015
Sep

Oct

25-Oct-15
26-Oct-15
28-Oct-15
29-Oct-15
03-Nov-15
10-Nov-15
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
18-Oct-15
20-Oct-15
21-Oct-15
26-Oct-15
27-Oct-15
10-Nov-15
04-Nov-15
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
04-Nov-15
04-Nov-15
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
04-Nov-15
04-Nov-15
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
04-Nov-15
04-Nov-15
06-Oct-15 A
08-Oct-15 A
11-Oct-15 A
12-Oct-15 A
14-Oct-15 A

Nov

Dec

10-Nov-15, MR-015 Ultrasonic Flow Meter

04-Nov-15, MR-048 13.8 kv Switchgear

04-Nov-15, MR-049 480V Switchgear

04-Nov-15, MR-056 Switchrack

04-Nov-15, MR-058 HV Transformer

Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked

Approved

BI-10-02186 Khafji to Tanajib Sour Gas Handling Compression at Tanajib Plant


Activity ID
Activity Name

MR2630
MR2631
MR2632
MR2633

MR Draft- Final
Receive MR Comments from Client
Submit Final MR
Receive Technical Bid

MR for other Materials


Materia
MR-010 VMS

MR2657
MR2658
MR2659
MR2660
MR2661

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC

MR-011 Fire Detec


Detection and Control System

MR2673
MR2674

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC

MR-012 RMPS

MR2689
MR2690
MR2691
MR2692
MR2693

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC

MR-013- Instrumentation
Instrume
Cable

MR2705
MR2706

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC

MR-017- Orifice A
Assembly

MR2721

Data Sheet. Drawings and Tech. Specs.-SDC

MR-019- Rotatom
Rotatometers

MR2753

Data Sheet. Drawings and Tech. Specs.-SDC

MR-033 Structural Steel

MR3009
MR3010
MR3011
MR3012
MR3013

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC

MR-034 Rebars

MR3025
MR3026
MR3027
MR3028
MR3029

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft
MR Draft- IDC

MR-035 Anchor Bolts


B

MR3041
MR3042
MR3043
MR3044

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft

MR-036 Civil Miscellaneous


Misc

MR3057
MR3058
MR3059
MR3060

Data Sheet. Drawings and Tech. Specs.-SDC


Data Sheet. Drawings and Tech. Specs.-IDC
Data Sheet. Drawings and Tech. Specs.- Final
MR Draft

Actual Work

Critical Remaining Work

Remaining Work

summary

Classic Schedule Layout


Original Start
Finish
Duration

1d
3d
1d
10d
8d
8d
2d
2d
1d
1d
2d
4d
2d
2d
8d
2d
2d
1d
1d
2d
4d
2d
2d
2d
2d
2d
2d
7d
1d
2d
1d
1d
2d
7d
1d
2d
1d
1d
2d
6d
2d
2d
1d
1d
6d
2d
2d
1d
1d

14-Oct-15 A
15-Oct-15 A
20-Oct-15
21-Oct-15
21-Oct-15
21-Oct-15
21-Oct-15
25-Oct-15
27-Oct-15
28-Oct-15
29-Oct-15
26-Oct-15
26-Oct-15
28-Oct-15
21-Oct-15
21-Oct-15
25-Oct-15
27-Oct-15
28-Oct-15
29-Oct-15
27-Oct-15
27-Oct-15
29-Oct-15
28-Oct-15
28-Oct-15
29-Oct-15
29-Oct-15
21-Oct-15
21-Oct-15
22-Oct-15
26-Oct-15
27-Oct-15
28-Oct-15
22-Oct-15
22-Oct-15
25-Oct-15
27-Oct-15
28-Oct-15
29-Oct-15
22-Oct-15
22-Oct-15
26-Oct-15
28-Oct-15
29-Oct-15
22-Oct-15
22-Oct-15
26-Oct-15
28-Oct-15
29-Oct-15

Page 12 of 12

20-Oct-15 08:51
2015
Sep

Oct

15-Oct-15 A
20-Oct-15
21-Oct-15
04-Nov-15
02-Nov-15
02-Nov-15
25-Oct-15
27-Oct-15
28-Oct-15
29-Oct-15
02-Nov-15
01-Nov-15
28-Oct-15
01-Nov-15
02-Nov-15
25-Oct-15
27-Oct-15
28-Oct-15
29-Oct-15
02-Nov-15
02-Nov-15
29-Oct-15
02-Nov-15
01-Nov-15
01-Nov-15
02-Nov-15
02-Nov-15
01-Nov-15
22-Oct-15
26-Oct-15
27-Oct-15
28-Oct-15
01-Nov-15
02-Nov-15
25-Oct-15
27-Oct-15
28-Oct-15
29-Oct-15
02-Nov-15
01-Nov-15
26-Oct-15
28-Oct-15
29-Oct-15
01-Nov-15
01-Nov-15
26-Oct-15
28-Oct-15
29-Oct-15
01-Nov-15

Nov

Dec

02-Nov-15, MR for other Materials


02-Nov-15, MR-010 VMS

01-Nov-15, MR-011 Fire Detection and Control Sy stem

02-Nov-15, MR-012 RMPS

02-Nov-15, MR-013- Instrumentation Cable

01-Nov-15, MR-017- Orifice Assembly


02-Nov-15, MR-019- Rotatometers
01-Nov-15, MR-033 Structural Steel

02-Nov-15, MR-034 Rebars

01-Nov-15, MR-035 Anchor Bolts

01-Nov-15, MR-036 Civil Miscellaneous

Date

Revision
Two Weeks look ahead sch.
( DD 17.10.2015)

Checked