Article information:
Access to this document was granted through an Emerald subscription provided by emerald-srm:602783 []
For Authors
If you would like to write for this, or any other Emerald publication, then please use our Emerald for
Authors service information about how to choose which publication to write for and submission guidelines
are available for all. Please visit www.emeraldinsight.com/authors for more information.
The current issue and full text archive of this journal is available at
www.emeraldinsight.com/1741-0401.htm
Adoption of Six
Sigma DMAIC
Anupama Prashar
IILM School of Higher Education, Gurgaon, India
Abstract
Purpose The purpose of this paper is to demonstrate the systematic application of Six Sigma tools for
identification and reduction of cost of poor quality (COPQ). The study examines one of the chronic problems
of failure of cooling fan assembly at repair division of a company dealing in helicopter components.
Design/methodology/approach The case adopted Six Sigma Define-Measure-Analyze-ImproveControl (DMAIC) methodology to achieve the goal of reduction in COPQ.
Findings After completing the Define, Measure and Analyze phase, it was found that use of extreme
tolerances and cross-fitment of bearings are the root cause of cooling fan assembly failure. The major
recommendations made during the Improve phase were to design a bearing matching software for
improving the cross-fitment of bearings and to procure a hydraulic jig with electronic jig instead of
manual jig. The value of implementing these recommended solutions equate to a saving of INR 34 lacs
per annum. Since it was a chronic problem, the company expects this to be a recurring saving.
Originality/value This specific case exhibits the successful application of Six Sigma DMAIC
methodology in repair and maintenance for driving down the cost of failure and improved processes.
Keywords Six sigma, DMAIC, Rework, Pareto analysis, Cost of poor quality (COPQ),
Capability analysis, Process failure mode effect analysis (PFMEA), Cause and effect diagram,
Control chart, Chronic
Paper type Case study
1. Introduction
Today, organizations strive for an improved level of process capability and a reduced
level of cost of poor quality (COPQ). The bottom-line objective is to generate a
profitable margin and sustainable competitiveness in the market. COPQ is the cost
associated with poor quality of products and services. For a manufacturing company,
COPQ is the total cost of repair, rework, scrap, service calls, warranty claims and
write-offs from obsolete finished goods. The concept of COPQ connects the improvement
priorities of a company with its strategic objectives of achieving improved financial
performance and greater customer satisfaction. As per statistics, COPQ is o10 percent
of sales for companies who are at Six Sigma level, about 15 to 20 percent of sales
for companies who are at four sigma level and about 20 to 30 percent of sales for
companies who are at three sigma levels (Clark, 1999).
One of the well-known approaches to reduce COPQ is a project-based approach
based on Six Sigma DMAIC methodology (Kumar and Sosnoski, 2009). Six Sigma
DMAIC methodology, is used to improve already existing processes and had been
proven to be successful in reducing costs, improving cycle times, eliminating defects,
raising customer satisfaction and significantly increasing profitability in every
industry and many organizations worldwide (Tong et al., 2004). There are number of
studies which show the successful application of Six Sigma DMAIC methodology in
automobile industry (Chen et al., 2005), small-scale enterprises (Sinthavalai, 2006;
Desai, 2006), manufacturing processes (Kumar et al., 2007; Li et al., 2008; Tong et al.,
2004; Kumar and Sosnoski, 2009) and services such as healthcare (Dreachslin and Lee,
2007; Taner et al., 2007) and retail (Kumar et al., 2008).
103
Received 24 January 2013
Revised 24 January 2013
Accepted 25 January 2013
IJPPM
63,1
104
The basic statistical tools used in five phases of DMAIC methodology helps identify,
quantify and eliminate the root cause of waste or rejections and sustain the improved
performance of the production line with well-executed control plans in future (Desai
and Shrivastava, 2008). The goal is to stop the defects before they appear and reduce
the COPQ by adopting a predictive rather a reactive approach toward rejection
and rework.
The repair division of a company dealing in helicopter components based in India
was facing the challenge of high COPQ. The division was responsible for overhauling
of critical and technology intensive components of transport helicopter. The present
paper presents the case of a Six Sigma project as practiced in the repair division of the
referred company.
Purposes of this paper are:
.
to describe the application of the Six Sigma DMAIC methodology for reducing
the rejection or rework (COPQ); and
The remainder of the paper is laid down as follows: the first section briefly reviews
the literature on status and adoption of Six Sigma in a variety of context such as
manufacturing, healthcare, retailing, financial services, etc. The following sections
provide an overview of the five phases of the DMAIC methodology to provide a context
of the case study. The discussion of the implementation is concluded in the last section.
2. Literature review
Before taking up the case explanations, let us briefly review the studies that have
shown successful cases of Six Sigma DMAIC methodology applications in a variety
of contexts.
Cho et al. (2011) identified the key ingredients of Six Sigma based on a survey of
diverse sizes, industries and implementation phases of Korean companies using factor
analysis. Compared with other studies conducted by empirical methods, the survey
data for this study were statistically analyzed and the evaluation results were represented
as quantitative indicators.
Mohamed conducted an empirical survey to validate the effectiveness of the
most influential barriers to Six Sigma implementation in a developing country.
The study identified the soft impediments knowledge and support, and hard
impediments professionals and finance, as the most influential barriers to Six
Sigma implementation. The study found that decision makers and quality managers
should not waste their resources on overcoming all Six Sigma barriers since only
specific barriers significantly influence the Six Sigma implementation in relation
to dimensions of organizational factors.
Firka (2010) investigated the results of a study conducted by the Argentinean
Institute for Quality to determine the variables which influenced the evolution and
growth of Six Sigma methodology within a set of organizations. The study involved
a qualitative investigation of multiple cases through interviews with key players in
some organizations. The study found that there cannot be a one size fits all definition
of Six Sigma, particularly years after the initial deployment. The study highlighted the
need for specific ways by which Six Sigma core concepts can be consciously
incorporated in the organization through a planned path.
Tjahjono et al. (2010) identified the latest trends, approaches, tools and techniques,
benefits and combinations of Six Sigma with other concepts by carrying out a
systematic and thematic literature review. The study proposed four interpretations
of Six Sigma: first, a set of statistical tools, second, an operational philosophy of
management, third, a business culture and fourth, an analysis methodology. The study
emphasized that the main goals of Six Sigma implementation, i.e. improving efficiency,
profitability and capability in the process, remained unchanged.
Antony and Desai (2009) presented the results from an empirical investigation
of Six Sigma status in the Indian industry. The results of empirical study reflected the
reasons for application of Six Sigma by Indian organizations, the most and least
commonly used tools and techniques, critical success factors (CSFs) for the implementation
of Six Sigma, and common impediments in the implementation.
Kaushik and Khanduja (2008) applied Six Sigma DMAIC methodology to specific
case of thermal power plant for conservation of energy. They implemented Six Sigma
project recommendations to reduce the consumption of demineralized (DM) make-up
water from 0.90 to 0.54 percent of maximum continuous rating (MCR) resulting in a
comprehensive energy saving of INR 304.77 lacs per annum.
Krishna et al. (2008) presented a case study illustrating how a multinational Indian
corporation was able to successfully implement Six Sigma principles to improve its
operations. The study provides an assessment of the importance of Six Sigma strategy
in Indian manufacturing companies.
Kumar et al. (2008) presented a case of implementation of the Six Sigma DMAIC
approach for improvement in service system by a major consumer electronics and
appliance retailing company in the USA. The study used a combination of design
methods which included creating multiple service blueprints and implementing the Six
Sigma DMAIC approach. A Service Quality (SERVQUAL) Survey was conducted and
analyzed the data, to give an understanding of customer satisfaction with the service
provided at the company, compared to its major competitors. The service blueprint was
analyzed and strategies were recommended to improve the present system, with the
goal of providing better customer service and an improved shopping experience. With
the recommendations, an improved service model for the company was created
along with fail safe mechanisms to ensure that service guarantees will be met.
Li et al. (2008) presented a specific case on implementation of Six Sigma DMAIC
approach to improve the capability of the solder paste printing process by reducing
variations in thickness from a nominal value. The study adopted the DMAIC approach,
which included the Taguchi method to reduce the estimated standard deviation of
solder thickness from 13.69 to 6.04. In addition, the process capability index Cpk was
enhanced from 0.487 to 1.432.
Kumar and Sosnoski (2009) highlighted the potential of DMAIC Six Sigma in
realizing the cost savings and improved quality by using the case study of a leading
manufacturer of tooling. The study examined one of the chronic quality issues on shop
floor by utilizing Six Sigma tools. The study showed that DMAIC Six Sigma process
is an effective and novel approach for the machining and fabrication industries to
improve the quality of their processes and products and ensuring profitability by
driving down manufacturing costs.
Kumar et al. (2007) presented a case on application of Six Sigma DMAIC
problem-solving methodology to identify the parameters causing casting defects and
to control these parameters. The results of the study were based on the application of
tools and techniques in the DMAIC methodology, i.e. Pareto Analysis, measurement
Adoption of Six
Sigma DMAIC
105
IJPPM
63,1
106
system analysis, regression analysis and design of experiment (DOE). The results
showed that the application of the Six Sigma methodology reduced casting
defects and increased the process capability of from 0.49 to 1.28. The application
of DMAIC resulted in a significant financial impact (over US$110,000 per annum)
on the bottom-line of the company.
Dreachslin and Lee (2007) presented a case on application of Six Sigma DMAIC
techniques in determining the effectiveness of diversity initiatives in healthcare
management in the USA. The authors inferred that Six Sigma and DMAIC can be
applied to diversity initiatives such as ameliorating racial and ethnic disparities in
healthcare, and recruiting and retaining a diverse workforce.
Taner et al. (2007) designed five case studies in healthcare to show the performance
improvement accomplished by Six Sigma DMAIC presenting a road-map for problem
solving and service/process improvement. The findings showed that the healthcare
organization gained a greater ability to address challenges across the system; maximized
resource utilization; reduced redundancies, waste and rework; diminished bottle-necks
related to scheduling; improved working conditions for healthcare personnel. The results
showed that healthcare organizations are able to increase their market share in the long
run after Six Sigma implementation.
Martins et al. (2006) carried out an action research in a Brazilian cosmetic factory
to identify the enablers and inhibitors of Six Sigma project. The study identified
that the main enablers were the continuous support of Six Sigma champion who
was the companys CEO, different backgrounds of team members, involvement of
team members, team members knowledge of process, preliminary results which
provided a positive feedback, and the intensive presentation of results of project.
The inhibitors were found to be difficulty to collect data, uncertainty regarding the
project payoff, difficulty to carry out experiments interfering in the production
process, lack of previous production process map, and the difficulty to apprehend the
Control phase of DMAIC. Moreover, the existence of an interaction among some
those factors was evidenced.
Sinthavalai (2006) developed and evaluated a model for implementation of Six
Sigma in small manufacturing enterprises (SMEs). The study highlighted that SMEs
have limitations when employing the Six Sigma program due to the limited time, cost
and effort, and other barriers typical of an SME (e.g. organization culture, structure
and strategies). Therefore, SMEs need a different methodology to guide and facilitate
the implementation of Six Sigma. The study proposed self-learning web-based system
(e-learning systems) for employees in order to reduce the costs of hiring the consultancy
and training, which are the high investment costs in Six Sigma implementation.
Desai (2006) presented real-life case where Six Sigma has been successfully applied
at one of the Indian small-scale industries (SSI) to improve one of the core processes.
The studies reflected that SSI sectors are constantly on the alert to gain a competitive
edge, using the many tools and techniques that have long been flaunted as a way to
beat the competitions.
Chen et al. (2005) presented a case study in context of automobile industry in
Taiwan. The study used the DMAIC model of Six Sigma to measure the performance of
customer requirements by creating a questionnaire and analyzing the performance
of the product quality mechanism. The study used the key elements found in the
quality process as countermeasures for planning and improvement.
Hendry (2005) presented empirical evidence from 11 case study companies in
context of Asian industry to determine the issues associated with implementation
process of Six Sigma methodology and how it differs between manufacturing and
service processes. The study found that while the Six Sigma phenomenon is generally
perceived positively, Six Sigma is more appropriate for high risk, complicated, large
scale and cross-functional projects and its costs cannot be justified for smaller
projects. The evidence also suggested that Six Sigma is less successful if it is too
much geared toward shortsighted financial targets that do not have management
involvement.
Hensley and Dobie (2005) proposed a model for assessing the readiness for Six
Sigma in service organizations. The study identified two components of organizational
readiness: organizational experience with improvement programs and organizational
understanding of processes. The proposed model was applied in an urban public
transit company by using a survey. The results of the survey identified the perceptual
differences between customers and the organization which provided the basis for
the development of a process improvement program that employees should be able
to undertake.
McAdam and Evans (2004) examined the principles and practice used in the
implementation and operation of Six Sigma. The study critically evaluated the application
of Six Sigma in two sites and at four levels within a case organization. Both qualitative and
quantitative research data were used for an investigation of Six Sigma implementation
and deployment. Qualitative data took the form of in-depth interviews of the key Six
Sigma senior management personnel in both plants. The quantitative data were obtained
from questionnaires distributed to four levels and two sites in the organization.
Tong et al. (2004) designed a case on improvement on the sigma level of the
screening process, which is regarded as the most critical process in printed circuit
boards (PCB) manufacturing through the DMAIC approach. At the early stages,
process capability analysis (PCA) and statistical process control (SPC) were used to
measure and analyze the current printing performance of the screening machines.
During later stages, DOE was conducted to determine the optimal settings of the
critical to quality (CTQs) factors in the screening process. The study showed that by
using these optimal settings, Six Sigma performance can be achieved.
Goh and Xie (2004) presented an overview of the Six Sigma approach as it is taken
today, followed by a discussion on how this approach can be taken further to enhance
the competitiveness of organization. The study emphasized that in an increasingly
competitive and globalized environment, the traditional Six Sigma concept will be
outright irrelevant since in many situations sigma levels cannot be measured. The
study emphasized that a thriving, growing and winning organization cannot be
operating on the basis of error avoidance aspects such as imagination, vision,
leadership, passion and creativity. As per the study, these aspects are irrelevant to
the DMAIC straight jacket.
3. Case study
The case is about repair division of a company engaged in overhauling of
critical components of transport helicopters. The division was struggling with
a high COPQ. It identified three areas for improvement and based on Project
Prioritization Index (PPI) selected the project on reduction in failure of cooling fan
assembly (Table I).
A cooling fan is a vital sub-assembly of a helicopter and its function is to cool
down the lubricating oil of aero-engines and gearbox by forced circulation of the
ambient air. The division was repairing 80-90 cooling fan assembles in a year and
Adoption of Six
Sigma DMAIC
107
IJPPM
63,1
Potential
Cost to
Probability of
Time to
savings (INR) complete (INR)
success
complete (year)
Projects
108
Table I.
Project selection (PPI)
Reduction in cost
of flight test
Reduction on spurious
fire warning
in helicopter
Reduction in cooling fan
assembly failure
PPI
(S/C) (P/T)
2,000,000
350,000
0.7
0.5
8.00
1,600,000
200,000
0.8
0.75
8.53
4,200,000
300,000
0.8
0.5
25.20a
the failure rate of cooling fan assembly at the testing phase was as high as 9 percent.
Thus, resulting in a COPQ (rework cost) of about INR 42 lacs per annum as shown in
Table II. This was the chronic problem for the company.
The division initiated a project in January 2011 with the aim of reducing this high
COPQ. A project team comprising of members of functions impacted by the project
implementation was formed. The team adopted project by project approach using Six
Sigma DMAIC methodology for solving the problem.
3.1 Methodology: Six Sigma framework
The project team followed the DMAIC process within a Six Sigma framework. The five
phases (Define-Measure-Analyze-Improve-Control) and key tools used in each phase
are listed in Figure 1.
These phases are discussed in detail in the following sections.
3.1.1 Define phase. The Define phase involves creating a project charter, identifying
customers to the project and their needs and requirements (CTQs) and creating a high
level process map (Benbow and Kubiak, 2010).
Project charter. The problem statement, mission statement, project goals, process
boundaries, project team composition and the project milestones are specified as part
of the project charter.
Table II.
Calculation of COPQ
(cooling fan assembly)
82
8
INR 7.1 lac
174,800
387,000
124,000
24,460
INR 12.57 lac
315,400
696,600
196,800
48,400
INR 42.18 laca
Phases
DEFINE
Tools
Project Charter, CTQ Tree, SIPOC
MEASURE
ANALYSE
IMPROVE
CONTROL
Mission statement. The rule of thumb is to solve 50 percent of the problem within four
to five months of time (Eckes, 2001). The mission statement is framed as:
The mission of the present project is to reduce the failure of cooling fan assembly during final
testing from 9% to less than 2% to achieve an annual gain of INR 34 Lacs, within five months
( January to May 11).
The details of project goals, process boundaries, project team composition and project
milestones are specified as part of the project charter in Appendix 1.
Identification of CTQ factors. A CTQ is an attribute of an assembly, sub-assembly,
product or process that has direct or significant impact on its direct or perceived quality.
The CTQ concept in Six Sigma enables to improve the quality from the customers
perspective (Lucas James, 2002). The CTQ tree for the present project is shown in Figure 2.
High-level process map (SIPOC). The high-level process map or SIPOC is a high-level
picture of the process that depicts how the given process is servicing the customer
(Desai, 2006). The SIPOC chart is illustrated in Figure 3.
3.1.2 Measure phase. This phase involves mapping the existing process (as is
process map), analysis of measurement system (MSA), data collection plan, calculation of
baseline sigma (present sigma level) and capability analysis of CTQs (Benbow and Kubiak,
2010). The as is flow chart of overhauling the cooling fan assembly is shown in Figure 4.
Process description. The overhauling process commences on receipt of the cooling
fan unit. The fan assembly is the dismantled, cleaned and inspected for any damage
and if found satisfactory, it is sent for micrometry or non-destructive testing. If the
parts are found damaged, they are replaced with new and serviceable ones. After
micrometry/NDT, if these parts are found within specification limits, they are treated
with appropriate electroplating/anti-corrosive treatments. After these processes,
final cleaning and subsequently post-micrometry is done. Parts which fail during
post-micrometry are to be again sent for protective treatment. If the parts are found
to be within specification limits, they are sent for assembly. After the assembly is
Adoption of Six
Sigma DMAIC
109
Figure 1.
Six Sigma framework
IJPPM
63,1
Need
Driver
110
Reduce COPQ
(Failure of cooling
fan assembly)
Figure 2.
A CTQ tree
Supplier
Kit Marshal
Input
Can D Fan
Units
Prevented
impeller rubbing
Blade cleaner
with housing
(0.2 + 0.03 mm)
Improved airflow
Flow rate
(4.85 + 0.25 m3/sec)
Prevented spline
damage
Extended dents,
notches
Process
Output
Customer
Dismantling
Overhauled
Fan Units
H/C Assembly
Line
Initial
Cleaning
OEM
Spares
Requirement
H/C
Operators
Defectation
Coating
Local
Supplier
Consumables
Final
Cleaning
Assembly
Figure 3.
High-level process
map or SIPOC
Testing
done, impeller clearance between the cooling fan blades and the housing is checked
and if found ok, the cooling fan unit will be passed for final testing. In case, the
clearance is not within the specification limit, the assembly has to be dismantled
again and has to go through all the process as mentioned above. After the final testing,
if the assembly fails, it has to go through the similar procedures. After successful
testing, the cooling fan assembly is sent for preservation/packing and after proper
documentation, it is passed out to either operating unit/helicopter final assembly.
Data collection plan for CTQs. A data collection plan was formulated depicting
the data type, sample size, data collection method and responsibilities. Format used for
data collection is illustrated in Table III. Data collected using this plan are given
in Appendix 2.
Dismantling
Cleaning
Impeller
check
Assembly
OK ?
No
Yes
Receipt
Viewing
Yes
START
Parts
OK ?
Micrometry
Checks
Yes
Functional
testing
Parts
OK ?
Test
OK ?
PostMicrometry
Final
Cleaning
NDT
No
Parts
OK ?
111
No
No
Replace
Parts
Adoption of Six
Sigma DMAIC
Yes
Packing/
Preservation
Pass Out
Electro-plating /
Anti-corrosive
End
Yes
Figure 4.
As Is process map
Note: COPQ due to rework is detected in two stages mentioned above and are
marked in red line in the diagram
CTQ
Operational definition
Data type
Size (each)
How collected
By whom
Capability analysis of CTQs. The capability analysis of the data on CTQs was done
using the Mini-Tab. For both the CTQ parameters namely impellor blade clearance (the
capability index, Cp 0.64, Cpk 0.53 which is o1.33) and flow rate (the capability
index, Cp 0.78 & Cpk 0.53 which is o1.33) the process was found to be incapable.
The capability plots are shown in Figure 5.
Base line sigma level. The present sigma levels were calculated for attribute CTQ
based on the following defect per million opportunities (DPMO) method (Benbow and
Kubiak, 2010).
DPMO Number of defects 106/number of opportunities number of units
Considering:
.
Table III.
Data collection plan
IJPPM
63,1
112
B/W
Overall
B/W Capability
0.78
Cp
0.53
CPL
1.03
CPU
Cpk
0.53
Overall Capability
Pp
0.81
PPL
0.55
PPU
1.07
Ppk
0.55
Cpm
*
4.6
USL
Process Data
LSL
4.6
*
Target
5.1
USL
4.76875
Sample Mean
40
Sample N
0
SD(Between)
0.106684
SD(Within)
0.106684
SD(B/W)
0.102961
SD(Overall)
Observed Performance
PPM < LSL 0.00
PPM > USL 0.00
PPM Total
0.00
4.7
4.8
4.9
5.0
5.1
USL
Process Data
LSL
0.17
Target
*
USL
0.23
Sample Mean
0.195474
Sample N
95
SD(Between)
0
SD(Within)
0.0157125
SD(B/W)
0.0157125
SD(Overall)
0.0153518
B/W
Overall
B/W Capability
Cp
0.64
CPL
0.54
CPU
0.73
Cpk
0.54
Overall Capability
Pp
0.65
PPL
0.55
PPU
0.75
Ppk
0.55
Cpm
*
0.16
Figure 5.
Capability plots of CTQs
Observed Performance
PPM < LSL
0.00
PPM > USL
0.00
PPM Total
0.00
0.17
0.18
0.19
0.20
0.21
0.22
0.23
Notes: (a) Capability plot of impeller blade clearance; (b) capability plot of flow rate
3.1.3 Analyze phase. During this phase, the project team examined the measurements
collected in the Measure phase and sought explanations for the various readings by
using the following tools and techniques: brainstorming, cause and effect diagram,
Pareto analysis (Benbow and Kubiak, 2010).
Cause and effect diagram. The project team conducted brainstorming to identify
the probable cause of failure. In order to narrow down the focus, these causes were
categorized in different categories in the cause and effect diagram (Figure 6).
Pareto analysis. In order to prioritize the cause, the team plotted a Pareto chart using the
data collected for 31 rework cases during last four years (2006-2011) as shown in Figure 7.
Based on the results of Pareto analysis, the team selected the problem of extreme
tolerances and wrong fitment for the improvement phase.
Identifying key process input variables (KPIVs). The project team used above
mentioned causes as basis for further detailed analysis to identify the contributing
Adoption of Six
Sigma DMAIC
Impeller rubbing
Loose
attachment
Use of extreme
tolerances
Play in
bearing
Wrong fitment
on Test bed
Wrong fitment
113
Operator error
Failure of
Cooling Fan
Ineffective
Damaged
Wrong
Iubrication
blade
handling Reduced
Play in
Wrong
bearing
Bad profile
speed
fan fitment
of blade
Use of extreme
Test rig
Non-adherence
Ineffective
tolerances
faulty
of SOPs
cleaning
Lesser air flow
Spline damage
Vital Few
25
Useful Many
20
15
10
5
0
Extreme
tolerances
Frequency
Percent
Cum. Frequency
Wrong
Fitment
21
67.7
67.7
2
6.5
87.1
Test rig
faulty
2
6.5
93.5
Figure 6.
Cause and effect diagram
Cum. Percent
100
90
80
70
60
50
40
30
20
10
0
30
Frequency
Wrong fitment
Wrong
Handling
1
3.2
96.8
1
3.2
100
Figure 7.
Pareto analysis
factors for each major cause. The team identified five KPIVs for the cooling fan assembly
based on the know-how of process owners with the objective of funneling the input
variables to identify most critical inputs and measuring their performance. The KPIVs,
its type and specifications are given in Table IV.
The team prepared a KPIV Impact Matrix to analyze the impact of the KPIVs on the
performance of cooling fan assembly as shown in Table V.
KPIVs
Type of data
Variable
Variable
Variable
Variable
Variable
Specifications (mm)
60 0.030
60 0.036
3070.017
30 0.015
0.033-0.071
Table IV.
KPIVs
IJPPM
63,1
Impeller rubbing
Spline damage
Outer diameter of the
Impeller rubbing
bearing
Spline damage
Outer diameter of fan shaft Impeller rubbing
Spline damage
Inner diameter of the
Impeller rubbing
bearing
Spline damage
Clearance between the hub Impeller rubbing
and shaft
Less air flow
114
3
4
Table V.
KPIV impact matrix
Impact (CTQs)
Medium
High
Low
Bracket damage
Less air flow
Less air flow
Bracket damage
Bracket damage
Spline damage
Increased power
consumption
Increased power
consumption
Increased power
consumption
The team collected data for KPIVs and performed capability analysis to study the
variation. Out of these five, the spread for two was found more, these were:
.
cross-fitment of bearings.
3.1.4 Improve phase. This phase involves identification of possible solutions, their
implementation and verification of workability of the solutions (Benbow and Kubiak,
2010).
Identification of possible solutions. In order to find out the probable solutions,
the team brainstormed and constructed a counter measure matrix (Figure 10).
Between/Within Capability of Inner Diameter of Sleeve
LSL
USL
Process Data
LSL
60
*
Target
USL
60.03
Sample Mean
60.0186
Sample N
40
0
SD(Between)
SD(Within)
0.00769284
SD(B/W)
0.00769284
SD(Overall)
0.00742466
Figure 8.
Capability analysis
of inner diameter of
bearing sleeve
B/W
Overall
B/W Capability
Cp
0.65
CPL 0.80
CPU 0.50
Cpk
0.50
Overall Capability
Pp
0.67
PPL 0.83
PPU 0.51
0.51
Ppk
Cpm
*
60.000
Observed Performance
PPM < LSL 0.00
PPM > USL 0.00
PPM Total 0.00
60.008
60.016
60.024
60.032
Adoption of Six
Sigma DMAIC
USL
Process Data
LSL
29.983
*
Target
USL
30.017
29.9963
Sample Mean
40
Sample N
0.00194525
SD(Between)
0.00615011
SD(Within)
0.00645041
SD(B/W)
0.00673829
SD(Overall)
B/W
Overall
B/W Capability
Cp
0.88
CPL
0.69
CPU
1.07
Cpk
0.69
Overall Capability
Pp
0.84
PPL
0.66
PPU
1.02
Ppk
0.66
Cpm
29.982
Observed Performance
PPM < LSL
PPM > USL
PPM Total
0.00
0.00
0.00
29.988
19,425.60
674.79
20,100.40
29.994
30.000
30.006
30.012
Figure 9.
Capability analysis of
outer diameter of fan shaft
115
23,992.23
1,076.44
25,068.67
Reduce Specification
tolerances
Extreme tolerance
specifications of shaft
and bearings
Ineffective cleaning
Training operator with existing
processes
Figure 10.
Counter measure matrix
IJPPM
63,1
116
The team created an Impact/Effort Matrix for assessing the potential impact of
solutions against the estimated effort (Figure 11).
The following probable solutions emerged out of the Impact/Effort Matrix:
.
A solution prioritization matrix was created on the basis of the criteria of: likely defect
reduction, time and cost of implementation, and likelihood of future complaints and
safety (Table VI).
Use of Bearing
Matching Software
Improved
automated jig
Reduce spec.
tolerances
Improved
cleaning bath
3
Impact
2
Training operator
Manual matching
of spares
Figure 11.
Impact/effort matrix
Quenching shaft
before fitment
Effort
Solutions
Table VI.
Solution prioritisation
matrix
1. Reduce spec.
tolerances
2. Use of bearing
matching software
3. Manual matching
spares
4. Improved
automated jig
5. Quenching of shaft
6. Training of operator
7. Improved cleaning
bath
Prioritization criterion
Likely defect
Time to
Cost to
Future complaints
reduction (10) implement (6) implement (8)
and safety (6)
Score w/score Score w/score Score w/score Score w/score Total (30)
90
12
116 >
=
90
24
56
30
200
30
30
56
12
128
8
7
3
80
70
30
4
3
5
24
18
30
5
2
6
40
16
48
5
2
2
30
12
12
174
116
120
70
24
32
24
150
>
;
Adoption of Six
Sigma DMAIC
117
Figure 12.
Bearing matching
software
IJPPM
63,1
118
Figure 13.
Hydraulic jig
3.1.5 Control phase. To sustain the improvement of the sigma level of the processes,
the following control measures were recommended by the project team (Table X):
.
The impact of the improvements on the out of control KPIVs was monitored by
using control charts (Figure 14).
Wrong results
Damage
Assembly
Testing
Packing/
transport
Damaged spline
Damaged
bracket
Wrong measurement
Micrometry
Rubbing of
impeller
Damaged spline
Operator error
Wrong spares
Use of extreme
tolerances
Faulty jig and
fixtures
Ineffective
cleaning
Test rig faulty
New operator
Ineffective
packing
Careless
handling
Instrument error
Operator error
Data entry error
Potential causes
Final check
Supervisor checks 2
QA checks
Periodic training
48
28
Improved cleaning
bath
Regular training
Preventive maint
Improved packaging
Training
New spline blanking
D RPN Actions
Supervisor checks 1
QA checks
Periodic
calibration
Supervisor checks 3
QA checks
Current controls
18
Scores after
improvement
S O D RPN
Adoption of Six
Sigma DMAIC
119
Table VII.
Process failure mode effect
analysis (PFMEA)
IJPPM
63,1
Plan
Activity
Responsibility
Target date
Completion date
Communication
plan
In charge
Fan Bay
20 April
15 April
In charge
Testing Bay
20 April
18 April
In charge
Admin
In charge
Assembly Bay
20 April
20 April
20 April
20 April
In charge
Assembly Bay
30 April
30 April
Resource plan
120
Budget
Process
implementation
Downloaded by Universitas Andalas At 01:42 21 March 2016 (PT)
Control plan
Table VIII.
Implementation plan
Table IX.
Cost benefit analysis
(a)
(b)
(c)
(d)
(e)
(f)
(g)
Root cause
Control measure
Responsibility
Technical officer
Supervisor
Operators
Ineffective cleaning
Cross fitment of bearings
Table X.
Control plan
Technical officer
Supervisor
Operators
Technical officer
Supervisor
Operators
improvement projects were proposed and approved by the top management after
successful implementation of the present project. Involvement of leadership proved to
be the major success factor of the project. This project unfastened the path for a new
culture and shared aims in the company.
The Six Sigma DMAIC methodology is appropriate fit for the reduction in COPQ
in manufacturing processes such machining, fabrication, repair and maintenance,
0.000
UCL = 0.000300
0.002
x = 0.003846
0.004
0.006
LCL = 0.007392
0.008
Moving Range
Adoption of Six
Sigma DMAIC
6
7
8
Observation
10
11
12
121
13
UCL = 0.004356
0.004
0.003
0.002
MR = 0.001333
0.001
LCL = 0
0.000
1
6
7
8
Observation
10
11
12
13
supply chain, etc. (Kumar et al., 2007; Li et al., 2008; Tong et al., 2004; Kumar
and Sosnoski, 2009). This approach can benefit different industries for solving
quality-related problems. However, the companies will be most likely to succeed
if their top-level management is supportive of a continuous improvement culture.
Another key to success is to choose projects that can be measured and that
potentially have a good return on quality.
References
Antony, J. and Desai, D.A. (2009), Assessing the status of Six Sigma, Management Research
News, Vol. 32 No. 5, pp. 413-423.
Benbow, D.W. and Kubiak, T.M. (2010), The Certified Six Sigma Black Belt, Handbook, Pearson
Education.
Chen, S., Chen, K. and Hsia, T. (2005), Promoting customer satisfaction by applying Six Sigma:
an example from the automobile industry, The Quality Management Journal, Vol. 12 No. 4,
pp. 21-33.
Cho, J.H., Lee, J.H., Ahn, D.G. and Jang, J.S. (2011), Selection of Six Sigma key ingredients (KIs)
in Korean companies, The TQM Journal, Vol. 23 No. 6, pp. 611-628.
Clark, T.J. (1999), Success for Quality: Support Guide for Journey to Continuous Improvement,
ASQ: Quality Press, Milwaukee, WI.
Desai, D. (2006), Improving customer delivery commitments the Six Sigma way: case study of an
Indian small scale industry, International Journal of Six Sigma and Competitive
Advantage, Vol. 2 No. 1, pp. 23-47.
Desai, T.N. and Shrivastava, R.L. (2008), Six sigma a new direction to quality and productivity
management, World Congress on Engineering and Computer Science WCECS,
San Francisco, CA.
Dreachslin, J. and Lee, P. (2007), Applying Six Sigma and DMAIC to diversity initiatives,
Journal of Healthcare Management, Vol. 52 No. 6, pp. 361-367.
Figure 14.
Control chart
IJPPM
63,1
122
Eckes, G. (2001), The Six Sigma Revolution, How General Electric and Others Turned Process Into
Profits, John Wiley & Sons Inc.
Firka, D. (2010), Six Sigma: an evolutionary analysis through case studies, The TQM Journal,
Vol. 22 No. 4, pp. 423-434.
Goh, T.N. and Xie, M. (2004), Improving on the Six Sigma paradigm, The TQM Magazine,
Vol. 16 No. 4, pp. 235-240.
Hendry, L. (2005), Exploring the Six Sigma phenomenon using multiple case study evidence,
Working Paper No. 2005/056, Lancaster University Management School, Lancaster.
Hensley, R.L. and Dobie, K. (2005), Assessing readiness for Six Sigma in a service setting,
Managing Service Quality, Vol. 15 No. 1, pp. 82-101.
Kaushik, P. and Khanduja, D. (2008), DM make up water reduction in thermal power plants
using Six Sigma DMAIC methodology, Journal of Scientific and Industrial Research,
Vol. 67 No. 1, pp. 36-42.
Krishna, R., Dangayach, G., Motwani, J. and Akbulut, A. (2008), Implementation of Six Sigma
approach to quality improvement in a multinational automotive parts manufacturer in
India: a case study, International Journal of Services and Operations Management, Vol. 4
No. 2, pp. 264-276.
Kumar, M., Antony, J., Antony, F. and Madu, C. (2007), Winning customer loyalty in an
automotive company through Six Sigma: a case study, Quality and Reliability Engineering
International, Vol. 23 No. 7, pp. 849-866.
Kumar, S. and Sosnoski, M. (2009), Using DMAIC Six Sigma to systematically improve shop
floor production quality and costs, International Journal of Productivity and Performance
Management, Vol. 58 No. 3, pp. 254-273.
Kumar, S., Strandlund, E. and Thomas, D. (2008), Improved service system design using Six
Sigma DMAIC for a major US consumer electronics and appliance retailer, International
Journal of Retail & Distribution Management, Vol. 36 No. 12, pp. 970-994.
Li, M.-H., Al-Refaie, A. and Yang, C.-Y. (2008), DMAIC approach to improve the capability of
SMT solder printing process, IEEE Transactions on Electronics Packaging
Manufacturing, Vol. 31 No. 2, pp. 126-133.
Lucas James, M. (2002), The essential Six Sigma, Quality Progress, January, pp. 27-31.
McAdam, R. and Evans, A. (2004), Challenges to Six Sigma in a high technology mass-manufacturing
environments, Total Quality Management & Business Excellence, Vol. 15 No. 5, pp. 699-706.
Martins, R., Mergulao, R. and Junior, L. (2006), The enablers and inhibitors of Six Sigma project
in a Brazilian cosmetic factory, Proceedings of the Third International Conference on
Production Research Americas Region (ICPR ICPR-AM06), Curitiba, July 30-August 2.
Sinthavalai, R. (2006), A methodology to support Six Sigma implementation in SMEs as
eLearning, Proceedings of the Third International Conference on eLearning for
Knowledge-Based Society, Bangkok, August 3-4.
Snee, R.D. (2001), Dealing with the Achilles heel of Six Sigma initiatives, Quality Progress,
Vol. 34 No. 3, pp. 66-72.
Taner, M., Sezen, B. and Anthony, J. (2007), An overview of Six Sigma applications in health care
industry, International Journal of Health Care Quality Assurance, Vol. 20 No. 4, pp. 329-340.
Tjahjono, B., Ball, P., Vitanov, V.I., Scorzafave, C., Nogueira, J., Calleja, J., Minguet, M., Narasimha, L.,
Rivas, A., Srivastava, A., Srivastava, S. and Yadav, A. (2010), Six Sigma: a literature review,
International Journal of Lean Six Sigma, Vol. 1 No. 3, pp. 216-233.
Tong, J., Tsung, F. and Yen, B. (2004), A DMAIC approach to printed circuit board quality
improvement, The International Journal of Advanced Manufacturing Technology, Vol. 23
Nos 7-8, pp. 523-531.
Further reading
Kumar, M. (2007), Critical success factors and hurdles to Six Sigma implementation: the case of
a UK manufacturing SME, International Journal of Six Sigma and Competitive
Advantage, Vol. 3 No. 4, pp. 333-351.
Adoption of Six
Sigma DMAIC
Wessel, G. and Burcher, P. (2004), Six Sigma for small and medium-sized enterprises, The TQM
Magazine, Vol. 16 No. 4, pp. 264-272.
123
IJPPM
63,1
124
Appendix 2. Data for CTQs
Appendix III
Adoption of Six
Sigma DMAIC
125
Figure A1.
Capability analysis
of KPIVs
IJPPM
63,1
126