Sei sulla pagina 1di 46

CONSTRUCTION BULLETIN

Sample Project of The Month

About The Publication


The BCI Asia Construction Bulletin - INDONESIA R071207 is published by:
BCI Asia Construction Information Pte Ltd
371 Beach Road, KeyPoint #02-25, Singapore 199597
65 6538 6836 f 65 6538 6896
Email singapore@bciasia.com

Website www.bciasia.com

Other offices:
6221 5790 2930
6231 8293056
844 537 8548
662 651 8600
848 997 4220
852 2538 0011
603 7661 1380
632 884 1122
612 9432 4100

Jakarta
Surabaya
Bangkok
Hanoi
Ho Chi Minh City
Hong Kong
Kuala Lumpur
Manila
Sydney

f
f
f
f
f
f
f
f
f

6221 5790 2933/34


6231 8293057
844 537 8549
662 651 8606

848 997 4150


852 2875 0511
603 7661 1381
632 884 1121
612 9432 4111

E-mail: jakarta@bciasia.com
E-mail: surabaya@bciasia.com
E-mail: bangkok@bciasia.com
E-mail: vietnam@bciasia.com
E-mail: vietnam@bciasia.com
E-mail: hk@bciasia.com
E-mail: kl@bciasia.com
E-mail: manila@bciasia.com
E-mail: sydney@bciaustralia.com

THE PUBLICATION
BCI Asia Construction Bulletin reports on building and construction projects in Southeast Asia, Hong Kong, and Macau.
Projects are researched locally by highly qualified in-house research staff. Projects are monitored from their inception through
various phases of planning, design, tender and contract award through to early construction.
PROJECT CATEGORIES
Projects are classified into 19 categories for easier reference. Categories are defined as follows:
Car Parks
Community
Education
Exhibition
Health
Hotel
Industrial
Infrastructure
Landscaping
Legal
Mining
Office
Oil and Gas
Recreation
Residential
Retail
Township
Transport
Utilities

Major car parks, approximately 50 bays or more.


Child care centres, kindergartens, churches, mosques, temples, funeral parlours and cemeteries, libraries,
community halls, meeting rooms, fire stations.
Universities, colleges, schools, research centres and any buildings that have an educational
function.
Conference centres and exhibition halls.
Hospitals, medical centres, surgeries (doctor/dental), pathology centres.
Hotels, serviced apartments, motels, hostels and other forms of tourist accommodation.
Factories, plants, workshops, warehouses and any other manufacturing and processing
facilities.
Roads, bridges, civil works, waterways, marinas, piers pipelines, subdivisions and tunnels.
Significant landscaping component.
Law courts, police stations and prisons.
Mines (e.g. coal, gold, tin, copper) excluding oil and gas.
Commercial and public offices.
Oil and gas exploration and production.
Sporting stadiums, sporting fields with clubrooms, swimming pools, tennis courts, cinemas,
theme parks, tourist attractions, clubs, pubs, museums, art galleries and gardens.
Apartments, townhomes, retirement homes, residential estates and houses.
Shopping centres, supermarkets, shops, restaurants and cafes.
Urban development.
Control towers, freight/passenger terminal buildings and bus/rail interchanges.
Water and sewerage plants, pipelines, telecommunications and power plants.

PROJECT STAGES
Projects are listed in order of their stage of development. Stages are defined as follows:
Competition
Concept
Design
Documentation
Tender
Post Tender
Construction

Architectural, interior and other construction-related design competitions


Concept or schematic design is underway
Project plans are being drafted for planning approval
Specification and working drawings are being drafted
Bids are being called for Main Contractor
Tender has closed
Main Contractor has commenced work on site. Main Contract Awarded or Subcontract(s) Tender
Or Subcontract(s) Awarded

Copyright 2013 BCI Asia Construction Information Pte Ltd. No part of this publication may be reproduced, stored in a retrieval
system, or transmitted in any form, or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior
written permission of the publisher. All rights reserved. Printed in Singapore by BCI Asia Construction Information Pte Ltd. MICA (P)
No.045/04/2009. Disclaimer: Every effort is made to ensure that information in this publication is accurate. However, no
responsibility will be taken for any errors which may inadvertently occur.

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

About The Publication


HOW TO READ A BCI ASIA CONTRUCTION BULLETIN

A typical page from BCI Asia Construction Bulletin. Illustrating the features and benefits. The simple concise lay out is eas y
to read and user friendly.

1. The type of project by


major category, e.g. hostel,
industrial , retail, office allows
the user to identify the projects
most relevant to him.

3. The project code- is a


unique code for each project
allowing the user to track the
progress of a project, to add
new information overtime and
to assign the project
to a specific sales
representative.

2. The stage of the project


gives up-to-date
information on how far the
project has advanced.
4. The project name
and address allows
quick and reliable
reference at a glance

5. Details of the projectprovided in English and


Indonesian contain
up-to-date and accurate
information on the
project thoroughly
researched and updated
whenever there is
a significant changed
in the development

6. The construction
timetable allows the user
to stage his sales priorities

7. The Developer often the


most critical decision maker
when it comes to a
construction
contact.

8. The key contacts


participants in the decision
making process. With this
list of verified names,
addresses and telephone
numbers, the user can save
countless hours of
searching and can go
straight to making contact
to win new business
9. The next tender to be
awarded, typically the main
contractor, who is invited to
bid. At the later stage, the
appointed contractor is
announced as a key contact
for interested sub-contractors.

THE BCI ASIA QUALITY PROMISE

Every project presented in BCI Asia Construction Bulletin


has been research and personally or orally confirmed by a member of the BCI Asia research staff
features at least one key decision maker with full contact details
certain jobs or contracts that are yet to be assigned
No project is included in BCI Asia Construction Bulletin unless it meets these minimum requirements.

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

ii

Sample Project of The Month


PROJECT CATEGORY

Education and Research/ Industrial


PROJECT STAGE

Competition

BALAI PENDIDIKAN DAN PELATIHAN ILMU


PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5)
(continued...)

PROJECT CODE

144374002

BALAI PENDIDIKAN DAN PELATIHAN ILMU


PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5)
Desa Nagari Tapakis, Kecamatan Ulakan, Padang
Pariaman, West Sumatera

Adhika Karsa Pratama PT


Contact Mr Ir. R. Hananto (Director)
62 21 314 7774
f 62 21 314 1923
Email: services@adhikakarsapratama.co.id
Website: adhikakarsapratama.co.id
Jalan Cimandiri No. 6, Flat 1, Lantai 3, Cikini, Jakarta
Pusat, 10330, Jakarta, Indonesia

2 x 3 storey training centre buildings (approx. 12,000


sq m)
30 classrooms
Workshops
Practical rooms

Asri Desindo Intiwidya PT


Contact Mr Wahyu Kristianto (Director - Project Architect)
62 21 765 2061 / 765
f 62 21 765 2065
2064
Email: adi0909@pt-adi.co.id
Website: www.pt-adi.co.id
Jalan Ciputat Raya No. 12A, Pondok Pinang, Kebayoran
Lama, Jakarta Selatan, 12310, Jakarta, Indonesia

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : steel frame
Aluminium framed doors & windows / solid wood
doors

Desigram Reka Matra PT


Contact Mr Hardi (Project Coordinator)
62 21 8370 6703
f 62 21 8370 6703
Email: desigram_rm@yahoo.com
Gedung Gajah Lantai 3A, Jalan Dr Sahardjo, Jakarta
Selatan, 12840, Jakarta, Indonesia

Estimated cost: Rp50.46 bn (US$3.65 mn).


Construction is expected to start in June 2016. Construction is
expected to end in late December 2016.

Mitra Fitrah Alam PT


Contact Mr Muhamamd Djabir Hasan (Director)
62 21 8591 7656
f Not available
Rukan Business Park Kirana Cawang Blok 33 Lantai 3,
Jalan Mayjen D.I. Panjaitan Kavling 48, Jakarta Timur, 13340,
Jakarta, Indonesia

Pembangunan 2 gedung balai pelatihan dan pendidikan 3


lantai dengan luas bangunan sekitar 12.000 meter persegi.
Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan
mulai Juni 2016 dan selesai Desember 2016.
Government Implementing Agency Kementerian
Perhubungan - Badan Pengembangan Sumber Daya Manusia
(BPSDM) Perhubungan
Contact Mr Wahyu Satrio Utomo, SH, M.Si (Head Officer)
62 21 386 5064
f 62 21 384 7480
Email: humas@bpsdm.dephub.go.id
Website: www.bpsdm.dephub.go.id
Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110,
Jakarta, Indonesia

Yodya Karya (Persero) PT


Contact Mr Colbert Thomas Pangaribuan (President
Director)
62 21 8590 5107 / 819
f 62 21 8591 2134
3951
Email: yodyajakarta@yahoo.com
Website: www.yoka.co.id
Gedung STT Sapta Taruna 6th Floor, Jalan D.I. Panjaitan
Kavling 12, Cawang, Jakarta Timur, 13340, Jakarta, Indonesia

Contact Mr Drs Ridwan Setiawan M.Si, M.Mar.E (Kepala


Pusat Pengembangan Sumber Daya Manusia Perhubungan
Laut)
62 21 386 5064
f 62 21 384 7480
Email: humas@bpsdm.dephub.go.id
Website: www.bpsdm.dephub.go.id
Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110,
Jakarta, Indonesia

Construction Manager To be appointed


Remarks: The tenderers are listed in alphabetical order.
Bidders include:

Interior Designer To be appointed


Remarks: The tenderers are listed in alphabetical order.
Bidders include:

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

Education and Research/ Recreation


BALAI PENDIDIKAN DAN PELATIHAN ILMU
PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5)
(continued...)

PROJECT STAGE

Competition

PROJECT CODE

145057002

JATIDIRI SPORTS CENTRE - SEKOLAH KHUSUS


OLAHRAGA
Jalan Karangrejo, Kawasan Gelanggang Olahraga
Jatidiri, Semarang, Central Java

Arkitek Team Empat PT


Contact Mr Zachri Zunaid (Director)
62 21 380 4368 / 380
f 62 21 380 4369
3766
Email: ate_ars@yahoo.com
Jalan Tanah Abang V No. 13, Petojo Selatan , Gambir,
Jakarta Pusat, 10160, Jakarta, Indonesia

Arkonin PT
Contact Mr Bambang Tutuko Warsokusumo (Technical
Director / Project Coordinator)
62 21 736 4176
f 62 21 736 3829
Email: bambangtutuko@hotmail.com
Website: www.arkonin-id.com
Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro Jaya
Sektor I, Jakarta Selatan, 12330, Jakarta, Indonesia

3 storey school building (approx. 4,160 sq m)


Classrooms
Practical rooms
Sports laboratory

Estimated cost: Rp26.00 bn (US$1.88 mn).


Construction is expected to start in early June 2016.
Construction is expected to end in early December 2016.
Gedung sekolah khusus olahraga 3 lantai dengan luas
bangunan sekitar 4.160 meter persegi. Perkiraan biaya: tidak
dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan
selesai Desember 2016.

Artefak Arkindo PT - Construction Manager


Contact Mr Agus Sutjatmiko (Project Director)
62 21 530 0137
f 62 21 530 1145
Email: artefak_emka@yahoo.com
Jalan Anggrek Cendrawasih No. 16 - 17, Jakarta Barat,
11480, Jakarta, Indonesia

Government Implementing Agency Dinas Pemuda dan


Olahraga Propinsi Jawa Tengah
Contact Mr Drs. Budi Santoso, M.Si (Head Officer - Kuasa
Pengguna Anggaran)
62 24 841 9956
f 62 24 841 9959
Website: dinpora.jawatengah.go.id
Jalan Ki Mangunsarkoro No.12, Semarang, 50241, Central
Java, Indonesia

Ciriajasa Cipta Mandiri PT


Contact Mr Aman Santoso (Director)
62 21 726 5320 / 726
f 62 21 725 8483
5322
Email: ccm@ciriajasa.com
Website: www.ciriajasa.com
Jalan Kerinci IX No. 14, Kebayoran Baru, Jakarta Selatan,
12120, Jakarta, Indonesia

Contact Mr Drs. Henky Sulomo MM (Project Manager Kabid Sarpras dan Kemitraan)
62 24 841 9956
f 62 24 841 9959
Website: dinpora.jawatengah.go.id
Jalan Ki Mangunsarkoro No.12, Semarang, 50241, Central
Java, Indonesia

Yodya Karya (Persero) PT


Contact Mr Colbert Thomas Pangaribuan (President
Director)
62 21 8590 5107 / 819
f 62 21 8591 2134
3951
Email: yodyajakarta@yahoo.com
Website: www.yoka.co.id
Gedung STT Sapta Taruna 6th Floor, Jalan D.I. Panjaitan
Kavling 12, Cawang, Jakarta Timur, 13340, Jakarta, Indonesia

Supervisory Consultant To be appointed


Master Planner Widha Consultant PT
Contact Mr Nugroho Pudji Rahardjo (Director)
62 24 746 4680 / 7077
f 62 24 746 4683
8492
Email: widhacon@yahoo.com
Graha Widya Dharma Lantai 1, Jalan Prof. H. Sudarto No.
58, Tembalang, Semarang, 50269, Central Java, Indonesia

Tender Office Kementerian Perhubungan - Badan


Pengembangan Sumber Daya Manusia (BPSDM) Perhubungan
Contact Mr Kurnia Djuprianto (Head of Tender Committee)
62 21 384 7403 / 384
f 62 21 384 7480
7404
Email: humas@bpsdm.dephub.go.id
Website: www.bpsdm.dephub.go.id
Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110,
Jakarta, Indonesia

Contact Mr Ronny AB Wardhana (Project Architect)


62 24 746 4680 / 7077
f 62 24 746 4683
8492
Email: widhacon@yahoo.com
Graha Widya Dharma Lantai 1, Jalan Prof. H. Sudarto No.
58, Tembalang, Semarang, 50269, Central Java, Indonesia

Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

Education and Research/ Office


JATIDIRI SPORTS CENTRE - SEKOLAH KHUSUS
OLAHRAGA (continued...)

PROJECT STAGE

Competition

PROJECT CODE

145279002

LABORATORIUM PENGUJIAN PENCEGAHAN DAN


PEMBERANTASAN PENYAKIT (P2P)
Dusun Karanganyar, Desa Wonosari, Kecamatan Tutur,
Nongkojajar, Kabupaten Pasuruan, East Java

Architect To be appointed
Remarks: Qualification : Non small scale business.
Qualification method : Pre-qualification. The aanwijzing
(tender explanation) is scheduled on 28 December 2015.

Tender opens on 23 December, 2015 and closes on 29


December, 2015.
Tender Office Dinas Pemuda dan Olahraga Propinsi Jawa
Tengah
Contact Mr Agus Prasutio, SH (Member of Tender
Committee - Pejabat Pelaksana Teknik Kegiatan (PPTK))
62 24 841 9956
f 62 24 841 9959
Website: dinpora.jawatengah.go.id
Jalan Ki Mangunsarkoro No.12, Semarang, 50241, Central
Java, Indonesia

3 storey laboratory building (approx. 5,000 sq m)


Equipment storage
Observation room

Estimated cost: undisclosed.


Construction is expected to start in early May 2016.
Construction is expected to end in late September 2016.
Bangunan laboratorium 3 lantai dengan luas bangunan
sekitar 5.000 meter persegi. Perkiraan biaya: tidak
dinyatakan . Konstruksi diharapkan mulai Mei 2016 dan
selesai September 2016.

Contractor To be appointed

Government Implementing Agency Balai Besar Teknik


Kesehatan Lingkungan dan Pengendalian Penyakit Surabaya
Contact Mr Zainal Ilyas Nampira, SKM.,M. Kes. (Head
Officer)
62 31 354 0189 / 354
f 62 31 352 8847
0191
Email: info@btklsby.go.id
Website: www.btklsby.go.id
Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, East
Java, Indonesia
Contact Mr Wahyu Hari Himawan (Kasubag Bina Program)
62 31 354 0189 / 354
f 62 31 352 8847
0191
Email: info@btklsby.go.id
Website: www.btklsby.go.id
Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, East
Java, Indonesia
Supervisory Consultant To be appointed
Architect To be appointed
Remarks: Qualification : Small scale business. Qualification
method : Pre-qualification. The aanwijzing (tender
explanation) is scheduled on 29 December 2015.
Tender opens on 28 December, 2015 and closes on 04 January,
2016.
Tender Office Balai Besar Teknik Kesehatan Lingkungan
dan Pengendalian Penyakit Surabaya
Contact Mr Ronny Koesnariyanto, ST, M.Kes. (Head of
Tender Comittee)
62 31 354 0189 / 354
f 62 31 352 8847
0191
Email: info@btklsby.go.id
Website: www.btklsby.go.id
Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, East
Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

Residential/ Retail/ Recreation


LABORATORIUM PENGUJIAN PENCEGAHAN DAN
PEMBERANTASAN PENYAKIT (P2P) (continued...)

PROJECT STAGE

Concept

PROJECT CODE

144893002

BANDUNG CENTRAL PARK


Site yet to be determined, Bandung, West Java

Contractor To be appointed

2 x 27 storey apartment buildings (approx. 50,000 sq


m)
Ground floor retail shops & restaurants
Children playground
Apartment lobby & reception lounge
Estimated cost: undisclosed.
Construction is expected to start in early June 2017.
Construction is expected to end in late December 2019.
Apartemen 27 lantai dengan luas bangunan sekitar 50.000
meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi
diharapkan mulai Juni 2017 dan selesai Desember 2019.
Developer Jabar Bumi Konstruksi PT
Contact Mr Ir Wibowo (Director)
62 22 250 1426
f 62 22 250 1426
Email: mail@jabarbumikonstruksi.co.id
Website: jabarbumikonstruksi.co.id
Jalan Sidomulya No. 39, Bandung, 40123, West Java,
Indonesia
Contact Mr Hidayat Karim (Project Manager)
62 22 250 1426
f 62 22 250 1426
Email: mail@jabarbumikonstruksi.co.id
Website: jabarbumikonstruksi.co.id
Jalan Sidomulya No. 39, Bandung, 40123, West Java,
Indonesia
Conceptual Designer Jabar Bumi Konstruksi PT
Contact Mr Ir Matheus (Operational Director)
62 22 250 1426
f 62 22 250 1426
Email: mail@jabarbumikonstruksi.co.id
Website: jabarbumikonstruksi.co.id
Jalan Sidomulya No. 39, Bandung, 40123, West Java,
Indonesia
Architect To be appointed
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

Residential/ Hotel/ Car Park/ Retail/ Recreation


PROJECT STAGE

Concept

CONDOTEL AT JALAN KOMBES POL M. DURYAT


(continued...)

PROJECT CODE

145339002

CONDOTEL AT JALAN KOMBES POL M. DURYAT


Jalan Kombes Pol M. Duryat, Surabaya, East Java

Mechanical & Electrical Engineer To be appointed

20 storey apartment & hotel building (approx. 18,210


sq m)
6 multi storey car park (approx. 4,200 sq m)
Up to 350 apartment units & hotel rooms
Lobby & reception lounge
Ground floor retail shops & restaurants
Swimming pool
Gymnasium, fitness centre

Quantity Surveyor To be appointed


Contractor To be appointed

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / acoustical ceiling
Walling : precast concrete panel
Facade : glass wall cladding / decorative cladding
Aluminium framed doors & windows / solid wood
doors
Roofing : concrete slab roof
Lifts
Duct connected air conditioning / split type air
conditioning
Fire protection system
Security system
Sanitary ware / plumbing
Building automation system
Estimated cost: Rp133.30 bn (US$9.65 mn).
Construction is expected to start in early March 2017.
Construction is expected to end in early December 2017.
Kondotel 20 lantai dan 6 lantai gedung parkir dengan total
luas bangunan sekitar 22.410 meter persegi. Perkiraan
biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan
Hotel Operator To be appointed
Architect Piter Gan Architect PT - Jakarta
Contact Mr Piter Gan (Director)
62 21 765 1781
f 62 21 765 2875
Email: pg@pitergan.com
Website: www.pitergan.com/
Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta
Selatan, 12150, Jakarta, Indonesia
Contact Mr Raymond Wibisono (Architect)
62 21 765 1781
f 62 21 765 2875
Email: jkt@pitergan.com
Website: www.pitergan.com/
Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta
Selatan, 12150, Jakarta, Indonesia
Structural Engineer To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

PROJECT CATEGORY

Hotel/ Recreation/ Retail

Residential/ Recreation/ Retail/ Car Park

PROJECT STAGE

Concept

PROJECT CODE

PROJECT STAGE

145474002

Concept

FAME HOTEL TEGAL (2 STARS)


Site yet to be determined, Tegal, Central Java

PROJECT CODE

144169002

GREEN OSO CITY - APARTMENTS


Jalan Metro Tanjung Bunga, Kecamatan Tamalate,
Makassar, South Sulawesi

4 storey hotel building (approx. 4,000 sq m)


up to 90 hotel rooms
Lobby & reception lounge
Dining & restaurant
Swimming pool

Estimated cost: undisclosed.


Construction timetable is to be determined.

35 storey apartment building (approx 35,000 sq m)


At grade car park
Apartment lobby & reception lounge
Ground floor retail shops & restaurants
Swimming pool
Gymnasium, fitness centre, spa, sauna
City walk, caf, convenience store, alfresco dining

Estimated cost: undisclosed.

Hotel 4 lantai dengan luas bangunan sekitar 4.000 meter


persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi
belum ditentukan.

Construction is expected to start in early January 2017. A


completion date is to be determined.

Developer Paramount Enterprise International PT


Contact Mr Norman Daulay (General Manager)
62 21 5420 0888 /
f 62 21 547 4335
5420 0999
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading Serpong
Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810,
Banten, Indonesia

Apartemen 35 lantai, dengan luas bangunan sekitar 35.000


meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi
diharapkan mulai Januari 2017. Waktu penyelesaian belum
ditentukan.
Developer Citra Putra Mandiri PT (OSO Group)
Contact Ms Myrani Isnaniati (President Director)
62 21 3199 6270 /
f 62 21 3199 6268 /
3199 6276
3199 6231
Website: www.cpm.co.id
The City Tower 18th floor, Jalan M.H. Thamrin No. 81,
Jakarta Pusat, 10350, Jakarta, Indonesia

Contact Mr Mohammad Zazuli (Staff of Planning Division)


62 21 5420 0888 /
f 62 21 547 4335
5420 0999
Email: mohamad.zazuli@paramount-land.com
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading Serpong
Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810,
Banten, Indonesia

Contact Mr Raja Sapta Ervian (Director)


62 21 3199 6270 /
f 62 21 3199 6268 /
3199 6276
3199 6231
Website: www.cpm.co.id
The City Tower 18th floor, Jalan M.H. Thamrin No. 81,
Jakarta Pusat, 10350, Jakarta, Indonesia

Hotel Operator Parador Hotels and Resorts


Contact Ms Pramita Sari Setiawan (Corporate Marketing
Communication Manager)
62 21 292 15999 / 291
f 62 21 292 16999
71111
Email: info@parador-hotels.com
Website: www.parador-hotels.com
Atria Residences Building, Lobby Level, CBD Gading
Serpong Lot #5,Jalan Boulevard Gading Serpong, Kabupaten
Tangerang, 15810, Banten, Indonesia

Contact Ms Nani Nadia (Secretary)


62 21 3199 6270 /
f 62 21 3199 6268 /
3199 6276
3199 6231
Website: www.cpm.co.id
The City Tower 18th floor, Jalan M.H. Thamrin No. 81,
Jakarta Pusat, 10350, Jakarta, Indonesia
Architect To be appointed

Architect To be appointed

Structural Engineer To be appointed

Structural Engineer To be appointed

Mechanical & Electrical Engineer To be appointed

Mechanical & Electrical Engineer To be appointed

Quantity Surveyor To be appointed

Contractor To be appointed

Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

PROJECT CATEGORY

Hotel/ Retail/ Recreation

Hotel/ Retail/ Recreation/ Car Park

PROJECT STAGE

Concept

PROJECT CODE

PROJECT STAGE

145461002

Concept

HARPER HOTEL SOLO (4 STARS)


Site yet to be determined, Surakarta, Central Java

PROJECT CODE

144916002

HOTEL AT JALAN PEMUDA - SURABAYA


Jalan Pemuda No. 17, Surabaya, East Java

10 storey hotel building (approx. 6,600 sq m)


up to 150 hotel rooms
Hotel lobby & reception area
Dining & restaurant
Swimming pool
Single basement level car park

19 storey hotel (approx 26,500 sq m)


Up to 180 hotel rooms
Hotel lobby & reception lounge
Dining & restaurant
Banquet & function room
Swimming pool
At grade car park

Estimated cost: undisclosed.


Building elements include:
Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / acoustical ceiling
Walling : light brick walls
Facade : glass wall cladding / aluminium composite
cladding
Roofing : concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors
Piling : bored pile / precast pile / tube pile
Lifts
Duct connected air conditioning
Fire protection system
Security system
Sanitary ware
Building automation system

Construction is expected to start in late June 2016. A


completion date is to be determined.
Bangunan hotel 10 lantai dan satu level basement, dengan
luas bangunan sekitar 6.600 meter persegi. Perkiraan biaya:
tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016.
Waktu penyelesaian belum ditentukan.
Hotel Operator Archipelago International (formerly Aston
International Indonesia)
Contact Ms Nurulita Amalia (Corporate Director of
Purchasing)
62 21 831 8800
f 62 21 831 7180
Website: www.archipelagointernational.com
Wisma Staco, 3rd Floor Suite 100, Jalan Casablanca
Kavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia
Contact Mr William Cornellius (Head of Project Department
- Design Coordinator)
62 21 831 8800
f 62 21 831 7180
Email: willyam.k@archipelagointernational.com
Website: www.archipelagointernational.com
Wisma Staco, 3rd Floor Suite 100, Jalan Casablanca
Kavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia

Estimated cost: undisclosed.


Construction is expected to start in early September 2016.
Construction is expected to end in early September 2017.

Architect To be appointed

Bangunan hotel 19 lantai dengan luas bangunan sekitar


26.500 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai September 2016 dan selesai
September 2017.

Structural Engineer To be appointed

Hotel Operator To be appointed

Mechanical & Electrical Engineer To be appointed

Architect Piter Gan Architect PT - Jakarta


Contact Mr Piter Gan (Director)
62 21 765 1781
f 62 21 765 2875
Email: pg@pitergan.com
Website: www.pitergan.com/
Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta
Selatan, 12150, Jakarta, Indonesia

Contractor To be appointed

Contact Mr Raymond Wibisono (Architect)


62 21 765 1781
f 62 21 765 2875
Email: jkt@pitergan.com
Website: www.pitergan.com/
Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta
Selatan, 12150, Jakarta, Indonesia
Structural Engineer To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

Education and Research


HOTEL AT JALAN PEMUDA - SURABAYA (continued...)

PROJECT STAGE

Concept
Mechanical & Electrical Engineer To be appointed

PROJECT CODE

142564002

INSTITUT AGAMA ISLAM NEGERI (IAIN)


TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU
HUKUM (FASIH)
Jalan Mayor Sujadi Timur No. 46, Tulungagung, East
Java

Quantity Surveyor To be appointed


Contractor To be appointed

4 storey campus building (approx 4,500 sq m)


Classrooms
Lecturer rooms
Administration room

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : steel frame
Aluminium framed doors & windows / fabricated
wood doors
Sanitary ware / plumbing
Estimated cost: undisclosed.
Construction is expected to start in late August 2016.
Construction is expected to end in late December 2016.
Gedung kampus 4 lantai terdiri dengan luas bangunan sekitar
4.500 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai Agustus 2016 dan selesai
Desember 2016.
Developer Institut Agama Islam Negeri Tulungagung
Contact Mr Saifudin Zuhri (Wakil Rektor Bidang
Administrasi Umum, Keuangan & Perencanaan)
62 355 321 513
f 62 355 321 656
Email: info@stain-tulungagung.ac.id
Website: www.iain-tulungagung.ac.id
Jalan Mayor Sujadi Timur No. 46, Plosokandang,
Tulungagung, 66221, East Java, Indonesia
Supervisory Consultant To be appointed
Architect Alco Art Studio Consultant PT
Contact Mr Ir. Gunawan ,MT, IAI (Director - Principal
Architect)
62 31 847 0138 / 841
f 62 31 841 0149
0149
Email: alco_sby@yahoo.com
Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239,
East Java, Indonesia
Contact Mr Ir. Mohamad Sjamsul Arifin (Team Leader)
62 31 847 0138 / 841
f 62 31 841 4549
4549
Email: alco_sby@yahoo.com
Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239,
East Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


PROJECT CATEGORY

Utilities/ Infrastructure
INSTITUT AGAMA ISLAM NEGERI (IAIN)
TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU
HUKUM (FASIH) (continued...)

PROJECT STAGE

Concept

PROJECT CODE

121308002

JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP BANTEN


Desa Terate, Kecamatan Kramatwatu, Serang, Banten

Construction Manager Etika Prana PT


Contact Mr Chasan Hindaroh (Director - Project Coordinator)
62 31 594 2677 / 594
f 62 31 594 1598
1598
Email: etika_9000@yahoo.com
Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya,
60285, East Java, Indonesia

Contact Mr Iqbal Ibnu Rosyid (Team Leader)


62 31 594 2677 / 594
f 62 31 594 1598
1598
Email: etika_9000@yahoo.com
Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya,
60285, East Java, Indonesia

Coal fired steam power plant (capacity of 2 x 1,000


MW)
Turbine house
Boiler house with steel structure
Chimney
Electrical system
Jetty & trestle
Oil tanks
Seal pit
Coal handling system
Cooling water system

Estimated cost: undisclosed.

Contractor To be appointed

Construction is expected to start in early June 2017.


Construction is expected to end in early January 2019.
Pembangkit listrik tenaga uap batubara dengan kapasitas 2 x
1.000 megawatt. Perkiraan biaya : tidak dinyatakan.
Konstruksi diharapkan mulai Juni 2017 dan selesai Januari
2019.
Concessionaire Pembangkitan Jawa Bali PT
Contact Mr Mulyo Adji (Development & Commercial
Director)
62 31 828 3180 - 828
f 62 31 829 1280
3186
Email: info@ptpjb.com
Website: www.ptpjb.com
Jalan Ketintang Baru No 11, Surabaya, 60231, East Java,
Indonesia
Regulator Perusahaan Listrik Negara (Persero) PT - Unit
Induk Pembangunan VIII
Contact Mr Pudjo Santoso (General Manager)
62 31 829 1377
f 62 31 828 8959 / 829
1538
Email: uip8@pln-uip-ktjb.co.id
Website: www.pln.co.id/uipkitthermaljb
Jalan Ketintang Baru I No. 1-3, Surabaya, 60231, East
Java, Indonesia
Perusahaan Listrik Negara (Persero) PT
Contact Mr Iwan Purwana (Head of Strategic Procurement
Division)
62 21 726 1122 / 726
f 62 21 722 7025 / 722
1875
7060
Email: kontakkami@pln.co.id
Website: www.pln.co.id
Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,
Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

Sample Project of The Month


JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP BANTEN (continued...)

JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP BANTEN (continued...)

Contact Mr Hernadi Buhron (Head of IPP Division)


62 21 726 1122 / 726
f 62 21 722 7025 / 722
1875
7060
Email: kontakkami@pln.co.id
Website: www.pln.co.id
Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,
Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia

Intimulya Multikencana PT
Contact Mr Ir. H. Suhardi (Direktur Utama)
62 22 780 3787
f 62 22 783 4961
Email: intimulyamultikencana@ymail.com
Komplek Ujung Berung Indah Blok 7 No. 7, Bandung,
40613, West Java, Indonesia
Royal Haskoning DHV
Contact Mr Wybe de Jager (Director)
62 21 750 4605
f 62 21 750 4610
Email: info@id.rhdhv.com
Website: www.royalhaskoningdhv.com
Ventura Building 2nd floor, Jalan R.A. Kartini No. 26
(Outer Ring Road) Cilandak, Jakarta Selatan, 12430, Jakarta,
Indonesia

Loan Agency To be appointed


Investor China Shenhua Energy Co.,Ltd
Contact Mr Wang Shumin (Vice President)
86 10 5813 1088
f 86 10 5813 1804
Email: ir@csec.com
Website: www.csec.com
No.22 Xibinhe Road Andingmen, Dongcheng District,
Beijing, China

Surveyor Indonesia PT
Contact Mr M. Arief Zainuddin (President Director)
62 21 526 5526 / 526
f 62 21 526 5525
3333 / 526 51591
Email: pt.surveyor@asia.com
Website: www.ptsi.co.id
Graha Surveyor Indonesia, Jalan Jendral Gatot Subroto
Kavling 56, Jakarta Selatan, 12950, Jakarta, Indonesia

Environmental Impact Assessment To be appointed


Remarks: The tenderers are listed in alphabetical order
Bidders include:
Adi Banuwa PT - Operational Office
Contact Mrs Yuliana Andriani (Director)
62 31 841 2536 / 841
f 62 31 841 2517
2543
Email: ptadibanuwa@yahoo.com
Ruko Panji Makmur Blok C No. 11, Jalan Raya Panjang
Jiwo, Surabaya, 60400, East Java, Indonesia

Tender Office Perusahaan Listrik Negara (Persero) PT


Contact Mr Kuswara Harjowijaya (Secretary of Procurement
Committee)
62 21 722 7049
f 62 21 722 7025 / 722
7060
Email: kontakkami@pln.co.id
Website: www.pln.co.id
Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,
Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia

Gelar Buana Semesta PT


Contact Mr Ardi Efendi Saleh (Director)
Not available
f Not available
Email: gelarbuanasemesta@gmail.com
Jalan Mentor No. 62, Sukaraja, Bandung, 40172, West
Java, Indonesia

EPC Contractor To be appointed

Nusa Buana Cipta PT


Contact Mr Dwisatya H (Staff of Marketing Division)
62 21 830 3718
f 62 21 830 3718
Email: pemasaran@nusabuanacipta.com
Jalan Tebet Utara IB No 3, Tebet, Jakarta Selatan, 12810,
Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

10

Sample Project of The Month


PROJECT CATEGORY

PROJECT CATEGORY

Infrastructure

Education and Research

PROJECT STAGE

Concept

PROJECT CODE

PROJECT STAGE

145664002

Concept

KALI WONOKROMO RIVER NORMALIZATION SURABAYA


Kali Wonokromo, Surabaya, East Java

PROJECT CODE

116747002

KOTA BARU PARAHYANGAN (PHASE 2) MARANATHA UNIVERSITY


Kota Baru Parahyangan, Bandung, West Java

River normalization (approx. 1.5 km length)


Dredging work
Civil works

4 storey university building (approx 12,000 sq m)


Classrooms
Lecturer rooms
Administration room

Estimated cost: Rp58.96 bn (US$4.27 mn).


Building elements include:
Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / acoustical ceiling
Walling : precast concrete panel
Roofing : concrete slab roof
Roof truss : steel frame
Aluminium framed doors & windows / solid wood
doors
Split type air conditioning
Sanitary ware / plumbing

Work is expected to start in early April 2016. Work is


expected to end in late July 2016.
Pekerjaan normalisasi sungai sepanjang 1,5 kilometer,
meliputi: pengerukan sungai dan pelebaran sungai.
Perkiraan biaya: Rp 58,96 milyar. Pekerjaan diharapkan
mulai April 2016 dan selesai Juli 2016.
Government Implementing Agency Kementerian Pekerjaan
Umum dan Perumahan Rakyat - SNVT Pelaksanaan Jaringan
Sumber Air Brantas
Contact Mr Ir. Achmad Fauzi, MT (Project Manager)
62 31 752 1645
f 62 31 752 1645
Jalan Menganti No. 312, Wiyung, Surabaya, 60227, East
Java, Indonesia

Estimated cost: Rp42.00 bn (US$3.23 mn).


Construction is expected to start in early July 2016.
Construction is expected to end in late December 2017.

Contact Mr Arianto, ST. MT (Team Leader - PPK. Irigasi


Rawa 2)
62 31 752 1645
f 62 31 752 1645
Jalan Menganti No. 312, Wiyung, Surabaya, 60227, East
Java, Indonesia

Gedung kampus 4 lantai dengan luas bangunan sekitar


12.000 meter persegi. Perkiraan biaya: Rp 42 milyar.
Konstruksi diharapkan mulai Juli 2016 dan selesai Desember
2017.
Developer Belaputera Intiland PT
Contact Mr Ryan Brasali (General Manager)
62 22 680 3777 / 680
f 62 22 680 7555
8022
Email: teknik@kotabaruparahyangan.com
Website: www.kotabaruparahyangan.com
Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta,
Home and Living Centre, Kota Baru Parahyangan, Bandung
Barat, 40553, West Java, Indonesia

Contact Mr Dasniar (Project Coordinator)


62 31 752 1645
f 62 31 752 1645
Jalan Menganti No. 312, Wiyung, Surabaya, 60227, East
Java, Indonesia
Supervisory Consultant To be appointed
Civil Engineer To be appointed
Tender Office To be appointed

Contact Mr Sugiharto Subagjo (Project Coordinator /


Architect)
62 22 8681 3837 / 680
f 62 22 680 7555
3333 / 680 7888
Email: tehnik@kotabaruparahyangan.com
Website: www.kotabaruparahyangan.com
Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta,
Home and Living Centre, Kota Baru Parahyangan, Bandung
Barat, 40553, West Java, Indonesia

Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

11

Sample Project of The Month


KOTA BARU PARAHYANGAN (PHASE 2) MARANATHA UNIVERSITY (continued...)

KOTA BARU PARAHYANGAN (PHASE 2) MARANATHA UNIVERSITY (continued...)

Yayasan Maranatha Bandung


Contact Mr Beng Sugiharto (Ketua Yayasan)
62 22 201 2186 / 200
f 62 22 200 7916
7916
Email: info@maranatha.edu
Website: www.maranatha.edu
Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,
West Java, Indonesia

Contact Mr Mario Andreti (Project Architect & Construction


Manager)
62 274 880 637
f 62 274 887 778
Email: adm_globalrancangselaras@yahoo.com
Website: www.globalrancangselaras.com
Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI
Yogyakarta, Indonesia

Belaputera Intiland PT
Contact Mr Viki Auliya (Architect)
62 22 8681 3837 / 680
f 62 22 680 7555
3333 / 680 7888
Email: viki.auliya@kotabaruparahyangan.com
Website: www.kotabaruparahyangan.com
Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta,
Home and Living Centre, Kota Baru Parahyangan, Bandung
Barat, 40553, West Java, Indonesia

Contact Mrs Dian (Staff Officer)


62 274 880 637
f 62 274 887 778
Email: adm_globalrancangselaras@yahoo.com
Website: www.globalrancangselaras.com
Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI
Yogyakarta, Indonesia
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed

Yayasan Maranatha Bandung


Contact Ms Cindy (Administrator / General Staff)
62 22 201 2186 / 200
f 62 22 200 7916
7916
Email: info@maranatha.edu
Website: www.maranatha.edu
Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,
West Java, Indonesia

Quantity Surveyor To be appointed


Piling Contractor To be appointed
Contractor To be appointed

Master Planner Townland International PT


Contact Mr Johannes Spies (Director)
62 21 2941 0621
f 62 21 2941 0622
Email: tcljkt@townland.com
Website: www.townland.com
Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna Said
Blok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950,
Jakarta, Indonesia
Contact Ms Farida Devi Kurniati (Senior Urban Designer)
62 21 2941 0621
f 62 21 2941 0622
Email: farida.devi@townland.com
Website: www.townland.com
Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna Said
Blok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950,
Jakarta, Indonesia
Architect Global Rancang Selaras PT
Contact Mr Adi Utomo Hatmoko (Principal Architect)
62 274 880 637
f 62 274 887 778
Email: adm_globalrancangselaras@yahoo.com
Website: www.globalrancangselaras.com
Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI
Yogyakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

12

Sample Project of The Month


PROJECT CATEGORY

PROJECT CATEGORY

Infrastructure

Residential/ Health

PROJECT STAGE

Concept

PROJECT CODE

PROJECT STAGE

145544002

Concept

PATIHAN MADIUN BRIDGE DEVELOPMENT


Desa Patihan, Kecamatan Manguharjo, Madiun, East
Java

PROJECT CODE

141195002

RSUD WATES HOSPITAL - DORMITORY


Jalan Tentara Pelajar Km 1 No. 5 Wates, Kulon Progo,
DI Yogyakarta

Bridge construct (35 m length x 10 m width)


Reinforced concrete bridge
Bridge abutment
Girder bridge
Bridge approach slab
Bridge safety barriers

3 storey dormitory building (approx. 3,000 sq m)


Up to 20 dormitory rooms
Multipurpose room

Estimated cost: undisclosed.


Construction is expected to start in early September 2016.
Construction is expected to end in early December 2016.

Estimated cost: undisclosed.

Bangunan asrama 3 lantai, dengan luas bangunan sekitar


3.000 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai September 2016 dan selesai
Desember 2016.

Work is expected to start in early July 2016. Work is expected


to end in late December 2016.
Pembangunan jembatan struktur beton bertulang dengan
total panjang sekitar 35 meter dan lebar 10 meter. Perkiraan
biaya: tidak dinyatakan. Pekerjaan diharapkan mulai Juli
2016 dan selesai Desember 2016.

Developer Rumah Sakit Umum Daerah (RSUD) Wates


Contact Ms Lies Indriyati (Director - Kuasa Pengguna
Anggaran)
62 274 773 169
f 62 274 773 092
Email: rsud@kulonprogokab.go.id
Website: www.rsud.kulonprogokab.go.id
Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo,
55611, DI Yogyakarta, Indonesia

Government Implementing Agency Dinas Pekerjaan Umum


Kota Madiun
Contact Mr Ir. Danardono (Head Officer)
62 351 471 151
f 62 351 496 541
Website: www.portal.madiunkota.go.id
Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java,
Indonesia

Contact Mr drg.Agung Sugiarto, M.Kes (Project Coordinator


- Kabag administrasi dan Umum)
62 274 773 169
f 62 274 773 092
Email: rsud@kulonprogokab.go.id
Website: www.rsud.kulonprogokab.go.id
Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo,
55611, DI Yogyakarta, Indonesia

Contact Mr Thariq Megah (Kepala Seksi Pemeliharaan Jalan


dan Jembatan)
62 351 471 151
f 62 351 496 541
Website: www.portal.madiunkota.go.id
Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java,
Indonesia

Supervisory Consultant To be appointed


Supervisory Consultant To be appointed
Master Planner Pola Data Consultant PT
Contact Mr Nufrizal F Hanafi (Director - Project Manager)
62 274 433 3680 / 747
f 62 274 433 3680
8764 / 719 4529
Email: pola_data@yahoo.com
Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo,
Depok, Sleman, 55283, DI Yogyakarta, Indonesia

Civil Engineer To be appointed


Bridge Contractor To be appointed

Contact Mr Eko Sulistiatmojo (Architect)


62 274 433 3680 / 747
f 62 274 433 3680
8764 / 719 4529
Email: pola_data@yahoo.com
Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo,
Depok, Sleman, 55283, DI Yogyakarta, Indonesia
Architect To be appointed
Structural Engineer To be appointed
Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

13

Sample Project of The Month


PROJECT CATEGORY

PROJECT CATEGORY

Industrial

Industrial

PROJECT STAGE

PROJECT CODE

Concept

PROJECT STAGE

144316002

Concept

SAMPOERNA AGRO CPO FACTORY KALIMANTAN BARAT


Site yet to be determined, West Kalimantan

PROJECT CODE

144541002

SIDO MUNCUL FOOD NUTRITION FACTORY SLEMAN


Sleman, DI Yogyakarta

Crude palm oil plant (capacity of 30 tph)


Mechanical work
Conveyor lines
Workshop

Single storey food nutrition factory (approx 25,000 sq


m)
Mechanical work
Production lines
Quality control room

Estimated cost: undisclosed.


Estimated cost: undisclosed.
Construction timetable is to be determined.
Construction is expected to start in early January 2017.
Construction is expected to end in late December 2017.

Pabrik pengolahan kelapa sawit dengan kapasitas produksi


30 ton buah tandan segar per jam. Perkiraan biaya: tidak
dinyatakan. Waktu konstruksi belum ditentukan.

Bangunan pabrik nutrisi makanan satu lantai, dengan luas


bangunan sekitar 25.000 meter persegi. Perkiraan biaya:
tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017
dan selesai Desember 2017.

Developer Sampoerna Agro, Tbk PT


Contact Mr Michael Kesuma (Head of Investor Relation)
62 21 577 1711 / 577
f 62 21 577 1712 / 577
0886
0015
Website: www.sampoernaagro.com
Sampoerna Strategic Square, North Tower 28 Floor, Jalan
Jendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,
Jakarta, Indonesia

Developer Sido Muncul Tbk PT - Semarang Factory Office


Contact Mr Irwan Hidayat (President Director)
62 298 523 515
f 62 298 523 509
Email: simuncul@indosat.net.id
Website: www.sidomuncul.com
Jalan Soekarno Hatta Km. 28, Kelurahan Klepu,
Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia

Contact Mr Elman Salim (Project Head of Engineering


Department)
62 21 577 1711 / 577
f 62 21 577 1712 / 577
0886
0015
Email: elman.salim@sampoernaagro.com
Website: www.sampoernaagro.com
Sampoerna Strategic Square, North Tower 28 Floor, Jalan
Jendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,
Jakarta, Indonesia

Contact Mr Stefanus Agus Triharyanto (Head of Building


Division)
62 298 523 515
f 62 298 523 509
Email: simuncul@indosat.net.id
Website: www.sidomuncul.com
Jalan Soekarno Hatta Km. 28, Kelurahan Klepu,
Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia
Architect To be appointed

Contact Mr Oke (Staff of Engineering Division)


62 21 577 1711 / 577
f 62 21 577 1712 / 577
0886
0015
Website: www.sampoernaagro.com
Sampoerna Strategic Square, North Tower 28 Floor, Jalan
Jendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,
Jakarta, Indonesia

Structural Engineer To be appointed


Mechanical & Electrical Engineer To be appointed
Piling Contractor To be appointed
Contractor To be appointed

EPC Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

14

Sample Project of The Month


PROJECT CATEGORY

Hotel/ Recreation/ Retail


PROJECT STAGE

Concept

THE RITZ CARLTON RESORTS AND SPA (5 STARS)


- TANAH LOT (continued...)

PROJECT CODE

103509002

THE RITZ CARLTON RESORTS AND SPA (5 STARS)


- TANAH LOT
Jalan Tanah Lot, Tabanan, Bali

Hotel Operator The Ritz-Carlton Hotel Company L.L.C.


Contact Mrs Ainslie Cheung (Regional Director)
852 2192 6207
f 852 2192 6073
Email: rc.hkgkw.leads@ritzcarlton.com
Website: www.ritzcarlton.com
Suite 701, 7/F, 1063 King's Road, Hong Kong, Hong
Kong, Hong Kong SAR

4 storey hotel building (approx 20,000 sq m)


Up to 200 hotel rooms
Hotel lobby & reception area
Dining & restaurant
Swimming pool

Architect Ground Kents Architect (GKA) Indonesia PT


Contact Mr Marthin Grounds (Principal)
62 361 703 517 / 703
f 62 361 703 652
518
Email: info@gkabali.com
Website: www.gkabali.com
Kawasan Bukit Permai, Mimpi Resort, Jimbaran, Badung,
80361, Bali, Indonesia

Project deferred indefinitely


Building elements include:
Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows / solid wood
doors
Lifts
Split type air conditioning / duct connected air
conditioning
Sanitary ware / plumbing
Fire protection system
Security system
Building automation system

Interior Designer Jaya Ibrahim, Jaya & Associates


Contact Mrs Xaviera (Interior Designer)
65 6645 3575
f 65 6645 3599
Email: info@jayainternational.com
Website: www.jayainternational.com
115 Amoy Street #02-03, Singapore,
Singapore 069935
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed

Estimated cost: undisclosed.

Quantity Surveyor To be appointed

Construction timetable is to be determined.

Contractor To be appointed

Pembangunan hotel 4 lantai terdiri dari 200 kamar hotel,


dengan luas bangunan sekitar 20.000 meter persegi.
Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum
ditentukan.
Developer Ciputra Property Tbk PT
Contact Mr Artha Dinata Zakar (Director)
62 21 2988 8898 /
f 62 21 2988 8899
5292 0982 / 2988 5858
Email: investor@ciputra.com
Website: www.ciputraproperty.com
Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940,
Jakarta, Indonesia
Contact Mr Antonius Andes (Staff of Project Division)
62 21 2988 8898 /
f 62 21 2988 8899
5292 0982 / 2988 5858
Email: investor@ciputra.com
Website: www.ciputraproperty.com
Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940,
Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

15

Sample Project of The Month


PROJECT CATEGORY

PROJECT CATEGORY

Hotel/ Recreation/ Retail

Residential

PROJECT STAGE

Concept

PROJECT CODE

PROJECT STAGE

145484002

Design

VEGA HOTEL YOGYAKARTA


Site yet to be determined, Yogyakarta, DI Yogyakarta

PROJECT CODE

138879002

CITI ALIT VILLA RESIDENCE - RESIDENTIAL


Jalan Raya Goa Gong, Mangupura, Badung, Bali

4 storey hotel building (approx. 4,000 sq m)


Up to 90 hotel rooms
Restaurant
Lobby & reception lounge
Swimming pool

200 x 2 storey residential houses (approx. 120 sq m


each)
Units to have 4 bedrooms
Internal road network
Gated entrance

Estimated cost: undisclosed.

Building elements include:


Flooring : homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile / concrete slab roof
Roof truss : lightweight steel
Timber framed doors & windows / solid wood doors

Construction timetable is to be determined.


Hotel 4 lantai dengan luas bangunan sekitar 4.000 meter
persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi
belum ditentukan.
Hotel Operator Parador Hotels and Resorts
Contact Mr Ricky Theodores (Chief Operating Officer)
62 21 292 15999 / 291
f 62 21 292 16999
71111
Email: info@parador-hotels.com
Website: www.parador-hotels.com
Atria Residences Building, Lobby Level, CBD Gading
Serpong Lot #5,Jalan Boulevard Gading Serpong, Kabupaten
Tangerang, 15810, Banten, Indonesia

Estimated cost: undisclosed.


Construction is expected to start in early March 2017.
Construction is expected to end in late March 2018.
Kawasan perumahan meliputi 200 unit rumah 2 lantai,
masing-masing dengan tipe luas bangunan sekitar 120 meter
persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi
diharapkan mulai Maret 2017 dan selesai Maret 2018.

Contact Ms Pramita Sari Setiawan (Corporate Marketing


Communication Manager)
62 21 292 15999 / 291
f 62 21 292 16999
71111
Email: info@parador-hotels.com
Website: www.parador-hotels.com
Atria Residences Building, Lobby Level, CBD Gading
Serpong Lot #5,Jalan Boulevard Gading Serpong, Kabupaten
Tangerang, 15810, Banten, Indonesia

Developer Citi Alits Cipta PT


Contact Mr Samuel (Staff of Project Division)
62 361 474 3060 / 474
f Not available
3062
Email: info@citialitswisata.com
Website: www.citialitswisata.com
Jalan Letda Tantular No. 90, Renon, Denpasar, 80226, Bali,
Indonesia

Architect To be appointed

Master Planner Johanes Architects


Contact Mr Dipl. Ing. Johanes A Kurnia (Director)
62 21 5890 3517 /
f 62 21 5890 3517 / 587
9826 5429
2482
Email: office@johanesarchitects.com
Website: www.johanesarchitects.com
Jalan Rubi Garden I/16 (Permata Mediterania), Pos
pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,
Jakarta, Indonesia

Structural Engineer To be appointed


Mechanical & Electrical Engineer To be appointed
Contractor To be appointed

Architect Johanes Architects


Contact Mr Dipl. Ing. Johanes A Kurnia (Director)
62 21 5890 3517 /
f 62 21 5890 3517 / 587
9826 5429
2482
Email: office@johanesarchitects.com
Website: www.johanesarchitects.com
Jalan Rubi Garden I/16 (Permata Mediterania), Pos
pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,
Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

16

Sample Project of The Month


PROJECT CATEGORY

Residential
CITI ALIT VILLA RESIDENCE - RESIDENTIAL
(continued...)

PROJECT STAGE

Design

PROJECT CODE

136313002

CITRALAND CITY LOSARI MAKASSAR - SUNSET


COVE CLUSTER
Centre Point of Indonesia, Losari, Makassar, South
Sulawesi

Contact Mr Agung R (Senior Architect)


62 21 5890 3517 /
f 62 21 5890 3517 / 587
9826 5429
2482
Email: a6ung_r@yahoo.co.id
Website: www.johanesarchitects.com
Jalan Rubi Garden I/16 (Permata Mediterania), Pos
pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,
Jakarta, Indonesia

Structural Engineer To be appointed


Mechanical & Electrical Engineer To be appointed

139 x 2 storey residential houses (3 types of houses :


120 sq m, 200 sq m & 240 sq m)
Units to have 3 & 4 bedrooms
Internal road network
Gated entrance
Communal garden
Perimeter fence walls

Please find more information at


www.citralandcitymakassar.com

Contractor To be appointed

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete slab roof / metal sheet roofing
Roof truss : lightweight steel
Aluminium framed doors & windows / fabricated
wood doors
Sanitary ware / plumbing
Estimated cost: undisclosed.
Construction is expected to start in early June 2016.
Construction is expected to end in late December 2017.
Kawasan perumahan meliputi 139 unit rumah 2 lantai,
dengan 3 tipe luas bangunan sekitar 120, 200 dan 240 meter
persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi
diharapkan mulai Juni 2016 dan selesai Desember 2017.
Developer Ciputra Fajar Mitra PT (aka Ciputra Group)
Contact Mr Tony Kustono (General Manager - Joint
Operation Ciputra Fajar Mitra PT - Yasmin Bumi Asri PT)
62 411 822 2288 / 822
f 62 411 822 2299
2299
Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232,
South Sulawesi, Indonesia
Contact Mr Abdul Hakim (Inhouse Architect - Staf of
Planning Division)
62 411 822 2288 / 822
f 62 411 822 2299
2299
Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232,
South Sulawesi, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

17

Sample Project of The Month


PROJECT CATEGORY

Hotel/ Recreation/ Retail


CITRALAND CITY LOSARI MAKASSAR - SUNSET
COVE CLUSTER (continued...)

PROJECT STAGE

Design

PROJECT CODE

135317002

LOMBOK EPICENTRUM - HOTEL (4 STARS)


Jalan Sriwijaya, Mataram, West Nusa Tenggara

Yasmin Bumi Asri PT


Contact Mr Adityawarman M Kouwagam (Director)
Not available
f Not available
Jalan Kakatua II, Makassar, 90133, South Sulawesi,
Indonesia
(For enquiry, please contact by Mail.)

Citraland City Makassar


Contact Mr Cipta Harun (Manager - Citraland City Makassar
Project)
62 411 873 625
f 62 411 873 625
Email: citralandcitymakassar@ciputra.co.id
Website: www.citralandcitymakassar.com
Jalan Citraland Boulevard No. 6 , Centre Point of
Indonesia, Makassar, 90224, South Sulawesi, Indonesia

16 storey hotel (approx 15,000 sq m)


400 hotel rooms
Hotel lobby & reception lounge
Dining & restaurant
Swimming pool

Project deferred indefinitely


Building elements include:
Flooring : homogeneous tile / wood flooring
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors
Piling : bored pile / precast pile
Lifts
Duct connected air conditioning
Fire protection system / security system
Sanitary ware / plumbing
Building automation system

Land Development Consultant Witteveen + Bos Consulting


Engineers
Contact Mr Sawarendro (Master Planner Engineer)
62 21 719 1282
f 62 21 719 1283
Email: info@witbo.co.id
Website: www.witteveenbos.com
Park View Plaza 6th Floor JalanTaman Kemang No. 27,
Jakarta Selatan, 12730, Jakarta, Indonesia
Architect DP Architects Pte Ltd
Contact Mr Wu Tzu Chiang (Project Director - Principal
Architect)
65 6338 3988
f 65 6337 9989
Email: dparchitects@dpa.com.sg
Website: www.dpa.com.sg
6 Raffles Boulevard #04-100 Marina Square,
Singapore 039594

Estimated cost: undisclosed.


Construction timetable is to be determined.
Bangunan hotel 16 lantai, dengan luas bangunan sekitar
15.000 meter persegi. Perkiraan biaya: tidak dinyatakan.
Waktu konstruksi tidak ditentukan.
Developer Sriwijaya Propindo Utama PT
Contact Mr Adi Putra (Project Coordinator)
62 370 631 777 / 631
f 62 370 648 129
888
Email: cs@lombokepicentrum.com
Jalan Sriwijaya, Mataram, 83121, West Nusa Tenggara,
Indonesia

Quantity Surveyor To be appointed


Earthworks Contractor Pembangunan Perumahan (Persero)
Tbk PT - Kantor Cabang VIII - Makassar
Contact Mr Fatchul Birri (Branch Manager)
62 411 887 879 / 868
f 62 411 868 692
701
Email: ptppcabang8@yahoo.com
Website: www.pt-pp.com
Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222,
South Sulawesi, Indonesia

Hotel Operator To be appointed


Investor Varindo Lombok Inti PT
Contact Mr Gede Agus Surya Primayadi (Managing Director)
62 370 635 421 / 626
f 62 370 622 5333
620 / 661 1111
Email: planning@varindolombokinti.com
Jalan Langko No 36A, Mataram, 83114, West Nusa
Tenggara, Indonesia

Contact Mr Muliadi (Staff of Procurement Division)


62 411 887 879 / 868
f 62 411 868 692
701
Email: muliadi_setiawan@yahoo.com
Website: www.pt-pp.com
Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222,
South Sulawesi, Indonesia

Contact Mrs Fauza (Architect / Technical Manager)


62 370 635 421 / 626
f 62 370 622 5333
620 / 661 1111
Email: planning@varindolombokinti.com
Jalan Langko No 36A, Mataram, 83114, West Nusa
Tenggara, Indonesia

Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

18

Sample Project of The Month


PROJECT CATEGORY

Residential/ Recreation/ Retail/ Car Park


LOMBOK EPICENTRUM - HOTEL (4 STARS)
(continued...)

PROJECT STAGE

PROJECT CODE

Design

129469002

SENTUL CITY - SENTUL GARDEN APARTMENT


(TOWER A)
Jalan M.H. Thamrin, Komplek Sentul City, Bogor, West
Java

Master Planner McKingley Team Architects


Contact Mr Sahlan Mckingley (Director - Principal
Architect)
612 9299 9779
f 612 9299 9779
Email: team@mt-architect.com
Website: www.mt-architect.com
72 Erskine St, Sydney, New South Wales NSW 2000,
Australia

Architect McKingley Team Architects


Contact Mr Sahlan Mckingley (Director - Principal
Architect)
612 9299 9779
f 612 9299 9779
Email: team@mt-architect.com
Website: www.mt-architect.com
72 Erskine St, Sydney, New South Wales NSW 2000,
Australia

16 storey apartment tower (approx 25,100 sq m)


Up to 448 apartment units
Studio type apartments (approx. 23 sq m), single
bedroom units (approx. 27 sq m), & 2 bedroom units
(approx. 48 sq m)
2 basement levels car park
Apartment lobby & reception area
Ground floor retail shops & restaurants
Swimming pool
Rooftop garden
Gym & fitness centre
Citywalk, caf & convenience store

Building elements include:


Flooring : ceramic tile / homogeneous tile / hardened
concrete floor
Structural : reinforced concrete
Ceiling : gypsum board
Walling : precast concrete panel / gypsum board
Facade : glass wall cladding / decorative cladding
Aluminium framed doors & windows / fabricated
doors
5 ifts
Split type air conditioning / duct connected air
conditioning
Pilling : bored pile
Sanitary ware / plumbing
Fire protection system
Security system
Building automation system

Contact Mrs Cory Elisabeth (Architect - Project Division)


612 9299 9779
f 612 9299 9779
Email: susan@h3architects.com.au
Website: www.mt-architect.com
72 Erskine St, Sydney, New South Wales NSW 2000,
Australia
Interior Designer To be appointed
Mechanical & Electrical Engineer To be appointed
Contractor To be appointed

Estimated cost: Rp150.60 bn (US$10.90 mn).


Construction is expected to start in early August 2016.
Construction is expected to end in late August 2018.
Apartemen 16 lantai dan 2 level basement, dengan luas
bangunan sekitar 25.100 meter persegi. Perkiraan biaya:
tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016
dan selesai Agustus 2018.
Developer Sentul City Tbk PT
Contact Mr Adi Dharmawan (Project Manager)
62 21 8792 6555
f 62 21 8792 6555
Email: adi.dharmawan@sentulcity.co.id
Website: www.sentulcity.co.id
Jalan M H Thamrin Kav.8, Sentul City, Bogor, 16810,
West Java, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

19

Sample Project of The Month


PROJECT CATEGORY

Community/ Education and Research


SENTUL CITY - SENTUL GARDEN APARTMENT
(TOWER A) (continued...)

PROJECT STAGE

Design

PROJECT CODE

145235002

UNIVERSITAS SAMUDRA - AUDITORIUM


Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,
Aceh

Contact Mr Petra Firman Pakpahan (Planning Division Staff)


62 21 8792 6555 /
f 62 21 8796 0778 /
8796 1889
8796 1777
Email: ptsc@sentulcity.co.id
Website: www.sentulcity.co.id
Gedung Graha Utama, Jalan M.H. Thamrin No. 1 Kavling
8, Sentul City, Bogor, 16810, West Java, Indonesia

Architect Kind Indonesia Architects


Contact Mr Adjie Negara (Principal Architect)
62 21 2995 9825
f 62 21 8771 0575
Email: info@kind.id
Website: www.kind.id
Citylofts Sudirman Suite 1516, Jalan K.H. Mas Mansyur
No. 121, Jakarta Pusat, 10220, Jakarta, Indonesia

3 storey auditorium building (approx 9,000 sq m)


Lobby lounge
Auditorium balcony
Equipment room

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : steel frame
Aluminium framed doors & windows / fabricated
wood doors
Sanitary ware / plumbing

Contact Ms Siti Aisah Ghani (Team Leader / Architect)


62 21 8771 6431
f 62 21 8771 6431
Email: info@kind.id
Website: www.kind.id
Jalan Komjen Polisi M. Yasin, Cimanggis, Depok, 16452,
West Java, Indonesia

Estimated cost: undisclosed.


Construction is expected to start in early April 2016.
Construction is expected to end in late November 2016.

Structural Engineer To be appointed

Gedung auditorium 3 lantai dengan luas bangunan sekitar


9.000 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai April 2016 dan selesai
November 2016.

Mechanical & Electrical Engineer To be appointed


Piling Contractor To be appointed
Contractor To be appointed

Developer Universitas Samudra


Contact Mr Drs. Bachtiar Akob, M.Pd (Rector)
62 641 426 534
f 62 641 426 535
Email: info@unsam.ac.id
Website: www.unsam.ac.id
Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,
24416, Aceh, Indonesia
Contact Mr Tuti Israyani, SP (Kasubbag Perencanaan)
62 641 426 534
f 62 641 426 535
Email: info@unsam.ac.id
Website: www.unsam.ac.id
Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,
24416, Aceh, Indonesia
Supervisory Consultant To be appointed
Architect Inochi Konsultan PT
Contact Mr Rickie Andre (Director)
62 651 29602
f Not available
Email: inochi_cv@yahoo.com
Jalan Teuku Panglima Nyak Makam No. 5, Gampong Kota
Baru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh,
Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

20

Sample Project of The Month


PROJECT CATEGORY

Hotel/ Retail/ Recreation/ Car Park


UNIVERSITAS SAMUDRA - AUDITORIUM (continued...)

PROJECT STAGE

Design
Contact Ms Cut Sri Sukma (Project Coordinator)
62 651 29602
f Not available
Email: inochi_cv@yahoo.com
Jalan Teuku Panglima Nyak Makam No. 5, Gampong Kota
Baru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh,
Indonesia

PROJECT CODE

144877002

YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA


Jalan Raya Rungkut, Surabaya, East Java

Contractor To be appointed

13 storey hotel building (approx 9,000 sq m)


Single basement level car park
Hotel lobby & reception area
Dining & restaurant
Banquet & function hall
Swimming pool

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / acoustical ceiling
Walling : precast concrete panel / gypsum board / light
brick walls
Facade : glass wall cladding / decorative cladding
Aluminium framed doors & windows / solid wood
doors
Lifts
Split type air conditioning / duct connected air
conditioning
Sanitary ware / plumbing
Fire protection system / security system
Building automation system
Estimated cost: undisclosed.
Construction is expected to start in early October 2016.
Construction is expected to end in late December 2017.
Pembangunan hotel 13 lantai dan satu level basement,
dengan luas bangunan sekitar 9.000 meter persegi. Perkiraan
biaya: tidak dinyatakan. Konstruksi diharapkan mulai
Oktober 2016 dan selesai Desember 2017.
Hotel Operator Tauzia Hotel Management
Contact Mr Armand Steinmeyer (Head of Business
Development)
62 21 526 5223 / 5296
f 62 21 526 5213
0490 ext 104
Email: development@tauzia.com
Website: www.tauzia.com
K-link Tower 25th Floor - Suite B, Jalan Jendral Gatot
Subroto Kavling 59A, Jakarta Selatan, 12950, Jakarta,
Indonesia
Architect Urbane Indonesia PT
Contact Mr Irvan P Darwis (Senior Architect)
62 22 253 1004
f 62 22 253 1024
Email: contact@urbane.co.id
Website: www.urbane.co.id
Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002,
Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java,
Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

21

Sample Project of The Month


PROJECT CATEGORY

Residential/ Hotel/ Exhibition/ Recreation/ Retail


YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA
(continued...)

PROJECT STAGE

PROJECT CODE

Documentation

116611002

AMARSVATI RESORT & CONDOTEL (5 STARS) AVANI TOWER


Jalan Raya Malimbu, Lombok Utara, West Nusa
Tenggara

Contact Mr Angga Latief (Architect)


62 22 253 1004
f 62 22 253 1024
Email: contact@urbane.co.id
Website: www.urbane.co.id
Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002,
Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java,
Indonesia

Structural Engineer To be appointed

Mechanical & Electrical Engineer To be appointed


Quantity Surveyor To be appointed
Piling Contractor To be appointed
Contractor To be appointed

14 storey apartment & hotel building (approx 18,250


sq m)
150 apartment units & hotel rooms
Studio type units, 1 bedroom units (type of units:
approx 45.43 sq m each)
Cafe & restaurant
Fitness centre & spa
Banquet & function room
Lobby & reception area
Swimming pool

Please find more information at www.amarsvati.com


Building elements include:
Flooring : marble tile / granite flooring / parquet /
carpet
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls / precast concrete panel
Roofing : concrete slab roof
Aluminium framed windows / solid wood doors
Piling : bored pile
Lifts
Split type air conditioning / duct connected air
conditioning
Fire protection system
Security system
Sanitary ware / plumbing
Building automation system
Estimated cost: undisclosed.
Construction is expected to start in early May 2016.
Construction is expected to end in late December 2017.
Kondotel 14 lantai dengan luas bangunan sekitar 18.250
meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi
diharapkan mulai Mei 2016 dan selesai Desember 2017.
Developer North Pacific Development PT (aka Pollux
Properties Indonesia)
Contact Mr Nico Purnomo Po (Chief Executive Officer)
62 21 515 1036
f 62 21 515 1037
Email: info@pollux.com.sg
Website: www.pollux.co.id
Sudirman Central Business District, Jalan Jendral Sudirman
Kavling 52-53, Indonesia Stock Exchange Building Tower II
#28-01, Jakarta Selatan, 12190, Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

22

Sample Project of The Month


AMARSVATI RESORT & CONDOTEL (5 STARS) AVANI TOWER (continued...)

AMARSVATI RESORT & CONDOTEL (5 STARS) AVANI TOWER (continued...)

Contact Ms Andriana Neysa Sutanto (Project Manager /


Architect)
62 21 515 1036
f 62 21 515 1037
Email: neysa.sutanto@pollux.com.sg
Website: www.pollux.co.id
Sudirman Central Business District, Jalan Jendral Sudirman
Kavling 52-53, Indonesia Stock Exchange Building Tower II
#28-01, Jakarta Selatan, 12190, Jakarta, Indonesia

Interior Designer Dreammetal


Contact Mr Raymon Cheng (Principal Architect)
65 9878 8687 / 9764
f Not available
0206
Email: dreammetal.id@gmail.com
Website: www.dreammetal.net
4B Boon Tiong Road #07 - 33, Singapore, Singapore
165004

Mega Citra Prima PT


Contact Undisclosed
62 21 2992 8020
f 62 21 2992 0060
Email: enquiry@amarsvati.com
Jalan M. H. Thamrin Kavling 20 - 30, The Plaza Indonesia
#45 - 1A, Jakarta Pusat, 10350, Jakarta, Indonesia

Structural Engineer Rekacipta Kinematika PT


Contact Mr Sugia Mulyana (Project Director)
62 21 8430 6407
f 62 21 8430 6407
Email: kine_cad@kinematika.com
Website: www.kinematika.com
Kawasan Niaga Citragrand, Blok R12 No. 3, Jalan
Alternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi,
17435, West Java, Indonesia

Consultant
Remarks: Furniture Consultant & Supplier
Mahakarya Warisan Nusantara PT (aka Arbor & Troy)
Contact Mr Kemal (Staff of Project Division)
62 21 719 9070
f 62 21 721 0529
Website: www.mahakarya-indonesia.com
The Papilion Kemang, Jalan Kemang Raya No. 45 AA,
Jakarta Selatan, 12730, Jakarta, Indonesia

Contact Mr Leonardi Kawidjaja (Project Manager)


62 21 8430 6407
f 62 21 8430 6407
Email: kine_cad@kinematika.com
Website: www.kinematika.com
Kawasan Niaga Citragrand, Blok R12 No. 3, Jalan
Alternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi,
17435, West Java, Indonesia

Hotel Operator Ariva Hospitality


Contact Mr Cameron Ong (Director)
65 6848 5029
f 65 6848 1083
Email: enquiries@stayariva.com
Website: www.stayariva.com
12 Tannery Road 02 - 05 HB Centre 1, Singapore,
Singapore 347722

Mechanical & Electrical Engineer Metakom Pranata PT


Contact Mr Agus Joko Triyanto (Project Coordinator)
62 21 582 3167 / 582
f 62 21 582 3168
6178
Email: mpranata.mp@gmail.com
Website: www.metakom-pranata.com
Puri Kencana Blok K7 No. 2 E - F, Kembangan, Jakarta
Barat, 11610, Jakarta, Indonesia

Contact Mr Stanley Ling (Chief Executive Officer)


65 6848 5029
f 65 6848 1083
Email: enquiries@stayariva.com
Website: www.stayariva.com
12 Tannery Road 02 - 05 HB Centre 1, Singapore,
Singapore 347722

Piling Contractor Satria Cipta Astakencana PT


Contact Mr Rudy Setyawan (Director & Project Manager)
62 361 463 451
f 62 361 462 773
Email: satria-bl@satria.famili.com
Jalan Sekar Jepun No 4 Gatot Subroto Timur, Denpasar,
80237, Bali, Indonesia

Architect Arkonin PT
Contact Mrs Sita Budi Saptawati (Architect)
62 21 736 4176
f 62 21 736 3829
Email: sbsaptawati@arkonin-id.com
Website: www.arkonin-id.com
Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro Jaya
Sektor I, Jakarta Selatan, 12330, Jakarta, Indonesia

Contractor To be appointed

Contact Ms Nadya Karina (Architect)


62 21 736 4176
f 62 21 736 3829
Email: arkonin@indo.net.id
Website: www.arkonin-id.com
Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro Jaya
Sektor I, Jakarta Selatan, 12330, Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

23

Sample Project of The Month


PROJECT CATEGORY

Residential/ Recreation/ Car Park


PROJECT STAGE

PROJECT CODE

Documentation

131227002

BANDUNG NASUTION SUPERBLOCK - APARTMENT


TOWER A (continued...)

BANDUNG NASUTION SUPERBLOCK APARTMENT TOWER A


Jalan A H. Nasution, Bandung, West Java

Contact Mr Ahmad Dani (Director & Team Leader)


62 22 540 5602 / 543
f 62 22 540 5602
3946 / 541 6631
Email: teisar_cs@yahoo.com
Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West
Java, Indonesia

27 storey apartment tower (approx. 30,000 sq m)


900 apartment units
Studio type apartments, single bedroom units & 2
bedroom units
Single basement level car park
Apartment lobby & reception lounge
Ground floor retail shops & restaurants
Swimming pool

Contact Mr Radi (Team Leader)


62 22 540 5602 / 543
f 62 22 540 5602
3946 / 541 6631
Email: teisar_cs@yahoo.com
Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West
Java, Indonesia

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : precast concrete panels / light brick wall
Facade : glass wall cladding
Roofing : concrete roof tile / concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors
Piling : mini pile / bored pile
Lifts
Sanitary ware / plumbing
Fire protection system
Security system
Building automation system

Architect Recta Optima PT


Contact Mr Hansen Setiawan (Team Leader / Architect)
62 22 727 2052
f 62 22 727 2052
Email: hansen@recta.co.id
Jalan Pratista Raya No. 49, Bandung, 40291, West Java,
Indonesia
Contact Mr Rovi (Architect)
62 22 727 2052
f 62 22 727 2052
Email: home@recta.co.id
Jalan Pratista Raya No. 49, Bandung, 40291, West Java,
Indonesia

Estimated cost: Rp152.00 bn (US$11.26 mn).

Structural Engineer Recta Optima PT


Contact Ms Paulina Jacintha (Structural Engineer)
62 22 727 2052
f 62 22 727 2052
Email: paulina@recta.co.id
Jalan Pratista Raya No. 49, Bandung, 40291, West Java,
Indonesia

Construction is expected to start in early December 2016.


Construction is expected to end in late December 2018.
Apartemen 27 lantai dan satu level basement, dengan luas
bangunan sekitar 30.000 meter persegi. Perkiraan biaya:
tidak dinyatakan. Konstruksi diharapkan mulai Desember
2016 dan selesai Desember 2018.

Mechanical & Electrical Engineer To be appointed


Piling Contractor To be appointed

Developer Robben Graha Mandiri PT


Contact Mr Benny Yoshawirja (Director / Project
Coordinator)
62 22 423 7518 / 422
f 62 22 423 9688
3237
Email: psb.square@gmail.com
Pecinan Lama No. 9, Bandung, 40111, West Java,
Indonesia

Contractor To be appointed

Environmental Impact Assessment Teisar Cipta Sarana PT


(aka Denisa Purnama CV)
Contact Ms Yunita Pusparini (Ririn) (Project Division Staff)
62 22 540 5602 / 543
f 62 22 540 5602
3946 / 541 6631
Email: teisar_cs@yahoo.com
Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West
Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

24

Sample Project of The Month


PROJECT CATEGORY

Health/ Education and Research/ Car Park


PROJECT STAGE

PROJECT CODE

Documentation

140714002

HOSPITAL - JALAN RAYA SOLO - SRAGEN


(continued...)

HOSPITAL - JALAN RAYA SOLO - SRAGEN


Jalan Raya Solo - Sragen (eks PT Palur Raya), Jaten,
Karanganyar, Central Java

Developer Gapura Mas Asri PT


Contact Mr Arya Wiryawan (Project Director)
62 271 821 363 / 821
f 62 271 821 363 / 825
800 / 825 888
405
Email: agungtex88@yahoo.com
Jalan Raya Palur Km 9,1, Karanganyar, 57771, Central
Java, Indonesia

4 storey hospital (approx. 12,000 sq m)


Inpatient care unit
Emergency unit
Polyclinic unit
Surgical unit
Medical laboratory
Medical consulting rooms
Patient medical record room
Patient recovery rooms
Obstetrics & gynaecology unit
Registration area & waiting room
Observation room
Pharmacy room
Neonatal Intensive Care Unit (NICU)
Medical equipment storage room
At grade car park

Contact Mr Yudi (Project Manager)


62 271 821 363 / 821
f 62 271 821 363 / 825
800 / 825 888
405
Email: agungtex88@yahoo.com
Jalan Raya Palur Km 9,1, Karanganyar, 57771, Central
Java, Indonesia
Architect Megatika International PT - Pos Pengumben Office
Contact Mr Joe Louis Widodo (Design Director)
62 21 5365 1221
f 62 21 5365 0880
Email: megatika@cbn.net.id
Website: www.megatika.com
Komplek Apartemen Permata Eksekutif, Gedung Kantor
Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,
Indonesia

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / acoustical ceiling
Walling : light brick walls
Facade : glass wall cladding / aluminium composite
cladding
Roofing : concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors
Lifts
Split type air conditioning / duct connected air
conditioning
Fire protection system
Security system
Sanitary ware
Building automation system

Contact Mr Frendy Martin Sudewo (Architect)


62 21 5365 1221
f 62 21 5365 0880
Email: megatika@cbn.net.id
Website: www.megatika.com
Komplek Apartemen Permata Eksekutif, Gedung Kantor
Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,
Indonesia
Structural Engineer Cipta Sukses PT
Contact Mr Anwar Susanto (Director / Project Coordinator)
62 21 5596 3655
f 62 21 5595 8211
Email: anwars@cbn.net.id
Ruko Pelangi Blok H No. 11, Taman Palem Lestari,
Cengkareng, Jakarta Barat, 11730, Jakarta, Indonesia

Estimated cost: undisclosed.

Mechanical & Electrical Engineer To be appointed

Construction is expected to start in early January 2017. A


completion date is to be determined.

Quantity Surveyor To be appointed

Bangunan rumah sakit 4 lantai dengan luas bangunan sekitar


12.000 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai Januari 2017. Waktu
penyelesaian belum ditentukan.

Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

25

Sample Project of The Month


PROJECT CATEGORY

Hotel/ Car Park/ Retail


PROJECT STAGE

PROJECT CODE

Documentation

140180002

HOTEL - JALAN SUMATERA GRESIK (3 STARS)


(continued...)

HOTEL - JALAN SUMATERA GRESIK (3 STARS)


Jalan Sumatera, Kebomas, Gresik, East Java

Architect Megatika International PT - Pos Pengumben Office


Contact Mr Joe Louis Widodo (Design Director)
62 21 5365 1221
f 62 21 5365 0880
Email: megatika@cbn.net.id
Website: www.megatika.com
Komplek Apartemen Permata Eksekutif, Gedung Kantor
Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,
Indonesia

11 storey hotel building (approx 7,800 sq m)


Up to 140 hotel rooms
Hotel lobby & reception lounge
Dining & restaurant
At grade car park

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / acoustical ceiling
Walling : light brick walls
Facade : glass wall cladding / aluminium composite
cladding
Roofing : concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors
Piling : bored pile / precast pile
Lifts
Split type air conditioning / duct connected air
conditioning
Fire protection system
Security system
Sanitary ware / plumbing
Building automation system

Contact Mr Hadijanto (Architect)


62 21 5365 1221
f 62 21 5365 0880
Email: megatika@cbn.net.id
Website: www.megatika.com
Komplek Apartemen Permata Eksekutif, Gedung Kantor
Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,
Indonesia
Structural Engineer To be appointed
Mechanical & Electrical Engineer Tritunggal Global
Mahakarya PT
Contact Mr Indra Pranaka (Project Director)
62 21 7888 1457
f 62 21 7888 1457
Email: tgm.ipi@gmail.com
Jalan Raya Lenteng Agung No. 26 A, RT 05 / RW 08,
Lenteng Agung, Jakarta Selatan, 12610, Jakarta, Indonesia

Estimated cost: undisclosed.

Quantity Surveyor To be appointed

Construction is expected to start in early December 2016.


Construction is expected to end in early November 2017.

Contractor To be appointed

Bangunan hotel 11 lantai dengan luas bangunan sekitar


7.800 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai Desember 2016 dan selesai
Desember 2017.
Developer Bumi Lingga Pertiwi PT
Contact Mr Ir. Rahmat Ridho MBA (Director)
62 31 393 0777 / 349
f 62 31 393 0666
30777
Email: gkbmanajemen@gmail.com
Website: www.blp-property.com
Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, East
Java, Indonesia
Contact Mr Yanto (Project Manager)
62 31 393 0777 / 349
f 62 31 393 0666
30777
Email: gkbmanajemen@gmail.com
Website: www.blp-property.com
Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, East
Java, Indonesia
Hotel Operator To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

26

Sample Project of The Month


PROJECT CATEGORY

Residential/ Infrastructure/ Recreation


PROJECT STAGE

PROJECT CODE

Documentation

137759002

PARAMOUNT HILLS MANADO - RESIDENCES


(continued...)

PARAMOUNT HILLS MANADO - RESIDENCES


Malalayang, Manado, North Sulawesi

Paramount Hills Manado


Contact Mr Nawawi (Associate Director)
62 813 1123 0188
f Not available
Jalan Wolter Monginsidi, Malalayang, Manado, 95115,
North Sulawesi, Indonesia

754 x 2 storey residential houses (4 types of houses :


103 sq m, 110 sq m, 161 sq m & 182 sq m)
Units to have 3 & 4 bedrooms
Internal road network
Gated entrance
Communal garden
Perimeter fence walls

Architect Paramount Enterprise International PT


Contact Mr Pramudya Djati Asmoro (Architect)
62 21 5420 0888 /
f 62 21 547 4335
5420 0999
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading Serpong
Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810,
Banten, Indonesia

Please find more information at www.paramountland.com/project/residential/335/paramount-hills-manado/


Building elements include:
Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile / concrete slab roof
Roof truss : lightweight steel
Aluminium framed doors & windows / fabricated
wood doors
Sanitary ware / plumbing

Quantity Surveyor Paramount Enterprise International PT


Contact Mr Sutikno (Staff of Purchasing Division)
62 21 5420 0888 /
f 62 21 547 4335
5420 0999
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading Serpong
Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810,
Banten, Indonesia

Estimated cost: undisclosed.

Contractor To be appointed

Construction is expected to start in early July 2016.


Construction is expected to end in early December 2018.
Kawasan perumahan meliputi 754 unit rumah 2 lantai,
dengan 4 tipe luas bangunan sekitar 103, 110, 161 dan 182
meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi
diharapkan mulai Juli 2016 dan selesai Desember 2018.
Developer Paramount Enterprise International PT
Contact Mr Aryo Tri Ananto (Technical Director)
62 21 5420 0888 /
f 62 21 547 4335
5420 0999
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading Serpong
Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810,
Banten, Indonesia
Contact Ms Esther Yuanita (Corporate Secretary / Corporate
Communication)
62 21 5420 0888 /
f 62 21 547 4335
5420 0999
Email: esthery@paramountenterprise.co.id
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading Serpong
Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810,
Banten, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

27

Sample Project of The Month


PROJECT CATEGORY

Education and Research


PROJECT STAGE

PROJECT CODE

Documentation

135128002

PELITA HARAPAN SCHOOL (continued...)

PELITA HARAPAN SCHOOL


Jalan Honggowongso, Surakarta, Central Java

Local Architect Prima Detailindo PT (aka Detail Studio


Engineering Consultant)
Contact Mr Erwin Cahyadi (Director / Project Coordinator)
62 21 5596 3206
f 62 21 5596 3206
Email: primadetailindo2015@gmail.com
Website: www.primadetailindo.com
Ruko Taman Palem Lestari, Ruko Pelangi Blok J No. 9,
Cengkareng Barat, Jakarta Barat, 11730, Jakarta, Indonesia

5 storey school building (approx 2,300 sq m)


12 classrooms
Administration office
Library room
Practical room
Teacher rooms

Foreign Architect DP Architects Pte Ltd


Contact Mr Wu Tzu Chiang (Project Director - Principal
Architect)
65 6338 3988
f 65 6337 9989
Email: dparchitects@dpa.com.sg
Website: www.dpa.com.sg
6 Raffles Boulevard #04-100 Marina Square,
Singapore 039594

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Facade : glass wall cladding / aluminium composite
cladding
Roofing : concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors
Lifts
Split type air conditioning
Fire protection system
Sanitary ware

Structural Engineer Satu Rekayasa Optima PT


Contact Mr Yoas Yuniananta (Team Leader / Structural
Engineer)
62 21 2903 4281
f 62 21 2903 4281
Email: yoas_y@yahoo.com
APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat,
11470, Jakarta, Indonesia

Estimated cost: undisclosed.

Contact Mrs Jennifer Khoo (Civil Engineer)


62 21 2903 4281
f 62 21 2903 4281
Email: yoas_y@yahoo.com
APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat,
11470, Jakarta, Indonesia

Construction is expected to start in early December 2016.


Construction is expected to end in early July 2017.
Gedung sekolah 5 lantai terdiri dari 12 kelas dengan luas
bangunan sekitar 2.300 meter persegi. Perkiraan biaya: tidak
dinyatakan. Konstruksi diharapkan mulai Desember 2016
dan selesai Juli 2017.

Mechanical & Electrical Engineer Meco Systech Internusa


PT
Contact Mr Bartholomeus Brajaguna Aritonang (Project
Engineer)
62 21 726 0817 / 726
f 62 21 726 0249
0841
Email: kimf@indosat.net.id
Jalan Kebayoran Lama No. 194 A, Blok B7-8, Kebayoran
Lama, Jakarta Selatan, 12220, Jakarta, Indonesia

Developer Lippo Karawaci Tbk PT


Contact Mr Eko Wahyudi (Design Manager)
62 21 5579 0190 /
f 62 21 5579 7109
5577 7808 / 5579 0191
Email: corsec@lippokarawaci.co.id
Website: www.lippokarawaci.co.id
2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park,
Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia

Contractor To be appointed

Architect Lippo Karawaci Tbk PT


Contact Mr Eko Wahyudi (Design Manager)
62 21 5579 0190 /
f 62 21 5579 7109
5577 7808 / 5579 0191
Email: corsec@lippokarawaci.co.id
Website: www.lippokarawaci.co.id
2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park,
Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

28

Sample Project of The Month


PROJECT CATEGORY

Residential/ Car Park/ Hotel/ Retail/ Recreation


PROJECT STAGE

PROJECT CODE

Documentation

109233002

PREMIERE CLASSE CONDOTEL (3 STARS)


(continued...)

PREMIERE CLASSE CONDOTEL (3 STARS)


Jalan HMS Mitaredja, Exit tol Baros 2, Cimahi, West
Java

Triputra Karya Agung PT - Bandung


Contact Mr Anto (Estimator)
62 22 8888 4145 /
f 62 8888 4148
8888 4148
Jalan HMS Mitadiredja, Exit tol Baros 2, Cimahi, 40521,
West Java, Indonesia

15 storey apartment & hotel tower (approx 21,000 sq


m)
440 apartment units & hotel rooms
2 basement levels car park
Lobby & reception lounge
Ground floor retail shops & restaurants
Swimming pool

Hotel Operator Golden Tulip Hotel Indonesia


Contact Mr Mark Van Ogtrop (Managing Director - Golden
Tulip South East Asia)
62 21 527 0215
f 62 21 527 0216
Email: indonesia@goldentulip.com
Website: www.goldentulip.com/id/asia-and-pacific/indonesia
Menara Global Lantai 12, Jalan Jendral Gatot Subroto
Kavling 27, Jakarta Selatan, 12950, Jakarta, Indonesia

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structures : reinforced concrete
Ceiling : gypsum board
Walling : precast concrete panels / light brick walls
Facade : glass wall cladding / aluminium composite
cladding
Roofing : concrete roof tile / concrete slab roof
Aluminium framed doors & windows / solid wood
doors
Duct connected air conditioning / split air conditioning
Sanitary ware / plumbing
Fire protection system
Building automation system

Contact Mr Erick Herlangga (Operational Director)


62 21 527 0215
f 62 21 527 0216
Email: indonesia@goldentulip.com
Website: www.goldentulip.com/id/asia-and-pacific/indonesia
Menara Global Lantai 12, Jalan Jendral Gatot Subroto
Kavling 27, Jakarta Selatan, 12950, Jakarta, Indonesia
Architect Triputra Karya Agung PT - Bandung
Contact Mr Deni Ishadinoto (Head of Planning Division)
62 22 8888 4145 /
f 62 8888 4148
8888 4148
Jalan HMS Mitadiredja, Exit tol Baros 2, Cimahi, 40521,
West Java, Indonesia

Estimated cost: Rp84.00 bn (US$6.22 mn).


Construction is expected to start in early March 2016.
Construction is expected to end in late December 2017.
Pembangunan kondotel 15 lantai dan 2 level basement
dengan luas bangunan sekitar 21.000 meter persegi.
Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan
mulai Maret 2016 dan selesai Desember 2017.

Contact Mr Eko Suwarno (Drafter)


62 22 8888 4145 /
f 62 8888 4148
8888 4148
Jalan HMS Mitadiredja, Exit tol Baros 2, Cimahi, 40521,
West Java, Indonesia

Developer Triputra Karya Agung PT - Head Office


Contact Mr Adrianto Trisnadi (Director)
62 21 2903 9988 /
f 62 21 2903 9983
2903 9984
Jalan Arjuna Utara, Kavling 16, Blok F, Ruko Office,
Menara Apartment, Kebon Jeruk, Jakarta Barat, 10260,
Jakarta, Indonesia

Structural Engineer Junaedi Masil & Associates


Contact Mr Junaedi Masil (Director / Structural Engineer)
62 21 585 6244
f 62 21 585 6244
Email: junaedi@engineer.com
Jalan Menara II No. 19, Meruya Selatan, Jakarta Barat,
11650, Jakarta, Indonesia

Contact Mr Darmawanto (Project Administration)


62 21 2903 9988 /
f 62 21 2903 9983
2903 9984
Jalan Arjuna Utara, Kavling 16, Blok F, Ruko Office,
Menara Apartment, Kebon Jeruk, Jakarta Barat, 10260,
Jakarta, Indonesia

Mechanical & Electrical Consultant Policipta Multidesain


PT
Contact Mr Jajap Tanudjaja (Project Director)
62 21 5365 1481 /
f 62 21 532 1385
5365 1525
Email: poli@policipta.com
Jalan H. Domang No. 31 B, Kelapa Dua, Kebon Jeruk,
Jakarta Barat, 11550, Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

29

Sample Project of The Month


PROJECT CATEGORY

Residential/ Hotel/ Recreation/ Car Park


PREMIERE CLASSE CONDOTEL (3 STARS)
(continued...)

PROJECT STAGE

PROJECT CODE

Documentation

111076002

PURI MENESA CONDOTEL


Jalan Raya Dharmawangsa, Nusa Dua, Badung, Bali

Contact Mr Arya (Mechanical & Electrical Engineer)


62 21 5365 1481 /
f 62 21 532 1385
5365 1525
Email: poli@policipta.com
Jalan H. Domang No. 31 B, Kelapa Dua, Kebon Jeruk,
Jakarta Barat, 11550, Jakarta, Indonesia

Construction Manager Dinamika Teknik Selaras PT


Contact Mr Victor H Sianipar (Director)
62 21 4786 9373
f 62 21 4786 9372
Email: dinamikateknik@gmail.com
Jalan Ahmad Yani No. 2 Perkantoran Pulo Mas Gedung IV
2nd Floor # 6-7, Jakarta, 13220, Jakarta, Indonesia

4 storey condotel (approx 15,000 sq m)


Up to 120 rooms
Single basement levels car park
Lobby & reception area
Swimming pool

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows/ solid wood
doors
Piling : mini pile / bored pile
Lifts
Split type air conditioning
Sanitary ware / plumbing
Building automation system

Piling Contractor To be appointed


Contractor To be appointed

Estimated cost: undisclosed.


Construction timetable is to be determined.
Kondotel 4 lantai terdiri 120 kamar, dengan luas bangunan
sekitar 15.000 meter persegi. Perkiraan biaya: tidak
dinyatakan. Waktu konstruksi tidak ditentukan.
Developer Citra Mutiara Bestari PT
Contact Mr Harso Utomo Suwito (Director)
62 21 5826856
f 62 21 5826857
Kompleks Puri Niaga II, Jalan Puri Kencana J1 No. 2J,
Jakarta, Jakarta, Indonesia
Contact Mr Erik Setiawan (Architect - Project Division)
62 21 5826856
f 62 21 5826857
Kompleks Puri Niaga II, Jalan Puri Kencana J1 No. 2J,
Jakarta, Jakarta, Indonesia
Landscape Consultant Studio Hijau Lumut
Contact Mr Jungyat (Landscape Designer)
62 361 366 6991
f 62 361 366 6991
Email: info@shl.asia
Website: www.shl.asia
Jalan Sedap Malam Gang Pakis No. 14, Denpasar, 80237,
Bali, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

30

Sample Project of The Month


PROJECT CATEGORY

Residential
PURI MENESA CONDOTEL (continued...)

Hotel Operator Metropolitan Golden Management PT MGM Centre


Contact Mr Basari Bachri (Operational Director)
62 21 7581 8999 / 766
f 62 21 766 4922
4921
Email: mgm@horisonhotels.com
Website: www.horisonhotels.com
MGM Centre, Jalan Rumah Sakit Fatmawati Raya No. 100
F, Jakarta Selatan, 12430, Jakarta, Indonesia

PROJECT STAGE

PROJECT CODE

Documentation

143186002

ROYAL TAJUR BY RANCAMAYA - THE


PROMINENCE CLUSTER PHASE I
Jalan Raya Boulevard, Tajur, Bogor, West Java

12 x 3 storey residential houses (approx. 191 sq m


each)
Units to have 3 + 1 bedrooms
Internal road network
Gated entrance

Architect A2 Associates Architects


Contact Mr Khoirul Ummam (Architect)
62 21 7279 0136 / 720
f 62 21 7279 6816
4938 / 7279 6816
Email: a2_jkt@yahoo.com
Ruko Duta Fatmawati Blok B2 No. 12, Jalan Fatmawati
Raya No. 39, Jakarta Selatan, 12420, Jakarta, Indonesia

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced construction
Ceiling : gypsum board
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows / solid wood
doors
Piling : mini pile
Sanitary ware / plumbing

Contact Mr Agus Prihananto (Architect)


62 21 7279 0136 / 720
f 62 21 7279 6816
4938 / 7279 6816
Email: a2_jkt@yahoo.com
Ruko Duta Fatmawati Blok B2 No. 12, Jalan Fatmawati
Raya No. 39, Jakarta Selatan, 12420, Jakarta, Indonesia

Estimated cost: undisclosed.


Construction is expected to start in early April 2016.
Construction is expected to end in late December 2016.

Structural Engineer To be appointed

Kawasan hunian terdiri dari 12 unit rumah 3 lantai, dengan


masing - masing luas bangunan sekitar 191 meter persegi.
Perkiraan biaya: tidak dinyatakan. Konstruksi dimulai April
2016 dan diharapkan selesai Desember 2016.

Mechanical & Electrical Engineer To be appointed


Contractor To be appointed

Developer Tajur Surya Abadi PT ( member of Suryamas


Dutamakmur Group)
Contact Ms Riska (Project Administrator)
62 251 880 0123 / 880
f 62 251 880 0123/ 880
0234
0234
Website: www.royaltajur.com
Jalan Raya Boulevard No.1, Tajur, Bogor, 16710, West
Java, Indonesia
Architect Suryamas Dutamakmur Tbk PT - Jakarta
Contact Mr Ricky Eman Syafarius (Head of Planning
Division)
62 21 5793 6733
f 62 21 5793 6730
Email: ricky@rancamayaestate.com
Sudirman Plaza Business Complex Plaza Marein, 16th
floor Jalan Jend. Sudirman kav 76-78, Jakarta Selatan, 12910,
Jakarta, Indonesia
Engineer Tajur Surya Abadi PT ( member of Suryamas
Dutamakmur Group)
Contact Mr Rian Reza (Architect & Engineer)
62 251 880 0123 / 880
f 62 251 880 0123/ 880
0234
0234
Website: www.royaltajur.com
Jalan Raya Boulevard No.1, Tajur, Bogor, 16710, West
Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

31

Sample Project of The Month


PROJECT CATEGORY

Health
ROYAL TAJUR BY RANCAMAYA - THE
PROMINENCE CLUSTER PHASE I (continued...)

PROJECT STAGE

PROJECT CODE

Documentation

137035002

RSUD PROPINSI SULAWESI BARAT (TYPE B)


Jalan R. E. Marthadinata, Mamuju, West Sulawesi

Earthworks Contractor Bumi Casa Manggala Utama PT


Contact Mr Rio Agustinus (Project Director)
62 21 538 8343
f 62 21 538 8343
Email: ptbumicasamanggalautama@gmail.com
Jalan Gunung Rinjani RE No 54, Sektor IV BSD Serpong,
Tangerang, 15310, Jakarta, Indonesia

Contact Mr Furqon (Project Division Staff)


62 21 538 8343
f 62 21 538 8343
Email: ptbumicasamanggalautama@gmail.com
Jalan Gunung Rinjani RE No 54, Sektor IV BSD Serpong,
Tangerang, 15310, Jakarta, Indonesia

4 x 3 storey hospital buildings (approx 17,500 sq m)


Medical consulting rooms
Patient medical record room
Patient recovery rooms
Registration area & waiting room
Observation room
Pharmacy room

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / fibre cement board
Walling : light brick walls
Facade : glass wall cladding
Roofing : concrete slab roof
Roof truss : steel frame
Aluminium framed doors & windows / fabricated
wood doors
Piling : mini pile
Lifts
Sanitary ware / plumbing

Contact Ms Mervin Oktaviana (Purchasing Staff)


62 21 538 8343
f 62 21 538 8343
Email: ptbumicasamanggalautama@gmail.com
Jalan Gunung Rinjani RE No 54, Sektor IV BSD Serpong,
Tangerang, 15310, Jakarta, Indonesia
Contractor To be appointed

Estimated cost: undisclosed.


Construction is expected to start in early August 2016.
Construction is expected to end in late December 2017.
Pembangunan 4 gedung rumah sakit 3 lantai dengan total
luas bangunan sekitar 17.500 meter persegi. Perkiraan
biaya: tidak dinyatakan. Konstruksi diharapkan mulai
Agustus 2016 dan selesai Desember 2017.
Developer Rumah Sakit Umum Daerah (RSUD) Propinsi
Sulawesi Barat
Contact Mr Andi Munatsir (Project Coordinator)
62 426 270 3259
f 62 426 22320
Jalan R. E. Marthadinata, Mamuju, 91511, West Sulawesi,
Indonesia
Supervisory Consultant To be appointed
Feasibility Consultant Dinamika Raya CV
Contact Mr Muhammad Zuhri (Director - Project Manager)
62 31 829 2043
f 62 31 829 2043
Email: dinamikaraya@gmail.com
Jalan Ketintang Baru II Kavling 45, Surabaya, 60231, East
Java, Indonesia
Contact Mr Agung Setyawan (Team Leader)
62 31 829 2043
f 62 31 829 2043
Email: dinamikaraya@gmail.com
Jalan Ketintang Baru II Kavling 45, Surabaya, 60231, East
Java, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

32

Sample Project of The Month


PROJECT CATEGORY

Health/ Car Park


RSUD PROPINSI SULAWESI BARAT (TYPE B)
(continued...)

PROJECT STAGE

PROJECT CODE

Documentation

143254002

UNGGUL KARSA MEDIKA HOSPITAL


Taman Kopo Indah III, Bandung, West Java

Architect Rancang Persada PT


Contact Mr Agung Setiawan, ST (Director)
62 31 829 2044
f 62 31 829 2044
Email: rancangpersadasby@gmail.com
Jalan Krukah Selatan No. 110, Ngagel Rejo, Wonokromo,
Surabaya, 60245, East Java, Indonesia

Contact Mr Achmad Ismangil (Architect)


62 31 829 2044
f 62 31 829 2044
Email: rancangpersadasby@gmail.com
Jalan Krukah Selatan No. 110, Ngagel Rejo, Wonokromo,
Surabaya, 60245, East Java, Indonesia
Construction Manager Delta Buana PT
Contact Mr Ir. Ahmad Kusaeri (Director)
62 31 829 3425 / 829
f 62 31 829 3425 / 829
2043
7261
Email: deltabuanas@gmail.com
Jalan Krukah Selatan No. 98, Ngagelrejo, Wonokromo,
Surabaya, 60245, East Java, Indonesia

4 storey hospital (approx 24,122 sq m)


Inpatient care unit (182 beds)
Emergency unit
Polyclinic unit
Surgical unit
Medical laboratory
Medical consulting rooms
Patient medical record room
Patient recovery rooms
Obstetrics & gynecology unit
Registration area & waiting room
Observation room
Pharmacy room
Medical equipment storage room
At grade car park

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Facade : glass wall cladding / aluminium composite
cladding
Roofing : concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors / UPVC framed doors & windows
Piling : bored pile
Lifts
Split type air conditioning
Fire protection system
Sanitary ware / plumbing
Building automation system

Contact Ms Atik Ragil Saputry (Administration Staff)


62 31 829 3425 / 829
f 62 31 829 3425 / 829
2043
7261
Email: deltabuanas@gmail.com
Jalan Krukah Selatan No. 98, Ngagelrejo, Wonokromo,
Surabaya, 60245, East Java, Indonesia
Contractor To be appointed

Estimated cost: undisclosed.


Construction is expected to start in early June 2016.
Construction is expected to end in late December 2017.
Bangunan rumah sakit 4 lantai, dengan luas bangunan
sekitar 24.122 meter persegi. Perkiraan biaya: tidak
dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan
selesai Desember 2017.
Developer Yayasan Maranatha Bandung
Contact Mr Beng Sugiharto (Ketua Yayasan)
62 22 201 2186 / 200
f 62 22 200 7916
7916
Email: info@maranatha.edu
Website: www.maranatha.edu
Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,
West Java, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

33

Sample Project of The Month


PROJECT CATEGORY

Residential/ Retail/ Recreation


UNGGUL KARSA MEDIKA HOSPITAL (continued...)

PROJECT STAGE

PROJECT CODE

Documentation

136594002

WONDERLAND APARTMENT - TOWER 1


Jalan Sersan Bajuri Km. 3,8, Bandung, West Java

Contact Ms Cindy (Administrator / General Staff)


62 22 201 2186 / 200
f 62 22 200 7916
7916
Email: info@maranatha.edu
Website: www.maranatha.edu
Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,
West Java, Indonesia

26 storey apartment tower (approx 34,384 sq m)


Studio type apartments, single bedroom units & 2
bedroom units
Apartment lobby & reception lounge
Ground floor retail shops & restaurants
Swimming pool

Architect Global Rancang Selaras PT


Contact Mr Adi Utomo Hatmoko (Principal Architect)
62 274 880 637
f 62 274 887 778
Email: adm_globalrancangselaras@yahoo.com
Website: www.globalrancangselaras.com
Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI
Yogyakarta, Indonesia

Building elements include:


Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : precast concrete panels / light brick wall
Facade : glass wall cladding
Roofing : concrete roof tile / concrete slab roof
Aluminium framed doors & windows / fabricated
wood doors
Piling : mini pile / bored pile
Lifts
Sanitary ware / plumbing
Fire protection system
Security system
Building automation system

Contact Mr Mario Andreti (Project Architect & Construction


Manager)
62 274 880 637
f 62 274 887 778
Email: adm_globalrancangselaras@yahoo.com
Website: www.globalrancangselaras.com
Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI
Yogyakarta, Indonesia
Structural Engineer Anugrah Multi Cipta Karya PT Bandung
Contact Mr Natan Madutujuh (Director / Project Coordinator)
62 22 604 1685
f 62 22 600 3595
Email: nathanmadutujuh@gmail.com
Jalan Situ Aksan No. 29, Bandung, 40182, West Java,
Indonesia

Estimated cost: Rp171.92 bn (US$12.44 mn).


Construction is expected to start in early June 2016.
Construction is expected to end in late December 2018.
Apartemen 26 lantai dengan luas bangunan sekitar 34.384
meter persegi. Perkiraan biaya: Rp 171,92 milyar. Konstruksi
diharapkan mulai Juni 2016 dan selesai Desember 2018.

Contact Mr Daud (Project Manager)


62 22 604 1685
f 62 22 600 3595
Email: nathanmadutujuh@gmail.com
Jalan Situ Aksan No. 29, Bandung, 40182, West Java,
Indonesia

Developer Kurnia Cipta Wahana PT (aka Wisata Kampung


Gajah Wonderland)
Contact Mr Jeffry Kurniawan (Director / Owner)
62 22 8888 4011 /
f Not available
8888 4012
Email: info@kampunggajah.com
Website: www.kampunggajah.com
Jalan Sersan Bajuri Km. 3,8, Bandung, 40154, West Java,
Indonesia

Mechanical & Electrical Engineer Malmass Mitra Teknik


(Matrik) PT
Contact Mr Mas'ud Dohim (Project Director)
62 21 799 4609 / 798
f 62 21 799 3093
9775
Email: matrik@malmass.co.id
Website: www.malmass.co.id
Jalan Rawajati Barat II No. 33, Kalibata, Jakarta Selatan,
12750, Jakarta, Indonesia

Architect Farchitect PT
Contact Mr Fardian Susanto (Director / Architect)
62 22 5441 0406
f 62 22 5441 0406
Email: info@farchitect.com
Website: www.farchitect.com
Jalan Kuta Maya No. 8, Kompleks Singgasana Pradana,
Bandung, 40236, West Java, Indonesia

Piling Contractor To be appointed


Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

34

Sample Project of The Month


PROJECT CATEGORY

Infrastructure
WONDERLAND APARTMENT - TOWER 1 (continued...)

PROJECT STAGE

PROJECT CODE

Post tender
Contact Mr Erik Setiawan (Project Manager)
62 22 5441 0406
f 62 22 5441 0406
Email: info@farchitect.com
Website: www.farchitect.com
Jalan Kuta Maya No. 8, Kompleks Singgasana Pradana,
Bandung, 40236, West Java, Indonesia

145435002

BANJAR CAHYANA IRRIGATION SYSTEM KABUPATEN BANJARNEGARA


Banjar Cahyana, Kelurahan Rejasa, Madukara,
Banjarnegara, Central Java

Structural Engineer Anugrah Multi Cipta Karya PT Bandung


Contact Mr Natan Madutujuh (Director / Project Coordinator)
62 22 604 1685
f 62 22 600 3595
Email: nathanmadutujuh@gmail.com
Jalan Situ Aksan No. 29, Bandung, 40182, West Java,
Indonesia

Irrigation system (covering of 500 ha)


Primary irrigation channel
Secondary irrigation channel
Water control & irrigation gates
Civil works

Estimated cost: Rp5.49 bn (US$0.40 mn).


Work is expected to start in early April 2016. Work is
expected to end in early December 2016.

Mechanical & Electrical Engineer To be appointed

Jaringan irigasi dengan cakupan seluas 500 hektar, saluran


irigasi primer, saluran irigasi sekunder, pengontrol air dan
pintu irigasi dan pekerjaan sipil terkait. Perkiraan biaya: Rp
5,49 milyar. Pekerjaan diharapkan mulai April 2016 dan
selesai Desember 2016.

Piling Contractor To be appointed


Contractor To be appointed

Government Implementing Agency Kementerian Pekerjaan


Umum dan Perumahan Rakyat - Direktorat Jenderal Sumber
Daya Air Propinsi DI Yogyakarta - Satuan Non Vertikal
Tertentu Pelaksanaan Jaringan Pemanfaatan Air Serayu - Opak
Contact Mr Ir. Singgih Nurcahya, Sp.1 (Project Coordinator
- SNVT PJPA Serayu - Opak)
62 274 446 2838
f 62 274 446 2838
Website: www.pu.go.id
Jalan Solo Km.6, Sleman, 55281, DI Yogyakarta, Indonesia
Contact Mr Antyarsa Ikanadani, ST. M.Eng (Project
Coordinator - PPK Irigasi dan Rawa I)
62 274 446 2838
f 62 274 446 2838
Website: www.pu.go.id
Jalan Solo Km.6, Sleman, 55281, DI Yogyakarta, Indonesia
Kementerian Pekerjaan Umum dan Perumahan Rakyat Direktorat Jenderal Sumber Daya Air Propinsi DI Yogyakarta Balai Besar Wilayah Sungai Serayu Opak
Contact Mr Ir. Tri Bayu Adji, MA (Project Manager- BBWS
Serayu Opak)
62 274 489 172
f 62 274 489 552
Jalan Solo Km. 6, Yogyakarta, 55281, DI Yogyakarta,
Indonesia
Contact Mr Untung Samiaji, Dipl.ATP (Project Coordinator
- PPK Perencanaan dan Program)
62 274 489 172
f 62 274 489 552
Jalan Solo Km. 6, Yogyakarta, 55281, DI Yogyakarta,
Indonesia
Supervisory Consultant To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

35

Sample Project of The Month


PROJECT CATEGORY

Industrial
BANJAR CAHYANA IRRIGATION SYSTEM KABUPATEN BANJARNEGARA (continued...)

PROJECT STAGE

Post tender

PROJECT CODE

144319002

COMBIPHAR DONGA INDONESIA BIOSIMILAR


FACTORY
Jalan Raya Science Boulevard, Jaya Mukti Cikarang,
Kawasan Industri Jababeka 5, Bekasi, Jakarta

Civil Engineer Putra Pertiwi Perkasa PT / Cahaya Persada


CV
Contact Mr Muhammad Rohim (Director - Senior Engineer)
62 24 671 0387
f 62 24 671 0387
Email: putrapertiwi@yahoo.co.id
Jalan Mahesa Raya No. 409, Semarang, 50192, Central
Java, Indonesia

2 storey biosimilar pharmacy factory (approx. 4,400 sq


m)
Production lines
Quality control room
Storage area

Contact Mr Mulyadi (Engineer)


62 24 671 0387
f 62 24 671 0387
Email: putrapertiwi@yahoo.co.id
Jalan Mahesa Raya No. 409, Semarang, 50192, Central
Java, Indonesia

Building elements include :


Flooring : ceramic tile / epoxy flooring
Structural : steel construction
Ceiling : gypsum board / metal ceiling
Walling : light brick walls / metal walling
Facade : metal panel cladding
Roofing : metal sheet roof
Roof truss : steel frame
Aluminium framed doors & windows / metal doors
Fire protection system
Security system

Tender Office Kementerian Pekerjaan Umum dan


Perumahan Rakyat - Direktorat Jenderal Sumber Daya Air
Propinsi DI Yogyakarta - Balai Besar Wilayah Sungai Serayu
Opak
Contact Ms Ir. Tuti Sutiarsih, MT (Secretary of BBWS Member of Tender Committee)
62 274 489 172
f 62 274 489 552
Jalan Solo Km. 6, Yogyakarta, 55281, DI Yogyakarta,
Indonesia

Estimated cost: undisclosed.

Contractor To be appointed
Remarks: Administrative & technical evaluation in progress.

Construction is expected to start in early February 2016.


Construction is expected to end in late October 2016.
Pabrik obat 2 lantai dengan luas bangunan sekitar 4.400
meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi
diharapkan mulai Februari 2016 dan selesai Oktober 2016.
Developer Combiphar Donga Indonesia PT
Contact Mr Raymond (Project Manager)
62 21 2933 3031
f 62 21 2933 3053
Website: www.combiphar.com
Office 8 Building 26th Floor Jalan Jendral Sudirman
Kavling 52-53 Sudirman Central Business District (SCBD)
Lot. 28, Jakarta Selatan, 12190, Jakarta, Indonesia
Contact Mr Ucok Tendi (Project Manager)
62 21 2933 3031
f 62 21 2933 3053
Email: ucok.tendi@combiphar.com
Website: www.combiphar.com
Office 8 Building 26th Floor Jalan Jendral Sudirman
Kavling 52-53 Sudirman Central Business District (SCBD)
Lot. 28, Jakarta Selatan, 12190, Jakarta, Indonesia
Architect U-IL architect & engineer
Contact Undisclosed
82 2 3484 8700
f 82 2 3484 8710
Website: www.u-il.com
Geopyeong Town Building 2F 139, Bongeunsa-ro,
Gangnam-gu, Seoul 06121, South Korea

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

36

Sample Project of The Month


PROJECT CATEGORY

Industrial
COMBIPHAR DONGA INDONESIA BIOSIMILAR
FACTORY (continued...)

PROJECT STAGE

PROJECT CODE

Post tender

144299002

INDONUSA AGROMULIA CPO FACTORY - MUSI


BANYUASIN
Kebun Air Tenggulang, Kecamatan Sungai Lilin, Musi
Banyuasin, South Sumatera

Construction Manager TeamworX Indonesia PT


Contact Undisclosed
62 21 780 0940
f 62 21 789 2151
Email: info@teamworx.co.id
Website: www.teamworx.co.id
Beltway Office Park, Building C, Ground floor Jalan T.B.
Simatupang No. 41, Cilandak, Jakarta Selatan, 12550, Jakarta,
Indonesia

Piling Contractor To be appointed

Crude palm oil plant (capacity of 60 tph)


Mechanical work
Conveyor lines
Workshop

Building elements include:


Flooring : hardened floor
Structural : steel construction
Ceiling : metal ceiling
Walling : metal walling
Roofing : metal sheet roofing
Roof truss : steel frame
Fire protection system
Security system
Aluminium framed doors / folding gates

Contractor To be appointed
Bidders include:
Taiyo Sinar Raya Teknik PT - Cibitung
Contact Mr Hikmah D. (Section Head of Purchasing Division
- Civil)
62 21 8832 9435
f 62 21 8832 9439 /
8832 0959
Email: hikmah@tsrt.co.id
Website: www.taiyosinar.com
Jalan K.H. Noer Alie RT 007 / RW 003, Desa Cibuntu,
Cibitung, Bekasi, 17520, West Java, Indonesia

Estimated cost: undisclosed.


Construction started in early January 2016. Construction is
expected to end in early March 2017.

Citra Karsa Dinamika PT


Contact Mr Kuncoro (Supervisor of Purchasing and Logistic
Division)
62 21 8261 0121
f 62 21 8261 0120
Email: kuncoro_tk@yahoo.com
Website: www.citrakd.com
Jalan Pangkalan II No. 36 RT 04 / RW 02 Cikiwul, Bantar
Gebang, Sebelah Pasar Bantar Gebang, Bekasi, 17310, West
Java, Indonesia

Pabrik pengolahan kelapa sawit dengan kapasitas produksi


60 ton buah tandan segar per jam. Perkiraan biaya: tidak
dinyatakan. Konstruksi diharapkan mulai Januari 2016 dan
selesai Maret 2017.
Developer Indonusa Agromulia PT - Head Office
Contact Mr Bagus Setiawan (Manager of Engineering
Division)
62 21 8378 0791
f 62 21 8378 0792
Email: bagus.setiawan@hamita-uk.com
Website: www.indonusaagromulia.com
Gedung Permata Kuningan lantai 19, Jalan Kuningan Mulia
Kavling 9C, Kelurahan Setiabudi, Jakarta Selatan, 12980,
Jakarta, Indonesia

Nusa Raya Cipta Tbk PT - Head Office


Contact Mr Tjoe Pardal (Estimator Manager)
62 21 819 3526 / 819
f 62 21 819 3471 / 819
3508
3544
Email: tjoekpardal1@gmail.com
Website: www.nusarayacipta.com
Gedung Graha Cipta, Jalan D.I. Panjaitan No. 40, Jakarta
Timur, 13350, Jakarta, Indonesia

Contact Mr Haris Munandar (Manager of Procurement


Division)
62 21 8378 0791
f 62 21 8378 0792
Website: www.indonusaagromulia.com
Gedung Permata Kuningan lantai 19, Jalan Kuningan Mulia
Kavling 9C, Kelurahan Setiabudi, Jakarta Selatan, 12980,
Jakarta, Indonesia

Harjaguna Kurniamitra PT
Contact Mr Darman (Estimator)
62 21 452 8415 / 452
f 62 21 453 2983
0976 / 451 3791
Email: estimate@harjaguna.com
Website: www.harjaguna.com
Kelapa Gading Bukit Indah Jalan Gading Bukit Raya Blok
K 02-03, Jakarta Utara, 14240, Jakarta, Indonesia

Tender Office Indonusa Agromulia PT - Head Office


Contact Mr Bagus Setiawan (Manager of Engineering
Division)
62 21 8378 0791
f 62 21 8378 0792
Email: bagus.setiawan@hamita-uk.com
Website: www.indonusaagromulia.com
Gedung Permata Kuningan lantai 19, Jalan Kuningan Mulia
Kavling 9C, Kelurahan Setiabudi, Jakarta Selatan, 12980,
Jakarta, Indonesia

Mechanical & Electrical Sub-Contractor To be appointed

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

37

Sample Project of The Month


PROJECT CATEGORY

Office
INDONUSA AGROMULIA CPO FACTORY - MUSI
BANYUASIN (continued...)

PROJECT STAGE

Post tender

PROJECT CODE

132072002

KANTOR PELAYANAN PAJAK (KPP) PRATAMA


PRABUMULIH (PHASE 1)
Jalan Jendral Sudirman No. 19, Prabumulih, South
Sumatera

EPC Contractor To be appointed


Remarks: Administrative & technical evaluation in progress

3 storey tax office building (approx. 5,100 sq m)


Work stations & office space
Public service counters
Waiting room

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : lightweight steel
Aluminium framed doors & windows / fabricated
wood doors
Estimated cost: Rp28.68 bn (US$2.08 mn).
Construction is expected to start in early February 2016.
Construction is expected to end in late June 2016.
Bangunan kantor pajak 3 lantai dengan luas bangunan
sekitar 5.100 meter persegi. Perkiraan biaya: Rp 28,68
milyar. Konstruksi diharapkan mulai Februari 2016 dan
selesai Juni 2016.
Government Implementing Agency Kantor Pelayanan
Pajak (KPP) Pratama Kota Prabumulih
Contact Mr Ramdanu Martis (Head Officer)
62 713 323 611
f 62 713 323 188
Jalan Jendral Sudirman No. 19, Prabumulih, 31121, South
Sumatera, Indonesia
Contact Mr Isanul Akbar (Kepala Bagian Umum - Project
Coordinator)
62 713 323 611
f 62 713 323 188
Jalan Jendral Sudirman No. 19, Prabumulih, 31121, South
Sumatera, Indonesia
Supervisory Consultant To be appointed
Remarks: The tenderers are listed in alphabetical order.
Bidders include:
Abdi Kriasy Konsultant CV
Contact Mr Said Hadi (Director - Project Coordinator)
62 61 820 1249
f 62 61 820 1249
Email: abdikriasy@gmail.com
Jalan Setiabudi No. 11 B, Kelurahan Tanjung Rejo,
Kecamatan Medan Sunggal, Medan, 20122, North Sumatera,
Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

38

Sample Project of The Month


KANTOR PELAYANAN PAJAK (KPP) PRATAMA
PRABUMULIH (PHASE 1) (continued...)

KANTOR PELAYANAN PAJAK (KPP) PRATAMA


PRABUMULIH (PHASE 1) (continued...)

Detail Merbang Seulawah CV


Contact Undisclosed
Not available
f Not available
Jalan Sukabangun I No. 160 A RT 022 / RW 003,
Kelurahan Sukabangun, Kecamatan Sukarami, Palembang,
30151, South Sumatera, Indonesia
(For enquiry, please contact by Mail.)

Tender Office Kantor Pelayanan Pajak (KPP) Pratama Kota


Prabumulih
Contact Ms Kana (Secretary of Tender Committee)
62 713 323 611
f 62 713 323 188
Jalan Jendral Sudirman No. 19, Prabumulih, 31121, South
Sumatera, Indonesia
Contractor To be appointed
Remarks: The tenderers are listed in bid price order.
Lowest bidders are:

Khalimal Consultant CV
Contact Mr Afandi Amran (Director - Architect)
62 61 847 0986
f 62 61 847 0986
Email: khalimal@yahoo.com
Komplek Pondok Surya Blok VI No. 225, Kelurahan
Helvetia Timur, Kecamatan Medan Helvetia, Medan, 20124,
North Sumatera, Indonesia

Mitra Gusnita Nanda PT (bids: Rp26,424 mn)


Contact Mr Tandanan Daulay (Director)
62 21 870 1390
f 62 21 877 2168
Email: mgn_gusnitananda@yahoo.co.id
Jalan Sawo Indah No. 24, Kelurahan Baru Cijantung III,
Kcamatan Pasar Baru, Jakarta Timur, 13780, Jakarta,
Indonesia

Kingstom Tekniktama CV
Contact Mr Tommy Bokings (Director)
62 435 829 261
f Not available
Email: bokingstommy@yahoo.com
Jalan Kijang No.186 Kelurahan Tanggilingo Kecamatan
Kabila, Bone Bolango, 96583, Gorontalo, Indonesia

Andi Syam Putra Perkasa PT (bids: Rp27,765 mn)


Contact Mr Iswahyudi (Project Director)
62 21 438 00281
f 62 21 438 00281
Jalan Bugis No. 124, Kelurahan Kebon Bawang,
Kecamatan Tanjung Priok, Jakarta Utara, 14270, Jakarta,
Indonesia

Rancang Bangun Consultant CV


Contact Mr Bangun Pasaribu (Director)
62 61 786 3706
f 62 61 786 3706
Email: cv.rancangbangunconsultant@ymail.com
Jalan Turi, Gang Salim No. 22, Timbang Deli, Medan
Amplas, Medan, 20148, North Sumatera, Indonesia

Sejahtera Intercon PT (bids: Rp28,575 mn)


Contact Mr Idrus (Director)
62 711 310 884
f 62 711 311 483
Email: s_intercon@yahoo.com
Jalan Veteran No. 7093 C / A, Kelurahan 20 Ilir I,
Kecamatan Ilir Timur I, Palembang, 30126, South Sumatera,
Indonesia

Architect Gubahlaras Arsitek dan Perencana PT


Contact Mr Bambang Hudiyanto (Director - Principal
Architect)
62 21 781 5281 / 781
f 62 21 781 5243
5249
Email: gubahlaras_2003@yahoo.co.id
Website: www.gubahlaras.co.id
Jalan Raya Jatipadang No. 63, Kelurahan Jatipadang,
Kecamatan Pasar Minggu, Jakarta Selatan, 12540, Jakarta,
Indonesia
Contact Mr Agus Setyasaroso (Senior Architect)
62 21 781 5281 / 781
f 62 21 781 5243
5249
Email: gubahlaras_2003@yahoo.co.id
Website: www.gubahlaras.co.id
Jalan Raya Jatipadang No. 63, Kelurahan Jatipadang,
Kecamatan Pasar Minggu, Jakarta Selatan, 12540, Jakarta,
Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

39

Sample Project of The Month


PROJECT CATEGORY

Oil and Gas/ Infrastructure


PROJECT STAGE

Post tender

LENGO GAS DEVELOPMENT PROJECT (continued...)

PROJECT CODE

144581002

LENGO GAS DEVELOPMENT PROJECT


Bulu A Area, Bulu PSC, Offshore East Java, East Java

Conceptual Designer
Remarks: Concept Development Study & RAM Study

Unmanned minimum facilities 4-leg / 8-wellslot fixed


structure wellhead platform installation (water depth
of 60 m)
66 km long of offshore / 7.8 km long of onshore & 20"
OD carbon steel export pipeline to transport the gas to
an onshore gas receiving facility
Onshore Receiving Facility (ORF) completed with
separated system, dehydration & metering sales
Engineering, procurement & construction
Tender Number : KE/BUL/15/0030

Synergy Engineering PT
Contact Mrs Hasta Nurullita (Electrical Engineer)
62 21 5315 0464 /
f 62 21 5315 0466
5315 0465
Email: enquiries@ptsynergy.co.id
Website: www.ptsynergy.co.id
Nusa Loka, Blok C1 No. 03, Sektor XIV - 4, BSD City,
Serpong, Tangerang Selatan, 15318, Banten, Indonesia
Design Consultant
Remarks: Front-End Engineering Design

Estimated cost: undisclosed.

Synergy Engineering PT
Contact Mr Arwin (Project Engineer)
62 21 5315 0464 /
f 62 21 5315 0466
5315 0465
Email: enquiries@ptsynergy.co.id
Website: www.ptsynergy.co.id
Nusa Loka, Blok C1 No. 03, Sektor XIV - 4, BSD City,
Serpong, Tangerang Selatan, 15318, Banten, Indonesia

Construction is expected to start in early September 2016.


Construction is expected to end in early September 2018.
Developer KrisEnergy Ltd.
Contact Mr Kusmutarto Basuki (General Manager)
62 21 2934 2700
f 62 21 2934 2710
Website: www.krisenergy.com
Talavera Office Park, 3rd Floor, Jalan Letjen T.B.
Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430,
Jakarta, Indonesia

Contact Mr Lutfi Indra (Process Engineer)


62 21 5315 0464 /
f 62 21 5315 0466
5315 0465
Email: enquiries@ptsynergy.co.id
Website: www.ptsynergy.co.id
Nusa Loka, Blok C1 No. 03, Sektor XIV - 4, BSD City,
Serpong, Tangerang Selatan, 15318, Banten, Indonesia

Contact Mrs Ratih Hupudio (Senior Commercial Manager)


62 21 2934 2700
f 62 21 2934 2710
Website: www.krisenergy.com
Talavera Office Park, 3rd Floor, Jalan Letjen T.B.
Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430,
Jakarta, Indonesia

Pre-Qualification Office KrisEnergy Ltd.


Contact Mr Andi (Staff of Procurement Division)
62 21 2934 2700
f 62 21 2934 2710
Website: www.krisenergy.com
Talavera Office Park, 3rd Floor, Jalan Letjen T.B.
Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430,
Jakarta, Indonesia

Contact Mr Neil Maclean (Project Manager)


62 21 2934 2700
f 62 21 2934 2710
Website: www.krisenergy.com
Talavera Office Park, 3rd Floor, Jalan Letjen T.B.
Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430,
Jakarta, Indonesia

EPC Contractor To be appointed


Remarks: Qualification : Non small scale business.
Qualification method : Pre-qualification. Classification :
01.d.01.02 Production facility of oil, gas & energy

Surveyor
Remarks: Geophysical & Geotechnical Surveys
Offshore Works Indonesia PT
Contact Mr Faisal (Geophysicist)
62 21 722 1690
f 62 21 722 5454
Email: info.id@javaoffshore.com
Website: www.javaoffshore.com
Jalan Mahakam 1 No. 11B, Kramat Pela, Kebayoran Baru,
Jakarta Selatan, 12130, Jakarta, Indonesia

Tender opens on 05 January, 2016 and closes on 08 January,


2016.

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

40

Sample Project of The Month


PROJECT CATEGORY

PROJECT CATEGORY

Infrastructure

Transport/ Infrastructure/ Retail/ Car Park

PROJECT STAGE

PROJECT CODE

Post tender

PROJECT STAGE

144674002

Post tender

MAKASSAR NEW PORT (PHASE B)


Jalan Pelabuhan, Makassar, South Sulawesi

PROJECT CODE

144680002

NUNUKAN SEAPORT - PASSENGER TERMINAL


Jalan Pelabuhan Baru, Nunukan, North Kalimantan

Breakwater construct (approx. 350 m length)


Road construct (approx. 8,000 m length x 18 m width)
Hotmix asphalt overlay
Rock revetment wall
Tetrahedral concrete structure
Reclamation work
Civil works

3 storey domestic passenger terminal (approx 10,000


sq m)
Ticketing hall
Commercial & retail area
At grade car park
Building elements include:
Flooring : ceramic tile / homogeneous tile
Structural : reinforced concrete
Ceiling : gypsum board / decorative ceiling
Walling : light brick walls / precast concrete panels
Facade : glass wall cladding / aluminium composite
cladding
Roofing : concrete slab roof / metal sheet roofing
Roof truss : steel frame
Aluminium framed doors & windows / fabricated
wood doors
Lifts / escalators
Duct connected air conditioning
Fire protection system / security system
Sanitary ware / plumbing
Building automation system

Estimated cost: Rp1280.00 bn (US$92.65 mn).


Work is expected to start in early May 2016. Work is
expected to end in late December 2016.
Pekerjaan pelabuhan meliputi reklamasi, akses jalan ke
lapangan penumpukan, pengerukan dan pemecah gelombang
sepanjang 350 meter dan pekerjaan sipil terkait. Perkiraan
biaya: Rp 1,28 trilyun. Pekerjaan diharapkan mulai Mei 2016
dan selesai Desember 2018.
Developer Pelabuhan Indonesia IV (Persero) PT
Contact Mr Doso Agung (President Director)
62 411 361 6549 ext.
f 62 411 361 9044
1008
Email: biro.logistik@inaport4.co.id
Website: www.inaport4.co.id
Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi,
Indonesia

Estimated cost: Rp110.00 bn (US$7.96 mn).


Construction started in late December 2015. Construction is
expected to end in late October 2017.

Supervisory Consultant To be appointed

Bangunan terminal penumpang 3 lantai, dengan luas


bangunan sekitar 10.000 meter persegi. Perkiraan biaya: Rp
110,00 milyar. Konstruksi diharapkan mulai Desember 2015
dan selesai Oktober 2017.

Tender Office Pelabuhan Indonesia IV (Persero) PT


Contact Mr Bambang Warsito (Head of Tender Committee)
62 411 361 6549 ext.
f 62 411 361 9044
1008
Email: biro.logistik@inaport4.co.id
Website: www.inaport4.co.id
Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi,
Indonesia

Developer Pelabuhan Indonesia IV (Persero) PT


Contact Mr Doso Agung (President Director)
62 411 361 6549 ext.
f 62 411 361 9044
1008
Email: biro.logistik@inaport4.co.id
Website: www.inaport4.co.id
Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi,
Indonesia

Contact Ms Fitri (Logistics Division Staff)


62 411 361 6549 ext.
f 62 411 361 9044
1008
Email: biro.logistik@inaport4.co.id
Website: www.inaport4.co.id
Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi,
Indonesia

Pelabuhan Indonesia IV (Persero) PT - Nunukan


Contact Mr Marihot Sigala (Operational Manager)
62 556 214 95
f 62 556 210 77
Jalan Pelabuhan Baru No. 10, Nunukan, 77182, North
Kalimantan, Indonesia
(For enquiry, please contact by Mail.)

Contractor To be appointed
Remarks: Qualification : Non small scale business.
Qualification method : Pre-qualification.

Supervisory Consultant To be appointed

Tender opens on 16 December, 2015 and closes on 31


December, 2015.

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

41

Sample Project of The Month


PROJECT CATEGORY

Transport/ Retail
NUNUKAN SEAPORT - PASSENGER TERMINAL
(continued...)

PROJECT STAGE

Post tender

PROJECT CODE

132307002

RADIN INTEN II AIRPORT - PASSENGER


TERMINAL
Jalan H. Alamsyah Ratu Prawira Negara Km 28 Branti
Raya, Kecamatan Natar, Bandar Lampung, Lampung

Tender Office Pelabuhan Indonesia IV (Persero) PT


Contact Mr Bambang Warsito (Head of Tender Committee)
62 411 361 6549 ext.
f 62 411 361 9044
1008
Email: biro.logistik@inaport4.co.id
Website: www.inaport4.co.id
Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi,
Indonesia

2 storey domestic passenger terminal (approx. 15,000


sq m)
Check-in hall with 6 counters
Waiting lounge
Commercial & retail area

Contact Ms Fitri (Logistics Division Staff)


62 411 361 6549 ext.
f 62 411 361 9044
1008
Email: biro.logistik@inaport4.co.id
Website: www.inaport4.co.id
Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi,
Indonesia
(For enquiry, please contact by Mail.)

Building elements include:


Flooring : ceramic tile
Structural : reinforced concrete
Ceiling : gypsum board
Walling : light brick walls
Roofing : concrete roof tile
Roof truss : steel frame
Aluminium framed doors & windows / solid wood
doors

Contractor To be appointed
Remarks: Qualification : Non small scale business.
Qualification method : Pre-qualification.

Estimated cost: Rp99.70 bn (US$7.22 mn).

Tender opens on 17 December, 2015 and closes on 31


December, 2015.

Construction is expected to start in late January 2016.


Construction is expected to end in late October 2016.
Pembangunan terminal penumpang 2 lantai dengan luas
bangunan sekitar 15.000 meter persegi. Perkiraan biaya: Rp
99,70 milyar. Konstruksi diharapkan mulai Januari 2016 dan
selesai Oktober 2016.
Government Implementing Agency Dinas Perhubungan
Propinsi Lampung
Contact Mr Albar Hasan Tanjung (Head Officer)
62 721 470 209
f 62 721 470 210
Website: www.dishub.lampungprov.go.id
Jalan Cut Mutia No. 76, Teluk Betung, Bandar Lampung,
35214, Lampung, Indonesia
Contact Mr Bambang Subogo (Head of Air Transportation
Sub Division)
62 721 470 209
f 62 721 470 210
Website: www.dishub.lampungprov.go.id
Jalan Cut Mutia No. 76, Teluk Betung, Bandar Lampung,
35214, Lampung, Indonesia
Developer Kantor Pengelola Bandar Udara Radin Inten II
Contact Mr Satimin (Head Officer)
62 721 769 7114
f 62 721 769 7115
Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu
Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar
Lampung, 35362, Lampung, Indonesia
Contact Mr Muhammad Yamin (PPK - Project Coordinator)
62 721 769 7114
f 62 721 769 7115
Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu
Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar
Lampung, 35362, Lampung, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

42

Sample Project of The Month


RADIN INTEN II AIRPORT - PASSENGER TERMINAL
(continued...)

RADIN INTEN II AIRPORT - PASSENGER


TERMINAL (continued...)

Contact Ms Rahayu (General Division Staff)


62 721 769 7114
f 62 721 769 7115
Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu
Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar
Lampung, 35362, Lampung, Indonesia

Tender Office Kantor Pengelola Bandar Udara Radin Inten II


Contact Mr Didi Santoso (Head of Tender Committee)
62 721 769 7114
f 62 721 769 7115
Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu
Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar
Lampung, 35362, Lampung, Indonesia

Supervisory Consultant To be appointed


Remarks: Administrative & technical evaluation in progress.

Contractor To be appointed
Bidders include:

Environmental Impact Assessment Gelar Buana Semesta


PT
Contact Mr Ardi Efendi Saleh (Director)
Not available
f Not available
Email: gelarbuanasemesta@gmail.com
Jalan Mentor No. 62, Sukaraja, Bandung, 40172, West
Java, Indonesia

Pembangunan Perumahan (Persero) Tbk PT - Jakarta


Contact Mr Ir. Ketut Darmawan (Operational Director)
62 21 840 3883
f 62 21 840 3936 / 841
3890
Email: kdvp@pt-pp.com
Website: www.pt-pp.com
Plaza PP - Wisma Subiyanto, Jalan Letjen T.B. Simatupang
No. 57, Pasar Rebo, Jakarta Timur, 13760, Jakarta, Indonesia

Contact Mr Achmad Ridwan (Project Coordinator)


Not available
f Not available
Email: gelarbuanasemesta@gmail.com
Jalan Mentor No. 62, Sukaraja, Bandung, 40172, West
Java, Indonesia
Master Planner Akbar Jaya Consultant PT
Contact Mr Mulyono ST MT (Director - Project Coordinator)
62 721 261 118 / 769
f Not available
1142
Email: akbarjayaconsultant@yahoo.co.id
Perum Bumi Puspa Kencana Blok EE No. 14, Gedong
Meneng, Bandar Lampung, 35213, Lampung, Indonesia
Contact Mr Suharyanto (Project Coordinator)
62 721 261 118 / 769
f Not available
1142
Email: akbarjayaconsultant@yahoo.co.id
Perum Bumi Puspa Kencana Blok EE No. 14, Gedong
Meneng, Bandar Lampung, 35213, Lampung, Indonesia
Architect Bennatin Surya Cipta PT
Contact Mr Pensong Benny (Director)
62 21 798 1546 / 798
f 62 21 798 1047
1047
Email: bennagroup@yahoo.com
Jalan Raya Pasar Minggu Km. 18 No. 1, Pejaten Barat,
Pasar Minggu, Jakarta Selatan, 12740, Jakarta, Indonesia
Contact Mr Endang Herawan (Project Coordinator)
62 21 798 1546 / 798
f 62 21 798 1047
1047
Email: bennagroup@yahoo.com
Jalan Raya Pasar Minggu Km. 18 No. 1, Pejaten Barat,
Pasar Minggu, Jakarta Selatan, 12740, Jakarta, Indonesia

Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com

BCI Asia Construction Bulletin

43

Potrebbero piacerti anche