DIAS PAGADOS/ DIAS LABORADOS
FACTOR DE SALARIO BASE DE COTIZACION (TP/DICAL) PARA CALCULO DE IMMS
SALARIO MINIMO; DISTRITO FEDERAL:
NO
1
2
3
4
5
6
7
8
9
10
11
12
CATEGORIAS
AYUDANTE
AYUDANTE DE INSTALACION
AUXILIAR DE TOPOGRAFO
RASTRILLERO
TORNILLERO
CADENERO
CARPINTERO DE OBRA NEGRA
OFICIAL DE ALBAIL
OFICIAL AZULEJERO
OFICIAL ELECTRICISTA
OFICIAL FIERRERO
OFICIAL PLOMERO
171.43
188.57
180.00
214.28
222.85
154.28
257.14
300.00
308.57
325.71
282.86
295.71
179.18
197.10
188.14
223.97
232.93
161.25
268.77
313.56
322.52
340.44
295.65
309.08
TP/TI
PS
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
0.2746
0.2698
0.2721
0.2652
0.2640
0.2804
0.2599
0.2561
0.2555
0.2543
0.2575
0.2565
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
$
OFICIAL VIDRIERO
$
OFICIAL YESERO
$
HERRERO DE CAMPO
$
ALUMINERO
$
OPERADOR DE CAMION
OPERADOR DE VEHICULO CON GRU $
$
OPERADOR DE CARGADOR
$
OPERADOR DE CARPETEADOR
$
OPERADOR DE EQUIPO LIGERO
$
OPERADOR DE DUO-PACTOR
OPERADOR DE MOTOCONFORMADO $
OPERADOR DE PETROLIZADORA
$
OPERADOR DE PLANCHA
$
OPERADOR DE RETROEXCAVADORA $
OPERADOR DE TRACTOR
$
OFICIAL PINTOR
$
TUBERO
$
CABO DE OFICIOS
$
CABO DE AYUDANTES
$
$
CARPINTERO DE BANCO
$
OFICIAL COLOCADOR
248.57
257.14
257.14
325.71
342.85
310.00
385.71
402.86
234.85
295.71
402.86
385.71
295.71
402.86
402.86
231.43
325.71
342.85
265.71
325.71
325.71
259.81
268.77
268.77
340.44
358.35
324.02
403.15
421.07
244.58
309.08
421.07
403.15
309.08
421.07
421.07
241.89
340.44
358.35
277.72
340.44
340.45
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
1.3155172414
0.2608
0.2599
0.2599
0.2543
0.2533
0.2554
0.2511
0.2503
0.2624
0.2565
0.2503
0.2511
0.2565
0.2503
0.2503
0.2629
0.2543
0.2533
0.2591
0.2543
0.2543
AL
365
15
1.5
381.5
52
6
7
3
5
2
75
290
1.3155172414
1.04521
67.29
FSR= PS(TP/TI)+ SALARIO REAL
(TP/TI
SR=SN*FSR
1.6767
1.6705
1.6734
1.6644
1.6628
1.6843
1.6574
1.6525
1.6516
1.6501
1.6543
1.6529
$
$
$
$
$
$
$
$
$
$
$
$
287.44
315.00
301.22
356.65
370.56
259.86
426.19
495.74
509.64
537.45
467.93
488.78
1.6586
1.6574
1.6574
1.6501
1.6487
1.6515
1.6458
1.6448
1.6608
1.6529
1.6448
1.6458
1.6529
1.6448
1.6448
1.6613
1.6501
1.6487
1.6563
1.6501
1.6501
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
412.29
426.19
426.19
537.45
565.26
511.96
634.80
662.63
390.03
488.78
662.63
634.80
488.78
662.63
662.63
384.48
537.45
565.26
440.10
537.45
537.45
NOMBRE DE LA DEPENDENCIA:
FECHA DE CALCULO:
OBRA:
CATALOG
LUGAR:
NOMBRE DEL LICITANTE
Ju
67.29
201.87
FECHA DE CALCULO:
1-Oct-14
63.77
NO
CATEGORIAS
1 AYUDANTE
2 AYUDANTE DE INSTALACION
3 AUXILIAR DE TOPOGRAFO
4 RASTRILLERO
5 TORNILLERO
6 CADENERO
7 CARPINTERO DE OBRA NEGRA
8 OFICIAL DE ALBAIL
9 OFICIAL AZULEJERO
10 OFICIAL ELECTRICISTA
11 OFICIAL FIERRERO
12 OFICIAL PLOMERO
13 OFICIAL VIDRIERO
14 OFICIAL YESERO
15 HERRERO DE CAMPO
16 ALUMINERO
17 OPERADOR DE CAMION
18 OPERADOR DE VEHICULO CON GRUA
SN
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
FSBC
FACTORES DE SALARIO
171.43
188.57
180.00
214.28
222.85
154.28
257.14
300.00
308.57
325.71
282.86
295.71
248.57
257.14
257.14
325.71
342.85
310.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
19 OPERADOR DE CARGADOR
20 OPERADOR DE CARPETEADOR
21 OPERADOR DE EQUIPO LIGERO
22 OPERADOR DE DUO-PACTOR
23 OPERADOR DE MOTOCONFORMADORA
24 OPERADOR DE PETROLIZADORA
25 OPERADOR DE PLANCHA
26 OPERADOR DE RETROEXCAVADORA
27 OPERADOR DE TRACTOR
28 OFICIAL PINTOR
29 TUBERO
30 CABO DE OFICIOS
31 CABO DE AYUDANTES
32 CARPINTERO DE BANCO
33 OFICIAL COLOCADOR
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
385.71
402.86
234.85
295.71
402.86
385.71
295.71
402.86
402.86
231.43
325.71
342.85
265.71
325.71
325.71
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
1.04521
Err:509
CATALOGO DE COSTOS DIRECTOS 2015
BALANCN TABASCO
Juan Natalio Arcos Lopez
ING. CIVIL
25 VECES SALARIO MINIMO TABASCO :
1594
SALARIO
BASE DE
COTIZACION
ENFERMEDAD Y MATERNIDAD
DIFERENCIA
DE SALARIO
BASE DE
COTIZACION
Y 3SMGDF
CUOTA
VARIABLE
ART. 27 LSS
SBC
1.10%
NO APLICA
179.18
197.10
188.14
223.97
232.93
161.25
268.77
313.56
322.52
340.44
295.65
309.08
259.81
268.77
268.77
340.44
358.35
324.02
CUOTA FIJA
$
$
$
$
$
$
$
$
$
$
$
$
$
$
22.10 $
31.06 $
$
66.90 $
111.69 $
120.65 $
138.57 $
93.78 $
107.21 $
57.94 $
66.90 $
66.90 $
138.57 $
156.48 $
122.15 $
0.243
0.342
0.736
1.229
1.327
1.524
1.032
1.179
0.637
0.736
0.736
1.524
1.721
1.344
PRESTACIONES
EN ESPECIE
PENSIONADO
ART. 106 LSS,
13.90%
13.90%
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
1.0500%
1.4250%
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1.88
2.07
1.98
2.35
2.45
1.69
2.82
3.29
3.39
3.57
3.10
3.25
2.73
2.82
2.82
3.57
3.76
3.40
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
403.15
421.07
245.47
309.08
421.07
403.15
309.08
421.07
421.07
241.89
340.44
358.35
277.72
340.44
340.44
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
201.28
219.20
43.60
107.21
219.20
201.28
107.21
219.20
219.20
40.02
138.57
156.48
75.85
138.57
138.57
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2.214
2.411
0.480
1.179
2.411
2.214
1.179
2.411
2.411
0.440
1.524
1.721
0.834
1.524
1.524
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
9.35
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
4.23
4.42
2.58
3.25
4.42
4.23
3.25
4.42
4.42
2.54
3.57
3.76
2.92
3.57
3.57
NIDAD
1594.25
RIESGOS
DE
GUARDERIAS
PRESTACIONE TRABAJO
S EN DINERO
ART. 106 LSS,
ART. 73 Y
FRACCION. I Y
74 LSS
II
0.7000%
7.58875%
0.95%
7.58875%
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1.25
1.38
1.32
1.57
1.63
1.13
1.88
2.19
2.26
2.38
2.07
2.16
1.82
1.88
1.88
2.38
2.51
2.27
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
13.60
14.96
14.28
17.00
17.68
12.24
20.40
23.80
24.48
25.83
22.44
23.46
19.72
20.40
20.40
25.83
27.19
24.59
ART. 168
FRACCION 1
LSS
2.00%
2.00%
ART. 211 Y
212
1.00%
1.00%
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
1.79
1.97
1.88
2.24
2.33
1.61
2.69
3.14
3.23
3.40
2.96
3.09
2.60
2.69
2.69
3.40
3.58
3.24
INVALIDEZ Y
VIDA
S.A.R.
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
3.58
3.94
3.76
4.48
4.66
3.23
5.38
6.27
6.45
6.81
5.91
6.18
5.20
5.38
5.38
6.81
7.17
6.48
3.14
3.45
3.29
3.92
4.08
2.82
4.70
5.49
5.64
5.96
5.17
5.41
4.55
4.70
4.70
5.96
6.27
5.67
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2.82
2.95
1.72
2.16
2.95
2.82
2.16
2.95
2.95
1.69
2.38
2.51
1.94
2.38
2.38
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
30.59
31.95
18.63
23.46
31.95
30.59
23.46
31.95
31.95
18.36
25.83
27.19
21.08
25.83
25.83
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
4.03
4.21
2.45
3.09
4.21
4.03
3.09
4.21
4.21
2.42
3.40
3.58
2.78
3.40
3.40
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
8.06
8.42
4.91
6.18
8.42
8.06
6.18
8.42
8.42
4.84
6.81
7.17
5.55
6.81
6.81
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
7.06
7.37
4.30
5.41
7.37
7.06
5.41
7.37
7.37
4.23
5.96
6.27
4.86
5.96
5.96
______________
FIRMA
INFONAVIT
ART. 29 DE
LEY DE
INFONAVIT
FRACC. II
5.00%
5.00%
5.64
6.21
5.93
7.05
7.34
5.08
8.47
9.88
10.16
10.72
9.31
9.74
8.18
8.47
8.47
10.72
11.29
10.21
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
8.96
9.85
9.41
11.20
11.65
8.06
13.44
15.68
16.13
17.02
14.78
15.45
12.99
13.44
13.44
17.02
17.92
16.20
PS=
OBLIGACIONES
OBREROPATRONALES
SUMA DE
PRESTACIONES
SP/SBC
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
0.2746
0.2698
0.2721
0.2652
0.2640
0.2804
0.2599
0.2561
0.2555
0.2543
0.2575
0.2565
0.2608
0.2599
0.2599
0.2543
0.2533
0.2554
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
12.70
13.26
7.73
9.74
13.26
12.70
9.74
13.26
13.26
7.62
10.72
11.29
8.75
10.72
10.72
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
20.16
21.05
12.27
15.45
21.05
20.16
15.45
21.05
21.05
12.09
17.02
17.92
13.89
17.02
17.02
101.2191
105.4027
64.4185
79.2646
105.4027
101.2191
79.2646
105.4027
105.4027
63.5842
86.5828
90.7639
71.9464
86.5828
86.5828
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
0.2511
0.2503
0.2624
0.2565
0.2503
0.2511
0.2565
0.2503
0.2503
0.2629
0.2543
0.2533
0.2591
0.2543
0.2543
Unidad
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
Costo
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
287.44
315.00
301.22
356.65
370.56
259.86
426.19
495.74
509.64
537.45
467.93
488.78
412.29
426.19
426.19
537.45
565.26
511.96
634.80
662.63
390.03
488.78
662.63
634.80
488.78
662.63
662.63
384.48
537.45
565.26
440.10
537.45
Clave
00-M0001
Cuadrilla
1
Descripcin
Ayudante
Cabo de ayudantes
Herramienta menor
Unidad
Cantidad
Jor
1
Jor
0.5
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0002
Oficial albail
Ayudante
Cabo de oficios
Herramienta menor
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0003
Oficial electricista
Ayudante de instalacin
Cabo de oficios
Herramienta menor
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0004
Oficial plomero
Ayudante de instalacin
Cabo de oficio
Herramienta menor
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0005
Oficial albail
Ayudantes
Cabo de oficio
Herramienta menor
Jor
1
Jor
2
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0006
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0007
Oficial fierrero
Ayudante
Jor
Jor
1
1
00-M0007
7
Cabo de oficio
Herramienta menor
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0008
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0010
10
Oficial azulejero
Ayudante
Cabo de oficio
Herramienta menor
Jor
Jor
Jor
1
1
0.333
00-M0012
12
Oficial yesero
Ayudante
Cabo de oficio
Herramienta menor
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0013
13
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0014
14
Oficial pintor
Ayudante
Cabo de oficio
Herramienta menor
Jor
1
Jor
1
Jor
0.333
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0016
16
Tubero
Ayudante de instalacin
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0017
17
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0018
18
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0019
19
Operador de camin
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0020
20
Operador de cargador
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0021
21
Operador de carpeteador
Tornillero
Rastrilleros
Ayudantes
Herramienta menor
Jor
1
Jor
1
Jor
2
Jor
3
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0023
23
Operador de duo-pactor
Herramienta menor
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0024
24
Operador de motoconformadora
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0026
26
Operador de petrolizadora
Jor
00-M0026
26
Ayudante
Herramienta menor
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0027
27
Operador de plancha
Herramienta menor
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0028
28
Operador de retroexcavadora
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0029
29
Operador de tractor
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0030
30
Auxiliar de topgrafo
Cadeneros
Herramienta menor
Jor
1
Jor
2
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0031
31
Oficial vidriero
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0032
32
Oficial albail
Ayudantes
Herramienta menor
Jor
1
Jor
6
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0033
33
Aluminero
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
00-M0034
34
Colocador
Ayudante
Herramienta menor
Jor
1
Jor
1
COSTO TOTAL DE LA CUADRILLA
%mo
0.03
COSTO DIRECTO:
Costo
Importe
$
287.44
$287.44
$
565.26
$282.63
TOTAL DE LA CUADRILLA
$570.07
$17.10
COSTO DIRECTO:
$
$587.18
495.74
$287.44
$
537.45
TOTAL DE LA CUADRILLA
$495.74
$287.44
$178.97
$962.15
$28.86
COSTO DIRECTO:
$991.02
$
537.45
$
315.00
$
537.45
TOTAL DE LA CUADRILLA
$537.45
$315.00
$178.97
$1,031.43
$30.94
COSTO DIRECTO:
$1,062.37
$
488.78
$
315.00
$
537.45
TOTAL DE LA CUADRILLA
$488.78
$315.00
$178.97
$982.75
$29.48
COSTO DIRECTO:
$1,012.23
$
495.74
287.44397271
$
537.45
TOTAL DE LA CUADRILLA
$495.74
$574.89
$178.97
$1,249.60
$37.49
COSTO DIRECTO:
$1,287.08
$
426.19
287.44397271
$
537.45
TOTAL DE LA CUADRILLA
$426.19
$287.44
$178.97
$892.61
$26.78
COSTO DIRECTO:
$919.39
$
467.93
287.44397271
$467.93
$287.44
$
537.45
TOTAL DE LA CUADRILLA
$178.97
$934.34
$28.03
COSTO DIRECTO:
$962.37
$
467.93
287.44397271
$
537.45
TOTAL DE LA CUADRILLA
$467.93
$287.44
$178.97
$934.34
$28.03
COSTO DIRECTO:
$962.37
$
509.64
287.44397271
$
537.45
TOTAL DE LA CUADRILLA
$509.64
$287.44
$178.97
$976.06
$29.28
COSTO DIRECTO:
$1,005.34
$
426.19
287.44397271
$
537.45
TOTAL DE LA CUADRILLA
$426.19
$287.44
$178.97
$892.61
$26.78
COSTO DIRECTO:
$919.39
$
440.10
287.44397271
$
537.45
TOTAL DE LA CUADRILLA
$440.10
$287.44
$178.97
$906.51
$27.20
COSTO DIRECTO:
$933.71
$
662.63
287.44397271
$
537.45
TOTAL DE LA CUADRILLA
$662.63
$287.44
$178.97
$1,129.05
$33.87
COSTO DIRECTO:
$1,162.92
$
384.48
$
315.00
TOTAL DE LA CUADRILLA
$384.48
$315.00
$699.48
$20.98
COSTO DIRECTO:
$720.46
$
390.03
TOTAL DE LA CUADRILLA
$390.03
$390.03
$11.70
COSTO DIRECTO:
$401.73
$
511.96
TOTAL DE LA CUADRILLA
$511.96
$511.96
$15.36
COSTO DIRECTO:
$527.32
$
565.26
287.44397271
TOTAL DE LA CUADRILLA
$565.26
$287.44
$852.71
$25.58
COSTO DIRECTO:
$878.29
$
634.80
287.44397271
TOTAL DE LA CUADRILLA
$634.80
$287.44
$922.25
$27.67
COSTO DIRECTO:
$949.92
$
662.63
$
370.56
$
356.65
287.44397271
TOTAL DE LA CUADRILLA
$662.63
$370.56
$713.30
$862.33
$2,608.82
$78.26
COSTO DIRECTO:
$2,687.09
$
488.78
TOTAL DE LA CUADRILLA
$488.78
$488.78
$14.66
COSTO DIRECTO:
$503.44
$
662.63
287.44397271
TOTAL DE LA CUADRILLA
$662.63
$287.44
$950.07
$28.50
COSTO DIRECTO:
$978.58
634.80
$634.80
287.44397271
TOTAL DE LA CUADRILLA
$287.44
$922.25
$27.67
COSTO DIRECTO:
$949.92
$
488.78
TOTAL DE LA CUADRILLA
$488.78
$488.78
$14.66
COSTO DIRECTO:
$503.44
$
662.63
287.44397271
TOTAL DE LA CUADRILLA
$662.63
$287.44
$950.07
$28.50
COSTO DIRECTO:
$978.58
$
662.63
287.44397271
TOTAL DE LA CUADRILLA
$662.63
$287.44
$950.07
$28.50
COSTO DIRECTO:
$978.58
$
301.22
$
259.86
TOTAL DE LA CUADRILLA
$301.22
$519.72
$820.94
$24.63
COSTO DIRECTO:
$845.57
$
412.29
287.44397271
TOTAL DE LA CUADRILLA
$412.29
$287.44
$699.73
$20.99
COSTO DIRECTO:
$720.72
$
495.74
$
287.44
TOTAL DE LA CUADRILLA
$495.74
$1,724.66
$2,220.40
$66.61
COSTO DIRECTO:
$2,287.01
$
537.45
$
287.44
TOTAL DE LA CUADRILLA
$537.45
$287.44
$824.90
$24.75
COSTO DIRECTO:
$849.64
$
537.45
$
287.44
TOTAL DE LA CUADRILLA
$537.45
$287.44
$824.90
$24.75
COSTO DIRECTO:
$849.64
DESCRIPCION
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
Cuadrilla
01
02
03
04
05
06
07
08
10
12
13
14
16
17
18
19
20
21
23
24
26
27
28
29
30
31
32
33
34
(Ayudante 0.5+CABO)
(Oficial albail + ayudante + cabo de oficios 0.33)
(Oficial electricista + ayudante de instalacin + cabo de oficio 0.33)
(Oficial plomero + ayudante de instalacin + cabo de oficio 0.33)
(Oficial albail + 2 ayudantes +cabo de oficio 0.33)
(Oficial carpintero de obra negra + ayudante + cabo de oficio 0.33)
(Oficial fierrero + ayudante + cabo de oficio 0.33)
(Oficial herrero en campo + ayudante + cabo de oficio 0.33)
(Oficial azulejero + ayudante + cabo de oficio 0.33)
(Oficial yesero + ayudante + cabo de oficio 0.33)
(Oficial carpintero de banco + ayudante + cabo de ofici 0.33)
(Oficial pintor + ayudante + cabo de oficio 0.33)
(Tubero + ayudante de instalacin)
(Operador de equipo ligero)
(Operador de vehiculo con grua)
(Operador de camin + ayudante)
(Operador de cargador + ayudante)
(Operador de carpeteador + 1 tornillero + 2 rastrilleros + 3 ayudantes)
(Operador de duo-pactor)
(Operador de motoconformadora + ayudante)
(Operador de petrolizadora + ayudante)
(Operador de plancha)
(Operador de retroexcavadora + ayudante)
(Operador de tractor + ayudante)
(Auxiliar de topgrafo + 2 cadeneros)
(Oficial vidriero + ayudante)
(Oficial albail + 6 ayudantes)
(Aluminero + ayudante)
(Colocador + ayudante)
UNIDAD
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
COSTO
$587.18
$991.02
$1,062.37
$1,012.23
$1,287.08
$919.39
$962.37
$962.37
$1,005.34
$919.39
$933.71
$1,162.92
$720.46
$401.73
$527.32
$878.29
$949.92
$2,687.09
$503.44
$978.58
$949.92
$503.44
$978.58
$978.58
$845.57
$720.72
$2,287.01
$849.64
$849.64
Un.
Ton.
m
$4,711.06
Un.
Ton.
m
$2,595.44
Un.
Ton.
m
$5,426.60
Un.
Ton.
m
$2,985.50
Un.
Ton.
m
$1,050.75
Un.
Ton.
Ton.
m
$4,009.19
TABLA
Pastas, cemento blanco-polvo marmol.
Clasificacion
Cemento Ton.
Proporcion 1:3
Proporcion 1:4
Proporcion 1:5
0.54
0.44
0.38
Valores netos
Cal-
Un.
Ton.
Ton.
Ton.
m
$3,249.55
TABLA
Pastas, cemento blanco-cal-polvo marmol.
Clasificacion
Proporcion 1:1:6
Proporcion 1:1:8
Cemento blanco
Ton.
0.27
0.22
Proporcion 1:1:10
Proporcion 1:1:12
0.19
0.135
Valores netos
Un.
Ton.
m
m
$577.58
TABLA
Mezclas calhidra-arena
Clasificacion
Calhidra Ton.
Proporcion 1:3
Proporcion 1:4
Proporcion 1:5
Proporcion 1:6
Proporcion 1:7
Proporcion 1:8
Proporcion 1:9
Proporcion 1:10
0.25
0.2
0.17
0.145
0.125
0.11
0.1
0.09
Valores netos
134
Analisis de costo tipo
Concepto
Mezclas cemento-arena 1:2
Un.
Ton.
m
m
$1,416.65
TABLA
Mezclas cemento-arena
Clasificacion
Proporcion
Proporcion
Proporcion
Proporcion
Proporcion
Proporcion
Proporcion
Cemento Ton.
1:2
1:3
1:4
1:5
1:6
1:7
1:8
0.6
0.51
0.43
0.36
0.3
0.25
0.21
Valores netos
136
Analisis de costo tipo
Concepto
Mezcla cemento-calhidra-arena 1:1:4
Un.
0.300
0.150
1.000
0.280
Ton.
Ton.
m
m
T, de cemento + 3 % desp.
T, de calhidra + 3 % desp.
m de arena + 8 % desp.
m de agua + 30 % desp.
Total:
$1,032.08
TABLA
Mezcla cemento-calhidra-arena
Clasificacion
Cemento Ton.
Proporcion 1:1:4
Proporcion 1:1:6
Proporcion 1:1:8
Proporcion 1:1:10
Proporcion 1:1:12
0.3
0.255
0.215
0.18
0.15
Valores netos
Un.
Ton.
m
m
m
$780.61
CLASIFICACION
Revenimiento
8 a 10 cm
12 a 15 cm
8 a 10 cm
12 a 15 cm
8 a 10 cm
12 a 15 cm
8 a 10 cm
12 a 15 cm
8 a 10 cm
12 a 15 cm
8 a 10 cm
12 a 15 cm
8 a 10 cm
12 a 15 cm
8 a 10 cm
12 a 15 cm
Agregado maximo
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
Un.
Ton.
Kg.
$15,604.95
Un.
Ton.
Ton.
Ton.
Kg.
$14,426.75
Tabla de aceros
Aceros normal y alta resistencia.
Diametros (pulg)
5/16"
3/8"
1/2"
5/8"
3/4"
7/8"
1"
1 1/4"
1 1/2"
Varilla
Ton
1
1
1
1
1
1
1
1
1
tipo
Cant.
1.339
1.17
$4,711.06
P. U.
$3,500.00
$20.99
Importe
$4,686.50
$24.56
tipo
Cant.
1.339
1.17
$2,595.44
P. U.
$1,920.00
$20.99
Importe
$2,570.88
$24.56
tipo
Cant.
1.545
0.91
$5,426.60
P. U.
$3,500.00
$20.99
Importe
$5,407.50
$19.10
tipo
Cant.
1.545
0.91
$2,985.50
P. U.
$1,920.00
$20.99
Importe
$2,966.40
$19.10
tipo
Cant.
0.8343
1.17
$1,050.75
P. U.
$1,230.00
$20.99
Importe
$1,026.19
$24.56
tipo
Cant.
P. U.
0.5562
2.163
0.364
$4,009.19
$3,500.00
$950.00
$20.99
Importe
$1,946.70
$2,054.85
$7.64
olvo marmol.
Polvo marmol
Ton.
2.1
2.2
2.3
Agua
m
0.28
0.275
0.272
Valores netos
Costo
$/m
$4,009.19
$2,226.63
$860.41
Valores con
desperdicio
tipo
Cant.
P. U.
0.2781
0.12875
2.205
0.364
$3,249.55
$3,500.00
$1,350.00
$950.00
$20.99
Importe
$973.35
$173.81
$2,094.75
$7.64
co-cal-polvo marmol.
Calhidra
0.125
0.1
Polvo
Ton. marmol
Ton.
2.1
2.2
Agua
0.28
0.278
m Costo
$/m
$3,249.55
$2,269.96
0.085
0.075
2.3
2.4
0.276
0.274
P. U.
Importe
Valores netos
tipo
Cant.
0.2575
1.08
0.351
$577.58
$1,350.00
$206.10
$20.99
$347.63
$222.59
$7.37
rena
Arena
m
1
1.07
1.13
1.18
1.22
1.25
1.27
1.285
Agua
m
0.27
0.26
0.255
0.25
0.245
0.24
0.235
0.23
Costo
$/m
$577.58
$263.97
$191.66
$202.01
$4,482.67
$1,401.18
$115.37
Valores con
desperdicio
Valores netos
tipo
Cant.
0.618
1.08
0.3575
$1,416.65
P. U.
$1,920.00 $
$206.10 $
$20.99 $
Importe
1,186.56
222.59
7.50
$489.86
$65.37
Valores con
desperdicio
rena
Arena
m
1
1.1
1.12
1.15
1.19
1.24
1.246
Agua
m
0.275
0.272
0.266
0.261
0.257
0.252
0.246
Valores netos
Costo
$/m
$1,416.65
$292.53
$197.79
$192.30
$4,697.94
$1,365.04
$79.22
Valores con
desperdicio
tipo
Cant.
P. U.
0.31
0.15
1.08
0.36
$1,032.08
$1,920.00
$1,350.00
$206.10
$20.99
Importe
$
$
$
$
593.28
208.58
222.59
7.64
-calhidra-arena
Calhidra
0.15
0.125
0.1
0.085
0.075
Ton.
Arena
m
1
1.05
1.095
1.065
1.185
Agua
m Costo
0.28
0.279
0.278
0.275
0.273
Valores netos
tipo
Cant.
0.2678
P. U.
$1,920.00 $
Importe
514.18
$/m
$1,032.08
$270.30
$190.37
$181.96
$4,991.38
Valores con
desperdicio
0.54
0.7344
0.2535
$206.10 $
$204.00 $
$20.99 $
111.29
149.82
5.32
Arena m
Grava m
Agua m
0.26
0.286
0.323
0.354
0.355
0.391
0.423
0.467
0.254
0.28
0.308
0.338
0.337
0.373
0.4
0.445
0.5
0.5
0.48
0.48
0.47
0.47
0.465
0.465
0.47
0.47
0.45
0.45
0.44
0.44
0.467
0.476
0.68
0.68
0.67
0.67
0.65
0.65
0.64
0.64
0.7
0.7
0.7
0.7
0.68
0.68
0.67
0.67
0.195
0.215
0.21
0.23
0.195
0.215
0.19
0.21
0.19
0.21
0.2
0.22
0.185
0.205
0.18
0.2
Cant.
P. U.
Importe
tipo
1.02
$14,000.00
88.33
$15.00
$15,604.95
$14,280.00
$1,324.95
Cant.
Importe
tipo
P. U.
1.03
$12,878.00
0.0126
$12,878.00
0.0433
$12,878.00
29.502
$15.00
$14,426.75
$ 13,264.34
$
162.26
$
557.62
$
442.53
Costo
$/m
$780.61
$294.83
$1,010.25
$101.59
$3,627.76
$566.63
$201.55
$8,769.49
$9,095.26
$7,919.07
$648.68
$1,634.03
$1,565.68
$1,417.90
e aceros
alta resistencia.
Traslape
0.01254
0.0126
0.01695
0.0213
0.0257
0.0305
0.0345
0.0435
0.0504
Ton
Ganchos
Ton
0.0366
0.0433
0.0507
0.0633
0.0866
0.0994
0.1255
0.1413
0.1742
Alambre
36.682
26.82
15.1
10.25
6.7113
4.933
3.715
2.415
1.677
Kg
Fyp= 4200
$/Ton.
$14,502.42
$14,426.75
$246,675.54
$15,136.87
$16,078.95
$2,448.36
$878.84
$874.34
$4,429.62
No.
1
2
3
4
5
6
7
D E S C R I P C I O N (Materiales)
Agua de toma municipal
Alambre ( normal ) TW 600 volts 60 grados No.10
Alambre liso galvanizado calibre 10
Alambre recocido del No.18
Alambrn liso de 1/4" (No.2)
ALFOMBRAS marca "ZAYAT" modelo GOLDEN GRAIN
Al-koat PG-45T SBS (sistema prefabricado), compuesto de asfaltos
destilados modificados con elastomeros del tipo SBS con refuerzo
central de poliester no tejido de 180 gr/m2, y acabado superior de
gravilla ceramica.
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Arena
Asiento con tapa alargado
Azulejo 11x11 cm color blanco
Azulejo de nueve cuadros liso de 1a. de color 11 x 11 cm
Bajo Alfombra
Base precolada para registro de 0.40x0.60x1.00 m
23
No.
Basecoat
D E S C R I P C I O N (Materiales)
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
No.
54
55
56
57
Calhidra en saco
Canal de amarre cal. 26 YPSA 9.20 cm ancho
Canal galvanizado "ESTREY" 41 x 3.05 m.
Canal galvanizado "ESTREY" 63 x 3.05 m.
Canaleta No. 20 1 1/2"
Carrete corto fofo 250x 51 mm
Carrete corto fofo 250x 64 mm
Carrete corto fofo 250x 76 mm
D E S C R I P C I O N (Materiales)
Carrete corto fofo 250x102 mm
Carrete corto fofo 250x152 mm
Carrete corto fofo 250x203 mm
Carrete corto fofo 250x254 mm
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
No.
94
95
D E S C R I P C I O N (Materiales)
Concreto premezclado R.N. f'c=250 kg/cm2 agregado mximo
3/4" (B ligero)
Contramarco canal 6" doble 1.80 m
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
No.
138
139
140
141
142
143
144
145
146
147
148
149
151
152
153
154
155
156
157
158
159
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
Escalerilla de 15 cm
Escaln fofo
Esquinero galvanizado "ESTERY" 2.44 m.
Estopa
Extremidad fofo bridada para tornillo 51 mm
Extremidad fofo bridada para tornillo 63 mm A-10
Extremidad fofo bridada para tornillo 76 mm A-10
Extremidad fofo bridada para tornillo 101 mm A-10
Extremidad fofo bridada para tornillo 152 mm A-10
Extremidad fofo bridada para tornillo 203 mm A-10
Extremidad fofo bridada para tornillo 254 mm A-10
Fabrimalla de acero de 2 x 2 - 14/14.
Festerblanc
Festerflex 1.10 x 10.0 m.
Fierro estructural de 1" x 1/8"
Flete Mty-Mex (224 m2)
Flete Mty-Mex (280 m2)
Foco de vapor de sodio de 150 watts
Foco de vapor de sodio de 250 watts
Fosa sptica prefabricada marca ROTOPLAS de 2,500 lt de
capacidad.
Franela 90x60
Gas butano
Gastos de taller (10% de materiales)
Grava cementada controlada
Grava de 1 1/2" (38 mm)
Grava de 3/4" (19 mm)
Gravilla
Hidroprimer
Jerga intermedia 90 x 60 cm
Juego de herrajes para puerta modelo 65 L 300
Juego de herrajes para ventana de 2".
Junta Gibault de 102 mm (4") de dimetro, de fierro fundido
Junta Gibault de 152 mm (6") de dimetro, de fierro fundido
Junta Gibault de 203 mm (8") de dimetro, de fierro fundido
Junta Gibault de 254 mm (10") de dimetro, de fierro fundido
Junta Gibault de 51 mm (2") de dimetro, de fierro fundido
No.
177
178
179
D E S C R I P C I O N (Materiales)
Junta Gibault de 64 mm (2 1/2") de dimetro, de fierro fundido
Junta Gibault de 76 mm (3") de dimetro, de fierro fundido
Junta prohel y pijas
180
160
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
205
206
207
208
No.
209
210
211
212
213
214
No.
215
216
217
204
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
No.
247
248
249
250
251
252
253
254
255
256
Pintura vinlica
Placa de conexion de 11 x 5
Placa de conexion de 9 x 5
Plafond "Acustone" mod. Fisurado, suspension donn Dx
contrafuego, de 61x61cm
Plato quiebra chorro con bola de contra peso y codo cespol, de
fierro fundido
Polietileno de 400 micras
Polin de madera de pino de 9 x 9 x 252 c
Poste cnico circular de 8.00 m
Poste galvanizado "ESTREY" 0.41 x 244 m.
Poste galvanizado "ESTREY" 0.63 x 244 m.
Poste galvanizado "ESTREY" 0.63 x 244 m.
Poste metalico cal. 26 YPSA 9.20 cm ancho
Poste octagonal de 5 m de altura, marca POLESA.
Prueba hidrosttica %mo
Puerta de abatir serie JEFFER de aluminio "MILL FINISH marca
"SALDI" de 1.80 x 1.20 m.cristal claro de 3 mm , completo con
manguete
Reduccin de Fo.Fo. de 76x 51 mm (3"x2") de dimetro
Reduccin de Fo.Fo. de 76x 64 mm (3"x2 1/2") de dimetro
Reduccin de fofo bridada para tornillo de 101x 51 mm
Reduccin de fofo bridada para tornillo de 101x 63 mm
Reduccin defofo bridada para tornillo de 101x 76 mm
Reduccin defofo bridada para tornillo de 152x 51 mm
Reduccin de fofo bridada para tornillo de 152x 64 mm
Reduccin de fofo bridada para tornillo de 152x 76 mm
Reduccin defofo bridada para tornillo de 152x 101 mm
Reduccin defofo bridada para tornillo de 203x 51 mm
Reduccin defofo bridada para tornillo de 203x 63 mm
Reduccin de fofo bridada para tornillo de 203x 76 mm
Reduccin de fofo bridada para tornillo de 203x 101 mm
Reduccin de fofo bridada para tornillo de 203x 152 mm
D E S C R I P C I O N (Materiales)
Reduccin de fofo bridada para tornillo de 254x 76 mm
Reduccin de fofo bridada para tornillo de 254x 101 mm
Reduccin de fofo bridada para tornillo de 254 x 152 mm
Reduccin de fofo bridada para tornillo de 254 x 203 mm
Refuerzo horizontal para muro de block
Rejilla de fierro fundido de 0.40 x 0.60 m con bisagra, calidad
"Fundiciones Ruiz"
Sellador vinlico "COMEX"
Silicon Fester
Slant de concreto de 15cm
Soldadura E-6013 de 1/8"
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
279
280
281
282
283
284
285
286
287
288
No.
289
290
291
292
293
294
295
296
No.
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
325
326
No.
327
328
329
330
331
332
333
334
335
No.
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
No.
359
360
361
362
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
No.
381
382
383
384
385
386
387
388
389
390
391
392
No.
393
394
395
Taza para fluxometro New Cadet 2" blanco 38mm marca IDEAL
STANDARD modelo 185001
Yeso
Mangueras de succion y descarga 76 mm
Aceite lubricante
Aceite Hidrulico
Difano
Diesel
Gasolina
Llantas
Llantas 1100-20 (6)
Llantas 15.5 X 25 12 C L-2 (4)
Llantas 1800 (4)
DESCRIPCION
Llantas 11x22 (12 capas) (8) & 33.25x29 26 PRE-3 (2)
Llantas 1300 x 24 14 PR G-2 (6)
Llantas 14.9-24 6 R-4 (2)
ACERO ESTRUCTURAL A-36 Fy = 2530 kg/cm2
396
397
398
399
400
401
402
403
404
enda
UNIDAD
m
m
m
kg
TON
m
COSTO 3
$20.99
$10.68
$0.71
$15.00
$14,000.00
$69.45
$185.36
Jgo
kg
m
PZA
$47.25
$13.85
$6.86
$1,758.00
PZA
$2,100.00
PZA
$1,745.99
PZA
$1,836.00
PZA
$3,624.08
PZA
$5,257.39
m
PZA
m
m
m
PZA
$206.10
$223.16
$151.80
$149.50
$11.00
$997.58
kg
UNIDAD
$13.90
COSTO 3
millar
$16,500.00
millar
$16,500.00
millar
$14,500.00
PZA
PZA
PZA
%mo
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
$12.89
$1,239.32
$1,603.83
$32.14
$13.68
$15.60
$142.20
$721.97
$1,027.64
$1,391.96
$1,934.76
$316.48
PZA
$408.48
PZA
PZA
PZA
PZA
$546.48
$1,335.84
$1,578.72
$1,578.72
PZA
$1,719.00
saco
$234.32
t
m
PZA
PZA
m
PZA
PZA
PZA
UNIDAD
PZA
PZA
PZA
PZA
$1,350.00
$12.01
$35.23
$44.28
$71.24
$289.35
$385.20
$530.55
COSTO 3
$662.85
$972.90
$1,480.50
$2,026.80
PZA
PZA
PZA
PZA
PZA
PZA
PZA
t
kg
t
PZA
kg
m
PZA
kg
lt
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
$434.25
$579.15
$821.70
$1,013.85
$1,480.50
$2,220.75
$3,040.65
$3,500.00
$4.70
$1,920.00
$45.00
$31.45
$4.14
$20.71
$24.56
$5.72
$43.70
$68.64
$807.30
$1,040.75
$120.12
$313.17
$776.49
$1,445.73
$81.51
$1,040.75
$1,270.75
$184.47
$411.84
$1,106.82
$2,213.64
PZA
$182.28
m3
$1,391.75
m3
$1,017.75
m3
$1,092.50
m3
$950.00
UNIDAD
COSTO 3
m3
$996.00
PZA
$1,700.08
PZA
PZA
PZA
PZA
m3
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
kg
cart
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UNIDAD
lt
PZA
$2,010.55
$1,221.34
$1,264.00
$1,417.26
$67.22
$1,067.20
$1,161.96
$1,338.60
$1,781.12
$1,907.16
$2,053.44
$2,149.12
$2,312.88
$2,547.48
$2,868.56
$3,102.24
$3,426.08
$3,983.60
$4,301.92
$3,267.84
$4,957.88
$5,180.52
$5,578.88
$5,973.56
$7,009.48
$7,500.76
$7,705.92
$8,284.60
$9,031.64
$9,944.28
$12,346.40
$15.59
$17.99
$15.56
$65.14
$13.00
$14.95
$16.90
$24.05
$32.50
$61.75
$96.85
COSTO 3
$10.46
$707.91
m
PZA
PZA
kg
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
cub
bolsa
kg
Flete
Flete
PZA
PZA
$5.90
$49.00
$17.93
$35.00
$632.96
$763.60
$1,104.92
$1,230.04
$1,830.80
$2,663.40
$3,995.56
$34.00
$1,989.57
$93.10
$13.85
$19,845.00
$21,498.75
$114.36
$152.14
PZA
$5,110.80
PZA
kg
%mo
m3
m3
m3
m3
cub
PZA
JGO
JGO
PZA
PZA
PZA
PZA
PZA
$18.00
$9.90
$14.90
$226.00
$324.00
$204.00
$215.25
$1,272.67
$25.00
$93.45
$44.10
$211.65
$323.85
$493.00
$641.75
$112.20
UNIDAD
PZA
PZA
JGO
COSTO 3
$114.75
$146.20
$9.10
mill
$4,650.00
mill
$4,350.00
mill
kg
kg
PZA
m
m2
m2
m2
pt
m2
m2
m
PZA
PZA
kg
kg
m
$4,864.50
$17.05
$18.43
$1,105.25
$1.98
$158.76
$129.46
$209.00
$10.00
$13.50
$22.00
$4.37
$50.14
$1,554.43
$950.00
$980.00
$45.87
PZA
$19.98
PZA
$22.24
m3
m3
h
$2,512.36
$2,512.36
$126.00
PZA
$415.04
PZA
PZA
PZA
PZA
UNIDAD
cub
saco
kg
m3
lt
lt
UNIDAD
$443.53
$374.14
$259.51
$114.00
COSTO 3
$481.90
$125.00
$18.00
$225.00
$92.56
$92.56
COSTO
lt
lt
lt
$92.56
$92.56
$92.56
lt
PZA
PZA
$73.73
$9.10
$8.12
caja
$884.78
JGO
$340.00
m2
pt
PZA
PZA
PZA
PZA
m
PZA
%mo
$10.08
$7.73
$2,860.20
$38.56
$45.36
$45.36
$20.21
$1,953.90
$32.14
PZA
$2,188.60
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UNIDAD
PZA
PZA
PZA
PZA
m
$676.00
$874.00
$797.64
$1,036.84
$1,114.12
$1,114.12
$1,355.16
$1,434.28
$1,593.44
$2,149.12
$2,149.12
$2,149.12
$2,312.88
$2,709.40
COSTO 3
$3,063.60
$3,148.24
$3,397.56
$4,143.68
$5.90
PZA
$971.52
lt
lt
PZA
kg
$38.21
$136.64
$43.70
$37.00
saco
millar
PZA
PZA
PZA
$94.54
$1,870.00
$189.00
$560.00
$864.00
PZA
$1,913.60
PZA
$150.88
PZA
$239.20
PZA
$276.00
PZA
$729.10
PZA
PZA
PZA
caja
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UNIDAD
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UNIDAD
PZA
$997.58
$0.12
$0.12
$25.72
$678.30
$812.00
$884.80
$1,085.00
$1,152.90
$1,223.60
$1,394.40
$1,513.40
$1,635.20
$1,760.50
$2,182.60
$2,242.80
$2,303.00
$2,486.40
$2,606.80
$3,637.90
$3,637.90
COSTO 3
$3,817.80
$4,001.90
$4,244.80
$5,547.50
$5,547.50
$5,863.20
$6,115.20
$6,433.00
COSTO 3
$7,693.00
PZA
PZA
PZA
m3
m2
m3
lt
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
caja
millar
m2
h
$10.22
$16.24
$51.98
$201.60
$199.23
$300.00
$25.82
$25.41
$22.63
$2.14
$15.27
$17.85
$9.94
$49.63
$16.64
$78.69
$130.00
$67.19
$162.24
$17.68
$547.69
$112.23
$154.28
$175.88
m
m
m
m
UNIDAD
m
m
m
m
m
m
m
m
m
UNIDAD
m
m
m
m
m
$302.39
$374.90
$465.75
$489.22
COSTO 3
$646.76
$943.00
$1,179.19
$1,500.31
$40.25
$33.50
$44.00
$62.00
$70.00
COSTO
$106.00
$171.00
$303.00
$88.55
$159.39
m
m
m
m
m
%mo
PZA
$95.10
$74.00
$53.95
$280.40
$368.00
$13.11
$6,768.00
PZA
PZA
$11,804.80
$22,192.00
PZA
$36,529.60
PZA
$3,840.00
PZA
$4,000.00
PZA
$4,784.00
PZA
$4,552.00
PZA
$7,905.00
PZA
$13,458.00
PZA
$22,674.00
PZA
$2,300.00
UNIDAD
COSTO 3
PZA
$2,600.00
PZA
$3,361.00
cub
TON
TON
TON
TON
TON
$1,381.90
$12,878.00
$12,878.00
$12,878.00
$12,878.00
$12,878.00
PZA
$504.00
PZA
$720.00
PZA
$702.00
PZA
$999.00
PZA
$972.00
PZA
$1,296.00
PZA
$1,440.00
PZA
$792.00
PZA
$1,152.00
PZA
$1,152.00
$194.26
$272.89
cub
UNIDAD
$730.00
COSTO 3
PZA
$1,228.50
TON
JGO
lt
lt
lt
lt
lt
JGO
JGO
JGO
JGO
UNIDAD
JGO
JGO
JGO
$1,230.00
$623.04
$60.00
$74.00
$9.50
$9.00
$13.85
$23,883.52
$23,883.52
$60,485.20
$137,927.94
COSTO 3
$340,309.33
$65,809.08
$14,197.01
pza
pza
pza
pza
pza
pza
pza
pza
pza
$134.44
$92.72
$75.93
$112.29
$83.45
$51.52
$4.13
$100.05
$35.00
Obra:
Ubicacin:
#REF!
Cd.
ME
MC
MH
I.
MATERIALE Unidad
S
Madera en
PT
estacas
Calhidra en
Kg
trazo
Kg
Hilos
Cant.
0.159
1.03
0.164
0.060
1.03
0.062
0.003
1.03
0.003
0.000
0.000
0.000
TOTAL DE MATERIALES
Cd.
Rend. (m/Jorn)
$991.02
Rend. (m/Jorn)
Rend. (m/Jorn)
III.EQUIPO
Unidad
Cantidad total
TOTAL DE EQUIPO
Cd.
Unidad
Cantidad total
% de mano de obra
Realiz:
Fecha:
Nov-15
Obra:
Ubicacin:
#REF!
Cd.
ME
MC
MH
I.
MATERIALE Unidad
S
Cant.
TOTAL DE MATERIALES
Cd.
Rend. (m/Jorn)
$587.18
Rend. (m/Jorn)
Rend. (m/Jorn)
III.EQUIPO
Unidad
Cantidad total
Palas
pieza
0.01
TOTAL DE EQUIPO
Cd.
Unidad
Cantidad total
% de mano de obra
Realiz:
Fecha:
Nov-15
Obra:
Ubicacin:
#REF!
Cd.
I.
MATERIALE Unidad
S
0.260 T, de
cemento
resistencia
Ton.
rapida + 3 %
desp
Cant.
0.268
0.3
0.260
0.500 m de
arena + 8 %
desp.
0.540
0.08
0.500
0.680 m de
grava + 8 %
desp.
0.734
0.08
0.680
0.195 m de
agua + 30 %
desp.
0.423
0.3
0.195
TOTAL DE MATERIALES
Cd.
Rend. (m/Jorn)
$991.02
Rend. (m/Jorn)
Rend. (m/Jorn)
III.EQUIPO
Unidad
Cantidad total
TOTAL DE EQUIPO
Cd.
% de mano de obra
Unidad
Cantidad total
Realiz:
Obra:
Ubicacin:
#REF!
Cd.
I.
MATERIALE Unidad
S
Concreto de f
c=200
m
kg/cm
Cant.
1.000
1.000
0.000
0.000
0.000
0.000
0.000
TOTAL DE MATERIALES
Cd.
Rend. (m/Jorn)
$991.02
Rend. (m/Jorn)
Rend. (m/Jorn)
III.EQUIPO
Unidad
Cantidad total
TOTAL DE EQUIPO
Cd.
% de mano de obra
Unidad
Cantidad total
Realiz:
Obra:
Ubicacin:
#REF!
Cd.
I.
MATERIALE Unidad
S
PT
Polin
Mg
Triplay
Kg
Clavo
2.020
0.200
1.400
0.03
0.03
0.03
2.081
0.206
1.442
Alambre rec.
Kg
0.098
0.03
0.101
Chaflan
Alambron
Ml
Ton
Cd.
Cant.
1.250
0.03
0.001
0.03
TOTAL DE MATERIALES
Rend. (m/Jorn)
1.288
0.001
Costo cuadrilla Rendimiento
$919.39
Rend. (m/Jorn)
Rend. (m/Jorn)
III.EQUIPO
Unidad
Cantidad total
TOTAL DE EQUIPO
Cd.
% de mano de obra
Unidad
Cantidad total
Realiz:
to de interes social
Costo
Unitario
Total
$10.00
$1.64
$1,350.00
$0.083
$35.00
$0.00
$0.00
$0.00
$0.094
$0.000
$0.000
$0.000
$1.815
$2.48
$2.48
Costo
Unitario
Total
$0.00
Costo
Unitario
Total
$0.07
$0.07
$4.37
$0.66
$5.02
Unidad:
to de interes social
Costo
Unitario
Total
$0.00
$0.000
$0.00
$0.000
$0.00
$0.000
$0.00
$0.000
$0.00
$0.000
$0.000
$23.49
$23.49
Costo
Unitario
Total
$76.00
$0.76
Costo
Unitario
Total
$0.70
$0.70
$24.95
$3.74
$28.69
Unidad:
to de interes social
Costo
Unitario
Total
$1,920.00
$499.20
$206.10
$0.103
$324.00
$220.320
$20.99
$4.093
$723.716
$17.70
$17.70
Costo
Unitario
Total
Costo
Unitario
Total
$0.53
$0.53
$741.94
$111.29
$853.24
Unidad:
m
to de interes social
Costo
Unitario
Total
$3,627.76
$1,813.88
$0.000
$0.000
$0.000
$0.000
$0.000
###
$17.70
$17.70
Costo
Unitario
Total
Costo
Unitario
Total
$0.53
$0.53
$1,832.11
$274.82
$2,106.92
Unidad:
m
to de interes social
Costo
Unitario
Total
$9.22
$19.18
$99.29
$20.45
$17.46
$25.18
$18.95
$1.91
$2.55
$16,500.00
$3.28
$17.00
$87.005
$14.37
$14.37
Costo
Unitario
Total
Costo
Unitario
Total
$0.43
$0.43
$101.80
$15.27
$117.07
Unidad:
m