ITAC
API 653, Tank Inspection, Repair, Alteration and Reconstruction, Third Edition,
December, 2001, including Addendum 1 (September, 2003) and
Addendum 2 (November, 2005).
ASME Boiler & Pressure Vessel Code, 2004 Edition, with 2005 and 2006 Addenda
Section V, Nondestructive Examination, Articles 1, 2, 6, 7 and
23 (Section SE-797 only)
Section IX, Welding and Brazing Qualifications
1.5
1
6
24
Section:
77.
Reference Publication:
If studs were installed on this tank, what polarity would have been used for the stud gun?
a.
b.
c.
d.
DCEN
DCEP
AC
No polarity
Section:
Reference Publication:
ITAC
78.
5
5.1
5.29
5.42
Section:
79.
1
2
3
4
Section:
80.
.316
.500
.262
Not enough information given
Section:
Reference Publication:
What is the hydrostatic test height of T 3-27 if the joint efficiency is .85 and the specific
gravity of the product is 1.3?
a.
b.
c.
d.
56.88'
40'
28.27'
Not enough information given
Section:
82.
Reference Publication:
What is the minimum acceptable shell plate thickness for the first course of T 3-27, if the
specific gravity of the stored product is 1.3? NOTE: current inspection (2003) based on
product alone, and full height operation.
a.
b.
c.
d.
81.
Reference Publication:
Reference Publication:
What is the minimum acceptable shell plate thickness for the top course of T 3-27 if each
course is 120" tall?
a.
b.
c.
d.
.1"
.062"
.269"
Not enough information given
Section:
Reference Publication:
1/07 ITAC API 653 Exam Prep Homework #4 Questions Page 4
ITAC
83.
1
.85
.70
.35
Section:
84.
.185"
.125"
.0625"
Not enough information given
Section:
85.
.269"
.310"
.500"
Not enough information given
Section:
Reference Publication:
How many settlement points are required for an external settlement of T 3-27?
a.
b.
c.
d.
4
6
8
10
Section:
87.
Reference Publication:
If T 3-27 was new, what would be the minimum first course thickness, based on product
alone?
a.
b.
c.
d.
86.
Reference Publication:
Reference Publication:
A depression in the floor is discovered near the east manway of T 3-27. The diameter of
the depression is 96", the deepest point in the depression is 4". The area _________.
a.
b.
c.
d.
is rejectable.
is acceptable.
must be monitored.
can be filled in with epoxy and accepted.
Section:
Reference Publication:
1/07 ITAC API 653 Exam Prep Homework #4 Questions Page 5
ITAC
88.
During the internal inspection of T 3-27, a patch plate welded to the floor, with a tombstone
shaped pad, extending to the inside of the shell was discovered. The plate had been
seal welded to the floor and shell, with a minimum dimension of 12 inches. The inspector
should _____________.
a.
b.
c.
d.
Section:
89.
During the same internal inspection of T 3-27, a square lap-welded patch was found over
an existing nozzle. The inspector should __________.
a.
b.
c.
d.
Section:
90.
Reference Publication:
T 3-27 has a hole, less than 1" in diameter, in the roof. Rain water does not contaminate the
stored product. Is a repair required by API 653?
a.
b.
c.
d.
Section:
91.
Reference Publication:
Reference Publication:
What is the position designation for welding pipe in the horizontal fixed position?
a.
b.
c.
d.
2G
3G
5G
6G
Section:
Reference Publication:
ITAC
92.
What is the minimum remaining thickness of a floor using the following conditions.
0r = 10 years
RTbc = .200
RTip = .190
a.
b.
c.
d.
.200
.190
.120
.100
Section:
93.
Weld reinforcement
Good weld technique
Weld toe
Weld throat
Section:
Reference Publication:
If T 3-27 had a new nozzle installed in the third course, north side, could the shell-to-nozzle
weld be made using the oxyfuel welding process, if impact testing is not required?
a.
b.
c.
d.
Yes
No
The oxyfuel process is not allowed by ASME Section IX
Nozzle welds must be made using SMAW only
Section:
95.
Reference Publication:
94.
Reference Publication:
A circular insert replacement plate was installed on an existing tank. How many radiographs
are required if the shell is 5/8 thick where the plate is installed?
a.
b.
c.
d.
1
4
None, if the thickness is less than 1 inch
None
Section:
Reference Publication:
ITAC
96.
The minimum lbf/in2 for a vacuum box test is a partial vacuum of ____ gauge.
a.
b.
c.
d.
1 lbf /in2
2 lbf /in2
3 lbf /in2
4 lbf /in2
Section:
97.
A pipe welder is qualified to API 1104 only. What welds can he make on the tank if he
is qualified in the 6G position?
a.
b.
c.
d.
Nozzle Welds
Shell Welds
Floor and roof fillet welds
None
Section:
98.
1"
1/2"
1/4"
1/8"
Section:
Reference Publication:
A procedure is qualified on plate .500" thick. Four nick break specimens were substituted
for the four side bends.
a.
b.
c.
d.
Section:
100.
Reference Publication:
A procedure is qualified on plate .500" thick. Which of the following thicknesses is not
qualified?
a.
b.
c.
d.
99.
Reference Publication:
Reference Publication:
A welder is qualified in the 3F and 4F positions. Which of the following groove welds can
he make?
a.
b.
c.
d.
1G
2G
6G
None
Section:
Reference Publication:
1/07 ITAC API 653 Exam Prep Homework #4 Questions Page 8