Sei sulla pagina 1di 5

DOCUM EN T R EVI EW AN D COVER SHEET

Construction Contractor:

Com pany:

Engineering Contractor:

Engineering and Technical Services:

R eview :

PROJECT

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE)


Project Bashkortostan, Russian Federation

CONTRACT NO

88621 - December, 2012

DOCUMENT TITLE

LV Bus Duct

DOCUMENT NUMBER

RSAE

DOCUMENT DESCRIPTION

Inspection and Test Plan (ITP)

- ITP

QA

- EL

- 012

REV. A1

Status

Status Code

APPROVED WITHOUT COMMENT

REVISE AND RESUBMIT. WORK MAY


INCORPORATON OF CHANGES INDICATED.

REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY NOT PROCEED

INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY PROCEED

CANCELLED/SUPERSEDED

Revieved Engineer:

Code Description

NAME

SIGN

PROCEED

SUBJECT

TO

DATE

Remarks or Comments:

Docum ent N um ber:

R evision:

RSAE

ITP

QA

EL

012

PROJECT CODE

DOCUMENT TYPE

DEPARTMENT CODE

DICIPLINE CODE

SEQUENCE NUMBER

A1

REVISION SHEET
Revision Description of changes
A1

Page

First Issued For approval

Docum ent N um ber:

R evision:

RSAE

ITP

QA

EL

012

PROJECT CODE

DOCUMENT TYPE

DEPARTMENT CODE

DICIPLINE CODE

SEQUENCE NUMBER

A1

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project

Inspection and Test Plan


LV BUS DUCT
Issue Date:

No

27/08/2014

RSAE-ITP-QA-EL-012

Doc. Number:

DESCRIPTION OF ACTIVITY

CONTROL DOCUMENT

Revision:

ACCEPTANCE CRITERIA

A1

VERIFICATION DOCUMENT

Page:

1 of 1

INVOLVEMENTS
RC
MHI Owner

Installation Check
1- Inspect panel assembly for
alignment, level, tightness of bolts

1.1

1.2

1.3

2- Inspect bus duct connection

(Torque check and marking)


3- Check frame earthing
4- Inspect termination
5- Check bus duct supports
Check phase rotation

connection

3935 E323-00100
LV MCC and Distribution
Transformers Drawings

3935 E323-00100
LV MCC and Distribution
Transformers Drawings

Correct Installation

Attachment
1- RSAE-FRM-216 INSPECTION CHECK LIST LV BUS DUCT

Owner

W
H

W
H

RSAE-FRM-216
Correct phase rotation

connection

500 VDC, 1 Min


>50 Mohm
>10MOhm

Insulation resistance measurement

RSAE-FRM-216

RSAE-FRM-216

DWG:
1. LV Busduct : 3935 E323-00100
2. Transformer : 3935 E322-00600
3. LV SWGR/MCC : 3935 E323-00200
Instruction manual :
1. LV Busduct : 3935 E423-00100
2. Transformer : 3935 E422-00600
3. LV SWGR/MCC : 3935 E423-00200 & 201

LEGEND
RC: Renaissance Construction, MHI: Mitsubishi Heavy Industries, GNS: Gasprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check), I: Inspection

0AO

Acrylic Acid Plant


SALAVAT, BASHKORTOSTAN, RUSSIAN FEDERATION

INSPECTION CHECK LIST


INSPECTION CHECK LIST LV BUS DUCT
Date:

Tag.
Tag

No.

No.
1
2
3
4
5
6
7
8

Check List Ref. No.:

Location:

DWG No.

Check bus duck alighment and levelling


Check bolt torques
Check busbar connections
Check bus bar terminations to Transformer and LV MCCs LV
Check earthing
Check bus duck supports
Check Insulation resistance according to below table
Check Phase Rotation

by Owner

RFI Ref. No.:

Terminal block: 25Nm


Others: M6 8Nm, M8 20Nm,
M10 40Nm, M20 80Nm

Item Checked

RSAE-FRM-216

Checked by
RC

Checked
by MHI

Checked
by GNS

Remarks

SWGR/MCC

duct

connection
Insulation Resistance Test

Test Voltage:

V DC
500VDC

Minimum resistance:

.M

>10MOhm

Phase - N
Result
Phase-Phase

Phase-PE

Phase-Grand

Insulation
Continiouty
Resistance

Phase
Rotation

[Ok or NG] [Ok or NG] [Ok or NG]

connection

Phase - Phase
(L1-L2, L2-L3, L3-L1)

Name

Testing Instruments List [The calibration certificate of the testing instruments shall be attached]
Manufacturer
Equipment serial No

RONESANS QC ENGINEER

MHI QC ENGINEER

OWNER ENGINEER

Name/Surname:

Name/Surname:

Name/Surname:

Signature:

Signature:

Signature:

Date:

Date:

Date:

RSAE-FRM-216

Calibration date