3.1. Advantages of EPM usage in an association:


EPM execution will be a piece of PMO usage and will benefit the association by
determining all the administration related issues. EPM usage will help with
organizing the activities to show which project will advantage the organization
subsequently disposing of the issue of task choice.
With the assistance of EPM-Project server Project administrator will have the
capacity to screen and control the task progress by keeping the track on the
venture advance and will effectively answer to the PMO about the undertaking. In
that way venture will be under control and won't get delayed.
EPM-Project Server will help with creating venture timetables and undertaking
cushions which will lessen the odds of task postponement.
Assets can without much of a stretch be arranged and dispensed through EPM
venture server and it will be simple for Project administrator to modify assets in
basic undertakings of task.
Activities won't keep running over expense as PMO will adequately monitor
venture spending plan and cost execution through Project Server.
As development tasks for the most part get influenced by dangers as far as venture
timetable and cost, so by symbolizing EPM arrangement, Gold Roof Company
will have the capacity to distinguish and arrange the dangers which will be
connected at whatever point any potential danger emerge.
EPM arrangement will give a correspondence phase which will help with
reporting project advancement to partners and CEO of the association.

3.2. Implement EPM- Project Server 2010 in selected organization:


After PMO execution, EPM-Project Server must to be actualized in an association for
powerful venture administration usage. PMO will be in charge of establishment and

synchronization of EPM arrangement. However EPM will be executed by considering and


applying these steps:
Organization must have a sentimentality with the undertaking group and divide the
capacity of task group for acceptance of present day devices and programming for
venture administration.
PMO must to brighten all partners about the presentation of new system and how it
will advantage the task as far as undertaking cost and timetable.
Team must consist of people which are in favor of EPM implementation.
Software training must be given to project team.
PMO must to keep the top administration include all through the EPM-Project Server
execution to keep them connected with and give frameworks to actualizing it.

3.3. Workflow of EPM-Project Server 2010 for selected organization:


3.4. Business drivers for selected organization with prioritizing

through justification:

Construction projects:

The significant business drivers for Gold roof are the development ventures as this
organization has an incomprehensible involvement in development ventures.
Additionally the group of this organization significantly contains designers and
structural architects. So the chose association offer need to development related

ventures.
Pre-manufactured development:
Another business driver incorporates pre-manufactured development ventures as this
organization has skill in the arrangement and execution of pre-created material in
building development. Likewise this organization is one of the pioneers in execution

of pre-manufactured development in Pakistan.


Socially helpful projects:
Socially helpful activities are one of the primary drivers for this association as it
principally works for undertakings like development in quake influenced ranges of
Pakistan. So this organization dependably offers need to such development ventures
which advantage the influenced individuals.