PROJECT NAME
DOCUMENT NO.
: KP-00+++-CQ712-B7702
TITLE
OWNER
26.12. 2015
Rev.
No.
DATE
First Issue
DESCRIPTION
L.E
PREPARED
TOTAL 3 PAGES
(Including Cover)
Purpose
For Information
For Review
For Approval
For Construction
As-Built
E.G.
CHECKED
REVIEWED
APPROVED
Contractor
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
C.A.
No.
1
1.1
1.2
2.1
2.2
3.1
ITP No.
KP-00+++-CQ712-B7702
Rev. No.
Page
1 of 2
Inspection Status
Application Document/Code/Spec. No.
Document Submittal
Subcon
tractor
GAMA
Remarks
Owner
GENERAL
Material Inspection
Document Review
Document Review
Visual&Dimension Inspection
Visual Inspection
Visual inspection
Visual Inspection
Visual inspection
Final
Notes) #1
Legend
Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review
Contractor
Area / Unit
ITP No
KP-00+++-CQ712-B7702
Report No
Owner Name
Main Subcontractor
Item Name / Item No
/ Description
ITP Item
Date
Rev.0
Drawing No
Approximate Date/Time of Pouring Concrete:
No.
ITEM DESCRIPTION
Subcontractor
Check that all dimensioning of down-conductor and clamps as per the approved attached
drawing are followed while implementation.
Check that all joints are properly fix as per the typical installation details attached with the
inspection checklist.
Check that connections are properly for the down-conductor connects the air terminals to
the grounding system.
GAMA
Remarks / Comments
Subcontractor
GAMA
3rd Party / AI
POSCO
Name:
Name:
Name:
Name:
Date:
Date:
Date:
Date:
Sign:
Sign:
Sign:
Sign: