Sei sulla pagina 1di 3

Inspection and Test Plan For

Lightning Protection System Installation


Works

PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

DOCUMENT NO.

: KP-00+++-CQ712-B7702

TITLE

: Inspection and Test Plan For Lightning


Protection System Installation Works

OWNER

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

26.12. 2015

Rev.
No.

DATE

First Issue
DESCRIPTION

L.E
PREPARED

TOTAL 3 PAGES
(Including Cover)

Purpose
For Information
For Review
For Approval
For Construction
As-Built

E.G.
CHECKED

REVIEWED

APPROVED

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

C.A.

Inspection and Test Plan


for Lightning Protection
System Installation
Works
Item Name

No.
1

1.1

1.2

2.1

2.2

3.1

Inspection & Test Activity

Inspection & Test


Description

ITP No.

KP-00+++-CQ712-B7702

Rev. No.

Page

1 of 2

Inspection Status
Application Document/Code/Spec. No.

Document Submittal
Subcon
tractor

GAMA

3rd Party POSCO


/AI
E&C

Lightning Protection System


Installation Works Inspection
Checklist

Remarks

Owner

GENERAL

Review of Technical Documents


(Drawings, Specs, Method statements etc.)

Material Inspection

Document Review

Document Review

KP-00B -EE210-G6015 Grounding & Lightning


Protection - Technical KP-00+++-CY712BKM7109 Method Statement For Lightning
Protection System Installation Works
KP--00B -EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Visual&Dimension Inspection

Material Certification Review


and Visual&Dimension
Inspection

KP-00B -EE210-G6015 Grounding & Lightning


Protection - Technical KP-00+++-CY712BKM7109 Method Statement For Lightning
Protection System Installation Works
KP--00B -EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Lightning Protection System


Installation Works Inspection
Checklist

Visual Inspection

KP-00B -EE210-G6015 Grounding & Lightning


Protection - Technical KP-00+++-CY712BKM7109 Method Statement For Lightning
Protection System Installation Works
KP--00B -EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Lightning Protection System


Installation Works Inspection
Checklist

Visual inspection

KP-00B -EE210-G6015 Grounding & Lightning


Protection - Technical KP-00+++-CY712BKM7109 Method Statement For Lightning
Protection System Installation Works
KP--00B -EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Lightning Protection System


Installation Works Inspection
Checklist

Controlling Test Results

KP-00B -EE210-G6015 Grounding & Lightning


Protection - Technical KP-00+++-CY712BKM7109 Method Statement For Lightning
Protection System Installation Works
KP--00B -EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Lightning Protection System


Installation Works Inspection
Checklist

Material Certificate Submission

Lightning Protection System Installation

Underground earthing system installation,Visual and


Dimensional Inspection

Above-grounding system installation ,Visual and


Dimensional Inspection

Visual Inspection

Visual inspection

Final

Earthing wire continuity check & Insulation resistance


check

Controlling Test Results

Notes) #1

Legend

Doc. No: KP-00+++-CQ712-6, Rev.1

Test Report Submission

Perform

Hold Point

Witness Point

Spot Witness

Surveillance

Report Review

Electrical Works(Underground and Aboveground


Earthing Works)
Inspection Checklist
Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2
POSCO ENGINEERING &
CONSTRUCTION CO.,
LTD.

Contractor
Area / Unit
ITP No

KP-00+++-CQ712-B7702

Report No

Ministry of Electricity (MOE) of


Kurdistan
Regional Government

Owner Name

Main Subcontractor
Item Name / Item No
/ Description

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING
INC.

ITP Item
Date
Rev.0

Drawing No
Approximate Date/Time of Pouring Concrete:
No.

ITEM DESCRIPTION

Subcontractor

Visual check of materials.

Check the installed down-conductor wire is visually proper.

Check that all dimensioning of down-conductor and clamps as per the approved attached
drawing are followed while implementation.

Check that all joints are properly fix as per the typical installation details attached with the
inspection checklist.

Check that connections are properly for the down-conductor connects the air terminals to
the grounding system.

GAMA

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712--F01, Rev.0