Inspection & Test Plan for Khabat PP

132kV Switchyard Conductor


Installation Works

TOTAL 13 PAGES
(Including Cover)

PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

Purpose

DOCUMENT NO.

: KP-00+++-CQ712-B7356

For Information

TITLE

: Inspection&Test Plan for Khabat PP


132kV Switchyard Conductor Installation Works

OWNER

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

For Review
For Approval
For Construction
As-Built

26.02.2015

For Construction

DE

AY

05.02.2015

For Construction

DE

AY

22.01.2015

First Issue

DE

AY

PREPARED

CHECKED

REVIEWED

APPROVED

Rev.
No.

DATE

DESCRIPTION

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.

ITP No.

Inspection & Test Plan


for CONDUCTOR INSTALLATION WORKS

Item Name

Aluminium Conductors
(MCM)

String Insulators

Tension and Suspension

No.

Inspection & Test


Activity

Inspection & Test


Description

Application
Document/Code/Spec.
Supplier/
No.

KP-00+++-CQ712-B7356

Rev. No.

Page

1/1

Document Submittal

Remarks

Inspection Status

Subcontractor

GAMA

3rd Party POSCO


/ AI
E&C

Owner

1.1

Visually checking of the


Material Receiving
conductor for and physical
Inspection
damage.

Drawings and Technical


Specifications

Check List for Conductors Erection Item 1

1.2

Package List &


Length of Wire
Meters

Checking materials that


arrive to site in accordance
with the Package List

Package List

Check List for Conductors Erection Item 2

1.3

Assembly and
fixing

Checking assembly and


fixing of conductors

Drawings and Technical


Specifications

Check List for Conductors Erection Item 3

1.4

SAG of Tension
Conductors

Checking deflection of
tension conductors

Drawings and Technical


Specifications

Check List for Conductors Erection Item 4

1.5

Erection of
Connectors

Checking of connector
erection

Drawings and Technical


Specifications

Check List for Conductors Erection Item 5

2.1

Visually checking of the string


Material Receiving
Drawings and Technical
insulator for and physical
Inspection
Specifications
damage.

Check List for Conductors Erection Item 1

2.2

Package List

Checking of package list

Package List

Check List for Conductors Erection Item 2

2.3

Assembly and
fixing

Checking assembly and


fixing of string insulator

Drawings and Technical


Specifications

Check List for Conductors Erection Item 3

2.4

Count of Insulators

Checking count of string


insulators

Drawings and Technical


Specifications

Check List for Conductors Erection Item 6

3.1

Visually checking of the


Material Receiving
equipment for and physical
Inspection
damage

Drawings and Technical


Specifications

Check List for Conductors Erection Item 1

3.2

Package List

Checking of package list

Package List

Check List for Conductors Erection Item 2

3.3

Assembly and
fixing

Checking assembly and


fixing

Drawings and Technical


Specifications

Check List for Conductors Erection Item 3

3.4

Site Construction
Dossier

Document preparation and


review

Drawings and Technical


Specifications

Site Construction Dossier

Notes) #1 CL (Check List) form of Conductors Erection is submitted as attachment of this ITP.
#2 Guard wire installation will be followed up with this ITP and related Check lists.
Legend

SIEMENS

P
H
W
S
V
R

Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review

CHECK LIST of Conductors


Erection

Num.

Identification

Visual check of the equipment

Checking of Package list

Assembly and fixing


a.

Checking of Tension and Suspension Hardware

b.

Reviewing and checking of lifting plan

c.

Checking of Aluminum Connectors

d.

Checking of String insulators pins

e.

Visual Control of Galvanizing

Checking SAG of Tension Conductors

Checking of Connector Erection

Counts of the insulators

Accept

KHABAT THERMAL POWER PLANT UNITS


1 & 2 PROJECT 132kV AIR INSULATED
SWITCHGEAR
Rev: 1
Page No:1 of 1
Job No:

Reject

N/A

Comments

SIGN OFF AS ACCEPTED


SIEMENS

GAMA

POSCO

Employer

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

Signature
Subcontractor

GAMA

POSCO

AAC Conductors Routine Test and


FAT Reports for Khabat PP 132kV
Switchyard

TOTAL 10 PAGES
(Including Cover)

PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

Purpose

DOCUMENT NO.

: KP-90AEH-VE691-V0002

For Information

TITLE

: AAC Conductors Routine Test and FAT Reports


for Khabat PP 132kV Switchyard

OWNER

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

26.02.2015

Rev.
No.

DATE

First Issue
DESCRIPTION

For Review
For Approval
For Construction
As-Built

DE

AY

PREPARED

CHECKED

REVIEWED

APPROVED

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.