TOTAL 13 PAGES
(Including Cover)
PROJECT NAME
Purpose
DOCUMENT NO.
: KP-00+++-CQ712-B7356
For Information
TITLE
OWNER
For Review
For Approval
For Construction
As-Built
26.02.2015
For Construction
DE
AY
05.02.2015
For Construction
DE
AY
22.01.2015
First Issue
DE
AY
PREPARED
CHECKED
REVIEWED
APPROVED
Rev.
No.
DATE
DESCRIPTION
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
ITP No.
Item Name
Aluminium Conductors
(MCM)
String Insulators
No.
Application
Document/Code/Spec.
Supplier/
No.
KP-00+++-CQ712-B7356
Rev. No.
Page
1/1
Document Submittal
Remarks
Inspection Status
Subcontractor
GAMA
Owner
1.1
1.2
Package List
1.3
Assembly and
fixing
1.4
SAG of Tension
Conductors
Checking deflection of
tension conductors
1.5
Erection of
Connectors
Checking of connector
erection
2.1
2.2
Package List
Package List
2.3
Assembly and
fixing
2.4
Count of Insulators
3.1
3.2
Package List
Package List
3.3
Assembly and
fixing
3.4
Site Construction
Dossier
Notes) #1 CL (Check List) form of Conductors Erection is submitted as attachment of this ITP.
#2 Guard wire installation will be followed up with this ITP and related Check lists.
Legend
SIEMENS
P
H
W
S
V
R
Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review
Num.
Identification
b.
c.
d.
e.
Accept
Reject
N/A
Comments
GAMA
POSCO
Employer
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
Signature
Subcontractor
GAMA
POSCO
TOTAL 10 PAGES
(Including Cover)
PROJECT NAME
Purpose
DOCUMENT NO.
: KP-90AEH-VE691-V0002
For Information
TITLE
OWNER
26.02.2015
Rev.
No.
DATE
First Issue
DESCRIPTION
For Review
For Approval
For Construction
As-Built
DE
AY
PREPARED
CHECKED
REVIEWED
APPROVED
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor