DOCUMENT NO.
: KP-00+++-CQ712-G0006
TITLE
11.06.2014
For Construction
K.Ozyurt
03.05.2014
For Construction
E.Karaali
16.04. 2014
First Issue
E.Karaali
Rev.
No.
DATE
DESCRIPTION
PREPARED
Purpose
For Information
For Review
For Approval
For Construction
OWNER
TOTAL 3 PAGES
(Including Cover)
As-Built
S.Elol
D.znder
S.Kepir
D.znder
S.Kepir
CHECKED
D.znder
A.Ba
G.apkan
A.Ba
G.apkan
A.Ba
REVIEWED
APPROVED
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
ITP No.
No.
1.1
1.2
Item Name
Material Inspection
1
1 of 1
Inspection Status
Document Submittal
Subcon
tractor
GAMA
Remarks
Owner
Document Review
Document Review
Visual&Dimension Inspection
Visual Inspection
Visual inspection
2.2
3.1
Page
KP-00+++-CQ712-G0006
GENERAL
2.1
Rev. No.
Visual Inspection
Visual inspection
Final
Notes) #1
Legend
Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review
Project Name
Owner Name
Contractor
Main Subcontractor
Area / Unit
ITP No
KP-00+++-CQ712-G0006
ITP Item
Report No
Date
Rev.
Drawing No
Approximate Date/Time of Pouring Concrete:
No.
ITEM DESCRIPTION
Subcontractor
Check that all dimensioning of earthing wire as per the approved attached drawing are
followed while implementation.
Check that all joints are properly fix as per the typical installation details attached with
the inspection checklist.
All related tests are properly finalized and all wiring routing & joints are completed in
line with installation details and approved drawings.
GAMA
Remarks / Comments
Subcontractor
GAMA
3rd Party / AI
POSCO
Name:
Name:
Name:
Name:
Date:
Date:
Date:
Date:
Sign:
Sign:
Sign:
Sign: