Sei sulla pagina 1di 3

Inspection and Test Plan

for Electrical Works (UnderGround


and AboveGround Earthing
Works)
PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

DOCUMENT NO.

: KP-00+++-CQ712-G0006

TITLE

: Inspection and Test Plan for Electrical Works


(UnderGround and AboveGround Earthing
Works)

11.06.2014

For Construction

K.Ozyurt

03.05.2014

For Construction

E.Karaali

16.04. 2014

First Issue

E.Karaali

Rev.
No.

DATE

DESCRIPTION

PREPARED

Purpose
For Information
For Review
For Approval
For Construction

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

OWNER

TOTAL 3 PAGES
(Including Cover)

As-Built

S.Elol
D.znder
S.Kepir
D.znder
S.Kepir
CHECKED

D.znder

A.Ba

G.apkan

A.Ba

G.apkan

A.Ba

REVIEWED

APPROVED

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.

ITP No.

Inspection and Test Plan


for Grounding

No.

1.1

1.2

Item Name

Review of Technical Documents


(Drawings, Specs, Method statements etc.)

Material Inspection

1
1 of 1

Inspection Status
Document Submittal

Application Document/Code/Spec. No.


3rd Party POSCO
/AI
E&C

Subcon
tractor

GAMA

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Remarks

Owner

Document Review

Document Review

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Visual&Dimension Inspection

Material Certification Review


and Visual&Dimension
Inspection

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Visual Inspection

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Visual inspection

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Controlling Test Results

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and Lightning
Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Material Certificate Submission

Earthing System Installation

Underground earthing system installation,Visual and


Dimensional Inspection

2.2

Above-grounding system installation ,Visual and


Dimensional Inspection

3.1

Inspection & Test


Description

Page

KP-00+++-CQ712-G0006

GENERAL

2.1

Inspection & Test Activity

Rev. No.

Visual Inspection

Visual inspection

Final

Earthing wire continuity check & Insulation resistance


check

Controlling Test Results

Notes) #1

Legend

Doc. No: KP-00+++-CQ712-G0006, Rev.1

Test Report Submission

Perform

Hold Point

Witness Point

Spot Witness

Surveillance

Report Review

Electrical Works(Underground and Aboveground


Earthing Works)
Inspection Checklist

Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2

Owner Name

Ministry of Electricity (MOE) of Kurdistan


Regional Government

Contractor

POSCO ENGINEERING &


CONSTRUCTION CO., LTD.

Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING INC.

Area / Unit

SEE ATTACHED DRAWING

Item Name / Item No


/ Description

ITP No

KP-00+++-CQ712-G0006

ITP Item

Report No

Date
Rev.

Drawing No
Approximate Date/Time of Pouring Concrete:
No.

ITEM DESCRIPTION

Subcontractor

Check the installed earthing wire is visually proper.

Check that all dimensioning of earthing wire as per the approved attached drawing are
followed while implementation.

Check that all joints are properly fix as per the typical installation details attached with
the inspection checklist.

Check that continuity of earthing system conductivity is ensured.

All related tests are properly finalized and all wiring routing & joints are completed in
line with installation details and approved drawings.

GAMA

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712-G0006-F01, Rev.1

Potrebbero piacerti anche