1.
Purpose.................................................................................................................................... 2
2.
Scope ....................................................................................................................................... 2
3.
Definitions............................................................................................................................... 2
4.
References ............................................................................................................................... 2
5.
Responsibilities ....................................................................................................................... 2
6.
5.1.
5.2.
5.3.
5.4.
IMPLEMENTATION ............................................................................................................. 3
6.1.
General ............................................................................................................................. 3
6.2.
6.3.
Transport .......................................................................................................................... 4
6.4.
Installation ........................................................................................................................ 4
HSE ......................................................................................................................................... 5
7.1.
7.2.
Machinery......................................................................................................................... 5
7.3.
7.4.
7.5.
Manual handling............................................................................................................... 6
7.6.
7.7.
Restriction ........................................................................................................................ 6
7.8.
Page 1 of 7
METHOD STATEMENT
NSPB Installation
Rev. 00
2 Sep 2011
1. Purpose
Purpose of this method statement is to define the sequence of non-segregated bus ducts installation and
safe execution of the job.
2. Scope
The procedure applies for non-segregated bus ducts transportation, handling, and installation at all
workplaces where these activities will be performed.
3. Definitions
NSPB : Non-Segregated Phase Bus Duct
4. References
Project HSE Manual
Drawings and design details
5. Responsibilities
5.1. Site Manager:
5.1.1.
5.1.2.
5.1.3.
5.1.4.
5.1.5.
5.1.6.
Page 2 of 7
METHOD STATEMENT
NSPB Installation
5.2.7.
5.2.8.
5.2.9.
5.2.10.
5.2.11.
5.2.12.
5.2.13.
5.2.14.
Rev. 00
2 Sep 2011
6. IMPLEMENTATION
6.1. General
Non-segregated bus ducts are used for carrying energy.
Galvanized spray
Page 3 of 7
METHOD STATEMENT
NSPB Installation
Rev. 00
2 Sep 2011
6.3. Transport
Transportation of non-segregated bus ducts is made proper places to work in site. Crane will be
used and all necessary precaution matures will be taken. Provide crane and truck to
transportation of non-segregated bus ducts and accessories from lay down area to the field. Use
crane for lifting and carrying NSPB. When crane will be used according to 7.3. lifting operation.
It will be stayed suitable places, so it prevents to work and workers work safely.
6.5. Installation
Check last revision of approved project then start installation. Controlling the montage
equipments of NSPB with the supervisor and performed an examination on the project then gives
the tasks to the team. Scaffold will be set by trained people. It will be tagged. Installation will be
carried out in accordance with the last approved revision of the installation projects. Request
form for materials will be prepared. Site will be controlled by NSPB supervisor then according to
supervisor, it will be transported. NSPB will be transported from lay down area to site with crane
and pickup. While it will be carried, it will be fixed safely in the truck board. The assembly
drawings will be checked on the place of installation. At the working area, the NSPB will be
placed in a way that will not prevent safe access and egress. Checking will be done for the
accessories of NSPB and preparation of NSPB accessories for montage, after boxes will be
opened. Erection of NSPB will be started by crane. Signaler will help operator when it will be
lifted. All personnel, who work high places, will have PPE. Installation of NSPB will be
executed according to the requirements. According to supervisor, it will be erected. Installation
will follow the erection drawing. The silicone bushings at phase side must be installed during
alignment of shipping units. Preconditions the excitation transformer must be installed before
erection of the connecting shipping units. Installation will follow the erection drawing. NSPB
comply with the projects requirements. Where cutting of NSPB is needed, it will be sprayed with
spray immediately. When all erection and testing will be done, scaffold will be dismantled by
Page 4 of 7
METHOD STATEMENT
NSPB Installation
Rev. 00
2 Sep 2011
competent personnel. PPE will be used all level of action. When all of works will be done, it will
be controlled all equipment. After the works is done daily, working areas will be cleaned.
7. HSE
7.1. Personal protective equipment
PPE will be provided and used in accordance with requirements. Helmet, safety glasses, high
visibility vest, and safety shoes will be used at all the times.
When work in dusty environment personnel will use dust protective half masks.
Hearing protection will be used where exposure levels exceed 85 dB.
When work at height fall arrest system will be used if other protective measures are not feasible.
When work with welding, welders will use welders clothes, gloves, protective face masks.
7.2. Machinery
All machinery, equipment and tools will be maintained in good working order; will be inspected
regularly; and will be operated by competent persons. All necessary measures will be in place in
order to prevent environmental pollution. In case of oil spill an immediate actions will be taken
to localize and clean the area in accordance with the procedure. Guards will be in place to protect
workers from moving parts. Electrical tools will be double insulated and grounded connected to
ground fault circuit interrupters (GFCI).
All vehicles will have backing warning device. Banks man will guide vehicles in narrow work
places and when reversing. Vehicles will not pass, will not be positioned or parked close to
excavation edges.
Page 5 of 7
METHOD STATEMENT
Rev. 00
2 Sep 2011
NSPB Installation
7.7. Restriction
No food or beverages to be consumed at jobsite
No smoking
No work without permit
Page 6 of 7
METHOD STATEMENT
NSPB Installation
Rev. 00
2 Sep 2011
List of attachments:
1. List of the staff involved in the job
2. Toolbox attendance sheet
3. Risk Assessment