Sei sulla pagina 1di 6

70 TPD CHLOR ALKALI PLANT QATAR

Client: M/s. GULF CHLORINE W.L.L.


Consultant: M/s.FATA
Main Contractor: M/s.AL ALIA
MEP Contractor : M/S. ALMOAYYED AIR CONDITION
Item

Description

Sl No

GC

BOQ Amount Variation


Variation Amount
(QR)
Amount V1 ( QR)
V2 (QR)

NEW corrected
Amount

GENERAL SUMMARY MEP WORKS: Bill no 27, Electrical Mechanica

Bill no.1

4,801.42

Bill no.2

42,321.88

10,868.98

Bill no.3

12,745.06

6,514.66

Bill no.4

23,151.60

18,408.00

5
6
7
8
9
10
11
12
13
14

Bill no.5
Bill no.6
Bill no.7
Bill no.8
Bill no.9
Bill no.10
Bill no.11
Bill no.12
Bill no.13
Bill no.14

34,346.60
47,078.46
5,029.16
6,185.56
11,660.38
1,486.80
(33,585.16)
(4,059.20)
507,610.06
(5,031.16)

34,346.60
25,314.71
5,029.16
6,185.56
11,660.38
1,486.80
(33,585.16)
(4,059.20)

15

Bill no.15

100,789.70

76,797.94

16

Bill no.16

21,043.33

21,043.33

(13,291.16)

26,550.51

2,213.01

17

Bill no.17

18

Bill no.18

19

Bill no.19

20

Bill no.20

(65,402.68)

(68,221.70)

21

Bill no.21

159,967.88

149,674.74

22

Bill no.22

5,567.24

5,040.96

23

Bill no.23

47,791.18

45,855.98

24

Bill no.24

(5,333.60)

(5,333.60)

25

Bill no.25

53,454.00

29,618.00

26

Bill no.26

164,334.63

143,387.13

(17,428.60)

TOTAL AMOUNT

1,162,503.64

451,526.51

LOR ALKALI PLANT QATAR

GC comments and Observations

Difference

Observations/ Comments

WORKS: Bill no 27, Electrical Mechanical Workshop building


There shall not be any change in Rain

4,801.42 Water installation, since there is No change


in it.

Since there is No change in Ground Floor


and Roof, Qty for First floor only to be
considered.
31,452.90 1) 110 mm Dia Pipe shall be 80M.
2) 75mm dia pipe shall be 13M.
3) 50 MM Dia pipe shall be 65 M.

1) Qty for Floor Gulley shall be 12 instead


of 16.
6,230.40 2) No Floor clean out at first floor, therfore
Qty shall be 0 instead of 2

1) No pedistral Wash Basin on first floor,


Qty to be 0 instead of 1.
4,743.60 2) Soap Dispenser Qty 5 instead of 7.
3) Mirror Qty 4 instead of 5.

21,763.75
-

ok, but double loading

ok
ok
ok
ok
ok
ok
Rejected. need to be discussed.
8,260.00 Variation calcuated by FATA
Variation is agreed by ATC, but still need

23,991.76 to understand why Duct insulation fibre


glass is added as new qty.( Please ca

ok

As per drawings All previous 4C x 25

24,337.50 sqmm cables are replaced with higher size.


Why still same cable is reflecting in BOQ.

There is reduction of Cable tray price by


Almoyed due to reduction in Qty from
17,428.60 QAR 55000 to QAR 40230. why there is
no propotianate reduction reflected in Al
Alalia offer.

ok
Qty for TYPE F8+E fixture shall be 1 Nos

2,819.02 instead of 2 Nos.

1) price for Type D1 fixture if already


fixed in cell house as QAR 762.28, it
10,293.14 should not be QAR 1057.28.
2) Qty for Type R1 fixture shall be 10
instead of 13.
1) Single pole switch, one way four gang
should be 0 instead of 1.
526.28 2) Flex outlet for exhaust fan shall be 2
instead of 3.

Deleted Qty not ok. 20A Two Pole Switch


1,935.20 and 45A Flex Outlet Qty shall be 4 Nos.
each instead of 2 Nos. what is considered.

ok

Qty:
1) Addressable smoke detector 22
insteadof 44.
23,836.00 2) Fire Alarm Bell with strobe Light is 6
instea of 10.
3) Heat Detector 4 instead of 5.

1) Total is wrong, it should be QAR


184687 instead of QAR 205634.63.
20,947.50 2) Two time loading of OH & Profit- Item
done, not acceptable. Further Qar 20947.50
can be reduced.

203,367.06