S.N. Descriptions
1 Earth Work
1.1 Clearing and grubbing the site for
construction.
Column Footing
CF1
CF2
CF3
Butress
Toe Wall
Ramp
Total
Length
Length (m) (m)
No.
Breadth
(m)
Height/De
pth (m)
Quantity
24.45
24.45
23.05
Total =
Say
1
2
2
2
2
1
19.05
1.95
1.95
1.95
3.00
13.05
19.05
3.90
3.90
3.90
6.00
13.05
49.80
1.05
1.10
57.52
1.05
1.05
1.10
1.10
81.28
-7.62
563.57
563.57 sq.m.
564.00 sq.m.
2
2
1
1
2
1
11.95
4.70
14.95
3.28
4.95
8.95
-4
1.65
23.90
9.40
14.95
3.28
9.90
8.95
70.38
-6.60
2
-4
-4
2
10.95
1.65
2.15
2.35
21.90
-6.60
-8.60
4.70
0.75
0.60
0.75
0.75
0.75
0.75
0.75
0.75
12.32
-2.97
-4.84
2.64
4
4
2
9
1.65
2.15
2.35
0.30
6.60
8.60
4.70
2.70
1.65
2.15
2.35
1.05
1.50
1.50
1.50
1.10
16.34
27.74
16.57
3.12
4
2
1
1
1
1
1
1
4
2
1
1
3.40
3.00
3.95
0.98
11.40
19.95
1.20
7.95
1.95
1.95
0.95
0.95
13.60
6.00
3.95
0.98
11.40
19.95
1.20
7.95
7.80
3.90
0.95
0.95
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55
0.55
0.55
Total =
Say
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
Page 1 of 55
Unit
3.67
1.62
1.07
0.26
3.08
5.39
0.32
2.15
2.57
1.29
0.31
0.31
224.13 cu.m.
225.00 cu.m.
DETAIL ESTIMATE
S.N. Descriptions
1.3 Filling in plinth with earth.
Arrival Hall
VIP/Baggage Handling
Departure toilet
Security
Departure Hall
Betn grid (1-2) & (B-C)
Betn grid (1-2) & (C-D)
Betn grid (2-6) & (C-D)
Total
Length
Length (m) (m)
No.
Breadth
(m)
Height/De
pth (m)
Quantity
Unit
1
1
1
1
1
1
1
2
2
1
2
1
2
1
1
1
1
1
1
2.55
5.55
2.40
2.55
5.55
2.55
2.55
2.63
2.70
2.55
2.55
11.55
2.95
4.00
11.55
19.05
6.00
22.00
6.00
2.55
5.55
2.40
2.55
5.55
2.55
2.55
5.25
5.40
2.55
5.10
11.55
5.90
4.00
11.55
19.05
6.00
22.00
6.00
2.55
5.63
2.55
2.55
5.55
2.55
3.55
3.65
3.65
3.40
2.55
5.55
2.55
1.05
1.55
1.05
1.05
22.00
1.05
Total =
Say
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.23
0.23
0.45
0.45
0.45
2.00
1.00
2.93
14.05
2.75
2.93
13.86
2.93
4.07
8.62
8.87
3.90
5.85
28.85
3.39
0.95
8.06
9.00
2.84
968.00
6.30
1098.13 cu.m.
1099.00 cu.m.
4
4
2
1.65
2.15
2.35
6.60
8.60
4.70
1.65
2.15
2.35
Total =
Say
0.15
0.15
0.15
1.63
2.77
1.66
6.06 cu.m.
7.00 cu.m.
2 Concrete Works
2.1 P.C.C. 1:3:6 under foundation
F1
F2
F3
4
4
2
1.65
2.15
2.35
6.60
8.60
4.70
1.65
0.075
2.15
0.075
2.35
0.075
Total =
Say
0.82
1.39
0.83
3.03 cu.m.
3.20 cu.m.
4
1.50
4 Av. Area =
4
2.00
4 Av. Area =
2
2.20
2 Av. Area =
6.00
1.50
1.25
2.00
2.13
2.20
2.55
Total =
8
2
0.30
0.30
2.40
0.60
8
5
2.70
3.70
1
2
2
2
2
1
18.45
2.55
2.55
2.55
3.00
12.45
b)
c)
2
2
1
12.55
4.70
15.55
Page 2 of 55
0.200
0.200
0.200
0.200
0.200
0.300
1.80
1.00
3.20
1.70
1.94
1.53
11.16 cu.m.
0.30
10.025
0.30
9.925
Total =
7.22
1.79
9.00 cu.m.
21.60
18.50
0.30
0.30
0.300
0.300
1.94
1.67
18.45
5.10
5.10
5.10
6.00
12.45
52.20
0.45
0.15
3.52
8.00
4.40
25.10
9.40
15.55
DETAIL ESTIMATE
S.N. Descriptions
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Toilet partition wall
Floor beams
First floor
Second floor
Tower Roof
e)
f)
Slabs
First floor
Second floor
Less
Wall tie
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Along Y-axis
Grid 1 & 7/(A-E)
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Gable tie
g)
h)
Lintels
W2
W4
W5
Wall stitch
Type -A
Type -B
No.
1
2
1
4
2
1
1
1
1
1
1
Total
Length
Breadth
Height/De
(m)
pth (m)
Length (m) (m)
Quantity
Unit
3.28
3.28
5.55
11.10
9.55
9.55
73.98
0.45
0.15
4.99
2.55
10.20
0.15
0.15
0.23
2.55
5.10
0.15
0.15
0.11
0.95
0.95
0.15
0.15
0.02
0.95
0.95
0.15
0.15
0.02
11.70
11.70
0.15
0.15
0.26
19.95
19.95
0.15
0.15
0.45
1.50
1.50
0.15
0.15
0.03
7.95
7.95
0.15
0.15
0.18
Total =
13.44 cu.m.
8
5
4
3
1
4
3
2.70
3.70
2.70
3.70
2.70
2.70
3.70
21.60
18.50
10.80
11.10
2.70
10.80
11.10
0.30
0.30
0.30
0.30
0.30
0.30
0.30
Total =
0.350
0.350
0.350
0.350
0.350
0.350
0.350
2.27
1.94
1.13
1.17
0.28
1.13
1.17
9.09 cu.m.
4
2
-1
2.70
2.70
3.70
10.80
5.40
-3.70
3.70
0.125
3.70
0.125
0.75
0.125
Total =
5.00
2.50
-0.35
7.15 cu.m.
1
2
2
2
2
1
18.45
2.55
2.55
2.55
3.00
12.45
18.45
5.10
5.10
5.10
6.00
12.45
52.20
2
2
1
1
2
1
12.55
4.70
15.55
3.28
5.55
9.55
5
4
2
4
2
1
1
7.12
8.22
3.31
2.55
2.55
0.95
0.95
1
8
1
2.85
1.20
1.35
6
6
13
13
1.05
0.60
1.65
0.60
25.10
9.40
15.55
3.28
11.10
9.55
73.98
35.58
32.88
6.62
10.20
5.10
0.95
0.95
2.85
9.60
1.35
13.80
6.30
3.60
21.45
7.80
0.45
0.25
0.45
0.45
0.45
0.45
0.15
0.15
0.15
0.15
Total =
0.25
0.15
0.15
0.15
0.15
0.15
0.15
0.15
8.32
2.40
2.22
0.45
0.23
0.11
0.02
0.02
19.65 cu.m.
0.45
Total =
Sub-total
0.15
0.93
0.93 cu.m.
70.43
0.45
0.45
0.45
0.45
0.10
0.10
0.10
0.10
Total =
Sub-total
Say
Page 3 of 55
5.87
0.28
0.16
0.97
0.35
1.76 cu.m.
72.19
73.00 cu.m.
DETAIL ESTIMATE
S.N. Descriptions
2.3 Form work
a) Column footing
F1
F2
F3
Total
Length
Length (m) (m)
No.
4
4
2
6.00
8.00
8.80
Breadth
(m)
Height/De
pth (m)
Quantity
24.00
32.00
17.60
0.200
0.200
0.200
4.80
6.40
3.52
14.72 sq.m.
10.025
9.925
0.300
0.350
0.350
96.24
23.82
-2.34
-2.73
-2.94
112.05 sq.m.
Total =
b)
8
2
-26
-26
-28
1.20
1.20
0.30
0.30
0.30
9.60
2.40
-7.80
-7.80
-8.40
Total =
c)
Plinth tie
Between grid (C-D) & (2-6)
C3
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Along Y-axis
Grid 1 & 7/(A-E)
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Toilet partition
16
10
2.70
3.70
43.20
37.00
0.300
0.300
12.96
11.10
1
2
2
2
2
1
18.45
2.55
2.55
2.55
3.00
12.45
18.45
5.10
5.10
5.10
6.00
12.45
52.20
0.30
15.66
25.10
9.40
15.55
3.28
11.10
9.55
73.98
10.20
5.10
0.95
0.95
11.70
19.95
1.50
7.95
27.65
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
22.19
3.06
1.53
0.29
0.29
3.51
5.99
0.45
2.39
8.30
47.98 sq.m.
0.875
1.000
1.000
1.000
1.000
1.000
1.000
Total =
18.90
18.50
10.80
11.10
2.70
10.80
11.10
83.90 sq.m.
3.70
3.70
0.75
Total =
39.96
19.98
-2.78
57.17 sq.m.
2
2
1
1
2
1
12.55
4.70
15.55
3.28
5.55
9.55
4
2
1
1
1
1
1
1
1
2.55
2.55
0.95
0.95
11.70
19.95
1.50
7.95
27.65
Total =
d)
Floor beams
First floor
Second floor
Tower Roof
e)
f)
Slabs
First floor
Second floor
Less
Wall tie
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Along Y-axis
Grid 1 & 7/(A-E)
Unit
8
5
4
3
1
4
3
2.70
3.70
2.70
3.70
2.70
2.70
3.70
21.60
18.50
10.80
11.10
2.70
10.80
11.10
4
2
-1
2.70
2.70
3.70
10.80
5.40
-3.70
1
2
2
2
2
1
18.45
2.55
2.55
2.55
3.00
12.45
18.45
5.10
5.10
5.10
6.00
12.45
52.20
12.55
Page 4 of 55
25.10
0.50
26.10
DETAIL ESTIMATE
S.N. Descriptions
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Gable tie
f)
Lintels
W2
W4
W5
No.
2
1
1
2
1
5
4
2
4
2
1
1
1
8
1
Total
Length
Breadth
Height/De
(m)
pth (m)
Length (m) (m)
Quantity
Unit
4.70
9.40
15.55
15.55
3.28
3.28
5.55
11.10
9.55
9.55
73.98
0.50
36.99
7.12
35.58
0.30
10.68
8.22
32.88
0.30
9.86
3.31
6.62
0.30
1.99
2.55
10.20
0.30
3.06
2.55
5.10
0.30
1.53
0.95
0.95
0.30
0.29
0.95
0.95
0.30
0.29
Total =
90.77 sq.m.
2.85
1.20
1.35
2.85
9.60
1.35
13.80
0.75
Total =
Sub-total
g)
Wall stitch
Type -A
Type -B
6
13
4.20
4.20
25.20
54.60
0.10
0.10
Total =
G. Total
Say
Column reinforcement
Column C-1 (4 nos)
12 mm main
Stirrupes 8 mm dia.
c)
10.35
10.35 sq.m.
416.94
2.52
5.46
7.98 sq.m.
424.92
425.00 sq.m.
80
1.64
131.20
unit wt.
0.62
81.34
88
2.19
192.54
0.89
171.36
52
2.39
124.18
0.89
Sub-Total =
110.52
363.22 kg
32
232
232
8.65
1.16
0.868
276.80
269.12
201.38
470.50
0.89
246.35
0.40
185.85
195.09
195.18
366.56
274.29
640.85
0.89
1.57
173.63
306.44
0.395
253.13
1.57
306.44
16
16
316
316
16
158
158
6
124
12.193
12.199
1.16
0.868
12.199
1.16
0.868
20.16
1.16
195.18
183.28
137.14
320.42
120.96
143.84
0.395
Sub-Total =
0.62
0.39
Total =
126.57
1598.41 kg
75.00
56.10
131.09
1.245 cu.m.
105.264 kg
9.83 cu.m.
1034.74
DETAIL ESTIMATE
Total
Length
Breadth
Height/De
(m)
pth (m)
S.N. Descriptions
No.
Length (m) (m)
Quantity
4-16 mm dia.
4
6.074
24.296
1.57
38.14
2-12 mm dia.
2
5.618
11.236
0.89
10.00
2L-8 stirrupes
38
1.16
44.08
0.39
17.19
Total =
65.34
Volume of concrete = 3.7*0.30*0.30 =
0.333 cu.m.
Weight of rebar per cum.m. of concrete =
196.204 kg
Total volume of concrete in plinth tie beam =
3.61 cu.m.
Total steel in plinth tie beam =
708.30
Sub-Total =
1743.04
d)
Floor beams
Grid 2 /(C-D)
16 mm dia
4
6.044
24.176
1.57
37.96
12 mm dia
1
5.588
5.588
0.89
4.97
16 mm dia
2
2.15
4.3
1.57
6.75
2L-8 stirrupes
35
1.26
44.1
0.39
17.20
Total =
66.88
Volume of concrete = 3.7*0.30*0.35 =
0.389 cu.m.
Weight of rebar per cum.m. of concrete =
172.148 kg
Total volume of concrete in floor beam =
9.09 cu.m.
Total steel in floor beam =
1565.35
Sub-Total =
1565.35
e)
Slabs
Main along X 10 mm @ 175 c/c
24
12.98
311.52
0.62
193.14
Main along Y 10 mm @ 175 c/c
64
4.41
282.24
0.62
174.99
Negative bar 10 mm @ 200 c/c
120
1.435
172.2
0.62
106.76
48
1.185
56.88
0.62
35.27
81
1.66
134.46
0.62
83.37
Disribution
10
12.834
128.34
0.39
50.05
32
4.378 140.096
0.39
54.64
Total =
698.22
Volume of concrete =
4.995 cu.m.
Weight of rebar per cum.m. of concrete =
139.783 kg
Total volume of concrete in floor slab =
7.15 cu.m.
Total steel in floor slab =
999.45
Sub-Total =
999.45
e)
Slabs
Main along X 10 mm @ 175 c/c
Main along Y 10 mm @ 175 c/c
Negative bar 10 mm @ 200 c/c
Disribution
Volume of concrete =
Weight of rebar per cum.m. of concrete =
Total volume of concrete in floor slab =
Total steel in floor slab =
24
64
120
48
81
10
32
12.98
4.41
1.435
1.185
1.66
12.834
4.378
311.52
282.24
172.2
56.88
134.46
128.34
140.096
Unit
kg
kg
kg
0.62
0.62
0.62
0.62
0.62
0.39
0.39
Total =
193.14
174.99
106.76
35.27
83.37
50.05
54.64
698.22
Sub-Total =
999.45
999.45 kg
4.995 cu.m.
139.783 kg
7.15 cu.m.
Page 6 of 55
DETAIL ESTIMATE
S.N. Descriptions
f)
Lintels
No.
Total
Length
Length (m) (m)
0.93 @
Page 7 of 55
Breadth
(m)
Height/De
pth (m)
Quantity
95
Sub-Total =
Unit
88.49
88.49 kg
DETAIL ESTIMATE
S.N. Descriptions
g)
Wall tie
Sample workout for 450 X 250 mm
Grid A/(1-7) [L = 18.45 m]
6-10 mm dia.
2L-8 stirrupes
Total
Length
Length (m) (m)
No.
6
124
20.16
1.16
120.96
143.84
Breadth
(m)
Height/De
pth (m)
Quantity
0.62
0.39
Total =
75.00
56.10
131.09 kg
2.076 cu.m.
63.158 kg
19.65 cu.m.
1241.06
1241.06 kg
7730.11 kg
Total =
Sub-Total =
h)
Wall stitch
Type -A 8 mm dia
7 mm dia
Type -B 8 mm dia
7 mm dia
24
12
72
26
26
26
195
1.02
0.60
0.62
1.62
1.04
1.02
0.62
24.48
7.20
44.64
42.12
26.91
26.52
120.90
0.39
0.39
0.30
0.39
0.39
0.39
0.30
9.55
2.81
13.39
16.43
10.49
10.34
36.27
99.28 kg
7829.39 kg
7830.00
Total =
G. Total =
Say
3 Stone Works
3.1 R/R Masonary in mud mortar in foundation
Ist footing
Wall Foundation - F1
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Along Y-axis
Grid 1 & 7/(A-E)
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Wall Foundation - F2
Grid C&D/(2-6)
Less column footing
Butress
Toe Wall
Ramp
Unit
1
2
2
2
2
1
2
2
1
1
2
1
19.05
1.95
1.95
1.95
3.00
13.05
11.95
4.70
14.95
3.28
4.95
8.95
19.05
3.90
3.90
3.90
6.00
13.05
49.80
1.05
0.30
15.69
23.90
9.40
14.95
3.28
9.90
8.95
70.38
1.05
0.30
22.17
2
-4
-4
2
9
10.95
1.65
2.15
2.35
0.30
21.90
-6.60
-8.60
4.70
2.70
0.75
0.60
0.75
0.75
1.05
0.30
0.30
0.30
0.30
0.30
4.93
-1.19
-1.94
1.06
0.85
4
2
1
1
1
1
1
1
4
2
1
1
3.40
3.00
3.95
0.98
11.40
19.95
1.20
7.95
1.95
1.95
0.95
0.95
13.60
6.00
3.95
0.98
11.40
19.95
1.20
7.95
7.80
3.90
0.95
0.95
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.55
0.55
0.55
0.55
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
1.22
0.54
0.36
0.09
1.03
1.80
0.11
0.72
0.86
0.43
0.10
0.10
Page 8 of 55
DETAIL ESTIMATE
S.N. Descriptions
2nd footing
Wall Foundation - F1
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Along Y-axis
Grid 1 & 7/(A-E)
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Wall Foundation - F2
Grid C&D/(2-6)
Less column footing
Butress
Toe Wall
Ramp
3rd footing
Wall Foundation - F1
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Along Y-axis
Grid 1 & 7/(A-E)
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Wall Foundation - F2
Grid C&D/(2-6)
Less column footing
Butress
Total
Length
Length (m) (m)
No.
1
2
2
2
2
1
2
2
1
1
2
1
18.85
2.15
2.15
2.15
3.00
12.85
12.15
4.70
15.15
3.28
5.15
9.15
Breadth
(m)
Height/De
pth (m)
Quantity
18.85
4.30
4.30
4.30
6.00
12.85
50.60
0.85
0.30
12.90
24.30
9.40
15.15
3.28
10.30
9.15
71.58
0.85
0.30
18.25
2
-4
-4
2
9
11.15
1.65
2.15
2.35
0.30
22.30
-6.60
-8.60
4.70
2.70
0.55
0.55
0.55
0.55
0.85
0.30
0.30
0.30
0.30
0.30
3.68
-1.09
-1.42
0.78
0.69
4
2
1
1
1
1
1
1
4
2
1
1
3.40
3.00
3.95
1.08
11.50
19.95
1.30
7.95
2.15
2.15
0.95
0.95
13.60
6.00
3.95
1.08
11.50
19.95
1.30
7.95
8.60
4.30
0.95
0.95
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.55
0.70
0.55
0.70
0.70
0.70
0.70
0.70
0.40
0.40
0.40
0.40
2.62
1.47
0.76
0.26
2.82
4.89
0.32
1.95
1.20
0.60
0.13
0.13
1
2
2
2
2
1
18.65
2.35
2.35
2.35
3.00
12.65
18.65
4.70
4.70
4.70
6.00
12.65
51.40
0.65
0.30
10.02
24.70
9.40
15.35
3.28
10.70
9.35
72.78
0.65
0.30
14.19
22.70
-6.60
-8.60
4.70
2.70
0.35
0.35
0.35
0.35
0.65
0.30
0.30
0.30
0.30
0.30
2.38
-0.69
-0.90
0.49
0.53
2
2
1
1
2
1
2
-4
-4
2
9
12.35
4.70
15.35
3.28
5.35
9.35
11.35
1.65
2.15
2.35
0.30
Page 9 of 55
Unit
DETAIL ESTIMATE
S.N. Descriptions
4th footing upto plinth
Wall Foundation - F1
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Total
Length
Length (m) (m)
No.
1
2
2
2
2
1
18.45
2.55
2.55
2.55
3.00
12.45
Along Y-axis
Grid 1 & 7/(A-E)
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
2
2
1
1
2
1
12.55
4.70
15.55
3.28
5.55
9.55
Butress
0.30
1
2
2
2
2
1
18.45
2.55
2.55
2.55
3.00
12.45
Deductions
W1
W2
W3
W4
W5
DW
D1
D2
Wall opening
18.45
5.10
5.10
5.10
6.00
12.45
52.20
Breadth
(m)
Height/De
pth (m)
Quantity
0.45
0.50
0.45
0.45
Total =
Say
0.50
0.50
18.45
5.10
5.10
5.10
6.00
12.45
52.20
0.45
2.75
64.60
0.45
0.45
0.45
0.45
2.75
2.75
0.725
0.73
72.80
4.08
3.07
1.07
25.10
9.40
15.55
3.28
11.10
9.55
73.98
2.70
11.75
16.64
0.61
154.88 cu.m.
155.00 cu.m.
2
1
1
1
1
12.55
15.55
3.00
5.63
9.55
11
2
1
0.30
4.70
3.28
25.10
15.55
3.00
5.63
9.55
58.83
3.30
9.40
3.28
2
2
4
1
2
2
2
2
6.225
7.225
6
3
2.55
2.55
2.55
2.55
6.225
7.225
12
1.5
2.55
2.55
2.55
2.55
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
3.37
3.37
3.87
1.40
1.40
3.37
2.67
1.40
9.44
10.95
20.90
0.94
1.61
3.87
3.06
1.61
-4
-1
-4
-8
-1
-2
-1
-2
-2
-1
-1
-1
-1
-1
-1
2.55
1.8
0.9
0.9
1.05
2.55
1.2
1
2
2
1.65
0.9
3.55
2.55
1.12
-10.2
-1.8
-3.6
-7.2
-1.05
-5.1
-1.2
-2
-4
-2
-1.65
-0.9
-3.55
-2.55
-1.12
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
2.45
1.20
2.45
0.75
0.75
2.75
2.10
2.10
2.10
2.10
2.10
2.10
2.75
2.75
2.10
-11.25
-0.97
-3.97
-2.43
-0.35
-6.31
-1.13
-1.89
-3.78
-1.89
-1.56
-0.85
-4.39
-3.16
-1.06
Page 10 of 55
Unit
DETAIL ESTIMATE
S.N. Descriptions
Total
Length
Length (m) (m)
No.
Breadth
Height/De
(m)
pth (m)
Quantity
Unit
Total =
153.00 cu.m.
Say
153.00 cu.m.
2.70
3.70
10.80
7.40
18.20
0.30
0.60
3.28
1.01
1.84
0.83
1
2
1
2.70
1.88
1.50
2.70
3.75
1.50
0.15
0.15
0.15
2.50
3.28
3.70
1
1
2
2
2.55
3.00
2.55
1.50
2.55
3.00
5.10
3.00
0.15
0.15
0.15
0.15
Total =
Say
4.85
4.85
2.10
2.10
Ground floor
Total =
Say
1.86
2.18
1.61
0.95
13.55 cu.m.
14.00 cu.m.
680.00
18.72
137.02
835.74 cu.m.
836.00 cu.m.
2
2
-1
6.94
5.19
1.2
13.88
10.38
-1.2
1.88
1.88
2.1
Total quant
1.2
1.2
2.1
Total quant
5
4
1
4
8
1
1
2
2
4
7
9
18.15
17.55
7.10
8.42
3.22
3.52
3.14
18.42
7.86
5.20
5.10
4.95
90.75
70.20
7.10
33.68
25.76
3.52
3.14
36.84
15.72
20.80
35.70
44.55
26.09
19.51
-2.52
43.08
Sqm
Sqm
Sqm
Sqm
Page 11 of 55
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
0.075
0.10
Total quantity
2.52 Sqm
2.52 Sqm
0.681
0.527
0.053
0.253
0.193
0.026
0.024
0.276
0.118
0.156
0.268
0.334
2.909
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
DETAIL ESTIMATE
S.N. Descriptions
38mm local hardwood framed fully glazed
4.4 shutter with 4mm thick clear float glass.
W (2.7 x 2.45) m2
W1 (2.55 x 2.45) m2
W2 (1.80 x 1.20) m2
W3 (0.90 x 2.45) m2
W4 (0.90 x 0.75) m2
W5 (1.05 x 0.75) m2
V1 (1.00 m dia)
DW (2.55x2.75)m2 glazed
38mm thick local hard wood framed fully
4.5 panneled door shutter.
a) D1 (1.2x2.10)m2
38mm thick local hard wood framed flush
4.6 door shutter.
D2 (1.00x2.10)m2
D3 (0.90x2.10)m2
D4 (0.75x2.10)m2
5 Flooring Works
5.1 150 mm thick stone soling under floor
Arrival Hall
VIP/Baggage Handling
Departure toilet
Security
Departure Hall
Betn grid (1-2) & (B-C)
Betn grid (1-2) & (C-D)
Betn grid (2-6) & (C-D)
Betn grid (6-7) & (C-D)
Betn grid (D-E) & (1-2 & 6-7)
Betn grid (D-F) & (2-6)
Ramp
Public concourse
Apron
Total
Length
Length (m) (m)
No.
Breadth
(m)
Height/De
pth (m)
Quantity
5
4
1
4
8
1
1
2
2.47
2.32
1.57
0.73
0.73
0.88
0.85
2.23
12.35
9.28
1.57
2.92
5.84
0.88
0.85
4.46
2.13
2.13
1.03
2.13
0.58
0.58
0.57
2.60
Total quantity
1.03
2.06
2.55
4
7
9
0.85
0.75
0.6
3.4
5.25
5.4
2.02
2.02
2.02
Total quantity
1
1
1
1
1
1
1
2
2
1
2
1
2
1
1
1
1
2.55
5.55
2.40
2.55
5.55
2.55
2.55
2.63
2.70
2.55
2.55
11.55
2.95
4.00
11.55
19.05
6.00
2.55
5.55
2.40
2.55
5.55
2.55
2.55
5.25
5.40
2.55
5.10
11.55
5.90
4.00
11.55
19.05
6.00
2.55
5.63
2.55
2.55
5.55
2.55
3.55
3.65
3.65
3.40
2.55
5.55
2.55
1.05
1.55
1.05
1.05
Total =
Total =
1
1
1
1
1
2
2
1
1
1
2.55
5.55
2.55
5.55
2.55
2.63
2.70
2.55
2.55
11.55
2.55
5.55
2.55
5.55
2.55
5.25
5.40
2.55
2.55
11.55
2.55
5.63
2.55
5.55
3.55
3.65
3.65
3.40
2.55
5.55
Total =
Say
1
1
1
2
1
1
1
1
2.40
2.55
2.55
2.95
4.00
11.55
19.05
6.00
2.40
2.55
2.55
5.90
4.00
11.55
19.05
6.00
2.55
3.40
2.55
2.55
1.05
1.55
1.05
1.05
Total =
Page 12 of 55
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
26.31
19.77
1.62
6.22
3.39
0.51
0.48
11.60
69.90
Unit
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
5.25 Sqm
6.87
10.61
10.91
28.39
Sqm
Sqm
Sqm
Sqm
0.98
4.68
0.92
0.98
4.62
0.98
1.36
2.87
2.96
1.30
1.95
9.62
2.26
0.63
2.69
3.00
0.95
42.72 cu.m.
43.00 cu.m.
6.50
31.22
6.50
30.80
9.05
19.16
19.71
8.67
6.50
64.10
202.23 sq.m.
203.00 sq.m.
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.46
0.65
0.49
1.13
0.32
1.34
1.50
0.47
6.36 cu.m.
DETAIL ESTIMATE
S.N. Descriptions
Total
Length
Length (m) (m)
No.
Breadth
Height/De
(m)
pth (m)
Quantity
Unit
Total =
6.50 cu.m.
1
2
1
1
1
1
1
2
2
1
1
2
1
1
1
1
2.55
2.00
5.55
2.55
5.55
2.55
2.55
2.63
2.70
2.55
11.55
2.95
4.00
11.55
19.05
6.00
2.55
4.00
5.55
2.55
5.55
2.55
2.55
5.25
5.40
2.55
11.55
5.90
4.00
11.55
19.05
6.00
2.55
0.45
5.63
2.55
5.55
2.55
3.55
3.65
3.65
2.55
5.55
2.55
1.05
1.55
1.05
1.05
Total =
Say
6.50
1.80
31.22
6.50
30.80
6.50
9.05
19.16
19.71
6.50
64.10
15.05
4.20
17.90
20.00
6.30
265.31 sq.m.
266.00 sq.m.
1
1
-1
12.00
5.70
3.00
12.00
5.70
-3.00
4.30
4.30
0.75
Total =
Say
51.60
24.51
-2.25
73.86 sq.m.
74.00 sq.m.
83.85
18.8
102.65 rm
103.00 rm
Total =
Say
5.7
3
1
1
2.55
2.55
1.88
7.65
2.55
1.88
1
2
1
1
1
1
1
2
1
1
6.8
5.55
5.6
3.9
8.15
5.5
7.9
5.6
8.7
5
6.8
11.1
5.6
3.9
8.15
5.5
7.9
11.2
8.7
5
2.55
3.55
1.50
Total =
Say
19.51
9.05
2.81
31.37
32.00 sq.m
Page 13 of 55
8.16
13.32
6.72
4.68
9.78
6.6
9.48
13.44
10.44
6
88.62 sq.m.
89.00 sq.m.
DETAIL ESTIMATE
S.N. Descriptions
6 Roofing Works
6.1 MS tubular roof supporting structure
Main Truss -1
Bottom chord M50
Top chord
Wall rafter
Total
Length
Length (m) (m)
No.
Breadth
(m)
Height/De
pth (m)
Quantity
Unit
unit wt./m
4
4
4
7.21
9.11
7.70
Struts M25 NB
4
8
52
40
0.25
0.70
0.25
1.16
4
18
14
14.55
19.95
1.15
6
6
6.50
8.90
28.84
36.44
30.81
96.09
1.00
5.60
13.00
46.40
66.00
58.20
359.10
16.10
5.10
490.04
2.46
3.61
5.10
3.61
unit wt./m
162.36
210.10
1831.41
58.12
39.00
53.40
92.40
5.10
471.24
3.00
41.76
44.76
0.20
0.23
0.09
0.07
0.07
2.46
2.00
1.69
0.28
1.60
0.17
Struts M25 NB
Struts M32 NB
Purlins M50 NB
Support plate 8 thick
End plate 5 thick
Purlin plate 5 thick
12
36
0.25
1.16
20
32
48
378
40
0.50
0.23
0.07
0.07
0.07
2
4
4.25
4.80
2
4
4
16
10
96
3.22
4.25
15.10
0.23
0.07
0.07
8.50
19.20
27.70
46.90
74.60
60.40
0.23
0.09
0.07
3.61
3.15
3.15
5.10
0.85
0.06
0.41
Sub total =
78.50
62.80
39.25
39.25
39.25
62.80
39.25
39.25
110.11
157.00
106.31
11.02
62.68
6.63
100.00
147.74
234.99
308.04
53.15
2.30
15.92
4539.16
226.96
4766.12 kg.
4770.00 kg.
Top roof
2
2
2
2
2
2
2
3.00
3.00
4.00
4.00
6.00
5.53
3.54
6.00
6.00
8.00
8.00
12.00
11.05
7.08
4
1
2
2
4.98
2
3
3.75
19.92
2
6
7.5
35.42
7.70
8.80
9.91
11.29
7.70
3.89
3.89
Total =
Say
46.21
52.83
79.27
90.30
92.42
42.98
27.54
431.54 sq.m.
432.00 sq.m.
35.42
35.42 rm
36.00 rm
Total =
Say
6.4 25 mm thick timber eaves board
1
2
32.2
19.95
Page 14 of 55
32.2
39.9
72.1
0.2
14.42
DETAIL ESTIMATE
S.N. Descriptions
Total
Length
Length (m) (m)
No.
Breadth
Height/De
(m)
pth (m)
Quantity
Unit
Total =
14.42 sq.m.
Say
15.00 sq.m.
1
1
32.2
19.95
6.3
5.55
32.2
39.9
72.1
6.3
5.55
Total =
Say
72.1
72.10 rm
73.00 rm
Total =
Say
27.09
34.45
61.54 sq.m.
62.00 sq.m.
4.30
6.21
7 Plaster/Finishes
7.1 Cement plaster
a)
20 mm thick cement plaster on walls
1
2
1
1
1
1
1
2
1
1
6.8
5.55
5.6
3.9
8.15
5.5
7.9
5.6
8.7
5
6.8
11.1
5.6
3.9
8.15
5.5
7.9
11.2
8.7
5
2.1
2.1
2.1
2.1
2.1
2.1
2.1
2.1
2.1
2.1
Total =
Say
b)
Floor beams
First floor
Second floor
Tower Roof
Slabs
First floor
Second floor
Less
Wall tie
Along X-axis
Gris A/(1-7)
Grid B/(1-2 & 4-5)
Grid C/(1-2 & 6-7)
14.28
23.31
11.76
8.19
17.115
11.55
16.59
23.52
18.27
10.5
155.09 sq.m.
155.00 sq.m.
8
2
-26
-26
-28
1.20
1.20
0.30
0.30
0.30
9.60
2.40
-7.80
-7.80
-8.40
8.700
9.050
0.300
0.350
0.350
83.52
21.72
-2.34
-2.73
-2.94
8
5
4
3
1
4
3
2.70
3.70
2.70
3.70
2.70
2.70
3.70
21.60
18.50
10.80
11.10
2.70
10.80
11.10
0.875
1.000
1.000
1.000
1.000
1.300
1.300
18.90
18.50
10.80
11.10
2.70
14.04
14.43
4
2
-1
2.70
2.70
3.70
10.80
5.40
-3.70
1
2
2
18.45
2.55
2.55
18.45
5.10
5.10
Page 15 of 55
3.70
3.70
0.75
39.96
19.98
-2.78
DETAIL ESTIMATE
S.N. Descriptions
Grid D/(1-2 & 67)
Grid E/(12 & 67)
Grid F/(2-6)
Along Y-axis
Grid 1 & 7/(A-E)
Grid 2 & 6/(F-F')
Grid 2/(A-F)
Grid 4/(A'-A)
Grid 4 & 5/(A-C)
Grid 6/(C-F)
Gable tie
Lintels
W2
W4
W5
Total
Length
Breadth
(m)
No.
Length (m) (m)
2
2.55
5.10
2
3.00
6.00
1
12.45
12.45
52.20
2
2
1
1
2
1
12.55
4.70
15.55
3.28
5.55
9.55
5
4
2
4
2
1
1
7.12
8.22
3.31
2.55
2.55
0.95
0.95
1
8
1
2.85
1.20
1.35
Height/De
pth (m)
Quantity
25.10
9.40
15.55
3.28
11.10
9.55
73.98
35.58
32.88
6.62
10.20
5.10
0.95
0.95
2.85
9.60
1.35
13.80
0.50
26.10
0.50
0.30
0.30
0.30
0.30
0.30
0.30
0.30
36.99
10.68
9.86
1.99
3.06
1.53
0.29
0.29
0.75
Unit
Total =
Say
10.35
345.99 sq.m.
346.00 sq.m.
Total =
Say
155.09
345.99
-88.62
412.45 sq.m.
413.00 sq.m.
8 Painting Works
8.1 Painting the plastered surface with
waterproof cement paint
20 mm plaster surface
12.5 mm plaster surface
Less tile area
32.20
19.95
32.20
39.90
72.10
Total =
Say
0.43
30.64
30.64 sq.m.
31.00 sq.m.
Total =
Say
61.54
61.54 sq.m.
62.00 sq.m.
Total =
Say
62.40
62.40 rm
63.00 rm
9 Miscellaneous Works
9.1 Providing and fixing precast window sill
5
4
1
4
8
1
2
2
2.85
2.70
1.95
1.05
1.05
1.20
6.40
4.40
Page 16 of 55
14.25
10.80
1.95
4.20
8.40
1.20
12.80
8.80
62.40
DETAIL ESTIMATE
S.N. Descriptions
9.2 20 mm thick cement plaster dado in plith
Ramp side
Total
Length
Length (m) (m)
No.
1
5
96.27
4.90
Breadth
(m)
Height/De
pth (m)
Quantity
96.27
24.50
Unit
0.60
0.30
57.76
7.35
65.11 sq.m.
66.00 sq.m.
1.00
1.00
Total =
Say
7.80
7.35
15.15 sq.m.
16.00 sq.m.
Total =
Say
15.15
15.15
16.00 rm
Total =
Say
9.3 Staircase railing
1
1
7.80
7.35
7.80
7.35
Less door
First floor
Less door
1
1
1
1
1
1
1
1
-2
2
1
-2
3.75
12.00
6.50
2.43
3.70
3.10
2.63
2.70
0.90
3.70
2.70
0.90
3.75
12.00
6.50
2.43
3.70
3.10
2.63
2.70
-1.80
7.40
2.70
-1.80
2.75
2.75
2.75
2.75
2.65
2.65
2.65
2.65
2.10
2.50
2.50
2.10
10.31
33.00
17.88
6.67
9.81
8.22
6.97
7.16
-3.78
18.50
6.75
-3.78
117.69 sq.m.
118.00 sq.m.
6.80
3.00
3.61
3.61
133.96
159.6
9.386
14.44
317.39
15.87
333.26 kg.
334.00 kg.
Total =
Say
9.6 Staircase
9.6.1 Main staircase made with MS sections with
Timber tread
a)
Structural steel work
ISA 75x75x6 @ 6.8 kg
2
2
2
3.35
3.25
3.25
19
2
2
2.80
1.30
2.00
6.70
6.50
6.50
19.70
53.20
2.60
4.00
@
@
@
@
Sub total =
19
1.05
19.95
0.28
Total =
Say
2
15
2
4.60
2.10
1.30
9.20 @
31.50 @
2.60 @
Sub total =
5.49
5.49 sq.m.
5.50 sq.m.
6.80
3.00
3.61
62.56
94.5
9.386
166.45
8.32
174.77 kg.
175.00 kg.
0.75
Page 17 of 55
14.25
0.275
Total =
Say
3.92
3.92 sq.m.
4.00 sq.m.
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
A
1
1.1
1.2
1.3
1.4
Description of work
FY: 2064-65
Site: Lamidanda Airport
Unit
Quantity
Rate (NRs)
In Figure
In Words
Per
Civil Works
EARTHWORK
Clearing and grubbing of site for construction
including removal of grass, shrubs and leveling
undulated ground all complete as per drawing
and instructions.
Earthwork in excavation in trenches, foundation etc.
in hard soil including dressing of sides,ramming of
bottom, lift upto 1.5m stacking of excavated materials
at least 3 m. clear from the edge of excavation and
then refilling stacked soil in150 mm layer by
ramming and watering and then disposing of all
surplus excavated soil as directed within a lead of 30
m complete as per drawing and instructions.
Filling in plinth and floor with earth in 150 mm layers
under floors including watering consolidating by
using mechanical vibrator and dressing complete
as per drawing and instructions.
Stone boulder soling under foundation including
sand blinding, watering consolidating and dressing
all complete as per drawing, specification and
instructions.
sq.m
564.00
one
cu.m
225.00
one
cu.m
1099.00
one
cu.m
7.00
2
2.1
CONCRETE WORK
Plain cement concrete of mix 1:3:6 in foundation
base with 1 cement, 3 coarse sand and 6
aggregate of 19 mm and down grade including
mixing,laying,compacting, finishing, curing, laid to
exact line, level and dimensions inclusive of side
shuttering complete as per drawing, specification
and instructions.
cu.m
3.20
one
2.2
cu.m
73.00
one
Page 18 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
2.3
2.4
Description of work
Form work, shuttering, centering with approved
materials such as shuttering plywood, plain steel
sheets etc. for all RCC Works of any shape, size
and at any level with necessary propping (MS pipe
/ timber) staging, supporting wedging, inclusive
of providing the final surface in correct line, level,
cleaning surface and applying form oil complete
as per drawing, specification and instructions.
Tor steel / torkari reinforcement (Fe 415) bar
tested grade I steel conforming to I.S.1786 - 1966
or IS 1139 -1966 in RCC work including bending,
binding with G.I. wire , placing in position and the
cost of G. I. wire complete as per drawing,
specification and instructions.
FY: 2064-65
Site: Lamidanda Airport
Unit
Quantity
sq.m.
425.00
kg
7830.00
Rate (NRs)
In Figure
In Words
Per
one
one
3
3.1
3.2
3.3
3.4
STONE WORKS
Random rubble stone masonry in mud mortar in
foundation in required line and level in any size and
shape including scaffolding, timbering etc all complete
as per drawing, specification and instructions.
Coursed stone masonry with face dressed stone in mud
mortar in superstructure in any size and shape of wall
made to required line and level, scaffolding etc, all
complete as per drawings, specification and
instructions.
Coursed stone masonry with face dressed stone in
cement mortar 1:6 (1cement: 6sand) in superstructure
in any size and shape of wall made to required line and
level, scaffolding etc, all complete as per drawings,
specification and instructions.
Recessed type cement pointing in coursed stone
masonry wall in cement sand mortar 1:3 (1cement:3fine
sand) including raking out the joints, cleaning and
surface preparation etc all complete as per drawings,
specifications and instructions.
cu.m
155.00
one
cu.m
153.00
one
cu.m
14.00
one
sq.m
836.00
one
4
4.1
Sqm
43.08
one
Page 19 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
4.2
Description of work
Providing and fixing in position aluminum glazed
doors including supplying all required hardwares, 6
mm thick float glass, weather strips,EPDM gasket,
fixing accessories, lock set etc all complete as per
drawings, specifications and instructions with
101x45x1.8 mm section.
Swing door
Unit
Quantity
Sqm
2.52
Cum
2.909
38mm local hardwood framed fully glazed shutter with 4mm thick
Sqm
clear float glass.
69.90
4.3 Local hard wood work for doors and windows chaukhats.
4.4
FY: 2064-65
Site: Lamidanda Airport
Rate (NRs)
In Figure
In Words
Per
one
one
one
4.5 38mm thick local hard wood framed fully panneled door shutter.
Sqm
5.25
4.6 38mm thick local hard wood framed flush door shutter.
Sqm
28.39
one
FLOORING
Stone boulder soling under floors including sand
blinding, watering, consolidating and dressing all
complete as per drawing, specification & instructions.
cu.m
43.00
one
5.2
sq.m
203.00
one
5.3
cu.m
6.50
one
5
5.1
5.4
one
sq.m
266.00
one
5.5
sq.m
74.00
one
5.6
rm
103.00
one
5.7
sq.m
32.00
one
Page 20 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
5.8
6
6.1
6.2
6.3
6.4
6.5
6.6
Description of work
Providing and laying approved brand glazed ceramic
tile in wall with 18 mm thick cement mortar of mix 1 : 3
backing and filling joints with approved materials all
complete as per drawing, specification and
instructions.
FY: 2064-65
Site: Lamidanda Airport
Unit
Quantity
Rate (NRs)
In Figure
In Words
Per
sq.m
89.00
one
kg
4770.00
One
sq.m
432.00
One
rm
36.00
One
sq.m
15.00
One
rm
73.00
One
sq.m.
62.00
One
ROOFING
Providing and fixing tubular roof trusses with rafters,
purlins, wind ties, brackets etc, made with required
grade mild steel tubes and mild steel sections of
required sizes, including hoisting, fixing in position
with MS bed plates, shoe angles, anchor bolts etc, and
concrete grouting, concreting nut bolts, fabrication,
fixing and treated with two coats of anticorrosive
paints all complete as per drawings, specifications
and instructions.
26 gauge corrugated galvanized iron color roof sheet of
approved make, required size, fixed to MS purlins or
wood purlins by nuts bolts, 8 mm J-hook, bitumen and
GI cup washer all complete as per drawings,
specifications and instructions.
26 gauge, 600 mm wide GI ridge/valley with
non-corrugated color sheet made to required shape
inclusive of fixing with 8 mm J-hooks all complete as per
drawings, specifications and instructions.
Providing and fixing in position (25 mm) thick timber
fascia board in position with required fittings inclusive of
waterproof painting all complete as per drawings,
specifications and instructions.
Providing and fixing in position prefinished GI gutter
in required size and shape with 22 gauge GI sheet
including making to shape, fixing in position, all
required fixing accessories all complete as per
drawings and instructions.
Providing and fixing in position 6 mm thick
waterproof plywood false ceiling in roof in required
pattern and type as per drawings, specifications and
instructions.
FINISHING/FINISHING WORKS
7.1
a)
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
Description of work
plinth including neat cement finish.
FY: 2064-65
Site: Lamidanda Airport
Unit
sq.m
Quantity
Rate (NRs)
In Figure
155.00
In Words
Per
One
Page 22 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
Description of work
FY: 2064-65
Site: Lamidanda Airport
Unit
Quantity
Rate (NRs)
In Figure
In Words
Per
b)
sq.m
346.00
One
8
8.1
PAINTING WORKS
Painting with two or more coats of cement paint of
approved manufacturers over plastered surface
on walls and ceilings at any height or shape
including wetting, surface preparation, curing all
complete as per drawings, specifications and
instructions.
sq.m
413.00
One
sq.m
31.00
One
sq.m
62.00
One
rm
63.00
One
sq.m
66.00
One
sq.m
16.00
One
rm
16.00
One
8.2
8.3
9.1
9.2
9.3
9.4
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
Description of work
FY: 2064-65
Site: Lamidanda Airport
Unit
sq.m
Quantity
Rate (NRs)
In Figure
118.00
In Words
Per
One
One
kgs
175.00
sq.m.
4.00
One
set
8.000
One
set
1.000
One
set
3.000
One
set
1.000
One
set
8.000
One
no
2.000
One
set
8.000
One
SANITARY INSTALLATION
Providing and fixing in position white glazed ceramic water
closet with 'R' or 'L' vent, 'P' or 'S' Trap, including white glazed
ceramic low-level flushing cistern with all necessary fittings,
complete with testing and ready for operation.
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
Description of work
FY: 2064-65
Site: Lamidanda Airport
Unit
Quantity
Rate (NRs)
In Figure
In Words
Per
complete.
no
8.000
One
no
9.000
One
Providing and fixing 100 mm PVC floor trap with heavy C.P.
grating
SOIL, WASTE, AND VENT PIPES AND FITTINGS
Providing jointing and fixing in position PVC soil and waste
pipes and fittings for the vertical lines and horizontal lines with
necessary clamps, cuttings, holes in the floor or walls and
repair in the same to its original finished all complete.
a) 75 mm dia UPVC pipe
b) 110 dia. UPVC pipe
no
8.000
rm
rm
34.000
59.000
rm
35.000
One
rm
25.000
One
rm
55.000
One
no
3.000
One
no
2.000
One
no
1.000
rm
50.000
One
rm
110.000
One
1.
WATER SUPPLY
Providing and fixing in position medium class approved GI
pipes with necessary fittings (standard 'R' brand fittings, sun
brand or superior) necessary clamps, for cold water supply,
cutting and making holes in the floor or walls and repairing the
same to its original finished.
C.
1
DRAINAGE
Providing and laying in position and in slope
various dia pipes for soil & waste line including
earth work excavation, jointing of pipes with
color and back filling complete.
a) 110 mm dia UPVC pipe.
c) 2 Nos of each 110 mm dia UPVC pipe.
Page 25 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
Description of work
FY: 2064-65
Site: Lamidanda Airport
Unit
Quantity
Rate (NRs)
In Figure
In Words
Per
no
12.000
one
no
1.000
One
no
1.000
One
1.1.
1.2
ELECTRICAL WORKS
Distribution Boards
Supply,delivary, installation, testing and
commissioning of fully enclosed, front
door operation double cover Main
Distribution Boards (MDB) suitable for
flush/wall mounting made out of 16 SWG
steel sheet having separate
compartments for incoming and outgoing
including earth and neutral links as per
drawings, specifications and instructions
and DB shall consists of
DB - 1(Ground floor)
Incoming
1 x 60 Amp DP MCB
Outgoing
1 x 40 Amp DP MCB
9 x 15 Amp DP MCB
10 x 5/10 Amp SP MCB
All MCB are Siemens India make
DB - 1(First floor)
Incoming
1 x 40 Amp DP MCB
Outgoing
7 x 15 Amp DP MCB
7 x 5/10 Amp SP MCB
All MCB are Siemens India make
One
Set
1.000
Set
1.000
One
Page 26 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
2
2.1
2.2
3.1
3.2
Description of work
Sub-mains Cables.
Supplying, laying and interconnection of
following types of 1100 volt grade PVC
insulated copper cables concealed in HDP
pipe to be run in walls, ceiling and floor
including suitable size compress type
cable shoes at both ends all complete as
per drawings, specifications and
instructions
2x7/20 + 1 x3/20 cables in 25 mm dia HDP
pipe for sub main connection to power
circuits from nominated DB to Junction
boxes at required locations
FY: 2064-65
Site: Lamidanda Airport
Rate (NRs)
Unit
Quantity
rm
85.000
One
In Figure
In Words
Per
rm
125.000
One
Pts
66.000
One
Pts
8.000
One
Page 27 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
3.3
Description of work
15 Amp Power outlets
15 A power point with 2x7/22+1x1/18 PVC
insulated copper cable in 16/20 mm Dai
HDP pipe with related accessories
Socket outlets.
Supply, installation and putting into
operation of following types of control
switches and socket outlets in modular
arrangements including suitable size
heavy guage GI box with required fixing
materials all complete as per specification,
drawing and instruction.
FY: 2064-65
Site: Lamidanda Airport
Rate (NRs)
Unit
Quantity
Pts
23.000
One
In Figure
In Words
Per
4.1.
Nos
8.000
One
4.2.
Nos
23.000
One
Set
41.000
One
Nos
19.000
One
Mirror light
Adjustable mirror light suitable for 2 nos
candle bulbs in off white finish
Nos
10.000
One
5.1.
6
6.1
6.2
Page 28 of 55
Amount(NRs)
Bill of Quantities
Project: Construction of Tower and Terminal Building
Contract No:-02/Lam/2064-065/CED/CAAN
S.No.
7
a
b
c
E
1
2
Description of work
System earthing
Earthing Supplying and installation
complete earthing systems with 600x600x3
mm pure copper earth plate, 25x3 mm
copper strip interconnected between earth
electrode and main earthing point
including required quantity of salt, charcoal
and related material so that the earth
resistance will not be more than 1 to 5
OHMS.
Lighting Protection System
Supply, installation, interconnection, testing
and putting into operation of lighting
arrestor system consisting of:
FY: 2064-65
Site: Lamidanda Airport
Rate (NRs)
Unit
Quantity
Set
1.000
One
Set
1.000
One
In Figure
In Words
Per
Amount(NRs)
50,000.00
50,000.00
Total(A+B+C+D+E)
Add 13 % VAT
Grand Total
Total Amount in Words NRs. .
Page 29 of 55
Unit
Quantity
set
set
8.000
1.000
set
3.000
set
1.000
set
8.000
no
2.000
set
8.000
no
8.000
no
9.000
Providing and fixing 100 mm PVC floor trap with heavy C.P.
grating
no
8.000
A.
1
Description of work
SANITARY INSTALLATION
Providing and fixing in position white glazed ceramic water
closet with 'R' or 'L' vent, 'P' or 'S' Trap, including white glazed
ceramic low-level flushing cistern with all necessary fittings,
complete with testing and ready for operation.
Rate in NRs.
In Figure
Description of work
SOIL, WASTE, AND VENT PIPES AND FITTINGS
Providing jointing and fixing in position PVC soil and waste
pipes and fittings for the vertical lines and horizontal lines with
necessary clamps, cuttings, holes in the floor or walls and
repair in the same to its original finished all complete.
a) 75 mm dia UPVC pipe
b) 110 dia. UPVC pipe
Unit
Quantity
rm
rm
34.000
59.000
rm
rm
rm
35.000
25.000
55.000
no
no
3.000
2.000
no
1.000
C.
1
WATER SUPPLY
Providing and fixing in position medium class approved GI
pipes with necessary fittings (standard 'R' brand fittings, sun
brand or superior) necessary clamps, for cold water supply,
cutting and making holes in the floor or walls and repairing the
same to its original finished.
Rate in NRs.
Rate in NRs.
In Words
Per
Amount (NRs)
Rate in NRs.
Per
Amount (NRs)
Description of work
DRAINAGE
Providing and laying in position and in slope
various dia pipes for soil & waste line including
earth work excavation, jointing of pipes with
color and back filling complete.
a) 110 mm dia UPVC pipe.
c) 2 Nos of each 110 mm dia UPVC pipe.
Unit Quantity
Rate
rm
rm
50
110
516.92
516.92
no
12
6,750.00
no
125,000.00
no
45,000.00
Amount
25,846.00
56,861.20
81,000.00
125,000.00
45,000.00
333,707.20
Description
ELECTRICAL WORKS (C1)
Distribution Boards
Supply,delivary, installation, testing and
commissioning of fully enclosed, front
door operation double cover Main
Distribution Boards (MDB) suitable for
flush/wall mounting made out of 16 SWG
steel sheet having separate
compartments for incoming and outgoing
including earth and neutral links as per
drawings, specifications and instructions
and DB shall consists of
Unit
Quantity
1.1.
DB - 1(Ground floor)
Incoming
1 x 60 Amp DP MCB
Outgoing
1 x 40 Amp DP MCB
9 x 15 Amp DP MCB
10 x 5/10 Amp SP MCB
All MCB are Siemens India make
Set
20,216.00
1.2
DB - 1(First floor)
Incoming
1 x 40 Amp DP MCB
Outgoing
7 x 15 Amp DP MCB
7 x 5/10 Amp SP MCB
All MCB are Siemens India make
Set
14,692.00
rm
85
161.00
rm
125
170.00
Sub-mains Cables.
Supplying, laying and interconnection of
following types of 1100 volt grade PVC
insulated copper cables concealed in HDP
pipe to be run in walls, ceiling and floor
including suitable size compress type
cable shoes at both ends all complete as
per drawings, specifications and
instructions
2.1
2.2
Rate(NRs)
3.2
3.3
Unit
Quantity
Rate(NRs)
Pts
66
1,096.00
Pts
536.00
Pts
23
566.00
Socket outlets.
Supply, installation and putting into
operation of following types of control
switches and socket outlets in modular
arrangements including suitable size
heavy guage GI box with required fixing
materials all complete as per specification,
drawing and instruction.
4.1.
Nos
366.00
4.2.
Nos
23
668.00
6.1
6.2
Description
Unit
Set
Quantity
41
Rate(NRs)
1,862.00
Nos
19
668.00
Mirror light
Adjustable mirror light suitable for 2 nos
candle bulbs in off white finish
Nos
10
537.00
System earthing
Earthing Supplying and installation
complete earthing systems with 600x600x3
mm pure copper earth plate, 25x3 mm
copper strip interconnected between earth
electrode and main earthing point
including required quantity of salt, charcoal
and related material so that the earth
resistance will not be more than 1 to 5
OHMS.
Set
8,393.00
Set
21,272.00
a
b
1.5
m high multi finnals type copper arial
conductor 4 Nos.
Total Electrical Works (C1)
Amount(NRs)
20,216.00
14,692.00
13,685.00
21,250.00
Amount(NRs)
72,336.00
4,288.00
13,018.00
2,928.00
15,364.00
Amount(NRs)
76,342.00
12,692.00
5,370.00
8,393.00
21,272.00
301,846.00
1.2
1.3
1.4
2
2.1
2.2
2.3
Description of work
Unit
Quantity
Rate(NRs)
Amount(NRs)
EARTHWORK
Clearing and grubbing of site for construction
including removal of grass, shrubs and leveling
undulated ground all complete as per drawing
and instructions.
sq.m
564.00
8.05
4,540.20
cu.m
225.00
161.00
36,225.00
cu.m
1099.00
243.51
267,617.49
cu.m
7.00
2191.50
15,340.50
cu.m
3.20
12841.94
41,094.21
cu.m
73.00
16407.51
1,197,748.23
CONCRETE WORK
3
3.1
3.2
3.3
3.4
4
4.1
4.2
Description of work
as per drawing, specification and instructions in;
Unit
sq.m.
Quantity
425.00
Rate(NRs)
393.09
Amount(NRs)
167,063.25
kg
7830.00
99.94
782,530.20
cu.m
155.00
2793.17
432,941.35
cu.m
153.00
3116.60
476,839.80
cu.m
14.00
9,642.93
135,001.02
sq.m
836.00
196.86
164,574.96
43.08
6,676.47
287,622.33
2.52
8,374.86
21,104.65
5.3
5.4
5.5
5.6
5.7
5.8
Unit
Cum
Quantity
2.909
Rate(NRs)
39,976.50
Amount(NRs)
116,291.65
Sqm
69.90
2,994.58
209,321.02
Sqm
Sqm
5.25
28.39
3,493.24
3,185.02
18,339.51
90,422.72
cu.m
43.00
2191.50
94,234.50
sq.m
203.00
93.29
18,937.87
cu.m
6.50
12841.94
83,472.61
sq.m
266.00
900.11
239,429.26
sq.m
74.00
707.52
52,356.48
rm
103.00
72.00
7,416.00
sq.m
32.00
2311.10
73,955.20
sq.m
89.00
2269.81
202,013.09
6.2
6.3
6.4
6.5
6.6
Description of work
Unit
Quantity
Rate(NRs)
Amount(NRs)
kg
4770.00
136.39
650,580.30
sq.m
432.00
1,051.87
454,407.84
rm
36.00
708.66
25,511.76
sq.m
15.00
738.27
11,074.12
rm
73.00
796.29
58,129.17
sq.m.
62.00
1,124.22
69,701.60
FINISHING/FINISHING WORKS
7.1
a)
sq.m
155.00
378.83
58,718.65
sq.m
346.00
320.34
110,837.64
b)
8.2
8.3
9
9.1
9.2
9.3
9.4
Description of work
Unit
Quantity
Rate(NRs)
Amount(NRs)
PAINTING WORKS
Painting with two or more coats of cement paint of
approved manufacturers over plastered surface
on walls and ceilings at any height or shape
including wetting, surface preparation, curing all
complete as per drawings, specifications and
instructions.
sq.m
413.00
64.32
26,564.16
sq.m
31.00
117.46
3,641.26
sq.m
62.00
54.96
3,407.52
rm
63.00
LS
725.00
45,675.00
sq.m
66.00
378.83
25,002.78
sq.m
16.00
LS
2,352.00
37,632.00
rm
16.00
LS
1,650.00
26,400.00
sq.m
118.00
1,124.22
132,657.89
MISCELLANEOUS
Unit
kgs
sq.m.
Quantity
Rate(NRs)
Amount(NRs)
175.00
136.39
23,868.25
4.00
1,975.00
7,900.00
7,008,143.03
Unit Quantity
Rate
set
set
8
1
6539.86
8757.14
52,318.87
8,757.14
set
3205.08
9,615.25
set
3218.21
3,218.21
set
5,922.85
47,382.76
no
343.11
686.23
set
605.43
4,843.45
no
254.22
2,033.79
no
812.51
7,312.62
Providing and fixing 100 mm PVC floor trap with heavy C.P.
grating
no
1150
9,200.00
Amount (NRs)
Description of work
SOIL, WASTE, AND VENT PIPES AND FITTINGS
Providing jointing and fixing in position PVC soil and waste
pipes and fittings for the vertical lines and horizontal lines with
necessary clamps, cuttings, holes in the floor or walls and
repair in the same to its original finished all complete.
a) 75 mm dia UPVC pipe
b) 110 dia. UPVC pipe
Unit Quantity
Rate
Amount (NRs)
rm
rm
34
59
228.71
516.92
7,776.14
30,498.28
rm
rm
rm
35
25
55
358.90
483.05
702.61
12,561.50
12,076.25
38,643.55
no
no
3
2
1,261.41
845.50
3,784.23
1,691.00
no
1 21,821.25
21,821.25
C. WATER SUPPLY
1 Providing and fixing in position medium class approved GI
pipes with necessary fittings (standard 'R' brand fittings, sun
brand or superior) necessary clamps, for cold water supply,
cutting and making holes in the floor or walls and repairing the
same to its original finished.
274,220.52
Description of work
DRAINAGE
Providing and laying in position and in slope
various dia pipes for soil & waste line including
earth work excavation, jointing of pipes with
color and back filling complete.
a) 110 mm dia UPVC pipe.
c) 2 Nos of each 110 mm dia UPVC pipe.
Unit Quantity
Rate
Amount
rm
rm
50
110
516.92
516.92
25,846.00
56,861.20
no
12
6,750.00
81,000.00
no
125,000.00
125,000.00
no
45,000.00
45,000.00
333,707.20
Description
Unit
Quantity
Rate(NRs)
Amount(NRs)
Distribution Boards
Supply,delivary, installation, testing and
commissioning of fully enclosed, front
door operation double cover Main
Distribution Boards (MDB) suitable for
flush/wall mounting made out of 16 SWG
steel sheet having separate
compartments for incoming and outgoing
including earth and neutral links as per
drawings, specifications and instructions
and DB shall consists of
1.1.
DB - 1(Ground floor)
Incoming
1 x 60 Amp DP MCB
Outgoing
1 x 40 Amp DP MCB
9 x 15 Amp DP MCB
10 x 5/10 Amp SP MCB
All MCB are Siemens India make
Set
20,216.00
20,216.00
1.2
DB - 1(First floor)
Incoming
1 x 40 Amp DP MCB
Outgoing
7 x 15 Amp DP MCB
7 x 5/10 Amp SP MCB
All MCB are Siemens India make
Set
14,692.00
14,692.00
rm
85
161.00
13,685.00
rm
125
170.00
21,250.00
Sub-mains Cables.
Supplying, laying and interconnection of
following types of 1100 volt grade PVC
insulated copper cables concealed in HDP
pipe to be run in walls, ceiling and floor
including suitable size compress type
cable shoes at both ends all complete as
per drawings, specifications and
instructions
2.1
2.2
3.2
3.3
Unit
Quantity
Rate(NRs)
Amount(NRs)
Pts
66
1,096.00
72,336.00
Pts
536.00
4,288.00
Pts
23
566.00
13,018.00
Socket outlets.
Supply, installation and putting into
operation of following types of control
switches and socket outlets in modular
arrangements including suitable size
heavy guage GI box with required fixing
materials all complete as per specification,
drawing and instruction.
4.1.
Nos
366.00
2,928.00
4.2.
Nos
23
668.00
15,364.00
6.1
6.2
Description
Unit
Set
Quantity
41
Rate(NRs)
1,862.00
Amount(NRs)
76,342.00
Nos
19
668.00
12,692.00
Mirror light
Adjustable mirror light suitable for 2 nos
candle bulbs in off white finish
Nos
10
537.00
5,370.00
System earthing
Earthing Supplying and installation
complete earthing systems with 600x600x3
mm pure copper earth plate, 25x3 mm
copper strip interconnected between earth
electrode and main earthing point
including required quantity of salt, charcoal
and related material so that the earth
resistance will not be more than 1 to 5
OHMS.
Set
8,393.00
8,393.00
Set
21,272.00
21,272.00
a
b
1.5
m high multi finnals type copper arial
conductor 4 Nos.
Total Electrical Works (C1)
301,846.00
DESCRIPTION OF WORK
A1
B1
B2
C1
Electrical Works
Contingencies @ 5 %
TOTAL
OF NEPAL
th Control Tower
epal
AMOUNT(NRs)
7,008,143.03
274,220.52
333,707.20
301,846.00
100,000.00
8,017,916.75
1,094,445.64
8,418,812.59
400,895.84
9,513,258.23