DESCRIPTION
SITE PROGRESS CIVIL WORKS
UNIT
Lot
ACCESS ROAD
Lot
SITE GRADING
Lot
SAFANIYAH 380/230 kV SUBSTATION ENER
SITE PROGESS COMMUNICATION WORKS
Equipment installations and Laying & termination of cables for PDS
Lot
Telephone Line sets installation in all buildings
Lot
Testing and Commissioning
Testing with Witness
Open/Close Loop Test and SCADA points List for SAS/SCADA
Lot
SITE PROGRESS MECHANICAL WORKS
CONTROL BUILDING
Smoke purge fan installation at control building
Lot
Indoor cladding of Control building
Lot
230KV GIS BUILDING
Internal testing of Fire alarm system (Balance for pump & guard house)
Lot
Installation of smoke detector in HVAC duct
Lot
Outdoor duct insulation work ( PACUs 6A & 6B)
Lot
380kV GIS BUILDING
Cladding of HVAC duct (4A & 4B)
Lot
Cladding of VDs inside GIS building
Lot
Outdoor Work
HVAC System
Installation of split type air conditioning unit at guard house
Lot
Plumbing System
Conduiting and cabling for sump pumps installed in BSP
Lot
Submersible pumps installation in all building's basement and tunnel.
Lot
V SUB 10 Substation
A
1
2
3
B
1
2
No.
No.
Lot
No.
Lot
3
4
5
6
7
8
9
10
11
C
1
2
D
1
DESCRIPTION
Groung work indoor and outdoor
Cable Tray and supports Installation
Cable glanding
Cable Peeling & Termination
LV Power Cable Pulling
Control and Protection Cable Pulling
Support structure installation for ACDC panels wall mounted
Installation of ACDC panels wall mounted
Cable Tag Installation
Internal Testing
Device/relays/component testing
Pre checking of panels
Material Delivery
Panel Shifting into Sub 10
UNIT
Lot
Lot
Lot
Lot
Lot
Lot
Lot
No.
Lot
Lot
Lot
No.
4
5
6
i
1
2
3
4
5
6
7
8
ii
1
2
3
4
5
6
7
8
9
10
D
1
2
3
1
2
3
4
5
DESCRIPTION
UNIT
1
7
6
0
4
MANPOWER ( SITE) - SU
1
2
3
SIEMENS direct
Siemens Indirect (Contraco, Q&E, IND etc)
Sub-contractor(Civil)
0
1
4
3 of 12
QUANTITY COMPLETED
PREVIOUS
TODAY
CUMULATIVE
Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C
BALANCE
REMARKS
87%
0%
87%
13%
On Hold
96.00%
0.50%
96.50%
3.50%
In-progress
1
100.00%
0.00%
100.00%
N ENERGIZED ON 31st DECEMBER 2013
0.00%
completed
1
1
88%
30%
0%
0%
88%
30%
12%
70%
On Hold
On Hold
98%
0%
98%
2%
On Hold
1
1
50%
82%
0%
0%
50%
82%
50%
18%
On Hold
On Hold
1
1
1
90%
70%
23%
0%
20%
0%
90%
90%
23%
10%
10%
77%
In-progress
In-progress
On Hold
1
1
95%
85%
0%
0%
95%
85%
5%
15%
On Hold
On Hold
80%
0%
80%
20%
On Hold
1
1
52%
63%
0%
0%
52%
63%
48%
37%
In-progress
On hold
6
6
1
6
6
40%
0
0
10%
6
6
50%
0
0
50%
completed
completed
In-progress
13
1
12
85%
0
0%
12
85%
1
15%
4 of 12
QUANTITY COMPLETED
PREVIOUS
TODAY
CUMULATIVE
Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C
BALANCE
REMARKS
1
1
1
1
1
1
1
2
1
44%
98%
53%
53%
95%
56%
100%
2
50%
0%
0%
0%
0%
0%
0%
0%
0
0%
44%
98%
53%
53%
95%
56%
100%
2
50%
56%
2%
47%
47%
5%
44%
0%
0
50%
No Activity
No Activity
No Activity
No Activity
No Activity
No Activity
No Activity
No Activity
No Activity
1
1
65%
80%
0%
0%
65%
80%
35%
20%
No Activity
No Activity
13
12
12
38
38
38
38
38
98
98
98
4
4
4
4
1
4
4
1
30.56
26
21
21
21
20
19.31
19
3.04
3
3
3
50%
1
0.8
100%
0
0
0
0
0
0
0
0
0
0
0
0
0%
0
0
0%
30.56
26
21
21
21
20
19.31
19
3.04
3
3
3
50%
1
0.8
100%
7.44
12
17
17
17
78
78.69
79
0.96
1
1
1
50%
3
3.2
0%
On Hold
On Hold
On Hold
On Hold
On Hold
In-progress
In-progress
On Hold
In-progress
No Activity
completed
In-progress
On Hold
On Hold
On Hold
completed
92%
65%
100.00%
8%
35%
0.00%
On Hold
In-progress
completed
5 of 12
Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C
QUANTITY COMPLETED
PREVIOUS
TODAY
CUMULATIVE
BALANCE
REMARKS
1
1
1
70.00%
15%
100.00%
0.00%
0%
0%
70.00%
15%
100.00%
30.00%
85%
0.00%
In-progress
Done for Bus 1B Only
completed
3
8
10
2
2
18
1
1
2
7
9
0
1
8
30%
67%
0
0
0
0
0
0
0%
0%
2
7
9
0
1
8
30%
67%
1
1
1
2
1
10
70%
33%
3
8
10
2
2
17
1
1
1
1
0
6
8
0
0
0
100%
85.00%
2%
100%
0
0
0
0
0
0
0%
0%
0%
0%
0
6
8
0
0
0
100%
85.00%
2%
100%
3
2
2
2
2
17
0%
15.00%
98%
0%
1
60%
0%
60%
1
30%
0%
30%
1
100%
0%
100%
kV BSP and Expansion of Associated Substations
1
7
6
0
4
40%
70%
0%
18
6 of 12
Daily Prog
DESCRIPTION
1
2
1
2
3
Asphalt
1
2
3
4
Application of MC1
Laying of Binding Course
Application of RC2
Laying of wearing Course
Main Transformer
Crash Barriers
1
2
3
Boundary Wall
II
A
1
2
B
1
C
1
Control Building
Control Building
HVAC System
Punch list items
Plumbing System
Piping installation at overhead water tank ( Concrete support foundation
balance)
IV
1
2
3
4
5
6
7
Daily Prog
DESCRIPTION
UNIT
TOTAL
QTY
PREVIOUS
Lot
Lot
1
1
100.0%
70%
0.0%
30%
100.0%
100%
0.0%
0%
Lot
Lot
Lot
1
1
1
99.5%
98%
97%
0%
0%
0%
99.5%
98%
97%
0.5%
2%
3%
Lot
Lot
Lot
Lot
1
1
1
1
71%
66.0%
64%
63.0%
0%
0%
0%
0%
71%
66.0%
64%
63.0%
29%
34.0%
36%
37.0%
Lot
35.0%
0%
35.0%
65.0%
Lot
Lot
Lot
1
1
1
70%
70%
70%
0%
0%
0%
70%
70%
70%
30%
30%
30%
Lot
3%
0%
3%
97%
BALANCE
1
1
99%
85%
0%
0%
99%
85%
1%
15%
Lot
98.5%
0.0%
98.5%
1.5%
Lot
0%
0%
0%
100%
Lot
91%
0%
91%
9%
TOTAL
QTY
No.
Total
1
3
20
0
0
0
0
24
PREVIOUS
QUANTITY COMPLETED
TODAY
CUMULATIVE
BALANCE
____________________________
Project Manager
Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C
REMARKS
completed
completed
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
DB Energized on 25-10-2015.
on hold
on hold
No Activity
In Progress
No Activity
In Progress
Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C
REMARKS
____________________________
Project Manager