CONTRACT: Safaniyah 380/230k

Location: Safaniyah 380/230kV BSP


Contractor: SIEMENS
Contract No: 30933106/00
S.NO.

I
A
1
B
1
C
1
II
1
2
III
A
1
IV
A
1
2
B

1
2
3
C

1
2
D
a

1
E

1
2

DESCRIPTION
SITE PROGRESS CIVIL WORKS

UNIT

FUTURE 380KV CABLE TUNNEL

2nd coat of epoxy on basement floor

Lot

ACCESS ROAD

General fill,Select fill & Basecourse

Lot

SITE GRADING

General fill, Select fill & basecourse

Lot
SAFANIYAH 380/230 kV SUBSTATION ENER
SITE PROGESS COMMUNICATION WORKS
Equipment installations and Laying & termination of cables for PDS
Lot
Telephone Line sets installation in all buildings
Lot
Testing and Commissioning
Testing with Witness
Open/Close Loop Test and SCADA points List for SAS/SCADA
Lot
SITE PROGRESS MECHANICAL WORKS
CONTROL BUILDING
Smoke purge fan installation at control building
Lot
Indoor cladding of Control building
Lot
230KV GIS BUILDING
Internal testing of Fire alarm system (Balance for pump & guard house)
Lot
Installation of smoke detector in HVAC duct
Lot
Outdoor duct insulation work ( PACUs 6A & 6B)
Lot
380kV GIS BUILDING
Cladding of HVAC duct (4A & 4B)
Lot
Cladding of VDs inside GIS building
Lot
Outdoor Work
HVAC System
Installation of split type air conditioning unit at guard house
Lot
Plumbing System
Conduiting and cabling for sump pumps installed in BSP
Lot
Submersible pumps installation in all building's basement and tunnel.
Lot

V SUB 10 Substation
A
1
2
3
B
1
2

SITE PROGRESS CIVIL WORKS


CT Foundation(concrete)
CT Foundation Pedestal(concrete)
Backfilling
SITE PROGRESS ELECTRICAL WORKS
Panels Erection in Control Room
Glanding for Cable Top Entry to Panels
1 of 12

No.
No.
Lot
No.
Lot

CONTRACT: Safaniyah 380/230k


Location: Safaniyah 380/230kV BSP
Contractor: SIEMENS
Contract No: 30933106/00
S.NO.

3
4
5
6
7
8
9
10
11
C
1
2
D
1

DESCRIPTION
Groung work indoor and outdoor
Cable Tray and supports Installation
Cable glanding
Cable Peeling & Termination
LV Power Cable Pulling
Control and Protection Cable Pulling
Support structure installation for ACDC panels wall mounted
Installation of ACDC panels wall mounted
Cable Tag Installation
Internal Testing
Device/relays/component testing
Pre checking of panels
Material Delivery
Panel Shifting into Sub 10

UNIT

Lot
Lot
Lot
Lot
Lot
Lot
Lot
No.
Lot
Lot
Lot
No.

VI Safaniyah 380/230kV BSP (Change Order)


A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
C
1
2
3

SITE PROGRESS CIVIL WORKS( 230kV)


GIB structure foundation( excavation)
No.
GIB structure foundation(select fill)
No.
GIB structure foundation(Lean concrete)
No.
GIB structure foundation(rebar & formwork)
No.
GIB structure foundation(concrete)
No.
GIB structure Pedestal(rebar)
No.
GIB structure Pedestal(formwork)
No.
GIB structure Pedestal Concrete with Anchor Bolt
No.
Gantry structure footing pad(excavation)
No.
Gantry structure footing pad(Lean Concrete)
No.
Gantry structure footing pad(rebar & formwork)
No.
Gantry structure footing pad(concrete)
No.
Gantry structure Pedestal(rebar & formwork)16nos
Lot
Gantry structure Pedestal(Rebar)
No.
Stub & Template Istallation Ground assembly(Gantry)
No.
Surge Arrestor foundation(Main Gate side)3 nos(concrete)
Lot
SITE PROGRESS ELECTRICAL WORKS
Bus-1B Energized Successfully on Monday 5th O
Shifting of GIS equipment to 230kV GIS Hall
Lot
Grounding work (GIS D01, D08, Cable ladders and Panels)
Lot
Cable glanding & termination in new panels(TCS, Sync Check & Metering)
Lot
2 of 12

CONTRACT: Safaniyah 380/230k


Location: Safaniyah 380/230kV BSP
Contractor: SIEMENS
Contract No: 30933106/00
S.NO.

4
5
6
i
1
2
3
4
5
6
7
8
ii
1
2
3
4
5
6
7
8
9
10
D
1
2
3
1
2
3
4
5

DESCRIPTION

UNIT

Cable peeling, glanding & termination in BF panels & UF panels


Lot
SAS Modification for new 230kV Dias
Lot
Bottom Covers preparation and installations in New Panels.
Lot
D08 Cross Bay
Circuit Breakers
No.
Disconnectors
No.
Earth Switches
No.
Voltage Transformers
No.
Installation of cross sections between breakers
No.
SF6 Gas Filling in Gas Compartments (RYB)
No.
GIB Installation
Lot
Cable Termination on GIS Assembly
Lot
D01 Cross Bay
Circuit Breakers
No.
Disconnectors
No.
Earth Switches
No.
Voltage Transformers
No.
Installation of cross sections between breakers
Lot
SF6 Gas Filling in Gas Compartments (RYB)
No.
Cable Pulling - LCC to GIS Equipment and looping
Lot
Cable, glanding, dressing and termination in LCC and BB/BF Panels
Lot
Cable glanding, dressing and termination on GIS
Lot
Cable Pulling - LCC to Control Room
Lot
Internal Testing
CT's Testing of D08 Dia.
Lot
Trip Coil Scheme Checks in LCC Panels for D08
Lot
Cable wiring continuety checks for D01 related Panels
Lot
MANPOWER ( SITE) - Safaniyah 380/230kV BSP
SIEMENS direct
Siemens Indirect (Contraco, Q&E etc)
Sub-contractor(Civil) KUC
Zamil (Zamil Mobilized to site on 21-10-2015)
Firefreeze

1
7
6
0
4

MANPOWER ( SITE) - SU
1
2
3

SIEMENS direct
Siemens Indirect (Contraco, Q&E, IND etc)
Sub-contractor(Civil)

0
1
4

3 of 12

80/230kV BSP and Expansion of Associated Substations


Daily Progress Report
TOTAL
QTY

QUANTITY COMPLETED
PREVIOUS
TODAY
CUMULATIVE

Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C

BALANCE

REMARKS

87%

0%

87%

13%

On Hold

96.00%

0.50%

96.50%

3.50%

In-progress

1
100.00%
0.00%
100.00%
N ENERGIZED ON 31st DECEMBER 2013

0.00%

completed

1
1

88%
30%

0%
0%

88%
30%

12%
70%

On Hold
On Hold

98%

0%

98%

2%

On Hold

1
1

50%
82%

0%
0%

50%
82%

50%
18%

On Hold
On Hold

1
1
1

90%
70%
23%

0%
20%
0%

90%
90%
23%

10%
10%
77%

In-progress
In-progress
On Hold

1
1

95%
85%

0%
0%

95%
85%

5%
15%

On Hold
On Hold

80%

0%

80%

20%

On Hold

1
1

52%
63%

0%
0%

52%
63%

48%
37%

In-progress
On hold

6
6
1

6
6
40%

0
0
10%

6
6
50%

0
0
50%

completed
completed
In-progress

13
1

12
85%

0
0%

12
85%

1
15%

SOE Panels is balance


No Activity

4 of 12

80/230kV BSP and Expansion of Associated Substations


Daily Progress Report
TOTAL
QTY

QUANTITY COMPLETED
PREVIOUS
TODAY
CUMULATIVE

Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C

BALANCE

REMARKS

1
1
1
1
1
1
1
2
1

44%
98%
53%
53%
95%
56%
100%
2
50%

0%
0%
0%
0%
0%
0%
0%
0
0%

44%
98%
53%
53%
95%
56%
100%
2
50%

56%
2%
47%
47%
5%
44%
0%
0
50%

No Activity
No Activity
No Activity
No Activity
No Activity
No Activity
No Activity
No Activity
No Activity

1
1

65%
80%

0%
0%

65%
80%

35%
20%

No Activity
No Activity

13

12

12

SOE Panels is balance

38
38
38
38
38
98
98
98
4
4
4
4
1
4
4
1

30.56
26
21
21
21
20
19.31
19
3.04
3
3
3
50%
1
0.8
100%

0
0
0
0
0
0
0
0
0
0
0
0
0%
0
0
0%

30.56
26
21
21
21
20
19.31
19
3.04
3
3
3
50%
1
0.8
100%

7.44
12
17
17
17
78
78.69
79
0.96
1
1
1
50%
3
3.2
0%

On Hold
On Hold
On Hold
On Hold
On Hold
In-progress
In-progress
On Hold
In-progress
No Activity
completed
In-progress
On Hold
On Hold
On Hold
completed

92%
65%
100.00%

8%
35%
0.00%

On Hold
In-progress
completed

ay 5th Oct 2015, 13:02 Hrs.


1
92%
0%
1
65%
0%
1
100.00%
0%

5 of 12

80/230kV BSP and Expansion of Associated Substations


Daily Progress Report
TOTAL
QTY

Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C

QUANTITY COMPLETED
PREVIOUS
TODAY
CUMULATIVE

BALANCE

REMARKS

1
1
1

70.00%
15%
100.00%

0.00%
0%
0%

70.00%
15%
100.00%

30.00%
85%
0.00%

In-progress
Done for Bus 1B Only
completed

3
8
10
2
2
18
1
1

2
7
9
0
1
8
30%
67%

0
0
0
0
0
0
0%
0%

2
7
9
0
1
8
30%
67%

1
1
1
2
1
10
70%
33%

3
8
10
2
2
17
1
1
1
1

0
6
8
0
0
0
100%
85.00%
2%
100%

0
0
0
0
0
0
0%
0%
0%
0%

0
6
8
0
0
0
100%
85.00%
2%
100%

3
2
2
2
2
17
0%
15.00%
98%
0%

1
60%
0%
60%
1
30%
0%
30%
1
100%
0%
100%
kV BSP and Expansion of Associated Substations
1
7
6
0
4

40%
70%
0%

18

TE) - SUB 10 Substations


0
1
4

6 of 12

Erection activities of D08 are


on Hold as shut down is
required on Bus 2B for
completion of the cross bay.
On Hold
On Hold
Erection activities of D01 are
on Hold as shut down are
required on Buses (1A & 2A)
to complete the installation of
the complete Cross Bay
completed
In-progress
On Hold
completed
On Hold
On Hold
completed

CONTRACT: Safaniyah BSP Dynamic Reactive


Location: Safaniyah 380/230kV BSP
Contractor: SIEMENS
Contract No: 30933116/00
S.NO.

Daily Prog
DESCRIPTION

SITE PROGRESS CIVIL WORKS

1
2

Surface preparation prior to paint on external wall


Final coat of paint on external wall

General Fence and Gates

1
2
3

Perimeter Fence Post (excavation & installation)


Perimeter Fence Post (concrete)
Perimeter Fence (Installation)

Asphalt

1
2
3
4

Application of MC1
Laying of Binding Course
Application of RC2
Laying of wearing Course

Main Transformer

Surface preparation of Oil retention pit wall(2 nos)

Crash Barriers

1
2
3

Excavation,fixing of rebar & formwork(around main transformer)


Concrete(around main transformer)
Installation of Crash Barrier(around main transformer)

Boundary Wall

Filling of gap below the wall panel

II

SITE PROGRESS ELECTRICAL WORKS


13.8kV RMU, 13.8kV Switchgear, Service Tr

A
1
2
B
1
C
1

Control Building

Control Room Building


PDS Duct, Conduits, oulets and wiring in control building
Equipment installation in SCADA room
Outdoor Work Progress
Grounding of Fence, Lighting poles, LCLM and shades structure
Testing and Commissioning
Testing and commissioning activities are completed. The Punch List Points
Points)

III SITE PROGRESS MECHANICAL WORKS


A
a
1
b
1

Control Building
HVAC System
Punch list items
Plumbing System
Piping installation at overhead water tank ( Concrete support foundation
balance)

CONTRACT: Safaniyah BSP Dynamic Reactive


Location: Safaniyah 380/230kV BSP
Contractor: SIEMENS
Contract No: 30933116/00
S.NO.

IV
1
2
3
4
5
6
7

Daily Prog
DESCRIPTION

DELIVERY OF MATERIAL AT SITE


MANPOWER SITE - Contractors
SIEMENS (Direct)
SIEMENS Indirect (HNCC, BWCC, Asaleeb, Quarany, S3C, Q&E, Contraco, Baud, Testing)
Al Kawasar (Civil Sub-contractor)
ICMS (LSP Subcontractor)
BAUD (Communication Subcontractor)
HVAC Sub-contractor EPC (punch item in progress)
REDA (Fire Alarm Sub-Contractor)

P Dynamic Reactive Power Compensation

Daily Progress Report


QUANTITY COMPLETED
TODAY
CUMULATIVE

UNIT

TOTAL
QTY

PREVIOUS

Lot
Lot

1
1

100.0%
70%

0.0%
30%

100.0%
100%

0.0%
0%

Lot
Lot
Lot

1
1
1

99.5%
98%
97%

0%
0%
0%

99.5%
98%
97%

0.5%
2%
3%

Lot
Lot
Lot
Lot

1
1
1
1

71%
66.0%
64%
63.0%

0%
0%
0%
0%

71%
66.0%
64%
63.0%

29%
34.0%
36%
37.0%

Lot

35.0%

0%

35.0%

65.0%

Lot
Lot
Lot

1
1
1

70%
70%
70%

0%
0%
0%

70%
70%
70%

30%
30%
30%

Lot

3%

0%

3%

97%

BALANCE

hgear, Service Transformer 2 and ACDB Energized on 25-10-2015.


Lot
Lot

1
1

99%
85%

0%
0%

99%
85%

1%
15%

Lot

98.5%

0.0%

98.5%

1.5%

he Punch List Points are in progress (Priority to clear A Category

Lot

0%

0%

0%

100%

Lot

91%

0%

91%

9%

P Dynamic Reactive Power Compensation

Daily Progress Report


UNIT

TOTAL
QTY

No.

Total

1
3
20
0
0
0
0

24

PREVIOUS

QUANTITY COMPLETED
TODAY
CUMULATIVE

BALANCE

____________________________
Project Manager

Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C
REMARKS

completed
completed
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold
on hold

DB Energized on 25-10-2015.
on hold
on hold
No Activity
In Progress

No Activity
In Progress

Date: 22-12-2015
Weather : Cloudy
Temperature: 15 C
REMARKS

____________________________
Project Manager