SECTION 01813
GREEN BUILDING DESIGN REQUIREMENTS
PART 1 - GENERAL
1.1
RELATED DOCUMENTS
A.
1.2
Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
SUMMARY
A.
1.3
Section includes general requirements and procedures for compliance with Dubai
Municipality Green Building requirements.
1.
Other Green Building requirements and credits needed to obtain Green Building
certification depend on material selections and may not be specifically identified as
Green Building requirements.
2.
Additional Green Building requirements and credits needed to obtain the indicated
Green Building certification depend on LEED requirements and documents and other
aspects of Project that are part of the Work of the Contract.
3.
Some sustainable products and technologies are relatively new to the market. Their
selection or recommendation does constitute a warranty of performance. The product
manufacturer maintains responsibility for all liability.
4.
Design and Architecture Bureau (DAR) will not be responsible or liable in any manner
should the final project not achieve the desired Green Building rating due to actions or
decisions of the Owner or Contractor.
SUBMITTALS
A.
B.
Green Building submittals are in addition to other submittals. If submitted item is identical to
that submitted to comply with other requirements, submit duplicate copies as a separate
submittal to verify compliance with indicated Green Building requirements.
C.
Project Materials Cost Data: Provide statement indicating total cost for materials used
for Project. Costs exclude labor, overhead, and profit. Include breakout of costs for the
following categories of items:
1.
Construction Cost for hard costs for all work associated with Divisions 2-10 of CSI
MasterFormat 1995, which are not necessarily correlated directly to the
Specification sections of these Contract Documents.
2.
Plumbing.
3.
Mechanical.
4.
Electrical.
5.
6.
Rev. 0
Page 1 of 6
QUALITY ASSURANCE
A.
B.
All wood products designated as FSC certified in this specification shall be certified
according to the rules of the Forest Stewardship Council (www.fscus.org).
PART 2 - PRODUCTS
2.1
MATERIALS, GENERAL
A.
2.2
Provide products and procedures necessary to obtain Green Building credits required in this
Section. Although other Sections may specify some requirements that contribute to Green
Building credits, the Contractor shall determine additional materials and procedures
necessary to obtain Green Building credits indicated.
REGIONAL MATERIALS
A.
2.3
Provide a minimum of 2 0 percent of building materials (by cost) that are regional
materials. For assemblies or products manufactured within the 500-Km radius but
containing only some components that also were extracted within the 500-Km radius, base
the proportionality of such products cost on the weight of their various components.
LOW-EMITTING MATERIALS
A.
For field applications that are inside the weatherproofing system, use adhesives and
sealants that comply with the following limits for VOC content.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Special Purpose Contact Adhesive (contact adhesive that is used to bond melamine
covered board, metal, unsupported vinyl, Teflon, ultra-high molecular weight
Rev. 0
Page 2 of 6
B.
19.
20.
21.
22.
23.
24.
For field applications that are inside the weatherproofing system, use paints and coatings
that comply with the following limits for VOC content when calculated according to Annex II
, Phase II , Table A of European Directive 2004/42/CE:2004 and the following chemical
restrictions:
Maximum VOC Content limits:
Product Category
Phase II (g/l)
Type
WB
30
SB
30
WB
100
SB
100
WB
130
SB
300
WB
130
400
SB
700
WB
30
SB
350
WB
30
SB
750
WB
140
SB
500
Primers
Binding Primers
Rev. 0
130
140
500
Page 3 of 6
Multi-colored coatings
WB
100
SB
100
WB
200
SB
200
1.
2.
Restricted Components: Paints and coatings shall not contain any of the following:
a.
Acrolein.
b.
Acrylonitrile.
c.
Antimony.
d.
Benzene.
e.
f.
Cadmium.
g.
Di (2-ethylhexyl) phthalate.
h.
Di-n-butyl phthalate.
i.
Di-n-octyl phthalate.
j.
dichlorobenzene.
k.
Diethyl phthalate.
l.
Dimethyl phthalate.
m.
Ethylbenzene.
n.
Formaldehyde.
o.
Hexavalent chromium.
p.
Isophorone.
q.
Lead.
r.
Mercury.
s.
t.
u.
Methylene chloride.
v.
Naphthalene.
w.
Toluene (methylbenzene).
x.
trichloroethane.
y.
Vinyl chloride.
Rev. 0
Page 4 of 6
All suspended ceiling system installed inside the weatherproofing system shall meet the
requirements of BS EN 13964 :2004 section 4.5 , in relation to asbestos (no asbestos ) and
formaldehyde content (which must meet class E1 at a minimum and be tested , classified
and appropriately marked ).
D.
Do not use composite wood or agrifiber products or adhesives that contain added ureaformaldehyde resin a n d all internal construction materials do not exceed formaldehyde
VOC content class E1 levels.
2.4
NonRoof : The site hardscapepaving and parking sheds must incorporate one (or more) of
the following strategies:
1- Paving materials with Solar Reflective Index (SRI) of minimum 29.
2- Open grid paving system with 50% perviousness.
3- Parking spaces under cover with 29 SRI.
B.
2.5
A.
PART 3 - EXECUTION
3.1
3.2
Design a sediment and erosion control plan, specific to the site that conforms to local
authorities. The plan shall meet the following objectives:
1.
Prevent loss of soil during construction by storm water runoff and/or wind erosion,
including protecting topsoil by stockpiling for reuse.
2.
3.
FSC-CERTIFIED WOOD
A.
3.3
The contractor shall verify and coordinate the use of all wood products specified as FSC
certified or otherwise required to achieve SM-12 Credit.
REFRIGERANT AND CLEAN-AGENT FIRE-EXTINGUISHING-AGENT
A.
B.
Do not use clean-agent gaseous fire suppression system that have a GWP of 1 or less and
ODP of Zero.
3.4
Rev. 0
Page 5 of 6
C.
D.
Measurement and verification period shall cover at least one year of post-construction
occupancy.
3.5
Monitor,
ENVELOPE TIGHTNESS
A.
B.
3.6
B.
The Contractor is required to prepare and submit the following to Engineer/ Project
Manager for approval prior to forwarding to Engineer/ Project Manager or the Engineer/
Project Managers Representative and prior to commencing construction, if applicable:
1.
2.
Storm water pollution prevention plan describing water quality protection measures
including erosion and sediment controls, inspections, monitoring, and staff training
including a drawing indicating location and type of erosion and sediment protection
measures.
3.
PCB
management and
emergency response plan
describing management,
reporting, emergency response, contact numbers, and staff training.
4.
5.
Comply with the requirements of all applicable regulations, guidelines, standards, and
best industry practices that pertain to construction activities.
6.
END OF SECTION
Rev. 0