Sei sulla pagina 1di 6

Site Survey Report

Site ID

Site Name

Location

INSTALLATION SITE SURVEY REPORT


Project Name
Project ID
Vendor Name
Assigning Date
Survey Date
RFA Date

R338 Building

IDX5185
SHABAKKAT OPT
15/10/2015

1. Site Details:
Building Details
Bldg. Name

R338 building

Bldg. Type

Comercial

Total No. of floors


Location

BF+GF+5 Floors
Opposite to Wafi Mall, Dubai

Site ID.
Latitude

IDX5185

Longitude

55.3223

25.2273

Contact Details
Name of Person
(Bldg. Rep.)
(Onsite
coordination during
installation and
access permit)

Position /
Company

Contact No.

Email Address

Mr. Faisal

Electrical Eng

050 928 0976

Materials Storage Area


Location:
(Please define)

Etisalat Tel Room, Rooftop

Site Survey Report


Site ID

Site Name

Location

Site Access Type and Apartments Access Availability


No
8Am 5PM
No

24 Hours
Working Hours
Access Permit Required
Total no. of
apartments
Access to apartments

No. of
apartments
require
access

Remarks/Comments

2. GSM Room Readiness:


GSM Room
Item Description
Wall finished done
Floor finished done
Entrance Door installed
Feeder Entry provided
Horizontal Cable Tray installed
Lighting Fixtures & Switch installed
Power Socket Outlet installed
Fire Suppressor Cylinder installed
Climate Control System installed
63A 3-Phase TP Isolator SW installed
Earth Bar installed
Dimension:
Location of the GSM room:
GSM room forecast completion:

YES

NO

Remarks

No
No

Our Scope

./
/
/
/

Our Scope

No
No
Our Scope
Our Scope
H
L:
W:
:
ETC tel room, rooftop
No

Note that:
Building management need to provide the accurate date
for applying the GSM Requirements.
GSM Room layout to be available during the survey and
to be matched with the GSM room

3. Cables routes and lengths:

Site Survey Report


Site ID

Site Name

Location

Cables Installation
essentials

Yes

Trucking Diagram matches


with the Actual Cable layout

Yes

NO

Horizontal Feeder Cable


Installation possibility

Vertical Feeder Cable


Installation possibility

Percentage
Value (%)

Remarks/Comments

Design cable lengths


meeting the actual cable
lengths

yes

Coring required

Yes

Coring required inside GSM Room to lay out main


cables as there is no entry.

Yes

Drilling allowed only on Fridays

80%

Drilling required
Total %

4. Antennas and components:


Antennas and passive components Installation
essentials

Yes

Locations in floor plan are


matching with the Actual
antennas and components
location
Any antennas cant be
installed because of
apartments access
unavailability?
Any antennas cant be
installed because of ceiling
is not ready?
Total %

Yes

NO

Percentage
Value (%)

Remarks/Comments

100%

/
.
None

5. Ceiling readiness and access holes required


FALSE CEILING / ACCESS PANELS

Site Survey Report


Site ID

Site Name

Temporary Ceiling Cutting


Required

yes

Location

20%

Total %

Name
Position
Company

Prepared by:
Sid Ali Smail
Site Engineer
Shabakkat Operations

Reviewed and Confirmed By:


Mohamed Akram
Project Manager
Shabakkat Operations

Signature
Date

Name
Company
Signature
Date

15/10/2015

15/10/2015

Site Survey Report


Site ID

Site Name

Location where we need to do the Coring

Storage location

Location

Site Survey Report


Site ID

Site Name

Overview of available ceiling type (Gypsum on all the floors)

Location

Potrebbero piacerti anche