Sei sulla pagina 1di 7

Giza, Egypt

Mobile : +2-012-00837050
:+2-01009644810
Email
: eng.bassam87@gmail.com
Bassam.ghreeb@yahoo.com

Bassam Ghreeb Abd El Fattah


Career Summary:
A total experience starts from July 2009 in Petroleum Projects and Technical Consultation and I have served as
Welding/NDT Engineer(Piping-Pressure vessels-Tanks-Pipeline-Fired heaters-Steel Structure) in Petrojet company
,NDT Instructor and Welding Instructor in Inspector (ICC company) and Moody. Intertek company ,Now I occupy
Welding /NDT Engineer position in Korean GS E&C

:Education
Bachelor degree of Engineering metallurgy and material Science dept petroleum and mining faculty
Suez Canal University (2004-2009).
Major

: metallurgical and materials engineering

Overall grade

: Good (70.29%)

The BS.C project(welding and Inspection of pressure vessels in petrojet company): very good
Secondary school

: High School (98.04%)

:Experience Summary
Six years and eight months experience in welding and NDT technology in petroleum, petrochemical and refinery projects
and Instructor (Welding-NDT methods-Corrosion-CWI-CSWIP-API570-API510-Heat treatment) in training centers as
.ICC and Moody Intertek
This experience include benefit from university study of welding design , welding metallurgy, welding physics ,welding
chemistry, Thermodynamics ,material science and NDT methods in
Establishes welding and NDT techniques and procedures relating to specification, restrictions ,material processes ,pre and post heat treatment requirements, complex alloys, unusual fabrication methods , welding and NDT of critical joints
Evaluates new developments in welding and NDT field for possible application to current welding and NDT problems -

:Education Scope
-.Physical Metallurgy
-Welding (Physical-Chemical-Welding Metallurgy-Design)
-Thermodynamics
-Heat Transfer
-.Heat Treatment of Steels
-.Manufacturing Technologies (Metal Casting, Metal Forming, Powder Metallurgy and Welding)
-.Mechanical Metallurgy (Material Testing Destructive and Non-Destructive)
Corrosion Engineering, and Materials Characterization Techniques etc. In view of the increasing demand in materials .-development
Material Science

:Occupation
Company

: Korean GS E&C.

Current Position: Welding/NDT Engineer

:Certificates
ASNT LEVEL III in Radiographic Testing ID#207246
ASNT LEVEL III in Ultrasonic Testing ID#207246
ASNT LEVEL III in Magnetic Particle Testing ID#207246
ASNT LEVEL III in Liquid Penetrant Testing ID#207246
EDDY CURRENT TESTING Level II

API 570 Authorized Piping Inspector Certification API Number:43051


API 510 Authorized pressure vessel InspectorCertification API Number : 61258
CSWIP Welding Inspector 3.1 Certification No: 85715 (Expiry Date:07-MAR-2019)
AWS-Certified Welding Inspector (CWI) :AWS- QC1, Certification NO.11071491
Candidate to AWS CWEng exam part 1&2 on 28,December,2015
IELTS (the International English Language Testing System) score 5
The Test of English as a Foreign Language (TOEFL) by Cairo University
Welding fundamentals from American university in Cairo(AUC)
Corrosion in petroleum industries certification from high technology institute
The International Computer Driving License (ICDL).
Training in Occupational health and safety and secure work environment
Welding Training course from Industrial Training Council ITC.

Work History:
A total experience starts from July 2009 in Welding , NDT, Training, Inspection, Quality Control & Quality
.Assurance in Oil industries, Refineries and Petrochemicals

Current Position
Company
Period
Job duties

Welding/NDT Engineer
Korean GS E&C
June,2015 Till Now
Responsible for all welding and NDT activities of ongoing fabrication and
erection activities and strictly implementing quality of works on required
project specifications;
Develops welding techniques, procedures, and applications of welding, utilizing
knowledge of production specifications, properties and characteristics of metals
and metal alloys, and engineering principles: Conducts research and
development investigations to develop and test new fabrication processes and
procedures, improve existing or develop new welding equipment, develop new
or modify current welding methods, techniques, and procedures
perform and direct NDT operations and evaluate and interpret results in terms
of existing standards, codes, and specifications;
Select NDT methods, establish NDT techniques, and assist in
establishing acceptance criteria where none are otherwise
available based on sufficient practical knowledge of applicable
materials, fabrication, process, and product technology
Managing and establishing control process for documentation and for
reviewing and validating inspection techniques and related documents to ensure
that the detection capability and probability of detection is within an acceptable
range. Documents relating to personnel qualification and certification,
equipment verification, reporting structure and archiving.
Verify NDE contractors are using qualified and competent personnel to carry
out NDE process being used
Verify NDE personnel is qualified and able to interpret the requirement of
NDE of the code ASME IX, ASME V, ASME B31.3,ASME VIII,API 650,
AWS D1.1 and Project Specification
Facilitate the creation of the quality environment in which NDT can be
performed; and ensure that the requirements of the client and that of the
governing codes are met.
Review radiography set-ups, against project approved NDE procedures

Review subcontractor's accepted UT, RT, MT, PT reports and radiographic

films for correct interpretations

Position
Company
Period
Job duties

Provide guidance for NDT personnel at all levels.

Welding and NDT Engineer


The Petroleum Projects and Technical Consultation CO (PETROJET)
Mar,2013 TO May,2015

Responsible for NDT and all Welding activities of ongoing fabrication and
erection activities and strictly implementing quality of works on required
project specifications.

Preparation quality documents (quality plan, ITPs..) & participate to preinspection meeting.

Review and validate manufacturing records

Develops welding techniques, procedures, and application of welding


equipment to problems involving fabrication of metals, utilizing knowledge of
production specifications, properties and characteristics of metals and metal
alloys, and engineering principles: Conducts research and development
investigations to develop and test new fabrication processes and procedures,
improve existing or develop new welding equipment, develop new or modify
current welding methods, techniques, and procedures

Prepares technical reports as result of research and development and preventive


maintenance investigations.

Establishes welding procedures to guide production and welding personnel


relating to specification restrictions, material processes, pre- and post-heating
requirements which involve use of complex alloys, unusual fabrication
methods, welding of critical joints, and complex post heating requirements.

Evaluates new developments in welding field for possible application to current


welding problems or production processes.

Directs and coordinates technical personnel in performing inspections to ensure


workers' compliance with established welding procedures, restrictions, and
standards; in testing welds for conformance with national code requirements; or
testing welding personnel for certification.

Contacts personnel of other agencies, engineering personnel, or clients to

exchange ideas, information, or offer technical advice concerning welding


matters.

May perform experimental welding to evaluate new equipment and techniques.

Period
DEC,2012 to MAR,2013
Company
PETROJET (Training Department)
Position
NDT and Welding Instructor
Job description Teaching ASNT NDT level II in RT,UT,MT,PT and VT as Instructor
Teaching Welding Fundamentals ,Welding Processes ,Welding Metallurgy and Heat
treatment
to trainee engineers
Job duties
Responsible for qualifying the trainee engineers, inspectors and welders to do
their jobs with the highest efficiency possible
Lectures in NDT methods ,Heat treatment and Welding Fundamentals
Period
Project Name
Position
Owner /Client
Position
Project duties

July,2012 to DEC,2012
South October Petro-Nefertiti Project
Welding/NDT engineer
Zeitco &DANA
Welding and NDT Engineer

Responsible for NDT and all Welding activities of ongoing fabrication and
erection activities and strictly implementing quality of works on required
project specifications.

Preparation quality documents (quality plan, ITPs..) & participate to preinspection meeting.

Develops welding techniques, procedures, and application of welding


equipment to problems involving fabrication of metals, utilizing knowledge of
production specifications, properties and characteristics of metals and metal
alloys, and engineering principles: Conducts research and development
investigations to develop and test new fabrication processes and procedures,
improve existing or develop new welding equipment, develop new or modify
current welding methods and techniques.

Prepares technical reports as result of research and development and preventive


maintenance investigations.

Establishes welding procedures to guide production and welding personnel


relating to specification restrictions, material processes, pre- and post-heating
requirements which involve use of complex alloys, unusual fabrication
methods, welding of critical joints, and complex post heating requirements.

Evaluates new developments in welding field for possible application to current


welding problems or production processes.

Directs and coordinates technical personnel in performing inspections to ensure


workers' compliance with established welding procedures, restrictions, and

standards; in testing welds for conformance with national code requirements; or


testing welding personnel for certification.

Period
Project Name
Position
Owner /Client
Job description
Project duties

Contacts personnel of other agencies, engineering personnel, or clients to


exchange ideas, information, or offer technical advice concerning welding
matters.

May perform experimental welding to evaluate new equipment, techniques,


and materials

MAR,2012 to July 2012


Antipollution Building
NDT and Welding engineer
Petrobel
NDT and Welding activities for tank construction
Performing different methods of NDT during Tank construction activities according to
API 650 including reviewing and verification of inspection procedures
.Visual Inspection
.NDT for Welding and Repair
Develops welding techniques, procedures, and application of welding equipment to
problems involving fabrication of metals, utilizing knowledge of production
specifications, properties and characteristics of metals and metal alloys, and
engineering principles: Conducts research and development investigations to develop
and test new fabrication processes and procedures, improve existing or develop new
welding equipment, develop new or modify current welding methods, techniques, and
procedures, discover new patterns of welding phenomena, or to correlate and
.substantiate hypotheses
Prepares technical reports as result of research and development and preventive
maintenance investigations.
Establishes welding procedures to guide production and welding personnel relating to
specification restrictions, material processes, pre- and post-heating requirements which
involve use of complex alloys, unusual fabrication methods, welding of critical joints,
and complex postheating requirements.
Evaluates new developments in welding field for possible application to current
welding problems or production processes.
Directs and coordinates technical personnel in performing inspections to ensure
workers' compliance with established welding procedures, restrictions, and standards;
in testing welds for conformance with national code requirements; or testing welding
personnel for certification.
Contacts personnel of other agencies, engineering personnel, or clients to exchange
ideas, information, or offer technical advice concerning welding matters.
May perform experimental welding to evaluate new equipment, techniques, and
materials

Period
Project Name

JAN, 2012 to MAR.2012


Crude fired heater and coking fired heater Project

Location
Owner /Client
Project description
Project duties

Suez -egypt
Suez oil processing company (S.O.P.C)
Construction, Welding, Testing and Inspection of fired heater
Responsible for welding and inspection activities in the piping process unit accord
B31.3 and steel structure according to AWS D1.1\

Period
Project Name
Location
Owner /Client
Project description
Project duties

DEC,2011 to JAN 2012


Distillation plant Shut down
Suez -Egypt
Suez oil processing company (S.O.P.C)
Distillation plant and fired heater tie in
Performing different methods of NDT during normal operation and shutdowns of
REFORMER PLANT including reviewing and verification of inspection procedures
according to international specifications
Visual Inspection
Thickness Measurement
NDT for New Welding and Repair
Corrosion Rate Calculation
Hydrostatic Test
Permanent or Temporary Repair Procedure

Period
Project Name
Location
Owner /Client
Project description
Project duties

NOV,2011 TO DEC 2011


piping unit construction in Suez Steel Company
Performing all QA/QC activities
Danieli
Construction, Welding, Testing and Inspection for piping unitconstruction
Responsible for assuring compliance of all construction, welding & quality control
activities
of the fuel hydrant system construction.
Witness, review & approve all activities procedures.
Material identification, traceability, storage & handling supervisions. .
Verify electrodes & consumables correctness, storage conditions.
Follow up the implementation of all activities procedure during construction (surveying,
stringing, welding, NDT inspection, excavation, lowering & testing).
Complete, update & approve Inspection & Test Plan (ITP) of the project different phases
&
steps.

Period

July 2009 to NOV 2011 (1 Year from all under training in different
organizations on welding processes (SMAW-GTAW GMAW-FCAW and
NDT methods VT-RT-UT-PT-MT)
E-Styrenics Polysytrene Project
Welding Inspector
E-Styrenics
Piping unit construction in petrochemical industries according to ASME B31.3
Responsible for welding and inspection activities in the piping process unit according
to ASME B31.3.
Material identification, traceability, storage & handling supervisions.
Verify electrodes & consumables correctness, storage conditions.
Follow up the implementation of all activities procedure during construction (surveying,
stringing, welding, NDT inspection, excavation, lowering & testing).
Complete, update & approve Inspection & Test Plan (ITP) of the project different phases

Project Name
Position
Owner /Client
Project description
Project duties

& steps.

Computer Skills
Windows

excellent command on windows 7.

MS Office

good command on office package.

Internet Use

good researcher on internet.

Languages
Arabic

mother tongue

English

excellent reading, writing and speaking

Personnel Data
Nationality

Egyptian

Marital

married

Military service :

exempted
.

Potrebbero piacerti anche