Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
exe
===============================================
Default Project..................................................MJFNTCR2-15
Projects:
MJFNTC-R2-15....................................................
.Revised Programme 5 August 2015 Rev 03
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as ...................................Longest
Path
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Free Fl
oat
Number of paths to calculate.....................................10
Statistics:
----------# Projects.......................................................1
# Activities.....................................................1047
# Not Started....................................................909
# In Progress....................................................48
# Completed......................................................90
# Relationships..................................................1452
# Activities with Constraint.....................................30
Project:
MJFNTC-R2-15
Activity:
GEN0001020
Receive Instruction from ADAC to procure additional MJF Pipe fittings & Valves
Project:
MJFNTC-R2-15
Activity:
GEN0001030
Section 2a - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
GEN0001040
Section 2b - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
GEN0001050
Section 2c - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
GEN0001060
GEN0001070
GEN0001080
GEN0001090
GEN0001140
GEN0001150
GEN0001190
GEN0001210
GEN0001230
GEN0001240
MS31020 Access t
MS31030 Cable Du
MS31060 Cable Du
MS31090 Cable Du
MS31110 Cable Du
MS31140 Cable Du
MS31160 Cable Du
MS31190 Cable Du
MS31220 Cable Du
MS31240 Cable Du
MS32720 CH156 MS33310 CH155 MS33590 CH101A SEC2B1000
SEC2E1980
SEC2E2120
Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
MJFNTC-R2-15
Activity:
GEN0001000
Project Start
F4 Remarking
Project:
MJFNTC-R2-15
Activity:
VO53
Cargo St
Project:
MJFNTC-R2-15
Activity:
VO55
Foreman
Project:
MJFNTC-R2-15
Activity:
VO57
Pavement
MJFNTC-R2-15
Activity:
VO63
Barrier
MJFNTC-R2-15
Activity:
VO69
Stop Bar
MJFNTC-R2-15
Activity:
VO76
FATO Add
MJFNTC-R2-15
Activity:
VO83
A3 Road
MJFNTC-R2-15
Activity:
VO85
AGL Prim
MJFNTC-R2-15
Activity:
VO87
Taxiway
MJFNTC-R2-15
Activity:
VO90-1 Optional
ands Barriers
Dayworks
Markings
Project:
Preparation for HLG
Project:
TWY C (Near TWY H)
Project:
itional Design
Project:
Formation
Project:
ary Cable Laying Constraints
Project:
D6 AGL Rerouting
Project:
Items Descope
different calendars.......62
Activity:
GEN0001030
Activity:
GEN0001030
Activity:
GEN0001030
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001040
Activity:
GEN0001050
Activity:
GEN0001050
Activity:
GEN0001050
Activity:
GEN0001060
Activity:
GEN0001060
Activity:
GEN0001060
Activity:
GEN0001060
Activity:
GEN0001060
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001070
Activity:
GEN0001080
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001090
Activity:
GEN0001140
Activity:
GEN0001160
Activity:
GEN0001180
Activity:
GEN0001190
Activity:
GEN0001220
GEN0001230
GEN0001240
SEC2E2120
Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................1047
# Relationships with other projects..............................0
Data Date........................................................05-Aug15
Earliest Early Start Date........................................05-Aug15
Latest Early Finish Date.........................................17-Jan17
Number of float paths............................................10
Exceptions:
----------Critical Activities..............................................72
Project:
MJFNTC-R2-15
Activity:
GEN0001090
Section 2e - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
MS32870 CH156 24" Spool Preparation
Project:
MJFNTC-R2-15
Activity:
MS32880 CH156 Piping Installation with DBB valves
Project:
MJFNTC-R2-15
Activity:
MS32890 CH156 RT Works
Project:
MJFNTC-R2-15
Activity:
MS32910 CH156 Painting/Wrap
Project:
MJFNTC-R2-15
Activity:
MS32920 CH156 Pipe Support Installation & Anchor Bolts
Project:
MJFNTC-R2-15
Activity:
MS32930 CH156 Insulation Gasket Kit Installation & Tourquing
Project:
MJFNTC-R2-15
Activity:
MS33440 CH155 24" Spool Preparation
Project:
MJFNTC-R2-15
Activity:
MS33450 CH155 Piping Installation with DBB valves
Project:
MJFNTC-R2-15
Activity:
MS33460 CH155 RT Works
Project:
MJFNTC-R2-15
Activity:
MS33480 CH155 Painting/Wrap
Project:
MJFNTC-R2-15
Activity:
MS33490 CH155 Pipe Support Installation & Anchor Bolts
Project:
MJFNTC-R2-15
Activity:
MS33500 CH155 Insulation Gasket Kit Installation & Tourquing
Project:
MJFNTC-R2-15
Activity:
PRCMT1130
Procurement 36" DBB Valves
Project:
MJFNTC-R2-15
Activity:
PRCMT1175
Procurement 24" DBB Valves
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1170
Site Delivery 36" DBB valves
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1175
Site Delivery 24" DBB valves
Project:
MJFNTC-R2-15
Activity:
SEC2E2020
CH-133 to CH-135 Nitrogen Purging - Setting-up & Preparation
Project:
MJFNTC-R2-15
Activity:
SEC2E2030
Project:
MJFNTC-R2-15
ct Civil Work Completion Section 6
Project:
MJFNTC-R2-15
ct Civil Work Completion Section 7
Project:
MJFNTC-R2-15
Trench Civil Work Completion
Project:
MJFNTC-R2-15
Fuel Farm Availability
Activity:
MS31220 Cable Du
Activity:
MS31240 Cable Du
Activity:
MS32720 CH156 -
Activity:
SEC2E2120
Project:
MJFNTC-R2-15
Activity:
ASBULT1150
Approval of As Built Drawing for Substations
Project:
MJFNTC-R2-15
Activity:
ASBULT1160
Submission of As Built Drawing for Air Side Road A3
Project:
MJFNTC-R2-15
Activity:
ASBULT1170
Approval of As Built Drawing for Air Side Road A3
Project:
MJFNTC-R2-15
Activity:
ASBULT1180
Submission of As Built Drawing for Temporary Road A3
Project:
MJFNTC-R2-15
Activity:
ASBULT1190
Approval of As Built Drawing for Temporary Road A3
Project:
MJFNTC-R2-15
Activity:
ASBULT1200
Submission of As Built Drawing for Taxi ways - Asphalt works
Project:
MJFNTC-R2-15
Activity:
ASBULT1210
Approval of As Built Drawing for Taxi ways - Asphalt works
Project:
MJFNTC-R2-15
Activity:
EN00001000
Design Concept - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
EN00001010
QA/QC Documents - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
ENMTAP1000
Material Approval of Insulation Gasket kit
Project:
MJFNTC-R2-15
Activity:
ENMTAP1010
Material Approval of 24" Ball Valves
Project:
MJFNTC-R2-15
Activity:
ENMTAP1020
Material Approval of CNAF Gasket
Project:
MJFNTC-R2-15
Activity:
ENMTAP1030
Material Approval of CS Spectacle Blind
Project:
MJFNTC-R2-15
Activity:
ENMTAP1040
Material Approval - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
ENMTSB1000
Material Submittal of Insulation Gasket kit
Project:
MJFNTC-R2-15
Activity:
ENMTSB1010
Material Submittal of 24" Ball Valves
Project:
MJFNTC-R2-15
Activity:
ENMTSB1020
Material Submittal of CNAF Gasket
Project:
MJFNTC-R2-15
Activity:
ENMTSB1030
Material Submittal of CS Spectacle Blind
Project:
MJFNTC-R2-15
Activity:
ENMTSB1040
Material Submittal- VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
ENSD001000
Shop Drawings Submitted and Approved till 5th August
Project:
MJFNTC-R2-15
Activity:
ENSDAP1000
Shop Drawign Approval - Parking & Fencing
Project:
MJFNTC-R2-15
Activity:
ENSDAP1010
Functional Design Specification (FDS) Approval - VO37 (AJF/MJF Interface)
Project:
MJFNTC-R2-15
Activity:
ENSDAP1020
Design Drawings - VO37 (AJF/MJF Interface) - Approval
Project:
MJFNTC-R2-15
Activity:
ENSDSB1000
Shop Drawing Submission - Parking & Fencing
Project:
MJFNTC-R2-15
Activity:
ENSDSB1010
Functional Design Specification (FDS) Submission
Project:
MJFNTC-R2-15
Activity:
ENSDSB1020
Design Drawings - VO37 (AJF/MJF Interface) - Submission
Project:
MJFNTC-R2-15
Activity:
GEN0001000
Project Start
Project:
MJFNTC-R2-15
Activity:
GEN0001010
Receive final MJF IFC-06 from ADAC
Project:
MJFNTC-R2-15
Activity:
GEN0001020
Receive Instruction from ADAC to procure additional MJF Pipe fittings & Valves
Project:
MJFNTC-R2-15
Activity:
GEN0001030
Section 2a - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
Section 2b - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
Section 2c - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
Section 2d - Substantial Completion
Project:
MJFNTC-R2-15
Activity:
Milestone 2 -Substantial Completion
Project:
MJFNTC-R2-15
Activity:
Milestone 3 -Substantial Completion
Project:
MJFNTC-R2-15
Activity:
Access to F3 in the GCAA Area
Project:
MJFNTC-R2-15
Activity:
Access to CH147 - East end in the GCAA Area
Project:
MJFNTC-R2-15
Activity:
Access to CH149 - GCAA Area
Project:
MJFNTC-R2-15
Activity:
Access to West end
Project:
MJFNTC-R2-15
Activity:
Access to Presidential Flight area
Project:
MJFNTC-R2-15
Activity:
Access in Fuel Farm Control Room
Project:
MJFNTC-R2-15
Activity:
Access to Area (For Remaining Fire Fighting Work)
Project:
MJFNTC-R2-15
Activity:
Receipt of NTP with Procurement (VO38)
Project:
MJFNTC-R2-15
Activity:
Submittal of VO 072 - IFC 33 Cost Proposal
Project:
MJFNTC-R2-15
Activity:
Approval of VO 072 - IFC 33 Cost Proposal
Project:
MJFNTC-R2-15
Activity:
Approval of VO 37
Project:
MJFNTC-R2-15
Activity:
Kick-off Meeting - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
Availability of Fuel in Fuel Farm
Project:
MJFNTC-R2-15
Activity:
Completion of Substation 1164 by Other Contractor
Project:
MJFNTC-R2-15
Activity:
Road diversion by HLG to its final position
Project:
MJFNTC-R2-15
Activity:
Availability of Fuel Farm (Installation of instruments)
Project:
MJFNTC-R2-15
Activity:
Project NOCs
Project:
MJFNTC-R2-15
Activity:
Mobilisation and Demobilisation
Project:
MJFNTC-R2-15
Activity:
Milestone 1
Project:
MJFNTC-R2-15
Activity:
Excavation
Project:
MJFNTC-R2-15
Activity:
Base concreting
Project:
MJFNTC-R2-15
Activity:
Wall -1st Lift concreting
Project:
MJFNTC-R2-15
Activity:
Wall - 2nd Lift concreting
Project:
MJFNTC-R2-15
Activity:
Water proofing
Project:
MJFNTC-R2-15
Activity:
Backfilling
GEN0001040
GEN0001050
GEN0001060
GEN0001070
GEN0001080
GEN0001100
GEN0001110
GEN0001115
GEN0001120
GEN0001130
GEN0001140
GEN0001150
GEN0001160
GEN0001170
GEN0001180
GEN0001190
GEN0001200
GEN0001210
GEN0001220
GEN0001230
GEN0001240
GEN0001250
GEN0001270
MS10001000
MS21000 CH147 MS21010 CH147 MS21020 CH147 MS21030 CH147 MS21040 CH147 MS21050 CH147 -
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
Project:
Water proofing
Project:
Backfilling
Project:
Internal finishing
Project:
Top slab installation
Project:
Excavation
Project:
Base concreting
Project:
Wall -1st Lift concreting
Project:
Wall - 2nd Lift concreting
MJFNTC-R2-15
Activity:
MS21060 CH147 -
MJFNTC-R2-15
Activity:
MS21070 CH147 -
MJFNTC-R2-15
Activity:
MS21080 CH148 -
MJFNTC-R2-15
Activity:
MS21090 CH148 -
MJFNTC-R2-15
Activity:
MS21100 CH148 -
MJFNTC-R2-15
Activity:
MS21110 CH148 -
MJFNTC-R2-15
Activity:
MS21120 CH148 -
MJFNTC-R2-15
Activity:
MS21130 CH148 -
MJFNTC-R2-15
Activity:
MS21140 CH148 -
MJFNTC-R2-15
Activity:
MS21150 CH148 -
MJFNTC-R2-15
Activity:
MS21160 CH149 -
MJFNTC-R2-15
Activity:
MS21170 CH149 -
MJFNTC-R2-15
Activity:
MS21180 CH149 -
MJFNTC-R2-15
Activity:
MS21190 CH149 -
MJFNTC-R2-15
Activity:
MS21200 CH149 -
MJFNTC-R2-15
Activity:
MS21210 CH149 -
MJFNTC-R2-15
Activity:
MS21220 CH149 -
MJFNTC-R2-15
Activity:
MS21230 CH149 -
MJFNTC-R2-15
Activity:
MS21240 CH154 -
MJFNTC-R2-15
Activity:
MS21250 CH154 -
MJFNTC-R2-15
Activity:
MS21260 CH154 -
MJFNTC-R2-15
Activity:
MS21270 CH154 -
MJFNTC-R2-15
Activity:
MS21280 CH154 -
MJFNTC-R2-15
Activity:
MS21290 CH154 -
MJFNTC-R2-15
Activity:
MS21300 CH154 -
MJFNTC-R2-15
Activity:
MS21310 CH154 -
MJFNTC-R2-15
Activity:
MS21320 CH155 -
MJFNTC-R2-15
Activity:
MS21330 CH155 -
MJFNTC-R2-15
Activity:
MS21340 CH155 -
MJFNTC-R2-15
Activity:
MS21350 CH155 -
Project:
MJFNTC-R2-15
Activity:
MS21360 CH155 -
Project:
MJFNTC-R2-15
Activity:
MS21370 CH155 -
Activity:
MS21380 CH155 -
Activity:
MS21390 CH155 -
Activity:
MS21400 CH156 -
Activity:
MS21410 CH156 -
Activity:
MS21420 CH156 -
Activity:
MS21430 CH156 -
Activity:
MS21440 CH156 -
Activity:
MS21450 CH156 -
Activity:
MS21460 CH156 -
Activity:
MS21470 CH156 -
Activity:
MS21480 CH101A -
Activity:
MS21490 CH101A -
Activity:
MS21500 CH101A -
Activity:
MS21510 CH101A -
Activity:
MS21520 CH101A -
Activity:
MS21530 CH101A -
Activity:
MS21540 CH101A -
Activity:
MS21550 CH101A -
Activity:
MS21560 CH138 (V
Activity:
MS21570 CH138 (V
Activity:
MS21580 CH138 (V
Activity:
MS21590 CH138 (V
Activity:
MS21600 CH138 (V
Activity:
MS21610 CH-102 -
Activity:
MS21620 CH-104 -
Activity:
MS21630 CH-107 -
Activity:
MS21640 CH-110 -
Activity:
MS21650 CH-108 -
Water proofing
Backfilling
Project:
MJFNTC-R2-15
Internal finishing
Project:
MJFNTC-R2-15
Top slab installation
Project:
MJFNTC-R2-15
Excavation
Project:
MJFNTC-R2-15
Base concreting
Project:
MJFNTC-R2-15
Wall -1st Lift concreting
Project:
MJFNTC-R2-15
Wall - 2nd Lift concreting
Project:
MJFNTC-R2-15
Water proofing
Project:
MJFNTC-R2-15
Backfilling
Project:
MJFNTC-R2-15
Internal finishing
Project:
MJFNTC-R2-15
Top slab installation
Project:
MJFNTC-R2-15
Excavation
Project:
MJFNTC-R2-15
Base concreting
Project:
MJFNTC-R2-15
Wall -1st Lift concreting
Project:
MJFNTC-R2-15
Wall - 2nd Lift concreting
Project:
MJFNTC-R2-15
Water proofing
Project:
MJFNTC-R2-15
Backfilling
Project:
MJFNTC-R2-15
Internal finishing
Project:
MJFNTC-R2-15
Top slab installation
Project:
MJFNTC-R2-15
O46) - Additional Wall concreting
Project:
MJFNTC-R2-15
O46) - Water proofing
Project:
MJFNTC-R2-15
O46) - Backfilling
Project:
MJFNTC-R2-15
O46) - Internal finishing
Project:
MJFNTC-R2-15
O46) - Top slab installation
Project:
MJFNTC-R2-15
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Insulating Gasket, Torquing & Platform Works
Project:
MJFNTC-R2-15
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Torquing & Platform Works
Project:
MJFNTC-R2-15
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Mechanical Installation Works
Project:
MJFNTC-R2-15
Activity:
orquing, Support & Platform Works
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
- Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Torquing & Platform Reinstallation Works
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing & Platform Works
Project:
MJFNTC-R2-15
Activity:
l DBB Valves
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Touruing
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Insulation Gaskets & Torquing
Project:
MJFNTC-R2-15
Activity:
Torquing of Bolts/Nuts
Project:
MJFNTC-R2-15
Activity:
Torquing of Bolts/Nuts
Project:
MJFNTC-R2-15
Activity:
MOV installation, Insulation Gaskets & Tourquing
Project:
MJFNTC-R2-15
Activity:
- MOV installation, Insulation Gaskets & Tourquing
Project:
MJFNTC-R2-15
Activity:
- MOV installation, Insulation Gaskets & Tourquing
Project:
MJFNTC-R2-15
Activity:
- MOV installation, Insulation Gaskets & Tourquing
Project:
MJFNTC-R2-15
Activity:
- MOV installation, Insulation Gaskets & Tourquing
Project:
MJFNTC-R2-15
Activity:
e Laying in Section 2 (except Cables connected to SS 1164)
Project:
MJFNTC-R2-15
Activity:
e laying in Section2 - Cables connected to SS 1164
Project:
MJFNTC-R2-15
Activity:
o SS 1164
Project:
MJFNTC-R2-15
Activity:
ct Civil Work Completion Section 2
Project:
MJFNTC-R2-15
Activity:
e laying in Section 2 - Main Cables
Project:
MJFNTC-R2-15
Activity:
e Laying in Section 3 (Except Main Cables)
Project:
MJFNTC-R2-15
Activity:
ct Civil Works Completion Section 3
Project:
MJFNTC-R2-15
Activity:
e Laying in Section 3 (Main Cables)
Project:
MJFNTC-R2-15
Activity:
e Laying in Section 4 (except new Apron chambers)
Project:
MJFNTC-R2-15
ct Civil Works Completion Section 4
Project:
MJFNTC-R2-15
e Laying in Section 4 (Main Cables)
Project:
MJFNTC-R2-15
ct Civil Work Completion (New Aprons)
Project:
MJFNTC-R2-15
e Laying in Section 4 - New Apron Chambers
Project:
MJFNTC-R2-15
e Laying in Section 1 (Except Main Cables)
Project:
MJFNTC-R2-15
ct Civil Work Completion Section 1
Project:
MJFNTC-R2-15
e Laying in Section 1 (Main Cables)
Project:
MJFNTC-R2-15
ct Civil Work Completion (VO)
Project:
MJFNTC-R2-15
e Laying in Section 1 (VO)
Project:
MJFNTC-R2-15
e Laying in Section 5 (Except Fuel Farm Control
Project:
MJFNTC-R2-15
ct Civil Work Completion Section 5
Project:
MJFNTC-R2-15
e Laying in Section 5 (Fuel Farm Control Room)
Project:
MJFNTC-R2-15
e Laying in Section 6
Project:
MJFNTC-R2-15
ct Civil Work Completion Section 6
Project:
MJFNTC-R2-15
e Laying in Section 6 (Main Cables)
Project:
MJFNTC-R2-15
ct Civil Work Completion Section 7
Project:
MJFNTC-R2-15
e Laying in Section 7
Project:
MJFNTC-R2-15
e Laying in Section 7 (Main Cables)
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Activity:
MS31090 Cable Du
Activity:
Activity:
MS31110 Cable Du
Activity:
Activity:
Activity:
MS31140 Cable Du
Activity:
Activity:
MS31160 Cable Du
Activity:
Activity:
Room)
Activity:
Activity:
Activity:
Activity:
MS31220 Cable Du
Activity:
Activity:
MS31240 Cable Du
Activity:
Activity:
Activity:
MS31270 CH134 -
Activity:
MS31280 CH134 -
Activity:
MS31290 CH134 -
Activity:
MS31300 CH134 -
Activity:
MS31310 CH134 -
Activity:
MS31320 CH134A -
Activity:
MS31330 CH134A -
Activity:
MS31340 CH134A -
Activity:
MS31350 CH134A -
Activity:
MS31360 CH134A -
Activity:
MS31370 CH135A -
Activity:
MS31380 CH135A -
MS31190 Cable Du
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Activity:
MS31390 CH135A -
Activity:
MS31400 CH135A -
Activity:
MS31410 CH135A -
Activity:
MS31420 CH136 -
Activity:
MS31430 CH136 -
Activity:
MS31440 CH136 -
Activity:
MS31450 CH136 -
Activity:
MS31460 CH136 -
Activity:
MS31470 CH137 -
Activity:
MS31480 CH137 -
Activity:
MS31490 CH137 -
Activity:
MS31500 CH137 -
Activity:
MS31510 CH137 -
Activity:
MS31520 CH138 -
Activity:
MS31530 CH138 -
Activity:
MS31540 CH138 -
Activity:
MS31550 CH138 -
Activity:
MS31560 CH138 -
Activity:
MS31570 CH139- C
Activity:
MS31580 CH139 -
Activity:
MS31590 CH139 -
Activity:
MS31600 CH139 -
Activity:
MS31610 CH139 -
Activity:
MS31620 CH140- C
Activity:
MS31630 CH140 -
Activity:
MS31640 CH140 -
Activity:
MS31650 CH140 -
Activity:
MS31660 CH140 -
Activity:
MS31670 CH141- C
Activity:
MS31680 CH141 -
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Activity:
MS31690 CH141 -
Activity:
MS31700 CH141 -
Activity:
MS31710 CH141- M
Activity:
MS31720 CH142- C
Activity:
MS31730 CH142 -
Activity:
MS31740 CH142 -
Activity:
MS31750 CH142 -
Activity:
MS31760 CH142- M
Activity:
MS31770 CH143- C
Activity:
MS31780 CH143 -
Activity:
MS31790 CH143 -
Activity:
MS31800 CH143 -
Activity:
MS31810 CH143- M
Activity:
MS31820 CH144- C
Activity:
MS31830 CH144 -
Activity:
MS31840 CH144 -
Activity:
MS31850 CH144 -
Activity:
MS31860 CH144- M
Activity:
MS31870 CH145- C
Activity:
MS31880 CH145 -
Activity:
MS31890 CH145 -
Activity:
MS31900 CH145 -
Activity:
MS31910 CH145- M
Activity:
MS31920 CH146- C
Activity:
MS31930 CH146 -
Activity:
MS31940 CH146 -
Activity:
MS31950 CH146 -
Activity:
MS31960 CH146- M
Activity:
MS31970 CH148- C
Activity:
MS31980 CH148 -
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Activity:
MS31990 CH148 -
Activity:
MS32000 CH148 -
Activity:
MS32010 CH148- M
Activity:
MS32020 CH147- C
Activity:
MS32030 CH147 -
Activity:
MS32040 CH147 -
Activity:
MS32050 CH147 -
Activity:
MS32060 CH147- M
Activity:
MS32070 CH149- C
Activity:
MS32080 CH149 -
Activity:
MS32090 CH149 -
Activity:
MS32100 CH149 -
Activity:
MS32110 CH149- M
Activity:
MS32120 CH133- C
Activity:
MS32130 CH133 -
Activity:
MS32140 CH133 -
Activity:
MS32150 CH133 -
Activity:
MS32160 CH133- M
Activity:
MS32170 CH111- C
Activity:
MS32180 CH111 -
Activity:
MS32190 CH111 -
Activity:
MS32200 CH111 -
Activity:
MS32210 CH111- M
Activity:
MS32220 CH112- C
Activity:
MS32230 CH112 -
Activity:
MS32240 CH112 -
Activity:
MS32250 CH112 -
Activity:
MS32260 CH112- M
Activity:
MS32270 CH150- C
Activity:
MS32280 CH150 -
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Activity:
MS32290 CH150 -
Activity:
MS32300 CH150 -
Activity:
MS32310 CH150- M
Activity:
MS32320 CH110- C
Activity:
MS32330 CH110 -
Activity:
MS32340 CH110 -
Activity:
MS32350 CH110 -
Activity:
MS32360 CH110- M
Activity:
MS32370 CH108- C
Activity:
MS32380 CH108 -
Activity:
MS32390 CH108 -
Activity:
MS32400 CH108 -
Activity:
MS32410 CH108- M
Activity:
MS32420 CH107- C
Activity:
MS32430 CH107 -
Activity:
MS32440 CH107 -
Activity:
MS32450 CH107 -
Activity:
MS32460 CH107- M
Activity:
MS32470 CH106- C
Activity:
MS32480 CH106 -
Activity:
MS32490 CH106 -
Activity:
MS32500 CH106 -
Activity:
MS32510 CH106- M
Activity:
MS32520 CH104- C
Activity:
MS32530 CH104 -
Activity:
MS32540 CH104 -
Activity:
MS32550 CH104 -
Activity:
MS32560 CH104- M
Activity:
MS32570 CH103- C
Activity:
MS32580 CH103 -
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
able Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
OV Isolator Installation
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Trench Civil Work Completion
Project:
MJFNTC-R2-15
36" Tee Installation
Project:
MJFNTC-R2-15
36" Tee Welding
Project:
MJFNTC-R2-15
24" Pipe Fit-up
Project:
MJFNTC-R2-15
6" Weldolet Joints Fit-up
Project:
MJFNTC-R2-15
24" Pipe Welding
Project:
MJFNTC-R2-15
RT Works
Project:
MJFNTC-R2-15
6" Weldolet Joints Welding
Project:
MJFNTC-R2-15
Painting/Wrap
Project:
MJFNTC-R2-15
Puddle Flange & Link Seal Insulation
Project:
MJFNTC-R2-15
Concrete Casting Surrounding the Puddle Flange
Project:
MJFNTC-R2-15
LDS conduit Installation
Project:
MJFNTC-R2-15
Installation of End Seal
Project:
MJFNTC-R2-15
Chamber Backfilling
Project:
MJFNTC-R2-15
Chamber Handover for Mechanical Works
Project:
MJFNTC-R2-15
Drain & Vent Installation
Project:
MJFNTC-R2-15
Platform Installation
Activity:
MS32590 CH103 -
Activity:
MS32600 CH103 -
Activity:
MS32610 CH103- M
Activity:
MS32620 CH102- C
Activity:
MS32630 CH102 -
Activity:
MS32640 CH102 -
Activity:
MS32650 CH102 -
Activity:
MS32660 CH102- M
Activity:
MS32670 CH101A-
Activity:
MS32680 CH101A -
Activity:
MS32690 CH101A -
Activity:
MS32700 CH101A -
Activity:
MS32710 CH101A-
Activity:
MS32720 CH156 -
Activity:
MS32730 CH156 -
Activity:
MS32740 CH156 -
Activity:
MS32750 CH156 -
Activity:
MS32760 CH156 -
Activity:
MS32770 CH156 -
Activity:
MS32780 CH156 -
Activity:
MS32790 CH156 -
Activity:
MS32800 CH156 -
Activity:
MS32810 CH156 -
Activity:
MS32820 CH156 -
Activity:
MS32830 CH156 -
Activity:
MS32840 CH156 -
Activity:
MS32850 CH156 -
Activity:
MS32860 CH156 -
Activity:
MS32900 CH156 -
Activity:
MS32940 CH156 -
Project:
MJFNTC-R2-15
Activity:
Grating Installation
Project:
MJFNTC-R2-15
Activity:
Manhole Cover installation with Top Slab Cover
Project:
MJFNTC-R2-15
Activity:
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Activity:
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Activity:
Instruments Installation
Project:
MJFNTC-R2-15
Activity:
Installation of Earthling Material
Project:
MJFNTC-R2-15
Activity:
MOV Isolator Installation
Project:
MJFNTC-R2-15
Activity:
Chamber Handover for Mechanical Work
Project:
MJFNTC-R2-15
Activity:
Cutting of Pipes
Project:
MJFNTC-R2-15
Activity:
Installation of Link Seal
Project:
MJFNTC-R2-15
Activity:
Puddle Flange Installation
Project:
MJFNTC-R2-15
Activity:
Tempoaray Installation of Spool Piece
Project:
MJFNTC-R2-15
Activity:
Concrete Casting Surrounding the Puddle Flange
Project:
MJFNTC-R2-15
Activity:
Installation of End Seal
Project:
MJFNTC-R2-15
Activity:
Anchor Bolts for Pipe Support
Project:
MJFNTC-R2-15
Activity:
Backfilling
Project:
MJFNTC-R2-15
Activity:
Pipe Support Installation
Project:
MJFNTC-R2-15
Activity:
PIpe Spool Preparation
Project:
MJFNTC-R2-15
Activity:
Assembly of Flanges with DBB Valves
Project:
MJFNTC-R2-15
Activity:
36" Piping Installation with DBB Valves Installation
Project:
MJFNTC-R2-15
Activity:
36" Welding Works
Project:
MJFNTC-R2-15
Activity:
Radiography Testing
Project:
MJFNTC-R2-15
Activity:
Installation of Ball Valve With Flanges
Project:
MJFNTC-R2-15
Activity:
Drain/Vent Installation
Project:
MJFNTC-R2-15
Activity:
24" Pipe Installation
Project:
MJFNTC-R2-15
Activity:
24" Welding Works
Project:
MJFNTC-R2-15
Activity:
Painting/Wrap
Project:
MJFNTC-R2-15
Activity:
Insulation Gasket Kit Installation
Project:
MJFNTC-R2-15
Activity:
Torquing
Project:
MJFNTC-R2-15
Activity:
Platform Installation
MS32950 CH156 MS32960 CH156 MS32970 CH156 MS32980 CH156 MS32990 CH156 MS33000 CH156 MS33010 CH156 MS33020 CH154 MS33030 CH154 MS33040 CH154 MS33050 CH154 MS33060 CH154 MS33070 CH154 MS33080 CH154 MS33090 CH154 MS33100 CH154 MS33110 CH154 MS33120 CH154 MS33130 CH154 MS33140 CH154 MS33150 CH154 MS33160 CH154 MS33170 CH154 MS33180 CH154 MS33190 CH154 MS33200 CH154 MS33210 CH154 MS33220 CH154 MS33230 CH154 MS33240 CH154 -
Project:
MJFNTC-R2-15
Manhole Cover installation with Top Slab Cover
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Trench Civil Work Completion
Project:
MJFNTC-R2-15
36" Tee Installation
Project:
MJFNTC-R2-15
24" Pipe Fit-up
Project:
MJFNTC-R2-15
36" Tee Welding
Project:
MJFNTC-R2-15
24" Pipe Welding
Project:
MJFNTC-R2-15
RT Works
Project:
MJFNTC-R2-15
Painting/Wrap
Project:
MJFNTC-R2-15
Puddle Flange & Link Seal Insulation
Project:
MJFNTC-R2-15
Concrete Casting Surrounding the Puddle Flange
Project:
MJFNTC-R2-15
LDS conduit Installation
Project:
MJFNTC-R2-15
Installation of End Seal
Project:
MJFNTC-R2-15
Chamber Backfilling
Project:
MJFNTC-R2-15
Chamber Handover for Mechanical Work
Project:
MJFNTC-R2-15
Drain & Vent Installation
Project:
MJFNTC-R2-15
Platform Installation
Project:
MJFNTC-R2-15
Grating Installation
Project:
MJFNTC-R2-15
Manhole Cover installation with Top Slab Cover
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
Trench Civil Work Completion
Project:
MJFNTC-R2-15
Main Pipe Line Laying & Fit Up
Activity:
MS33250 CH154 -
Activity:
MS33260 CH154 -
Activity:
MS33270 CH154 -
Activity:
MS33280 CH154 -
Activity:
MS33290 CH154 -
Activity:
MS33300 CH154 -
Activity:
MS33310 CH155 -
Activity:
MS33320 CH155 -
Activity:
MS33330 CH155 -
Activity:
MS33340 CH155 -
Activity:
MS33350 CH155 -
Activity:
MS33360 CH155 -
Activity:
MS33370 CH155 -
Activity:
MS33380 CH155 -
Activity:
MS33390 CH155 -
Activity:
MS33400 CH155 -
Activity:
MS33410 CH155 -
Activity:
MS33420 CH155 -
Activity:
MS33430 CH155 -
Activity:
MS33470 CH155 -
Activity:
MS33510 CH155 -
Activity:
MS33520 CH155 -
Activity:
MS33530 CH155 -
Activity:
MS33540 CH155 -
Activity:
MS33550 CH155 -
Activity:
MS33560 CH155 -
Activity:
MS33570 CH155 -
Activity:
MS33580 CH155 -
Activity:
MS33590 CH101A -
Activity:
MS33600 CH101A -
Project:
MJFNTC-R2-15
Main Pipe Line Welding
Project:
MJFNTC-R2-15
RT Works / Painting/Wrap
Project:
MJFNTC-R2-15
Puddle Flange & Link Seal Insulation
Project:
MJFNTC-R2-15
Concrete Casting Surrounding the Puddle Flange
Project:
MJFNTC-R2-15
LDS conduit Installation
Project:
MJFNTC-R2-15
Installation of End Seal
Project:
MJFNTC-R2-15
Chamber Backfilling
Project:
MJFNTC-R2-15
Chamber Handover for Mechanical Work
Project:
MJFNTC-R2-15
Pipe Fabrication & Installation of DBB Valves
Project:
MJFNTC-R2-15
Pipe Welding
Project:
MJFNTC-R2-15
RT Works
Project:
MJFNTC-R2-15
Drain / Vent Installation
Project:
MJFNTC-R2-15
Painting/Wrap
Project:
MJFNTC-R2-15
Pipe Support Installation & Anchor Bolts
Project:
MJFNTC-R2-15
Insulation Gasket Kit Installation & Tourquing
Project:
MJFNTC-R2-15
Platform Installation
Project:
MJFNTC-R2-15
Grating Installation
Project:
MJFNTC-R2-15
Manhole Cover installation with Top Slab Cover
Project:
MJFNTC-R2-15
Cable Tray & Support Installation
Project:
MJFNTC-R2-15
Installation of Junction Boxes
Project:
MJFNTC-R2-15
Instruments Installation
Project:
MJFNTC-R2-15
Installation of Earthling Material
Project:
MJFNTC-R2-15
MOV Isolator Installation
Project:
MJFNTC-R2-15
allation
Project:
MJFNTC-R2-15
l Installation
Project:
MJFNTC-R2-15
abinet Installation
Project:
MJFNTC-R2-15
scan Cabinet
Project:
MJFNTC-R2-15
ion 1
Project:
MJFNTC-R2-15
ion 2
Project:
MJFNTC-R2-15
ion 3
Activity:
MS33610 CH101A -
Activity:
MS33620 CH101A -
Activity:
MS33630 CH101A -
Activity:
MS33640 CH101A -
Activity:
MS33650 CH101A -
Activity:
MS33660 CH101A -
Activity:
MS33670 CH101A -
Activity:
MS33680 CH101A -
Activity:
MS33690 CH101A -
Activity:
MS33700 CH101A -
Activity:
MS33710 CH101A -
Activity:
MS33720 CH101A -
Activity:
MS33730 CH101A -
Activity:
MS33740 CH101A -
Activity:
MS33750 CH101A -
Activity:
MS33760 CH101A -
Activity:
MS33770 CH101A -
Activity:
MS33780 CH101A -
Activity:
MS33790 CH101A -
Activity:
MS33800 CH101A -
Activity:
MS33810 CH101A -
Activity:
MS33820 CH101A -
Activity:
MS33830 CH101A -
Activity:
Activity:
Activity:
MS33860 Server C
Activity:
Activity:
MS33880 Workstat
Activity:
MS33890 Workstat
Activity:
MS33900 Workstat
Project:
MJFNTC-R2-15
Activity:
MS33910 UPS DB I
Project:
MJFNTC-R2-15
Activity:
MS33920 Cable tr
Project:
MJFNTC-R2-15
Activity:
MS33930 Cable La
Project:
MJFNTC-R2-15
Activity:
MS33940 Glanding
nstallation
ay for UPS DB
ying
& Termination
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 714
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 714
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 714
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 708
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 708
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 708
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 718
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 718
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 718
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 709
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 709
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 709
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 710
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 710
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 710
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 711
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 711
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 711
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 719
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 719
MS33950 JB Insta
MS33960 Cable Tr
MS33970 Earthing
MS33980 Insulati
Box 714
MS33990 JB Insta
MS34000 Cable Tr
MS34010 Earthing
MS34020 Insulati
Box 708
MS34030 JB Insta
MS34040 Cable Tr
MS34050 Earthing
MS34060 Insulati
Box 718
MS34070 JB Insta
MS34080 Cable Tr
MS34090 Earthing
MS34100 Insulati
Box 709
MS34110 JB Insta
MS34120 Cable Tr
MS34130 Earthing
MS34140 Insulati
Box 710
MS34150 JB Insta
MS34160 Cable Tr
MS34170 Earthing
MS34180 Insulati
Box 711
MS34190 JB Insta
MS34200 Cable Tr
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 719
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 703
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 703
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 703
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 702
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 702
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 702
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 713
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 713
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 713
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 701
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 701
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 701
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
llation - Junction Box 712
Project:
MJFNTC-R2-15
Activity:
ay Installation - Junction Box 712
Project:
MJFNTC-R2-15
Activity:
and Termination - Junction Box 712
Project:
MJFNTC-R2-15
Activity:
on and Continuity test for Instrumentation cables - Junction
Project:
MJFNTC-R2-15
Activity:
tion of Earthing Material
Project:
MJFNTC-R2-15
Activity:
Protection System Works
Project:
MJFNTC-R2-15
Activity:
n Loop - FDB & SDB Installation
Project:
MJFNTC-R2-15
Activity:
n Loop - Cable Ducts Civil Work Completion
Project:
MJFNTC-R2-15
Activity:
n Loop - LD Sensor Cable Laying
Project:
MJFNTC-R2-15
Activity:
n Loop - LDS Sensor Cable termination
Project:
MJFNTC-R2-15
Activity:
n Loop - LD Jumper Cable Laying
Project:
MJFNTC-R2-15
Activity:
n Loop - LDS Jumper Cable termination
MS34210 Earthing
MS34220 Insulati
Box 719
MS34230 JB Insta
MS34240 Cable Tr
MS34250 Earthing
MS34260 Insulati
Box 703
MS34270 JB Insta
MS34280 Cable Tr
MS34290 Earthing
MS34300 Insulati
Box 702
MS34310 JB Insta
MS34320 Cable Tr
MS34330 Earthing
MS34340 Insulati
Box 713
MS34350 JB Insta
MS34360 Cable Tr
MS34370 Earthing
MS34380 Insulati
Box 701
MS34390 JB Insta
MS34400 Cable Tr
MS34410 Earthing
MS34420 Insulati
Box 712
MS34430 Installa
MS34440 Cathodic
MS34450 New Apro
MS34460 New Apro
MS34470 New Apro
MS34480 New Apro
MS34490 New Apro
MS34500 New Apro
Project:
MJFNTC-R2-15
Activity:
MS34510 New Apro
n Loop - Instrument & Control Cable Laying
Project:
MJFNTC-R2-15
Activity:
MS34520 New Apro
n Loop - Instrument & Control Cable Termination
Project:
MJFNTC-R2-15
Activity:
MS34530 New Apro
n Loop - Power Cable Laying
Project:
MJFNTC-R2-15
Activity:
MS34540 New Apro
n Loop - Earth Cable Laying
Project:
MJFNTC-R2-15
Activity:
MS34550 New Apro
n Loop - Power Cable Termination
Project:
MJFNTC-R2-15
Activity:
MS34560 New Apro
n Loop - Earth Cable Termination
Project:
MJFNTC-R2-15
Activity:
MS34570 New Apro
n Loop - Instrument & Control Cable Loop Testing
Project:
MJFNTC-R2-15
Activity:
MS34670 Continui
ty & Loop Checking
Project:
MJFNTC-R2-15
Activity:
MS34680 Testing
and Commissioning of Field Instruments, ESD and MOV after Field Modification
Project:
MJFNTC-R2-15
Activity:
O&MMNL1000
Opeartion and Maintanance Manual for AGL Network - Submission
Project:
MJFNTC-R2-15
Activity:
O&MMNL1010
Opeartion and Maintanance Manual for AGL Network - Approval
Project:
MJFNTC-R2-15
Activity:
O&MMNL1020
Opeartion and Maintanance Manual for MJF Network - Submission
Project:
MJFNTC-R2-15
Activity:
O&MMNL1030
Opeartion and Maintanance Manual for MJF Network - Approval
Project:
MJFNTC-R2-15
Activity:
O&MMNL1040
Operation and Maintanance Manual for Telecommunication Network - Submission
Project:
MJFNTC-R2-15
Activity:
O&MMNL1050
Operation and Maintanance Manual for Telecommunication Network - Approval
Project:
MJFNTC-R2-15
Activity:
PRCMT1000
Procurement Stud Bolts
Project:
MJFNTC-R2-15
Activity:
PRCMT1010
Procurement Heat Shrink Sleeve
Project:
MJFNTC-R2-15
Activity:
PRCMT1020
Procurement Link Seal
Project:
MJFNTC-R2-15
Activity:
PRCMT1030
Procurement End Seal
Project:
MJFNTC-R2-15
Activity:
PRCMT1040
Procurement CS Pipes
Project:
MJFNTC-R2-15
Activity:
PRCMT1050
Procurement CS Fittings
Project:
MJFNTC-R2-15
Activity:
PRCMT1060
Procurement CS WNR Flanges
Project:
MJFNTC-R2-15
Activity:
PRCMT1070
Procurement CS Blind Flanges
Project:
MJFNTC-R2-15
Activity:
PRCMT1080
Procurement HP Vent Assembly
Project:
MJFNTC-R2-15
Activity:
PRCMT1090
Procurement Puddle Flanges
Project:
MJFNTC-R2-15
Activity:
PRCMT1100
Procurement Pipe Supports
Project:
MJFNTC-R2-15
Activity:
PRCMT1110
Procurement Valve Operating Platforms
Project:
MJFNTC-R2-15
Activity:
PRCMT1120
Procurement Manhole Cover
Project:
MJFNTC-R2-15
Activity:
PRCMT1140
Procurement Insulation Gasket Kits
Project:
MJFNTC-R2-15
Activity:
PRCMT1150
Procurement CNAF Gasket
Project:
MJFNTC-R2-15
Procurement Ball Valves
Project:
MJFNTC-R2-15
Procurement CS Spectacle Blind
Project:
MJFNTC-R2-15
Procurement of additional Pipe Fittings (VO-38)
Project:
MJFNTC-R2-15
Procurement Leak Detection System
Project:
MJFNTC-R2-15
Procurement Instruments Cables
Project:
MJFNTC-R2-15
Procurement Earthing Material
Project:
MJFNTC-R2-15
Procurement Power Cables
Project:
MJFNTC-R2-15
Procurement Earth Cables
Project:
MJFNTC-R2-15
Procurement Junction Box
Project:
MJFNTC-R2-15
Procurement SDB & FDB
Project:
MJFNTC-R2-15
Procurement Tightness Control System
Project:
MJFNTC-R2-15
Procurement Temperature Transmitter
Project:
MJFNTC-R2-15
Procurement Thermowells
Project:
MJFNTC-R2-15
Procurement Pressure Transmitter
Project:
MJFNTC-R2-15
Procurement Pressure Gauge
Project:
MJFNTC-R2-15
Procurement Level Transmitter
Project:
MJFNTC-R2-15
Procurement MOV Isolator Switch
Project:
MJFNTC-R2-15
Procurement Cathodic Protection System
Project:
MJFNTC-R2-15
Procurement Cable Trays & Accessories
Project:
MJFNTC-R2-15
Procurement Cable Glands, Glands & Ties
Project:
MJFNTC-R2-15
Site Delivery Stud Bolts
Project:
MJFNTC-R2-15
Site Delivery Heat Shrink Sleeve
Project:
MJFNTC-R2-15
Site Delivery Insulation Gasket Kit
Project:
MJFNTC-R2-15
Site Delivery Link Seal
Project:
MJFNTC-R2-15
Site Delivery End Seal
Project:
MJFNTC-R2-15
Site Delivery CNAF Gasket
Project:
MJFNTC-R2-15
Site Delivery CS Pipes
Project:
MJFNTC-R2-15
Site Delivery CS Fittings
Project:
MJFNTC-R2-15
Site Delivery CS WNR Flanges
Project:
MJFNTC-R2-15
Site Delivery CS Blind Flanges
Activity:
PRCMT1160
Activity:
PRCMT1170
Activity:
PRCMT1180
Activity:
PRCMT1185
Activity:
PRCMT1190
Activity:
PRCMT1200
Activity:
PRCMT1210
Activity:
PRCMT1220
Activity:
PRCMT1230
Activity:
PRCMT1240
Activity:
PRCMT1250
Activity:
PRCMT1260
Activity:
PRCMT1270
Activity:
PRCMT1280
Activity:
PRCMT1290
Activity:
PRCMT1300
Activity:
PRCMT1310
Activity:
PRCMT1320
Activity:
PRCMT1330
Activity:
PRCMT1340
Activity:
PRCMTSD1000
Activity:
PRCMTSD1010
Activity:
PRCMTSD1020
Activity:
PRCMTSD1030
Activity:
PRCMTSD1040
Activity:
PRCMTSD1050
Activity:
PRCMTSD1060
Activity:
PRCMTSD1070
Activity:
PRCMTSD1080
Activity:
PRCMTSD1090
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1100
Site Delivery HP Vent Assembly
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1110
Site Delivery Puddle Flanges
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1120
Site Delivery Pipe Supports
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1130
Site Delivery Valve Operating Platforms
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1140
Site Delivery CS Spectacle Blind
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1150
Site Delivery Manhole Cover
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1160
Site Delivery Ball Valves
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1177
SIte Delivery VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1180
Site Delivery Cable Trays & Accessories
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1190
Site Delivery Cable Glands, Glands & Ties
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1200
Site Delivery Leak Detection System
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1210
Site Delivery Instruments Cables
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1220
Site Delivery Earthing Material
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1230
Site Delivery Power Cables
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1240
Site Delivery Earth Cables
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1250
Site Delivery Junction Box
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1260
Site Delivery SDB & FDB
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1270
Site Delivery Cathodic Protection System
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1280
Site Delivery Tightness Control System
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1290
Site Delivery Temperature Transmitter
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1300
Site Delivery Pressure Transmitter
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1310
Site Delivery Pressure Gauge
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1320
Site Delivery Level Transmitter
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1330
Site Delivery MOV Isolator Switch
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1340
Site Delivery Thermowells
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1345
Procurement and Site Delivery- Required for LV Panel Modification
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1350
Procurement and Site Delivery Addtionaol Work - 400Hz Cable
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1360
Procurement and Site Delivery Bollard
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1370
Procurement and Site Delivery Generators for MV Substations
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1380
Procurement and Site Delivery Doors for AGL Substation
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1390
Procurement and Site Delivery Windows for AGL Substation
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1400
Procurement and Site Delivery Crash Gate - A3 Road
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1410
Procurement and Site Delivery Stop Bar Light - A3 Link Road
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1420
Procurement and Site Delivery CCTV System - A3 link Road
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1430
Procurement and Site Delivery Traffic Signal System - A3 Link Road
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1440
Procurement and Site Delivery Guard Rail - A3 Link Road
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1450
Procurement and Site Delivery Additional SIgns - Taxiway C
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1460
Procurement and Site Delivery Roman Numerals
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1490
Procurement and Site Delivery of Fire Extinguishers for Cargo Apron (VO-65)
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1500
Procurement and Site Delivery RVR Gantries and Field box (VO-61)
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1520
Procurement and Site Delivery (AJF/MJF Interface)
Project:
MJFNTC-R2-15
Activity:
PRCMTSD1530
Procurement and Site Delivery of SCADA System (VO-32)
Project:
MJFNTC-R2-15
Activity:
SEC1001000
Section 1
Project:
MJFNTC-R2-15
Activity:
SEC2A1000
Installation of Door (Remaining) - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1010
Installation of Window (Remaining) - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1020
Generator Installation - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1030
Generator Testing and Commissioning - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1040
Software Modification - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1050
Chiller Unit Installation - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1060
Sound Attenuator Installation - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1070
Fiber Optic Connection to ATCT
Project:
MJFNTC-R2-15
Activity:
SEC2A1080
Fire Fighting System - Testing and Commissioning - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1090
Switching from Temporary to Permanent A/C - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1100
Finalised Snag List - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1110
ADAC AGL Inspection -AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1120
GCAA Inspection and Substantial Completion - AGL SS
Project:
MJFNTC-R2-15
Activity:
SEC2A1130
AGL Chamber Stencilling (Ch 4+100 - Ch2+810) - Taxiway C (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1140
Roman Numerals Installation - Taxiway C (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1150
Finalised Snag List - Taxiway C (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1160
GCAA Inspection - Taxiway C (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1170
Substantial Completion - Taxiway C (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1180
Tunnel Area Fence
Project:
MJFNTC-R2-15
Activity:
SEC2A1190
AGL Chamber Stencilling (Ch 4+100 - Ch2+810) - Taxiway D (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1200
Roman Numerals Installation - Taxiway D (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1210
Finalised Snag List - Taxiway D (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1220
GCAA Inspection - Taxiway D (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2A1230
Substantial Completion - Taxiway D (East of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1000
Access to Runways
Project:
MJFNTC-R2-15
Activity:
SEC2B1010
Primary & Secondary Cabling - West of Taxiway G&H
Project:
MJFNTC-R2-15
Activity:
SEC2B1020
AGL Lighst Installation - West of Taxiway G&H
Project:
MJFNTC-R2-15
Activity:
SEC2B1030
AGL Chamber Stencilling (Ch 2+810 - Ch1+460) - Taxiway C
Project:
MJFNTC-R2-15
Activity:
SEC2B1040
Additional Signs Installation - Taxiway C (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1050
Roman Numerals Installation - Taxiway C (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1060
Testing and Commissioning - Taxiway C (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1070
Finalised Snag List - Taxiway C (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1080
GCAA Inspection - Taxiway C (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1090
Substantial Completion - Taxiway C (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1100
Remaining Work - Fire Main Constrcution
Project:
MJFNTC-R2-15
Activity:
SEC2B1110
Testing and Commissioning - Fire Fighting Network
Project:
MJFNTC-R2-15
Activity:
SEC2B1120
AGL Chamber Stencilling (Ch 2+810 - Ch1+460) - Taxiway D (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1130
Stop Bar Lights Installation - Taxiway D
Project:
MJFNTC-R2-15
Activity:
SEC2B1140
Roman Numerals Installation -Taxiway D (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1150
Testing and Commissioning -Taxiway D (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1160
Finalised Snag List - Taxiway D (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1170
GCAA Inspection -Taxiway D (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1180
Substantial Completion - Taxiway D (West of Taxiway G&H)
Project:
MJFNTC-R2-15
Activity:
SEC2B1190
Cabling, Lights and Transformer Installation- Connecting Taxiway D1
Project:
MJFNTC-R2-15
Activity:
SEC2B1200
Cabling, Lights and Transformer Installation- Connecting Taxiway D2
Project:
MJFNTC-R2-15
Activity:
SEC2B1210
Testing and Commissioning - Taxiway D1
Project:
MJFNTC-R2-15
Activity:
SEC2B1220
Cabling, Lights and Transformer Installation- Connecting Taxiway D3
Project:
MJFNTC-R2-15
Activity:
SEC2B1230
Testing and Commissioning - Taxiway D2
Project:
MJFNTC-R2-15
Activity:
SEC2B1240
Cabling, Lights and Transformer Installation- Connecting Taxiway D4
Project:
MJFNTC-R2-15
Activity:
SEC2B1250
Testing and Commissioning - Taxiway D3
Project:
MJFNTC-R2-15
Activity:
SEC2B1260
Cabling, Lights and Transformer Installation- Connecting Taxiway D5
Project:
MJFNTC-R2-15
Activity:
SEC2B1270
Testing and Commissioning - Taxiway D4
Project:
MJFNTC-R2-15
Activity:
SEC2B1280
Testing and Commissioning - Taxiway D5
Project:
MJFNTC-R2-15
Activity:
SEC2B1290
Finalised Snag List - Connecting Taxiways
Project:
MJFNTC-R2-15
Activity:
SEC2B1300
GCAA Inspection - Connecting Taxiways
Project:
MJFNTC-R2-15
Activity:
SEC2B1310
Substantial Completion - Connecting Taxiways
Project:
MJFNTC-R2-15
Activity:
SEC2B1320
Installation of Gantries
Project:
MJFNTC-R2-15
Activity:
SEC2B1330
Substantial Completion of Gantries
Project:
MJFNTC-R2-15
Activity:
SEC2C1000
Bollard Installation -EMCA
Project:
MJFNTC-R2-15
Activity:
SEC2C1010
Finalised Snag List -EMCA
Project:
MJFNTC-R2-15
Activity:
SEC2C1020
Permit to Work - ATCT Connection
Project:
MJFNTC-R2-15
Activity:
SEC2C1030
Fiber Optic Cabling - EMCA
Project:
MJFNTC-R2-15
Activity:
SEC2C1040
Connections and Termination with ATCT
Project:
MJFNTC-R2-15
Activity:
SEC2C1050
Testing and Commissioning of VDGS
Project:
MJFNTC-R2-15
Activity:
SEC2C1060
Installation of Fire Extinguishers - EMCA
Project:
MJFNTC-R2-15
Activity:
SEC2C1070
Testing/Commissioning of Fire Extinguishers -= EMCA
Project:
MJFNTC-R2-15
Activity:
SEC2C1080
Testing and Commissioning of CCTVs
Project:
MJFNTC-R2-15
Activity:
SEC2C1090
400Hz Cable Installation - EMCA
Project:
MJFNTC-R2-15
Activity:
SEC2C1100
Testing and Commissioning - EMCA
Project:
MJFNTC-R2-15
Activity:
SEC2C1110
Stand Energisation
Project:
MJFNTC-R2-15
Activity:
SEC2C1120
Remaining Civil Works - MV SS
Project:
MJFNTC-R2-15
Activity:
SEC2C1130
Finalised Snag List - MV SS
Project:
MJFNTC-R2-15
Activity:
SEC2C1140
Generator Installation - MV SS
Project:
MJFNTC-R2-15
Activity:
SEC2C1150
LV Panel Modification - MV SS
Project:
MJFNTC-R2-15
Activity:
SEC2C1160
Fiber Optic Panel Installation - MV SS
Project:
MJFNTC-R2-15
Activity:
SEC2C1170
Fiber Optic Connection to ATCT
Project:
MJFNTC-R2-15
Activity:
SEC2C1180
Fire Fighting System - Testing and Commissioning - MV SS
Project:
MJFNTC-R2-15
Activity:
ADDC LV Inspection - MV SS
Project:
MJFNTC-R2-15
Activity:
ADDC MV Inspection - MV SS
Project:
MJFNTC-R2-15
Activity:
ADAC Inspection and Substantial Completion - MV SS
Project:
MJFNTC-R2-15
Activity:
Complete Storm Water Chamber - East End - A3 Road
Project:
MJFNTC-R2-15
Activity:
AOA Fence East End
Project:
MJFNTC-R2-15
Activity:
Completion of Work by HLG
Project:
MJFNTC-R2-15
Activity:
SL Duct Bank North of EMCA
Project:
MJFNTC-R2-15
Activity:
SL Duct Bank Landside to SS PU-3
Project:
MJFNTC-R2-15
Activity:
Install Road Studs
Project:
MJFNTC-R2-15
Activity:
SS PU-5 Parking & Fencing (SS1205)
Project:
MJFNTC-R2-15
Activity:
Crash Gate Installation
Project:
MJFNTC-R2-15
Activity:
SS PU-4 Parking & Fencing (SS1204)
Project:
MJFNTC-R2-15
Activity:
AOA Fence SS PU-4 to HLG Underpass
Project:
MJFNTC-R2-15
Activity:
SS PU-3 Parking & Fencing (SS1206)
Project:
MJFNTC-R2-15
Activity:
Relocate Gate A2 (by others)
Project:
MJFNTC-R2-15
Activity:
Finalised Snag List - A3 Road
Project:
MJFNTC-R2-15
Activity:
Police Approval of New Insatlled Fence
Project:
MJFNTC-R2-15
Activity:
LV Cable into SS PU-5
Project:
MJFNTC-R2-15
Activity:
LV Cable into SS PU-4
Project:
MJFNTC-R2-15
Activity:
Street Light Cabling - North of EMCA
Project:
MJFNTC-R2-15
Activity:
Fedder Pillar Installation
Project:
MJFNTC-R2-15
Activity:
LV Cable into SS PU-3
Project:
MJFNTC-R2-15
Activity:
Storm Water Chamber Internal Finishing - A3 Link Road
Project:
MJFNTC-R2-15
Activity:
Guard Rail Installation - A3 Link Road
Project:
MJFNTC-R2-15
Activity:
Backfilling Work Completion in Aviation Area
Project:
MJFNTC-R2-15
Activity:
A3 Road Widening @ Stand 222
Project:
MJFNTC-R2-15
Activity:
Design Submission - Traffic Signal System
Project:
MJFNTC-R2-15
Activity:
Design Approval - Traffic Signal System
Project:
MJFNTC-R2-15
Activity:
Installation of Traffic Signal System
Project:
MJFNTC-R2-15
Activity:
Installation of Stop Bars F3 - F5
SEC2C1190
SEC2C1200
SEC2C1210
SEC2D1000
SEC2D1010
SEC2D1020
SEC2D1030
SEC2D1040
SEC2D1050
SEC2D1060
SEC2D1070
SEC2D1080
SEC2D1090
SEC2D1100
SEC2D1110
SEC2D1120
SEC2D1130
SEC2D1140
SEC2D1150
SEC2D1160
SEC2D1170
SEC2D1180
SEC2D1190
SEC2D1200
SEC2D1210
SEC2D1220
SEC2D1230
SEC2D1240
SEC2D1250
SEC2D1260
Project:
MJFNTC-R2-15
Activity:
SEC2D1270
Installation of CCTV to F3 & F5
Project:
MJFNTC-R2-15
Activity:
SEC2D1280
Testing and Commissioning
Project:
MJFNTC-R2-15
Activity:
SEC2E1000
South Runway And Taxiways (Package 2) as on 5th August 2015
Project:
MJFNTC-R2-15
Activity:
SEC2E1010
East Midfield Cargo Apron PAL 2
Project:
MJFNTC-R2-15
Activity:
SEC2E1020
New Fuel Hydrant System
Project:
MJFNTC-R2-15
Activity:
SEC2E1030
AOA Perimeter Fence
Project:
MJFNTC-R2-15
Activity:
SEC2E1040
E&I Ducts Installation (MART)
Project:
MJFNTC-R2-15
Activity:
SEC2E1050
Modification of SDB and FDB
Project:
MJFNTC-R2-15
Activity:
SEC2E1060
Excavation - F3 to CH148
Project:
MJFNTC-R2-15
Activity:
SEC2E1070
Sand surround- F3 to CH148
Project:
MJFNTC-R2-15
Activity:
SEC2E1080
Backfilling - F3 to CH148
Project:
MJFNTC-R2-15
Activity:
SEC2E1090
Concrete P&I Duct banks and EDP chambers installation - F3 to CH148
Project:
MJFNTC-R2-15
Activity:
SEC2E1100
Final backfilling - F3 to CH148
Project:
MJFNTC-R2-15
Activity:
SEC2E1110
Excavation - CH147 - East End
Project:
MJFNTC-R2-15
Activity:
SEC2E1120
Sand surround - CH147 - East End
Project:
MJFNTC-R2-15
Activity:
SEC2E1130
Backfilling - CH147 - East End
Project:
MJFNTC-R2-15
Activity:
SEC2E1140
Concrete P&I Duct banks and EDP chambers installation - CH147 - East End
Project:
MJFNTC-R2-15
Activity:
SEC2E1150
Final backfilling - CH147 - East End
Project:
MJFNTC-R2-15
Activity:
SEC2E1160
Pavement reinstatement - CH147 - East End
Project:
MJFNTC-R2-15
Activity:
SEC2E1170
Excavation - New Apron Loop
Project:
MJFNTC-R2-15
Activity:
SEC2E1180
Sand surround - New Apron Loop
Project:
MJFNTC-R2-15
Activity:
SEC2E1190
Backfilling - New Apron Loop
Project:
MJFNTC-R2-15
Activity:
SEC2E1200
Concrete P&I Duct banks and EDP chambers installation - New Apron Loop
Project:
MJFNTC-R2-15
Activity:
SEC2E1210
Final backfilling - New Apron Loop
Project:
MJFNTC-R2-15
Activity:
SEC2E1220
Concrete P&I Duct banks and EDP chambers installation - Additional Cable Ducts N
ear Fuel Depot
Project:
MJFNTC-R2-15
Activity:
SEC2E1230
Final backfilling - Additional Cable Ducts Near Fuel Depot
Project:
MJFNTC-R2-15
Activity:
SEC2E1240
Backfilling - West End (CH101A)
Project:
MJFNTC-R2-15
Activity:
SEC2E1250
Concrete P&I Duct banks and EDP chambers installation - West End (CH101A)
Project:
MJFNTC-R2-15
Activity:
SEC2E1260
Final backfilling - West End (CH101A)
Project:
MJFNTC-R2-15
Activity:
SEC2E1270
Project:
SAT and PTP TEST (SCADA System)
Project:
Nitrogen Purging Loop 4.1 & 4.2
Project:
Nitrogen Purging Loop 4.1 & 4.2
Project:
Nitrogen Purging Loop 4.1 & 4.2
Project:
Nitrogen Purging Loop 4.1 & 4.2
Project:
Nitrogen Purging Loop 4.1 & 4.2
Project:
Nitrogen Purging Loop 4.1 & 4.2
Project:
Nitrogen Purging Loop 3.1 & 3.2
Project:
Nitrogen Purging Loop 3.1 & 3.2
Project:
Nitrogen Purging Loop 3.1 & 3.2
Project:
Nitrogen Purging Loop 3.1 & 3.2
Project:
Nitrogen Purging Loop 3.1 & 3.2
Project:
Nitrogen Purging Loop 3.1 & 3.2
Project:
Nitrogen Purging Loop 1.3 & 1.4
Project:
Nitrogen Purging Loop 1.3 & 1.4
Project:
Nitrogen Purging Loop 1.3 & 1.4
ir Blowing & Drying - Loop 1.3
Project:
Nitrogen Purging Loop 1.3 & 1.4
Project:
Nitrogen Purging Loop 1.3 & 1.4
Project:
Nitrogen Purging Loop 1.3 & 1.4
Project:
Nitrogen Purging Loop 1.1 & 1.2
Project:
Nitrogen Purging Loop 1.1 & 1.2
Project:
Nitrogen Purging Loop 1.1 & 1.2
Project:
Nitrogen Purging Loop 1.1 & 1.2
Project:
Nitrogen Purging Loop 1.1 & 1.2
Project:
Nitrogen Purging Loop 1.1 & 1.2
Project:
Nitrogen Purging Loop 5.1 & 5.2
Project:
Nitrogen Purging Loop 5.1 & 5.2
Project:
Nitrogen Purging Loop 5.1 & 5.2
Project:
Nitrogen Purging Loop 5.1 & 5.2
Project:
MJFNTC-R2-15
Activity:
SEC2E1570
MJFNTC-R2-15
Activity:
SEC2E1580
- T&C Preparation All HPs/LPs/VCs
MJFNTC-R2-15
Activity:
SEC2E1590
- CH-103 T&C Spools Instln RRC
MJFNTC-R2-15
Activity:
SEC2E1600
- Pneumatic, Air Blowing & Drying - Loop 4.1
MJFNTC-R2-15
Activity:
SEC2E1610
- Nitrogen Filling - Loop 4.1
MJFNTC-R2-15
Activity:
SEC2E1620
- Pneumatic, Air Blowing & Drying - Loop 4.2
MJFNTC-R2-15
Activity:
SEC2E1630
- Nitrogen Filling - Loop 4.2
MJFNTC-R2-15
Activity:
SEC2E1640
-T&C Preparation All HPs/LPs
MJFNTC-R2-15
Activity:
SEC2E1650
- CH-103 T&C Spools Instln RRC
MJFNTC-R2-15
Activity:
SEC2E1660
- Pneumatic, Air Blowing & Drying - Loop 3.1
MJFNTC-R2-15
Activity:
SEC2E1670
- Nitrogen Filling - Loop 3.1
MJFNTC-R2-15
Activity:
SEC2E1680
- Pneumatic, Air Blowing & Drying - Loop 3.2
MJFNTC-R2-15
Activity:
SEC2E1690
- Nitrogen Filling - Loop 3.2
MJFNTC-R2-15
Activity:
SEC2E1700
- T&C Preparation All HPs/LPs
MJFNTC-R2-15
Activity:
SEC2E1710
- CH-133 T&C Spools Instln RRC
MJFNTC-R2-15
Activity:
SEC2E1720
- Nitrogen Purging Loop 3.1 & 3.2 - Pneumatic, A
MJFNTC-R2-15
Activity:
SEC2E1730
- Nitrogen Filling - Loop 1.3
MJFNTC-R2-15
Activity:
SEC2E1740
- Pneumatic, Air Blowing & Drying - Loop 1.4
MJFNTC-R2-15
Activity:
SEC2E1750
- Nitrogen Filling - Loop 1.4
MJFNTC-R2-15
Activity:
SEC2E1760
- T&C Preparation All HPs/LPs/VCs
MJFNTC-R2-15
Activity:
SEC2E1770
- CH-139 T&C Spools Instln RRC
MJFNTC-R2-15
Activity:
SEC2E1780
- Pneumatic, Air Blowing & Drying - Loop 1.1
MJFNTC-R2-15
Activity:
SEC2E1790
- Nitrogen Filling - Loop 1.1
MJFNTC-R2-15
Activity:
SEC2E1800
- Pneumatic, Air Blowing & Drying - Loop 1.2
MJFNTC-R2-15
Activity:
SEC2E1810
- Nitrogen Filling - Loop 1.2
MJFNTC-R2-15
Activity:
SEC2E1820
- T&C Preparation All HPs/LPs
MJFNTC-R2-15
Activity:
SEC2E1830
- CH-140 T&C Spools Instln RRC
MJFNTC-R2-15
Activity:
SEC2E1840
- Pneumatic, Air Blowing & Drying - Loop 5.1
MJFNTC-R2-15
Activity:
SEC2E1850
- Nitrogen Filling - Loop 5.1
MJFNTC-R2-15
Activity:
SEC2E1860
Nitrogen Purging Loop 5.1 & 5.2 - Pneumatic, Air Blowing & Drying - Loop 5.2
Project:
MJFNTC-R2-15
Activity:
SEC2E1870
Nitrogen Purging Loop 5.1 & 5.2 - Nitrogen Filling - Loop 5.2
Project:
MJFNTC-R2-15
Activity:
SEC2E1880
Nitrogen Purging Loop 2.1 & 2.2 - T&C Preparation All HPs/LPs
Project:
MJFNTC-R2-15
Activity:
SEC2E1890
Nitrogen Purging Loop 2.1 & 2.2 - CH-133 T&C Spools Instln RRC
Project:
MJFNTC-R2-15
Activity:
SEC2E1900
Nitrogen Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.1
Project:
MJFNTC-R2-15
Activity:
SEC2E1910
Nitrogen Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.1
Project:
MJFNTC-R2-15
Activity:
SEC2E1920
Nitrogen Purging Loop 2.1 & 2.2 - Pneumatic, Air Blowing & Drying - Loop 2.2
Project:
MJFNTC-R2-15
Activity:
SEC2E1930
Nitrogen Purging Loop 2.1 & 2.2 - Nitrogen Filling - Loop 2.2
Project:
MJFNTC-R2-15
Activity:
SEC2E1940
Software Development - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
SEC2E1950
System Built - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
SEC2E1960
Sytem Testing - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
SEC2E1970
Integrated FAT- VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
SEC2E1980
Fuel Farm and Control Room Availability
Project:
MJFNTC-R2-15
Activity:
SEC2E1990
Installation and Testing Works Related to AJF/MJF Interface
Project:
MJFNTC-R2-15
Activity:
SEC2E2000
Pre-Commissioning - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
SEC2E2010
Commissioning - VO37 (AJF/MJF INterface)
Project:
MJFNTC-R2-15
Activity:
SEC2E2070
CH-102 to CH-101 Nitrogen Purging - Setting-up & Preparation
Project:
MJFNTC-R2-15
Activity:
SEC2E2080
CH-102 to CH-101 Nitrogen Purging - Pneumatic Testing
Project:
MJFNTC-R2-15
Activity:
SEC2E2090
CH-102 to CH-101 Nitrogen Purging - Air Blowing
Project:
MJFNTC-R2-15
Activity:
SEC2E2100
CH-102 to CH-101 Nitrogen Purging - Drying
Project:
MJFNTC-R2-15
Activity:
SEC2E2110
CH-102 to CH-101 Nitrogen Purging - Nitrogen Purging
Project:
MJFNTC-R2-15
Activity:
SEC2E2120
Fuel Farm Availability
Project:
MJFNTC-R2-15
Activity:
SEC2E2200
Loop 1B - Pressure Testing of Loop 1B & Loop 1A
Project:
MJFNTC-R2-15
Activity:
SEC2E2220
Loop 1B - Removal of BFs from DBB in CH-139 & Connection to Pump Skid
Project:
MJFNTC-R2-15
Activity:
SEC2E2230
Loop 1B - Rearrangements as part of 1B Flushing Commencement
Project:
MJFNTC-R2-15
Activity:
SEC2E2270
Loop 1B - Draining of Sections Between VCs & Installation of HP/LP Assemblies
Project:
MJFNTC-R2-15
Activity:
SEC2E2280
Loop 1A - Preparation & Set-up
Project:
MJFNTC-R2-15
Activity:
SEC2E2290
Loop 1A - Installation of Christmas Trees on HPs & LPs
Project:
MJFNTC-R2-15
Activity:
SEC2E2300
Loop 1A - Fuel Filling in Loop 1B & Loop 1A
Project:
MJFNTC-R2-15
Activity:
SEC2E2310
Loop 1A - Soak Testing of Loop 1B & Loop 1A
Project:
MJFNTC-R2-15
Activity:
SEC2E2320
slands Descope
Project:
MJFNTC-R2-15
Activity:
VO03
Hydrant
Project:
MJFNTC-R2-15
Activity:
VO04
AGL Tran
Project:
MJFNTC-R2-15
Activity:
VO05
MV subst
Project:
MJFNTC-R2-15
Activity:
Project:
MJFNTC-R2-15
Activity:
Project:
MJFNTC-R2-15
& 2 Level Differences
Project:
MJFNTC-R2-15
rant Pits
Project:
MJFNTC-R2-15
C Pipe Concrete Surround Reinforcement
Project:
MJFNTC-R2-15
Cable Connectors
Project:
MJFNTC-R2-15
onal CCR rated 30kW
Project:
MJFNTC-R2-15
Chambers
Project:
MJFNTC-R2-15
Type 1 - 1000x1000mm
Project:
MJFNTC-R2-15
Redesign
Project:
MJFNTC-R2-15
Redesign
Project:
MJFNTC-R2-15
House
Project:
MJFNTC-R2-15
House
Project:
MJFNTC-R2-15
IIB
Project:
MJFNTC-R2-15
ulances
Project:
MJFNTC-R2-15
rol Room & TMS
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
itor Antenna Relocation
Project:
MJFNTC-R2-15
tial Flight
Project:
MJFNTC-R2-15
rmwater & Firefighting Lines
Project:
MJFNTC-R2-15
rb
Project:
MJFNTC-R2-15
rete Collars
Project:
MJFNTC-R2-15
Fence - Patrol Road
Project:
MJFNTC-R2-15
F - AGL Lights Replacement
Project:
MJFNTC-R2-15
Descope
Project:
MJFNTC-R2-15
n Tie - in Points
Project:
MJFNTC-R2-15
hting at D4
Activity:
VO07
Zones 1
Activity:
VO08
Fire Hyd
Activity:
VO09
EMCA - R
Activity:
VO10
Primary
Activity:
VO11
2 Additi
Activity:
VO12
AGL F900
Activity:
VO13
AGL Pits
Activity:
Activity:
Activity:
Activity:
Activity:
VO16
AGL CATI
Activity:
VO17
Site Amb
Activity:
VO18
MJF Cont
Activity:
Activity:
VO19
VO20
Not Used
DVOR Mon
Activity:
VO21
Presiden
Activity:
VO22
MART Sto
Activity:
VO23
Flush Ke
Activity:
VO24
MJF Conc
Activity:
VO25
AOA Temp
Activity:
VO26
Taxiway
Activity:
VO27
A-SMGCS
Activity:
VO28
Fire Mai
Activity:
VO29
Fire Fig
Fuel Casings
sformers
ations Resize
ocation
ocation
Project:
MJFNTC-R2-15
rk & Standby Power
Project:
MJFNTC-R2-15
Item - Bill 3 - Fencing Barriers
Project:
MJFNTC-R2-15
stem - SOuth Runway and Taxiways
Project:
MJFNTC-R2-15
stem - East Midfield Cargo Apron PAL 2
Project:
MJFNTC-R2-15
curity Gate Obstruction
Project:
MJFNTC-R2-15
Access Roads - Substations
Project:
MJFNTC-R2-15
Primary Cable Joints
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Interface
Project:
MJFNTC-R2-15
ant Control Work Pk. 1
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Underpass Fence Removal
Project:
MJFNTC-R2-15
Markings - Thermoplastic
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Protection Omission
Project:
MJFNTC-R2-15
ns AGL Chambers
Project:
MJFNTC-R2-15
rs 4 Stands
Project:
MJFNTC-R2-15
138 Wall Modifications
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Modifications
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
F4 Remarking
Project:
MJFNTC-R2-15
ks - 31L
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
ands Barriers
Project:
MJFNTC-R2-15
ection Cable Redundancy Works
Project:
MJFNTC-R2-15
Dayworks
Project:
MJFNTC-R2-15
cts Near New Fuel Depot
Project:
MJFNTC-R2-15
Markings
Project:
MJFNTC-R2-15
Additional
Project:
MJFNTC-R2-15
Amendments
Project:
MJFNTC-R2-15
ks at Taxiways E13 & E14
Project:
MJFNTC-R2-15
ry Tower
Activity:
VO30
MV Netwo
Activity:
VO31
Optional
Activity:
VO32-1 SCADA Sy
Activity:
VO32-2 SCADA Sy
Activity:
VO33
MJF - Se
Activity:
VO34
External
Activity:
VO35
MART AGL
Activity:
Activity:
VO36
VO37
Not Used
AJF/MJF
Activity:
VO38
MJF Hydr
Activity:
Activity:
VO39
VO40
Not Used
B2 Road
Activity:
VO41
Pavement
Activity:
Activity:
VO42
VO43
Not Used
Surface
Activity:
VO44
Step Iro
Activity:
VO45
Generato
Activity:
VO46
MJF CH-0
Activity:
Activity:
VO47
VO48
Not Used
MV & FOC
Activity:
Activity:
VO49
VO50
Not Used
Taxiway
Activity:
VO51
Earthwor
Activity:
Activity:
VO52
VO53
Not Used
Cargo St
Activity:
VO54
Leak Det
Activity:
VO55
Foreman
Activity:
VO56
Cable Du
Activity:
VO57
Pavement
Activity:
VO58
Signage
Activity:
VO59
Signage
Activity:
VO60
Earthwor
Activity:
VO61
RVR Gant
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Preparation for HLG
Project:
MJFNTC-R2-15
rs 9 Stands
Project:
MJFNTC-R2-15
inguishers for Cargo Apron Stands
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
TWY C (Near TWY H)
Project:
MJFNTC-R2-15
Stormwater line realignment
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
ant Control Work CH101, CH21, CH22 & 700 Stands
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
itional Design
Project:
MJFNTC-R2-15
enerators 12 Stands (MAY - AUG)
Project:
MJFNTC-R2-15
AGL Duct Crossing
Project:
MJFNTC-R2-15
ppage of Work
Project:
MJFNTC-R2-15
Lighting Taxiway D9
Project:
MJFNTC-R2-15
L
Project:
MJFNTC-R2-15
Markings
Project:
MJFNTC-R2-15
Formation
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
ary Cable Laying Constraints
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
D6 AGL Rerouting
Project:
MJFNTC-R2-15
le Identification
Project:
MJFNTC-R2-15
tion Boxes Relocation
Project:
MJFNTC-R2-15
Items Descope
Project:
MJFNTC-R2-15
Items Descope
Project:
MJFNTC-R2-15
Items Descope
Project:
MJFNTC-R2-15
Project:
MJFNTC-R2-15
at Taxiway D
Project:
MJFNTC-R2-15
ary Cable Duct Rerouting
Project:
MJFNTC-R2-15
able
Activity:
Activity:
VO62
VO63
Not Used
Barrier
Activity:
VO64
Generato
Activity:
VO65
Fire Ext
Activity:
Activity:
Activity:
Activity:
VO66
VO67
VO68
VO69
Not Used
Not Used
Not Used
Stop Bar
Activity:
VO70
A3 Road
Activity:
Activity:
VO71
VO72
Not Used
MJF Hydr
Activity:
Activity:
Activity:
Activity:
VO73
VO74
VO75
VO76
Not Used
Not Used
Not Used
FATO Add
Activity:
VO77
EMCA - G
Activity:
VO78
TWY G&H
Activity:
VO79
ADAC Sto
Activity:
VO80
Lead-on
Activity:
VO81
TWY H AG
Activity:
VO82
TWY H CL
Activity:
VO83
A3 Road
Activity:
Activity:
VO84
VO85
Not Used
AGL Prim
Activity:
Activity:
VO86
VO87
Not Used
Taxiway
Activity:
VO88
11kV Cab
Activity:
VO89
Distribu
Activity:
VO90-1 Optional
Activity:
VO90-2 Optional
Activity:
VO90-3 Optional
Activity:
Activity:
VO91
VO92
Not Used
Stop bar
Activity:
VO93
AGL Prim
Activity:
VO94
400 Hz C