Station: NTPCBHEL Ref No.

PS-DC-202-500-0001
Sheet 1 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
SLNO

LIST OF CONTENTS

1.0

PLANT DETAILS

2.0

OBJECTIVE

3.0

PROPOSAL

4.0

SERVICES REQUIRED

5.0

SAFETY PRECAUTIONS

6.0

EMERGENCY PROCEDURES

7.0

STATE OF THE PLANT

8.0

METHOD

9.0

COMPLETION CRITERIA

10.0

APPENDICES
a) DRAWINGS
b) LOG SHEETS.

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 2 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SLNO
1.0
PLANT DETAILS:
The Pre Boiler system consists of Condensate system, Drip
system and Feed water system.
The plant under this Pre boiler system mainly consists of
following equipments and pressure vessels.
1) Condensate system comprises 3 nos. Condensate Extraction
Pumps, Low Pressure Heaters, Gland steam cooler, Drain
cooler, Deaerator, connecting pipelines including excess
condensate line upto condensate storage Tank.
2) Feed water system comprises 1 No. of H.T. motor driven and
2 Nos Turbo driven Boiler Feed Pumps, their Booster pumps
and recirculation lines, High Pressure Heaters, their
connecting pipelines upto Economiser inlet. RH & SH spray
lines are also included for the purpose of flushing.
3) Drip system comprises the shell side of all LP and HP Heaters
and the Drip lines.
4) Temporary circulation pumps (4 nos) each having a capacity
of 200 T/hr at 20 Kg/sq cm will be used in this activity.
Drawings enclosed in section 10.0 e) provide the layout of
connections between temporary and permanent systems.
5) Extraction lines of LP & HP Heaters.
2.0

OBJECTIVE:
To remove dirt, oil, grease etc., from the Condensate, Feed water
and Drip system, using a non-ionic detergent, prior to putting
these systems in regular service. This ensures flow of clean
condensate and feed water to the boiler.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 3 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SLNO
3.0
PROPOSAL:
3.1

Each of the Condensate, Feed water and Drip system shall be


flushed separately using fresh detergent.

3.2

The three stages are:


Stage I : Feed lines of Regenerative System
Stage II : Condensate lines of Regenerative System
Stage III: Drip lines of Regenerative System
Stage IV : Detergent flushing of Extraction lines of LP & HP
Heaters.

3.3

Each system shall be suitably sub-divided into various sub


circuits to cover all the lines and components.

3.3.1

STAGE 1 (Feed Lines Of Regenerative System)


This stage is divided into sub- stages 1A, 1B & 1C

3.3.1.1

Stage 1 A
Mixing Tank Circulating pumps BFP suction lines (one line at
a time) booster pump suction line feed storage tank
recirculation lines Mixing Tank.

3.3.1.2

Stage 1 B
Mixing Tank Circulating pumps discharge line of BFP by-pass
of HP Heaters 5A & 5B and HP Heaters 6A & 6B-feed control
station point near economizer inlet valve Mixing Tank.

3.3.1.3

Stage 1C
Mixing tank Circulation pumps S. H. Spray & R.H. Spray lines
feed control station Point near Economiser inlet valve Mixing
Tank.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 4 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SLNO
3.3.2.0

STAGE II

(Condensate lines of Regenerative System)

3.3.2.1

A
Mixing Tank - Circulation pumps condensate discharge
line by pass Gland steam condenser- by pass of CPU- bypass
of drain cooler & LP heater 1 - bypass LPH 2 - bypass LPH 3 upto a point before deaerator Mixing Tank. Loop from GSCExcess condensate Return Mixing Tank is also to be included.

3.3.2.2

B Mixing tank circulation pumps Condensate discharge line


then through gland steam condenser bypass of CPU Drain
cooler Bypass of LPH 1 LPH 2 LPH 3 upto deaerator Mixing tank.
STAGE: III (Drip lines of Regenerative System)

3.3.3.0

HP HEATER DRIP LINES:

3.3.3.1

a) Mixing Tank-circulation Pumps alternate drip line to HPH 6


A to HP flash tank HPH 6 A shell HPH 5 A shell HPH 5A
drip line to Deararator Mixing Tank.

3.3.3.2

b) Mixing Tank circulation Pumps HPH 6 B alternate drip line


to HP flash tank HPH 6 B shell HPH 5 B shell HPH 5 B
drip line to Deararator Mixing Tank.

3.3.3.3

c) Mixing tank Circulation pumps alternate drip line to HPH 5


A HP flash tank HPH 5 A drip line to deaerator Mixing
Tank.

3.3.3.4

d) Mixing tank circulation pumps alternate drip line of HPH 5


B HP flash tank HPH 5 B drip line to deaerator Mixing
Tank.
NOTE: In the above, a) , b) and c), d) to be combined.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 5 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SLNO
LP HEATER DRIP LINES:
e) Mixing Tank Circulation Pump alternate drain line from LPH
3 to LP flash tank LPH 3 shell Drip line from LPH 3 to LPH
2 LPH 2 shell Alternate drain from LPH 2 to LPFT Mixing
Tank.
f)

Mixing Tank Circulation Pump Alternate drain line from LPH


3 to LPFT Drip from LPH 3 to LPH 2 -LPH 2 shell Drip
from LPH 2 to LPH 1 Drip line from LPH 1 to drain Cooler
Drip line from the cooler to LP Flash Tank - Mixing Tank.

In each stage the following activities shall be carried out :i.

Open circuit Mass flushing in each individual sub circuit


with cold water till the effluent is visibly clean.
ii.
Mass flushing in closed circuit with cold water in individual
sub circuits is to be done for one hour and sample analysed
for turbidity and drained. This process of filling, circulation
and draining is to be continued till the turbidity of discharge
water is same as that of DM water being used.
iii.
Mass flushing in closed circuit with hot water, at a
temperature of 600 C, in individual sub circuits is to be done
for two hours and sample analysed for turbidity and drained.
This process of filling, circulation and drained. This process
of filling, circulation and draining is to be continued till the
turbidity of discharge water is same as that of DM water
being used.
iv.
Detergent Flushing for 4 hours each in individual sub circuit.
v.
Rinsing operation of the entire system as per completion
criteria.
vi.
Passivation of individual circuit for 8 hours.
vii.
Manual removal of debris from FST and other accessible
pipelines.
After successful completion of Detergent flushing of Pre-Boiler
system, the permanent system is isolated from the temporary
system and released for normalisation.

3.4
Signatures

NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 6 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SLNO
4.0
SERVICES REQUIRED:
4.1

Availability of approximatilly 5000 Tons of DM water for the entire


operation.

4.2

Availability of nonionic detergent viz


Rinopol Jet 100%
OR
Sumisol N 100
Estimated quantity and required concentration is 1000 Litres and
0.05% V/V respectively.

4.3

Availability of chemicals for passivation viz.,


i.
ii.

4.4

Hydrazine Hydrate (min. 80% concentration); 800 KG


(IS: 12086 / 1991).
(Liquor Amomonia) (Min 25% concentration) 400 KG
(IS: 799 / 1985)

Availability of 4 Nos. of temporary circulation pumps having


capacity 200 T/Hr and dischage pressure of 20 Kg/sq.cm.
Availability of temporary tank of capacity of 40 cu.metre.
Availability of power supply to temporary circulation pumps.

4.5

Availability of adequate lighting in all workings areas.

4.6

Availability of reliable communication system such as walkie


talkie sets, telephones etc.

4.7
4.8

Availability of laboratory facility for analysis of samples of the


detergent flushing process.

Availability of workmen with supervisor for round the clock operation


with required tools.
4.9
Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 7 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SLNO
4.10
Availability of workmen with supervisor for round the clock
operation with required tools.
5.0

SAFETY PRECAUTIONS:

5.1

Readinees of Staircases, platforms, hand rails, approaches etc


as decided jointly by BHEL and NTPC at site, should be ensured.

5.2

Ensure the availability of First aid facilites during the process.

5.3

Ensure the availability Safety and protection equipments like


Hand gloves, eye protection equipments, Helmets etc during the
process.

5.4

Ensure the availability of Service water near the activity area.

6.0

EMERGENCY PROCEDURES:

6.1

The testing team should be aware of the procedures to be


followed in case of accident involving injury to personnel.

6.2

The team conducting the flushing activity should be aware of the


operating procedures of fire entinguishers to be used for
quenching minor fires.

6.3

An operator, posted at the pump area, should be instructed to


stop the circulation pumps and properly isolate the system in the
event of emergency. Emergency operating instructions, in this
regards, should be prepared at site.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 8 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SL.NO
7.0
STATE OF THE PLANT:
7.1

Hydraulic test of the entire system to be flushed should be


complete.

7.2

All the regenerative equipments are installed in position and


temporary pipe line connections as shown in the enclosed schemes
are completed.

7.3

All the isolating valves of the steam extraction lines to heaters are
tightly closed. Ensure that all the NRVS in these lines are also
closed.

7.4

BFPs, their booster pumps and CEPs are bypassed suitably with
temporary piping.

7.5

Suction and discharge ends of BFPs and CEPs are capped to


prevent the entry of flushing fluid in to the pump.

7.6

BFP suction strainer elements are removed before flushing.

7.7

All the valves in the steam lines to and from deaerator are closed.

7.8

Installation of circulation pumps, mixing tank and connected


temporary piping along with pressure gauges is complete.

7.9

All H.P. heaters safety valves are removed and blanks are provided
with a 1 / 2 valve for air venting. Temperature stubs in extraction
steam lines for L.P heaters may be used for venting of LP heaters.
Care is to taken for venting and proper filling of the heaters. While
carrying out the flushing of shell side of HP and LP heaters,

7.10

Safety valves of L.P. heaters are erected in position. This is required


to release the pressure in the system, incase, the pressure exceeds
the set value during the operation due to any unforeseen reasons.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 9 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SL.NO
7.11

All the cutting and welding work on instrument tapping points are
complete upto isolating root valves.

7.12

No cutting/welding work is permitted to be carried out on any


equipment after the flushing is completed.

7.13

Deaerator and Hotwell are manually cleaned and inspected


jointly.

7.14

All the orifices, flow nozzles, control valves and NRVs are
removed and spool pieces are to be provided wherever required.
A check list we prepared, this would avoid the error during
normalization of the system.

7.15

All the instruments of the system other then the required ones
shall be kept isolated during flushing activity.

7.16

All permanent supports are provided for all the pipelines before
starting the flushing.

7.17

The flushing shall be done as per the schemes attached


herewith. Sec. 10.0) e).

7.18

The bore of temporary pipe lines should be preferably same as


that used in permanent system.

7.19

Temporary Mixing tank is provided with 2 Nos of level Indicators.

7.20

Temperature gauges with the discharge header of circulation


pumps and in the return line to mixing tank provided for
monitoring the temperature during the process.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 10 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SL.NO
8.0
METHOD:
8.1
Flushing of Regenerative system shall be carried out in three
stages as depicted in section 3.0.
8.2

Line up the stage to be flushed. Carry out the open circuit


flushing of individual sub- stage with cold DM water

8.3
Fill the total system with DM water by running Circulation pumps
and establish flow of around 100-250 TPH through the
circuits/Sub-circuits by operating one pump/Two pumps/Three
pumps as per requirement. This is to be suitably decided at site.
8.4

Carryout DM water circulation in all the sub loops with cold water
as detailed in section 3.3.1, 3.3.2 & 3.3.3 for one hour each to
carry out Cold Water Mass Flushing.

8.5

Admit steam into the mixing tank and raise the water temperature
to 60oC and continue the DM water circulation in all the sub loops
as detailed in section 3.3.1, 3.3.2 & 3.3.3 for two hours each to
carry out hot Water Mass Flushing.

8.6

Stop the pumps and drain the system.

8.7

Refill the total system with DM water by running circulation


pumps and establish circulation.

8.8

Admit steam into the mixing tank and raise the water temperature
to 60 deg C Add Rinopol JET 100% OR SUMISOL N 100 in
mixing tank to achieve the solution concentration of 0.05% V/V.

8.9

Circulate the solution in each of the loops as per section 3.3.1,


3.3.2 & 3.3.3 for a minimum duration of four hours. During
circulation make up shall be made as per the system requirement
keeping the solution temperature at 60oC.

8.10

On completion of flushing of all the loops, carry out continuous


make up and draining in all the loops one by one for duration of
15 minutes each.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 11 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SLNO
8.11

Drain the system completely and again fill it with DM water.

8.12

DM water shall be circulated in each loop for half an hour once


again.

8.13

Drain the system completely.

8.14

Rinse the system with DM water by continuous filling and draining


while keeping the pumps running till effluent is visibly clean and
the conductivity and oil parameters meet the values specified in
completion criteria.

8.15

Stop the pump and drain the whole system.

8.16

Fill the system with DM water and establish the circulation. Raise
the system temp to 60 deg. C by admitting steam in the mixing
tank.

8.17

Obtain Hydrazine content of 200 PPM and add Ammonia to get


pH value of the solution of the order of 9.5 to 10.0. Raise the
temp of the solution to 80 deg. C by steam admission in mixing
tank. Maintain the Circulation for 8 Hrs. at this temp. The system
is completely drained hot. All air vent valves and feed storage
tank manholes are opened to aerate the system.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 12 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
STATUS
SL.NO
POST FLUSHING OPERATION:
8.18

Remove all the temporary connections from the permanent


scheme.

8.19

Check that all the pipelines and connections are as per the final
scheme.

8.20

After draining the deaerator, make internal inspection for foreign


material, if any, and clean thoroughly.

8.21

After welding of flow nozzle in BFP suction line flush the suction
line by draining water from Deaerator for half an hour through
each line. For this purpose, temporary pipe connections from
suction of each BFP, near the pump, to drain pit is to be made.

8.22

After synchronization of the Unit, Drips of LP & HP Heaters are to


be taken in the system after checking the quality of drip. (Silica
should be less than 20ppb)

9.0

COMPLETION CRITERIA:
DM water mixing after chemical flushing shall be considered
complete once drained water conductivity is less than 10 micro
mhos / cm, and oil content is NIL.

10.0

APPENDICES:

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 16 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
LOG SHEET # 1
PROJECT:
UNIT :
ACTIVITY: DETERGENT FLUSHING OF FEED WATER SYSTEM
SN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14

Activity
Open circuit flushing of sub
stage 1A
Open circuit flushing of sub
stage 1B
Open circuit flushing of sub
stage 1C
Closed circuit flushing with cold
water of sub stage 1 A
Closed circuit flushing with cold
water of sub stage 1 B
Closed circuit flushing with cold
water of sub stage 1 C
Closed circuit flushing with hot
water of sub stage 1 A
Closed circuit flushing with hot
water of sub stage 1 B
Closed circuit flushing with hot
water of sub stage 1 C
Complete draining of the
system.
Refilling of the System and
establish circulation
Raising the water temp. to 60
deg C. and addition of detergent
Circulation of detergent solution
in sub stages 1A + 1B
Circulation of detergent solution.
In sub stage 1C

Dura
Start
Finish
tion time/date time/date

Remarks
Flushing to continue till
effluent is visibly clear
Flushing to continue till
effluent is visibly clear
Flushing to continue till
effluent is visibly clear

1 hr
1 hr
1 hr
2 hr
2 hr
2 hr

4 hr
4 hr

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 17 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
SN
15.
16.
17.
18.
19.
20.
21.

Activity
Continuous make up & draining
of sub stages 1 A + 1B
Continuous make up & draining
of sub stage 1C
Drain the complete system & refill with DM water
Circulate DM water in sub stage
1A + 1B
Circulate DM water in sub stage
1C
Drain the system completely
Rinse sub stage 1A + 1B with
DM water by continuous filling &
draining

22.

Rinse sub stage 1C with DM


water by continuous filling &
draining

23.

Draining of the system

24.

Refill the System and establish


circulation
Raise the water temp. to 60 deg
C and add Hydrazene &
Ammonia to required
concentration
Raise the solution temp. to 80
deg C and passivate of the
system
Drain the system hot

25.

26.
27.

Dura
Start
Finish
tion time/date time/date
15
min
15
min

Remarks

1 hr
30
min
Rinsing is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil.
Rinsing is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil.

8
hrs

Hydrazene content
should be 200 ppm and
add Ammonia to get pH
9.5 to 10

8
hrs

Signatures
NTPC
Station: NTPC-

BHEL Ref No.PS-DC-202-500-0001

BHEL
Sheet 18 of 25

Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
LOG SHEET # 2
PROJECT:
UNIT :
ACTIVITY: DETERGENT FLUSHING OF CONDENSATE SYSTEM
SN

Dura
Start
Finish
tion time/date time/date

Activity

1.

Open circuit flushing of sub


stage II A
2.
Open circuit flushing of sub
stage II B
3.
Closed circuit flushing with cold
water of sub stage II A
4.
Closed circuit flushing with cold
water of sub stage II B
5.
Closed circuit flushing with hot
water of sub stage II A
6.
Closed circuit flushing with hot
water of sub stage II B
7.
Complete draining of the
system.
8.
Refill of the System and
establish circulation
9.
Raise the water temp. to 60 deg
C. and addition of detergent
10.
Circulation of detergent solution
in sub stages II A
11.
Circulation of detergent solution.
In sub stage II B
12.
Continuous make up & draining
of sub stages II A
13.
Continuous make up & draining
of sub stage II B
14.
Drain the complete system & refill with DM water
15.
Circulate DM water in sub stage
IIA
Signatures
NTPC
Station: NTPC-

Remarks
Flushing to continue till
effluent is visibly clear
Flushing to continue till
effluent is visibly clear

1hr
1hr
2
hrs
2
hrs

4
hrs
4
hrs
15
min.
15
min.
1 hr

BHEL Ref No.PS-DC-202-500-0001

BHEL
Sheet 19 of 25

Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
SN
16.
17.
18.

Activity
Circulate DM water in sub stage
II b
Drain the system completely
Rinse sub stage II A with DM
water by continuous filling &
draining

19.

Rinse sub stage II B with DM


water by continuous filling &
draining

20.

Draining of the system

21.

Refilling of the System and


establish circulation
Raise the water temp. to 60 deg
C and add Hydrazene &
Ammonia to required
concentration
Raise the solution temp. to 80
deg C and passivate sub stage
II A
Raise the solution temp. to 80
deg C and passivate sub stage
II B
Drain the system hot

22.

23.
24
25.

Dura
Start
Finish
tion time/date time/date
1 hr

Remarks

Rinsing is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil .
Rinsing is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil.

8
hrs
8
hrs

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 20 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
LOG SHEET #3

PROJECT :
UNIT :
ACTIVITY :
SN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
11.
12.
13.
14.
15.

DETERGENT FLUSHING OF HP HEATERS DRIP SYSTEM


Activity

Open circuit flushing of sub stage


III A
Open circuit flushing of sub stage
IIIB
Open circuit flushing of sub stage
IIIC
Open circuit flushing of sub stage
IIID
Closed circuit flushing with cold
water of sub stage IIIA
Closed circuit flushing with cold
water of sub stage IIIB
Closed circuit flushing with cold
water of sub stage IIIC
Closed circuit flushing with cold
water of sub stage IIID
Closed circuit flushing with hot
water of sub stage IIIA
Closed circuit flushing with hot
water of sub stage IIIB
Closed circuit flushing with hot
water of sub stage IIIC
Closed circuit flushing with
hotwater of sub stage IIID
Complete draining of the system
Refilling of the System and
establish circulation
Raising the water temp. to 60 deg
C. and addition of detergent

Dur
a
tion

Start
Time /
date

Finish
time /
date

Remarks
Flushing to continue till
effluent is visibly clear
Flushing to continue till
effluent is visibly clear
Flushing to continue till
effluent is visibly clear
Flushing to continue till
effluent is visibly clear

1hr.
1hr.
1hr.
1hr.
2hr.
2hr.
2hr.
2hr.

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 21 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
SN
16.
17.
18.
19.
20.
21.
22.
23.
24
25.
26.
27.
28.
29.
30.

31.

Activity
Circulation of detergent solution
in sub stages IIIA
Circulation of detergent solution
in sub stages IIIB
Circulation of detergent solution
in sub stages IIIC
Circulation of detergent solution
in sub stages IIID
Continuous make up & draining
of sub stages IIIA
Continuous make up & draining
of sub stages IIIB
Continuous make up & draining
of sub stages IIIC
Continuous make up & draining
of sub stages IIID
Drain the complete system &
refill with DM water
Circulate DM water in sub stage
IIIA
Circulate DM water in sub stage
IIIB
Circulate DM water in sub stage
IIIC
Circulate DM water in sub stage
IIID
Drain the system completely
Rinse sub stage IIIA with DM
water by continuous filling &
draining.
Rinse sub stage IIIB with DM
water by continuous filling &
draining.

Dura
Start
Finish
tion time/date time/date
4hr.

Remarks

4hr.
4hr.
4hr.
15
min
15
min
15
min
15
min
1hr.
1hr.
1hr.
1hr.
Rinising is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil
Rinising is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 22 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM
SN
32.

Activity

Rinising is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil

Rinse sub stage IIIDwith DM


water by continuous filling &
draining.

Rinising is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil

Drain the system

34.

Refill the system and establish


circulation
Raise the water temp. to 60 deg
C and add Hydrazene &
Ammonia

36.
37.
38.
39.
40.

Remarks

Rinse sub stage IIIC with DM


water by continuous filling &
draining.

33.

35.

Dura
Start
Finish
tion time/date time/date

Raise the solution temp. to 80


deg C and passivate sub stage
IIIA
Raise the solution temp. to 80
deg C and passivate sub stage
IIIB
Raise the solution temp. to 80
deg C and passivate sub stage
IIIC
Raise the solution temp. to 80
deg C and passivate sub stage
IIID
Drain the system

Hydrazene content should


be 200 ppm and add
Ammonia to get pH 9.5 to
10
8
hrs.
8
hrs.
8
hrs.
8
hrs.

Signatures
NTPC

BHEL

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 23 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM

LOG SHEET #4
PROJECT :
UNIT :
ACTIVITY : DETERGENT FLUSHING OF LP HEATERS DRIP SYSTEM

SN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

Activity
Open circuit flushing of sub
stage IIIE
Open circuit flushing of sub
stage IIIF
Closed circuit flushing with cold
water of sub stage IIIE
Closed circuit flushing with cold
water of sub stage IIIF
Closed circuit flushing with hot
water of sub stage IIIE
Closed circuit flushing with hot
water of sub stage IIIF
Complete draining of the system
Refill the System and establish
circulation
Raise the water temp. to 60
degC. And add detergent
Circulate the detergent solution
in sub stage IIIE
Circulate the detergent solution
in sub stage IIIF
Continuous make up & draining
of sub stage IIIE
Continuous make up & draining
of sub stage IIIF
Drain the complete system &refill
with DM water

Dura
Start
Finish
tion time/date time/date

Remarks
Flushing to continue till
effluent is visibly clear
Flushing to continue till
effluent is visibly clear

1hr.
1hr.
2hrs.
2hrs.

4hrs.
4hrs.
15
min
15
min

Station: NTPCBHEL Ref No.PS-DC-202-500-0001


Sheet 24 of 25
Ramagundam
NTPC Ref no RGM /1/TS/2/002
Plant area: TURBINE
DETERGENT FLUSHING OF PREBOILER AND CONDENSATE SYSTEM

SN
15.
16.
17.

Activity
Circulate DM water in sub stage
IIIE
Circulate DM water in sub stage
IIIE
Drain the system completely

18.

Rinsing of sub stage IIIE with DM


water by continuous filling &
draining

19.

Rinsing of sub stage IIIFwith DM


water by continuous filling &
draining

20.
21.

Drain the system


Refill the System and establish
circulation
Raise the water temp. to 80 deg
C and add Hydrazene &
Ammonia

22.

23.
24.
25.

Raise the solution temp. to 80


deg C and passivate of the sub
stage IIIE
Raise the solution temp. to 80
deg C and passivate of the sub
stage IIIF
Drain the system hot

Dura
Start
Finish
tion time/date time/date
1hr.

Remarks

1hr.

Rinsing is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil
Rinsing is considered
complete, when water
conductivity is less than
10 micro mhos / cm and
oil content is nil

Hydrazene content should


be 200 ppm and add
Ammonia to get pH 9.5 to
10
8hrs
8 hrs

Signatures
NTPC

BHEL

SHEET 25 OF25
DETAILS OF CHEMICALS USED DURING THE PROCESS
SN SYSTEM

ACTIVITY

NAME OF
CHEMICALS ADDED

QUANTITY

FEED WATER
CONDENSATE
DRIP (HP HEATERS)
DRIP (LP HEATERS)

REMARKS :

Signatures
NTPC

BHEL

DETERGENT FLUSHING OF PREBOILER


AND CONDENSATE SYSTEM

PS:TSX:159:00:03
PROJECT : RAMAGUNDAM 500 MW

TECHNICAL SERVICES DEPARTMENT

BHARAT HEAVY ELECTRICALS LIMITED


(A Government of India Undertaking)
Power Sector Southern Region
474, Anna Salai, Nandanam, Chennai 600 035.

PROJECT

RAMAGUNDAM 500MW

PROCEDURE

DETERGENT FLUSHING OF PREBOILER AND


CONDENSATE SYSTEM

PURPOSE OF
DOCUMENT

FOR EXECUTION / INFORMATION

DOCUMENT NO.

PS:TSX:159:01:03

COPY NO:
ISSUED TO:

00
Rev. No.

K.J

K.R

K.B

18-08-03

Prepared by

Reviewed by

Approved by

Date

TECHNICAL SERVICES DEPARTMENT

BHARAT HEAVY ELECTRICALS LIMITED


(A Government of India Undertaking)
Power Sector Southern Region
474, Anna Salai, Nandanam, Chennai 600 035.

DETERGENT FLUSING OF PRE-BOILER & CONDENSATE SYS


RAMAGUNDAM 500 MW UNIT-7 DRG:NO:4 : PS : TSX : 00134:01
DRAWN
CHECKED
APPROVED
DATE
KJ
K.R
K.B
18-08-03

DETERGENT FLUSING OF PRE-BOILER & CONDENSATE SYS


RAMAGUNDAM 500 MW UNIT-7 DRG:NO:4 : PS : TSX : 00135 :01
DRAWN
CHECKED
APPROVED
DATE
KJ
K.R
K.B
18-08-03

DETERGENT FLUSING OF PRE-BOILER & CONDENSATE SYS


RAMAGUNDAM 500 MW UNIT-7 DRG:NO:4 : PS : TSX : 00136 :01
DRAWN
CHECKED
APPROVED
DATE
KJ
K.R
K.B
18-08-03

DETERGENT FLUSHING OF PRE-BOILER AND CONDENSATE SYSTEM, RAMAGUNDAM 500MW


FEED WATER LINES

DETERGENT FLUSHING OF PRE-BOILER AND CONDENSATE SYSTEM, RAMAGUNDAM 500MW