Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ML
hr
Gambang 3 Reservoir
TWL =
BWL =
82.4
75.0
m
m
TWL =
BWL =
71.0
66.0
m
m
2525.0
Length of Pipeline, L =
Static Head, h1 =
- Based on water demand up to year 2010 = 9.872 Mld (with NRW 30%)
TWL of
Gambang 3 Res
=
82.4
=
15.4
m
Proposed
Pumping
Duration,
(hr)
12
14
16
16
16
Pumping
Rate, Qpumping
(m3/s)
0.2083
0.1786
0.1563
0.1563
0.1563
Pipe Dia.
Actual
ND
Velocity, v Static Head,
(mm)
(m/s)
h1 (m)
550
500
500
450
350
0.877
0.909
0.796
0.982
1.624
BWL of
- Depth to
Suct. Tank
IL of pipe
66.0
- 1.0
Frict. Losses
(with +5%
minor losses), h2
(m)
15.4
15.4
15.4
15.4
5.643
6.746
5.269
8.797
2.23
2.67
2.09
3.48
1.0
1.0
1.0
1.0
22.043
23.146
21.669
25.197
60.796
54.718
44.824
52.122
efficincy, n pump =
efficincy, n motor =
B. Sizing of Suction Tank
i.Sizing based on Ave. Daily Flow
Proposed Res.Cap (Gambang 3 Res.) =
Storage Time =
Ave. Daily Flow =
9.0
24
0.1042
ML
hr
m3/s
3
0.1042
1125
5.0
17.84
1250
3.33
hr
x
m3
m
m
m3
hr
0.1563
3 hr
3600 s
1250
2.22
m3
hr
<3.33 hr - Less than Actual Storage Time (based on Ave. Daily Flow)OK
=
=
=
=
=
=
=
TWL =
BWL =
Say Pump Start at Level =
50
450
0.1563
0.983
100
0.20
1.2
71.0
66.0
68.0
m
mm
m/s (to refer table above)
m
m
m
m
m (+2m above BWL)
Pump
Start Level
68.0
66.6
Headloss
through Suction
Main
0.20
1.2
Height of
Pump + Plinth
Cap =
TWL =
BWL =
800 m3
118 m
114 m
Cap =
TWL =
BWL =
115 m3
85 m
84 m
Length of Pipeline, L
2200
Static Head, h1 =
=
=
Proposed
Pumping
Duration,
(hr)
16
250
Actual
Velocity, v
(m/s)
Static
Head, h1
(m)
0.283
33.0
TWL of J10
Res
118 m
33.0 m
Frict. Losses
(with
+5% minor losses), h2
(m)
(m/km)
1.520
0.69
BWL of
Suct. Tank
84.0
Depth to IL
of pipe
1.0
Total head for loji air mempaga
In-Plant
Total Pumping
Losses, h3 Lift, H
(m)
(m)
1.0
35.520
Input Power
Required, HP
(kW)
6.531
for Pumping Main
Selected - for Check Valve
0.0
24
0.0000
m3
hr
m3/s
4
0.0000
0
5.8
6.00
164
#DIV/0!
hr
x
m3
m
m
m3
hr
#REF!
164
36,078
#REF!
4 hr x
3600
0
0
0
11.5
5.00
226
0
0
gallon
m
m
m3
=
=
#REF! m3/hr
#REF! m3/hr
#REF! m3/min
Cap =
680 m3
TWL =
113.38 m
BWL =
109.5 m
Cap =
115 m3
TWL =
88.01 m
BWL =
84.36 m
Length of Pipeline, L
2800
Static Head, h1
=
TWL of J10 Res
Proposed Pumping
Duration,
(hr)
Pumping Rate,
Qpumping
(m3/s)
Pipe Dia.
ND
(mm)
Actual
Velocity, v
(m/s)
Static Head,
h1 (m)
113.38 m
28.0 m
Frict. Losses
minor losses), h2
(with +5%
BWL of Suct.
Tank
84.4
(m)
(m/km)
In-Plant
Losses, h3
(m)
16
0.0118
200
0.376
28.0
4.240
1.51
1.0
12
0.0157
200
0.501
28.0
7.220
2.58
1.0
12
0.0157
150
0.891
680.0
m3
24
hr
0.0079
m3/s
hr
0.0079
113
m3
Length of cylinder =
5.8
Internal Diameter =
6.00
164
m3
5.79
hr
4 hr
0.0157
164
36,078
2.89
680
m3
227
m3
49,861
gallon
Length of cylinder =
11.5
Internal Diameter =
5.00
226
m3
BWL of Suct.
Tank
Depth to IL of
pipe
84.4
1.0
Total Pumping
Lift, H
(m)
33.260
5.198
36.240
7.552
3600
efficincy, n pump
78%
efficincy, n motor
95%
C (Hazen William)
100
56.66667 m3/hr
0.944444 m3/hr
0.9444444444
m3/min