Sei sulla pagina 1di 26

1

ISSUED FOR INFORMATION

JAP

JSI

CGP

30.01.13

ISSUED FOR INFORMATION

JAP

JSI

CGP

03.10.12

REV

DESCRIPTION

PREP

CHKD

APPD

DATE

PROJECT:

PP10 CCGT POWER STATION


CONTRACT NO: 31121111/00
CLIENT

CONSULTANT:

CONTRACTOR:

DOCUMENT TITLE:

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION


COMPANY/ORIGINATOR:

PROJECT DOCUMENT NUMBER:

ARABIAN BEMCO
CONTRACTING COMPANY
DISTRIBUTION CODE:

PP10CC-00-6LBB-YR-ABC-001

SHEET NO.

I&C

1 OF 24

SIZE

REV.

SCALE:

A4

N.T.S

FILE NAME:

PP10CC-00-6LBB-YR-ABC-001-REV 1-LP STEAM & BYPASS SYSTEM FUNCTIONAL


DESCRIPTION

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 2

/ 24

Rev.: 1

INDEX OF CONTENTS

1. INTRODUCTION............................................................................................................... 3
1.1.OBJECTIVE OF THE DOCUMENT .................................................................................. 3
1.2.SCOPE OF THE DOCUMENT.......................................................................................... 3
1.3.REFERENCE DOCUMENTATION ................................................................................... 3
2. SYSTEM DESCRIPTION .................................................................................................. 5
2.1.MAIN EQUIPMENT, PERMISSIVES AND INTERLOCKS ................................................ 5
2.2.MECHANICAL BATTERY LIMITS .................................................................................... 7
2.3.FUNCTIONALITY.............................................................................................................. 8
2.4.CONTROL INTERFACES WITH OTHER SYSTEMS ....................................................... 8
2.5.SIGNALS MONITORING .................................................................................................. 9
2.5.1. Measuring instrument....................................................................................... 9
2.5.2. Selection logic architecture ........................................................................... 10
2.5.3. Bad quality concept ........................................................................................ 11
2.6.PROCESS DRIVES/ACTUATORS ................................................................................. 11
2.6.1. Process drives/actuators ............................................................................... 11
2.6.2. Drives/Actuators Fault Tolerance .................................................................. 13
2.7.FUNCTIONAL GROUPS................................................................................................. 13
2.7.1. Number of Functional Groups ....................................................................... 13
2.7.2. Functional Groups Operation Modes ............................................................ 14
2.8.SYSTEM CONTROL LOCATION ................................................................................... 14
3. SYSTEM OPERATION MODES ..................................................................................... 15
3.1.POSITION IN THE PLANT GENERAL START-UP SEQUENCE ................................... 15
3.2.CRITERION FOR SYSTEM START-UP ......................................................................... 15
3.3.START-UP SEQUENCE ................................................................................................. 15
3.3.1. Start-up sequence with first HRSG (By-Pass not available) ....................... 16
3.3.2. Start-up sequence with second, third or fourth HRSG (By-Pass available)17
3.4.NORMAL OPERATION................................................................................................... 18
3.5.POSITION IN THE PLANT GENERAL SHUTDOWN SEQUENCE ................................ 19
3.6.SHUTDOWN SEQUENCE .............................................................................................. 19
3.6.1. Shutdown sequence ....................................................................................... 19
3.7.EMERGENCY SHUTDOWN SEQUENCE ...................................................................... 20
4. LOGIC LOOPS/CONTROL DESCRIPTION ................................................................... 21
4.1.LOGIC LOOPS................................................................................................................ 21
4.2.CONTROL DESCRIPTION ............................................................................................. 23

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 3

/ 24

Rev.: 1

1.

INTRODUCTION

1.1. OBJECTIVE OF THE DOCUMENT


The objective of the document is to provide the functional description of the LOW
PRESSURE STEAM & BYPASS SYSTEM of the project.
For design information on the system, as well as details and functions of each item, refer to
PP10CC-00-LBB-MR-ABC-001 LP STEAM & BYPASS SYSTEM DESCRIPTION

1.2. SCOPE OF THE DOCUMENT


The scope of the document is to describe the followings topics:
System description
System operation
Control loops

1.3. REFERENCE DOCUMENTATION


PP10CC-00-LBB-MDD-ABC-001 P&ID LP STEAM & BY-PASS
PP10CC-00-LBB-MR-ABC-001 LP STEAM & BYPASS SYSTEM DESCRIPTION
PP10CC-00-6LBB-YDY-ABC-001 LP STEAM & BYPASS LOGIC DIAGRAMS
PP10CC-00-6Y-YR-ABC-001 CCPP OPERATION PHILOSOPHY
PP10CC-0009-6Y-YDZ-ABC-001 CONTROL TYPICAL DEVICES
PP10CC-0009-6Y-YLI-ABC-002 DEVICE DEFINITION CONCEPT
PP10CC-0009-6Y-YDY-ABC-001 MASTER LOGIC DIAGRAMS
PP10CC-00-2MAG-GDD-RCD-002 ACC PID STEAM & CONDENSATE SYSTEMS
PP10CC-00-2MAG-GID-RCD-001 ACC FUNCTIONAL DESCRIPTION
PP10CC-0009-6Y-YDY-ABC-004

PERMANENT

STANDBY

PREPARATION

SEQUENCE
1

PP10CC-0009-6Y-YDY-ABC-002 CC SIMULTANEOUS START UP SEQUENCE


PP10CC-0009-6Y-YDY-ABC-005 CC SEQUENTIAL START UP SEQUENCE

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 4

/ 24

Rev.: 1

PP10CC-0009-6Y-YDY-ABC-003 NORMAL SHUT DOWN SEQUENCE

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13
Page 5

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

/ 24

Rev.: 1

2.

SYSTEM DESCRIPTION

2.1. MAIN EQUIPMENT, PERMISSIVES AND INTERLOCKS


The main equipment which belongs to this system is one (1) by-pass valve. Each HRSG
LP-steam supply line is connected via a common steam header which has one by-pass line
with a combined pressure reducing and steam desuperheating valve (by-pass valve)
connected to the exhaust steam duct. The TAG of this by-pass valve is the following:
A115-MAP10-AA101.
For further information see system description PP10CC-00-LBB-MR-ABC-001 LP STEAM
& BYPASS SYSTEM DESCRIPTION
The LP system has the following permissive (start condition) and interlocks:

For HRSG-1

Instrument

Service

A111-LBB10-

HRSG-1 LP Steam

CP003

Pressure

A111-LBB10-

HRSG-1 LP Steam

CP004

Pressure

A111-LBB10-

HRSG-1 LP Steam

CT003

Temperature

A111-LBB10-

HRSG-1 LP Steam

CT004

Temperature

A111-LBB10-

HRSG-1 LP Steam

CT005

Drain Temperature

Setting

Level

Consequences/Actions

13 barg

HH

Alarm

13 barg

HH

Alarm

LL

Alarm

LL

Alarm

LL

Alarm

T < Tsat + BIAS


(10% of Tsat)
(for 1 minute)
T < Tsat + BIAS
(10% of Tsat)
(for 1 minute)
T < Tsat + BIAS
(10% of Tsat)
(for 1 minute)

For HRSG-2, HRSG-3 and HRSG-4 there are the same permissive/interlocks.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 6

/ 24

Rev.: 1

For LP Steam Header

Instrument
A115-LBB10CP001
1

A115-LBB10CP002

Service

Setting

Level

Consequences/Actions

LP Steam Pressure

13 barg

HH

Alarm

LP Steam Pressure

13 barg

HH

Alarm

LL

Alarm

LL

Alarm

LL

Alarm

LL

Alarm

HH

Alarm

LL

Alarm

P > 6 bara

HH

Alarm

P > 6 bara

HH

Alarm

T > 86 C

HH

Alarm

T > 86 C

HH

Alarm

A115-LBB10-

LP Steam

CT002

Temperature

A115-LBB10-

LP Steam

CT003

Temperature

A115-LBB10-

LP Steam Drain

CT001

Temperature

A115-LBB10-

LP Steam Drain

CT005

Temperature

A115-LCE20CP003

Strainer Differential

CT001

Drain Temperature

A115-MAP11CP002

A115-MAP11CT001
A115-MAP11-

(for 1 minute)
T < Tsat + BIAS
(10% of Tsat)
(for 1 minute)
T < Tsat + BIAS
(10% of Tsat)
(for 1 minute)
T < Tsat + BIAS
(10% of Tsat)
(for 1 minute)
DP > 0,2 bar

Pressure
LP Steam By-Pass

CP001

(10% of Tsat)

Condensate Water

A115-LBB30-

A115-MAP11-

T < Tsat + BIAS

T < Tsat + BIAS


(10% of Tsat)
(for 1 minute)

Steam from LP ByPass Station to ACC


Pressure
Steam from LP ByPass Station to ACC
Pressure
Steam from LP ByPass Station to ACC
Temperature
Steam from LP By-

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 7

/ 24

Rev.: 1

Instrument

Service

CT002

Pass Station to ACC

Setting

Level

Consequences/Actions

Temperature
A115-LCE20-

Condensate Water

CF001

Flow

A115-LCE20-

Condensate Water

CF002

Flow

A115-LCE20-

Condensate Water

CP001

Pressure

A115-LCE20-

Condensate Water

CP002

Pressure

A115-LCE20-

Condensate Water

CT001

Temperature

A115-LCE20-

Condensate Water

CT002

Temperature

2.2. MECHANICAL BATTERY LIMITS

Terminal

Service

System From / To

Ref. Document.

Point
TP-0801

LP Steam from HRSG-1

TP-0801

LP Steam from HRSG-2

TP-0801

LP Steam from HRSG-3

TP-0801

LP Steam from HRSG-4

From HRSG to LP Steam &


By-pass System
From HRSG to LP Steam &
By-pass System
From HRSG to LP Steam &
By-pass System
From HRSG to LP Steam &
By-pass System
From LP Steam & By-pass

LP Steam drains

System to Steam Turbine


Vents & Drains System

LP Steam from Steam

From ST Seals system to

PP10CC-00-H-MDD-NEM-008
PP10CC-00-H-MDD-NEM-008
PP10CC-00-H-MDD-NEM-008
PP10CC-00-H-MDD-NEM-008
PP10CC-0009-3MAL-MDDABC-001
PP10CC-0009-0MAW-MDD-

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 8

/ 24

Rev.: 1

Terminal

Service

System From / To

Ref. Document.

Turbine Seals System

LP Steam & By-pass

ABC-001

Point
System
TP-AD310
TP-AD320

From LP Steam & By-pass


LP Steam to Steam Turbine

System to Steam Turbine

102T7896

System
From Condensate System

Condensate

PP10CC-00-LCA-MDD-ABC-

to LP Steam & By-pass

001

System
-

LP Steam to Air Cooled


Condenser

From LP Steam & By-pass


System to Air Cooled

RCD-002

Condenser System
From LP Steam & By-pass

LP Steam sampling

System to Sampling
System

PP10CC-00-2MAG-GDD-

PP10CC-0009-1QU-MDDABC-001

2.3. FUNCTIONALITY
The LP Steam & By-Pass system functionality is described in the system description. See:
PP10CC-00-LBB-MR-ABC-001 LP STEAM & BYPASS SYSTEM DESCRIPTION

2.4. CONTROL INTERFACES WITH OTHER SYSTEMS


System control interfaces with other systems are:
From (Origin of the signal)
ACC System

Signal Description
Air Cooled Condenser pressure
(A115-MAG01CP001/2/3)

To (Destination of the signal)


LP Steam & By-pass System

Air Cooled Condenser


ACC System

temperature

LP Steam & By-pass System

(A115-MAG01CT001/2/3)
ST System
1

IPC In

LP Steam & By-pass System

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13
Page 9

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

/ 24

Rev.: 1

2.5. SIGNALS MONITORING

2.5.1.

Measuring instrument

The measuring instruments which belong to this system are the followings:

For HRSG-1
Equipment/Line
A111-LBB10-BR001-2003A2-HC
A111-LBB10-BR001-2003A2-HC

Service

Instrument
PIT

HRSG-1 LP Steam

A111-LBB10-CP003
A111-LBB10-CP004
TIT

HRSG-1 LP Steam

A111-LBB10-CT003
A111-LBB10-CT004

A111-LBB10-BR402-50-

HRSG-1 LP Steam

TIT

3A2-HC

Drain

A111-LBB10-CT005

Selection
Logic

Notes

DUAL
SELECT
DUAL
SELECT
-

For HRSG-2, HRSG-3 and HRSG-4 there are the same measurement instruments.

For LP Steam Header


Equipment/Line
A115-LBB10-BR001-3503A1-HC

A115-LBB10-BR001-3503A1-HC
A115-LBB10-BR402-503A1-HC
A115-LBB10-BR405-503A1-HC
A115-LBB30-BR401-50-

Service

Instrument
PIT

LP Steam

A115-LBB10-CP001
A115-LBB10-CP002
TIT

LP Steam

A115-LBB10CT002
A115-LBB10CT003

LP Steam Drain
LP Steam Drain
LP Steam By-Pass

TIT
A115-LBB10CT001
TIT
A115-LBB10CT005
TIT

Selection
Logic
DUAL
SELECT
DUAL
SELECT
-

Notes

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13
Page 10

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

/ 24

Rev.: 1

Equipment/Line

Service

Instrument

3A1-HC

Drain

A115-LBB30-CT001

A115-MAP11-BR001-

Steam from LP By-Pass

350-1A1-PP

Station to ACC

A115-MAP11-BR001-

Steam from LP By-Pass

350-1A1-PP

Station to ACC

PIT
A115-MAP11-CP001
A115-MAP11-CP002
TIT
A115-MAP11-CT001
A115-MAP11-CT002

Selection
Logic

Notes

DUAL
SELECT
DUAL
SELECT

For Condensate Header


Equipment/Line
A115-LCE20-BR001-403A3-HC

Service

PIT
Condensate Water

A115-LCE20-CP001
A115-LCE20-CP002

A115-LCE20-BR001-403A3-HC

Instrument

TIT
Condensate Water

A115-LCE20-CT001
A115-LCE20-CT002

A115-LCE20-BR001-403A3-HC

FIT
Condensate Water

A115-LCE20-CF001
A115-LCE20-CF002

A115-LCE20-BR001-403A3-HC

2.5.2.

Condensate Water

PDIT
A115-LCE20-CP003

Selection
Logic

Notes

DUAL
SELECT
DUAL
SELECT
DUAL
SELECT
-

Selection logic architecture

As a general rule, if a signal is out of configured range, an alarm shall be generated in the
control system.
When two or more measurements are available for the same process value, the value used
for interlocking will depend on the selected logic architecture.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13
Page 11

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

/ 24

Rev.: 1

In a DUAL SELECT logic architecture, two measures are available, if both are healthy the
average of the two measurements is used. In case of bad quality of one of the
measurements, automatic change-over to the healthy measurement takes place and an
alarm is generated.
In a MEDIAN SELECT logic architecture, three measures are available if all of them are
healthy the average of the three measurements is used. In case of bad quality of one of the
measurements, automatic change-over to the other healthy measurements takes place and
an alarm is generated.
The selected logic architecture of each instrument has been identified in the previous table
(see section 2.5.1).

2.5.3.

Bad quality concept

In case of bad quality of one of the redundant measurements, automatic change-over to


the healthy measurement will take place and an alarm will be generated. Bad quality
means that the signal is out of range < 4 or > 20 mA.

2.6. PROCESS DRIVES/ACTUATORS

2.6.1.

Process drives/actuators

The process drives/actuators which belong to this system are the followings:

For HRSG-1
Line/Equipment

Service

Drive/Actuator

Fail Safe

Notes

Position
A111-LBB10-BR402-50-

HRSG-1 LP Steam

3A2-HC

Drain Valve

A111-LBB10-BR001-200-

HRSG-1 - Header LP

3A2-HC

Steam Shut-off Valve

A111-LBB11-BR001-50-

HRSG-1 - Header LP

A111-LBB10-AA051

FS

A111-LBA20-AA001

FS

A111-LBA20-AA011

FS

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13
Page 12

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

/ 24

Rev.: 1

Line/Equipment

Service

Drive/Actuator

Fail Safe

Notes

Position
3A2-HC

Steam Shut-off
bypass Valve

Notes:
1.- Valve electrically actuated. Not fail safe position. Fail Steady (in position).
For HRSG-2, HRSG-3 and HRSG-4 there are the same actuators.

For LP Steam Header


Line/Equipment

Service

Drive/Actuator

Fail Safe

Notes

Position
A115-LBB10-BR402-50-

LP Steam Header

3A1-HC

Drain Valve

A115-LBB10-BR405-50-

LP Steam Header

3A1-HC

Drain Valve

A115-LCE20-BR001-40-

Condensate Water

3A3-HC

Shut-off Valve

A115-LCE20-BR001-40-

Condensate Water

3A3-HC

Control Valve

A115-LBB30-BR401-50-

LP Steam By-Pass

3A1-HC

Drain Valve

A115-LBB30-BR001-350-

LP Steam By-Pass

3A1-HC

Shut-off Valve

A115-MAP11-BR001-

LP Steam By-Pass

350-1A1-PP

Valve

A115-LBB10-AA051

FS

A115-LBB10-AA053

FS

A115-LCE20-AA081

Close

A115-LCE20-AA101

Close

A115-LBB30-AA052

FS

A115-LBB30-AA051

FS

A115-MAP10-AA101

Close

Notes:
1.- Valve electrically actuated. Not fail safe position. Fail Steady (in position).
2.- Valve pneumatically actuated
3.- Valve hydraulically actuated.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 13

/ 24

Rev.: 1

2.6.2.

Drives/Actuators Fault Tolerance

When redundant drives/actuators are available, at least one of the followings strategies
shall be configured:

Maximum waiting time


When it is required to start a drive/actuator or to change its position, the control system
shall monitor the maximum admitted time to finish its maneuver. If this time is exceeded,
the control system will generate an alarm.

Fail safe position


It will be considered the Fail Safe Position the one that the device will go to in case of
control signal or air supply failure.
The fail safe position of each actuator has been identified in the previous table (see 2.6.1).

2.7. FUNCTIONAL GROUPS

2.7.1.

Number of Functional Groups

There will be the following functional groups:


For HRSG-1
HRSG-1 LP Steam Drain Valves: LP-HRSG-1-DV
1

For HRSG-2, HRSG-3 and HRSG-4 there are the same functional groups.

For LP Steam Header


LP Steam Header Drain Valves: LP-HPSH-DV
LP By-Pass Valves 1: LP-HRSG-BP1
LP By-Pass Valves 2: LP-HRSG-BP2

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 14

/ 24

Rev.: 1

2.7.2.

Functional Groups Operation Modes

As a general rule, the system will operate in automatic mode, following not only required
sequences and settings, also taking into account required protections over the operation in
the control system. All functional groups could operate in one of the following modes:

Automatic mode
In auto mode the functional group will follow the control strategies configured in the control
system.

Manual mode
In manual mode the functional group will check required sequences, settings and
protections for system operation depending on control strategy, but in this case some
process actuators could be selected to be operated according to operators decision.

2.8. SYSTEM CONTROL LOCATION


The DCS controller location for this system is the STG Control Compartment.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 15

/ 24

Rev.: 1

3.

SYSTEM OPERATION MODES


The system operation modes are the followings:
Cold start-up: cover the initial filling and the initial preparation (system ready to start).
Hot start-up: cover all required sequences up to the moment the system is in operation.
Normal operation.
Shutdown: cover all required sequences up to the moment the system has been
stopped.
Emergency shutdown.

3.1. POSITION IN THE PLANT GENERAL START-UP SEQUENCE


This system belongs to operation systems and it will be set in operation following the steps
described in one of the following start-up sequences:
1

Combined Cycle Simultaneous Start-Up Sequence: PP10CC-0009-6Y-YDY-ABC-002


Combined Cycle Sequential Start-Up Sequence: PP10CC-0009-6Y-YDY-ABC-005

3.2. CRITERION FOR SYSTEM START-UP


From the plant general start-up sequence it will be required to start-up this system under
the following requirements:
Condensate system in Operation

3.3. START-UP SEQUENCE


The start-up sequence will be in accordance with PP10CC-00-6Y-YR-ABC-001 CCPP
Operation Philosophy. However, for further detail see PP10CC-0009-6Y-YDY-ABC-002CC
1

Simultaneous Start-Up Sequence or PP10CC-0009-6Y-YDY-ABC-005 CC Sequential


Start-Up Sequence.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 16

/ 24

Rev.: 1

3.3.1.

Start-up sequence with first HRSG (By-Pass not available)

Note: it has been decided to use HRSG-1 for system start-up sequence as an example but
it could be selected any other HRSG.
The start-up sequence of the system with first HRSG will follow the following steps:
During the first HRSG start-up and because the ACC isnt in operation, the pressure in
HRSG-1 LP Steam line and LP Steam Header will be controlled by LP start-up vent valve
(A111- LBA20-AA101) until the ACC is in operation, ensuring a minimum steam flow.
Step 01: HRSG-1 LP Steam drain valve (A111-LBB10-AA051) to AUTO MODE.
Step 02: HRSG-1 LP Steam Shut-Off valve (A111-LBA20-AA001) and LP Steam ShutOff Bypass valve (A111-LBA20-AA011) to AUTO MODE.
Step 03: LP Steam Header drain valves (A115-LBB10-AA051, A115-LBB10-AA053 and
A115-LBB30-AA052) to AUTO MODE.
Step 04: LP Steam By-Pass Shut-Off valve (A115-LBB30-AA051) and Condensate
water Shut-Off valve (A115-LCE20-AA081) to AUTO MODE.
Step 05: Condensate water control valve (A115-LCE20-AA101) and By-Pass control
valve (A115-MAP10-AA101) to AUTO MODE
Step 06: HRSG-1 LP Steam drain valve (A111-LBB10-AA051) OPEN. This valve will
remain open (force open) until the HRSG-1 LP Steam reached the value of 6 barg. From
this moment the valves will be released to AUTO CONTROL MODE, so they will open if
it is necessary.
1

Step 07: LP Steam Shut-Off Bypass valve (A111-LBA20-AA011) will OPEN.


Step 08: Because the differential pressure upstream/downstream HRSG-1 LP Steam
Shut-Off valve (A111-LBA20-AA001) is less than 0,5 bar and the differential
temperature is less than 30C, the valve will OPEN.
Step 09: LP Steam Shut-Off Bypass valve (A111-LBA20-AA011) will CLOSE.
Step 10: LP Steam Header drain valves (A115-LBB10-AA051, A115-LBB10-AA053 and
A115-LBB30-AA052) OPEN. These valves will remain open (force open) until the LP
Steam Header reached the value of 6 barg. From this moment the valve will be released
to AUTO CONTROL MODE, so it will open if it is necessary.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 17

/ 24

Rev.: 1

Once the ACC system is in operation and the HRSG is soaked, the By-Pass valve is
released to be opened. Then LP Steam By-Pass Shut-Off valve (A115-LBB30-AA051) and
Condensate water Shut-Off valve (A115-LCE20-AA081) will OPEN.

From this moment the HP header pressure control will be transferred from HP start-up vent
valve to By-Pass control valve.
These steps are done by operation systems: see CC Simultaneous Start-Up Sequence and
CC Sequential Start-Up Sequence for further information.

3.3.2.

Start-up sequence with second, third or fourth HRSG (By-Pass available)

It has been decided to use HRSG-2 for system start-up sequence as an example but it
could be selected any other HRSG. The start-up sequence of the system with first, third or
fourth HRSG will follow the following steps:
Step 01: HRSG-2 LP Steam drain valve (A112-LBB10-AA051) to AUTO MODE.
Step 02: HRSG-2 LP Steam Shut-Off valve (A112-LBA20-AA001) and LP Steam ShutOff Bypass valve (A112-LBA20-AA011) to AUTO MODE.
Step 03: HRSG-2 LP Steam drain valve (A112-LBB10-AA051) OPEN. This valve will
remain open (force open) until the HRSG-1 LP Steam reached the value of 6 barg. From
this moment the valves will be released to AUTO CONTROL MODE, so they will open if it
is necessary.
1

Step 04: When the HRSG-2 Steam pressure reaches the required value according to
the start-up sequence, LP Steam Shut-Off Bypass valve (A112-LBA20-AA011) will
OPEN.
Step 05: When the differential pressure upstream/downstream HRSG-2 LP Steam ShutOff valve (A112-LBA20-AA001) is less than 0,5 bar and the differential temperature is
less than 30C, the valve will OPEN.
Step 06: LP Steam Shut-Off Bypass valve (A112-LBA20-AA011) will CLOSE.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 18

/ 24

Rev.: 1

3.4. NORMAL OPERATION


In a normal operation, four HRSG supply LP Steam to the Steam Turbine through the LP
Steam Header.

By-Pass Station normal operation


There will be two normal operation modes: IPC (Inlet Pressure Control) Control Mode or ST
Load Control Mode
When the ST is in IPC Control Mode, the by-pass valve will control that the header
1

pressure variation rate is less than 3,5 bar/min.


When the ST is not in IPC Control Mode (in Load Control Mode or STG not running), the
by-pass valve will control that the header pressure is constant.
In case of emergency trip of the STG the by-pass system will open to by-pass the LP
superheated steam to the Air Cooling Condenser after reducing temperature and pressure
to the required levels.
In the event of an Air Cooled Condenser (ACC) duct high pressure or temperature, the

bypass valve will be forced closed to protect the ACC. This will result in an increase in the
LP Steam header pressure and (if not corrected) will cause the safety valves to open.
The By-Pass system has been designed using a Feed-Forward control strategy where the
amount of spray water required to achieve the desired outlet steam enthalpy is calculated
based on the inlet steam and spray water enthalpies and the outlet steam flow. Steam flow
is determined using the pressure drop across the downstream dump tube. The process
value flow rate of spray water is measured with an ultrasonic flow meter.
For more information see section 4.1 where each control loop has been identified.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 19

/ 24

Rev.: 1

Drain Valves normal operation


These drain valves are used to remove condensate from the drip legs located in steam
lines. In normal operation they are controlled based on drip leg temperature measurement.
When the corresponding drip leg temperature is near saturation the valve will be opened.
When the drip leg temperature is sufficiently superheated the valve will be closed.
The saturation temperature is calculated with the pressures transmitters located in the
main steam line where the drip leg is located. For more information see section 4.1 where
each control loop has been identified.

Interlock
For process interlocks see section 2.1.

Alarms
For process alarms see section 2.1.

3.5. POSITION IN THE PLANT GENERAL SHUTDOWN SEQUENCE


This system belongs to operation systems and it will be set out of operation following the
1

steps described in the normal shut down sequence PP10CC-0009-6Y-YDY-ABC-003

3.6. SHUTDOWN SEQUENCE


The shutdown sequence will be in accordance with PP10CC-00-6Y-YR-ABC-001 CCPP
1

Operation Philosophy. However, for further detail see PP10CC-0009-6Y-YDY-ABC-003


CC normal shut down sequence.

3.6.1.

Shutdown sequence

During the combined cycle shutdown sequence, all the HRSGs will be shutdown
sequentially. During this shutdown sequence, each by-pass valve will keep each HP HRSG
1

header pressure at the same value than the HP Main header pressure.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 20

/ 24

Rev.: 1

For further detail see PP10CC-0009-6Y-YDY-ABC-003 CC normal shut down sequence.

3.7. EMERGENCY SHUTDOWN SEQUENCE


There is not an emergency shutdown sequence for this system.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 21

/ 24

Rev.: 1

4.

LOGIC LOOPS/CONTROL DESCRIPTION

4.1. LOGIC LOOPS


In this system there are the following logic loops:

For HRSG-1
Loop
PV

HRSG-1 LP Steam Drain Valve


Temperature Control
Temperature
Open if T < Tsat + BIAS (10% of Tsat)

SP

Close if T > Tsat + BIAS (10% of Tsat)


Tsat = Steam saturated temperature calculated via
steam pressure measurement.

Permissives
Override

- Start-up sequence force open until the HRSG-1


LP Steam reached the value of 6 barg.

Actuator

Motorized valve

Instrument TAG:
A111-LBB10CT005
Instrument TAG:
A111-LBB10-CP003
A111-LBB10-CP004
A111-LBB10-AA051

For HRSG-2, HRSG-3 and HRSG-4 there are the same control loops.

For LP Steam Header


Loop
PV

LP Steam Header Drain


Temperature Control
Temperature
Open if T < Tsat + BIAS (10% of Tsat)

SP

Close if T > Tsat + BIAS (10% of Tsat)


Tsat = Steam saturated temperature calculated via
steam pressure measurement.

Permissives
Override

- Start-up sequence force open until the LP Steam


Header reached the value of 6 barg.

Actuator

Motorized valve

Instrument TAG:
A115-LBB10CT001
Instrument TAG:
A115-LBB10-CP001
A115-LBB10-CP002
A115-LBB10-AA051

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 22

/ 24

Rev.: 1

Loop
PV

LP Steam Header Drain


Temperature Control
Temperature
Open if T < Tsat + BIAS (10% of Tsat)

SP

Close if T > Tsat + BIAS (10% of Tsat)


Tsat = Steam saturated temperature calculated via
steam pressure measurement.

Permissives
Override

- Start-up sequence force open until the LP Steam


Header reached the value of 6 barg.

Actuator

Loop
PV

Motorized valve

LP Steam By-Pass Drain


Temperature Control
Temperature
Open if T < Tsat + BIAS (10% of Tsat)

SP

Close if T > Tsat + BIAS (10% of Tsat)


Tsat = Steam saturated temperature calculated via
steam pressure measurement.

Permissives
Override

- Start-up sequence force open until the LP Steam


Header reached the value of 6 barg.

Actuator

Loop

Motorized valve

Condensate Water Flow Control Valve

Instrument TAG:
A115-LBB10CT005
Instrument TAG:
A115-LBB10-CP001
A115-LBB10-CP002
A115-LBB10-AA053

Instrument TAG:
A115-LBB30CT001
Instrument TAG:
A115-LBB10-CP001
A115-LBB10-CP002
A115-LBB30-AA052

Instrument TAG:

PV

Flow

A115-LCE20CF001
A115-LCE20CF002

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 23

/ 24

Rev.: 1

Loop
SP
Permissives
Override

Condensate Water Flow Control Valve


Calculated SP (SPRAY WATER FLOW CONTROL
ALGORITHM)

Actuator

Loop

Force to Close if valve position demand 6%

Force Open (Quick Open)

Control valve

LP Steam By-Pass Pressure Control Valve

ST Trip
A115-LCE20-AA101

Instrument TAG:

PV
Pressure

A115-LBB10-CP001
A115-LBB10-CP002

In Load Control or STG not running:


SP = Existing header pressure
1

SP

In IPC Control:

Header pressure variation 3,5bar/min or


0bar/min
Permissives
Override

To open if LP Steam has a +5C of superheating


Force to close if:

From ACC system

- ACC Trip (HHH) Pressure

A115-MAG01CP001/2/3

- ACC Trip (HHT) Temperature

A115-MAG01CT001/2/3

- Valve position demand 6%


Force Open (Quick Open)

Actuator

Control valve

ST Trip
A115-MAP10-AA101

4.2. CONTROL DESCRIPTION


The Master Sequence Following Controller (M.S.F.C) will send an automatic command to
HRSG-1 LP Steam Drain Valves Functional Group (LP-HRSG-1-DV) in order to set in
AUTO MODE HRSG-1 Drain Valves.

PP10CC Combined Cycle

Document Code

Date

PP10CC-00-6LBB-YR-ABC-001

30/01/13

LP STEAM & BYPASS SYSTEM FUNCTIONAL DESCRIPTION

Page 24

/ 24

Rev.: 1

The same it will be done for LP Steam Header Drain Valves through LP Steam Header
Drain Valves Functional Group (LP-HRSG-DV), for LP By-Pass Valves 1 Functional
Group (LP-HRSG-BP1) and for LP By-Pass Valves 2 Functional Group (LP-HRSGBP2).
During system start-up the M.S.F.C will force drain valves to open in order to drain and
1

warm-up the HRSGs LP-steam lines.


When according to the established sequence a HRSG is required to be connected to LP
steam header, first the M.S.F.C will send an automatic command to HRSG-1 LP Steam
Shut-Off Valves. The shut-off valves will open according to the sequence explained in
chapter 3.3.
In normal operation, the LP by-pass will be controlling the pressure in the LP-steam header
supply line. The pressure set point for opening of the bypass station will be adjusted
according to the required operation conditions.
Because a feed-forward control algorithm is being used, the amount of spray water
required to achieve the desired outlet steam enthalpy is calculated based on the inlet
steam STM_ENTH and spray water WTR_ENTH enthalpies and the outlet steam flow.
The enthalpies are based on measured pressures and temperatures, and the steam flow
can be determined using the pressure drop across the downstream dump tube.
During the combined cycle shutdown sequence, all the HRSGs will be shutdown
sequentially.

For further detail see: PP10CC-00-6Y-YR-ABC-001 CCPP Operation Philosophy and


PP10CC-0009-6Y-YDY-ABC-003 CC normal shut down sequence
See attached sketch for better understanding of above explanation.

AUTO / MANUAL
AUTO / MANUAL
AUTO / MANUAL

M.S.F.C

TO LP BYPASS
9

SH: 2/2

GROUP
LP-HRSG-DV

FORCE OPEN

FORCE OPEN

AUTO / MANUAL

FORCE OPEN

SH: 2/2

TO LP BYPASS

HRSG-2 STEAM & BYPASS


HRSG-3 STEAM & BYPASS
HRSG-4 STEAM & BYPASS

AUTO / MANUAL
OPEN / CLOSE

AUTO / MANUAL

TO LP BYPASS
6

TO LP BYPASS
SH: 2/2

SH: 2/2

SH: 2/2

TO LP BYPASS
2

SH: 2/2

STM_ENTH
TO LP BYPASS

SAT_TEMP

SH: 2/2

TO LP BYPASS

SAT_TEMP

FT
FT

DUALSEL

DUALSEL

DUALSEL

DUALSEL

ST SEALS

MV-08
PT

TT

PT

TT

PT

TT

PT

SH: 2/2

TT

STEAM TURBINE

HRSG-1

STEAM TURBINE
TT

MV-08

MV-01

GROUP
LP-HRSG-1-DV AUTO / MANUAL
FORCE OPEN

DRAIN
SYSTEM

TT
TT
MV-01

MV-01

M
DRAIN
SYSTEM

DRAIN
SYSTEM

SH: 1/2

HRSG-1 LP STEAM & BYPASS SYSTEM

FROM LP STEAM

CONDENSATE
SYSTEM

FROM LP STEAM
9

GROUP
LP-HRSG-BP2

SH: 1/2

SH: 1/2
LP STEAM
STM_ENTH

PT
AUTO / MANUAL
DUALSEL

WTR_ENTH

PT

FT
CALCULATED SP /
SPRAY WATER

DUALSEL

FT

XV-01

TT

CV-01

SPRAY WATER
FLOW
CONTROL ALGORITHM

STEAM FLOW
CALCULATION

CONDENSER
PRESSURE
FROM
ACC SYSTEM

CONDENSER
PRESSURE

DUMP-TUBE
PRESSURE

PDT

DUALSEL

TT

FILTER

ACC TRIP
FROM
ACC SYSTEM

BY-PASS TRIP

DUALSEL

FROM LP STEAM
3

DUALSEL

SH: 1/2

MV-01
CV-20

PT

PT

TT

TT

FROM LP STEAM
1

EXHAUST DUCT

SH: 1/2

DUMP-TUBE

FROM LP STEAM
5

SH: 2/2

DRAIN
SYSTEM

HP STEAM
SAT_TEMP

TT
FORCE OPEN
7

MV-01

AUTO / MANUAL
2

SH: 1/2

SH: 1/2

M
DRAIN
SYSTEM
OPEN / CLOSE
AUTO / MANUAL
FROM LP STEAM
8

SH: 1/2

AUTO / MANUAL

GROUP
LP-HRSG-BP1

SH: 2/2

HRSG-1 LP STEAM & BYPASS SYSTEM