Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
206
MGC / MGS
Guided Climbing/Screens
Climbing Process
Design
Configuration
BENEFITS
Easy application
The photo shows MGS units being lifted far over the slab edge of the top
floor of a high-rise building. The right unit is in its final position while the
left one is being lifted. The 3 cm gap between the units is necessary to
avoid friction between the units when lifting them. It is no safety hazard.
When lifting an MGS unit, its guiding profiles slide through the sliding
shoes that are attached at the slab edge and hold them tight. The safey
latches on the shoes and other safety features make sure that the strict
safety standards vaild in high-rise construction are fully met.
207