Sei sulla pagina 1di 35

Organisation

Question:- Name of department/executive agency

Question:- Total Size


Question:of Estate - Buildings
Total number (m agent letting
of FTEs
area)

CO

Cabinet Office

2066

62,756

DCA

DCAHQ

3950

44998

DCLG
DCMS

DEFRA

Department for Communities and Local Government


The Department for Culture, Media and Sport/The Royal
Parks

Department for Environment, Food & Rural Affairs

8247

201463

660.4

13269

15317

386923

DfES

Department for Education and Skills

5920

90982

DfID

Department for International Development

1735

26870

DfT

Department for Transport

17,353

332,620

DH

Department of Health

2800

65119

DTI

DTI (Department for trade & Industry)

4716

852996

DWP
ECGD

FC

Department for Work and Pensions


Export Credits Guarantee Department

Forestry Commission (FCGB - Silvan House, FC


England, Forest Research)

FCO

Foreign and Commonwealth Office

FSA

Food Standards Agency

HMRC
HMT

HM Revenue & Customs


Her Majesty's Treasury

HO

Main Home Office (includes Immigration & Nationality


Directorate, Prison Service HQ buildings, and National
Offender Managment Service-non custodial)

LOD

Law Officers Department

MOD

Ministry of Defence

ONS

Office for National Statistics

120708
297

890

2235971
10600

21515

3157

84536

630

11,865

94007
1132

1787608
35914

72442

Question:- Total
Size of Estate Land Holdings
(ha)

Question:- Additional information on departments/executive agencies

6.2756 N/A
HMCS - 21,706 FTEs - 987,940.14 m2 - 0ha Tribunals - 1,554 FTEs - 54,645m2 - 0ha Land Registry
4.4998 - 7,996 FTEs - 219,780 m2 - 0ha National Archives - 550 FTEs - 61,190 m2 - 5.26ha

Question:- Omissions from the estate

Question:- List all executive agencies and whether they are included in the survey

The below sites are excluded from the SDiG Questionnaire as these are sites which are either leased and paid for by a service charge and/or we could not reasonably get actual data for energy
consumption; are not part of the core Cabinet Office estate: St Clements House (Norwich) - Office of Public Service Information Grosvenor House (Basingstoke) - Financial Services Unit Sunningdale
(Berks) - National School For Government London - National School for Government Edinburgh - National School for Government Easingwald (York) - Emergency Planning College Hercules House
(London) - Central Office of Information

The Government Car and Despatch Agency (GCDA - sole Executive Agency of the Cabinet Office) was unde
HMCS - Fully Included Tribunals - Fully Included Scotland Office - Fully Included Wales Office - Fully Inc

Our SDiG return includes our full estate and also the Government Office Network and our executive
agencies, which include the Fire Service College, Queen Elizabeth II Conference Centre and the
185 Planning Inspectorate.
1.3269 The Royal Parks 96 full time employees Approx 20,735 m2Approx 2048 ha

Queen Elizabeth II Conference Centre - fully included Fire Service College - fully included Planning Inspe
Blandford Street Leased on a short term lease to Culture on line

The Royal Parks Partially included

See below for full Exec Agency titles. Defra (incl SVS,MFA, GDA): FTE= 6538; ALA= 252165; Land=
502 RPA: FTE= 4466; ALA= 41622; Land= 0 CEFAS: FTE= 521; ALA= 16841; Land= 4 CSL: FTE=
679; ALA= 28873; Land= 33 VLA: FTE= 1356; ALA= 42002; Land= 31 VMD: FTE= 138; ALA= 1215; 100 sites have been excluded for one or more of the following reasons. Defra or Agency is an minor occupier to an OGD, it is a store, very few staff on site, property vacant or suplus. Defra ALA = 89376
570 Land= 0 PSD: FTE= 198; ALA= 4205; Land= 0 SVS: FTE= 1315 GDS: FTE= 5 MFA: FTE= 101
VLA ALA = 1020 MFA ALA 992
Centre for Environment, Fisheries & Aquaculture Science (CEFAS) Central Science Laboratory (CSL) P
Wales Bar, Sheffield - Minor occupation Maltravers Road, Sheffield - Minor occupation Bolton Street/Picadilly - Occupied by NDPB Sheffield Nursery - Minor Occupation Blenheim Court, Peterborough Vacant Fountain Court, Bradford - Assigned 1st floor, Wesley House, Luton - Vacant 2nd floor, Manorgate House, K.O.T. - Vacant Grd & 1st floors, Manorgate House, K.O.T. - Sub-let Bayley House,
Bolton - Sub-let Atlas House, Bolton - Sub-let 200 Great Dover Street, London - Sub-let Medway S/C Annexe, Sittingbourne - Sub-let Middlesborough S/C Annexe - Sub-let Grd, 1st & 2nd floors, Skyline
House, London - Sub-let Albion Wharf, York - Sub-let Brandon Court, Coventry - Sub-let The Oaks, Redditch - Sub-let Enterprise House, Wolverhamption - Sub-let 12 Grosvenor Crescent, London - Sublet Acorn House, Grimsby - Sub-let
None

9.0982

4.25 N/A
33.262

Medicines & Healthcare Products Regulatory Agency (MHRA) FTEs 819; ALA 12100.87 NHS
Purchasing & Supply Agency (NHS PASA) FTEs 242; ALA 3302 Note: DH main estate reduced to
6.5119 49989m2 by Sept 05. Staffing figure does not include all contractors/temporary staff.
Patent Office
Insolvency Service
85.2996 4481m2

We are excluding our overseas estate. We have rolled out the principles of the EMS to our main overseas offices and are planning to implement a more formal structure to three of our main offices during
the period 2006/2007. We are also working with the FCO to consider the best approach to overseas offices which are co-located by DFID and FCO.
N/A
55 Victoria Street (Vacant during large part of reporting period and now sub let to (non UK) Government body), 25 Victoria Street (Vacant during large part of reporting period but will be reported on in 0607), 6 former Rail Passenger Council Offices ((936 m2)Empty during reporting period and all services are landlord controlled).
DfT Executive Agency - DSAYes fully DfT Executive Agency - DVLAYes fully DfT Executive Agency - GCD
Belgrave Road - MHRT, now part of DCA. >50 staff Canons Park - Closed May 06. >50 staff chalfont Drive - MHRT, now part of DCA. >50 staff Dominions House - closed August 05. >50 staff Eastway
Business Village, Preston - MHRT, now part of DCA. >50 staff Heron House - Closed June 05. Had >50 staff. DH minor occupier Hinchley Wood - Empty. Will close March 07 Kierran Cross - lease
passed to CHRE in 2005. >50 staff Millenium Block A - Returned to landlord Jan 06. Previously empty New Kingsbeam House - DH minor occupier. Building managed by HMRC (who will report) Premier
Buildings - filestore. >50 staff Quarry House - DH minor occupier. Building managed by DWP (who will report) Tyne Bridge Tower - Empty. Handed back to landlord July 05 Maid Marian House - MHAC >50 staff Westward House - >50 staff Pocock Street - Care Standards Tribunal >50 staff Dominions House - NHS Estates >50 staff. Agency abolished wef Sept 05. Canons Park (MHRA) - >50 staff
Crown House (MHRA) - >50 staff Hinchley Wood (MHRA) - >50 staff Hunter House (MHRA) - >50 staff New Court (MHRA) - >50 staff Wheelchair evaluation Centre (MHRA) - >50 staff Sheffield (NHS
PASA)- >50 staff Normanton (NHS PASA)- >50 staff
MHRA - partially included (main building Market Towers (MT) is landlord controlled. We are reporting

FTE 964.26 21915m2 Companies House


FTE 1157
33400m2
FTE 2481
30209m2 National Weights and Measures FTE 47.3
Patent OfficeYes fully / Companies HouseYes fully Insolvency service: Yes fully Employment trib

All staffing figures rounded up to the nearest whole number. Child Support Agency - 10287 staff 102344.8m2 Disability and Carers Service - 6448 staff - 117650.4m2 Corporate Centre -11082
staff - 305966.1m2 Jobcentre Plus -72895 staff - 1484193.0m2 The Pensions Service - 14914 staff
- 132542.8m2 The Rent Service - 684 staff - 12789.0m2 Health and Safety Executive -3647 staff 223.5971 79733.0m2 Appeals Service -751 staff - 751.77m2
Hectares not known.
1.06
ECGD's Lambourne House site in Cardiff is excluded as the office is now closed and the Building has been "mothballed" pending disposal.
FC Cambridge office - 40 employees, total size - buildings 1727 m2 FC Bristol office - 30
employees, total size - buildings 465 m2 FC GB - Silvan House - 550 employees, total size buildings 10000 m2 FC Forest Research Alice Holt - 120 employees, total size - buildings 5058 m2
total size - nursery 3357 m2 FC Forest Research Northern research
station - 90 employees,
total size buildings 4265 m2
258514
total size nursery 1597 m2

47.2 Wilton Park 67 FTE 2326 m2 2.46 ha


1.1865

All agencies as above included in the report, unless otherwise indicated in responses.
N/A

Forestry Commission Wales - Funded through National Assembly for Wales Forestry Commission Scotland - Funded through Scottish Parliament
Apollo House Home Office is our landlord and returns this building. 89 Albert Embankment (UKV) Site of joint FCO/ Home Office organisation; UKVisas. Space is leased in a commercial building where
utilities etc are not separately metered. Staff covered by e.g. waste minimisation recycling and energy good housekeeping initiatives, but little scope to influence building management. Kingsgate House
(UKTI) Site of joint FCO/DTI organisation: UKTI reports. FCO Overseas Network A number of overseas posts have begun to implement Environmental Management best practice wherever local
conditions and resources allow.
We have offices in Scotland, Wales and Northern Ireland. The offices consist of one to two floors. They are tenants and pay their utility charges as part of their service charge, so therefore collate no
data. They are also not included in the FSA's EMS, as this is for Aviation House at present.

178.7608 VOA 4,799 (FTE's) 88,925.8 m2 (total size of the estate)


3.5914 Agencies have not previously been reported on

Wilton Park Yes fully.


Meat Hygiene Service is an executive Agency of ours, they will also not be reported on. Their offices fall
VOA - Fully included

3898731

HM Prison Service - 48,874 FTE's,


3,545,000m2 Buildings
3,700 ha land
holdings Identity and Passport Service (previously UKPS)- 2,772 FTEs,
40,505m2 Buildings
No land Forensic Science Service (FSS) 2486 FTEs
46481m2 Buildings
No land Criminal Records
3735 Bureau (CRB) - 427 FTEs
2946m2 Buildings
No land
All of the following are included in the above. Crown Prosecution Service(CPS)-8358
FTE,135000m2;Attorney Generals Office(AGO)- 50 FTE, 1017m2; Serious Fraud Office(SFO)- 297
FTE, 7767m2;Treasury Solicitors(TSol-863 FTE,11117m2; HM Crown Prosecution Service
Inspectorate(HMCPSI)-35FTE,9671m2;Revenue and Customs Prosecution Office(RCPO)16.8917 300FTE,4345m2. None of these departments have land holdings.

CPS, SFO,TSol,AGO none. HMCPSI Northern group United House, minor occupier. RCPO Both Sites London and Manchester. minor occupier.

none

No omissions.

As at 01/05/2005:- ON-VOTE DEFENCE AGENCIES: Armed Forces Personnel Administration Agency Army

9903

168917

315300

6888586

240000

4331

79002

14.91

Privately managed prsions - working with contractors to agree commitments to FSDGE targets HOSDB (2 properties)- working with colleagues to agree commitments to all FSDGE targets. Currently able
to report only on water and energy (included in this return).
HM Prison Service - Fully included Forensic Science Service (FSS) - Fully included Identity and Passport

Question:- How
many office based
sites do you have? Question:- Please provide additional information about these

Question:- Of
these, how many
main offices do
Question:- Additional info about main offices
you have*?

Question:- How many


mixed or mainly nonoffice sites do you
have**?

Question:- Please outline any major changes in your estate since 1999/2000

CO

The Cabinet Office's estate has changed significantly since 1st May 1997. The Cabinet Office was re

DCA

The Department has undergone a number of chances since 1999/2000. In June 2003, the Lord Chancellors

DCLG

In 1999/01, the Department was DETR, this included sections of DEFRA and all of DfT and some of what

DCMS

The MOTO for the offices at Woburn Place expired March 2005

DEFRA

Defra was created in June 2001, as part of wider 'machinary of government' changes. It was largely fo

DfES

Ranmoor Hall, Sheffield transferred to DWP in April 2002. East Lane House, Runcorn was sold in Mar

DfID

In December 2001 the London office moved ofices and work began to refurbish the East Kilbride office. A

DfT

The Government Car and Despatch Agency transferred to the Department in November 2005. The data in th

93

48

DH

1999-02 - abolished DH Regional Offices. Small numbers of staff relocated to Government Offices. E

27 Reduced to 17 by March 06 (also includes those empty in April 05)

10 Skipton House (SKH), Wellington House (WEL), Richmond House (RH), Eileen House (EH) (closed 31/0

3 DH & MHRA filestores. MHRA Wheelchair evaluation centre.

Yes reviewed and verified

DTI

The Department has lost a number of reporting agencies under MOG changes. These include Radio Agency

50

16 Insolvency has 33 small office location comprising less than 50 persons hence the variation in numbers

Yes reviewed and verified

DWP
ECGD

The DWP did not exist in 99/2000. This department was created by the merging of the Benefits Agency an

0
1 See earlier response

Yes reviewed and verified


No

FC

None

FCO

The assessment of 99/00 data was extremely difficult due to our consolidating our operations into fewer,

2 Main Building, and Old Admiralty Building

2 Main Building, and Old Admiralty Building

FSA

No change to our estate.

4 HQ Aviation House, London St Magnus House, Scotland Southgate House, Wales Clarendon Dock, Nort

2 Aviation House, London - 630 Staff St Magnus House, Scotland - 79 Staff

HMRC
HMT

The integration of the former HM Customs & Excise with Inland Revenue in April 2005 and the creatio
Sharing of building with HMRC

678
1

HO

An increase of 4,500 in the number of public sector prison places since 31 March 2000 to accommodate a

666 This includes 590 minor National Probation Dirctorate offices all of which are omitted from this questionn

LOD

CPS No major changes. SFO In December 2005, the SFO signed a lease for additional accommodation at

MOD

Since the launch of The Strategy for the Defence Estate "In Trust and On Trust" in 2000, Defence Estates
N/A

ONS

New annexe built at Newport site in September 2004

15 The above figure refers to those office based sites included in the SDiG Questionnaire.

12 The above figure refers to main offices included in the SDiG Questionnaire.

131

131

18

18

4 Royal Parks have

43

5 Offices are based at: Sanctuary Buildings, London; Caxton House, London; Castle View House, Runcor

53 These comprise FC England offices ( FCE and FC district offices/conservancies), Forest research offices

MoD estate classified as mixed or mainly non-office sites.


5

5 FTE staff based at each location is as follows: London (2 buildings) 2590; Runcorn 552; Sheffield 1822;

1473 For the purposes of this return, all our offices are being treated as main offices as we do not have the da
1

Yes reviewed and verified

0 The Royal Parks have 117 mixed or mainly non-office based sites

Yes - reviewed only

Yes - reviewed only

Yes reviewed and verified

989

Yes reviewed and verified

68 CPS 62, SFO 2 TSol 1 HMCPSI 0 RCPO 2 AGO 1


MoD estate classified as mixed or mainly non-office sites.
5

Outstations, depots, workshops, stores, laboratories, deer larders, 13 Forest Research Field Stations

Yes reviewed and verified

4 Hanslope Park (mixed), Lancaster House (conference centre), Carlton Gardens (Official Residence), WiYes reviewed and verified
0
238
0

72 This includes 38 main NPD offices.

<10

Yes - reviewed only

0 There are no mixed or mainly non-office sites included within the 5 buildings we are reporting on.

5 FC main offices in Cambridge, Bristol, Forest Research Alice Holt, and Northern Research Station Ros nk

378
1

99 This is an amalgam of all the departments.CPS 90, SFO 3, TSol 1 HMCPSI 2 RCPO 2 AGO 1

35

2 DFID has 2 main offices, and a third smaller office. DFID will be giving up the smaller office in London

1473
1 Although this response covers two sites for ECGD one of these is an archive warehouse rather than an off

1 The above figure refers to a non-office site included in the SDiG Questionnaire. The site mainly provide Yes reviewed and verified
735 This refers to Courts, Dwellings, Archive Storage and Tribunals. This approach has been carried throughou
Yes reviewed and verified

2 Royal Parks Royal Parks staff do not occupy all these buildings. There are no buildings with more than

81

Question:- Additional info about mixed and non-office sites

Question:- Do you carry out any


reviews and/or verification of your
data collection processes or systems?

Organisation

No
Yes reviewed and verified
Yes reviewed and verified

843 This includes 710 minor NPD premises - all of which are omitted from this questionnaire. We have 147 sign
Yes reviewed and verified

0 None of the LOD Departments have any mixed or non office.

Yes reviewed and verified

224 224 major sites on which we are focusing our environmental and energy activities (e.g., these are the si Yes reviewed and verified
1

Yes reviewed and verified

Question:- If yes,
is this conducted
internally or by an
Question:- Additional information
external party?

Question:- Do you
complete any verification
of performance data to
ensure accuracy and
completeness?

Question:- additional information

Question:- Is this
conducted
internally or
Question:- Additional information about internal or external
externally?

Question:- If you do not carry out any verification of systems or data, please explain why

Question:- Is the
performance data you
publicly report verified?

Internally

N/A

Yes

Organisation

Question:- Additional information about reviews and verifications

CO

Data collection processes and systems are reviewed and verified as part our Environmental ManagemenBoth

Data collection processes and systems are reviewed and verified internally and externally as part ou

Yes

Verification of performance data to ensure accuracy and completeness is undertaken as part of our E

DCA

All the data is reviewed by the central SD&E team before publication.

All utility invoices are checked and verified before payment internally. In addition, utilities for DCAHQ

Yes

Data that is provided for annual returns is all checked for accuracy. For example, energy figures reporte Internally

Yes

We verify to an extent internally. This involves carrying out a sense check on the data and a comparison Internally

DCLG
DCMS

Internally
DCMS -Data relating to energy is reviewed on a regular basis as part of DCMS's energy action plan TheBoth
Roy

DEFRA

DfES

Internally

DCMS- Facilities management company review data on a regular basis. The Sustainable Estate manageNot known

Internally

Data collection reviewed. Consideration of system verification to be considered as part of an intern

DfID

Yes

Both

Majority of data is verified internally. Water consumption is externally verified.

Yes

We expect that verification of performance data will be externally verified as part of our Environmen

Yes

See above

Yes

Not known

Not known

Internally

Yes

Statistics collected and checked.

Both

See above.

NA

N/A

No

Internally

Energy metered data is recorded by the Facilities Management Team. This is then reviewed at monthly cYes

As above

Internally

DfT

Internal review conducted, External verification exercise to begin in September 2006

Both

Internal review conducted, External verification exercise to begin in September 2006

Yes

Internal review conducted, External verification exercise to begin in September 2006

Both

Internal review conducted, External verification exercise to begin in September 2006

DH

Main DH: issues raised at monthly EMS meetings, and reviewed as necessary.

Internally

NHS PASA: Internal & external

Yes

Internally

NHS PASA: both Main DH: verified internally by comparison with earlier years, and with bill data (water/energy) NHS PASA: performance data verified as part of audit process.

DTI

With the exception of Insolvency service all are reviewed and verified. NWML engaged with Carbon Trust
Both

Both

Undertaken externally by those with ISO 14001 certification and internally by those without. Energy data NWML have only recently established a sustainable Development action plan and are reporting in a structYes

DWP
ECGD

Some data collection processes have been reviewed to provide improvements in the data collected. NotBoth
al
DWP, internal and external service providers are involved in reviews of systems and processes.
Yes
Not Applicable ECGD's operation is small, the amount of data collected is limited and the department is reasonably confid
No

Due to the nature of some data, it cannot be verified. Where practicable data is checked, mainly in relatiBoth
Data is checked both in-house and reconciliation exercises are carried out by internal and external auditors.
Not applicable
See previous answer above.

Yes
No

FC

Life Cycle Assessment study by BRE / Imperial College helped the assessment of significant impacts. Data
Both

The forest Estate is subject to external audit through the UK Woodland Assurance Scheme (UKWAS), whi
Yes

By comparing outputs with outcomes, this is often a monitoring and evaluation requirement for securing Both

Yes

FCO

Both

Yes

Both

FSA

Not Applicable

No

Not applicable

Internally
Internally

Yes
Not known

HMRC
HMT

Have reviewed energy monitoring data. Still establishing waste data collection systems.

HO

Practice varies across the estate but commonly energy, water, waste and procurement are reviewed onl Internally

LOD
MOD
ONS

Reviews are undertaken externally by those with ISO 14001 certification and internally by those without Yes

No

The performance of the forest estate in meeting the UKWAS Standard is audited and reported on external
NA

Yes

Yes

Yes
Don't publically report

For travel (fleet).

Internally
Not known

In process of improving our data management systems.

Yes
Not known

Practice varies across the estate but commonly energy, water, waste and procurement are reviewed onl Yes

Verification checks carried out on water, waste, energy. Discrepencies/anomolies are investigated.

Internally

For procurement - there is a resiliance on the manufacturer and industry watchdogs.

Yes

This answer may not be representative of all the departments responding. The CPS and TSol response is
Internally

CPS SFO TSol HMCPSI RCPO Internally.SFO Reviewed within the FM Section

CPS SFO HMCPSI Y / TSol RCPO AGO N . CPS Invoices are seen and data base is examined. SFO Acc
Internally

CPS SFO HMCPSI Internally. SFO within FM section

Some data reviewed by internal audit. Data sample verified by Enviros for MoD SD Report 2005. Data Both

Some data reviewed by internal audit. Data sample verified by Enviros for MoD SD Report 2005. Data Yes

Some data reviewed by internal audit. Data sample verified by Enviros for MoD SD Report 2005. Data Both

Some data reviewed by internal audit. Data sample verified by Enviros for MoD SD Report 2005. Data sample to be verified by Enviros for MoD SD Report 2006.

Both

Yes

Both

Yes

Tsol We moved to new premises in August 2005, which are service managed by the Landlords. Data is obta
Yes
Yes
Yes

Organisation

Question:- Additional information on public reporting

CO

N/A
Information is available to anybody upon request, annual report completed for Internal Use. In
addition, some performance data is placed on the DCA website.

Question:- If yes,
is this conducted
internally or
Question:- Additional information
externally?

Question:- If yes to any of the above, please provide details:

Internally

Data collection processes and systems will continue to be reviewed as part of the implementation of our EMS. We expect to seek verification of data collection processes and systems via external bodies as part of
our Environmental Management System (EMS). The EMS is based, or modelled upon, a recognised system and we are currently seeking certification of the EMS to ISO14001 environmental standards by the end of
2006.
The department provides returns to annual reports for DEFRA and BRE as well as reporting progress on the DCA SD web page. Prior to any data being published internal checks are carried out to satisfy senior
officers of accuracy and completeness.

DCLG

Internally

We verify to an extent internally. This involves carrying out a sense check on the data and a comparison with previous year's performance. If something looks unlikely we follow this up and ask the office in question
to double check. The cost of verifying externally is too sigificant so we carry it out internally.

DCMS

Not known

DCA

Internally

We expect that performance data we publicly report on will be externally verified as part of our Env

DEFRA

In previous years we have had SDiGQ data externally verified by independent consultants, but due
to delays in issuing the final questionniare, combined with structural changes within the department
we have not been able to do so this year.

Internally

DfES

This data will be verified as part of the Department's internal Sustainable Operations Management
System.

Not applicable

Majority of data is verified internally with water consumption externally verified.

DfID

Performance data is not publically reported. But the annual Departmental Report and annual
Resource Accounts contain a generic summary of how DFID is progressing towards the targets.

Not applicable

Energy metered data is recorded by the Facilities Management Team. This is then reviewed at monthly contractors meetings and is checked again on receipt of bills. Waste data is supplied by the waste contractors
but DFID do complete 6 monthly waste audits at both sites to ensure accuracy and completeness

DfT

Internal review conducted, External verification exercise to begin in September 2006

Both

Internal review conducted, External verification exercise to begin in September 2006

Internally

NHS PASA: Performance data verified as part of audit process, but published documents not independen
NHS PASA: Review of performance data collection and performance data is part of the internal and external audit processes carried out under the ISO14001 certified EMS

DH

DTI

Undertaken externally by those with ISO 14001 certification and internally by those without. Energy
data is checked by DTI HQ for the Agencies from annual utility returns.

Internally

DWP
ECGD

To a degree, as already detailed. Some data cannot be verified but figures in these circumstances
are subject to a sense check.
SD reporting focuses on policies and projects.

Both
Not applicable

FC

See above

Both

FCO

HMRC
HMT

HO

LOD
MOD
ONS

See answers against each section

Verification is limited to those areas where specific information is available. Energy data is checked where possible for the larger buildings. Smaller and multi occupancy sites are more difficult to obtain specific
information on. Further audits are being commissioned on various data streams.

See above

Forest Estate data is subject to an internal review and verification process, which is independently audited against the UKWAS Standard by SGS (accredited auditors). The whole forest estate is certified i.e meets
the Standard. Back-office functions are subject to internal auditing procedures.

All elements of the EMS at the London Offices are subject to internal and external audit. Hanslope Park is subject to internal audit at this present time and we hope to have external accreditation and auditing
processes by Autumn 2006.

Both

FSA

Internal review conducted, External verification exercise to begin in September 2006

Not applicable
Verified by PFI contractors.

Internally
Not known

The data for energy and water is verified by our PFI contractors as agreed with their suppliers. The data for travel (fleet) is verified by our Departmental travel unit in conjunction with our contracted suppliers.

Prisons report water consumption monthly. This is checked for consistency with previous performance and benchmarks. Prisons report energy consumption monthly. This is also checked for consistency with previous
performance and benchmarks. Across the HO for energy a check is also done with utilty company data from invoices etc. Establsihments with waste managment units provide quarterly returns reporting recycling
rates.

Internally

CPS Y / RCPO AGO N / SFO TSol HMCPSI Dont publicly report.


Internally
Data sample verified by Enviros for MoD SD Report 2005. Data sample to be verified by Enviros for
MoD SD Report 2006.
Both
Both

CPS Internally, SFO TSol HMCPSI RCPO NA. CPS See notes above

CPS See notes above SFO Comprehensive records of consumption allow trends to be identified and monitored. In the periods since monitoring began, we have detected a decrease in the amount of paper which is
ordered, and we have also maximised the amount of paper sent for recycling. We are now purchasing 100% recycled paper, however problems with the punched version jamming in machines has led us to switch
supplier to one using different production methods. HMCPSI Invoices checked against meter reads, peer reviewed and management checks

Some data reviewed by internal audit. Data sample verified by Enviros for MoD SD Report 2005. Data Some data reviewed by internal audit. Data sample verified by Enviros for MoD SD Report 2005, published 31 August 2006.
Each site Environmental Manager comletes EPIs and returns for aggregation and analysis by a specialist corporate Environmental Manager.Data is compared with previous data collated since 1997 and anomalies
are examined. Checks for consistency of source data is carried out as necessary and is examined by BSI inspectors as part of ISO14001 accreditation visits.

Question:A.1
Have you met
the A3 target
in this
reporting year
Organisation (2005-06)?
Question:- Additional information

Question:A.
2 Have you
met the A5
target in this
reporting
year (200506)?

Question:- Did
you meet the
A5 target by
the original
deadline?
Question:- Additional information Question A2

Question:A3.1 How does your department manage its EMS data? E.g. do you use the
Government EMS ENVOY tool, or any other tools? What does the EMS cover?

We manage our EMS using the Government EMS ENVOY tool. The EMS mainly covers our core central
N/ALo

CO

NO

We have implemented an EMS based, or modelled upon, a recognised system and are currently seekin
Yes

No

We currently publicly report on the sustainable development impacts of our estate operations via th

DCA

No

The department has been trialing EMSs at two of the largest sites. Although not accredited, an inter Yes

No

DCLG
DCMS

Yes
Yes

Yes
Royal Parks The eight London Royal Parks (Bushy, Greenwich, Hyde, Kensington, Regent's (with Pri NO

No
Yes

DEFRA

Yes

DfES

No

DFiD

Yes

By 31 March 2006, a total of 74 Defra and Executive Agency sites were covered by an EMS
modelled on ISO14001. This represents 85% by staff covered, and includes all main offices.
Although Defra (& EAs) is categorised as a mixed estate, a number of laboratories have been
certified to ISO14001 standard. Some land-managed sites (ex-FMD burial sites) have also been
independently certified to ISO14001. Sites have been excluded from scope if planned for disposal
in the short-term,
sites to
with
very
staff, minor
occupier
to an
OGD.
Software
was in place
use
butfew
a structured
approach
forstatus
an EMS
was
not. Environmental Impact Yes
Reviews have been completed for two HQ buildings that reflect the full estate. Findings indicate that
a change to procedures and methods of information gathering is required and this is in progress.
Yes

Yes

DfT

No

Following environmental impact assessments it was more sensible to concentrate efforts at those
sites where the most significant environmental impacts were occurring. Also, a number of our sites
are specialist, remote and usually un-manned and would require disproportionate effort to comply
with A3 and A5.. In light of the specialist nature of the DfT estate, our Executive Agencies have
developed programmes to ensure EMS coverage at appropriate sites and to extend coverage to the
rest of the estate where sensible to do so. For example the DVLA EMS is being extended to their 50
local offices during 2006.
No

DH

No

DH/MHRA: We have an EMS in those buildings where we have control of utilities, and which we are re
Yes

DTI
DWP
ECGD
FC

NO
Yes
NO
No

FCO
FSA

Yes
Yes

HMRC
HMT

No
Yes

HO

Question:- Additional information A3.1

Question:A3.2 April
2005 - March 2006:
Please state how
many of your main
offices have an
EMS certified to a
recognised
standard e.g.
ISO14001, EMAS

Question:April 2005 March 2006:


Question:- April Please state
2005 - March
how many
2006: Please
of your
state how many main offices
of your main
are
offices have a currently
non-certified
implementin
EMS
g an EMS

The department reports on progress towards sustainable targets on the DCA website, through SDiG and
Currently the data for the EMS is kept electronically on a shared drive. Plans to use Entropy at some sites are being considered.

All of the estate uses web based software, ENVOY to host its EMSs.
Royal Parks System verification happens both internally (via an independent IEMA registered EMS audito
DCMS has a paper based system and it covers water, energy, waste. The Royal Parks do not use ENVOY. All central EMS procedures are held on a networked Public Folder. Specific data for areas su

4
1

14
2

0
2

Yes

23

27

Yes

DfES website recently reviewed and updated. The DfES Sustainable Development Action Plan is alsoWe are developing a Sustainable Operations Management System (SOMS) during this financial year that will be based on ISO14001:2004 standard. Our developing EMS will cover all aspects of the new

Defra and Executive Agencies use the Government EMS ENVOY tool to manage EMS data. This facilitates exchange of best practice among participating sites, and enables the independent certifying body

Yes

DFID's annual Departmental Report and annual Resource Accounts contain a generic summary of how
DFID uses word and excel documents for our EMS. The EMS covers travel, water, waste, procuremenDFID did give careful consideration to Envoy but as we only have the two UK main offices, it was not

No

Following environmental impact assessments it was more sensible to concentrate efforts at those siteWe would not regard the Envoy system as being the 'Government EMS' but do use a combination of Envoy and other electronic methods to manage our EMS data. Our EMSs typically cover office based impact

18

28

Yes

5
88
0
0

9
1359
1
0

1
26
0
0

Main DH: Our EMS covers water, energy, waste, timber procurement. We were using ENVOY, but are now migrating to a system using in house online tools. NHS PASA: The EMS covers all aspects of

Yes
Yes
Not known
Yes

No
Yes
Not known
Yes

Yes
Yes

Yes
1 out of 4 of our mixed sites (Hanslope Park) has an uncertified EMS, however that 1 site houses 91%We operate a paper-based EMS. The scope of the EMS includes water services, waste, energy, biodiversity, procurement, estates management, travel and transport.
Not applicable
Aviation House uses the Government EMS ENVOY tool

2
0

0
1

0
0

Yes
The Treasury upgraded it's EMS during this period in response to a Carbon Trust recommendations YES

Yes
Not known

We publicly report on our significant impacts through SDIG and Annual Sustainable Development repoWe are approaching environmental management through corporate management of our significant impacts energy and water use, waste management and procurement. We have maintained ISO 14001 on our New
The Treasury uses the EMS ENVOY tool

1
1

0
0

0
0

NO

Target was met in part. See comments at 3.10 below.

Yes

Yes

An Annual Sustainable Development Report has been produced since 2000 setting out progress in the
Varies
p
across the estate - some are accredited, others are based on an accredited system. EMSs typically cover energy, waste, water, fuel storage, hazardous materials, procurement, site incidents, air em

33

LOD

No

SFO Y / CPS TSol HMCPSI AGO N / RCPO NA

Yes

Yes

this reporting year.CPS TSol AGO Y / SFO HMCPSI N / RCPO NA / . Original deadline-TSol Y / CPS CPS We have access to the EMS Envoy tool.Our EMS would cover Utilities, travel, waste, pollution, purchasing and contract management, refurbishment and construction. SFO The SFO uses in house des

MOD

Yes

Based on a figure calculated as an average of data provided across MoD.

Yes

Yes

MoD SD Report and Action Plan published at http://www.mod.uk/DefenceInternet/AboutDefence/WhatWe are conducting pilots of two electronic-based EMSs and to develop corporate EMSs to help support the development of EMS and to provide the mechanisms to collect accurate and timely MoD wide N/A

ONS

Yes

Yes

Not known

EMS process initiated in 05-06

Original Deadline met by main Dept and all major agencies

DTI and its agencies all use Envoy. Each agency is autonomous in nature and similarly have stand alone EMSs. Each EMS within the agencies and DTI HQ covers the Estates and facilities management
DWP has been exploring alternative products to ENVOY to better suit its operational requirements. A database is now in the process of being constructed. DWPs EMS covers all office based activities.
ECGD's main office has an EMS operated by the building managers for this multi tenant site. This EMS covers 98% of staff but is not certified.
SD impacts on the forest estate publicly reported through relevant Environmental Impact Assessme Forest Estate subject to the UKWAS Standard.

Use web based ENVOY system. Covers all clauses of ISO14001.

N/A

N/A

Question:April 2005 March 2006:


Please state
how many of
your main
offices are
considering
or planning
Organisation an EMS

Question:- April
2005 - March
Question:2006: Please
April 2005 state how many
March 2006:
of your main
Please state
offices have no
how many of
information
your main
available
offices have no regarding an
EMS
EMS

Question:- If necessary, please provide additional details about your previous answers.

Question:A3.
3 April 2005 March 2006:
% of main
offices with
an EMS
based on a
recognised
standard?

DCA

125

DCLG
DCMS

0
0

0
0

100
3

45
3

DEFRA

53

48

DfES

0 We aim for a Departmental approach rather than site specific. Our Sustainable Operations Management

DFiD

0 The EMS covers the UK estate at present. We are planning to start the implementation of an EMS at t

DfT

33

DH

1 No EMS in two buildings (HANH & EH) that are now closed. No information on MT (building is landlor

83

DTI
DWP
ECGD
FC

0
0
0
5

1
0
0
0

0
0 85 offices in DWP, Jobcentre Plus South East are certified to ISO14001. 3 HSE headquarters buildin
0
0 As part of our on-going SD project, FC are in the process of implementing EMS's for all their main

88
100
0
0

88 EMSs based on Entropy and written to ISO 14001 standard. Although only DTI HQ and Companies ho
100
0
0

83
100
0
0

Difficult to calculate: some staff moved from building with no EMS (EH) to NKBH (managed by
41 HMRC). Others (MHRA) moved from HANH (no EMS) to MT (landlord controlled)
Data not presented in this way before and we do not have the past figures available. * Estimate
83 assuming little change in the past year.
100
0
0

FCO
FSA

0
2

0
3 NK

0
Scotland and Northern Ireland Offices are considering ISO14001, so therefore will be looking at an E

100
100

100
100

100
100

100
100

0
0

0 The EMS at the Newcastle Estate covers 17,000 staff on five sites. A corporate EMS is being develop
0 HM Treasury is now ISO14001 certified for the entire building.

1
100

17
100

13
73

HO

38 NK

LOD

61

MOD

ONS

N/A

NK

N/A

One region is currently considering a regional EMS, which would cover 3 offices and 38 non-office sit

21

Within the NOMS office estate there are no EMSs at present. An environmental consultant was appoi

N/A

100
100

100

Data for 04-05 can be found here: http://www.sdcommission.org.uk/watchdog/rawdata.php

N/A

N/A

100

Data for 04-05 can be found here: http://www.sdcommission.org.uk/watchdog/rawdata.php

70

1 0.5 is actual figure for Apr 2005-2006 % of main offices with an EMS based on a recognised standard
50 This includes the HMRC occupation of the building
NK

100

N/A

This information is not held in this way for 2004/05

76

62 EMS in Reading,Chester, SKH, WEL, RH No EMS in MT (landlord controlled)

N/A

100

0
0

35

0
0

0
0

0
0

na

na

NK

NK

NK

MoD estate classified as mixed.

100

0
2

na

N/A

0
8

0
Staff at NPD offices are local authority employees, not civil servants: to enter a value of 0 for those
offices produces a misleading result.

NK

MoD estate classified as mixed.

Question:April 2005 March 2006:


Please state
how many of
your other
offices/sites
are currently
implementing
an EMS

0 See above. Once fully in place the SOMS will cover all staff.

100

46 NK

Question:April 2005 March 2006:


Please state
how many
of your
other
offices/sites
have a noncertified
EMS

52
50

79 NK

100

N/A

71% N/A

Question:A3.5 April
2005 - March 2006:
Please state how
many of your other
offices/sites have an
EMS certified to a
recognised standard
e.g. ISO14001,
EMAS

47

0 See above. Once fully in place the SOMS will cover all main offices.

100

N/A

75%

0.25 Last year DCA failed to report on National Archives and Land Registry. We therefore do not have acc

MoD estate classified as mixed.

53% N/A

Question:- If necessary, please provide additional details about your previous answer.

378
0

60%

Question:- April 2004 March 2005: % of staff


covered in main offices by
an EMS based on a
recognised standard. (To
calculate, please use the
FTE number of staff based
in offices rather than total
estate FTE figure)

CO

HMRC
HMT

0 N/A

Question:- April
2004 - March 2005:
% of main offices
with an EMS
based on a
recognised
standard?
Question:- If necessary, please provide additional details about your previous answer.

Question:A3.4 April 2005 March 2006: % of staff


covered in main offices by
an EMS based on a
recognised standard. (To
calculate, please use the
FTE number of staff based
in offices rather than total
estate FTE figure)

N/A

N/A

N/A

Question:- April
2005 - March
2006: Please state
how many of your
other offices/sites
are considering or
Organisation planning an EMS

Question:April 2005 March 2006:


Please state
how many of
your other
offices/sites
have no EMS

Question:- April
2005 - March 2006:
Please state how
many of your other
offices/sites have
no information
available regarding
an EMS
Question:- If necessary, please provide additional details about your previous answers.

Question:A3.
6 April 2005 March 2006:
% of other
offices/sites
which have
an EMS
based on a
recognised
standard?

Question:April 2004 March 2005:


% of other
offices/sites
which have
an EMS
based on a
recognised
standard?

CO

N/A

N/A

N/A

N/A

N/A

N/A

DCA

We have classified all sites that are not main offices as mixed or non-office.

Question:- April 2004 March 2005: % of staff


covered in other
offices/sites by an EMS
based on a recognised
standard. (To calculate,
please use the FTE
number of staff based in
offices rather than total
estate FTE figure)
Question:- If necessary, please provide additional details about your previous answer.

N/A

N/A

N/A

N/A

Last year DCA failed to report on National Archives and Land Registry. We therefore do not have this information.

0
0

0
0

DEFRA

0 NA

0 See above. By concentrating on introducing EMS at major sites (50 or more staff) we have focussed on

0 See above

DfES

0 We have no other offices/sites to be reported upon and so this question is not applicable to our Depa

0 See additional details provided in A3.5 above. We do not have any other offices/sites and so the ques

0 See additional details provided in A3.5 above. We do not have any other offices/sites and so the ques

DFiD

0 N/A

0 N/A

DfT

0 Data for 04-05 can be found here: http://www.sdcommission.org.uk/watchdog/rawdata.php

DH

DTI
DWP
ECGD
FC

0
0

0
0

53

53

NA

0 The remaining DTI and agency locations have on average less than 50 persons and there is no inmedia
0
53

0
100

12

12 Sheffield/Normanton (NHS PASA)

na

na

HO

NK

NK

NK

LOD

29

N/A

N/A

0 NHS PASA: 51 staff in minor offices covered by EMS (both 2004-5 and 2005-6) Main DH: considerabl

0
0

0 as above
0

0
na

NK

NK

MoD estate classified as mixed.

N/A

Not Known

N/A

na

NK

NK

N/A

100

The FCO does not have any 'other offices/sites' in the UK .

na

N/A

Data for 04-05 can be found here: http://www.sdcommission.org.uk/watchdog/rawdata.php

0 As Above
0

Not Known for all questions

0
100

The FCO does not have any 'other offices/sites' in the UK .

3 NK

300

0
100

0
0

The FCO does not have any 'other offices/sites' in the UK .

na

ONS

We have explained under estate Background, which sites have been excluded from coverage of this q

17 These figures relate to a number of minor buildings that are elsewhere shown as omitted from estate

HMRC
HMT

MOD

0
100

Last year DCA failed to report on National Archives and Land Registry. We therefore do not have accu

DCLG
DCMS

FCO
FSA

Question:- If necessary, please provide additional details about your previous answer.

Question:A3.7 April 2005 March 2006: % of staff


covered in other
offices/sites by an EMS
based on a recognised
standard. (To calculate,
please use the FTE number
of staff based in offices
rather than total estate FTE
figure)

MoD estate classified as mixed.

0 Accreditation obtained at Christchurch archive site in February 2006

N/A

Not Known

N/A

100

MoD estate classified as mixed.

Question:April 2005 March 2006:


Please state
how many of
your mixed /
mainly nonoffice sites
are currently
implementing
an EMS

Question:April 2005 March 2006:


Please state
how many of
your mixed /
mainly nonoffice sites
have a noncertified EMS

Question:April 2005 March 2006:


Please state
how many of
your mixed /
mainly nonoffice sites are
considering or
planning an
EMS

Question:- April
2005 - March
2006: Please
state how many
of your mixed /
mainly nonoffice sites have
no EMS

Question:- April
2005 - March
2006: Please
state how many
of your mixed /
mainly non-office
sites have no
information
available
regarding an EMS Question:- If necessary, please provide additional details about your previous answers.

N/A

N/A

N/A

Question:A3.11
April 2005 March 2006: %
of mixed /
mainly nonoffice sites
with an EMS
based on a
recognised
standard

Question:April 2004 March 2005:


% of mixed /
mainly nonoffice sites
with an EMS
based on a
recognised
standard

Question:A3.8 Where your main/other offices include multi-occupancy buildings please


describe how you contribute to their EMS e.g. whether you run your own EMS or if it is
Organisation shared or whether you are subordinate to someone elses EMS.

Question:A3.10 April
2005 - March 2006:
Please state how
many of your mixed /
mainly non-office
sites have an EMS
certified to a
Question:A3.9 Do you have any mixed or non-office recognised standard
sites?
e.g. ISO14001, EMAS

CO

N/A

Yes (please answer the questions in A3.10 to A3.13)

1 N/A

DCA

Currently the data for the EMS is kept electronically on a shared drive. Plans to use Entropy at some Yes (please answer the questions in A3.10 to A3.13)

38

696

DCLG
DCMS

All sites run their own EMS


N/a

Yes (please answer the questions in A3.10 to A3.13)


Yes (please answer the questions in A3.10 to A3.13)

DEFRA

Where we share office buildings with OGDs and they are the major occupier, they manage the EMS on
Yes (please answer the questions in A3.10 to A3.13)

10

DfES

As the main occupier in all buildings where accommodation is shared, OGD and Private Sector occupiNo (please skip questions A3.10 to A3.13)

DFiD

N/A

DfT

We work with the major and other occupiers in the building and aim to comply with existing EMS objectives but only where it is compatible with our own activities / operations. . This arrangement has worked well at some sites (As

DH

Quarry House: DWP is major occupier; DWP EMS covers whole building (DH space is 14,872m2) NeYes (please answer the questions in A3.10 to A3.13)

0 Only 29 people altogether working in our three non-office sites (Departmental Records Office, Prem

DTI
DWP
ECGD
FC

In general, EMS systems relate to DTI and Agency operations and are not subordinate or shared.
Yes (please answer the questions in A3.10 to A3.13)
Where DWP is a minor occupier, staff are encouraged to contribute to the major occupier initiatives. No (please skip questions A3.10 to A3.13)
ECGD's main office is a multi tenant site with an EMS operated by the building management company.
Yes (please answer the questions in A3.10 to A3.13)
Shared offices will be subject to their own EMS in the future, as part of the overall FC SD strategy
Yes (please answer the questions in A3.10 to A3.13)

60

60

0
0

0
0

0
0 nk

0
0

FCO
FSA

N/A
NA

Yes (please answer the questions in A3.10 to A3.13)


No (please skip questions A3.10 to A3.13)

HMRC
HMT

HMRC staff would fully support the main occupants EMS arrangements.

Yes (please answer the questions in A3.10 to A3.13)


No (please skip questions A3.10 to A3.13)

HO

Varies across the estate. Eg IPS run their own EMSs in multi-occupancy buildings but within the ma Yes (please answer the questions in A3.10 to A3.13)

LOD

CPS We would support the major occupier in their EMS. SFO we run our own EMS systems. TSol WeNo (please skip questions A3.10 to A3.13)

MOD

MoD estate classified as mixed.

ONS

N/A

6%

Question:- If necessary, please provide additional details about your previous answer.

6% N/A

0 Following the transfer of the magistrates court from the local authorities to DCA ownership, legal issues are still outstanding before a

Actual figure is 1 of 696 site = 0.15%

50
0
All non-office sites are covered by ISO 14001such as: Brompton Cemetery, Grosvenor Square Gardens and Victoria Tower Gardens. There are areas managed by the Royal Parks such as numbers 10, 11 and 12 Downing Street Gardens but they do not come under the scope of I

No (please skip questions A3.10 to A3.13)

Yes (please answer the questions in A3.10 to A3.13)

No (please skip questions A3.10 to A3.13)

NK

NK

NK

989

1
nk

NK

This information can only be provided at disproportionate effort and is of limited value in that we will not be implementing EMS at all

nk
3

NK

0 1 out of 4 of our mixed sites (Hanslope Park) has an uncertified EMS, however that site houses 91%

0
0 no data available on non-office sites

25

NK

Yes, we have a number of sites at airports and harbours, e.g. Dover Eastern Docks, where we have aNK

11

133

0 NK

The Prison Service achieved ISO 14001 at two prisons and at the Prison Service College at Newbold Re

12

151

95

33

11 N/K

>80

25 1 out of 4 of our mixed sites (Hanslope Park) has an uncertified EMS, however that site houses 91%

NK

17

Data for 04-05 can be found here: http://www.sdcommission.org.uk/watchdog/rawdata.php

NK

1.5 2% of prison staff are in prisons certified to ISO14001. A further 15% of staff are in prisons covered

66 EMS are produced in accordance with MODs own EMS standards in Joint Service Publication 418 - SD

Question:A3.12 April 2005


- March 2006: % of staff
covered in mixed / mainly
non-office sites by EMS
based on a recognised
standard (To calculate,
please use the FTE
number of staff based in
mixed/non office sites
rather than total estate
Organisation FTE figure)

CO

N/A

DCA

Question:- April 2004 March 2005: % of staff


covered in mixed /
mainly non-office sites
by EMS based on a
recognised standard (To
calculate, please use the
FTE number of staff
based in mixed/non
office sites rather than
total estate FTE figure)
Question:- If necessary, please provide additional details about your previous answer.

N/A

Question:A3.13 Where your mixed / mainly non-office sites include multi-occupancy


buildings please describe how you contribute to their EMS e.g. whether you run your own
EMS or if it is shared or whether you are subordinate to someone elses EMS.

Question:- Please use this space to provide additional information that you feel is essential
for us to know. For example, your overall approach in this area, barriers to progress and
significance to your business.

N/A

N/A

The Cabinet Office will undertake an on-going system of environmental impact monitoring,
management and improvement. As part of the EMS we will set local targets and report publicly on
progress towards achieving these and the challenging objectives and targets set for the Government
Estate. The EMS and its monitoring will be externally validated annually.

Actual figure is 900 of 24969 sites = 3.6%

The biggest problem that we have in implementing EMSs across our 800+ sites is the resource
implications in putting the EMS in place and maintaining the documents in the initial period leading
to an audit. Sites are not provided with a budget for this and there are no internal resources
Our non-office shared sites are usually courts, sometimes shared with local authorities or police. Wheavailable.

DCLG
84
0
bers 10, 11 and 12 DowningDCMS
Street Gardens but they do not come under the scope of ISO 14001

n/a - run their own EMS

It has been a struggle finding the resource to take responsibility for this area of work, particularly
with the Government Office Network.

DfES

The development of a Sustainable Operations Management System (SOMS) will allow DfES to: Prioritise and set site specific actions for meeting the new targets; - Deliver quick wins as well as
It
has proved
difficult(sustainable
to provide information
broken
in the- Transparently
way that is requested,
where this
longer
term benefits
development
and down
financial);
review and
Where we share office buildings with OGDs and they are the major occupier, they manage the EMS on
detail was notsustainable
requested in
the 2004/05achievements;
questionnaire.- Easily maintain it. The SOMS will illustrate,
demonstrate
development
at an operational level, how the Department will meet the DfES Sustainable Development Action
Plan and Framework Targets. We are working with consultants to achieve this.

DFiD

N/A

DEFRA

82

DfT

Data for 04-05 can be found here: http://www.sdcommission.org.uk/watchdog/rawdata.php

DH

DTI
DWP
ECGD
FC

45

45

FCO
FSA

91

HMRC
HMT

0
0

NK

HO

91

ONS

n/a

HMRC staff would fully support the main occupants EMS arrangements.

1.5 2% of prison staff are in prisons certified to ISO 14001. A further 15% of staff are in prisons covere

We consider that implementing a Corporate EMS will help us to meet current Sustainable
Operations targets and lead to an overall improvement in our performance.We have had difficulties
in gaining the full co-operation of our main PFI contractor for our environmental management
objectives. It has been difficult to gather data and co-ordinate activity on EMS work, which has been
a real barrier to progress. However, a new contractor has now taken over facilities management and
is currently developing systems and processes to support the Department in progressing our
environmental agenda.

The non-office estate comprises prisons and these are not multi occupancy buildings. The FSS plans to run its own seperate EMSs in shared occupancy buildings.

None of the LOD Departments have any mixed or non office sites. CPS Implementation of our EMSs
has been delayed due to internal reorganisation of our Facilities Management Unit. This has resulted
in a transfer of responsibility for the implementation and a skills gap which needs to be addressed.
SFO Being a small department at two locations next door to each other, we can accurately take
readings and analyse trends which can be quickly transferred to a spreadsheet. We are able to
suggest changes which can be quickly considered by management. We are also able to keep
bureaucracy to a minimum. HMCPSI Scarce resources make it difficult to take this forward for
example the listed status of 26/28 Old Queen Street. TSol We moved to new premises in August
2005, which are service managed by the Landlords. We have not yet managed to build an EMS
system with the Landlords, but there are plans do so over the coming year.RCPO na.

LOD

MOD

DH: We have struggled somewhat to get the EMS itself in place. We were using the Envoy EMS
management tool, but found it to be too inflexible. We are in the process of migrating our data to an
inhouse online tool. We see this as an interim measure, pending a major new FM contract to be
introduced May 2007 which will incorporate a requirement for a robust EMS. NHS PASA: The EMS
is central to ensuring that the Agency maintains consideration of environmental and sustainable
development throughout its operations and decision making processes. The future development of
the system will see a broadening of focus to consider wider sustainable development aspects
alongside Environmental aspects.
Envoy is a workable product but has a number of limiting factors. It is quite cumbersome and time
consuming to use. Resourse, qualified or not, along with funding remains an issue.

N/A

NK

14

Where EMSs already exist or are planned we would aim to comply with all objectives that are compatible with our own activities / operations. .

Not applicable

0
0 no data available on non-office sites

DFID made a firm committment to the environment from the outset of the major refurbishments to
the UK estate. We achieved a "very good" and an "excellent" BREEAM rating for the design of the
London and East Kilbride offices.

N/K

N/K

We are continuing to explore options for provision of an electronic reporting system and to develop
corporate EMSs to help support the development of EMS and to provide the mechanisms to collect
accurate and timely MoD wide data. We continue to roll out site based EMSs across our
This figure is especially hard to calculate especially given movement of service personnel on active d EMS are produced in accordance with MODs own EMS standards in Joint Service Publication 418 - organisations.

Question:- Please outline any examples of what you consider to be good practice in the way that you manage your EMS and/or undertake monitoring and
Organisation reporting Should your information be selected to be highlighted as a case-study in the report, we will contact you for further information.

CO

We feel that to have a good EMS you must have good data collection and monitoring systems in place. Therefore, and in partnership with our Total Facilities
Management Provider, we appointed a dedicated Energy Manager whose first job was to build on and improve existing data collection and monitoring systems. We now
have comprehensive data collection and monitoring systems in place in respect of utility usage and expenditure which allows us to identify opportunities for
improvement. These systems will be reviewed on a regular basis.

DCA

DCLG
DCMS

DEFRA

We have gained the support of a Director General (SOB rep Peter Unwin)to write to all CE and RD of the Government Office Network requesting that they take note of
the new targets and assign appropriate resources to achieving them. Internally, we have rolled out bespoke, on-site EMS and ENVOY training to all of our sites to
ensure we met the EMS target. We have also co-ordinated the use of ENVOY across the whole of the estate, for all EMS to ensure a consistant approach to data
collecting. We organised an in-house auditor training course for all sites so each site has a qualified EMS auditor. We have also promoted auditors visiting each others
sites to offer 3rd party audits to widen their auditing experience.

In addition to our office sites, and non-office sites (laboratories etc) we have also sought certification to ISO 14001 for several land managed sites, which the department
used during the Foot & Mouth Disease outbreak in 2001/02. These sites have been very sensitively managed to eliminate risk of ground contamination and promote and
enhance biodiversity. Four sites have acheived certification to ISO 14001. Defra is working with the local Wildlife trust to manage the Watchtree site in Cumbria.

DfES

DFiD

DFID has implemented an EMS at both UK offices. As well as the Environmental team managing our environmental impacts, we have also included environmental
clauses in the Facilities Management contracts at both sites. This means that all data is checked by the Facilities Management team and cross-checked by DFID and is
reported on and discussed formally at each monthly meeting.

DfT

The Vehicle and Operator Services Agency have carried out initial assessments at 20 of their non-office sites. The assessments have identified five clear trends which
have helped in the roll out of further assessment and with the development of specific local site targets and will in due course lead to national targets being developed
for the whole of the Agency estate. The EMS will be largely electronic with local intranets being used to hold data and communicate information. The Highways Agency
are developing an FM contract specification which will require the FM provider to use a recognised EMS. In addition the Agency is working with their FM providers to
ensure their EMS is modelled on the ISO 14001 standard. The Driving Standards Agency is currently trialling a recording scheme in a number of Driving Test Centres to
see how much time it takes and whether this can be extended to cover all Driving Test Centres. The Agency is also looking at ways in which a partial EMS could be
introduced at the Area Offices where they have very few staff or are minor occupiers.

DH
DTI
DWP
ECGD
FC
FCO
FSA

HMRC
HMT

NHS PASA: The EMS is closely aligned with other management systems and integrated with normal working practice across the Agency.
A consistent standard achieved in EMS structure across the DTI and Agency estate. The main HQ estate EMS encompasses also ICT, File store, reprographics and all
facility Management service providers and contractors

The EMS team has expanded from 1 FTE equivalent to 2.5 FTE equivalents, and we now only operate one EMS over our three main sites. This permits more effective
administration, and allows the Environmental Manager to concentrate on the delivery of sustainable operations outcomes.

The EMS at Newcastle Estate is supported by a number of different government departments as well as their PFI and IT contractors.

HO

MOD

HMCPSI Regular reporting of Sustainable Development issues to senior management. Introduction of water coolers that run off the mains rather than having water
delivered. Switching to renewable energy sources for electricity. 100% recycled paper for office use and introduction of recycling practices for paper, tins, can, plastic and
glass bottles. Sourcing recycled products wherever possible. We encourage our staff to cycle to work and offer onsite shower facilities for this reason.
within 18 months of signature. The Army is about to launch their activity based EMS for Army Sites (EMSAS) which outlines the methodology for Army units to
implement EMS. This EMS is different but complementary to the methodology set out in JSP 418. This methodology provides standard sheets to manage up to 19
activities that are commonly found at Army (regular and TA) units, which could have an impact on the environment. The EMSAS methodology simplifies the EMS
process in as much as removes the requirement to assess the environmental risk associated with activities. Instead EMSAS asks units to confirm whether they have
specified activities and, if so, to follow instructions regarding meeting MOD targets and good practice. The benefits of the EMSAS include: Co-ordinated actions to
protect the environment; Improved awareness and response to MOD targets; Better instructions regarding the management of environmental issues; and Less
paperwork, filing and bureaucracy. Where a unit has identified an activity is present, the corresponding leaflet within EMSAS outlines mandatory actions (Requirements
and Actions Plans) and a series of good practices. Electronic access to the EMSAS will be available.

ONS

Each of our six sites has its own environmental manager. Each site environmental manager completes a EPI spreadsheet and return for aggregation and analysis by a
corporate environmental manager. Data is compared with previous data collated since 1997 and anomalies examined. Checks for consistency on source data is carried
out as necessary and is examined by BSI inspectors as part of ISO14001 accreditation visits.

LOD

Organisation

Question:B.1 The
question refers to
the B1 target.
Have you met the
target in this
reporting year
(2005-06)?

CO

Not applicable

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
Question:B1.1 For Question:- April
The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants caused by travelling, wherever
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
2002-03 (Baseline): 2005 - March
reasonably practical to do so. The Cabinet Office owns 2 hybrid road vehicles (cars) used for Government administrative operations.
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
What was the total 2006: What was
The other road vehicles are owned by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
number of
the total number of carbon emitted by these journeys, through supporting innovating projects, such as green
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only undertake business travel if there are no
vehicles
in
fleet
of
vehicles
in
suitable and practical alternatives available, such as video-conferencing facilities. If no suitable and practical alternatives are available
technologies and renewable energy projects that will reduce associated carbon emissions and act
fleet (on March
Cabinet Office employees will use the least polluting forms of transport, wherever reasonably practical to do so. We will use air miles as (on March 31st
as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
Question:- If necessary, please provide additional details about your previous answer.
2003)?
31st 2006)?
Question:- If necessary, please provide additional details about your previous answers.
a surrogate measure of pollution emissions as these are by far the biggest component of our impacts. Cabinet Office Ministers and
working in central London, travel to and from work by public transport. Some employees travel to
officials sometimes have to travel by air to undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
amount of carbon emitted by these journeys, through supporting innovating projects, such as green technologies and renewable energy
following measures: No car parking facilities are provided for employees. Some car parking is
projects that will reduce associated carbon emissions and act as a counter balance. Travel to and from work The vast majority of
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
Cabinet Office employees working in central London, travel to and from work by public transport. Some employees travel to work by
showers are available in the vast majority of buildings.
Interest free loans are available for
bicycle and motorbike. Travel to and from work by car is actively discouraged by the following measures:
No car parking facilities
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
are provided for employees. Some car parking is available for Ministers, operational vehicles and disabled employees.
Bicycle
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
parking and showers are available in the vast majority of buildings. Interest free loans are available for purchasing bicycles and
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
equipment. Ministerial / senior official and operational vehicles The small number of vehicles in operation are owned and managed by
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
the Cabinet Offices primary service providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
that all vehicles owned and managed by our service providers use alternative fuels or are the most
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure that all vehicles owned and managed
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
by our service providers use alternative fuels or are the most fuel efficient available., wherever reasonably practical to do so. When
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
hiring, staff will choose vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our primary service
primary service providers and the contractor responsible for providing self-drive hire cars to review
providers and the contractor responsible for providing self-drive hire cars to review technological developments with a goal of moving to
technological developments with a goal of moving to zero emission vehicles, as soon as practically
zero emission vehicles, as soon as practically possible.
N/K
11 possible.

DCA

No

Due to and increase in cars, following over 100 cars transferring from Local Authority Distinction, carbon emissions from road transport
has actually increased this year.

571

Baseline data for Land Registry not included in this answer. In addition there has been an increase
809 in cars due to transfers from local authorities.

DCLG

Yes

Most of the estate have systems in place to collect the data required, however this is a fairly inconsistance area of data as offices are
collecting different information depending on the travel suppliers they are working with and also the expense claims procedure.

116

139

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoQuestion:B1.2
conferencing facilities. If no suitable and practical alternatives are available Cabinet Office
For 2002-03
Question:- For
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
(Baseline): What
2002-03 (Baseline): Question:- April 2005 Question:- April
Question:- April 2005 will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
was the number Question:- For 2002-03 What was the
- March 2006: What
2005 - March 2006: March 2006: What
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
of vehicles in
(Baseline): What was number of vehicles was the number of
What was the
was the number of
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
fleet which were the number of vehicles in fleet which were vehicles in fleet
number of vehicles vehicles in fleet which of carbon emitted by these journeys, through supporting innovating projects, such as green
owned cars (on in fleet which were
other vehicles; e.g. which were owned
in fleet which were were other vehicles; technologies and renewable energy projects that will reduce associated carbon emissions and act
March 31st
leased cars (on March vans, trucks (on
cars (on March 31st leased cars (on
e.g. vans, trucks (on as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
2003)?
31st 2003)?
March 31st 2003)? 2006)?
March 31st 2006)? March 31st 2006)?
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
N/K
N/K
2
0
9 possible.

311

260

217

592

24

33

324

117

Baseline data for Land Registry not included in this answer. In addition there has been an increase
in cars due to transfers from local authorities.

84 We have data gaps for previous years as there was an incomplete set of data for travel

Re Royal Parks New 1.8 litre Euro 4 engines introduce 2005 produce CO2 emissions of 167g/km, which will lead to a 10 15%
reduction in CO2 emissions

128

219

27

711

65

683

27

Information on the number of other vehicles (vans, trucks) for 2002-03 was not separately identified
7 and so has been included within the total number of cars.

DFiD

Not known

No data available for 2002/2003

DfT

No

See explanation below.

711

65

DH

Not known

We do not have data for 2002/3, and do not have a baseline against which to measure current performance. However, the substantial
growth in use of VCs, and the virtual abolition of the DH lease car fleet, suggests that we may have met the target.

146

Yes

HO

LOD

MOD

ONS

2852
1

618

146 2002/3 - information not available 2005/6: 143 NHS PASA 3 Main DH 0 MHRA

NK

4633

4464

Not known

So much more data is available now compared with the baseline year that it is not possible to make a meaningful comparison.

1387

No

This reporting year.CPS SFO TSOL HMCPSI RCPO AGO N Tsol does not operate fleet vehicles. Travel is carried out using public
transport or the GCDA. The GCDA are unable to provide us with any supporting information RCPO We did not exist in 2003 but are
keeping our situation under review. We do not have a vehicle fleet. AGO The department does not own or lease any vehicles. Taxis are
used occasionally but we do not hold any data on the length of journey.

20

11,808

14

0 Treasury owns no vehicles

The Forensic Science Service has a separate fleet of around 170 vehicles, nearly all of which are
1467 leased cars. No figures on mileage are available.

CPS These fleet vehicles are leased to the CPS. SFO We do not maintain a car fleet, it encourages
the use of smaller hire cars and has publicised the availability of dual powered cars. This facility is
publicised on an annual basis. TSol We do not have any fleet vehicles. HMCPSI AGO We do not
18 operate a fleet of cars and encourage staff to use public transport

UK White Fleet Contract only excludes operational logistical support vehicles, plant & armoured
vehicles. Baseline data revised to cover UK based passenger vehicle fleet provided under UK White
13,527 Fleet contract only.

14

0
1

192

16
NA

Owned vehicles assumed that each person claiming mileage is equal to one car. These are
individually owned vehicles. 2002/03 lease car data only available. Previous travel targets did not
0 require number of owned vehicles.

445

0
NA

25 All vehicles are purchased outright and owned.


NA

NK

NK

2832
1

644

41
0

2002/3 - information not available 2005/6: NHS PASA: 120 leased cars at start of year; 143 leased
cars at end of year (average 131.5). Main DH: 3 leased cars and 6 other vehicles (see above)
140 MHRA: Nil

134

1500

1495

Figures by month for fleet vehicles. All details added together and divided by 12 for average 05/06
fleet figure. Apr 05 2673 May - 2669 Jun - 2644 Jul - 2584 Aug - 2570 Sep - 2547 Oct - 2539 Nov 2576 2555 dec - 2566 Jan - 2544 Feb - 2531 Mar 06 - 2492
1

639

41 There has been no purchases or disposal of vehicles during the year.


0

178

16
NA

446

0
NA

25
NA

195

16
NA

444

0
NA

25
NA

2395

2238

250

2440

2024

4633

4464

2409

2224

250

2440

2024

422

386

378

623

359

473

635

1387

386

378

623

359

473

635

14

13

20

14

13

7,495

7,530

14

5,757

6,051

6,780

14

14

0 All vehicles are either loaned or leased

NK

Information on our 02-03 data can be found in the earlier SDIGQ returns. See
1459 http://www.sustainable-development.gov.uk/publications/report2003/foreword.htm

2002/3 - information not available 2005/6: NHS PASA: 143 cars Main DH: 3 cars, 2 vans (GCDA), 1
6 furniture van, 2 shuttle buses (between buildings), 1 fork lift truck MHRA: Nil

Vans and trucks etc were not included in the baseline data as this was not required at the time.
Since April 03 the DWP fleet has decreased by 373 vehicles. The Fleet team have actively vetted all
applications and declined to replace vehicles that have not been utilised effectively, this measure
together with re-educating our customers to consider whether journeys are actually necessary has
resulted in the reductions. As a direct result the mileage, fuel consumption and emissions have all
decreased. Strict policies on vehicles available have also contributed to lowering emissions. Note:
75 the 75 other vehicles comprise of 44 mobile units, 11 motorcycles and 20 vans.
0

0
1

25
NA

Information on our 02-03 data can be found in the earlier SDIGQ returns. See
683 http://www.sustainable-development.gov.uk/publications/report2003/foreword.htm

2417
0

444

0
NA

1495

0
0

174

16
NA

15

2852
0

637 Headquarters and Research (GB) vehicles are included in the baseline and result

We have reduced road related CO2 emissions by 10.8%.


Treasury owns no vehicles but has the use of a hybrid vehicle as one of the cars provided for the use of it's Ministers by the
Government Car Service

02/03 baseline did not include vans etc as this data was not required at the time. The 05/06 figures
2492 do include vans etc and still show a redcution in figures.
1

41
0

NO

NK

1500 Seee b1.2

41
0

On a like for like basis we have reduced our business road mileage by 38.7% against the 2002/3 baseline. However, since 2002/3 the
ONS staff numbers increased by the inclusion of a social survey field force of some 1000 interviewers who were prevously fee paid and
not classified as directly employed FTEs. This addition has added some 7.2 million miles to our annual figures.

NK

Information on our 02-03 data can be found in the earlier SDIGQ returns. See
1459 http://www.sustainable-development.gov.uk/publications/report2003/foreword.htm

Not known

84

371

Yes

33

45

HMT

24

34

HMRC

592

45

45

Yes
Not applicable

217

34

Yes

Yes

311

757

DfES

FCO
FSA

N/K

Question:- April
2005 - March 2006:
Number of vehicles
in fleet throughout
the year which were
other vehicles; e.g.
vans, trucks (April
2005 - March 2006)?

45

685

FC

N/K

Question:- April
2005 - March 2006:
Number of vehicles
in fleet throughout
the year which were
leased cars (April
2005 - March 2006)?

639

639

There were no baseline figures recorded for all vehicles. However, it is clear from the large reduction in Fleet vehicle only targets against
the 02/03 baselines together with overall reductions in % figures comparing 05/06 data to 04/05 that DWP bettered targets by some
margin.

N/K

Baseline data for Land Registry not included in this answer. In addition there has been an increase
809 in cars due to transfers from local authorities.

Question:- April 2005


- March 2006:
Number of vehicles in
fleet throughout the
year which were
owned cars (April
2005 - March 2006)?

2002/03 data not broken down in this way. NB: Car count includes only vehicles listed as 'cars'. It
does notinclude MPVs or 4x4s (i.e. Space Wagons & Range Rovers - significant nos both owned &
leased). Total cars owned & leased = 477 (324 owned + 117 leased + 36 that we are unable to
categorise). Other vehicles: vans - 47; 4x4s - 141; MPVs - 9; livestock carriers - 5; minibus - 1; HGV
208 - 1; quad bike - 2; misc - 2.

No

Yes
Not known

Question:- For
2002-03 (Baseline):
Number of vehicles
in fleet throughout
the year which
were other
vehicles; e.g. vans,
trucks (April 2002 March 2003)?

139

DEFRA

DWP
ECGD

Question:- For 2002-03


(Baseline): Number of
vehicles in fleet
throughout the year
which were leased
cars (April 2002 March 2003)?

116

NO

Yes

Question:B1.4
For 2002-03
(Baseline):
Number of
vehicles in fleet
throughout the
year which were
owned cars
(April 2002 March 2003)?

Total business road vehicle mileage (miles) 572,959 310,150 2004-5 figures low because last
calculation was half way through 2005. Data continues to be collated Fuel consumption for
business mileage - Petrol (litres)
16,386 15,956 250 character limit Fuel consumption for
business mileage - Diesel (litres)
13,875 12,880 250 character limit Fuel consumption for
business mileage LPG (litres) 106,397 41,907 Car sharing schemes will have reduced LPG
consumption, and fleet was larger in 2002-3. Fuel consumption for business mileage - Other (litres)
250 character limit Total fuel consumption (litres) 136,658 70,743 250 character
limit

DCMS

DTI

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
Question:B1.3
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
For 2002-03
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
(Baseline): Total
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
number of
Question:- April 2005 undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
vehicles in fleet March 2006: Total number of carbon emitted by these journeys, through supporting innovating projects, such as green
throughout the of vehicles in fleet
technologies and renewable energy projects that will reduce associated carbon emissions and act
year (April 2002 - throughout the year (April as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
March 2003)?
2005 - March 2006)?
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
11 possible.

Within other vehicles are 2002-3 1,741 minibuses, 235 coaches, 2,069 light freight, 757 Freight
>3.5T, 544 Special to role vehicles, 705 4x4s Other vehicles 2005-6 are 1,530 minibuses, 271
coaches,2,573 light freight, 798 freight over 3.5T, 593 special to role vehicles & 982 4x4s. Trailers &
semi-trailers excluded in both cases As at end 2005, we also manage another 39,375 vehicles
including 32475 in-service vehicles, 4700 in-service airfield vehicles, 2200 in-service yellow fleet
6,747 vehicles (mechanical handling, e.g., forklift trucks).
N/K

1467 Total fleet size at beginning of April 2006 was 1503

18 CPS 17 vehicles are alternatively fuelled. 1 is diesel

15,035 1,715 new vehicles delivered, 1,576 removed on replacement, termination or as efficiencies

14

14

N/K

N/K

14

N/K

CO

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
of carbon emitted by these journeys, through supporting innovating projects, such as green
technologies and renewable energy projects that will reduce associated carbon emissions and act
as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
possible.

DCA

Baseline data for land Registry not available.

DCLG

We have data gaps for previous years as there was an incomplete set of data for travel

5,559,151

6,150,394 2002-03 baseline not available, baseline taken from 2005-05 data

DEFRA

2002/03 data not broken down in this way. Total cars owned & leased = 538 (371 owned + 128
leased + 39 that we are unable to categorise). Other vehicles: vans - 57; 4x4s - 142; MPVs - 9;
livestock carriers - 5; minibus - 1; HGV - 1; quad bike - 2; misc - 2.

20510000

22618914

DfES

See additional comments for B1.2. Separate information was not kept for the number of vans or
trucks. This information is within the overall total for the baseline year.

2832877

450138

Organisation

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoQuestion:- conferencing facilities. If no suitable and practical alternatives are available Cabinet Office
Question:B1. April 2005
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
5 For 2002-03 - March
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
(Baseline):
2006: Total
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
Total
business
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
business
road
of carbon emitted by these journeys, through supporting innovating projects, such as green
road vehicle vehicle
technologies and renewable energy projects that will reduce associated carbon emissions and act
mileage? (in mileage? as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
miles)
(in miles) Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
N/K
possible.

Question:B1.
6 For 2002-03
(Baseline):
Total
business
road vehicle
mileage by
fleet
vehicles? (in
miles)

Question:- For
2002-03
(Baseline): Total
business road
vehicle mileage
by hire
vehicles? (in
miles)

Question:- For
2002-03 (Baseline):
Total business
road vehicle
mileage by taxis
used for work
travel? (in miles)

Question:- For 200203 (Baseline): Total


business road
vehicle mileage by
personal vehicles
used for business
travel? (in miles)

Question:- April
2005 - March
2006: Total
business road
vehicle mileage
by fleet
vehicles? (in
miles)

Question:- April
2005 - March
2006: Total
business road
vehicle mileage
by hire
vehicles? (in
miles)

N/K

N/K

N/K

N/K

N/K

N/K

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoQuestion:- April conferencing facilities. If no suitable and practical alternatives are available Cabinet Office
Question:- April 2005 - March
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
2005 - March
2006: Total
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
2006: Total
business road
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
business road
vehicle mileage
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
vehicle mileage by personal
of carbon emitted by these journeys, through supporting innovating projects, such as green
by taxis used for vehicles used for technologies and renewable energy projects that will reduce associated carbon emissions and act
work travel? (in business travel? as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
miles)
(in miles)
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
N/K
possible.

This figure has not been reduced in line with the targets due to baseline data for Land Registry not
7459116 being available and overall increase in teh number of cars which transferred from local authorities.

5000000

Question:B1.
7 For 2002-03
(Baseline):
Fuel
consumption
for business
road vehicle
mileage Petrol (in
litres)

N/K

Not recorded separately.

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
Question:- April
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
2005 - March
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
2006: Fuel
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
consumption for of carbon emitted by these journeys, through supporting innovating projects, such as green
business road
technologies and renewable energy projects that will reduce associated carbon emissions and act
vehicle mileage - as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
Petrol (in litres) Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
possible.

1000

Question:B1.
8 For 2002-03
(Baseline):
Fuel
consumption
for business
road vehicle
mileage Diesel (in
litres)

Question:April 2005 March


2006: Fuel
consumpti
on for
business
road
vehicle
mileage Diesel (in
litres)

N/K

N/K

107346 Baseline data for land Registry not available.

This data was not requested in the initial questionnaire sent out by the SDC, therefore was not
compiled by our offices.

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
of carbon emitted by these journeys, through supporting innovating projects, such as green
technologies and renewable energy projects that will reduce associated carbon emissions and act
as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
possible.

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoQuestion:B1. Question:conferencing facilities. If no suitable and practical alternatives are available Cabinet Office
9 For 2002-03 April 2005 employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
(Baseline):
March 2006:
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
Fuel
Fuel
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
consumption consumption
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
for business for business of carbon emitted by these journeys, through supporting innovating projects, such as green
road vehicle road vehicle technologies and renewable energy projects that will reduce associated carbon emissions and act
mileage - LPG mileage - LPG as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
(in litres)
(in litres)
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
N/K
possible.

Baseline data for Land Registry not included in this answer. In addition there has been an increase
522400 in cars due to transfers from local authorities.

497435

204545 Data not available for 6 offices

Question:B1.10
For 2002-03
(Baseline):
Fuel
consumption
for business
road vehicle
mileage Hybrid petrol
(in litres)

N/K

Baseline data for Land Registry not included in this answer. In addition there has been an increase
36255 in cars due to transfers from local authorities.

97422 Data not available in 2002-03. Data not available for 6 offices

3710 Data not available for 6 offices in 2005-06 or for any in 2002-03

DCMS

DFiD

N/K

DfT

Information on our 02-03 data can be found in the earlier SDIGQ returns. See
http://www.sustainable-development.gov.uk/publications/report2003/foreword.htm

DH

2002/3 - information not available

DWP
ECGD

69740144
60000

FC

FCO
FSA

MOD

ONS

8251518

n/k

Numbers fluctuate on a monthly basis - refer to answer B1.2

66894212
n/k

2550850

1284801

46930

450138

75917

72047

12,057,272

826,950

574433

30023

109614

176000

268740

1795815

36688

204209

268740

Not provided by GCDA in time

nk

5166

NK

0
nk

1019611

0
nk

7102513

191818

66894212

6807

10,066,434

103

NK

1202865

497658
0 NK

NK

8382362

No total figure is known for either period due to lack of full information. however, some details are
available.(see data below) CPS Total mileage is combined figure for fleet vehicles (338,279.08
miles) and hire vehicles (119,693 miles) only and personal vehicles used for business mileage
(5465087 miles). Taxi mileage not known. Figure for fleet vehicle is taken from estimate based on
service readings. Figure for hire cars taken from on-hire and off-hire odometer readings. The figure
in 02-03 is an amended figure to include personal vehicles as this was not included at the time.
TSol We are reviewing the processes for reporting this information. HMCPSI Baseline unknown
Period 02/03 CPS 5851462 SFO TSol AGO RCPO HMCPSI nk
Period 05/06 CPS 5923059
0 SFO TSol AGO NK HMCPSI 75000 RCPO 11165

8858609

183863

11452429

NK

14226081 2002/03 mileage data not available for hires or taxis.

NK

0 Information is not gathered on mileage for hire vehicles, taxi's or personal vehicles.

Whilst it was not possible to obtain fuel consumption in litres, MI was collected on mileage by fuel
type for FY 05/06. For petrol this was 6,010,109 miles.

NK

20918

N/K

5241

21540.65 No data available for 02/03

1669570

46 N/K

N/K

122

52 N/K

NK

NK

186427

353036 NK

5000 No data available for 02/03

N/A. The DfT, in line with Defra guidance, has elected to achieve this taget primarily through mileage
reduction.

N/A. The DfT, in line with Defra guidance, has elected to achieve this taget primarily through mileage
reduction.

0 Fuel consumption figures are not captured for lease fleet, spot hire fleet or personal vehicles.

No data available. The Department is unable to determine from the data it has what the actual fuel
0 consumption is for erach vehicle used. This is not cost effective to capture.

No data available. The Department is unable to determine from the data it has what the actual fuel
0 consumption is for erach vehicle used. This is not cost effective to capture.

No data available. The Department is unable to determine from the data it has what the actual fuel
0 consumption is for erach vehicle used. This is not cost effective to capture.

1137282

Baseline 02/03 year was based upon Fleet only data and did not include private and hire car data.
Comparing fleet only data for 05/06 against baseline year shows an increase in diesel fuel
consumption of 130,842 litres a 10.3% increase. This due to the introduction of a no petrol vehicle
policy increasing the numbers of diesels. Overall figures for 05/06 for all vehicles show a reduction
in total fuel consumption of 366,244 litres (6%) against the previous year. Fuel type for private
vehicles cannot be identified. For the sake of this return , a 50/50 split has been made between
3133349 petrol and diesel.

Baseline 02/03 year was based upon Fleet only data and did not include private and hire car data.
Comparing fleet only data for 05/06 against baseline year shows a reduction in petrol fuel
consumption of 523,569 litres a 79.7% reduction. Figures for 05/06 for all vehicles show a reduction
in total fuel consumption of 366,244 litres (6%) against the previous year. Fuel type for private
vehicles cannot be identified. For the sake of this return , a 50/50 split has been made between
2424491 petrol and diesel. This is the same approach as used in previous years.
9500 Average fuel consumption of 30mpg assumed.

657228
9100

94280

87052

NK

3256066
nk

3027196
nk

Fleet figures based on 18,000 miles per annum. Hire figures based on 300 miles per hire event.

8319146

5,175 ,000

1651625
nk

NK

5,850,000 Based on 40 mpg. Consumption by hire vehicles

NK

416190

909050

22434

NK

45116
No accurate fuel estimate is possible for personal vehicles, taxis or hire cars, as we do not know the
average MPG performance of the vehicles. Therefore we have calculated Kg CO2 from mileage
data only.

NK

1908969
nk

NK

NK

39385

150151

05/06 CPS Currently switching to fleet fuel card that will produce reports showing this data for our
0 fleet only . N/K CPS SFO TSol AGO RCPO HMCPSI

0
nk

2132495 Purchased and leased fleet vehicles only.

0506 CPS Currently switching to fleet fuel card that will produce reports showing this data for our
0 fleet only . HMCPSI 7382 litres,N/K CPS SFO TSol AGO RCPO,

Baseline 02/03 year was based upon Fleet only data and did not include private and hire car data.
Comparing fleet only data for 05/06 against baseline year shows a reduction in LPG fuel
consumption of 132,229 litres a 42.6% reduction. LPG cars are no longer being offered as an
alternative due to cessation of investment in development of these vehicles by the industry and
181228 difficulties with maintenance and reliability.

No accurate fuel estimate is possible for personal vehicles, taxis or hire cars, as we do not know the
average MPG performance of the vehicles. Therefore we have calculated Kg CO2 from mileage
data only.
NK

18045 Purchased fleet vehicles only.

No total figure is available for either period due to lack of full information. However, some details are
available.(See data below) CPS Additional responsibilities for CPS has included providing direct
advice to police in respect of charging. This has necessitated additional attendance at police
charging sites. SFO Data recorded by Finance from staff T & S claims. Excludes passenger miles.
Baseline does not include official car hire mileage for which records are not available. TSol Travel is
carried out by public transport and the GCDA. The GCDA are unable to give us this information
Period 02/03 Total business road vehicle mileage by: - fleet vehicles CPS 259675 - hire vehicles
CPS SFO TSol AGO N/k RCPO 0 -taxis used for work travel CPS SFO TSol AGO n/k RCPO 0
-personal vehicles used for business travel CPS 5591787 SFO 222654 RCPO 0 TSol AGO nk
Period 05/06 Total business road vehicle mileage by: - fleet vehicles CPS 338279 - hire vehicles
CPS119693 SFO49922 RCPO 9524 TSol AGO Nk -taxis used for work travel CPS SFO TSol AGO
RCPO n/k -personal vehicles used for business travel CPS 5465088 SFO 82502 RCPO 1641 TSol
0 AGO nk

N/K

1021409
No accurate fuel estimate is possible for personal vehicles, taxis or hire cars, as we do not know the
average MPG performance of the vehicles. Therefore we have calculated Kg CO2 from mileage
data only.

NK

This figure includes leased vehicles. In previous years leased vehicles were excluded. Hire vehicle
information was calculated based on the Management Information supplied by the HO contracted
suppliers for vehicle hire for 01/04/05-31/03/06. Due to the switch to a new accounting system
personal vehicle business mileage is inaccurate for this year and would probably be much higher
2487747 than the quoted figure.

0 N/A

NK

2954

0 We do not have baseline figures for 2002-2003 as SDIG has never required them before.
Business mileage in personal vehicles includes claims for Government Whips, which distorts this
0 figure (non-treasury staff that HMT pay for.)

168500

7534

Currently we do not capture mileage information for hire cars.Taxi mileage has been estimated,
8441 based on number of typical journeys Figures for 2002/03 not provided by type.

0 nk

51124

Whilst it was not possible to obtain fuel consumption in litres, MI was collected on mileage by fuel
type for FY 05/06. For LPG this was 46,899 miles.

NK

1560112

NK

37651115

55815

NK

Figures for fleet and hire cars relate to NHS PASA only. Main DH: Fleet and hire car mileage data
n/a. New hire car contract will enable us to collect data. DH&NHS PASA: taxi mileage is not
captured, and it is envisaged that this would be difficult to achieve with any degree of consistency or
1333536 accuracy. MHRA: information not available.

991754

48672
NK

Whilst it was not possible to obtain fuel consumption in litres, MI was collected on mileage by fuel
type for FY 05/06. For diesel this was 12,418,676 miles.

NK

N/A. The DfT, in line with Defra guidance, has elected to achieve this taget primarily through mileage
reduction.

Official vehicles mileage amounts to 3460247 miles. Data for taxis is not available. As already
stated baseline year of 02/03, fleet only data was avaiable. Therefore comparisons between these
35134487 categories will not be possible, other than for fleet.

NK

14062

The data requirements at left is inconsistent with the Framework guidance and 04-05 SDC return
and in some cases data is not available - e.g. taxis. Information on our 02-03 data can be found in
the earlier SDIGQ returns. See http://www.sustainable16,500,635 development.gov.uk/publications/report2003/foreword.htm

Approximation. In 2005, the fleet is estaimated to have travelled over 180 million miles. Total MoD
180 million fleet including in-service vehicles, estimated to be 600 million miles.

N/K

7061102

3368736
0 NK

8382362 10,066,434 Updated data does not include lease cars.

CPS all 18 vehicles are leased to CPS.

15134000

7519617

554771
NK

72972877

NK

Baseline 02/03 year was based upon Fleet only data and did not include private and hire car data,
as it does now. Comparing fleet only data for 05/06 against baseline year shows a reduction in
51250028 mileage of 7,391,344 miles a 33.1% reduction.
63000 Total is for leased vehicle and personal vehicles when used for business.

3368736
NK

HMT

LOD

2069749

8748201
Vehicle Replacement Plan for 2006-8 covers the replacement of the HGVs, which have to comply
with Euro regulations for emissions and noise regulations whilst conveying freight throughout Europe
and the UK.

HMRC

HO

2002/3 - information not available 2005/6: PASA: Comprised of 551,933 miles on Leased Fleet,
616,689 miles on Own Vehicles, and 30,023 miles (calculated from fuel spend) for spot hire fleet
MHRA: N/k Main DH: 716,847 in own vehicles. 22500 London shuttle bus. Lease cars, spot hire
1937992 and taxis n/k

2350169

There are no leased vehicles in the fleet. The data has been maintained to supply total numbers for
the year but has not been broken down into cars and vans etc. Therefore figures would be the same
as those supplied to answer B1.3.

2832877

147244 No data available for business mileage for 02/03.


N/K
Information on our 02-03 data can be found in the earlier SDIGQ returns. See
http://www.sustainable-development.gov.uk/publications/report2003/foreword.htm 05-06 is subject
to external verification but does represent a significant increase on reported 02-03 mileage owing to
changes in the role of a number of our Executive Agencies: The Police Reform Act 2002 allows
Chief Constables to accredit Vehicle and Operator Services Agency staff with the power to stop
goods and passenger vehicles. Traffic Management Act 2004 provides newly created Highways
Agency Traffic Officers with special powers so that they are able to perform certain traffic
management tasks previously carried out by the police. The data at left therefore includes additional
mileage undertaken by these agencies, which did not exist in our 02-03 baseline data. The table
above also includes 4.6 million extra miles undertaken by the GCDA (reported on by Cabinet Office
in 02-03). Given the changing nature of DfT operations when compared to our position in 02-03 this
table does render comparison meaningless. In light of this the DfT is undertaking a review of all its
fleet based operations with a view to setting local Agency targets that will enable the Department to
29,384,857 achieve the revised travel co2 reduction target.

DTI

5376000 NK

05/06 CPS Currently switching to fleet fuel card that will produce reports showing this data for our
0 fleet only . HMCPSI 2531 N/K CPS SFO TSol AGO RCPO

10,300 ,000

Based on 50mpg in 05-06, 45 mpg in 02-03 - All leased vehicles. Fleet in 02-03 included nearly
10,980 ,000 2,000 cars aged 5 years & older. Average age of passenger vehicle fleet now 2.5 years

NK

NK

NK

NK

NK

Organisation

CO

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
Question:- April
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
2005 - March 2006:
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
Fuel consumption
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
for business road of carbon emitted by these journeys, through supporting innovating projects, such as green
vehicle mileage technologies and renewable energy projects that will reduce associated carbon emissions and act
Hybrid petrol (in
as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
litres)
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
possible.

Question:B1.11
For 2002-03
(Baseline):
Fuel
consumption
for business
road vehicle
mileage - Dual
fuel (in litres)

Question:- April
2005 - March 2006:
Fuel consumption
for business road
vehicle mileage Duel fuel (in litres)

N/K

N/K

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
of carbon emitted by these journeys, through supporting innovating projects, such as green
technologies and renewable energy projects that will reduce associated carbon emissions and act
as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
possible.

Question:B1.12
For 2002-03
(Baseline):
Fuel
consumption
for business
road vehicle
mileage Other, please
specify (in
litres)

N/K

DCA

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
Question:- April 2005 component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
March 2006: Fuel
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
consumption for
of carbon emitted by these journeys, through supporting innovating projects, such as green
business road vehicle technologies and renewable energy projects that will reduce associated carbon emissions and act
mileage - Other, please as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
specify (in litres)
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
possible.

5000

DCLG

8575 Data not available for 6 offices in 2005-06 or for any in 2002-03

0 Data not recorded fully and not at all in 2002-03

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
Question:employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
April 2005
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
Question:B1.13 - March
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
For 2002-03
2006: Total
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
(Baseline):
fuel
of carbon emitted by these journeys, through supporting innovating projects, such as green
Total fuel
consumpti technologies and renewable energy projects that will reduce associated carbon emissions and act
consumption on (in
as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
(in litres)
litres)
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
N/K
N/K
possible.

02-03 figure includes all fuel that isnt petrol or diesel.

Question:B1.14
For 2002-03
(Baseline):
Total CO2
emissions in
kg (see
guidance for
conversion
factors)

Question:April 2005 March 2006:


Total CO2
emissions in
kg (see
guidance for
conversion
factors)

N/K

N/K

Baseline data for Land Registry not included in this answer. In addition there has been an increase
666002 in cars due to transfers from local authorities.

513435

0 Data not recorded fully and not at all in 2002-03

314252 Data not recorded fully and not at all in 2002-03

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants
caused by travelling, wherever reasonably practical to do so. The Cabinet Office owns 2 hybrid road
vehicles (cars) used for Government administrative operations. The other road vehicles are owned
by our two primary service providers (2 LPG, 2 electric and 5 diesel vans - the latter will shortly be
replaced with alternatively fulled vans). Business travel Cabinet Office employees will only
undertake business travel if there are no suitable and practical alternatives available, such as videoconferencing facilities. If no suitable and practical alternatives are available Cabinet Office
employees will use the least polluting forms of transport, wherever reasonably practical to do so. We
will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to
undertake their official duties. Such journeys are unavoidable. Therefore, we will offset the amount
of carbon emitted by these journeys, through supporting innovating projects, such as green
technologies and renewable energy projects that will reduce associated carbon emissions and act
as a counter balance. Travel to and from work The vast majority of Cabinet Office employees
Question:- If necessary, please provide additional details about your previous answers.
working in central London, travel to and from work by public transport. Some employees travel to
work by bicycle and motorbike. Travel to and from work by car is actively discouraged by the
following measures: No car parking facilities are provided for employees. Some car parking is
available for Ministers, operational vehicles and disabled employees. Bicycle parking and
showers are available in the vast majority of buildings.
Interest free loans are available for
purchasing bicycles and equipment. Ministerial / senior official and operational vehicles The small
number of vehicles in operation are owned and managed by the Cabinet Offices primary service
providers (Ecovert FM and the Government Car and Despatch Agency). We will monitor the use of
vehicles owned and managed by our service providers and vehicles hired by staff. We will ensure
that all vehicles owned and managed by our service providers use alternative fuels or are the most
fuel efficient available., wherever reasonably practical to do so. When hiring, staff will choose
vehicles than can run on alternative fuels or are the most fuel efficient. We will encourage our
primary service providers and the contractor responsible for providing self-drive hire cars to review
technological developments with a goal of moving to zero emission vehicles, as soon as practically
possible.

Baseline data for Land Registry not included in this answer. In addition there has been an increase
1314000 in cars due to transfers from local authorities.

1366000

NK

733864 Data not recorded fully and not at all in 2002-03

Question:- Please explain your workings for your calculated CO2 emissions for transport.
What assumptions were used? What was included/excluded? Has your situation changed
since the baseline year? Please limit your response to 500 words.

N/A

The significant increase in emissions is due to the transfer of 139 vehicles to DCA as part of the Unified

Where data exists, hire car, pool car, private car and taxi travel have all been reported on. However, no

DCMS

DEFRA

Whilst it was not possible to obtain fuel consumption in litres, MI was collected on mileage by fuel
type for FY 05/06. For hybrid/petrol this was 57,032 miles.

NK

DfES

DFiD

0 N/A

NK

Whilst it was not possible to obtain fuel consumption in litres, MI was collected on mileage by fuel
type for FY 05/06. For dual fuel this was 465,093 miles.

NK

63349

54078 Dual fuel relates to Diesel and LPG.

0 Fuel consumption figures n/a

DTI

No data available. The Department is unable to determine from the data it has what the actual fuel
0 consumption is for erach vehicle used. This is not cost effective to capture.

No data available. The Department is unable to determine from the data it has what the actual fuel
0 consumption is for erach vehicle used. This is not cost effective to capture.

Information not available as this breakdown has not been kept throughout the year. Fuel
0 consumption has been included in figures for petrol/diesel/LPG as appropriate.

n/k

HMRC
HMT

Information not available as this breakdown has not been kept throughout the year. Fuel
0 consumption will be included in figures for petrol/diesel/LPG as appropriate.

0 Fuel consumption figures n/k

No data available. The Department is unable to determine from the data it has what the actual fuel
0 consumption is for erach vehicle used. This is not cost effective to capture.

1138123

0 We do not have baseline figures for 2002-2003 as SDIG has never required them before.
nk

NK

NK

NK

5,000,402
nk

MOD

ONS

NK

05/06 CPS Currently switching to fleet fuel card that will produce reports showing this data for our
0 fleet only . N/K CPS SFO TSol AGO RCPO HMCPSI

13,000

NK

13,000

NK

05/06 CPS Currently switching to fleet fuel card that will produce reports showing this data for our
0 fleet only . N/K CPS SFO TSol AGO RCPO HMCPSI

NK

15,488,000 16,843,000

NK

NK

Total 2002/03 data now includes fleet, hire and taxi mileage. Unable to identify petrol and diesel fuel

145003 Total CO2 emissions has been calculated from the total business mileage

See B1.14 for details. As already explained, baseline data does not directly correlate with current dat
Assumptions shown above.

Biodiesel is blended with conventional diesel mostly at 5% but up to 30% biodiesel Biodiesel CO2 is ta

The Hire Car company does not supply mileage information for hire cars and no estimate has been made.

NK

19824549
nk

05/06 CPS Currently switching to fleet fuel card that will produce reports showing this data for our
0 fleet only . N/K CPS SFO TSol AGO RCPO HMCPSI

Emission calculations based on mileage, for average car (type of car unknown).

591948

2565571 13% reduction, target exceeded

1007964

Using best practice Defra guidelines. Scope of DfT operations has changed considerably since baselin

554266

Baseline 02/03 year was based upon Fleet only data and did not include private and hire car data.
This reason for a 7,660,441 (54.4%) increase on the baseline figure. Comparing fleet only data for
05/06 against baseline year shows a reduction in CO2 emissions of 2,514,017 kilograms a 39.1%
reduction. Overall figures for 05/06 for all vehicles show a reduction of 808,261 kilograms (5.4%)
14087067 against the previous year.
18000

21391275
17400

6150263
nk

NK

Total fleet car mileage = 57197(petrol)+ 18000(LPG)= 75197 Total taxi mileage PS = 16047 + AH = 56000

NK

This cannot be calculated due to incomplete data.

05/06 CPS Currently switching to fleet fuel card that will produce reports showing this data for our
0 fleet only . N/K CPS SFO TSol AGO RCPO HMCPSI

56993.5

2943828

NK

HO

LOD

672148

No accurate fuel estimate is possible for personal vehicles, taxis or hire cars, as we do not know the
average MPG performance of the vehicles. Therefore we have calculated Kg CO2 from mileage
data only.
NK

CO2 emissions were calculated using DEFRA guidelines on fuel consumption. Reduced workforce within D

NK

1043081

No accurate fuel estimate is possible for personal vehicles, taxis or hire cars, as we do not know the
average MPG performance of the vehicles. Therefore we have calculated Kg CO2 from mileage
data only.
NK

171201

The figure is approximate as it is based on average emissions per mile. Information on our 02-03
data can be found in the earlier SDIGQ returns. See http://www.sustainable9,697,003 development.gov.uk/publications/report2003/foreword.htm

Baseline 02/03 year was based upon Fleet only data and did not include private and hire car data.
5739068 This is the reason for a 3,528,399 (61.5%) increase on the baseline figure.
9500

2210699
9100

1,863Biodiesel, Litres
No accurate fuel estimate is possible for personal vehicles, taxis or hire cars, as we do not know the
average MPG performance of the vehicles. Therefore we have calculated Kg CO2 from mileage
data only.
NK

26540.65 No data available for 02/03

602657

N/A. The DfT, in line with Defra guidance, has elected to achieve this taget primarily through mileage
reduction.

No data available. The Department is unable to determine from the data it has what the actual fuel
0 consumption is for erach vehicle used. This is not cost effective to capture.

Emissions have been calculated in the prescribed way using provided SDC figures. But for the
2004/05 return engine size as well as fuel type was used to calculate emissions in line with SDC
guidance. This will distort year-on-year comparisons. Due to changes in the Departments
organisational structure, and key deliverables, without any prescribed methodology to re-baseline, it
6294659 is questionable how any comparisons can be extrapolated from the data.
The prescribed methodology has been used to calculate CO2 emissions from mileage data. But would wel

6072000

68140

N/K

n/k

FC

FCO
FSA

84367

0 N/A

Whilst it was not possible to obtain fuel consumption in litres, MI was collected on mileage by fuel
type for FY 05/06. See previous responses.

NK

N/A. The DfT, in line with Defra guidance, has elected to achieve this taget primarily through mileage
reduction.

Information not available as this breakdown has not been kept throughout the year. Fuel
0 consumption will be included in figures for petrol/diesel/LPG as appropriate.

NK

14062

N/A. The DfT, in line with Defra guidance, has elected to achieve this taget primarily through mileage
reduction.

DH

DWP
ECGD

Whilst it was not possible to obtain fuel consumption in litres, MI was collected on mileage by fuel
type for FY 05/06. For other/unknown fuel types this was 3,621,105 miles.

NK

20918

0 N/A

N/A. The DfT, in line with Defra guidance, has elected to achieve this taget primarily through mileage
reduction.

DfT

NK

9331678
nk

2397642

27,639,000

496230.2

Former Inland Revenue and Customs and Excise fleet is managed separately at present. There are plans
The Treasury owns no vehicles

This includes emissions from taxis - however Radio Taxis is a carbon neutral company (see Best
2879000 Practice).

CPS SFO RCPO Please see notes below Tsol AGO nk. TSol Processes for reporting information
0 are being reviewed.

CO2 emissions were calculated based on a total mileage of 19,653,978 and used the generic conversion fa

No total figure is available for either period due to lack of full information. However, some details a

28,914,000 05-06 includes 2,400 Tonnes for NI, 640 passenger cars + 8,100 hire events. Source HQ NI

Calculated by Defence Logistics Agency.

2494306.3

The calculation for CO2 emmissions was 0.2 factor used for the fleet, private vehicles, diesel hire cars.

CO

The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants caused by travelling, wherever reasonably practical to
do so. The Cabinet Office owns 2 hybrid road vehicles (cars) used for Government administrative operations. The other road vehicles are owned by
Question:Please
outline
any examples
what you
to be
good
practice
in the
that you
transport
and/or
our two primary
service
providers
(2 LPG, 2of
electric
and consider
5 diesel vans
- the
latter
will shortly
beway
replaced
with manage
alternatively
fuelledimpacts
vans). Business
undertake
monitoring
and reporting
of your
performance
thisifarea.
your information
bealternatives
selected toavailable,
be highlighted
a casetravel
Cabinet
Office employees
will only
undertake
business in
travel
there Should
are no suitable
and practical
such asasvideostudy in the report, we will contact you for further information..
conferencing facilities. If no suitable and practical alternatives are available Cabinet Office employees will use the least polluting forms of transport,
wherever reasonably practical to do so. We will use air miles as a surrogate measure of pollution emissions as these are by far the biggest
component of our impacts. Cabinet Office Ministers and officials sometimes have to travel by air to undertake their official duties. Such journeys are
unavoidable. Therefore, we will offset the amount of carbon emitted by these journeys, through supporting innovating projects, such as green
technologies and renewable energy projects that will reduce associated carbon emissions and act as a counter balance. Travel to and from work
The vast majority of Cabinet Office employees working in central London, travel to and from work by public transport. Some employees travel to work
by bicycle and motorbike. Travel to and from work by car is actively discouraged by the following measures: No car parking facilities are provided
for employees. Some car parking is available for Ministers, operational vehicles and disabled employees.
Bicycle parking and showers are
available in the vast majority of buildings. Interest free loans are available for purchasing bicycles and equipment. Ministerial / senior official and
operational vehicles The small number of vehicles in operation are owned and managed by the Cabinet Offices primary service providers (Ecovert
FM and the Government Car and Despatch Agency). We will monitor the use of vehicles owned and managed by our service providers and vehicles
hired by staff. We will ensure that all vehicles owned and managed by our service providers use alternative fuels or are the most fuel efficient
available., wherever reasonably practical to do so. When hiring, staff will choose vehicles than can run on alternative fuels or are the most fuel
efficient. We will encourage our primary service providers and the contractor responsible for providing self-drive hire cars to review technological
The Cabinet Office will seek to reduce emissions from greenhouse gases and other pollutants caused by travelling, wherever reasonably practical to do so.
developments with a goal of moving to zero emission vehicles, as soon as practically possible.

DCA

Much of the departments business travel is undertaken by judges and clerks. Circuit Judges attend hearings at various court centres and this
accounts for up to 90% of business travel. There is little then that can be done to reduce this travel as both judges and clerks carry documents for
sensitive court cases, preventing the use of public transport. This is a significant barrier to progress.

Best practice examples include; Interest free loans for bicycles Provision of secure bicycle parking facilities for staff along side lockers and showers.
Ensuring good transport links at outline sketch design for new builds.

DCLG

It needs to be made clearer how travel needs to be reported in the future i.e. by fuel type or mileage. This will allow us to get more consistency with
the data.

Marketing campaign with Direct Visual to increase video conferencing use Staff travel survey to assess work commuting behaviour Green travel plans
Charged car parking to offset public travel costs at the Planning Inspectorate loans for cycles and season ticket train purchases

DEFRA

DCMS is an office based estate and uses cars through the Government Dispatch Agency. The data supplied in this questionnaire refers to the Royal
Parks
were outstanding local mean averages were applied. No figure was provided to calculate emissions from 4x4s, lorries, etc, which produce greater
CO2 emissions than standard cars. We have applied SDC car figures as no other emissions figures were provided, but would highlight that this
method is likely to underestimate emissions for these vehicles. Hire Vehicles - Unable to identify hires made off-contract and then claimed back
through expenses. Where hire company not able to provide precise mileages, local mean averages used. Taxis - Taxi data is only available and in
part for core Defra and RPA. The remaining Agencies have not been able to isolate expenditure in their account code systems. Where available, MI
from contractor was used (either direct miles or cost, which was approximated to mileage assuming the provided 2 per mile conversion rate). For FY
2005/2006, core Defra did not have a separate single account code for Taxi spend. This has since been rectified but it has not been possible to
isolate this expenditure. We have been able to capture MI for our central London HQ taxi service but core Defra data is incomplete. General - We
have assumed all mileage driven in dual fuel vehicles was by petrol where no split provided.

See Social section for more info on Royal Parks . The Royal Parks are committed to reducing non-sustainable transport within the Parks. By the
end of 2002, 29 of the 40 vehicles in The Royal Parks had been converted to LPG. An independent study undertaken by Motorvate has estimated
that this conversion produced a 38% or 120.45 tonne reduction in CO2 emissions. The Royal Parks Central Fleet Manager continues to work
towards a more sustainable transport fleet and has recently been awarded a maximum 5 star award by Motorvate. In addition to the installation of
LPG, The Royal Parks take a holistic view of transport within the Parks, aiming to reduce negative environmental impacts whilst providing access and
enjoyment for all.
facilitating best practice guidance and generating ideas that develop and deliver on sustainable travel policies for Government as a whole. It's a
voluntary, inclusive group (estab. 24 March 2006) with representation from the SDC, Energy Savings Trust, MOD, HMRC, Environment Agency, DWP,
OGC, DFT & Scottish Executive on the Executive Panel and 50 members from central government and agencies. It welcomes further membership.
Defra was instrumental (with DWP & OGC) in embedding SD criteria in the Pan-Government Travel Contract, developing MIS to faciltate detailed
analysis to provide new opportunities for delivering business in a sustainable way. It also minimises back-end resource within departments, placing
the onus on the contractor and the supply chain to deliver prescribed MIS and results. Defra is also engaged in the delivery of the OGC/DWP PanGovernment Vehicle Contract, ensuring SD criteria is embedded into the procurement process. MIS will be shared across departments that access
the contract. Defra intranet websites promote SD principles, e,g. material from the Focus On Sustainable Travel Campaign (June 2006) was also
used by 25 OGDs, demonstrating the desire within government for material to promote sustainable travel.

DfES

Monitoring of vehicle performance is undertaken with mileage, cost and maintenance details recorded. Customer feedback obtained on vehicle
Electronic systems are in place to ensure greater accuracy when recording vehicle mileage, costs and maintenance. Improved quality of fleet
performance and reliability. Improved quality of fleet vehicles resulted in greater customer satisfaction and reliability. Regular review and updating of
vehicles resulted in greater customer satisfaction and reliability. Improved value for money. During 2005-06, DfES wrote off 1 car, disposed of 3 cars internal website is undertaken to provide staff with performance information, advice and guidance to help staff make the most out of vehicle
and sent one van for salvage. Incorrect figure (2003/04 figures) reported last year for 2002/03 baseline.
performance.

DFiD

In the SDIG 04/05, DFID commented that we did not have an current system for collating taxi mileage but we were rectifying this by introducing an
electronic system. Figures prior to 05/06 were based on travel claims so were not a complete, accurate representation of our taxi mileage. DFID
changed over to the new electronic taxi booking system in 05/06 which is providing much more accurate data for taxi bookings.

DfT

The above information is in some cases estimated but the Department is taking active steps to address this issue and is organising an external
review of our impacts in this area for the whole of our estate (including our Executive Agencies). This will typically cover our owned / leased fleet, hire
care usage and private car usage and lead to local targets being set to meet or exceed the revised targets recently set for this area. The lessons
learned will be made public and shared with other Government departments.

Organisation

DCMS

Question:- Please use this space to provide additional information that you feel is essential for us to know. For example, your overall
approach in this area, barriers to progress and significance to your business Please limit your response to 500 words.

As from April 2006, two of our fleet cars are now Toyota Prius. DFID also has an on-line car-sharing swop-shop facility and has in recent years
increased the number of bicycle racks and lockers for cyclists at both UK offices. We publish links to public transport sites and timetables on our staff
intranet, public transport maps etc, and regularly issue notices encouraging staff to consider car sharing or use other modes of travel. DFID is also a
corporate affiliate of the London Cycling campaign. We have also reformatted our travel booking form which asks staff to confirm that their business
cannot be done by Video Conferencing(VC). We have extensive award winning heavily used V/C facilities and have currently issued a questionnaire
to staff asking their views on the V/C facilities and if we can improve them further. Although air travel is not included in the framework targets, DFID
recognises that it is a significant impact. We will be a major contributor to the Government Carbon Offsetting Fund.

DH

VOSA is planning to replace 40-50 fleet vehicles this year and it is envisaged the replacement vehicles will be new Euro IV diesels and a small
selection (approx 5%) of hybrid (electric/petrol) vehicles. GCDA local emission reduction targets exceed those set for the Government estate and is
projecting a 15% reduction in co2 by 2008-09. The Highways Agency has undertaken the following:
Reduction of engine size for hire cars to 1.6

Liftshare/HA car share website for home to work and business travel in Manchester and Exeter extending Agency wide by the end of 2006
Car parking Policy giving priority to car sharers Pool bike scheme in Bedford Information notices for public transport at new office in Bedford
Video and audio conferencing facilities at all offices and RCCs (Regional Control Centres) Green Travel group for new building in Leeds
Promote discounted public transport schemes where available
equipment. The number of VCs has increased from 6658 in 2004/5, to 7691 in 2005/6. Over 75% of these are between London and Leeds. In March
06 the decision was made to terminate the contract for a shuttle bus that had run between London DH buildings since the mid 90s. Staff are being
encouraged to use public transport, or to walk, and information about moving between buildings is posted on the intranet. The loss of the shuttle bus
NHS PASA: We are working to achieve accurate CO2 emissions calculations for future years reporting on the lease fleet and spot hires for 2006-07, will save 22500 miles of London mileage per annum. NHS PASA: The Agency has a driving at work policy and encourages employees to drive less
and hope to be also able to do this retrospectively for 2005-06 on lease fleet. These calculations will be based on the vehicles stated CO2 emissions than 12000 miles for work per year. Parking is also heavily restricted at Reading and employees are encouraged to utilise other modes of transport
rating and the business mileage reported against that vehicle. Private vehicle use will still be restricted to calculating CO2 using an average CO2
when travelling to the Reading office. All office direction include directions using public transport. MHRA: The system for car parking in MT has been
factor. For spot hire, OGC framework providers of Spot Hire vehicles are currently having difficulty in reporting this despite signing up to supporting
changed. Staff used to be able to go on a waiting list for a free car parking space. We now allocate free spaces only to registered disabled staff and
Government standards in the contract. There is no aim to capture Taxi mileage as the expenses system does not support this and users of taxis will charge all others the going rate for the space for the year (2,500 pa) if they wish to use a car to come to work. In addition, we used five of our car
be unaware of the mileage travelled in many instances. Taxi use is also relatively limited within the Agency.
parking spaces to build a secure bike storage facility for bicycles and motorbikes to encourage more staff to use greener methods of getting to work.

DTI

Data not available to determine the engine capacity or fuel type and consumption of privately owned vehicles used on business.

DWP
ECGD

DWP fleet aim to achieve targets well in advance of their due data. The Department has consistently achieved this by introduction of new policies on
vehicle selection, fuel types available etc. Achieving a cultural shift in the approach to travel is required. This biggest issue to reducing travel and
subsequent emissions. DWP will introduce demand management policies addressing this issue. It will become policy for line managers to actively
challenge a request to travel prior to authorisation in light of increasing availability of telekit and video conferencing facilities.
For the 2006 / 07m year ECGD willbe switching its leased car to a hybrid vehicle.

FC

Forestry Commission England promotes sound environmental management practices in its transport policy. It encourages cycling, walking, sharing of
vehicles, use of smaller more efficient vehicles and alternative fuels. Its sustainable practices in operation of its fleet resulted in an appearance on
BBC Scotlands Landward programme in 2005, winning Scotlands Green Energy Award and getting third place in the innovative category of the
national Green Fleet Award. Biodiesel is currently issued from the Forestry Commissions own bulk tanks and little or none is available from local
filling stations. It is impractical to make bulk supplies available to all vehicles and the lack of availability from filling stations is restricting use of
biodiesel. The absence of a scheme to rebate fuel duty for blended bio-fuel makes it uneconomic to use biodiesel in tractors and other machines.

FCO
FSA

All vehicles are purchased outright and where possible dual fuel or alternative fuel vehicles such as LPG, Low Emission Diesels, Electric Floats and
vans are purchased. This allows strict maintenance regimes to be applied, and enables compliance with government and European guidelines on
emissions to be strictly adhered to.
We have no car fleet. We have no car park so no one commutes to work by car. We are investigating business mileage.

HMRC

We are a member of the Civil Service Travel Group and we have been actively looking at ways in which we can reduce business travel. We are
developing guidance to encourage staff to think before they travel and use telephone and video conferencing facilities as an alternative. We are
currently auditing both our fleet and grey fleet to identify efficiencies and reduce business mileage and travel related emissions.

DTI HQ caterer is, albeit at early stages, converting his vehicles used on this contract to enable him to convert his used cooking oil into vehicle fuel.
Best Practice initiatives include:
*DWP fleet now has a fully established 4 year vehicle replacement programme. Replacing older fleet vehicles
reduces on going running costs and increases overall fuel efficiency and vehicle safety. *A long established no petrol and EURO IV compliant diesel
vehicles only policies limits harmful emissions. *Removal of under utilised vehicles. *Limits on hire car engine sizes. *Online interactive database
used for fleet customers: DWP has ensured a speedier and more efficient application process as well as ensuring the customer has a method of
instantly amending their personal/vehicle details. Mileage logs are on-line for all customers enabling a more efficient method of monitoring all mileage
logs to ensure all drivers/vehicles are fully compliant with the minimum mileage criteria. The system has the added value of reducing paper usage &
transport miles/costs eliminated. *Promotion of telekits/video conferencing as a travel alternative.
We now have considerable experience in the use of bio diesel in blends from 5% to 100%, and currently operate about 200 vehicles, or 14% of our
fleet, on bio diesel from bulk tanks in 13 locations across GB, with plans for further expansion to additional sites. We are considered to be experts in
the field of alternative low carbon fuels, and routinely give presentations, advice and encouragement to other organisations, both public and private
sector, who are considering use of bio diesel in their fleets. We encourage our staff to use diesel vehicles, and to move to smaller more fuel efficient
engines when they come up for replacement. We have one member of staff whose sole responsibility is the introduction of measures to reduce
carbon dioxide emissions and encourage energy saving and fuel efficiency, and will soon be training local energy champions to roll these practices
out at grass roots level. We have even introduced small scale renewable energy systems, such as wind turbines and wood fuel heating, to trial in
some of our fleet repair workshops.
Both Hanslope Park and Wilton Park are in rural locations not served by public transport. Hanslope Park operates a minibus service to convey staff to
and from Milton Keynes Rail Station, plus two minibuses every day to convey staff to and from Milton Keynes and Northampton. These measures
reduce CO2 emissions, and the environmental impact of road traffic.

We have purchased alternatively fuelled vehicles during 2005-06, all of which are being used effectively, as can be gauged by the 62% increase in
LPG fuel consumption.

HMT

HO

The main Home Office taxi contract is with Radio Taxis - a carbon neutral company. Promotion of video conferencing - drop in sessions to
demonstrate ease of use to staff. Launch of new travel pages for staff on the HO intranet - asks them to think of the best way to travel, and think
A system for recording FSS lease car and hire car business mileage is now in place and 1st April 2006-31 March 2007 will act as a baseline. There is about whether they need to travel? Also directs them to HO travel providers such as Green Cars. This in turn helps ensure travel is booked through
no centrally stored information from which to collate a 2003 baseline.
the formal route and helps data collection.

MOD

CPS Travel is an essential part of our business. Our staff have to attend courts wherever they are. We now have to provide face to face advice in
respect of charging of suspects at police charging sites. Public transport is not available or suitable. This is the first year mileage figures have been
available for the car-hire contract. All fleet vehicles bar one, are LPG or dual fuel. Due to poor availability of factory-produced LPG vehicles the CPS
have largely converted petrol vehicles to LPG. Conversion can take as long as six months and, without PowerShift assistance, has proven to be an
expensive method. HMCPSI Travel is primarily by Inspectors attending site inspections. Wherever possible they are encouraged to use Public
Transport but on occasions will use their own vehicles for business use. We do not maintain a record of which type of vehicle (petrol/diesel) that each
inspector uses. RCPO do not have any leased/fleet vehicles, however we have started work on monitoring single car journeys to and from the office
and will be working closely with the LODs for 06/07 in order to reduce CO2 emissions to reduce our impact on the environment. AGO The
department does not own or lease any vehicles. Taxis are used occasionally but we do not hold any data on the length of journey.
HMCPSI No company cars maintained
.The DLO will only include vehicles which are used in an administrative role this will exclude vehicles such as Police cars, ambulances & fire
engines which are special to role and thus, we believe should count as operational vehicles. DLO will not be including trailers in the fleet as obviously
they do not produce emissions as they are not powered 3.
As far as business travel is concerned DLO will only include passenger cars the
vast majority of the minibus/coach travel done by MoD in the UK is either operational (e.g. travel to airheads prior to deployment) or to training areas.
These are not activities which are undertaken by OGDs & we should endeavour to compare like for like! In any case CO2 emissions data are only
available for passenger cars. 4.
Looking at the guidelines & vehicle definitions DLO cannot provide any data on c. personal vehicles used for
business travel and d. taxis used for work travel. 5. Data for car hires will be only for hires made through our Service Provider some
units/business areas have local enabling contracts. Car hire data will only be for hires made in England, Scotland & Wales. 6. DLO will up-date the We have completed a project, which looked at turning our own used cooking oil into bio-diesel. As a result we are in the middle of the tender process
2002-3 baseline using the same criteria.
to place a contract to turn 1.2 million litres of used cooking oil into bio-diesel which has the potential to be used in some of our vehicles.

ONS

Bike User Groups have been set up at our London and Southport offices and cyclists' facilities have been enhanced. This includes changing rooms,
showers and bicycle shelters. In June every year 'Bike to Work Week' is one of our initiatives and for that whole week every site holds activities eg
ONS fleet cars undertook 186427 miles during 2005/06. All 14 vehicles were diesel powered, 6 were Euro IV compliant and as of May 2006 a further free bike checks, bike raffle and other gifts and incentives to encourage cycling to work. All sites except London have travel plans and car-sharing
4 will be. Average fuel consumption for 2005/06 was 51 mpg. This translate to approx 3655 gallons of diesel fuel a 4.2% on previous year.
database.

LOD

Organisation

CO

Question:C.1 The
question refers to the
C2 target. Have you
met the target in this
reporting year (200506)?

No

Question:- Did
you meet the
target by the
original
Question:- If necessary, please provide additional details
deadline?
about your previous answers.

We have comprehensive data collection and monitoring systems in place to collect water usage and
expenditure data.

13 The above figure relates to offices included in the SDiG Questionnaire.

The changes shown this year are due to changes within our
estate; whereby the estate has doubled the number of sites.

All owned sites collect water data on a monthly basis, which is then recorded centrally for reporting
purposes. In addition to this, data is input into a utility monitoring programme, which highlights
discrepancies as well as producing an alarm system for excessive usage at any site.

94

191586

44659

Not known

Yes

No

DCMS

No

No

Nearly all sites have meters so check data through bills and meter readings.

We are not the sole occupier at Cockspur Street. We sublet to


Team Energy Bureau Service collate our data from water bills
two tenants

Yes

No

No

Yes

Yes

DfT

Not applicable

Yes

DH

Yes

Yes

Main DH: data from water meters is collected using STARK, and compared with bill data. NHS
PASA: Water meters are read weekly and bills checked against these readings.

No

DTI and the Agencies have met the current targets. Further
improvement may be difficult within the existing building
infrastructures.

Where there is separate metering DTI HQ and Agency locations collect water consumption data
from meter readings taken by the utility company or, by a contractor. Data is verified and is
submitted to DTI HQ as a part of the annual energy return and recoded using a utility tracking
system. In other locations this is included in a service charge which is calculated on an
apportionment.

No

Water consumption on the DWP estate has reduced by almost


20% during the last 3 years, due mainly to an ongoing
programme of waterless urinal installations. However we have
not met the target, partly due to a significant number of public
toilets on the estate, for which usage data cannot be collected.
Additionally, we have resident staff on most sites, such as
security staff and facilities management staff who are not
directly employed by the Department and therefore their
Billing information is collected by our PFI partners 'energy and utility bureau' and stored on thier
numbers, usage of water is not effectively captured currently.
database.
Water is the responsibility of the building management
company in our multi tenant main office site. ECGD's ability to
influence water usage is minimal. DEFRA's Sustanable
development unit has therefore agreed that this set of targets
do not apply to ECGD. However, the building is modern and
follows good practice with regard to water usage. The building
management company has introduced measures such as low
flow toilets to reduce water use.

No

Watermark target does note apply to 05-06.

This varies in some cases external specialist will be used for data collection and bill validation and
in other case this will be the responsibility of facilities management contractors.

ECGD

Not known

Not known

FC

No

Not applicable

Some districts have local data records. Forest research receives monthly invoices from Water
Company. The water meters are positioned at entrances to sites and meters ALL water that comes
onto the site.

FCO
FSA

No
No

No
Not applicable

Monthly manual meter readings


We have joined Watermark and have established monitoring arrangements with them.

Yes

All buildings that have a separately billed & metered supply are collated on a centrally managed
monitoring and targeting system. Water meter readings are taken from the buildings, with the largest
buildings having monthly readings recorded and smaller buildings are quarterly.

HMRC

Yes

HMT

NO

Not known

HO

No

No

This figure excludes water used by an on site Nursery that was included in SDiG 2005. Water usage
61569 is included for a private organisation undertaking DfES work.

13556

38,954.42 The data at left excludes one site where further verification is pending.

Eileen House figures have been omitted from total. Building closed 31/07/05. EH water consumption
15662 for period April-July 05 was 475m3

6 Richmond House, Wellington House, Skipton House, Eileen House, Reading, Chester

12

55708

1473 All sites that are adminsterd by our PFI partners are now billed for water. For the purposes of this return a

1059081 m3 usage would be the usual figure reported, however additional information has been
obtained to show the water consumption from the HSE = 28103 and Rent Service of 1609, giving a
grand total of 1088793. Due to the nature of the Department's accommodation, some sites are
shared with other occupiers. In cases where we are the major occupier, we are billed for the whole
of the sites water consumption. Furthermore, there are a few anomaly sites from which water data is
not obtainable. However it is considered that the excess data from some sites offsets against the
1088793 lack of data from others. The data has always been calculated and reported in this way.

Billing information is not known, however most offices/work premises will be directly billed for water charges

2
1 Only Aviation House (London HQ) is billed directly

760,584

This figure includes a calculated water consumption of 3537.56m per year for the Cabinet War
18503 Rooms Museum, which attracts many vistors.

63 This represents 36 NPS offices included for the first time this year , 2 IPS offices and 25 main HO build

CPS Copy invoices are sent to the Energy Manager for inputting on to a data base. Due to changes
in processes and organisation this system is in the process of being reviewed. SFO We currently
have a water meter. We record monthly usage figures converted into an annual total which is
maintained electronically. TSol We are based in a Landlord Service Managed Building and pay for
our water within the service charge. Water usage data is controlled by our Landlord. HMCPSI
Quarterly bills averaged out per person. AGO Record data from water bills and take metre readings

39 This figure is an amalgam of departments.CPS 36 SFO 1 HMCPSi 1 AGO 1

No

MOD

Not applicable

MoD estate classed as mixed, therefore, we are not reporting


Not applicable against this target.

MoD estate classed as mixed, therefore, we are not reporting against this target

Not applicable

Monitoring of all water bills is carried on all sites, and data is collated in the monthly/annual EPIs.
Data is taken from a combination of meter readings and bills.

24657
9153

415

Water meters are read and data collected by Local Property Centre staff and/or consultants such as
ADSM. Bills are checked against readings supplied to ensure accuracy.

No

Yes

LOD

ONS

81535

21 In line with the target guidance data at left relates to main offices.

The occupancy figure used for this period has not been
confirmed. The figures currently represent staff of the Treasury,
Cabinet Office, Office of Government Commerce and the
Royal Mint. The figures do not take account of the number of
visitors (average of 183 visitors per day with a 4 hour or more
visit) to the building or the water used during this period for the
irrigation system or water feature. The project to install
Water usage data is collected weekly and entered on to the Envoy environmental management
secondary metering is currently being managed.
system.

This reporting period.CPS SFO HMCPSI AGO N / TSol RCPO


NA. Original deadline. CPS SFO HMCPSI AGO N / TSol
RCPO NA. CPS We are reviewing our water data collection
processes to enable us to collect better water information. SFO
General statement has been published on the SFO website. It
is hoped to produce a comprehensive environmental
contribution to the Departments website during 2006/07. TSol
We are based in a Landlord Service Managed Building and
pay for our water within the service charge. Water usage data
is controlled by our Landlord. RCPO sub lets from HMRC
therefore this information will be included in HMRCs return.
AGO We are moving offices in 2007 and water conservation
will be integral to the office design

8423 The tenants water consumption is included in the figures

52 These offices are directly billed on the basis of water consumed. A few smaller offices are not billed on

Water usage is monitored on behalf of the Department by ADSM, an OGC Watermark Scheme
contractor, specialising in energy conservation measures. Usage figures are collated by ADSM and
trend analyses submitted to DfES with any recommendations for action. They provide information on
bill information, trend assessment, benchmark assessment and CO2 assessment. Usage and trends
are discussed with the in-house maintenance contractor and any actions taken as necessary.
Facilities Management Team collect monthly meter readings which is then reviewed at monthly
meetings.

DfID

DWP

4 Cockspur Street is billed directly. Included in the charge is the tenants usage which is then charged th

Data is collected from sites where we pay for services, based on metered charge. Local FMs also
take meter readings and monitor performance. A TEAM data base enables recovery and
manipulation of the data for analysis and management purposes and to provide feedback to staff to
influence behavioural changes.

DfES

Yes

Question:- If necessary, please provide additional details about your previous answer.

N/A

No

DTI

Question:C2.3 Of
these offices billed,
what was the total
volume of water used
(m3)?

No

DCLG

Yes

Question:C2.2 How
many of your offices are
billed directly for water
(rather than included in
service charge)?
Question:- If necessary, please provide additional details about your previous answer.

Current data collection and monitoring systems have been significantly improved including the
undertaking of a detailed and thorough review of occupancy figures for our central London estate.
We currently have a number of minor occupiers on our estate. The cost of their utilities consumption
is paid for as part of their service charge. This service charge is calculated on a percentage basis
according to the floor space taken up by the minor occupier. However, the actual utilities usage
figure is not split so we are essentially recording their consumption as our own, hence showing a
disproportionately high figure for our consumption. In order to overcome this, we have used the
percentile values used in the calculation of the service charge to adjust the utilities figure, to more
accurately reflect the amounts used by Cabinet Office. This methodology has been approved by the
50,224 Building Research Establishment (BRE).

DCA

DEFRA

Question:C2.1 What arrangements does your Department have to collect water usage data?

N/A

MoD estate classed as mixed, therefore, we are not reporting against this target

5 The figure above includes one 'non office'

246474

Although we have some information for some of the departments we do not have it for all.Therefore
a total is unavailable. CPS N/k SFO 1659 HMCPSI 333 AGO 704m3 SFO Since 2004 05 we have
begun an upgrade programme which includes installation of spray nozzle taps and dual flush toilet
0 facilities. These features will be extended through Elm House during the next period.

N/A

MoD estate classed as mixed, therefore, we are not reporting against this target
Our office premises at Myddleton Street (Family Records Centre) is not included in this total as we
occupy only part of the building which is not billed directly. We have 51 FTEs at the FRC. The main
33702 users of the premises are the public.

Organisation

Question:C2.4 How
many FTEs do you have
based in those offices
that are billed directly for
water? (Please use
average figure)
Question:- If necessary, please provide additional details about your previous answer.

Question:C2.5 Please
estimate how many full
time contractors on
average were working at
your office-based estate
during 2005-06?

Question:- If necessary, please provide additional details about your previous answer.

CO

2066 N/A

DCA

9698

2355

DCLG

5785

222

DCMS

584 N/A

546 We donot have any FTE figures for the tenants

DEFRA

Question:- If necessary, please provide additional details about your previous answer.

N/K

Question:C2.7 For your


office estate only, what
was the average water
consumption per person
in 2005-6(m3)?
(Please include office
based FTEs, full time
contractors and average
visitor numbers when
calculating your average) Question:- If necessary, please provide additional details about your previous answer.

N/A

18.95 The above figure relates to FTEs, full time contractors and consultants. Visitors are not included.

1436 This is a very rough estimate using the guidance given, based on average visits to our sites. DCA is not
279

114

11341

0 DCMS estate doesnot keep records which would assist in calculating this figure

2094 Defra 650; PSD 0; RPA 1414; SVS 23; GDS 2; MFA 5.

DfES

6041 Includes DfES 3720, contractors 737, OGDs 1463, visitors 121

737 Contractor figures include those who have a full time presence.

DfID

1577 This figures includes FTW staff - 1525 plus Secondees - 46 and 6 development attachments from overs

158 This figure includes Agency staff, Consultants, Catering, Gym, Security and Cleaning staff.

DfT

5858

DH

2717 Staff numbers, not FTEs (EH excluded). Includes some desk based contractors.

DTI

6686

DWP

Question:C2.6 Please
estimate the FTE
equivalent for the
average annual visitors
to your office sites
during 2005-06 (see the
guidance for how to
calculate)

6.05 FTE = 11,341 + 45 visitors + 2094 consultants = 13,480 81,535 m3 /13,480 = 6.05

121 The Department had 121,115 visitors (including visiting contractors) during 2005/06. For the purposes o
36 Estimated visitors is 36000 per year who spend an average of 2hrs on site.

109 Non-desk based contractors only

120708 As stated above, a large number of offices have public toilet facilities. No records are maintained to s

4419 Levels of contractor staffing at each site vary. This would include staff such as resident maintenance sta

ECGD

25

A new gym was created at our East Kilbride office during 05/06.

5.26 Actual consumption 5.26m3pppa Total staff and visitors 2976 NHS PASA consumption: 5.65m3 pppa Gym in SKH. Restaurants in SKH, WEL, RH. Ministerial bathrooms in RH. Showers in all buildings.

93 DTI HQ has a confrerence centre and two staff resdtaurants utilised by non DTI staff. We have made a

DTI HQ has two restaurants, Cooling towers and a sports centre, plus two conference centres. The
agencies have three further restaurants

1473 Levels of site visitors vary. They are either visiting contractors, customers or business reps from other

9 Our average water consumption is actually 8.6m3 per person, however this on-line return will not acceptQuarry House in Leeds has sports facilites and a swimming pool.

Seed testing water tanks. Forest Research Nursery facilities. Private Houses. Staff restaurant.

2452
630

HMRC

HMT

MoD estate classed as mixed, therefore, we are not reporting against this target

3937

0 Data is not collected for all our sites. A significant proportion of our visitors come into our enquiry cen

100

3620 This figure is an amalgam of departments.CPS 3432 SFO 103 HMCPSI 35 AGO 50

N/A

NK

NK

MoD estate classed as mixed, therefore, we are not reporting against this target

10 This figure is based upon the following information at the time. Treasury staff approx 1413, Site Bas

There has not been an unusual change in overall annual consumption. However additional water
usage has been offset by water reduction measures undertaken. The increase in two buildings
water usage during the year is being critically examined. Office refurbishments during the year and
the replacement of cooling towers have been a contributing factor.
N/A

N/A
NHS PASA: Increase of 18% on previous year due to two water leaks at the Reading office, and
installation of plumbed in cooled water dispensers. Last year's consumption 6.17m3pppa; however,
this excluded visitors and non-desk based contractors. If these are excluded from current year,
consumption is 5.76m3pppa. This represents an overall 6.65% reduction.

Both DTI HQ and Psatents Office experienced significant water leaks during the course of the year.

This years water consumption has reduced against the previous years consumption. 10.2m3 against
8.6m3 this year, which equates to 15.7% reduction. As already stated this is mainly due to the large
scale installation of waterless urinals. Consumption is expected to reduce further as the
programme continues. Consumption has also been estimated for visitors and contractors, giving a
more accurate consumption figure overall.

0 We do not have figures for all departments.CPS Nk SFO 21.26 HMCPSI 1.72 AGO 0.75

N/A

MoD estate classed as mixed, therefore, we are not reporting against this target

660

nk

No, but we have some showers at some sites and we have a swimming pool and en-suite facilities
at our training centre in Lincoln.

No.

The building has a water feature and irrigation system for the courtyard.(The water feature was
switched off during the drought period). In addition the actual consumption of water for the Cabinet
War Rooms is not known, this is a calculated figure from trials held in June 2006. The building also
has shower rooms for the sports, recreation areas.

The increase in consumption has been considered to be due to the completion of the phase two
refurbishment. From January 2005 1575 members of HMRC have occupied phase two with the
building offering a shared services culture. This has resulted in members of HMRC using toilet,
shower and catering facilities within the HMT area.

Some buildings have the following: - cooling towers, a site creche, gym, restaurants/coffee shops,
showers, and washing facilities for prayer rooms, and water features. High numbers of public callers
12.48 This total is an increase on the offices total which takes account of the 144% increase in the number o place demands on sanitation facilities.
142% increase in number of properties reported on.

1325 Excludes NPS offices where visitor numbers are not recorded centrally.

0 we do not have figures for all departments.CPS Nk SFO 18 HMCPSI 0 AGO 0

401

7.68

47000

Unknown so not included in the consumption calculations below.

N/A

Re the Royal Parks Increasing temperatures and dry conditions result in increased water usage.

At KCS (Main Building) they are cooling towers which are sub-metered and deducted from the total.
There is large usage from the restaurants and we intend to sub-meter this in the future. At the OAB
8.5 The restaurant is not sub-metered at present, however we estimate usage at 2500m3/yr for KCS (main we
b have a gym with showers that are not currently sub-metered.
12.2
We have shower facilites to encourage walking to work and cycling.
No

71.5

0 Our contractors have been unable to provide this information due to the size of our estate.

18422

LOD

ONS

NK

1513 This figure is based on workstations due to the unavailability of an accurate headcount.

HO

MOD

388 We only know how many Contractors Security Passes were issued during the year not if they were FT

98980

The overall change in estate has altered our baseline figures considerably. Its not possible to
determine precisely what our increase or decrease would have been, due to the change in estate.
Some sites have closed and in some cases moved to new sites.

2000 Estimate - assuming 10 visitors x 200 working days.

FC

FCO
FSA

Current data collection and monitoring systems have been significantly improved including the
undertaking of a detailed and thorough review of occupancy figures for our central London estate.
We currently have a number of minor occupiers on our estate. The cost of their utilities consumption
is paid for as part of their service charge. This service charge is calculated on a percentage basis
according to the floor space taken up by the minor occupier. However, the actual utilities usage
figure is not split so we are essentially recording their consumption as our own, hence showing a
disproportionately high figure for our consumption. In order to overcome this, we have used the
percentile values used in the calculation of the service charge to adjust the utilities figure, to more
accurately reflect the amounts used by Cabinet Office. This methodology has been approved by the
Building Research Establishment (BRE).

Staff restaurants in some buildings. Cooling towers in three buildings. On-site creches at two
buildings.

6.6 Data at left has been calculated using staff numbers, visitors and contractors to our site. We have conceNo.

150 Estimate from 4 month figures, extrapolated to 12 months (RH/WEL/SKH). Assumed each visitor stays

1162 This is a daily figure

Re the Royal Parks Numerous areas of the Royal Parks require watering e.g. to maintain flower
beds / young trees. This is a significant issue for the Royal Parks and therefore best practice is
applied to reduce the need to water plants and for reducing the volume of potable water used, see
best practice section below.

Cooling Towers have been replaced in one of our buildings with those that are more efficient. This
required complete drainage of the system and refilling. The results will be reported in the next
period. Two of our buildings have water features (a large fountain within an internal atrium and a
small external fountain). Two buildings have gym facilities. All five buildings have shower facilities
and restaurants. Three buildings have internal planting, two of which are located within internal
atriums requiring additional watering. Two of our buildings (comprising approx 50% of estate) are
fully air conditioned and one other operates a mechanical ventilation system with heater battery
10.19 Performance varies in each of our 5 buildings. Consumption ranges from 6.22 m to 14.16 m per person
attachments (all use various amounts of water).
7.65

Included above. Most sites have included information on total numbers of contractors, consultants and visitor numbers but this can Included above. Most sites have included information on total numbers of contractors, consultants and

Shower facilities, internal and external water features.

We have a mixture of water features that could impact on water usage, including water towers,
14 This represents a major increase in water usage compared with last year. This can be explained in part several
w
gyms, water fountains and on site restaurants.
London HQ sites drinking water for catering and hospitality is from the mains, therefore increasing
7.1
water usage.

15 Answer based on FTE and contractors for DCMS estate. Tenant and visitor figures not included

45 Based on estimated average visitor hours 90K.

Question:C2.8 Do you have any special water using features that may have an impact on your Question:C2.9 If you have experienced an unusual change in consumption (10% increase or
water consumption figures e.g. cooling towers, sports amenities, water features?
decrease), please provide any reasons for this change

0 We do not have figures for all departments.CPS nk SFO 13.91 HMCPSI 9 AGO 13.9

N/A

MoD estate classed as mixed, therefore, we are not reporting against this target

7.33

CPS Our HQ building at Ludgate that has 825 staff, has chillers and a staff canteen. SFO An
increase in the no of staff cycling and jogging to work has resulted in increased use of Departmental
shower facilities. Replanted front flowerbeds contain plants requiring minimal water which has
removed the need for us to use a hosepipe to maintain them. HMCPSI Facilities available to staff
include a shower and dishwasher.
HMCPSI Mains water usage has increased since changing to mains supplied water coolers

MoD estate classed as mixed, therefore, we are not reporting against this target
Cycling and gym facilities include showers at 4 of the 5 main sites. Water fountain at London site.
Pond at Titchfield. Ceased using 50 litre bottled water dispensers in exchange for mains supplied
dispeners. Fire sprinkler system tanks had to be serviced twice at our London site this year.

MoD estate classed as mixed, therefore, we are not reporting against this target

Organisation

Question:C2.10 For those offices which are not directly billed for water, please outline your
overall approach to water efficiency

Question:C2.11 Do you collect water


consumption data for your significant non-office
sites?

Question:- If necessary, please provide additional details about your previous answer.

CO

Offices where we are not directly billed for water are leased and paid for by a service charge and/or wh Yes for all non-offices sites

N/A

DCA

Where sites are not directly billed for water, we ensure that good housekeeping information on water usage
Yes - equal to or greater than 50% non-office sites

Water consumption data is collected for all owned sites across the non-office estate.

DCLG

Landlords have been able to calculate the proportion of water use for those offices not billed directly,

DCMS

DEFRA

412 N/A

NA

Not applicable

DfID

N/A

Not applicable

DfT

We follow best practice advise, encourage staff and visitors to use water wisely, report dripping taps,

DH

Main DH: All employees are encouraged to conserve water (tips etc are on our intranet). NHS PASA: Not applicable

DTI

The same approach to introducing counter measures are adopted in all buildings irrespective of billing Yes for all non-offices sites

DWP

Yes - less than 50% non-office sites

Current data collection and monitoring systems have been significantly improved including the
undertaking of a detailed and thorough review of occupancy figures for our central London estate.
We currently have a number of minor occupiers on our estate. The cost of their utilities consumption
is paid for as part of their service charge. This service charge is calculated on a percentage basis
according to the floor space taken up by the minor occupier. However, the actual utilities usage
figure is not split so we are essentially recording their consumption as our own, hence showing a
disproportionately high figure for our consumption. In order to overcome this, we have used the
percentile values used in the calculation of the service charge to adjust the utilities figure, to more
accurately reflect the amounts used by Cabinet Office. This methodology has been approved by the
Building Research Establishment (BRE).

92990

Due to the unique situation the Royal Parks are in the collation of water usage data is problematic.
The Royal Parks are however, committed to reducing potable water use and have employed
numerous water saving measures. These are listed in the best practice section below

Not known

Local building managers work with major occupiers and landlords to consider initiatives to drive down Yes - equal to or greater than 50% non-office sites

Question:- Please use this space to provide additional information that you feel is essential
for us to know. For example, your overall approach in this area, barriers to progress and
significance to your business Please limit your response to 500 words.

Due to the change in estate, the figures shown this year show a dramatic increase in water used
against previous years. We are looking at our inherited estate to see what water saving initiatives
may be available.

280874

Yes for all non-offices sites

DfES

ECGD

Question:C2.12 If yes
to C2.11, what was
your total water
consumption for these
non-office sites for
2005-06 (m3)?
Question:- If necessary, please provide additional details about your previous answer.

Consumption data is entered on TEAM data base for analysis and to allow site based benchmarkls and t

N/A

304970 Laboratories - 273,024 m3; Farms - 304,970 m3

N/A

Data is collected for all significant non-office sites and smaller non-office sites where possible.

N/A

Question:- Please outline any examples of what you consider to be good practice in the way that you manage water impacts and/or undertake monitoring and reporting of
your
performance
in this area. Should
your information
be selected
to beishighlighted
as anot
case-study
thefurther
report,
we will
youoffor
information.
consumption
with representatives
of The Environmental
Agency.
Their advice
that we should
undertakein
any
works
untilcontact
the results
thefurther
water audits
referred to above are
known. They have offered to examine those results and provide any advice/help they can to help us reduce our consumption. Other initiatives being undertaken to reduce water usage
are shown below: As part of our response last year to the Water target in the Framework for Sustainable Development on the Government Estate, we signed up to the WaterMark project.
This enabled us to validate our water bills with a view to identifying areas for improvement. Using this information we have been working alongside our Total Facilities Management
Provider and have secured the appointment of a dedicated Energy Manager. Recognising that whatever measures we undertake must represent value for money, we have moved ahead
with some Quick Wins. For example: A programme of placing Hippo Bags in the toilet cisterns across our central London estate is nearing completion. In Admiralty Arch this will
potentially make efficiency savings of 925m3 per annum (203,472 gallons or 925,000 litres or a financial saving of 1,319 per annum based upon latest water charges from Thames
Water). Relevant FM staff are being trained in how to use data loggers (to more accurately assess water usage) which have been installed as part of the water audit works mentioned
above. As part of routine maintenance works and all refurbishment projects, there is a rolling programme of exchanging existing and expired water fittings with more water efficient
devices. For example when we recently refurbished the disabled toilet in Admiralty House, various water and energy efficient devices were included. Agreement has been reached with
our Total Facilities Management Provider to only purchase water fittings and white goods (i.e. dishwashers in canteens) which are water and energy efficient. Estate and facilities
managers have been asked to take steps to reduce water usage across the whole estate; e.g. not using hosepipes for watering and cleaning purposes. Staff and contractors will also
being encouraged to conserve water through regular staff awareness notices and guidance.

The department undertakes a rolling programme of energy and water surveys. These surveys identify where savings can be made and are split into no cost and low cost options, all with a
maximum five-year payback.
Government Office East reported the following.. Dual flush toilets and self stopping taps were included in initial design of the building which was constructed in 2003. In November 2005,
and following a successful trial period, waterless urinals were installed across the building
Ongoing water minimisation strategies include: o mulching around the bases of trees o
mulching shrub beds ochanging the times of day when watering to reduce evaporation i.e. to
first thing in the morning (between 5am and 8am) o
using water from boreholes instead of from the mains e.g. the Diana Fountain o
Hyde Park nursery almost solely uses water
from a well o water retaining gel is used in the beds (seasonal bedding) that are more susceptible to drying o allowing areas of grass to remain longer than normal. This trial will verify
how well longer grass can withstand to drought (i.e. ability to catch dew and ability to withstand wear and tear at dry times) The Royal Parks aim to minimise water use from all sources,
especially mains potable water. Borehole usage will continue to be developed for irrigation purposes

Opportunities are taken during new builds and major refurbishment projects to incorporate water
saving measures - dual/low flush toilets; low-water or waterless urinals; spray, percussion or PIR
controlled taps. As budgets allow, these measures are also being retro-fitted to other buildings. We
are also actively considering the feasibility of installing grey and rain water recycling facilities at sites
on the defra estate.

The DfES is currently in the process of reducing its Estate in London and by 2007 will only be
occupying one Building. In the meantime, occupancy and consumption figures are fluctuating as
staff relocate as part of this exercise. A number of water conservation measures have been installed
over the last year including push-button taps, motion detector taps, taps fitted with spray units to
reduce water flow, water hippos to reduce WC flush volumes and flow controls for urinals.
Facilities Management Team Leaders have been asked to consider what further additional measures
can be taken to reduce water usage. Their proposals will form part of an action plan. Building
managers have been actively monitoring water consumption and as a result one site has identified a
small leak in the system. Overnight readings are occasionally taken to help identify faults and leaks.
DFID created new gym facilities at our East Kilbride office which will have impacted on our water
As part of the refurbishments DFID included sensor mechanisms on the urinals, and spray taps in the toilets. We are currently looking at our other energy saving devices such as dual
consumption.
flushes.
The Driving Standards Agency have installed Cistermisers (hydraulic valve) at their Northern Area office (Newcastle) and are planning a trial of waterless urinals and installation of Save a
Flushs bags at the HQ site, where water consumption is currently 4 cu metres per person. This forms part of the Agencies plans to meet the recently published longer term water
reduction targets. The MCA has also installed Cistermisers at their HQ and rainwater re-use is in operation at one site. The DVLA is will be making an assessment across their Morriston
site (houses more than 4,000 staff across a number of sites) for the suitability of waterless urinals. The Agency has also undertaken Water Risk Assessments and remedial actions have
been completed/are ongoing. In addition the Agency is also evaluating options to capture grey water for toilet flushing and the refurbishment of some sites has included the fitting of dual
flush toilets and water efficient taps.

3,450 Data at left relates to the DSA Cardington site (residential driver training site).

The Department has made efforts to reduce water consumption beyond the current target levels,
and to implement good practice where economically feasible. Few opportunities exist to reduce
water consumption further by any significant amount that do not reduce the quality of workplace
facilities for employees, or that would incur considerable capital expenditure. However, the situation Monthly reading of meters and comparison against bills, periodic checks of facilities to detect leaks promptly, use of waterless urinals and time limited push taps in toilet areas. Staff
will be kept under review.
awareness campaigns.

No significant non-office sites.

698 Data is a little inaccurate as one of the sites transferred from DTI in the reporting year and some co

Improvement intiatives will be difficult as the building infrastryucture and most lease agreements
prevent us from making significant in-roads.

Both DTI HQ and the agencies have introduced a number of water saving initiatives which include, awareness campaigns, hippo bags, waterless urinals, water efficient dishwashers, flow
reducers on taps, water recyclers on cooling tower system.

Not applicable

See earlier answer.

No

FC

Forest research Alice Holt have installed a Water Management Systems in Gents toilets x 7, plus water No

FCO
FSA

N/A
The regional offices manage their own premises.

HMRC

As of Feb 2005, ADSM, the Watermark contractor has been contracted to provide the Department with wat
No

HMT

Some local data is collected, but not throughout all Forest Districts. As part of our overall
environmental management strategy, we will begin to collect and collate baseline data for water
consumption throughout the organisation, in an effort to reduce future consumption. Forest
Research two main sites combine Plant Nursery facilities, FC owned private houses occupied by
mixture of FC and private tenants, Laboratories and Offices with about 210 staff and a Committee
run Staff Restaurant. We have one meter which records total consumption for each site. We are
categorised. We feel that because of the nature of our sites as described above, a distorted picture
would be given if we reported water usage on an employee/m3 water usage basis. We are installing
additional meters to give a more accurate picture.
Forest Research - Water Management Systems for gents urinals. Hippo bags in cisterns.

Yes for all non-offices sites


No

We have installed recently a number of sub meters to be able to monitor usage better and these are linked back to the Building Management System (BMS) to provide continuous hourly
profile readings.

38620

No we are unable to collect this data. Please see A.3.9

We have not had the resources to invest in significant water saving measures, although the
Watermark consultant has been implementing low cost measures. We will be exploring shared
savings schemes to make further reductions in our consumption during the coming year.

N/A

All buildings that have a metered water supply are monitored by the Watermark Contractor utilising specialist monitoring and targeting systems. The consumption of the buildings is
assessed each month for increases in consumption, with any significant increase resulting in an investigation into the causes of the increased consumption.

Not applicable

HO

All LPCs are encouraged to use water responsibly and efficiently.

Yes for all non-offices sites

LOD

CPS We are intending to review and advise on methods of water conservation including a review of meas
Not applicable

NA CPS SFO TSols HMCPSI RCPO AGO

MOD

MoD estate classed as mixed, therefore, we are not reporting against this target

AQUATRINE is the MOD GB-wide Water and Wastewater Public Private Partnership project which transfer

ONS

Monitoring of bills for FRC carried out. This is a fairly new building and quite energy efficient but as we Yes for all non-offices sites

Yes - less than 50% non-office sites

8764859 HMPS 8724874m3 FSS 37831m3 HOSDB 2154m3

On the public sector prisons estate, water use increased by 6.5% in 2005/06 compared to 2004/05.
Some of this increase is due to a higher prison population, but the majority is due to mains leakage.
Drought conditions prevalent over much of the country cause the land to shrink, which puts stress on
water pipes causing them to rupture. Many leaks have been identified and repaired; unfortunately
others have appeared at different establishments. All establishments are required to provide a
monthly water consumption report to headquarters. This means that water meters are read at least Each prison establishment has an annual target for water consumption based on benchmarks developed for prisons as part of the Watermark Initiative. Targets are expressed as litres per
monthly. Many establishments find it desirable to read their meters more frequently, or have installed prisoner per month and performance is assessed against the target using a twelve month rolling average. Establishments are asked to explain any increase of more than 2.5% above the
logging devices, to facilitate early detection of leaks.
moving average stating the reasons for the increase and the actions taken to rectify the situation. FSS - improvement in reporting and recording of data compared to previous years.

TSol We are based in a Landlord Service Managed Building and pay for our water within the service
charge. Water usage data is controlled by our Landlord. The building was refurbished in 2004/2005
and a BREAM rating of very good was achieved. Waters services to toilets are linked to
sensors.CPS we are reviewing our water data collection processes to enable us to collect more
accurate water information.
distribution system, thereby providing an incentive for reducing leakage. We anticipate an overall
annual water saving of over 0.75 million cubic metres through leakage reduction by the end of March
2006. Benchmarking can provide valuable and realistic comparisons. As data become available on
consumption and leakage at our operational bases this can be benchmarked against an interim
figure of 51 cubic meters per person per year and against other defence departments. We are also
working to reduce consumption through improved design and better management of fittings through
better construction processes. A Consumption Reduction Plan to achieve the new SDiG Operational
Targets, as announced in Jun 06, is in development. This requires a reduction of water consumption
(including leakage) of 25 per cent by 2020. This will be dependent upon reducing the size of the
MOD estate to which water is delivered, and reducing the amount of water required by the remaining
MOD estate through leakage reduction work and consumption reduction measures. The main
threats to the achievement of these reductions surround achieving estate rationalisation and
manpower reduction targets. A linked threat surrounds the Departments ability to get water and
1,525,297 Royal Navy only - This total RN water consumption figure (which is 6.45% less than the base year of 200
wastewater infrastructure adopted for the parts of the estate that are sold.

205

Leakage reduction at Aldershot: Since 1 Jan 06, 37 leaks have been fixed at Aldershot Garrison, reducing the water being delivered to site by 0.257 million cubic meters. The lives of
around 2,400 people in the villages of Kpalusogu and Koshibu in Northern Ghana have been transformed, thanks to a six-man team of Royal Engineers. The soldiers, who are all
members of 521 Specialist Team Royal Engineers (Water Development), part of 170 (Infrastructure Support) Engineer Group, completed a five week project in 2005 which has seen fresh
running water being delivered to the villages for the first time in 800 years. Working with St Dunstans, the charity that provides life-long care for blind ex-service men and women, the
Royal Engineers connected a 5.7 kilometre pipeline to the regions existing water infrastructure which can now supply the fresh water at the turn of a tap to the two villages.

Organisation

Question:D.1
Have you met
the D2 target
in this
reporting year
(2005-06)?

Question:- Did
you meet the
D2 target by
the original
Question:- If necessary, please provide additional details about your progress against the D2
deadline?
target.

Question:D.2
Have you met
the D3 target
in this
reporting year
(2005-06)?

Question:- Did
you meet the
D3 target by
the original
Question:- If necessary, please provide additional details about your progress against the D3
deadline?
target.

Question:D.3
Have you met
the D4 target
in this
reporting year
(2005-06)?

Question:- Did
you meet the
D4 target by
the original
Question:- If necessary, please provide additional details about your progress against the D4
deadline?
target.

CO

Yes

Yes

N/A

Yes

Yes

Yes

Yes

The department is currently analysing results from a comprehensive waste survey undertaken over
the past year. This survey will form the baseline figure for the department. Additionally, the data will
be used to form the basis of a waste strategy and action plan, which will be rolled out over the next
couple of years.

Not known

Not applicable

Not applicable Not applicable The department is still calculating waste arising figures. This will be complete by December 2006.

Yes

Yes

DCA

No

No

DCLG

Yes

Yes

DCMS

Not known

Not known

DEFRA

Yes

Yes

Waste data has been collected over a number of years. Pre-existing data collection systems have
been refined to comply with the model set out in the target We regularly review data collection
methods to best reflect the information we need for government reports and to adapt better to the
waste hierarchy. Wherever practical, data collection is extended to additional sites to improve the
records on waste within Defra.

DfES

Yes

DfID

Improved data collection has meant the amount of waste we are reporting has increased from 200405 to 2005-06. However, 2004-05 was not a complete set of data with 4 offices not reporting fully in
this area.
Yes

N/A

Yes

The recycling rate has increased by 8% since 2004-05 to 2005-06

Not known

Not known

DCMS is in the process of reviewing its data collection of waste as part of its ongoing target of
achieving ISO14001 Our waste data is currrently being collated and previous year's validated Royal
Parks have sumittd the following data Total Waste Arisings (tonnes) Total Waste Recovered
(tonnes) Percentage of Waste Recovered 2003-04
2004-05 2003-04 2004-05 2003-04 2004-05
1200
2162
200 962 17%40% ( with Greenwaste)

Not known

Not known

No

No

To some extent, the increase in recorded waste arisings is due to the in-year extention of waste
monitoring from sites with over 50 staff to sites with over 25 staff. We have also continued to
improve recording methods at all sites.

No

Yes

Due to nature of parts of Defra business, significant amounts of special waste are produced, that
cannot be recycled (e.g. in specialist laboratories and animal facilities etc). We therefore record
recycling rates with and without this special waste. 04/05 Recycling rate incl special waste = 50.68%;
excl special waste = 86.73% 04.06 Recycling rate incl. special waste = 49.58%; excl. special waste
= 77.19%

Yes

Systems are in place to monitor waste arisings. They changed during the year when a national
waste collection contract was awarded. This was introduced on a staggered basis across all sites. A
housekeeping policy, published on our internal website, promotes reducing waste arisings through
reduced printing to essential only, printing double sided documents, using the phone or email to
contact people, circulating papers instead of sending out copies.
No

Yes

Waste arisings have been falling each year from 2002-03 until 2005-06. This has been due to
publications being disposed of through a one-off exercise to clear obsolete or overstocked items.
There has also been a large amount of furniture sent for recycling. Companies are contractually
required to remove their own waste and packaging daily or on completion of building work or
furniture/IT deliveries.

Yes

Yes

See additional detail provided in D2 above. A national waste contract was awarded during the year
which introduced changes to the identification and separation of waste streams. This was introduced
on a site by site basis.

Yes

Yes

Yes

Yes

NO

Yes

DFID waste contractors at both offices recycle more than 80 - 85% of all waste.

DfT

No

No

Not applicable Not applicable D3 can be achieved by December 2006

No

DH

Yes

Yes

Yes

Yes

Yes

Yes

85.4% of waste arisings are recycled

Yes

Only achieved 51.14% using the criteria set in this questionnaire, however, in the past we have been
able to claim waste to energy as recovery. This has a significant impact on DTI HQs returns as 41%
Yes
of its arisings go to waste to energy which is not captured in the data collection as RECOVERY.

Yes

New cleaning/waste contract (Feb 05) requires contractor to provide comprehensive details of
quantities of waste removed from site.

DTI

Yes

No

Yes

DWP
ECGD

The vast majority of waste arisings have been measured since 2001, with only minor anomalies not
being measured. Improvements have been made in reuse and recycling with more waste being
separated out from the mainstream landfill. We consider that we have met this target, given the
scale of our Department and its many varied buildings. As we continue to develop our understanding
of waste arisings and improve our data gathering, this causes difficulty in trying to reconcile the new
improved data streams against the initial baselines, often making comparison irrelevant and to
appear as if performance is failing, rather than improving. We consider that it is essential to report as
Yes
Yes
Yes
The total measurable office waste has decreased by 8%
accurately as possible but will qualify the data wherever possible to make our rationale transparent. Yes
Not applicable Not applicable
Not applicable Not applicable

The percentage of waste recycled increased by 1%. The tonnage decreased by 5%. Offices have
closed during the year, generating more non-paper waste. A review of the monitoring procedures
No
Yes
took place in the autumn.
Not applicable Not applicable Waste management is the responsibility of the building management company.

FC

Not known

Not known

Not known

Not applicable NK

Not known

Not applicable NK

FCO

Yes

Not applicable

Yes

Not applicable

NO

Not applicable Based on total waste reused and recycled/composted.

FSA

No

We have been very proactive in collating waste data, but this is done by our outsourced FM
Not applicable contractors who manage the waste contract on our behalf

Yes

Yes

Yes

Not known

HMRC

No

No

No

Yes

NO

Yes

Our main PFI contractor is currently putting arrangements in place to provide waste data.
Not known
Waste removed from site has been recorded since 2003 with progressive waste reduction each year
Yes
in line with the waste management plan.

Not known

YES

Our main PFI contractor is currently putting arrangements in place to provide waste data.
This information is recorded on the ENVOY System via transfer notes. Current waste reduction for
this period is 50%.

YES

HMT

Yes

The waste strategy is targeted to be 60% by 2008.

HO

Yes

Yes

the public secor prisons estate works towards bespoke targets agreed with defra. theses targets are
designed to increase waste management activity across the prisons estate and also levels of
performance with regard to recovery, reuse and recycling.
NK

Yes

see above

Yes

Yes

see above

No

This reporting year CPS SFO TSol AGO N / RCPO NA / HMCPSI NK. Original deadline CPS SFO
TSol AGO N / RCPO NA / HMCPSI NK. CPS We only have data for one full year ending Dec 05
on the above contract. We are looking at widening our waste strategy and will be looking to increase
the amount minimised.
Yes

Yes

This reporting year SFO Y / CPS TSol HMCPSI AGO N / RCPO NA. Original deadline SFO Y / CPS
TSol AGO N / RCPO NA / HMCPSI NK. CPS The above contract and our extended waste strategy
will assist us into moving in the right direction.HMCPSI No baseline figures to compare against
although recycling programmes have been introduced.

Not known

Not known

Progress is being made in certain areas of MoD, but an overall MoD-wide assessment is not
possible as waste segregation and recycling percentages data collection methodologies are in their
infancy.

Not known

Not known

Progress is being made in certain areas of MoD, but an overall MoD-wide assessment is not
possible as waste segregation and recycling percentages data collection methodologies are in their
infancy.

Yes

Yes

Yes

Yes

NK

LOD

No

No

This reporting year CPS SFO TSol HMCPSI AGO N / RCPO NA . Original deadline CPS SFO TSol
HMCPSI AGO N / RCPO NA.
CPS On deciding that paper was our main waste arising, we set up
a contract that collected all of out confidential waste, cardboard and tapes. TSol Recycling services
provided by our Landlord with the service charge. Data has only just started to be produced by them
to us from May 06 onwards. RCPO sub lets from HMRC therefore this information will be included in
HMRCs return
No

MOD

Yes

Yes

Progress is being made in certain areas of MoD, but an overall MoD-wide assessment is not
possible as waste segregation and recycling percentages data collection methodologies are in their
infancy. Target has been met to the extent that we have information from some Top Level Budget
holders.

ONS

Yes

Yes

Organisation

Question:- What
percentage of your
estate is covered by
waste monitoring
programmes
incorporating
comprehensive data
collection methods
for identifying and
quantifying waste
arisings? (%)
Question:- If necessary, please provide additional details about your previous answer.

CO

100% N/A

Question:
- What
Question: Question: was the
- How
- How
percentag
much
much
e change
waste
waste
in waste
was rewas rere-used
used
used
from
(metric
(metric
2004-05
tonnes) in tonnes) in to 20052004-05 ? 2005-06 ? 06 ?
Question:- If necessary, please provide additional details about your waste re-used.

N/A

Approximately 10% of our estate is already covered by waste monitoring programmes as part of
10% their EMSs

DCA

DCLG

100

DCMS

The Royal Parks have a specific waste objective to look at the movement of waste streams
generated within the Royal Parks up the waste hierarchy. Projects are therefore being discussed
100 and are underway to continue progress in this area.

DEFRA

This is based on the percentage of staff in the department working at sites where waste is
76.9 monitored. It covers all major Defra and Agency sites.

DfES

100 See additional detail provided in D2 above.

DfID

100

Data at left is an estimate based on sites where this is directly controlled and does not form part of
70 centrally provided services.

DH

Richmond House, Wellington House, Skipton House, Market Towers, Hannibal House (until closure
24/09/05), Eileen House (until closure 31/07/05), Reading, Chester Note: Market Towers - last year
all waste but paper was collected by landlord (amount n/k). This year the figures include all waste
100 streams collected from the building.

63

22

64

90

40 Extensive moves and changes programme through HQ properties to move to fully open plan offices.

0.0043

6.41

35.21

17.115

N/K

15

100% of estate is covered by monitoring programmes for the following: *general office waste,
including cardboard (waste from desks, restricted waste, paper recycling and kitchen bins) *waste
cooking oil, recycled as biodiesel from all the 160 offices with staff restaurants. Not all sites have
staff restaurants. *toner cartridges *Furniture and carpet tiles *IT. 26% of the estate currently has
fluorescent lamps recycled from 407 offices in Scotland, NE and Y&H. We are hoping to increase
100 this to 100% in the coming year.

FCO

100

FSA

100 This data is for Aviation House only. The regional offices have their own waste procedures.

HMT

100

227

450

1035

36

119

362

8.41

40.42

NK

nk

nk

nk

LOD

CPS SFO TSol AGO 100% HMCPSI 66% SFO Since April 2004 we have records for general waste
that we produce. We will be refining this record to show waste in litres for the period 2006-07
onwards. TSol Restricted waste only. The Landlord has in place procedures for general waste in
100 06/07.HMCPSI London site. AGO We are investigating the feasibility of collecting this data

Progress is being made in certain areas of MoD, but an overall MoD-wide assessment of our 4000+
sites is not possible as waste segregation and recycling percentages data collection methodologies
are in their infancy.

1286.6

3629.7

NK

NK

This figure is still being calculated as part of its comprehensive waste survey.

130

205

274

34 All incineration has energy recovery

214.3

218.4

1267

502

Data from 2004-05 did not include 4 offices, we have a complete data set for 2005-06. Fire Service
College had extensive site clearance work carried out in 2004-05 which contributed to a larger waste
60 to landfill figure

To some extent, the increase in recorded waste in this category is due to the in-year extention of
waste monitoring from sites with over 50 staff to sites with over 25 staff (17 more sites). We also aim
-11.8 to improve recording methods on an on-going basis.

313.37

228.83

-26.9

0.234

100

-85 Main DH: under new waste contract a much higher proportion now goes for recycling (via MRF).

* 04/05 adjusted to account for an error in reporting by one agency to maintain consistency in
-37 reporting

45.02

1.68

1390

Local re-use furniture market saturated. Larger quantities of IT equipment went for landfill compared
51 to last year.

294.17

1533.783

Increase mainly due to the successful completion of publications recycling project and an increase in
421 furniture recycling following storage clearouts and local re-use market saturation.

154.13

166.42

Only one of our sites sends waste for heat generation. Site occupancy reductions generated large
8 scale paper disposal for incineration.

1723.58

1826.24

DFID does not monitor/record re-use of fixture/fittings, IT equipment etc. DFID environmental
policies ensure that all resources are extensively used and only disposed off once they are not fit for
purpose.

279

263

6%

85

37

2302.6

2330.6

1.22

855.5

828.9

417.14

60.77

687.18

879

04/05 reuse figure is comprised of 119 tonnes of IT equipment only 05/06 figures: 22 tonnes of
toner cartridges were refilled. 340 tonnes of IT equipment was reused The percentage increase in
reuse is 304% but this figure cannot be used with any confidence to portray improvement. What is
does support is the improvements in our data gathering. We detailed the reuse of 30000 items of
furniture in last years return. (no tonnage available) Unfortunately, our PFI partners have been
unable to supply us with any data on furniture for this year. Data on mobile phones being reused
around the department is not available for this year (this system is in its first year but figures are
304 likely to be low).

15524

14782

The large increase in re-use and reduction of recycle waste is because after better investigation of
the final fates of waste streams, we discovered that large proportions of IT and Furniture disposals
381 were actually re-used not recycled.

727.66

493.88

52.12

57.57

N/K

2005/6 figure includes 93 tonnes of waste furniture (that could not be resold) removed from
redundant buildings. Figure has reduced due to fewer people now in buildings reported on (most
staff from closing buildings moved to NKBH, which is reported on by HMRC) All figures exclude IT
(some is refurbished and resold; the rest is dismantled and disposed of in accordance with
-16 legislation)

542.74

779

12.8

35 N/K

145.6

165.6

14.7

337

04/05 figures are made up of: 15348 tonnes of paper, 2 tonnes of fluorescent tubes 174 tonnes of
IT. 05/06 figures comprise of: 1.7 tonnes of fluorescent tubes 4.5 tonnes toner cartridge
components 266 tonnes of IT equipment 14510 tonnes of paper/cardboard The percentage figure is
misleading as our overall tonnage of measurable office waste arising has reduced by 8% in year.
The percentage of that waste that was recycled has increased by one percent. Measuring in tonnes
alone in such circumstance is not the best measure of data capture and does not in fact
demonstrate our improved performance on recycling. Additionally the following were also recycled:
15135 litres waste cooking oil recycled as biodiesel, as opposed to 74880 in the previous year. The
drop in figures has been queried with our PFI partners but they are unable to check data
retrospectively. This reduction may be due in part to the change in the nature of some canteens,
which have reduced the amount of fried foods to support healthy eating initiatives. Others have
scaled down the type of service available to staff, such as supplying only sandwiches and light
lunches, rather than the previous full range of hot and cold food. Litres cannot be added to tonnes
-5 for the purpose of this report.

4 Figure for Army overseas (Germany) only.

5443

6745

204

198.72

3851

6273

119

1769

11366.15

26695.82

553

709.8

This is other waste collected by the London office which is then incinerated to generate electricity

13.7

0 Figures not available for 2004/5

284

NK

04/05 totals reported from 30 prisons

Question:
- What
was the
percentag
e change
in
special/cli
nical
waste
from
2004-05
to 200506 ?

539

1576.33

0 Data not known for all departments.

NK

5.1 Further recycling is being undertaken but accurate data is still being analysed.

15% N/A

Question:
- How
much
special/cli
nical
waste
was
produced
(metric
tonnes) in
2005-06 ?

632

To some extent, the increase in recorded waste in this category is due to the in-year extention of
waste monitoring from sites with over 50 staff to sites with over 25 staff (17 more sites). We also aim
42.6 to improve recording methods on an on-going basis.

We are unable to provide this information as it is difficult to asses what is being re-used.

NK

N/A

Question:
- How
much
special/cli
nical
waste
was
produced
(metric
tonnes) in
2004-05 ?

0 N/A

The figures shown do not reflect the waste of the whole department but are figures that have been
1.9 checked and verified from across the department.

NK

NK

NK

0 N/A

2148.71

139

NK

1506.95

4,968 NK

100

151

-1.3 N/A

Question:
- How
much
waste
was
incinerate
d (metric
tonnes) in
2005-06 ?

Question:
- What
was the
Question: Question: percentag
- How
- How
e change
much
much
in waste
waste
waste
that went
went to
went to
to landfill
landfill
landfill
from
(metric
(metric
2004-05
tonnes) in tonnes) in to 2005Question:- If necessary, please provide additional details about your waste that went to
2004-05 ? 2005-06 ? 06 ?
landfill .

To some extent, the increase in recorded waste in this category is due to the in-year extention of
waste monitoring from sites with over 50 staff to sites with over 25 staff (17 more sites). We also aim
47 to improve recording methods on an on-going basis.

Waste reused - Not known. Furniture from redundant buildings sold where possible. Establishment
of surplus stationery store has enabled redistribution of stationery that might otherwise have been
0 treated as waste. Some of our redundant IT equipment is refurbished for reuse.

for the offfice estate our published waste management strategy identified our priority action was to
55 establish comprehensive waste data collection systems across the estate from april 2006.

ONS

798

Question:
- How
much
waste
was
incinerate
d (metric
tonnes) in
2004-05 ?

Question:
- What
was the
percentag
e change
in waste
incinerate
d from
2004-05
to 200506 ?
Question:- If necessary, please provide additional details about your waste incinerated.

1387

HO

N/K

823

Question:
- What
was the
percentag
e change
in waste
recycled/c
omposted
from
2004-05
to 2005Question:- If necessary, please provide additional details about your waste
06 ?
recycled/composted.

943

This covers the former Customs and Excise estate and our Newcastle site.Our main PFI contractor
30 is currently putting arrangements in place to provide waste data across our estate.

HMRC

MOD

The % change was +148,969% To some extent, the increase in recorded waste in this category is
due to the in-year extention of waste monitoring from sites with over 50 staff to sites with over 25
staff (17 more sites). We also aim to improve recording methods on an on-going basis.

N/K

Forest and related waste is dealt with under UKWAS certification. The UKWAS standard and reaccreditation report by SGS is in the public domain. The Forestry Commission is in the process of
developing a Sustainable Development Action Plan, which will in-corporate monitoring of waste
0 disposal and recycling.

FC

N/A

Question:
- How
much
waste
was
recycled/c
omposted
(metric
tonnes) in
2005-06 ?

NK

Those locations not able to submit comprehensive data have waste collections provided by the
91 landlord.

DWP
ECGD

N/A

Our HQ building division has passed furniture for re-use to companies like Greenworks or Azcom.
The reduction in re-use was attributable to the fact that no major refurbishment was undertaken on
the HQ estate during this reporting year. Unfortunately it is not possible to provide a percentage
change due to the different collection methods. Reuse for other sites is still being calculated as part
66 of our waste management programme.

N/K

DfT

DTI

N/A

Question:
- How
much
waste
was
recycled/c
omposted
(metric
tonnes) in
2004-05 ?

Decrease in waste sent for incineration largely due to reporting methods. Also waste sent to
incineration is in fact WASTE TO ENERGY which in the past is classed as recoverable. The two are
-15 very different

626

520

PFI partner not able to supply data but states the amount is minimal. Incineration occures for a small
number of offices in London and Sheffield.

14767

13307

1072.38

969.85

92.8

75.39

NK
The large increase in re-use and reduction of recycle waste is because after better investigation of
the final fates of waste streams, we discovered that large proportions of IT and Furniture disposals
-32 were actually re-used not recycled.

10

4.02

2.59

NK

NK

nk

nk

25.7 This figure includes paper.


9

6.2 04/05 totals reported from 30 prisons, 05/06 totals reported from 46 prisons

Full data is not available for both years. 2004-05 CPS HMCPSI AGO n/k,SFO 59.13,TSol 59.67
tonnes. 2005-06 HMCPSI AGO NK,CPS 1672.8 tonnes,SFO 57.94,TSol 37.52. The CPS SFO
0 TSol HMCPSI figures are for Paper recycled.

Data are for Army (overseas) and DLO in UK. Percentage is +15.89 Army - Liquid waste stream
that had originally been recycled is now being incinerated, which is reflected within the increased
incineration figures: 2004/05 120026 litres recycled/composted, 0 litres 2005/06. Figures include
15 DLO hazardous waste.

21.2

NK

We were unable to provide figures in 2004/05.

203

148 NK

10080.2

13489

3.12 Percentage change is -3.12.

Landfill waste figures for this year include 15 tonnes of IT components. This waste stream data was
-10 not available last year but despite this additional information, our waste to landfill has still decreased.

NK

0 Data not available.

Data are for Army (overseas). Percentage tonnes is -7.58% Army - Waste incinerated in Germany is
regarded as having been recycled through the energy process. 29400 litres incinerated 2004/05,
-7.5 194864 litres incinerated 2005/06, a change of +80.32%

NK

-10

22 Waste from the bins underneath desks, it can range from paper to waste food and packaging

46,292

nk

-43

NK

-36

470

NK

Increase mainly due to residues from publications project that could not be recycled. Also a large
6 portion of IT equipment for disposal went to landfill instead of recycling/reuse

NK

Our contractors have been unable to provide figures for 2005-2006.


233.12

-1

9645 NK

22365.8

23710.7

518.15

295.45

NK

147

182

23.8

NK

0 Data not available.

159 NK

Data are for Army (overseas) and DLO in UK. Percentage is -10.2% (i.e., 10.2% less went to landfill
-10 in 2005/6)

75.3

5304.8

NK

-96

NK

1866.2

NK

-7.8

NK

Organisation

Question:- If necessary, please provide additional details about your special/clinical waste.

CO

N/A

DCA

No figures currently available.

DCLG

The amount of hazardous waste is included in the above waste figures and not reported separately.

Question:
- How
much
total
waste
arisings
(metric
tonnes) in
2004-05 ?

1440

DfES

No special waste reported last year

DfID

N/A

DfT

DH

We are not provided with this information

DTI

DWP
ECGD

1338

2384

PFI partner is not able to supply data for clinical waste.

3397.04

HMRC
HMT

05/06 figures are from FSS.

LOD

Data not available.

MOD

Data are for Army (overseas) and DLO in UK. Percentage is -7.83% (i.e., less produced 2005/06)
Special includes hazardous waste.

ONS

To some extent, the overall increase in recorded waste is due to the in-year extention of waste
monitoring from sites with over 50 staff to sites with over 25 staff (17 more sites). We also aim to
12.2 improve recording methods on an on-going basis.

3811.51

2207.09

3543.8

364

335

-8%

3304.832

3326.163

0.65

1015

635.48

1757

1718

30,116

Question:- Please outline any examples of what you consider to be good practice in the way
that you manage waste impacts and/or undertake monitoring and reporting of your
performance in this area. Should your information be selected to be highlighted as a casestudy in the report, we will contact you for further information.

The Cabinet Office will continuously seek ways to reduce its waste production and work with
suppliers to minimise packaging and other waste and prefer products that eliminate or minimise
waste. We will seek to meet waste reduction targets set for the Government Estate by continuing to
separate waste streams, re-use, recycle and compost material wherever possible. We will review
and seek to improve existing systems for monitoring waste streams to move us closer to 100%
separation of recyclable material from our waste stream. The Cabinet Office currently recycles
paper, cardboard, glass, all cans and tins, rigid plastic containers, batteries, aerosols, CDs and
DVDs, mobile phones, fluorescent tubes, toner cartridges and furniture. Recycling bins are provided
in offices for the disposal of paper/cardboard, cans/tins/rigid plastic containers, batteries. An aerosol
recycling bin is provided in the staff gym. Glass, CDs and DVDs, mobile phones, fluorescent tubes,
toner cartridges and furniture are collected and held in secure locations before being sent for
recycling. Waste cooking oil is supplied to the bio-diesel market or for technical use. We will look at
options for composting food waste from our canteens.

The Cabinet Office will continuously seek ways to reduce its waste production and work with
suppliers to minimise packaging and other waste and prefer products that eliminate or minimise
waste. We will seek to meet waste reduction targets set for the Government Estate by continuing to
separate waste streams, re-use, recycle and compost material wherever possible. We will review
and seek to improve existing systems for monitoring waste streams to move us closer to 100%
separation of recyclable material from our waste stream. The Cabinet Office currently recycles
paper, cardboard, glass, all cans and tins, rigid plastic containers, batteries, aerosols, CDs and
DVDs, mobile phones, fluorescent tubes, toner cartridges and furniture. Recycling bins are provided
in offices for the disposal of paper/cardboard, cans/tins/rigid plastic containers, batteries. An aerosol
recycling bin is provided in the staff gym. Glass, CDs and DVDs, mobile phones, fluorescent tubes,
toner cartridges and furniture are collected and held in secure locations before being sent for
recycling. Waste cooking oil is supplied to the bio-diesel market or for technical use. We will look at
options for composting food waste from our canteens.

A barrier to quantifying waste arising is the lack of information available when local authority
collectors are used. Staff are also taking a pro-active approach and, where no recycling scheme is
available, will use local municipal schemes.

food waste composting scheme in January 2006. This scheme provides safe, hygienic and legally
compliant disposal of food waste generated in the buildings by the restaurants (food preparation &
scraps) and individuals (through tea-point kitchen caddies). All food can be collected, including
(cooked & uncooked) vegetables, fruit, meat, fish, bones, and tea bags, as well as napkins. In the
first three months of operation, approximately 4.5T of food waste was composted across the whole
estate. The scheme operates in partnership with the East London Community Recycling
Partnership (ELCRP). This is the first large scale commercial food composting scheme of its kind in
the UK. It is hoped that the continual success of the scheme will prove to be a model for similar
schemes across Government. Government Office East reported.. We have worked with Honeywell
(building FM provider) and other occupiers to increase re-cycling and reduce waste to landfill. We
have removed individual waste bins under peoples desks and replaced these with a small number of
Data collection for waste is fully complete this reporting year for the first time. Therefore it is more
communal bins for non-recyclable waste and paper. Bins are available in each of the two kitchens to
realistic for DCLG to use this year as a baseline. Last year ODPM also reported that waste sent to deposit plastic, glass and cans. Following the success of this initiative within GO-East other
incineration with energy recovery contributed to the waste recovery figure.
occupiers of the building (Defra, Inland Revenue, Valuations) have followed suit.
Re the Royal Parks o 100% of uncontaminated green waste is now recycled within the Royal Parks
o Parks have designated recycling areas for landscaping material such as soil and aggregate o
Recycling schemes are in place in Park offices and lodges o
Contractors are required to
provide waste data and recycle material

61 Increase in tonnages mainly due to publications recycling project tonnages.

All sites have been informed of their baseline percentage recycling/composting rate and given
guidance on achieving a 5% p.a. improvement. When quarterly reports are received they are
checked for progress against the annual target. Where they appear to be failing against the target
the reasons are investigated and consideration given to the most appropriate ways of improving
performance. This could include awareness raising for staff, training for the Recycling Champions, or
discussion with waste collection companies. Several sites have already exceeded their recovery
target rate of 75%.

We have established a network of 'Waste Champions' across the estate. Data is collected on a
quarterly basis. Guidance notes have been circulated to standardise data collection methods and
ensure smooth running in the absence of regular Waste Champions. They have been asked to
produce local procedure guides with details of how their data is collected and compiled. This will
provide an auditable 'paper' trail and will ensure consistency and accuracy. Data sheets were
amended in 2005-06 to calculate the amount of waste produced per person in each quarter. This
means that despite the staff numbers changing, we will have an accurate idea about which sites are
reducing their waste production.

This has been a developing year for changes to how we manage our waste collection and
segregation. There are a more wide ranging spread of the different types of waste segregated on the
different sites. The national contract introduced mid year is relatively new and has not yet fulfilled its
potential. It has taken some time for the new procedures to settle down with staff on each site.
Facilities management staff actively explores more sustainable options for disposals considering
landfill as the last resort. Challenging existing methods of sustainable waste disposals will continue
as innovations within the waste recovery industry increase. Converting items to weight continues to
be time consuming when considering the wide range of items for disposal. Improvements to
encourage further staff buy in will be an integral part of the Sustainable Operations Management
System Action Plan.

The department encouraged a number of schemes that ensure that waste recovery achievement is
above the minimum target of 40%. The paper, packaging, equipment and furniture are used more
efficiently through reuse, recycling and reduction of waste that goes to the landfill. Suppliers are
encouraged to demonstrate the latest developments and industry standards to ensure we keep up to
date with what is offered in the market place.

DFID reviewed and changed waste contractors at both offices last year. The new contractors
produce monthly breakdowns of all waste recycled, waste sent to landfill or for incineration.

Figures exclude IT and potential waste that has been reused. Main DH: Figures not directly
comparable with last year (see note in "additional information"). NHS PASA: Reorganisation led to
-31 increased waste disposal requirements (3% up on 2004/5).

Employees are encouraged to segregate in each office area. Our waste contractors source waste
disposal services which maximise recycling opportunities. Figures are not directly comparable with
last year additional waste streams now collected from MT; two buildings have closed and staff
have moved to NKBH, managed by HMRC (not reported here). Also, under new contract (Feb 05)
waste collection figures are more accurate than for previous years.

The weight of total measurable office waste and the weight of measurable office waste recycled
have both decreased. The percentage of the waste that is recycled has been maintained and
increased slightly. Re-use of items is more difficult whilst the estate and staffing levels are reducing
as the demand is not as high. We continue to introduce recycling of all clean waste paper and
cardboard in offices with suitable storage facilities. Other recycling - on an individual basis, office
generate relatively little in the way of cans, plastics etc however we are continuing to work with our
In response to increased numbers of requests for help with disposal of unwanted items, the
Detailed in previous narrative. Figures for this year are 14,782 recycled and 13,307 to landfill, giving PFI partner to look at ways of bringing this in to effect.Surplus desk consumables such as desk trays sustainable development team have set up a DWP wide Swap Shop, enabling offices to advertise
a total of 28,089 tonnes. However there are an additional 15,135 litres of cooking oil that were
have had to be sent to landfill as no other means of disposal could be secured. The introduction of
their surplus stocks and items on the DWP intranet. This is still in its infancy but is proving to be very
recycled as biodiesel which cannot be captured in the tonnage.
the sustainable development Swap Shop may reduce the occurrence of this.
popular and saving on waste generation and costs.

28,089

Forest and related waste is dealt with under UKWAS certification. The UKWAS standard and reaccreditation report by SGS is in the public domain. The Forestry Commission is in the process of
developing a Sustainable Development Action Plan, which will in-corporate monitoring of waste
disposal and recycling. Forest Research - All non-hazardous waste is despatched to Landfill via
skips provided by Onyx (now Veolia). Skip size 1 cubic metre and approx 40 skips per annum.
Weight of waste N/K. Some of our paper and cardboard waste has been collected for pulp by
various collecting companies but no records of weight or volume has been kept until quite recently.

Forest Research, Alice Holt - Following our involvement with a recycling for business initiative
facilitated by Hampshire County Council we have contracted DOVE Recycling to assist us in our
recycling. We have converted some old sheds into a 3 bay recycling and storage facility which acts
as a weekly collection point. Dove collect and weigh paper and cardboard separately. They also
collect plastic, glass bottles, and any other recyclable that we can store in an uncontaminated
format. We are waiting delivery from Veolia of a recycling container for fluorescent light tubes. We
are storing batteries in readiness to recycle when we have collected enough of the same type. Our
intention is to reduce our skip requirement to 30 or less in the first year. FY 06/07.
Glass/can bins in restaurant areas and present at large functions. Recently purchased benches for
OAB are made of recycled plastic.

1857.49

1508.43

-19

Plastics are not yet recycled due to the significant amount of space needed to store it. We are
working on other approaches to reduce the use of plastic on our estate. Dedicated Christmas card
recycling points in Main Building, OAB and Hanslope Park.

144.92

132.96

There are no barriers to our business, our waste is managed efffectively by our contractors and we
are actively trying to increase recycling and reduce waste by a series of awareness programmes

53,132

50,184

8.87

374

431.89

15

10879

17679

50403.65

69391.82

1070.92

1005.25

The waste reports are an excellent source of data. We also conduct waste audits every six months
to ensure that the reports are a fair and accurate reflection of our waste arisings.
subscription to statutory marine notices (M-Notices) reducing printing and postage and carbon
emissions (during delivery)
T&S claim BACS payment receipt only issued electronically
Where possible tender and contract documentation sent out electronically On line registration for
Voluntary Safety Registration system (CG66)
Building demolished and waste arisings used as
hard core for new building on site. Timbers from same building recycled for use by local farmer on
his property The Vehicle and Operator Services Agency have recently tendered for a total waste
review of waste produced at sites looking at both waste produced and ways to reduce waste
produced. The contract will enable VOSA to have a comprehensive waste management system for
all waste streams. The Driver and Vehicle Licensing Agency: Removal of under desk bins across
Local Office and improve secure waste collection. All paper to be considered as secure waste and
shredded. To include introduction of colour coded bins.
Reviewing options for improving recycling across Local Offices. In addition, at our HQ buildings it is estimated that savings of
100,000 were made and consumption reduced by approximately 4 million sheets of A4 following
the introduction of an wholly electronic 'Bulletin' (internal staff newsletter).
requiring stationery could view what was available online, and collect what they needed. Staff
outside London could request stationery be sent to them. Staff with surplus stationery can arrange
for its collection and removal to the store. Since the closures, the store has relocated to another of
our main buildings. Redundant furniture has been removed by Azcom Business Solutions, and
refurbished and sold where possible. Non-saleable furniture is dismantled and the component parts
recycled. There are recycling bins in office areas, kitchens and restaurants. Bins for toner cartridges
have also been deployed. MHRA: new drug registration procedures mean that companies are not
now required to provide paper copies of documents (in the past this generated around 1500
standard archive boxes of paper per month!). This will, in time, also reduce the amount of waste
paper . From the paper copies of applications that we used to destroy, we had many hard file covers,
which we offered to local schools or charities but no-one was terribly interested! We have recycled a
lot of these internally rather than order new ones from stationery. NHS PASA: Employees are
encouraged to segregate in each office area. Estates management source waste disposal services
which maximise recycling opportunities.

DTI and its agencies have implemented a number of initiatives including recycling schemes, waste
reduction in terms of reducing delivery packaging, use of reusable delivery pallets containers. The
We find that there are regional differences in the availability of waste recycling and recovery centres DTI HQ caterer has introduced a range of disposable products into its operation which are either
and recycling operated by waste contractors which inhibit the ability to make improvements.
biodegradable or recyclable.

-2

NK

2004-05 included disposal of leaked oil.

FSA

HO

Data for 2004-05 did not include data from 4 offices where as 2005-06 figure includes a full set of
data across the estate. Total waste arisings in 2004-05 included a large volume from the Fire
Service College due to site clearance works. The data submitted was not the complete data set,
several offices submitted their data after the deadline which I have since added to our figures to
20 reflect a more accurate picture of what the waste actually was in 2004/05.

Question:- Please use this space to provide additional information that you feel is essential
for us to know. For example, your overall approach in this area, barriers to progress and
significance to your business

NK

FC

FCO

8% N/A

1901

NK

To some extent, the increase in recorded waste in this category is due to the in-year extention of
waste monitoring from sites with over 50 staff to sites with over 25 staff (17 more sites). We also aim
to improve recording methods on an on-going basis.

Question:
- What
was the
percentag
e change
in total
waste
arisings
from
2004-05
to 200506 ?
Question:- If necessary, please provide additional details about your total waste arisings.

A total waste arising figure has yet to be calculated.

DCMS

DEFRA

Question:
- How
much
total
waste
arisings
(metric
tonnes) in
2005-06 ?

3.8
Full data is not available for both years.CPS Data is not available at present but we are extending
our waste strategy. SFO Although we do not hold data on all recycling activity (eg we do not count
individual light fluorescent tubes) when disposing of waste wherever possible we aim to recycle.
There are too few can, glass, plastic or wood produced to warrant an in house scheme. However our
staff do make use of public recycling facilities situated about 50 yards from our building under
schemes devised by divisions. TSol We moved to new premises in August 2005, which are service
managed by the Landlords. Data is obtained from our Landlords and we pay for recycling services
through our service charge. However, our Landlord terminated their contract with their recycling
contractor soon after we moved in, and had to retender the service. A contractor has been appointed
as is now in place, but the Landlord is unable to give us any data for 05/06. HMCPSI All Paper is
now recyclable incl. headed paper, staff are encouraged to participate in the recycling system such
0 as staff Initiative to recycle cans and bottles.

Data are for Army (overseas) and DLO in UK. +37.67% is percentage change. Army Increased
waste arisings are thought to be due to fluctuations in personnel manning as units deploy on active
service in Iraq/Afghanistan or to overseas training units. This also results in waste profile changes
as units transfer from steady state to preparation for deployment status Total liquid waste 2004/05
37 149426 litres, 194864 litres 2005/06, +30.4 % change.

6.50%

Our main PFI contractor, Mapeley is introducing a new approach to report regular data on waste
arising and to also include recycling quantities broken down by waste stream where possible. Data
has been supplied for the purposes of this report using a one-off data collection exercise, but the
new approach will enable us to monitor waste more effectively and explore ways of reducing /
reusing. One difficulty we have is that waste contractors cannot always specify tonnage of waste
recycled at sorting plants nor can they specify categories of waste that they are sorted into. Another
issue is that landlords do not necessarily have full obligations within the terms of the lease to report
waste removed from site. We will however continue to consider ways in which we can improve our
data collection systems for future reports.

Waste removed from majority of our sites is done through a mixture of indirectly employed subcontractors and contractors employed by the site landlord depending on the tenure of the site
(Freehold or Leasehold). Recycling obligations are generally satisfied through waste sorting at
Material Recycling Facilities, but we are currently unable to provide data. A national paper re-cycling
scheme is being introduced in September 2006 and other waste category recycling schemes are
being trialled across the country prior to the end of 2006. For Former Customs & Excise we recycle
toner cartridges via our IT company Fujitsu in all of our offices. 100% of the profits, based on the
difference between new & recycled cartridges, go to the Marie Curie Cancer Charity.All former Inland
Revenue offices can use the Hewlett Packard Planet Partners Printer toner cartridges recycling
scheme. In the year 2005/6 we recycled 11.3 tonnes via this scheme. This represents a significant
improvement on 2004/5 (3.2 tonnes).

in 2004-05 30 prisons recovered or recycled 41.7% of the total household waste arisings from those
sites. in 2005-06 46 prisons recovered or recycled 42.7% of the total household waste arisings from
those sites. key barrier to progress is availability of budget to pump prime initiatives. capital
expenditure has to be found from within existing budgets with individual prisons taking responsiblity
for the on-going ataffing costs for the supervision of waste management activities. the cost
strategies to manage waste impacts are bespoke to individual prisons to accommodate the range of
pressures of meeting core operational requirements take priority - additional costs that cannot be
diversity across the prison estate. the 'waste management monitoring system' has been designed to
taken on with a climate of decreasing funding.
capture data on waste arisisngs (excluding hazardous wastes) quantities recycled and costs.

have reduced waste on many production lines within ABRO, measurement of these savings is not
robust enough to supply statistical figures. Recycling is a basic tenet of this scheme (after reduce
and re-use). Site-specific initiatives include recycling/re-use of steel drums and cardboard boxes
and we are reasonably confident that the 5% target has been achieved but as with targets D2&3,
measurement is not currently sufficient to endorse this. For historical and geographical reasons, the
separate ABRO sites have always enjoyed a large degree of autonomy. Consequently, it is difficult to
implement systems which are suitable for all sites. For the same reason it is difficult to obtain data
in a standardised format from all sites, and data on waste disposal can differ greatly in terms of
denomination of quantity (i.e. tonnes, drums, skips, cubic metres etc). A great move forward in
commonality throughout ABRO is the partnership with our FM service provider, Alfred McAlpine
Business Services (AMBS). It is envisaged that in time AMBS will take over the management of the
majority of ABRO waste streams, and be responsible for providing accurate statistical analysis. This
will enable us to make informed decisions on how best to manage our waste and to provide
evidence of our performance.

The storage of untreated food waste onboard our vessels has impacts on operational capability as
well as potential health, safety and habitability issues. Bicester Garrison possesses the largest
distribution outlet in the UK. 23 Pioneer Regiment, is the largest producer of waste in the Armys 4th
Division. At the beginning of 2005 waste management for the site cost 132k per annum. Although
recycling was in place in some areas, the level of control was low and the site suffered from flytipping. By implementing waste segregation measures across the Garrison the recycling rate for the
site has almost tripled from 10% to 28% within a year. Despite an overall increase in capacity of
waste receptacles to cope with increased activity on site, the Garrison has realised savings of 24k
per annum by improving bin utilisation and rationalising excess capacity, where possible. The
instances of dumping on site have been significantly reduced through a programme of education,
improved control on the gate and the implementation of incident investigation and a policy of name
and shame which highlights the cost of each incident of mismanagement. 6 million litres of waste
oils recycled. 100 tonnes of acid batteries recycled. Disposal Services Agency provides a crossGovernment disposal service for a wide variety of goods, oils, etc.

Waste collection contractors for all ONS sites provide information to enable reporting against
government targets. Site procedures for waste management systems on each site are discussed
along with best practice at six monthly Green Focus Group meetings.

The waste contractor for our Southport site undertakes hand sorting of all waste enabling us to
achieve very high recycling figures there.

Question:E.1 Have
you met the E1 target
in this reporting year
Organisation (2005-06) ?

CO

DCA

No

No

Question:E.2
Have you met
the E2 target
in this
reporting year
(2005-06) ?

Question:- How
do you rate your
progress towards Question:- If necessary, please provide additional details about your progress against the E1
the E1 target ?
target.
of electricity supplied to the Cabinet Offices core central London estate comes from renewable
sources. We are currently considering increasing this to 100%. Nevertheless we will seek to reduce
our use of electricity. We will aim to achieve targets for a reduction in CO2 emissions. In order to
achieve these reductions we will: Install energy saving lights wherever possible; Purchase
energy efficient TFT monitors; Check non-essential equipment and lights every night and switch off
when not in use; Ensure all windows are closed when heating is on; Give preference to best of
class energy performance when ordering electronic equipment;
Encourage staff to set air
conditioning between 190C and 210C this is the optimum comfort zone for most people. We are
currently actively undertaking a number of initiatives to improve our energy management practices
and with a view to meeting the new Framework energy targets (including the existing targets E3 &
E4). For example, we have signed up to the Carbon Trust Carbon Management Programme, Energy
Efficiency Accreditation Scheme, OGC Energy Efficiency Review. We are also undertaking a number
of other initiatives which include PC Switch Off, Air Con Lock Off, running own Energy Efficiency
No answer
Week, raising awareness of energy efficiency issues amongst staff and contractors.
No

No

Question:How do
you rate
your
progress
towards
the E2
target ?

No answer

Question:E.3
Have you met
the E3 target
in this
Question:- If necessary, please provide additional details about your progress against the E2 reporting year
target.
(2005-06) ?
of electricity supplied to the Cabinet Offices core central London estate comes from renewable
sources. We are currently considering increasing this to 100%. Nevertheless we will seek to reduce
our use of electricity. We will aim to achieve targets for a reduction in CO2 emissions. In order to
achieve these reductions we will: Install energy saving lights wherever possible; Purchase
energy efficient TFT monitors; Check non-essential equipment and lights every night and switch off
when not in use; Ensure all windows are closed when heating is on; Give preference to best of
class energy performance when ordering electronic equipment;
Encourage staff to set air
conditioning between 190C and 210C this is the optimum comfort zone for most people. We are
currently actively undertaking a number of initiatives to improve our energy management practices
and with a view to meeting the new Framework energy targets (including the existing targets E3 &
E4). For example, we have signed up to the Carbon Trust Carbon Management Programme, Energy
Efficiency Accreditation Scheme, OGC Energy Efficiency Review. We are also undertaking a number
of other initiatives which include PC Switch Off, Air Con Lock Off, running own Energy Efficiency
Week, raising awareness of energy efficiency issues amongst staff and contractors.
Yes

Question:How do
you rate
your
progress
towards
the E3
target ?

Question:- If necessary, please provide additional details about your progress against the E3
target.

Excellent

Currently 76% of electricity supplied to the Cabinet Office's core central London estate is generated
from renewable sources.

The department, due to an increase in size, has increased its carbon emissions. Work to improve
the efficiency of the estate has continued and nearly 1m was invested in energy efficient projects
on the HMCS estate. A planned programme of energy surveys of the inherited estate has
Satisfactory commenced and savings are already being realised

Yes

Excellent

The department is currently sourcing 15% of electricity from renewable sources.

Satisfactory

The increase in emissions is attributable to the increase in the estate size since the baseline year.

All sites across the estate are signed up and committed to the Carbon Management Programme.
The estate has been audited by the Carbon Trust to highlight opportunities to reduce energy use
Satisfactory and related carbon emissions.

Yes

Excellent

93% of the electricity procured across the estate is from renewable sources.

Excellent

The whole of DCMS was supplied by 100% renewable energy from January 2005

DCLG

Yes

Satisfactory

All sites across the estate are signed up and committed to the Carbon Management Programme.
The estate has been audited by the Carbon Trust to highlight opportunities to reduce energy use
and related carbon emissions.

DCMS

No

Satisfactory

We donont have baseline information as far back as 1999/2000 We have developed an energy
action plan which if fully implemented should deliver 496 tonnes of carbon over a x period

Although we donont have baseline data for 1999/2000,we have taken significant steps in addressing
Satisfactory energy efficiency within the department. We have developed a strategy with an action plan
Yes

Poor

KgC rose against the base year by the % shown below. Office estate - 21.9% Laboratory estate 17.7% RPA - 13.8%

Not applicable

Poor

Target date is 2010-11. The trend is not consistent. It is planned to consider this as part of the
SOMS Action Plan. Estate changes in progress on the London site will have a major effect on the
Departments achievement of this target for the future. This will significantly reduce the Departments
Not applicable
accommodation as well as reducing the amount of energy used.

Excellent

DEFRA

No

Poor

We report separately on the office estate, Defra Laboratories and an Executive Agency (Rural
Payments Agency) that was created in 2001. Compared to the base year, carbon emissions rose by
7% in the office estate, 12% in the Laboratory estate, and 8% in RPA (taking 2001/02 as the base
year).
No

DfES

Not applicable

Satisfactory

Target date is 2010-11 and we are half way towards meeting this target.

No

DFID has now moved to an open plan layout making much more effective use of the space.
However, as there are now more staff per m2 using energy more efficiently) this will also result in a
need for more IT kit, A/Cs etc, therefore increasing your energy usage per m2. So although an office
has improved its energy efficiency per m2 , the statistics will still show an increase in energy usage
per m2 as staffing levels are not taken into account. DFID has analysed the increase in staff
numbers with the increase in energy. Our statistics show that although we are consuming more
Satisfactory energy, we are actually more energy efficient per capita.
Yes

Yes

Satisfactory 62.3% of electricity purchased for the estate came from certified renewable sources.

Electricity supplier provides us with 10% renewable energy. This was originally allocated against one
of our sites representing at least 10%of the total estates consumption. However, the site and its
consumption has reduced to approx 9% of the national consumption. Contract clauses allow
Satisfactory changes to be made annually in October each year and we will be seeking if a change is possible.

DfID

No

Satisfactory

DFID underwent two major refurbishments to it's UK estate during the period 1999-2004. Therefore
baseline data before 2004 is an unrealistic representation of normal DFID operations - we have
asked BRE to change our baseline to 2003/2004. DFID energy usage has continued to increase
over the last few years. The main factors for the increase are: additional electricity usage during the
refurbishment works of the East Kilbride (EK) office with the build of an additional annex(completed
Dec 2004 with snagging issues in 2005); significant increases in staffing/workstations during this
time (including consultants and contractors, etc., the total number of workstations in EK has risen
from around 500 to 650 over this period, and from 850 to 1100 workstations in London). We have
also implemented new IT systems, which have resulted in the need for new test and production
environments. Substantial new IT kit is required to support these systems; this is based at our EK
office but also supplies all our overseas estate. All these factors have resulted in significant energy
demands throughout the buildings via the PCs and related equipment, demands on heating/cooling
plant and staff restaurants.

DfT

Not applicable

Satisfactory

Target does not have to be achieved in 05-06. DfT has undertaken a number of measures aimed
primarily at our larger sites which will help the Department meet the target by the target date. Initial
data and planned initiatives suggest (see best practice measures below) that the Department is on
track.

Not known

No answer

BRE data analysis pending

Yes

Excellent

DH

Yes

Excellent

Market Towers & Hannibal House excluded from figures energy paid for as part of amenity charge.
Eileen House ceased to be part of DH estate on 31/07/05; floor area has been pro ratad See also
note under "additional information"
Not known

No answer

DH: Cannot confirm progress until we receive weather corrected data from BRE PASA: Excellent

Yes

Excellent

DTI

Yes

Satisfactory

The estate buys mostly green electricity resulting in an overall reduction which contributes to its
progress.

Yes

Satisfactory Since the base year, there has been a reduction in energy consumed

Yes

Satisfactory The Department has exceeded the target with DTI HQ and agencies achieving in excess of the target

No
Not applicable

Poor
No answer

Not known

Poor

Yes

Excellent

We operate our central energy contracts from 100% renewable sources through the Scottish
Executive and OGC contracts.

No
No

We have increased fossil fuel efficiency by 18.15%, exceeding the 15% target. For electricity we
Satisfactory have not met the target.
Satisfactory

Yes
Yes

Excellent
Excellent

The "green" electricity contract for the Main Building represents 37.7% of the total (excluding Wilton
Park).
We have 100% renewable electricity

Yes

Satisfactory

Yes

Excellent

Exceeded by 70%

Excellent

Excellent

DWP
ECGD

Yes
Not applicable

Satisfactory
No answer

FC

Not known

Poor

FCO
FSA

No
No

Poor
Satisfactory

HMRC

Yes

Satisfactory

We consider we are meeting this target as we are currently purchasing 48% of our electricity from
renewable source for which we are given no credit on this return or the main energy return to Defra.
Whilst we have reduced our consumption of fossil fuels, our electricity consumption has not
reduced. This is partly due to the recent rollout of new Jobcentre Plus offices, many of which have
included air-conditioning/cooling and new lighting installations. We also have significant amounts of
IT equipment in use throughout the estate. However it is expected that a number of new initiatives,
as detailed below will have a favourable impact on our electricity consumption.

Not achieved. Emissions are rising due to our increasing operational requirement for IT systems to
facilitate delivery of our global commitments.

Our programme of space rationalisation results in more staff occupying less space. This means that
electricity consumption per m2 will rise as each staff member will usually require at least a PC. This
can also result in the need for additional cooling systems when high numbers of staff occupy
Yes
buildings.
Yes

HMT

Not known

Satisfactory

The area of the building populated by HMT was reduced after a full refurbishment. HMT occupied
Phase 1 of the refurbishment on the 19th July 2002. There is no current data available to confirm
the carbon emissions in 1999-2000. Presently HMT has reduced the carbon emissions by 5.8%
between April 05 & March 06 in comparison with the April 04 & March 05 period.

Not known

Gas Consumption The net internal area for HMT is 35,914m. In April 2004 to March 2005 the
kwh/m was 0.24 kwh/m. In November 2004 the net internal area increased with the completion of
the phase II refurbishment to 76,856m. Therefore the April 2005 to March 2006 period confirms the
energy efficiency of the building is 0.12 kwh/m. This represents an energy efficiency saving of
50.4%. Electricity Consumption Between April 2004 & March 2005 the energy efficiency was
206.48 kwh/m and in the period of April 2005 & March 2006 the energy efficiency is 193.75 kwh/m.
This represents an energy efficiency saving of 6.17%. We are unable to confirm the compliance with
Satisfactory the targets, as there is no relative
Yes

HO

No

Satisfactory

Within the Prisons estate weather corrected performance for 2005/06 shows an absolute reduction
of 5.7% in energy use from the base year. As the size of the prison estate and prisoner population
have increased significantly since the base year this is a satisfactory performance.

No

Within the Prisons estate Energy consumption per m2 is 17.3% below the base year. Fossil fuels are
Satisfactory 22.5% below and electricty is 5.1% above base year.
Yes

LOD
MOD

No
Not known

Poor
No answer

ONS

No

Poor

This reporting period CPS SFO AGO N / TSol RCPO NA / HMCPSI NK. Progress SFO HMCPSI
AGO Poor / CPS TSol Satisfactory. CPS Our energy consumption has reduced this year according
to our figures. TSol We moved to our new building in August 2005, so we are unable to compare
like with like. We do not now pay our utilities direct. We pay the Landlord. HMCPSI Baseline
unknown. RCPO sub lets from HMRC therefore this information will be included in HMRCs return

No
Not known

Poor
No answer

No

Poor

This reporting period. CPS SFO AGO N / TSol RCPO NA / HMCPSI NK Progress SFO HMCPSI
AGO Poor / CPS TSol Satisfactory. CPS This figure was 2%last year and hopefully will have
increased this year. The BRE report should support this. TSol see above.

Excellent
No answer

DFID has 100% renewable electricity at both main UK offices.

100% renewable

48% of our electricity is secured from renewable sources. We have met the target well in excess of
the required volume and well ahead of time.

Proportion of green electricty is 5.1% in the prisons estate. Plans are in place to increase this to over
10% in 2006/07. In the main HO the proportion is 66% renewable in current year. The large increase
in our office estate with the inclusion of the NOMS (non custodial) offices which is largely supplied
with standard grid electricty has resulted in a decrease in the proportion since last year.

Yes
Not known

This reporting year CPS TSol Y / SFO HMCPSI AGO N / RCPO NA. Progress. SFO TSol HMCPSI
AGO Satisfactory / CPS Excellent. CPS We are receiving about 79% renewable on our controlled
estate. SFO To be considered by Management Board before the contract is renewed. However,
implications are that this will increase costs. TSol 100% renewable energy provided by the Landlord
Satisfactory wef October 05. HMCPSI Renewable elec supplied from 7/8/06
No answer

No

Excellent

2005/06 figure is 9.58%

Question:E.4
Have you met
the E4 target
in this
reporting year
Organisation (2005-06) ?

Question:How do
you rate
your
progress
towards
the E4
target ?

Question:- Please use this space to provide additional information that you feel is essential
Question:- If necessary, please provide additional details about your progress against the E4 for us to know. For example, your overall approach in this area, barriers to progress and
target.
significance to your business.
of electricity supplied to the Cabinet Offices core central London estate comes from renewable
sources. We are currently considering increasing this to 100%. Nevertheless we will seek to reduce
our use of electricity. We will aim to achieve targets for a reduction in CO2 emissions. In order to
achieve these reductions we will: Install energy saving lights wherever possible; Purchase
energy efficient TFT monitors; Check non-essential equipment and lights every night and switch off
when not in use; Ensure all windows are closed when heating is on; Give preference to best of
class energy performance when ordering electronic equipment;
Encourage staff to set air
conditioning between 190C and 210C this is the optimum comfort zone for most people. We are
currently actively undertaking a number of initiatives to improve our energy management practices
and with a view to meeting the new Framework energy targets (including the existing targets E3 &
E4). For example, we have signed up to the Carbon Trust Carbon Management Programme, Energy
Efficiency Accreditation Scheme, OGC Energy Efficiency Review. We are also undertaking a number
Currently 76% of electricity supplied to the Cabinet Office's core central London estate is generated of other initiatives which include PC Switch Off, Air Con Lock Off, our own Energy Efficiency Week,
from renewable sources.
raising awareness of energy efficiency issues amongst staff and contractors.

CO

No

Excellent

DCA

Not applicable

The department considers CHP for all new builds and major refurbishments and is also considering
Micro CHPs as alternatives. Targets are not due until 2010 but progress across the department so
Satisfactory far is satisfactory.

DCLG

Not applicable

No answer

Due to the considerable estate change since the baseline year, the department is showing an
increase in energy usage and emissions.

The target states that allowances are made for Department's who already purchase 100%
renewable energy

DCMS has developed an energy strategy which consists of Procurement via OGC Buying Solutions Monitoring and Targeting - AMR is being investigated and a trial run
has been arranged for one of our offices Energy Surveys- Carbon Trust energy surveys and our facilites management exception reports Capital Expenditure- Cockspur
Street refurbishment project specification and design review + BMS upgrade Awareness via environmental champions and key playes such as the maintenance team
There is a detailed energy action plan from the strategy with savings of 70,700 and 496 tonnes of carbon Responsibility/ownership with key delivery dates Monthly
reviews/process status report on Red = stopped of not started Green = completed Yellow = up and running If required I can send you a sample of the energy action
plan

DEFRA

No

DfES

Not applicable

Funding available during 2006/07 - 2008/09 under the Defra Carbon Management Programme will
The E4 target date is 2010. We are on track to meet it. 13.7% of electricity used was sourced from a enable us to prioritise allocation of resources for capital investment on those projects which will
Good Quality CHP plant in 2005/06. A further CHP plant is due to be commissioned during 2006/07 produce significant carbon savings in the medium to long term. With this resource, which has not
Satisfactory at a large London HQ building. This will enable defra to meet target E4.
been available to us in recent years, we can raise energy efficiency levels across the entire estate.
light system (value 20K). Total expenditure during 2005-06 on energy saving equipment
installations is approximately 642K. Efficiency of plant and machinery are regularly reviewed by
building engineers and remedial action taken where necessary. Building Engineers check building
management systems are operating effectively. Facilities Managers are arranging for timer plugs to
be installed on photocopiers and potentially other equipment. Additional sensor lighting has been
installed within one of our buildings car park and internal offices and we are considering the
feasibility of extending this further. Light fittings have been replaced with those that are more energy
efficient and PIRs installed. New software, called NightWatchman, has been introduced which
shuts down PCs automatically at a set time each evening. More energy efficient flat screen monitors
have been installed at every workstation which doesnt have one already. We will be trialling Multi
Functional Devices which can print, scan and fax. If successful, they will be implemented
throughout the Department. A change during 2005 in how we manage waste streams has resulted
in waste formerly sent to generate heat is now recycled. This benefits the waste hierarchy but has a
Satisfactory Target due in 2010. We will be discussing further with energy advisors.
contrary impact on energy usage.

DfID

No

DFID has completed feasibility studies on CHP, solar panels and a wind turbine at our East Kilbride
office to determine the most appropriate technology for DFID. We are currently working with the
Carbon Trust to agree a renewable source on site(probably CHP) and begin the implementation by
Satisfactory December 2006.

DfT

Yes

Excellent

DTI

DWP
ECGD

FC

FCO
FSA

Yes

Yes
Not applicable

No answer

A high profile energy saving campaign - the BIG SWITCH - was run throughout Defra and Agencies in the months January - March 2006. Building managers and FMs
were given clear guidance on a number of measures including tighter controls on building temperatures. Intranet messages and posters also encouraged staff to take
greater responsibility for making savings by switching off lights and IT equipment when not in use. Although it took effect only during the last quarter of the year under
report, the campaign was successful in some areas, and we are taking forward lessons learned from this exercise to inform progress on the Carbon Management
Programme during 2006/07 and onwards.

Energy saving IT software that shuts off PCs automatically each evening has been introduced in DfES. Defra have indicated their interest and are working with our IT
specialists to consider the feasibility of introducing within their Department if IT compatibility allows.

As a result of the refurbishments DFID is already highly energy efficient(we achieved an "excellent"
and "very good" BREEAM rating for the design of the East Kilbride and London office). DFID has
signed up to the Carbon Trust framework agreement. The CT consultants have conducted energy
audits at both UK offices and concluded that both offices are "well operated and maintained" and are
"inherently energy efficient". They also highlighted that our East Kilbride office is an "excellent
example of a modern highly serviced office building avoiding large ducted ventialtion and cooling
systems".

As DFID energy usage has continued to increase over the last few years, we have now installed sub-meters. This will let us identify areas where there are major
fluctuations in usage and look for any possible savings. At both offices we are reviewing the timers of the highly technical lighting systems to ensure the scene settings
meet staff needs, but are also as energy efficient as possible. We have installed sensors to our roof/car park lights and timers to our boilers at the tea points in London.
We are also working with the CT to implement a renewable source of energy at both of our UK sites; improve our energy management and run energy saving campaigns
to help raise staff awareness.
communicated. DSA
solar film has been fitted to the windows at the Agency training facility to reduce the use of the air conditioning units and adjustments made to
The DfT has a large and varied estate comprising offices and non-offices. In a determined effort to
the timers on the heating/lighting control during the winter. The lighting in the garage has been reduced by blocking two switches. In Scotland where refurbishments
reduce our impacts in this area we have reviewed our data and targeted our bigger sites with local
have been completed, sensored lighting, energy efficient electrical appliances have been installed where appropriate. Educational leaflets and information on reducing
reduction targets. For example the energy used at our main HQ site accounts for approximately 11% energy use have also been provided. DSA has also used information from the Carbon Trust about fluorescent lights to encourage people to Switch Off between
of the total reported DfT usage. However, a progressive system of changes to the heating and
driving tests and monitors overnight etc. Instructions are also given to Contractors to ensure that they use and/or install the most energy efficient where-ever possible.
cooling arrangements in the building are expected to reduced usage by 17%. Our Executive
MCA Use of professional advice (via OGC call off contracts) for utility monitoring and bill validation. Regular maintenance programme for equipment and buildings
Award winning CHP build at one of our larger Executive Agency sites. See case study contained with Agencies are taking similar action and also including smaller sites where sensible to do so
to ensure equipment is working efficiently. Upgrade of windows to double glazed specification in Operations Room in Dover, and thermal imaging of building to
04-05 SDC report.
(examples in the box below).
assess areas of heat loss Switch off stickers issued to be placed in strategic locations throughout the estate Ongoing review of utility usage
As we do not weather correct our own energy data, we are unable to confirm our performance until
we receive weather corrected data from BRE (under Government Energy Efficiency Returns) - due
15 September. We have asserted that we have met target E1 based on our performance in previous
years, and the reduction in the size of our estate. Barriers to progress include genuine confusion
among staff about whether they should switch off their PCs at night, and ingrained bad habits. This
is being addressed through a combination of staff awareness raising and reports by IT security
following out of hours checks.

Main DH: Reduced ambient temperature in 3 buildings. Replaced ceiling bulbs with low energy type. Commenced campaign to persuade staff to switch off PCs at night.
Arranged for Carbon Trust to conduct energy survey of SKH, WEL and RH (took place June 06) NHS PASA: Energy readings are taken weekly and compared against
bills. Trends are monitored by using energy usage analysis provided by supplier to identify areas for improvement. All staff are made aware of energy saving through
training and periodic inspections of office areas and equipment. We are currently undertaking an energy audit at the Reading office to identify ways of offsetting the
impacts of increased IT requirements. Also planning employee initiative for energy efficiency at all offices.

DTI have investigated, with the Carbon Trust, using micro generation plant located on its buildings.
Additionally, DTI HQ is investigating the feasibility of large capacity wind turbines on its overall
estate. Calculation methodology for E2 does not favour optimising the use of space and
accommodating more people in less space as consumption has inevitably risen in the buildings in
which people have been accommodated. Over all there is an energy reduction in comparison.

DTI has through it Insolvency agency generating electricity through roof mounted PV cells in a glass atrium roof of it London HQ building. DTI has reduced the number
of printers and copiers located around the estate in favour of centralised ICT areas with energy efficient rated equipment. It has introduced energy efficient ICT
equipment and replaced the old CRT monitors with FST replacements. DTI HQ has reduced its overall London accommodation by 30% with corresponding reductions in
its environmental footprint by introducing more efficient use of space through flexible desking (8 workstations for every 10 staff)

The current efficiency challenge within DWP is having a major impact on the number of new staff
and the size of the estate. It is expected that as buildings are disposed of, occupancy levels within
remaining buildings will rise. This may have a negative impact on energy used as additional cooling
may be required. It will also impact on the amount of carbon emissions per square meter. However
the IT refresh programme which has commenced rollout and is due for completion next year, will
replace our existing computer monitors and processors with more energy efficient kit. Approximately
We procure 15% of our renewable electricity from good quality CHP sources through a contract with 100,000 pieces of kit are being replaced with an estimated reduction in energy consumption of
Npower. This has been the case since March 2005, meaning that DWP have met this target well
40%. A further initiative currently being implemented by our PFI Partners will raise awareness
ahead of the target date.
amongst staff and building managers and greatly improve energy management of our buildings.

Our PFI partners are working to improve the accuracy of billing data through a new initiative to install electronic meter reading equipment in the majority of DWP sites. As
well as avoiding errors from estimated billing, this will provide half hourly utility data and enable any unusual consumption patterns to be identified, leading to better
control of building management systems. Service provider staff are instructed to be energy efficient whilst on our sites, such as utilising lighting efficiently and ensuring
heating for overtime/extended periods of working are controlled and reset. We already have a shared savings arrangement in place which incentivises our Partners by
ensuring they take a share of any energy savings made, whcih is reinvested in further spend to save initiatives. DWP together with our partners are undertaking an
awareness campaign for both staff and offices with specific SD duties. Publicity has been launched on the intranet, which enables staff to access advice and seek
guidance on energy related issues. Energy posters can be downloaded for display in offices and monthly energy reports for individual sites are accessible with staff
being encouraged to check their own performance. Appointed SD champions disseminate information at regional level and are available to answer specific site
enquiries. This approach should show positive benefits in energy management and awareness for the Department.

CHP has not been regarded as practical - we aim for 100% renewable instead (as allowed for by
Framework target)

Satisfactory The Department buys in CHP excess of the target as a part of its green energy.

Excellent
No answer

The department has a rolling programme of energy surveys and energy savings works. This equates to a 1 million investment in energy efficiency. In addition to this
work, the department is also undertaking major refurbishment works at many of the sites transferred to HMCS as part of the unified administration. Work at these sites
considers sustainable improvements to the building and at potential self-generation. For example - CHPs, Micro CHPs, solar and wind energy are all put forward as
options during any refit.
An Energy Efficiency Action Plan has been developed for all head quarter buildings with site specific actions. Regular meetings are held between the Sustainability Team
and the Engineering Team to identify and develop energy efficiency projects.Quarterly out-of-hours environmental surveys are conducted to identify energy usage and
identify opportunities to reduce consumption. PIR sensors have been fitted to office lighting with timers reduced from twelve minutes to two and half minutes. DCLG
entered into the carbon management programme with the Carbon Trust in March 2006 (this was made mandatory in the new targets).

No

Not applicable

The Cabinet Office will continuously seek ways to reduce its use of energy (fossil or renewable) with the objective of ultimately reducing its impact on Climate Change.
We use most electricity for powering computers and lighting. Electricity is supplied by Edf on a renewable tariff. Currently, 77% of electricity supplied to the Cabinet
Offices core central London estate comes from renewable sources. We are currently considering increasing this to 100%. Nevertheless we will seek to reduce our use
of electricity. We will aim to achieve targets for a reduction in CO2 emissions. In order to achieve these reductions we will:
Install energy saving lights wherever
possible; Purchase energy efficient TFT monitors;
Check non-essential equipment and lights every night and switch off when not in use; Ensure all windows
are closed when heating is on;
Give preference to best of class energy performance when ordering electronic equipment; Encourage staff to set air conditioning
between 190C and 210C this is the optimum comfort zone for most people. We are currently actively undertaking a number of initiatives to improve our energy
management practices and with a view to meeting the new Framework energy targets (including the existing targets E3 & E4). For example, we have signed up to the
Carbon Trust Carbon Management Programme, Energy Efficiency Accreditation Scheme, OGC Energy Efficiency Review. We are also undertaking a number of other
initiatives which include PC Switch Off, Air Con Lock Off, running own Energy Efficiency Week, raising awareness of energy efficiency issues amongst staff and
contractors.

Good quality CHP is not currently available from energy providers so this target is not currently possible

DCMS

DH

Question:- Please outline any examples of what you consider to be good practice in the way that you manage energy impacts and/or undertake monitoring
and reporting of your performance in this area. Should your information be selected to be highlighted as a case-study in the report, we will contact you for
further information.

1 If using original units please ensure that the


form clearly states the units your return uses (e.g. MTOE [Million tonnes oil equivalent], tonnes,
litres, BTU [British Thermal Units] etc.) in the Notes column. NOW FILL IN FORM 4 FORM 4:
OTHER INFORMATION A: If you have supplied weather corrected data please indicate with an X
which factor has been used below, otherwise go to 4 B Locally (i.e. site by site)
UK Average
Other (please specify) B: If you have not weather corrected your own data please indicate below
with an X which region best describes your estate so that we can weather correct your data for you
Thames Valley
South Eastern
Southern South Western
Severn Valley
Midland West Pennines
North Western
Borders North Eastern
East
Pennines
East Anglia West Scotland
East Scotland
x
NE Scotland Wales
Northern Ireland
NW Scotland UK Mainland (excluding NW Scotland)
UK
Excluding N.I.
UK excluding NI and NW Scotland England and Wales
England
Scotland excluding NW
C: Total Floor Area in m2 (use Agents Letting Area ALA) Total
Floor Area (m2) E2
16,000 D: Own investment in Energy Efficiency in 2005/2006 () Investment
in energy efficiency () 0

FC is undergoing a process of introducing renewables to supplement or replace conventional bought-in energy. We have installed a small scale hydro in kielder Forest
District (500 watts off grid). Also, a wood fuel heating at Northants FD, 90kw Binder wood chip boiler and a 8kw wood pellet stove.
Bedgebury Pinetum
installed a 40 kw KWB boiler in early 2005, and the new visitor centre at Dalby will have various renewables including solar and woodfuel, but is still under construction
at present. Forest research electricity is supplied by EDF Energy. The contract is negotiated by OGC Buying Solutions on our behalf via Silvan House. SSE Power are
the mains distributor and we have recently contracted them to increase the max supply to our site from 300KVA to 500KVA In order to cope with our business need. We
have commissioned a report on the suitability of wood fuel heating for the Alice Holt site. Following a Carbon Trust energy survey, Alice Holt have converted to low
energy light bulbs wherever practicable. We have installed timers to our hot water heaters. We have installed time switches to our chilled water machines. We have
serviced our security lighting PIR`s. Most of our radiators wherever practicable have TVR`s. We have reminded staff to switch off lights, PC`s and electrical equipment
when not required. We have discouraged the use of personal kettles to heat drinking water.

Not known

No answer

No
Not applicable

We pro-actively monitor all energy usage by means of detailed monthly energy reports and investigate any discrepancies identified. Following recommendations from
commissioned energy surveys we have recently invested in two major energy projects at the Main Building and Hanslope Park which are expected to reduce both usage
and carbon emissions at these sites by more than 10%. Among the equipment we have installed and arrangements made are: energy efficient lighting,
timer
controls on hot water tea boilers,
energy efficient domestic fridge controls (savaplugs), additional sub metering,
automatic meter monitoring,
an upgrade of
We currently purchase no electricity from CHP (but 20% of heating). We are looking at opportunities A major barrier to our progress is the massive increase in IT requirements in both power for systems BMS controls and
on-going monitoring and improvements to BMS control strategies. Our recent campaign to increase energy awareness and promote good
Satisfactory to buy electricity from the WDHS when they are ready to provide it.
and subsequent requirement for cooling loads.
housekeeping contributed to reduced energy consumption at our two London offices.
No answer

Our main PFI contractor Mapeley has developed an action plan together with HMRC to ensure we
achieve the energy targets. However our energy management bureau procures energy in a strategic
manner, all energy purchased for the half hourly rates is 100% renewable energy, the non-half
hourly sites are supplied by good quality, large scale hydro electricity. In total this equates to 70% of
the HMRC estate being covered by renewable energy.We have reviewed our energy monitoring
arrangements and our contractors now take proactive actions to reduce consumption. A real barrier
to progress is that we currently need to leave our computer base units on overnight for software
updates. We are currently exploring ways in which we can change this situation. We have already
replaced our computer hardware with more energy efficient equipment, but we also want to gauge if We are planning a major energy efficiency campaign later this year aimed at all staff on how to reduce consumption and we are going to introduce internal energy
we can carry out the software updates more efficiently.
efficiency awards to help encourage people. This will be backed up by new sustainable development guidance and advice on our Corporate Responsibility intranet site.

HMRC

No

Poor

HMT

Not known

No answer

HO

No

Poor

LOD
MOD

No
Not known

The most significant driver in prison energy use is prison population. The prison population is at
record levels.
CPS We are in the process of having our energy supplied by one supplier for Gas and two for
electricity as appropriate. Most of our energy is purchased through the OGC and we as a member
of their Energy Forum are looking to implement Automatic meter readers and other measures for
improving efficiency.. We have had free Energy surveys carried out by the Carbon trust and will be
disseminating the reports across the estate. SFO A limited upgrade in our HQ is introducing more
energy efficient lighting to the building, including a sensor activation facility. We have identified a
waste of electricity through staff not turning off computer monitors in addition to their PCs. This is to
be addressed during the next reporting period. Overall energy consumption has increased over the
1999-2000 baseline figures because of increased staffing and leasing additional accommodation.
Also, work has been undertaken to restore defective air conditioning systems to full working order.
Unfortunately this will increase demand for power both from the main plant and wall units throughout
This reporting year. CPS SFO HMCPSI AGO N / RCPO TSol NA.
Progress HMCPSI TSol Poor / the building. TSol The Landlord manages the provision of energy to the building HMCPSI HMCPSI
CPS SFO AGO Satisfactory.
CPS We are aware of this target and will consider implementing it consult the Carbon Trust and the Chartered Institution of Building Services Engineers (CIBSE) 100
Satisfactory as appropriate to our estate. TSol see above.
days of carbon clean up campaign.
No answer
Data from different areas of MoD are with BRE awaiting amalgamation.

ONS

No

Poor

CHP entirely dependant on Whitehall Heating Scheme as to when it is turned on.

Energy consumption is monitored by the BMS (building management systems), manual meter readings and verification of utilities invoices from energy suppliers. All of
the utilities consumption is recorded on to the Envoy EMS (Environmental management system) and reviewed at regular intervals by the strategic management team.

Proportion of electricty obtained from CHP is 0.02% in the prisons estate. Ongoing liason with
suppliers to purchase CHP and seeking opportunities to install CHP as construction projects arise.

Each establishment has an annual carbon dioxide target based on benchmarks developed for prisons by the Building Research Establishment. Targets are expressed as
tonnes of carbon dioxide per month and performance is assessed against the target using a twelve-month rolling average.

Feasability study suggested potential at our largest site but at prohibitive costs. Position will be
reviewed in 2006/07

Performance reported annually to ONS Executive Board in a progress report of performance against
framework targets. The web based ENVOY system has action plans for all sites. A Green Fund is
ringed-fenced to be used on energy, water and waste management related projects.

The CPS is a member of the OGC Energy Forum. We also record all utilities on a Monitoring and Targeting software package. SFO Other departments may also find
computer monitors are being left on over night. HMCPSI Electricity is now sourced from 100% renewable energy.

Organisation

Question:- Please use this space to provide information on your performance over the last year, your overall approach in this area, barriers to
progress and significance to your business.

Question:- Please outline any examples of what you consider to be good practice in the way that you manage energy impacts and/or undertake monitoring
and reporting of your performance in this area. Should your information be selected to be highlighted as a case-study in the report, we will contact you for
further information.

CO

The Cabinet Office is committed to promoting good environmental practice through its purchasing policies. For example, we only buy: Timber that has
been certified by the Forest Stewardship Council (FSC) and other Defra / CPET certification bodies; 100% post-consumer recycled paper and paper for
printed publications; Food procurement is the responsibility of our catering contractor(s)Wherever competitively possible our catering contractors provide
fair-trade goods, healthy eating options, locally produced goods. All suppliers are provided with the Cabinet Offices environmental and purchasing policies
and asked for evidence of compliance. All budget holders within the Cabinet Office are responsible for ensuring that all materials and equipment purchased
from their budget complies with the purchasing policy.

The Cabinet Office is committed to promoting good environmental practice through its purchasing policies. For example, we only buy: Timber that has been certified
by the Forest Stewardship Council (FSC) and other Defra / CPET approved certification bodies;
100% post-consumer recycled paper and paper for printed
publications;
Food procurement is the responsibility of our catering contractor(s)Wherever competitively possible our catering contractors provide fair-trade goods,
healthy eating options, locally produced goods. All suppliers are provided with the Cabinet Offices environmental and purchasing policies and asked for evidence of
compliance. All budget holders within the Cabinet Office are responsible for ensuring that all materials and equipment purchased from their budget complies with the
purchasing policy.

DCA

Sustainability is an integral part of the Procurement Tender Process and as such, when appropriate, is always a consideration during a tender exercise. A
departmental wide sustainability policy has been drafted by a member of Procurement Division and is currently awaiting sign off. In addition, as part of our
tendering exercise we ask for all service providers/contractors for details of their environmental policy.

DEFRA

The Central Procurement Division (CPD) are reposnsible for integrating sustainability into their activities. However, there are no sustainable procurement
professionals or resource within the Department so it is a new area that they are adapting to. Basic level training and attendance at the annual Government
Sustainable Procurement conference have occurred and with further guidance falling out from the SPTF action plan CPD are gearing up to implementing
sustainable procurement.
resource responsible. Wherever possible, the Royal Parks require staff and contractors to pursue the following goals and adhere to specified procurement
principles when purchasing products, materials and services: 1) Zero Waste: Purchases only to be made once it has been determined that the product or
service is necessary. Purchasing decisions are to be made in the context of the waste hierarchy to reduce, reuse and recycle. 2) Zero Climate Damage:
Purchase energy efficient products and materials by checking that the energy rating and efficiency features are the best available for the price. Purchase
materials and products that are free of toxic or polluting materials. Purchase renewable energy and reduce the purchase of fossil fuels. Purchase goods that
have not been transported long distances. 3) Zero Habitat Destruction: Purchase paper and wood products obtained from recycled, plantation, salvaged or
renewable sources. 4) Zero Pollution: Purchase products and materials that will not release toxic substances that can pollute water, land or air at any stage of
their life cycle. 5) Zero Soil Degradation: Purchase products, materials and services that will not degrade or pollute the soil, or result in erosion through their
use.
of the Sustainable Procurement Action Plan on building capacity. Building capacity on sustainable procurement is being delivered through Defras Strategic
Procurement Groups award wining DEEPS Programme- Delivering Efficient and Effective Procurement Solutions programme. As part of the programme,
category management strategy is being implemented through commodity expenditure analysis, undertaken by procurement analysts, with the express
purpose of embracing both efficiency and sustainability considerations in tactical and strategic sourcing. The commodity areas being managed through the
programme reflect the high spend / high sustainability risk areas identified by the Sustainable Procurement Action Plan. They include transport, print/paper,
facilities management and IT consumables. To ensure effective delivering of the DEEPS programme and the Sustainable Procurement toolkit across the
whole of Defra, including other significant spend areas, a sustainable procurement training and awareness programme for key procurement staff is being
developed and will be rolled out during 2006/7. Over the next year Defra will continue to lead by example on sustainable procurement for Government and
will work towards implementing all the recommendations of the Sustainable Procurement Action Plan.

DfES

We are integrating sustainability throughout our procurement processes and have revised our guidance to reflect this commitment and included new clauses
to address sustainability in our model contract templates. All of which is underpinned by our Sustainable Procurement Strategy. For 2006-07, we will take
on board the recommendations of the Sustainable Procurement Task Forces Action Plan to further our aims.

DCLG

DCMS

DFID
DfT

DH

DTI

DWP
ECGD

During 2005/2006 DFIDs Procurement Group developed and implemented its Sustainable Procurement Strategy and Environmental Purchasing Policy. This
included training and familiarisation for our own staff, reforms to our contracting documents and meetings with our procurement agents to explain what is
required from them. We developed a Supplier Appraisal Questionnaire and Supplier Environmental Appraisal Matrix for the agents to use to ensure that they
are all adopting the same approach. We will be monitoring their experiences.
Guidance on sustainability issues in procurement issues have been refreshed. DfT continues to lead the recycled paper for printed publications framework,
available via OGCbs for others to use.
Main DH: The Desk Guide to Procurement provides advice on how to consider the level of importance of sustainable development (SD) for each procurement
exercise. Many contracts in the DH are for consultancy services which has little adverse impact on the environment as these contracts are mainly for advice
and/or policy. Because of this, the level of importance given to SD issues by people responsible for these procurement exercises is low. The procurement
pages on our intranet now include advice on SD, and link to other relevant web pages within the DH and other government departments. The revised
Expression of Interest (EOI) Questionnaire now requires suppliers to provide details of SD within their organisation. However, as DH procurement support is
now provided through the NHS Purchasing and Supply Agency (PASA), further development of the SD guidance will be carried out in conjunction with advice
from PASA. The need to be more proactive in ensuring all our procurement activities are sustainable is a major focus of our 2006 Departmental SD Action
Plan.
remains unchanged from the 2005 response. Environmental questionnaires are issued by our Estates business area and one of our Agencies to all
interested parties at the invitation to tender stage of any procurement.Environmental reviews are undertaken of at least 2 key suppliers held each year, by
one of our agencies, and also by DTI HQ Estates. All timber based furniture requirements are sourced through OGC buying solutions frameworks, ensuring
FSC accreditation where applicable. Within mainstream DTI, timber based products are not procured because all existing building material are of different
materials and are re-used within any refurbishment programmes.Areas which maybe of interest to you are:1.In our publications activity we utilise the OGC
Buying Solutions / Department for Transport Recycled Printing Papers Framework- recycled paper @ minimum of 75% post consumer waste. For full details
of this framework please contact Andy Seal at DfT andy.seal@dft.gsi.gov.uk. We started using this framework within the last 12 months.2. Recycled paper as
defined by DEFRA standards used in all copiers and printers across DTI, as reported previously. This includes print contractors. 3. Energy consultants are
engaged on no win no fee basis to review energy tariffs and contracts.
education for those in the procurement field. Commencing with a series of one day workshops, backed up with one to one sessions with commodity group
leaders, commodity specific strategies are being developed. High level commitment has been demonstrated by Lord Hunt, Sustainable Development
Minister and Leigh Lewis, the Permanent Secretary, when they hosted the Procurement Conference in December 05. This emphasised that embedding
sustainable development is essential, not optional, for the DWP. There are some notable successes that have arisen particularly over the last year, as a
result of specifying sustainable goods and services. In September 05, a new stationery contract was let, resulting in a catalogue of goods with a wide range of
recycled or sustainable products, which are competitively priced alternatives to the regular stationery items. Recycled paper for print and desktop publishing
has been sourced and its use made mandatory across the Department. Using sustainable development principals has secured new IT kit for roll out across
the DWP which has a greatly reduced operational and standby energy requirement, contains less finite resources such as lead and ultimately at the end of its
life, has more recyclable components and materials.

FCO
FSA

develop policy, guidance and requirement in areas which are not so well understood. The appointment of a New Head of Procurement in Dec 05 has allowed
the formation of a complete review of procurement activity across the FC and FR. The outcome of this review will be published in FY06/07. There has been a
clear commitment to develop a Corporate Sustainable Procurement Strategy, a draft of which will be available by the end of FY 06/07. The relevant Training
needs analysis is also being conducted concurrent to these other activities. The barriers to progress are the same barriers, which exist in relation to the
development of a Procurement Strategy to meet the future needs of the FC. These barriers are being managed through a structured process of reporting at
the highest levels of the organisation, and are cultural and change-management related. There is a high level of support from all areas of the business to
support the development and implementation of a Corporate Sustainable Procurement Strategy, as it is closely aligned with the core activities of the
organisation. The barriers to progress are, and will continue to be managed effectively. The revised focus on Procurement within the FC, of which
Sustainability is a portion means that the targets which have been agreed as part of the FCs wider Corporate Sustainability plan will be met.
procurement can help us achieve our savings through our Efficiency Programme, and, beyond this, in our business-as-usual activities, allowing us to apply
such savings to delivery of our core objectives. However, coupled with this is the perception by some that sustainable products are generally more expensive
and less readily available. Although we can promulgate the accepted principle that energy efficient goods can reduce whole life costs, initial capital
investment can create difficulties. This is probably the single most important barrier to progress as we see it. Furthermore, if the benefits of sustainable
products are not realised within the period of a Spending Review it makes it harder for Departments to obtain settlements from HMT that allow for the up-front
costs or capital investment. Availability of sustainable goods is less of a problem in the UK and we make use of the Sustainable Procurement Groups
Quick Wins, products that meet high environmental standards and sustainability criteria. The list of products is however limited and we welcome the
governments commitment to extending and updating the list. Overseas though, our network of posts often has to source goods locally in markets where
suppliers ability to provide, and knowledge of, sustainable products is at best limited.
Significant work in the area including publishing guidelines and developing web notices has been undertaken.

HMRC

The new Commercial Directorate for HMRC is currently being developed alongside the implementation of a new integrated finance/HR/procurement IT
system. A Sustainable Procurement Strategy has been published and the new centralised team, based on commodities, will develop more specific
sustainable procurement plans. All buyers currently use an environmental assessment tool to identify environmental impacts associated with all new
contracts.

FC

MOD

Sustainability has been incorporated into the Treasury's procurement process: customers have been asked to evaluate their procurement requirements in line
with sustainable options which has extended from defining the need, evaluating options, design and specifying, supplier selection, tender evaluation, postcontract management and supplier development. Though our strategy is not quite optimized, we are pro-actively seeking continuous improvement.
the Procurement Senior Managemnet Teams monthly meetings. The Procurement Sustainability Action Plan produced by Procurement Group is regularly
updated and developed to ensure that improvements are maintained. Quarterly reports are submitted within Procurement regarding progress made, which in
turn, is then submitted to the Sustainable Development Working Group. Among the noticeable achievements and ongoing work for 2005/06 are:
Documentation: Updated documentation to support the sustainability agenda now published on the HMPS Procurement website. An environmental checklist
exists, and is used by all the buying teams to Energy: Project initiated with the aim of reducing consumption. Recycling: Purchasing of many varieties of
recycled goods. Eg stationary products, polythene bags. The intent is that the new packaging contract to be awarded in 06 will only include packaging from
recycled materials. Collaboration: Close links developed with the Home Office and other government departments Eg Disposal Services Agency ensure
maximum integration of sustainability issues. The above are just a snapshot of the achievements in 2005/06. Access to the full HMPS Sustainability Annual
Report is available upon request.
matters in previous postings. Our Procurement Officer is qualified in procurement, has attended sustainable development awareness training and is
committed professionally and personally to the aims and objectives of sustainable development, keeping abreast of progress and developments. A formal
procurement policy has been agreed by the Management Board but not yet published. Most contracts held by the SFO are standard OGC frameworks. Our
energy suppliers were appointed through one of these frameworks. TSol We are considering guidance from the Sustainable Procurement Task force Action
plan. HMCPSI We constantly review contracts to check whether EMS systems are in place. RCPO has introduced an SD procurement strategy. Although
RCPO is a small department it procures a large amount of paper, whilst this meets the targets/requirements set, it is felt that there is a barrier to progress by
the lack of clarity of which type of paper is more sustainable for example 100% recycled Vs paper from sustainable sources. AGO We are in the process of
drawing up a sustainable procurement plan. We already ensure that all timber purchased is from a sustainable source and only buy recycled paper. We are
intending to move to a new office in the next year and sustainability will be central to any refurbishment work carried out.
requirements continue to be routinely incorporated into bidding and contracts for our partners. The Main DE two-day induction training course was updated
in March 2006 and now contains a comprehensive SD module and exercises with specific emphasis on sustainable procurement. Training courses on
Projects and Minor Works also now incorporate SD elements that link to the sustainable procurement information in the induction course.
The
Sustainable Procurement Strategy was produced by DE for the MOD Estate to meet the Framework for Sustainable Development on the Government Estate
Target F1. DE work also reached beyond the Agency itself to influence the wider MOD procurement processes and procedures. DE has introduced SD
criteria into the Acquisition Management System and the Smart Acquisition Handbook. This aims to ensure that estate sustainable development issues are
considered from the early phases of acquisition. The AMS is the pan-MOD source of Acquisition policy, processes and information. SD has been integrated
into the AMS as a topic page which identifies SD policy, definitions, advice and contacts ands simple steps for integrating sustainability into the procurement
process. Information is also provided to direct users to more detailed reference material.

ONS

ONS has a Sustainable Procurement strategy endorsed by our Perm Sec. This is reviewed every 3 years and last reviewed in December 2005. All request to
purchase require confirmation that sustainable development issues have been considered. Evaluation criteria for every tender includes environmental
considerations as standard. Training guidance for devolved purchasing officers covers the purchase of environmentally friendly products when appropriate.

HMT

HO

LOD

Regular meetings between the Sustainable operations team and central procurement division. Sustainable procurement strategy has been drafted. We arranged a
meeting with Barbara Morton from the SP task force who kindly reviewed our strategy and offered us feedback

See Royal Parks entry previous question


PSFPI web site. In its report into public sector food procurement published in March the NAO found that 60% of respondents were aware of the PSFPI and a MLC
survey of LEAs in early 2006 found an increase of 13 in the number of LEAs that had adopted sustainable food procurement policies - up from 85 in 2005 to 98. 33 had
not.Flagship projects have been established in all Defras London and York catering facilities and Defra has been instrumental in facilitating the implementation of the
PSFPI in other public sector bodies such as the City of London Police. The initiative has also delivered successful collaboration with the regional Government Offices
and the Government Office for London has used Defra catering facilities to show their own catering service providers the successes of the initiative.The initiatives has
also greatly influenced the supply side with major catering companies adopting the principles of the PSFPI into their organisations and changing the emphasis of their
public sector operations to focus upon fresh and nutritional products from both Assured and Organic sources. The catering services and food procurement toolkit is now
being enhanced to take account of input from across a broad range of public sector organisation as well as key suppliers to the public sector, to ensure implementation is
maximised and to deliver continued success with this nationally recognised initiative.
In collaboration with OGC, DfES published "Approaches to Support Workforce Skills Through Public Procurement - The Policy and Legal Framework" offering
Government Departments a range of approaches to ensure Government suppliers and their staff are offered appropriate opportunities to develop the basic and higher
skills of the workforce, where relevant to the subject matter of the contract, and in so doing help achieve the successful delivery of contracts and the economic
sustainability of communities. We believe this Workforce Skills policy is intrinsically linked to the wider issue of sustainable procurement and hope to develop this linkage
further over the coming year.

DFID has specified to OGC when renewing electricity contracts that we require 100% renewable. We slso ensure when making any purchases that we adhere to Defra's
"quick wins", and that all products such as IT equipment etc are energy star.
Agency Procurement Forums continues and best practice is shared. Continue to use and support OGCbs for procurement of energy

NHS PASA: drafted its Sustainable procurement strategy for Dec 05 and has since consulted with a range of key stakeholders on this Strategy. The Strategy and
supporting action plan are currently being finalised. The Agency also maintains regular forum meetings among NHS procurement professionals, has supported research
in the area through CRiSPS, and contributed to the SPTF report. DH: With the assistance of CPET we revised our timber procurement policy, and associated
procedures, to ensure that all timber purchased complies with the new guidelines.
DTI HQ has established a framework contract for stationery covering all DTI buildings and agencies. The framework includes environmental switch items whereby
green products are automatically substituted in place of non-environmentally items. DTI has established a framework for ISO 14001 EMS auditing, for use by DTI and
its agencies.DTI HQ has established a proactive approach to PSFPI activities and monitor its caterers performance in this area.DTI HQ estates section have developed
a bespoke performance measurement system (PMS) which it applies to all of its estates and Accommodation service provision contracts, resulting in improvements in
service delivery and value for money. The PMS includes monitoring of environmental performance amongst all other aspects of the contract specification. DTI HQ has
developed project management ENVIRONMENTAL CHECKLISTS which are used in all project business cases which transfer through to the procurement process and
ultimately the subsequent operational and whole-life cycle.

As above.

We operate our central energy contracts from 100% renewable sources through the Scottish Executive and OGC contracts.

We are offsetting 38,730 tonnes of CO2 equivalent generated by the air travel of Ministers, and officials based in the UK starting with 2004 (one year ahead of the
requirement for Government departments to offset air travel by April 2006). Renewable Energy and Energy Efficiency Partnership (REEEP), will pilot this scheme on our
behalf, investing in carbon credits from renewable energy and energy efficiency projects. It is envisaged that investment will be in projects based in developing
countries, which are highly dependent on fossil fuels and inefficient energy technology.

HMRC participate in many procurement exercises lead by our main PFI contractor and as such have the opportunity to advise on the inclusion of environmental impacts
during the placement of a new/renewed contract. There is also an online training module available for all staff.
Successes to date have included ensuring our paper supply is 100% recycled; energy savings have been made with IT equipment switched off (where possible) at night,
office cleaning carried out during working hours saving the lights being used at night; improved contract management to entertain more sustainable options. Suppliers
are encouraged and pro-actively seeking greener back-office and operational methods to improve their supply.

A Fair Trade Fair for HO staff was held at the main HO Headquarters building during Fair Trade Fortnight. The event was very popular with staff and traders and raised
the profile of Fair Trade within the HO.

The CPS complies with the existing Government-wide standards on sustainable procurement and with the requirement, that all new central government department
contracts must apply the minimum environmental standards when purchasing certain types of products, which cover aspects such as energy efficiency, recycled content
and biodegradability i.e. the Quick Wins Progress will be measured via the environmental risk assessment process and the environmental supply chain management
programme. Mechanisms for measuring progress and success will be included at the time of developing these two areas. SFO N/a

Approximately 100 Projects across both Platform and Equipment Integrated Project Teams are now developing internal processes to apply POEMS and put into place an
Environmental Management System (EMS). Many examples of environmental contract conditions are already in place and work is ongoing to develop others.

Question:G.1
Have you met
the G1A target
in this
reporting year
Organisation (2005-06) ?
Question:- If necessary, please provide additional details about your previous answer.

Question:G1A.1
Have you
commenced
design of any
new build since
1st December
2005?
Question:- If necessary, please provide additional details about your previous answer

Question:G1A.2 If yes,
what percentage of these
new designs have
incorporated sustainable
development
considerations as
outlined in Part G of the
Framework?
Question:- If necessary, please provide additional details about your previous answer.

Question:G1A.3 Have you


commenced design of any
major refurbishment
construction projects since
1st December 2005 ? A
major project is any over
500,000.

Question:- If necessary, please provide additional details about your previous answer.

N/A

No

N/A

Yes

Several refurbishment projects including; 1, Heating system at Land Registry 2, Bristol Guildhall
Refurbishment 3, Queen Annes Gate

Yes

Current estate management strategies already incorporate significant issues for sustainable
development, where reasonably practical to do so.

No

N/A

DCA

Yes

The departments estate strategy centres around estate integration, rather than management of our
estates, which is managed by managing agents, who use the estate management manual for
direction and requirement of data. A chapter on sustainability has been added to the manual with
each aspect of sustainability having an individual section covering the requirements of G1.

Yes

The Business Court has had an outline sketch design produced since 1st December 2005.

100

DCLG

Not applicable

Answer above refers to Royal Parks only The Royal Parks have tendered for 2 PFI/PPP style
projects. These include a new build sports facility at Regents Park and the redevelopment of
Richmond Park Golf Course. Both projects require the design and build of a new clubhouse and the
capital value of both projects are in the region of 2m each. As these are PFI/PPP projects they will
be designed and built by the newly appointed operator who will also operate the facility. As such the
Royal Parks have set out within the specification the design requirements which also included an
element of sustainability. Bids for the Regents Park project were received prior to December 2005
but the design is still in development and for the Richmond Park project the bids were received after
December 2005 and again these design proposals are still being worked up.

Yes
sports facility issues of sustainability and energy saving have been extremely important. The design
has been detailed fully in accordance with the latest revisions of the Building Regulations Approved
Documents particularly the new revisions Conservation of Fuel and Power. The building is therefore
insulated to the latest standards required to prevent unwanted heat loss, cold-bridges and air
leakage through the fabric. This reduces energy consumption for internal heating. As part of the
design sustainability has been considered as reflected by the inclusion of a green roof as an
example. Richmond Park A Sustainable Approach The proposal for the new Clubhouse has been
designed with environmental and sustainability issues to the fore. Our sustainable design matrix sets
out the environmental measures that we are proposing to incorporate into the building and covers
aspects of passive design, building systems, water management, landscaping, materials and social
sustainability. Suggested initiatives include:
The collection and conservation of water in
building and landscape; Ground source heating pumps to warm and cool the building;
Proposing timber structure and cladding that are from sustainable sources and a sedum roof;
100 Incorporating solar hot water for showers and wash hand basins.
Yes

The Department commenced a 8.5 million refurbishment project of its Cockspur Street Offices in
April 2005. This involved replacing the fan coil units and running new IT infastructure over 6 floors.

Design of a new building at Alnwick Northumberland was commenced during this period.

SD considerations are central at all stages of significant construction projects. At design stage
project managers work through a detailed checklist on feasibility of a compehensive range of SD
initiatives. This maximises sustainability during construction and operation. It also addresses the
specific issues assessed by the Building Research Establishment Environmental Assessment
100 Method (BREEAM).

Major refurbishment work has been underway at the Kings Pool site in York. On-going major works
are underway at the large Weybridge site of Veterinary Laboratories Agency.

CO

DCMS

Not applicable

DEFRA

Yes

DfES

Not applicable

DFID

Not applicable

No

The Department commenced a major refurbishment in April 2006 An initial BREEAM assessment
has been completed Re Royal Parks The target of the standards set within the Common Minimum
Standards have been met where appropriate at this stage of the procurement process. However
neither of the projects specified below has reached the construction phase as of yet and as such
certain elements have not been implemented. We are confident that we are going to achieve
approximately 95% of the requirements of the Common Minimum Standards but because these
standards were introduced towards the end of a lengthy PFI/PPP procurement tender process it may
be more difficult to achieve the final 5%. We shall continue to work with our PFI/PPP partners to
attempt to achieve this target.
Yes

Yes

There have been no new build or major refurbishment projects. However, minor refurbishment work
incorporates sustainable materials and disposal methods as far as practicable.

No

DfT

No

DH

Not applicable

No new build or major refurbishment commenced in 2005/6.

Yes

DWP
ECGD

Yes
Not applicable

FC

Not known

The Patent Office commenced design on a new build in excess of 500K before 1st Dec 2005

Yes
No

There is no formal estates management and strategy, but we follow defined policy and instruction
such as BRE guidence
Target is to apply the Governments Common Minimum Standards for Procurement of Built
Environments

Yes

FCO
FSA

Yes
No

HMRC
HMT

Yes
Not applicable

No
No

HO

Yes

Yes

LOD

Not applicable

MOD
ONS

Not known
Yes

CPS SFO TSol RCPO AGO N/A,HMCPSI N.

Information not available for 05/06. Some evidence of application of the appropriate types of
assessments, but robustness of data currently being improved during FY 06/07

N/A

10 new builds.

No

90

Yes

No

No

Yes
No

No

Yes
No

Yes

No

No
Data submitted to the NAO as part of the separate study into Sustainable Construction in
Government demonstrates that the Departments applicable projects did incorporate the full range of
principles (if not the targets) required under this target. In one instance it was decided that
sustainable development considerations could be best served by adopting an innovative approach
which is aimed at reducing whole life costs and construction waste by 50% see example below
and VOSA case study in 04-05 SDC report.
Yes

DTI

N/A

6 major refurbishments. Please note it has not been agreed that Major refurbishments are those
above 500,000. Some of the above will include projects of less value than this definition.

No
The Patent Office commenced design on a new build in excess of 500K before 1st Dec 2005.
Specification includes environmental considerations to be taken into account during total
process,including: maintenance, disposalof construction waste, pollution, noise minimisation, local
impact and procurement of construction materials from sustainable sources, energy efficiency and
local evnviornmental impact assessment on water table and general environment.

100

No
As figures are not known, percentages cannot be calculated however sustainable development
considerations are included in designs. The Jobcentre Plus refurbishment and build programme was
conducted within the specifications of the Jobcentre Plus design guide, incorporating SD principles.
The proposed plans for Falkirk include also include a host of energy efficiency measures,
addressing SD considerations. Designs are required to conform with BREEAM excellence
standards.
Yes
No

New office and major refurbishment of Jobcentre Plus Offices is currently planned until 2007. There
is also a new development in Falkirk planned for the CSA. Plans must conform with Breeam
standards of excellence. Specific numbers have not been calculated. DWP PFI partners are
responsible for the majority of the estate.

New visitor centre at Dalby, now under construction

Dalby has been designed to a high environmental standard incorporating a wood fuel system, use of
100 certified timber, and BRE energy efficiency measures.
No

We have not commenced new designs in the UK to which this Return applies. However, for
completeness of information we designed new British Embassies in Harare, Algiers and Warsaw

100 Design consultants are briefed to apply BREEAM standards to all new designs

0 N/A

100 All projects to some extent incorporate sustainable development considerations.

CPS SFO TSol HMCPSI RCPO AGO N. TSol We moved to our new building in August 2005, so we
do not expect this to apply to us for some time. A BREAM rating of very good was achieved

For example, the Army has commenced design on, and parially or fully funded 95 new-build
projects, either as capital works or minor new works. These include a wide range of buildings and
facilities, including single living accommodation, messing facilities, offices, and technical buildings.
NA

As per 1A.1

Yes
No

4th floor refurbishment (Phase II) of FCO HQ, King Charles St , SW1

Yes
No

Portcullis House was refurbished in 2005 and achieved a very good BREEAM Rating.

Yes

No
major MOD plans, programmes and projects to incorporate sustainable development principals into
decision-making. 10 MOD major projects have completed BREEAM and achieved excellent or good
scores. Data for minor projects is currently being baselined. This is being addressed by (a) the
launch of the Defence Related Environmental Assessment Methodology (DREAM) and (b) reporting
mechanism within the electronic Project Management system that is being rolled out in Defence
Estates - see additional information for more detail. Army - MOD policy is now that every building,
either as a new-build or refurbishment, is designed to meet Building Research Establishments
Environmental Assessment Methodology (BREEAM) Excellent standard. Although this is a recent
requirement, since further back than Dec 95, all designs for refurbishments had to meet BREEAM
Very Good standard. Although these standards have not always been met, due to financial reasons
or because the measures required to meet these standards would have made the building
ineffective for its military purpose, consideration is always given to SD measures, and every project
is required to undergo a Sustainability Appraisal (SA). This will identify options for reducing a
100 projects negative environmental and social impacts, and enhancing their positive aspects.
Yes
Yes

CPS SFO TSol HMCPSI RCPO AGO N

Newport Data block

Question:G1A.4
If yes, what
percentage of
these new
designs have
incorporated
sustainable
development
considerations
as outlined in
Part G of the
Organisation Framework ?
Question:- If necessary, please provide additional details about your previous answer.

Question:- Please outline any examples of what you consider to be good practice in the way that you manage estate management and construction impacts
Question:G1A.5 If you have incorporated sustainable development considerations into minor Question:- Please use this space to provide additional information that you feel is essential for us to know. For example, your overall approach and/or undertake monitoring and reporting of your performance in this area. Should your information be selected to be highlighted as a case-study in the
refurbishments, please use this space to outline your achievements.
in this area, barriers to progress and significance to your business.
report, we will contact you for further information.

CO

Sustainable development considerations are incorporated into routine maintenance works and all
refurbishment projects. There is a rolling programme of exchanging existing and expired water
fittings with more water efficient devices. For example, we recently refurbished the disabled toilet in
Admiralty House with various water and energy efficient devices. Agreement has been reached
with our Total Facilities Management Provider to only purchase water fittings and white goods (i.e.
dishwashers in canteens) which are water and energy efficient.

Sustainable development considerations are incorporated into routine maintenance works and all refurbishment projects. There is a rolling programme of
exchanging existing and expired water fittings with more water efficient devices. For example, we recently refurbished the disabled toilet in Admiralty
House with various water and energy efficient devices. Agreement has been reached with our Total Facilities Management Provider to only purchase
water fittings and white goods (i.e. dishwashers in canteens) which are water and energy efficient.

Sustainable development considerations are incorporated into routine maintenance works and all refurbishment projects. There is a rolling programme of exchanging
existing and expired water fittings with more water efficient devices. For example, we recently refurbished the disabled toilet in Admiralty House with various water and
energy efficient devices. Agreement has been reached with our Total Facilities Management Provider to only purchase water fittings and white goods (i.e. dishwashers
in canteens) which are water and energy efficient.

100

Our estate managers have been trained to look at sustainability regardless of the scale of the
project. Energy and water efficiencies are always considered as well as other SD commitments.

This year we have ensured that comprehensive chapters on sustainability have been incorporated into the Court Standards Design Guide and the Estate
Management Manual. These documents are used in the design of any new court or refurbishment of an existing court and the management of the estate
by our managing agents.

The approach to BRE for a Court Specific BREEAM has been our biggest achievement. This takes into account the uniqueness of court buildings and removes aspects
of contention that appear in office BREEAM which within a court are unacceptable. For example, natural ventilation in cells.

100 Project involved re-stacking. Sustainable procurement policies were adhered to.

Recycle all unwanted furniture and other materials; Only procure replacement furniture
through the OGC Framework arrangements; Ensure all replacement electrical equipment is of the
highest energy efficiency rating;
Only use paints and varnishes with low/zero volatile
compounds; Consider Whole Life costings as part of our replacement system selection process;
Use standard size furniture to maximise the flexibility of our workplaces; Maintain a rigorous
review of timber supply chains for any wood products used. Every member of our refurbishment and
other project teams are given an initial briefing on ODPM/DCLG's SD Policy. They are given open
access to our in-house SD team, who are able to advise on any impacts of processes and materials.

N/A

DCA

DCLG

N/A

Fire Service college reported the following.. Timber purchased from sustainable sources, Furniture bought from OGC Supplier which meets sustainable criteria, Low
energy lighting, PIR system

During the procurement cycle for the main contractor sustainable considerations were included at
every stage. DCMS has chosen a supplier that has a commitment to sustainable practices; e.g. have
an Environmental Management System and are ISO 14001 compliant; they recycle approximately
65% of the material used. They also have a dedicated timber policy in place and a dedicated
environment manager to support project teams. We also invited representatives from our
100 environmental champions group to make representations at the various stakeholder groups

Re Royal Parks The Royal Parks believe that it is very important to adopt sustainable development considerations into all that we do. For instance in the
last 5 years we have invested in sinking three boreholes so that we can reduce our consumption of potable water, and in 2005 we won the Public Sector
Green Fleet Award. Since 2000 we have opened three significant new build constructions in the parks - The Attendant building and toilets in the Diana,
Princess of Wales Memorial Playground, the Regents Park Sports Pavilion (The Hub) and a new restaurant in St. James's Park (Inn the Park). All of these
have incorporated significant sustainable construction elements in their design. For instance all of them incorporate green roofs and benefit from the
additional levels of insulation that these provide. In 2004 we commenced design of a new Welcome Centre in Bushy Park and this will incorporate many
sustainable features - a wood fired boiler using wood harvested from the estate; maximisation of passive and active solar design; maximising the use of
natural ventilation and daylighting; use of sustainable low-risk materials; rainwater harvesting and the use of waterless urinals in the public toilets;
minimising the impact in the ground through the use of helical screw piles. Additionally the siting of the facility has been very carefully considered and will
enable us to close a car-park in the core of the historic parkland which improves visitor safety, improves the quality of the historic parkland and reduces
the deleterious effect of foot traffic and dog faeces upon the regionally important habitat that is the acid-free grassland.

The Royal Parks are very conscious of the impact of construction proposals upon the Parks and seek to utilise ways of reducing adverse impacts and creating positive
opportunities. One method of doing this is to secure contributions from members of the public when designing significant new public buildings. For instance the design of
the Welcome Centre project (part of the Bushy Park Restoration Programme) involved a consultation and engagement process of over thirty meetings. The project was
discussed at all stages of its design. This resulted in a number of significant alterations to the siting and the design, and should mean that it will be fitter for use and will
benefit from greater acceptance in what is a sensitive location. This in turn should translate into more income being generated through the catering outlet, making the
building more sustainable financially as well.

100

All works undertaken on the Defra estate are planned with sustainability considerations in mind.
Opportunities are taken to improve performance against targets wherever possible.

All Project Sponsors set high standards for SD in new build and refurbishment projects. They are fully attuned to the need to design in particular for longterm water and energy efficiency, and if possible self generation. They work closely on all projects with consultants acting as SD 'champions', who advise
on emerging technologies and provide an independent review for the design teams. Considerations at design stage cover a comprehensive list of SD
options. Each is considered for its benefits and suitability for the site and is prioritised according to funding for the project. Detailed sustainability charters
are developed for all major projects.

The Mills building at Veterinary Laboratories agency was opened by Ben Bradshaw, Defra's Minister for Local Environment, Marine and Animal Welfare on 3 November
2005. It is one of VLA's most innovative buildings. It incorporates many SD features and has achieved a BREEAM Excellence Rating, the highest ever bespoke
assessment. The building was tested on a number of aspects including design, building materials and running efficiency. The building won the 2006 RICS SE Region
Sustainability Award. SD features in the major refurbishment work to the London Nobel House building led to it winning the RICS London Region Sustainability Award
(from 36 entrants). High standards of sustainable construction gained Defra's Whitehall Place Building the RICS national Sustainability award for 2005.

Recent refurbishment work has included new push button tap controls, water hippos to reduce WC
flush volumes and flow controls for urinals. Office refurbishment Projects have included more
efficient fan coil units and carpet fitted that has a BREEAM A rating. The benefits of these
installations will be presented in the next Annual Return. Other minor refurbishments include office
moves and the building or removal of partition walls for offices. We try to re-use as much material
as possible e.g. glass walls and doors and discuss the provision of new materials with suppliers to
encourage sustainability.

The use of materials from sustainable sources is of great importance to the DfES as is the avoidance of environmentally damaging material. This
approach is communicated to our partners and service providers through clauses contained in our contracts.

N/A

Both DFID Uk main offices underwent major refurbishments during the period 1999-2004.

DH

Main DH: we have reviewed our timber purchasing policy to reflect the latest guidance issued by
CPET. All contractors are required to comply with the policy.

The Departments and its ALBs are ensuring full recording of property information on the now mandated OGC e-PIMS Civil Estate property database
(please see GHM Treasurys DAO(GEN) 08/05).

The Department of Health is fully committed to the OGC Property Benchmarking Project. We were part of the original Pilot and have used the indicative rough resulting
occupancy rate benchmark to compare our HQ buildings. DH is due to take part in Phase III of the roll-out of this Project as are 1 or 2 of its ALBs.

DTI

All projects carried out in DTI HQ buildings include environmental risk assessments and whole life
cycle consideration. Any works undertaken to buildings such as refurbishments are managed
accordingly.

DTI HQ and the agencies are not planning any refurbishment of its estate.

DTI HQ has embarked on a rationalisation of its estate footprint by releasing 30% of its estate footprint in London. It has introduced 8 for 10 desking and encourages
flexible working. This has optimised the use of available space and allows us to concentrate a greater population density in the remaining buildings and infrastructure.

DCMS

DEFRA

DfES
DFID

N/A

DfT

100

DWP
ECGD

A new Estates Management Strategy is in the final stages of preparation, incorporating sustainable development. BREEAM assessments will continue to
be undertaken where appropriate (e.g. for new builds or major refurbishments where there has been a significant change to the buildings or its services).
The DWP sustainable development team has two qualified BREEAM assessors who are able to advise project managers and developers. A BREEAM
assessment conducted this year on Seaham Jobcentre Plus resulted in an excellent rating being achieved.

Not known

Our main constraint is working within existing buildings, sometimes as tenants, where we have little or no control over building management, and no
financial resourses. Many FC buildings and offices are 40+ years, and would be costly to upgrade e.g. installing new efficient heating, lighting, and water
systems, insulation, etc. We do believe we can make a modest difference to our energy and water consumption, by raising staff awareness through a
network of local champions volunteers.

FC

FCO
FSA

When we carry out minor refurbishments we consider and take actions which enhance the
sustainability of our estate over and above the basic requirements of the refurbishment.
No minor refurbishments have been undertaken

100
We have been unable to gather a precise percentage this year, but will aim to do so for future
0 reports. We do try to incorporate energy efficiency into all of our projects.

HMRC
HMT
HO

100 All projects to some extent incorporate sustainable development considerations.

LOD

MOD
ONS

N/K

Comprehensive data not available but improvement actions in hand. As G1A.2


100

In one of our buildings, three recent office refurbishments have been completed or are about to be completed. In each area, DfES has selected a carpet range from its
supplier which is BREEAM A rated. This Certification demonstrates that organizations and products make a reduced impact on the environment compared with the
industry average. This covers a number of environmental aspects, including air and water pollution, energy use, environmental implications of materials and emissions of
CO2.
DFID achieved a "very good" and "excellent" BREEAM award for the design of the refurbishments at our London and East Kilbride office. We implemented EMS's at
both offices but also ensured that the Facilites Management Teams at both offices had environmental management clauses as part of their contract.
value 10 million per annum). This form of contract is supported by Constructing Excellence and VOSA recently gave a talk at one of their annual conferences. The
contract focuses on risks and gives VOSA the opportunity to risk share thus reducing project costs. By closely working with the suppliers and sub - contractors they have
been able to drill down through the costs and risks to extract efficiencies. The collaborative working has meant that that the team has been able to take 'risks' where
otherwise they may have not - this has had a high impact of sustainability of the projects and introduced many more environmental features to their buildings.
Engineers have been tasked with designing buildings that are more energy efficient than their predecessors by installing technology which is less energy intensive i.e.
Passive Stack Ventilation, automatic light activation in the test hall, intelligent central heating systems that control heating levels throughout the building, improved
natural lighting to test halls lanes, improved thermal properties of offices, and at Grantham and Newcastle Goods Vehicle Test Stations, the introduction of wind turbines.
It is expected that this approach will reduce whole life costs and construction waste by 50% over the full project term.

N/A
Sustainable development considerations have to some extent been incorporated into minor
refurbishments.

Timber purchased for refurbishment or new build is FSC certified. (or other accredited certifier). In some cases, timber from our own estate is use for new build and
refurbishment projects. We hope to use our network of visitor centres across the UK to showcase sustainable design and construction in the future.

Two barriers that we have faced. First is that high tech solutions that save energy are often difficult to maintain in Third World countries and it may not be We have commissioned BRE and the consultants, TPS, to develop a bespoke BREEAM standard for the FCO to use overseas. All new projects are assessed against
sensible to use them. Second is that achieving an excellent BREEAM score adds 5-10% to the capital cost of construction
that brief.

We encourage contractors to take sustainability criteria into account and we conduct environmental assessments for all major projects.
The devolved ways in which projects have been procured and managed in the Home Office have made reporting difficult. More centralised methods for
project delivery and estate management are being developed.

CPS Our Specification of works includes some SD issues which are incorporated into minor
refurbishment as appropriate. SFO As part of an upgrade to Elm House, we are replacing existing
energy efficient lighting with more modern versions, which are controlled by proximity sensors. This
is an ongoing project. In addition, our new and recently upgraded accommodation on the 1st floor at
200 Grays Inn Road, WC1 also benefits from this sort of lighting. The SFO is very IT orientated and TSol Our new premises was BREAM assessed in 2005 and we achieved a rating of very good. HMCPSI The properties at Old Queen Street are leased
we have been withdrawing our CRT monitors in favour of flat screen versions which are more energy from private landlords and we are restricted in what contractors we can use and the buildings are also Grade II listed which limits what changes we can
efficient and gentler on the eye.
make. AGO We are intending to move to a new office in the next year and sustainability will be central to any refurbishment work carried out.
Over the last five years we have changed the nature of contracting for construction and maintenance through the development and implementation of
Prime Contracting. We have in place fewer, larger contracts than before, employing principal contractors to manage the whole supply chain. Client project
teams have brought together end-user, relevant commercial and professional expertise through collaborative working. Emphasis is now placed on
minimising whole-life rather than just construction costs. With support from industry experts we have been developing an in-house environmental
performance assessment tool called the Defence Related Environmental Assessment Methodology (DREAM). It will help to integrate sustainable
development considerations into defence new build and refurbishment projects. It will be officially launched in 2006. DREAM is a web based IS
application designed to enable project teams, designers and contractors to deal positively with environmental issues and meet environmental assessment
commitments for construction at minimum cost. It was launched by MOD at the Statutory Body & NGO Conference on 21 Mar 06. Initial pickup from DE
project teams has been excellent, with many assessments now underway. The recording of the uptake of DREAM for annual reporting purposes is also a
key element of its functionality. The DREAM tool is recognised by OGC. The application of the MODs in-house Sustainability Appraisal method is also
The MOD in house Sustainability Appraisal method has been updated to include a minor new works mandatory on all construction projects commenced in this period. The level of application is currently estimated at 54% of the total number of projects.
checklist to encourage the consideration of sustainable development issues in small scale
Additional, procedures are being put in to the electronic Project Management system that is being rolled out in Defence Estates to increase accuracy of
refurbishment and maintenance projects. The success of its application will be evident in the next
reporting. This appraisal method works in addition to BREEAM or equivalent methods to incorporate sustainable development considerations into projects
reporting period.
from as early as the definition of the requirement.

Upgrading the standard of single living accommodation is essential for improving our Service personnels quality of life, providing clean and comfortable areas in which
they can relax. Improvements will see all new accommodation meeting a Grade 1 physical condition with en-suite rooms that provide adequate storage, phone and
television connections and robust good quality furniture. In 2005 the Parliamentary Under Secretary of State for Defence opened a Junior Ranks Single Living
Accommodation Demonstration Block at Perham Down, home to 36 soldiers from 22 Engineer Regiment returning from Iraq. The block received an Excellent rating
from the Building Research Establishments Environmental Assessment Methodology (BREEAM) by incorporating a range of features such as metering and monitoring
of the buildings electricity, gas, and water, incorporating renewable, solar energy technologies, harvesting rainwater, and utilising timber from sustainable sources.

Question:H.1 Have
you met the H4
target in this
reporting year
Organisation (2005-06)?

Question:H4.1 Do you
have any sites of
special scientific
Question:- How
interest (SSSIs)? If
do you rate your
not, please move onto
progress towards Question:- If necessary, please provide additional details about your progress against the H4 "Additional
Question:- If necessary, please provide additional details
the H4 target ?
target.
information" below
about your previous answer.

CO

No answer

Due to the location of our main sites, our activities have no significant impacts on biodiversity.
However, it is realistic to assume that any significant biodiversity issues will be addressed as part our
EMS and seeking certification of the EMS to ISO14001 environmental standards.
Not applicable
A chapter on sustainability has been included within the HMCS Estate Management Manual. This
includes instructions for our managing agents on all aspects of sustainability and paragraphs on
biodiversity. In addition to this the Court Standards Design Guide, which is used for all new builds
and major refurbishments, also includes relevant information on biodiversity and land management
and development.

Not applicable

DCA

Yes

Satisfactory

DCLG

Not applicable

No answer

DCMS

Not known

Satisfactory

The Royal Parks have many examples of excellent practice to be proud of. The unfavourable
condition of the Acid Grassland in Richmond Park SSSI is not a simple matter that can rapidly be
resolved, although we are investigating possible ways forward (see below).

Defra owns a very small area of land (0.1 ha) forming part of an SSSI (17.7 ha in total) at Boxworth,
Cambridgeshire. The site - ancient secondary woodland now dominated by small leaved elm - is
managed by the Wildlife Trust for Bedfordshire, Cambridgeshire, Northamptonshire and
Peterborough (WTBCNP). Its EN designation is 'unfavourable no change', due to the adverse
impact of muntjac deer. WTBCNP would need to make management changes to bring it to
favourable recovering condition. [NB, Six EN SSSI classifications: Favourable, Unfavourable
recovering, Unfavourable no change, Unfavourable declining, Part destroyed, Destroyed]
Yes

No

No answer

DfES

Not applicable

Satisfactory

DFID

Not applicable

No answer

DFID does not have any SSSIs

Sites are reviewed as part of normal estate management activities and action taken as appropriate.
For example the DSA Training Facility was visited by the RSPB and recommendations that would
enhance biodiversity are currently being evaluated with a view to implementation.
DH buildings all urban sites; no SSSIs
DTI have no SSSI

Yes
Not applicable
Not applicable

Excellent
No answer
Satisfactory

DWP
ECGD

Yes
Not applicable

Excellent
No answer

No

N/A

N/A

No

DEFRA

DfT
DH
DTI

N/A

Question:H4.
2 How many
SSSIs do you
have?
Question:- If necessary, please provide additional details about your previous answer.

Yes

Richmond Park

See above

1 See above.

N/A

0 N/A

No

No

There is only one SSSI on the DfT estate (Hook Moor SSSI, on the A1 near Aberford in North
Yorkshire) captured by this target. However, the Department is working to address this target with
respect to sites that are in part-ownership or part-control, Due to the nature of tenure, many SSSI
1 overlap ownership but are not soley owned or managed by the Department.

Yes
No
Not applicable

We have one SSSI site. It is a geological site and is below ground level, in an area of the estate that
1 will not be distrubed by digging. The SSSI site is in excellent condition.

Yes
No

193 SSSI (or parts of SSSI ) on FC England Estate managed by Forest Enterprise England in
addition, FC England have statutory responsibility for approx. 420 privately owned SSSI (or parts of
SSSI ) through England Woodland Grant Scheme (EWGS) delivery. Approximate number 193 organisation responsible subject to change.
0

FC
FCO
FSA

Yes
Not applicable
Not applicable

Satisfactory
No answer
No answer

Yes
No
No

HMRC
HMT

Not applicable
Not applicable

No answer
No answer

No
No

0
0

HO

Yes

Excellent

Yes

HMP Frankland HMP Usk/Prescoed - x2 (HMP Usk is the parent establishment for Prescoed and
7 each site has a SSSI) HMP North Sea Camp HMP Dartmoor HMP Hewell Grange HMP Leyhill

LOD

Not applicable

No answer

MOD

Yes

Excellent

ONS

Not applicable

No answer

Considering the extent of the public sector prison estate and the operational pressures, which have
been placed on the Service, progress has been consistently excellent.

CPS SFO TSol HMCPSI RCPO AGO NA . TSol We are a London based office.
No
favourable/unfavourable recovering condition. We have completed the audits of SSSIs and ASSIs in
Scotland, Northern Ireland and Wales and developed the works required to achieve favourable
condition where possible. Further work clarifying ownership and boundaries has changed the
number of SSSIs for which we have management responsibility from 176. Our conservation status
has never been better, with record numbers of Sites of Special Scientific Interest (SSSIs) in
favourable/unfavourable recovering condition and continued action to reduce the number of historic
buildings at risk. We have undertaken a biodiversity audit across our estate to assess biodiversity
impacts and developed biodiversity action plans for all of its significant sites. In 2005, work clarifying
ownership and boundaries has changed the number of SSSIs for which we have management
responsibility from 188 to 179 (by end 2005/06 this was 176) Following 2.5 million of capital works
undertaken as a result of funding made available at the end of 2004, the number of our SSSIs in
favourable or unfavourable but improving condition has increased from 70.7% in 2003-04 to 78.1%,
in England. Works were also undertaken in Scotland and Wales, but figures are not yet available
Yes
due to differences in the Statutory Bodies assessment methodologies.

No

CPS SFO TSol HMCPSI RCPO AGO N, CPS See below.

176 SSSIs represents MOD interests in SSSIs and ASSIs in England, Scotland and Northern
Ireland. Decrease of 3 SSSIs from 2005 to 2006 due to disposal of 2 sites, and clarification of
176 boundaries and management responsibility at 1 site.

Question:H4.3 How many


of your SSSIs are in a
favourable or
unfavourable recovering
Organisation condition?
Question:- If necessary, please provide additional details about your previous answer.

Question:- Please outline any examples of what you consider to be good practice in the way
Question:- Please use this space to provide additional information that you feel is essential
that you manage biodiversity impacts and/or undertake monitoring and reporting of your
for us to know. For example, your overall approach in this area, your approach to biodiversity performance in this area. Should your information be selected to be highlighted as a caseon land other than SSSIs, barriers to progress and significance to your business.
study in the report, we will contact you for further information.

CO

N/A

Due to the location of our main sites, our activities have no significant impacts on biodiversity.
However, it is realistic to assume that any significant biodiversity issues will be addressed as part our
EMS and seeking certification of the EMS to ISO14001 environmental standards.
N/A

DCA

N/A

N/A

The DCA and its executive agencies have very little land attached to its buildings. Most space
surrounding offices or courts is used for car parking for visitors or small greens for aesthetic
purposes.

DCLG

The Royal Parks are unable to answer in these terms. They have one SSSI with 15 units, its
principal interest features are its areas of Lowland Acid Grassland and its invertebrate interest
especially its saproxylic fauna. EN has this year reassessed these units in terms of one interest
feature only the Lowland Acid Grassland. Following reassessment, each of the grassland areas
are considered to be in unfavourable condition due to low frequency of positive indicator species
and excessive sward height. Most of the other quality target criteria (low frequencies of negative
indicators) were met however. No recent re-evaluations of the invertebrate interest features have
taken place, but they would judge (from current work on the saproxylic fauna, and moth trapping)
that the SSSI would be found to be favourable with regard to this interest feature.

DCMS

DEFRA

0 See above.

0 N/A

DfT
DH
DTI

DWP
ECGD

FC
FCO
FSA
HMRC
HMT

We have identified Defra and Agency sites that have may have existing or potential for biodiversity,
and prioritised them for ecological survey. Seventeen sites were surveyed by consultants and 9
others were surveyed locally. Biodiversity management plans have been developed for those sites
identified as having existing biodiversity or potential to develop biodiversity.

The biodiversity targets only apply to our East Kilbride office as there are no grounds at our London
Office. DFID met the targets to conduct an audit of the grounds and publish our action plan on our
external website.

DFID audited the grounds at our East Kilbride office before it became a requirement of the targets.
This demonstrates our committment to biodiversity and our awareness of the potential impacts from
our business. We also met the target to complete and publish our Biodiversity Action Plan which has
been based on the recommendations of the SWT audit.

The Highways Agency is in the process of undertaking a detailed review of all SSSIs on or adjacent
to its landholdings, to refine the current ownership lists and is in discussion with English Nature on
this issue.

Surveys were undertaken during the planning phase of a new build at the Air Accident Investigation
Branch (Farnborough) to confirm the ecological benefit of the land and to determine the extent of
wildlife at the build location. Landscaping for the works will consider the bio-diversity of the site,
using local wild grasses in uncultivated areas. The opportunity was also taken to restore a
previously developed area of the site back to its natural state. This was achieved by utilising topsoil
removed during construction. This area will be again be seeded with local grasses. At a corporate
level an Highways Agency research commission was published. This was: CIRIA (2006). A guide to
rabbit management. Published: February 2006. At local level the Agencies environmental Key
Performance Indicators for 2005-06, included a biodiversity element which stated: Achieve at least
7% of HA Biodiversity Action Plan extending across 15 priority targets (making a cumulative total of
35%). In 2005-06, 12% was delivered, exceeding the 7% target, bringing the cumulative total
delivered to 39

FC England has a corporate responsibility to improve the condition of public forest estate SSSI by
1% p.a. In addition to this FC England is committed to the Defra PSA target of achieving 95%
favourable condition by 2010 and with the help of additional funding received from Defra in April
FC England estate 82% FC Statutory Responsibility for private woodlands 16%* The
2006 is making significant progress with enhancing the condition of both woodland and open habitat
percentage of SSSI in favourable (or unfavourable recovering) condition has increased from 73% in SSSI. This is being achieved on the FC estate through the concerted efforts of FC staff through
October 2004 to 82% August 2006. *This figure is based on the 14,000ha of SSSI for which FC
partnership and liaison with other conservation bodies. Progress in the private sector is being
has been given responsibility for delivering through the EWGS and is not representative of the whole achieved through encouraging private woodland owners to carry out specific woodland management
82% woodland resource where approximately 78% is in favourable condition
operations with advice from EN under the new Woodland Improvement Grant for SSSIs.

0
0

HO

We have 4 sites that are considered to be in favourable condition and 3 sites which are
7 unfavourable but recovering.

LOD

CPS This department does not have any SSSIs but we will have procedures in place to deal with
Biodiversity issues as appropriate. TSol We do not lease any land from our Landlord. We are purely
office based.

ONS

At a Forest District level best practice is achieved through: - Local policies for the reduction of
disturbance to biodiversity interests during routing operations and the completion of detailed
environmental assessments - Recording presence of species, priority habitats and monitoring
restoration of key habitats such as Ancient Woodland - Working with advice from and consultation
with conservation organisations and agencies At a National Level best practice is achieved through:
- Measuring change in restoration of Plantations on Ancient Woodland Sites - Recording open and
wooded priority habitat restoration and recreation - Monitoring actions and costs associated with
delivering SSSI condition

We encourage contractors to take sustainability criteria into account and we conduct environmental
assessments for all major projects.
All our designated sites whether they are SSSIs, SACs or SPAs or locally designated SINCs have a
dedicated BAP, which is linked into the UK BAP structure. All other sites which are not designated
but may still have biodiversity significance including those inner city sites which may have industrial
or brown field as a priority will still have implemented a Biodiversity Managment Plan (BMP) albeit
this may be limited to just a Habitat Action Plan (HAP). Significant barriers would be the
implementation of the prisons multi-million pound building programme for refurbishment and
development projects, which inevitably will have some effect on habitats and species. However,
sustainable development is now core within programme delivery and all aspects of sustainable
development including biodiversity are taken into account throughout the building process. The
Prison Service following a 12 month pilot scheme for an environmental manual, is now looking to
implement an Environmental Manual at all of its sites which will assess not just the waste and
recycling issues as well as the energy and water conservation issues but more importantly the
protection of flora and fauna.

MOD

1. Coley Park Reading has a detailed management plan. Good practice includes an environmental
records board by reception for staff to record birds, animals and insects seen around the site. Five of
the bird boxes installed last year are being used (three used in first year). Dead wood is retained on
site, piled up next to the woodland path. In Autumn 05 wildflower seeds from a local donor meadow
were sown on a meadow on-site.(picture available) Soil was raked in winter to open up the sward
and improve habitat for butterflies. 2. SVS Office at Worcester - Previously, grassed areas were
mown and all hedges neatly clipped. This regime is now adopted only for immediate surrounds to
buildings. Other areas have returned to its natural state. A wetland area has developed and the
range of flora and fauna has increased. Boards have been erected for identification of species.

Two of our four sites have landscaped grounds. Both reuse grass cuttings and tree pruning for
mulching flower beds and borders. One site has a woodland walk area where bird boxes have been
installed and wildlife encouraged. Part of their external seating is made from recycled plastic. Other
buildings are located in urban areas and have internal planting. Biodiversity is not significant to our
business.

DfES

DFID

The Fire Service College although not an SSI, is the only major land holding in the estate and has
biodiversity significance, with sightings of rare and protected species. A full biodiversity survey has
been undertaken in association with the Local Authority over each season of the past year. The
results and recommendations are being put into a site biodiversity action plan.
implemented, the trial will answer questions about the response of the grassland to low intensity,
contracts work for wildlife: how to encourage biodiversity in urban parks p.11. &#61607;
winter-time cattle grazing rather than itself being a means quickly to transform the parks grasslands Conservation grassland management. Continuing sensitive management of grasslands in all parks
into favourable condition. Nevertheless, it may lead to the more widespread use of cattle in the
but in particular: Kensington Gardens, Greenwich, Hyde and Regents Parks. &#61607;
Park which could help the habitat to meet the condition assessment criteria. However, care will be
Saproxylic beetle survey in Richmond Park. A major survey aiming to establish a repeatable
needed to avoid impact on areas of particular botanical or other interest that are maintained by the baseline monitoring method for saproxylic invertebrates. &#61607; Skylark Surveys in Richmond
current management. It should also be noted that there are other issues affecting the condition of
Park. The final year of a 5 year study by volunteers and staff has firmly established the benefits of
the Acid Grassland which requires low pH and low nutrient conditions. The Park is in an urban
the experimental Skylark Protection Zone. Changes to the pattern of autumn mowing in some
environment and has heavy visitor pressure. Nutrient enrichment from dog fouling is a significant
grassland areas will also benefit skylarks. &#61607;
Bird monitoring by volunteers in Richmond,
problem that has particularly clear effects around entrances and car parks and there is an
Bushy, Hyde, Kensington Gardens, Greenwich and St Jamess Park. Volunteers carry out monthly
unquantified contribution of nitrogen oxides from atmospheric pollution. Notwithstanding this, The
standard bird monitoring walks. &#61607;
Butterfly monitoring by volunteers in Richmond and
Royal Parks, with the support of volunteers, have been very active in trialing management changes Bushy Parks. Since 2003, volunteers in Richmond Park carry out 26 weekly standard walks (Aprilto reverse the decline in breeding skylarks (see best practice), to limit bracken encroachment , and September). &#61607;Moth surveys in Kensington Gardens, Greenwich Park and Bushy Park
to create valuable areas of scrub in suitable areas via natural regeneration by means of temporary
surveys all will have reported by end March 2007. &#61607; Reedbed planting in St Jamess
fencing.
Park. A new area of marginal reeds and bankside wild flowers was planted in Winter 2005/6.

As part of the biodiversity process and the implementation of BAPs at all our nationally designated
sites and biodiversity significant sites we are incorporating the Biodiversity Action Reporting System
(BARS). As a consequence of this we now have a national biodiversity coordinator responsible for
BARS and all stage 1 designated sites will have staff trained on the BARS system, allowing all of our
actions and targets for species and habitats to be recorded. This system will allow for reports to be
downloaded and updated as to which sites are on target and which actions are achieved or not
achieved. It will also help us to monitor our progress with our partnerships and their actions towards
our shared targets.

priority habitat and a priority species at one site, but within the Defence Estate, 35 habitats and 138
species have been recorded. The MOD BAP review and audit project is establishing the nature of
management actions carried out across the estate. Strensall Training Area in North Yorkshire is
An audit of the estate is currently underway and is attempting to more accurately quantify the
probably the most important site in the UK for the Dark-Bordered Beauty Moth, a UKBAP priority
biodiversity of the estate using information obtained from Conservation Groups, existing and draft
species. An area of lowland heath used for military training, it is also designated as a Site of Special
integrated land management plans (ILMPs), integrated rural management plans (IRMPs) and other Scientific Interest and Special Area of Conservation. Since 2002, monitoring of the population has
England 78.2% (21.8%) Scotland 70.3%* (28.7%), Wales 67.9%** (32.1%) N. Ireland 57.1%***
site-based plans, consultants reports, survey reports and records held by MOD staff. Detailed
been carried out in partnership with English Nature, Butterfly Conservation, Yorkshire Wildlife Trust
(42.9%) Due to different assessment methodologies used by the different statutory bodies in
records exist for 179 establishments, with priorities being the 142 establishments that have been
and numerous volunteers. Nine moths were detected in 2002 but the 2006 count recorded 109!
England, Northern Ireland, Scotland, Wales it is not possible to report a single figure for the UK.
identified as supporting significant biodiversity interest. These include the large Defence Training
Lowland heathland restoration has taken place through the Tomorrows Heathland Heritage Project,
Scotland, Wales and Northern Ireland assess SSSI features, not SSSI area parcels as in England. * Estate land holdings such as Salisbury Plain and Otterburn. The extent and status of UKBAP priority contributing to this BAP target and ensuring the SSSI is in a recovering condition. Management
Scotland SSSIs 192 of 216 features assessed ** Wales SSSIs 56 of 99 features assessed *** N. habitats and status of UKBAP priority species at individual establishments and current management prescriptions contained in the management plan for the site also include maintenance of suitable
Ireland ASSIs 7 of 11 features assessed. NI ASSI target 95% of features on statutory designated action is recorded. A programme has been drawn up identifying sites which require the development conditions for the moth, including its food plant creeping willow. To aid understanding of the
sites are in, or approaching, favourable condition by 2016; Figures given are for SSSIs / ASSIs
of plans. Currently, 70 establishments have been identified as the highest priorities requiring
requirements of this rare moth research projects have been carried out by students from York
78.2 parcels or features meeting the target or not meeting the target (in brackets).
management plans to be completed in the period 2006-2010.
University and these will be used to refine the management plan.
Bird and bat boxes are installed at some sites; a pond at Titchfield, bird feeding points and natural
garden area at Newport. Biodiversity is discussed and encouraged at Green Focus Group meetings.

CO

Question:- Please use this space to provide information on your performance over the last year, your overall approach in this area, barriers
to progress and significance to your business.
Office. These include working:
Compressed hours this means staff work their hours over a shorter period of time (for example, work their full
weekly hours over four days instead of five); Flexible hours this lets staff vary the time they get to work and leave, provided they work their
conditioned hours and record the hours they work;
From home occasionally so that staff can work without distractions
Full time at least 36
hours net per week, excluding breaks; As part of a job share this usually involves two people working part- time, but working together to cover a
full-time post;
Part-time this means that staff can work less than full-time hours (36 hours net) and are paid only for the hours they work;
At
term time only this lets staff have time off during the school holidays. In April 2003, new legislation gave parents of children under six or disabled
children under 18 the right to ask their employer to consider their request for flexible working. The Cabinet Office provides Guidance to staff if they are
interested in flexible working. The Cabinet Office provides a work/life balance smart working checklist to make sure that staff are doing everything they
can to get a good work/life balance.

DCA

The Outreach Forum has been launched. The aim of the Outreach Forum is to enable the department to share best practice between regions and
DCAHQ and associated offices on the topic of outreach. This will involve: Raising awareness about the DCA and the service that it provides. Seeking
feedback from the community. Using the feedback received to improve service delivery. A Diversity Impact Assessment Toolkit has been developed
and training on its use has been rolled out and further guidance placed on the departmental infonet. When considering diversity impacts on all new
revised policies, practices, the guidance highlights the need to engage with communities affected. As well as introducing an outreach forum, the
department is undertaking a pay and grading review.

Organisation

DCLG

DCMS

The Royal Parks are in a unique position to be able to educate the community about sustainable development issues. We provide a range of learning
opportunities for all ages, both formal and informal, and aim to be accessible to all. A Palace for the 21st Century. A new pilot project took place in
Greenwich Park in June 2006. The project developed 12 sustainable activity modules that link directly to GCSE exam portfolios of students. Teachers
and professionals from specialist fields met, designed and delivered the programmes. These should be available on the Web as a teachers resource
to be used in any park by October 2006.

Question:- Please outline any examples of what you consider to be good practice in the way that you manage social impacts and/or undertake monitoring
and reporting of your performance in this area. Should your information be selected to be highlighted as a case-study in the report, we will contact you for
further information.
diversity and tries to accommodate different work patterns. If employees want to change their work patterns, their Line Managers are encouraged to take their requests
seriously. There are a number of ways staff can improve their work/life balance in the Cabinet Office. These include working: Compressed hours this means staff
work their hours over a shorter period of time (for example, work their full weekly hours over four days instead of five); Flexible hours this lets staff vary the time they
get to work and leave, provided they work their conditioned hours and record the hours they work; From home occasionally so that staff can work without
distractions Full time at least 36 hours net per week, excluding breaks; As part of a job share this usually involves two people working part- time, but working
together to cover a full-time post; Part-time this means that staff can work less than full-time hours (36 hours net) and are paid only for the hours they work;
At
term time only this lets staff have time off during the school holidays. In April 2003, new legislation gave parents of children under six or disabled children under 18 the
right to ask their employer to consider their request for flexible working. The Cabinet Office provides Guidance to staff if they are interested in flexible working. The
Cabinet Office provides a work/life balance smart working checklist to make sure that staff are doing everything they can to get a good work/life balance.

A tool called the Diversity Excellence Framework has been developed, based on the EFMQ model (European Foundation for Quality Management), to assist in
mainstreaming diversity objectives and incorporating them into business plans. It is used alongside other business improvement tools to identify strengths and areas for
improvement covering all aspects of business, including Partnerships and Outreach.
devastating effects on marine life. Government Office North East reported.. On 28 March 2006, Transport division held a team-building away-day at Blaydon Burn,
Gateshead prioritising tasks and utilising key skills and attributes, within a remit to clear an area of Blaydon Burn of litter and debris. Gateshead Council provided litter
pickers, black bags, wheelbarrows and a small skip. Our role to pick up the array of plastic bags, bottles, litter and general household items such as plastic bowls, pans
and food products. Government Office East reported... August 2005 GO-East organised 2 days of voluteering for Welney Wildfowl Trust. Volunteers from the office
cleared an area of scrub land for the wildfowl trust. In countryside and Farming week 26-30 September 2005 the Rural Team and the Regional Public Health Group lead
a week of internal events to coincide with British Food Fortnight including, healthy eating, environmental awareness and a farmers market. During the later stages of this
reporting year we initiated a sustainable development policy for the office embracing the social aspects of sustainable development. The policy developed in partnership
includes aspects of development and training, work life balance and well being.
Liberty Drives, Hyde Park: The Liberty Drives began in the summer of 1995. Since beginning, the scheme has provided up to 50,000 elderly, disabled and infirm people
free rides in Hyde Park in electrically powered buggies driven by trained volunteers. There are two buggies specially designed to carry wheelchair bound passengers. All
buggies will pick up and deliver passengers back at clearly marked collection points on the Park's perimeter. Bushy Park Companion Cycling: Bushy Park houses
Companion Cycling. Those with special needs can therefore experience the joys of cycling, riding in tandem on specialised bikes with those more able assisting them.
Horse riding is available for those less able.

DfES

DEFRA has made significant contributions to improving public access to the Rhydymwyn Valley Site in North Wales & the Foot & Mouth burial site at Watchtree, by the
Solway coast of Cumbria. 1. The Rhydymwyn site was used for chemical weapons production & storage from 1938 until the early 1960s (production ceased in 1945). It
has been transformed into an important nature reserve and site of historic interest, thats open for managed public access. In 2005-2006 DEFRA signed a ten year
Assessment of the potential for public access to Defra sites reflects security, insurance, third party liability, health and safety implications and the
agreement with the North East Wales Wildlife Trust to manage the reserve. Visitors can explore a site with a rich history and see how nature is reclaiming one of Britains
impact on operational and business flexibility. There is public access through footpaths, bridle paths and other public rights of way across some Defra World War II chemical warfare plants. 2. Since the Watchtree Nature Reserve opened in 2002 the site has developed into an important nature reserve. The site is rich in
land holdings. We aim to support and encourage the continued use of such access and to review the definitive plans of such rights of way held by local flora and fauna and many species of bird, and Great Crested Newts breed on site. As well as allowing public access to the site, a series of guided evening and Dragonfly
authorities, to ensure completeness.
walks take place throughout the summer.
language, magistrates, charity board members, readers and mentors in schools, colleges and universities, painting of community centers,
environmental work/clearing green spaces. Time constraints, work priorities and lack of budget sometimes restrict staff involvement. The lack of budget
allocated to Volunteering is something we are looking at as a long term strategy. Volunteers bring a different perspective to each project and they have
certainly made a difference. There are pictures in the Departmental Magazine and on the intranet website to capture the various volunteering aspects A formal and informal monitoring system is in place to capture feedback from Volunteers. This is included within bi-monthly Newsletters and Intranet articles which also
of the work done by DfES Volunteers. Benefits to the Community include releasing the various individual talents and potential of volunteers (e.g.
link to a volunteering website. Staff are encouraged to provide feedback. Statistical information is broken down annually into community projects, mentoring partnerships
Creativity, practical DIY experience), and embedding the Departments policies in serving the wider community. DfES recognises the advantages to
in primary/secondary schools and universities and voluntary work in London Cares Day. Guidance for staff on how to get involved is included within a comprehensive
volunteers including acquiring new skills, achieving their objectives, personal satisfaction in seeing the results of their work, being better equipped in
intranet site with hyperlinks including: providing help for staff and managers, information on frequently asked questions and feedback from volunteering undertaken. This
seeing the impact of the Departments policies on the different groups. DfES in the Community is the banner we fly our volunteering and corporate
also includes DfES in the Community which is the banner we fly our volunteering and corporate social responsibility programmes under. Staff are advised that there is
social responsibility programmes under.
the possibility for local groups to apply for a cash injection whether painting a local school, planting flowers or installing a water butt to save water.

DFID

DFID has made vast improvements to the work/life balance staff through increased provision of flexible and remote working opportunities. We operate over 440 different
DFID published our Social Impacts Strategy on our external website within the original target deadline of March 06. During this reporting year we have work patterns and have invested 1.5 million in remote working facilities. Remote working is available to two-thirds of our UK-based workforce across 40 different
also met our SCS diversity target for disabled staff and have made significant progress towards 37% of women. We are currently undergoing our IIP
countries. DFIF also actively promotes our volunteering policy through our website.We conduct annual management and stress surveys and promote well being by
re-accreditation.
having gym facilities in both UK offices. DFID also offers placements for work experience. We also recycle IT kit and furniture to local charities, schools etc.

DFT

The Department actively encourages and promotes volunteering and provides time for staff to undertake such activities. Staff have participated in wide
range of activities during the reporting year with local and national organisations. Examples below: The DVLA provides significant resources in
partnership with Careers Wales West in respect of mentoring programmes, mock interview programmes and business and enterprise days. All of these
take place in schools. As well as helping the young people involved prepare for their exams and the world of work, they also highlight the opportunities
available by the Agency as a prospective employer. DSA details of volunteering are published on their local intranet. DSA staff also have the
opportunity to participate in various events at work such as Jeans for Genes day, Macmillan coffee mornings, Children in Need etc. The MCA also
functions with the assistance of 3000+ volunteer auxiliary Coastguards

DEFRA

DH

DTI

DWP
ECGD

FC

Main DH: Social impacts forms a major strand of our current SD Action Plan. We have made progress in identifying some of the issues that we need
to take forward as an organisation strategically for example the need to improve our Diversity profile in our Leeds office. Where possible we have
focussed on existing initiatives that are relevant to the SD agenda and will deliver improvements to the way we deliver our business. NHS PASA is
currently developing its Social Impacts strategy as a key strand of the Sustainable Development Action Plan. Reorganisations in 2005-06 and again in
2006-07 have delayed progress but it is seen as important to put in place.
purpose is to inspire, engage, support and challenge companies, to continually improve the impact they have on society. We continue to forge links
with Career Wales and schools by offering career advice together with awareness visits and our Marketing Team are embarking upon a programme to
provide local schools with the opportunity to receive innovative work shop based programmes which illustrate the commercial values of Intellectual
Property to both business and society. We also have 10 staff currently offering reading support in primary schools.A recent venture was in assisting the
Home Office in the delivery of Application Form training and Interviewing Skills workshops for prisoners about be released into society.In addition we
continue to support the New Deal Initiative and we offer Work Experience placements to local students. We also recycle our white paper, cans, plastic
and glass via a socially-owned recycling company whose profits go directly to a local charitable trust and donate surplus furniture and IT equipment to
schools and other charitable organisations.We have also been awarded with the Justice in the Community Award for our contribution to the lay
summary justice in Gwent.
inclusion of sustainable development principals. People orientated groups within the Department take forward various aspects of socially related
issues, such as race, disability and work life balance. In support of work life balance, the Department has this year formally published a policy on
homeworking, providing an opportunity for staff to take advantage of this option in certain circumstances. DWP recognises that it has a place within
local communities and that it can have a positive impact because of its placement within that community. Staff are supported in their desires to
become involved in community based activities and can in some cases be offered time off from their normal duties. Volunteering in this way can
provide vital skills to community groups and projects but also provide opportunities to the individual to benefit from an enriching experience and to
develop new skills which may be useful in their workplace. Of particular note is the Disability and Carers Service Community 500. An initiative to
provide 500 days to the community for various projects. Amongst the activities this year, staff have collaborated with Wyre Countryside Service and the
Marine Conservation Society to become involved in Beachwatch.
emphasis. This year a working group of practitioners from several Forest Districts carried out an exercise to collate current information and guidance
from across the Commission. The results were co-ordinated and standardised guidance and documents required for the sustainable management of
volunteer groups and activities. Hundreds of volunteers are active across the estate. Tasks include managing car parks, litter picking and assisting with
events. General conservation work parties are still important providing physical and mental well being opportunities as well as supporting the delivery
of biodiversity aims. Volunteers are taking part in specific activities such as assisting with school visits and family fun days. Recruitment includes
people who are retired, unemployed, suffering from the aftermath of head injuries, from refugee communities, other minority groups and individuals
who turn up to join in. Some projects such as a scheme to provide useful activity for failed asylum seekers were progressing well but failed to be
implemented due to a lack of government support. Volunteers remain a vital part of the Forestry Commissions community engagement programme
and District Staff will continue to seek new ways for volunteers to take part.

HMRC
HMT

HO

LOD

MOD
ONS

As above.
relationships can be built up between rangers and representatives of local ethnic community organisations including local Race Equality Councils. Outreach, training
and research The extended role of outreach work outlined above could be co-ordinated by the Community Staff Development Network and strengthened by linking it to
the diversity training offered by Forestry Training Services at national and local level. Translation and interpretation Translations of FC leaflets, documents and signs
need to be proportionate to local needs, and planned through consultation with local BME representatives identified through community outreach. Volunteering and
employment Volunteering groups in woodlands rarely include members of BME communities. Groups of volunteers recruited from particular BME community groups may
be easier to organise but may contribute less to racial integration. Volunteering by asylum seekers (because paid work is prohibited) can have considerable
psychological benefits for participants. Volunteering by members of BME groups may gradually help to address the BME under-representation among applications for
employment with FC. Other cultural groups Gypsies and Travellers are classified as ethnic minorities by CRE, and pose entirely different challenges with respect to
woodland access.
The FCO was a fore-runner in voluntary work during the Year of the Volunteer for 2005, with staff permitted to take five days off for voluntary projects and this is still the
case. Senior management strongly supported voluntary work and staff were provided with more information on how they could volunteer through Community Voluntary
Service (CVS). There are plans to continue to promote voluntary work within the office.

FCO

FSA

Main DH: One practical example is an employee health event that was held last year. Following the publication of the Choosing Health white paper we identified a range
of interventions that could be used to support the health and well-being of our staff. This culminated in 2 events where we promoted a range of new initiatives including
Health y eating, physical activity, Occupational Health tests etc . These events were hugely successful and we are planning to build on them this year in conjunction with
a new Occupational Health provider.

The Investors in People Standard significantly contributes to the social and economic strands of social development. The Food Standards Agency
successfully obtained Investors in People (IiP) accreditation in 2004 and we are committed to maintaining this external validation of our business
practices. The Food Standards Agency is due to undertake re-assessment against the new IiP standard by the end of 2006. We have an active group
of staff who cycle to work, and we support this with by providing racks and shower facilities. We have a sports and social club, where staff can take
part in Yoga and Tai Chi. The Agency has a subsidised gym membership. Health Checks are also carried out free of charge.
A draft Corporate Responsibility Strategic Framework document has been agreed by the CR Steering Group and will now be considered by the Board
at their meeting in September 06. This sets out what CR means for HMRC and how it will be taken forward including actions required and
performance measures. At the same September meeting the Board will be considering the development of a possible 'flagship programme' for HMRC.
Our new Departmental CR adviser is helping to take all this forward and will also be looking to develop a CR planning template for business units to
use when considering their own CR plans. The Boards endorsement of the Strategic Framework and flagship programme will enable the existing
volunteering policies for former Inland Revenue and former Customs and Excise staff to be replaced by a new HMRC volunteering policy and will also
provide focus to the volunteering/community activity currently being carried out across the Department. The Department conducts full risk and
environmental impact assessments on any changes to our estate or business that will impact on our staff, customers or local communities in which we Participation in the Business in the Community annual CR Index 87th place in 2005 and the only Government Department to feature in the top 100. Regular staff and
have a presence.
customer surveys.Articles in oneHMRC magazine.CR site on Departmental intranet. An annual CR report to be published for 06/07.
Within the Treasury a number of teams undertake volunteering and contribute to community based projects as part of team building. The Treasury is
working on a new Volunteering programme to incorporate into mainstream practice at the workplace.
Home office staff are encouraged to take part in volunteering under the banner of a scheme entitled "the Out of Office Experience". Staff are allowed
to take up to five days' paid special leave per annum to take part in volunteering activities. Take up of special leave for this purpose is not currently
monitored, although we are about to launch a short questionnaire on the intranet to gauge roughly the level of participation. The Home Office is a
member of Westminster Time and Talents, an organisation which matches volunteering activities to potential volunteers in the Westminster area. We
have initiated a programme of monthly visits from charities to staff a stall over lunch time in the foyer of 2MS. There is a programme of short-term
funded secondments to the voluntery sector for Home Office staff - up to fifty per year. The Home Office employee volunteering strategy was
refreshed earlier in the year.
Ramp access is available to the building along with rails and anti slip treads. We are modernising our disabled toilet facility to allow access for
motorised wheelchairs. All our sensitive waste paper is subjected to recycling and spent light tubes are disposed of appropriately. Redundant
computer equipment which was serviceable was redistributed to schools, so enabling it to be used to the end of its effective life. HMCPSI All Printer
cartridges are collected and donated to the Civil Service Benevolent Fund. Members of staff are also encouraged to become involved in local charities
such as the scheme asking members of staff to make a small monetary donation to charity in return for chilled soft drinks. RCPO During 2005/06
RCPO equipped it's main office in London with new shower facilities for staff who cycle to the office or undertake exercise at lunchtime to use. One of
the buildings major government tenants (DoH) have also equipped the building with new gym facilities and these have been made available for use by
all members of the Civil Service Sports club. AGO We actively encourage staff to take part in volunteer work. During the last year we have provide free
a medical for all staff that wanted one. We also provide childcare during the school holidays Tsol none
called out to deal with devices left over from the two World Wars, all of which require quick and safe disposal. The Meteorological Office The Met
Office provides a weather forecasting service for the military and civilian community. It produces the weather reports and updates which we see on our
television screens every day. The Met Office is a world leader in modelling climate change. The UK Hydrographic Office The UK Hydrographic Office
provides nautical maps and charts for both the national and international maritime community. Post Conflict Recovery Unit This interdepartmental
Unit was established by MoD, Foreign and Commonwealth Office and Department for International Development in September 2004 to improve the
United Kingdoms capacity to deal with post conflict stabilisation. MoD makes grants-in-aid of over 14M a year to the national museums for all three
Services, and owns a wide range of historically significant assets. These include such unique items as HMS Victory, recently declared a national
treasure and one of 100 Icons of England, and the Battle of Britain Memorial Flight, as well as over 1,500 items of fine art and antiques in the MoD Art
Collection.

Examples of volunteering activity in the community undertaken by Home Office staff include: Tower Hamlets Bio-diversity Project - clearing an area of woodland for replanting; British Trust for Conservation Volunteers - clearing and surveying litter along the coast; Queen Elizabeth Country Park - practical conservation and
management of wildlife;

HMCPSI Members of staff are encouraged to take their own initiative and participate in existing recycling schemes and to set up new ones such as the can and plastic
bottle recycling
Conservation Group at Leconfield Defence School of Transport, Yorkshire. The trails include car park boards detailing the routes and photographs of some of the
species likely to be seen. The aim of the project is to encourage an interest in the various conservation initiatives on site, to foster environmental education and
knowledge of the work that takes place on the site. The trails are to be used by staff, students, dependants and hosted visitors. Although not open to the public, the
Conservation Group is willing to support local schools and groups with organised visits. The Defence Training Estate South West is hosting two Heritage Open Days
at Okehampton Battle Camp for the third year running. Not only do they provide an opportunity for staff and military to explain how the area is used and cared for, but
other events and displays cater to a wide range of public interest. The training area also hosts visits from special interest groups, and staff give talks to local groups
such as the Women's' Institute. Defence Estates in association with the Northumberland National Park Authority are delivering a significant visitor information project
relating on Otterburn Training Area. The outputs of this project comprise: 22 external/internal interpretation panels DVD web site suite of leaflets all aimed at
promoting safe access and recreational opportunities on the defence estate for the local and wider community.

uid
315233
315265
315297
315329
316737
316769
316801
316833
316865
316897
316929
316961
316993
317025
317057
317153
317185
317729
318657
317281
317089

Name
Marion Tierney
Mia Rayner
Richard Brewin
Tim Dexter
alexandra.limberg@hmcourts-service.gsi.gov.uk
Elaine.Lloyd@dfes.gsi.gov.uk
greg marshall
James Brodie-Rendon
Julia Armstrong
DfT
Louis Loizou
Jane Whitehead
Nigel Hall
Nigel Hutcheon
Peter Gregory
Sue Ryan
Zoe Haseman
Philipp Reinfeld
savnama
worksueb23@aol.com
Steph Betton

Email Address
m-tierney@dfid.gov.uk
mrayner@estate.fco.gov.uk
richard.brewin993@mod.uk
tim.dexter@cps.gsi.gov.uk
alexandra.limberg@hmcourts-service.gsi.gov.uk
elaine.lloyd@dfes.gsi.gov.uk
greg.marshall11@homeoffice.gsi.gov.uk
james.brodie-rendon1@hmrc.gsi.gov.uk
julia.armstrong@dh.gsi.gov.uk
khasru.ali@dft.gsi.gov.uk
louis.loizou@foodstandards.gsi.gov.uk
jane.whitehead@forestry.gsi.gov.uk
nigel.hall@dti.gsi.gov.uk
nigel.hutcheon@cabinet-office.x.gsi.gov.uk
peter.gregory@ons.gsi.gov.uk
sue.m.ryan@dwp.gsi.gov.uk
zoe.haseman@odpm.gsi.gov.uk
philipp.reinfeld@ecgd.gsi.gov.uk
saravana.namasivayam@hm-treasury.x.gsi.gov.uk
worksueb23@aol.com
stephanie.betton@defra.gsi.gov.uk

Organisation
Department for International Development
FCO
Ministry of Defence
Crown Prosecution Service
Department for Constitutional Affairs
DfES
home office
HM Revenue & Customs
Department of Health
Department for Transport
Food Standards Agency
Forestry Commission
Dept of Trade & Industry (DTI)
Cabinet Office
Office for National Statistics
Department for Work and Pensions
Department for Communities and Local Government
ECGD
HM Treasury
DCMS
DEFRA

Answer Date (ISO) Answer Date


20060726083736
7/26/2006 8:37
20060905121933
9/5/2006 12:19
20060907190234
9/7/2006 19:02
20060725130614 7/25/2006 13:06
20060904153324
9/4/2006 15:33
20060801093212
8/1/2006 9:32
20060801155259
8/1/2006 15:52
20060801094131
8/1/2006 9:41
20060822111500 8/22/2006 11:15
20060908104803
9/8/2006 10:48
20060908093821
9/8/2006 9:38
20060802125833
8/2/2006 12:58
20060831114434 8/31/2006 11:44
20060906102839
9/6/2006 10:28
20060907111011
9/7/2006 11:10
20060830134935 8/30/2006 13:49
20060801144349
8/1/2006 14:43
20060814105728 8/14/2006 10:57
20060905162409
9/5/2006 16:24
20060801115025
8/1/2006 11:50
20060809161112
8/9/2006 16:11

is Draft
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N

Privacy State
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential

Question:Marion Tierney
Mia Rayner
Richard Brewin
Tim Dexter
Andrew Rodgers
Elaine Lloyd
Julia Wright
James Brodie-Rendon
Julia Armstrong
Khasru Ali
Louis Loizou
Jane Whitehead
Nigel Hutcheon
Peter Gregory
Sue Ryan
Zoe Haseman
Philipp Reinfeld
Saravana Namasivayam
Sue Bullen
Stephanie Betton [Anita

Question:Environmental Management Officer


Snr EHS Officer
Head of Sustainable Development Policy
Sustainable Development Advisor
Project Officer
Departmental Sustainable Operations Adviser
Sustainable Development Manager
Sustainable Development Officer
Sustainable Operations Manager
Estates Adminstrator / Higher Executive Officer
Accommodation Manager
Corporate Sustainable Development Project Officer
Sustainable Development Policy Adviser
Head of Security & Environment Branch, Finance & Planning Directorate
Sustainable Development Planning and Reporting Manager
Sustainability Manager
Business Principles Unit
Head of Sustainable Development Operations Branch & MCS Finance Manage
Sustainable Estate Manager
Head of Sustainable Operations

Question:Abercrombie house, Eaglesham Road, Glasgow G75 9NA


FCO Services 1801 Apollo House Wellesley Rd Croydon CR0 9YA
6D21, Main Building, MoD Whitehall London SW1H 2HB
CPS, Artillery House, Heritage way, Droitwich,WR9 8YB.
4 Abbey Orchard St Westminster London SW1P 2BS
Sustainable Operations Team Area 2C Castle View House Runcorn Cheshire WA7 2GJ
Home Office, BEMU, 2nd floor, Seacole Building,2 Marsham Street,London SW1P 4DF
Somerset House, Room 69, 2nd Floor,New Wing, London. WC2R 1LB
152C Skipton House, 80 London Road, London SE1 6LH
Zone 9/03, Southside, 105 Victoria Street London SW1E 6DT
Aviation House, 125 Kingsway,London WC2B 6NH
Town Hall, Great Oak Street, Llanidloes, Powys SY18 6BN
Cabinet Office Sustainable Development Team Strategy & Policy Development Branch Infrastructure
Office for National Statistics, Room CB04, Segensworth Road, Titchfield, Fareham, Hants, PO15 5R
Sustainable Development team H wing, Government Buildings, Otley Road, Lawnswood, Leeds,
Ashdown House 1/A3, 123 Victoria Street, London, SW1E 6DE
PO Box 2200, 2 Exchange Tower, Harbour Exchange Square, London E14 9GS
HM Treasury, MCS, Room 2/09, 1 Horse Guards Road, SW1A 2HQ
2-4 Cockspur Street London SW1y 5DH
Area 2B Eastbury House, 30-34 Albert Embankment, London, SE1 7TL [Rm 201, Foss House, Kings

Question:01355 843182
2082536201
020 7218 9438
0773 4077 333
020 7340 6602
01928 794355
020 7035 0157
0207 438 4301
020 7972 6082
0207 944 6141
0207 276 8072
01686 411043 / 07747722903
020 7276 5471
01329 813293
0113 2309701
020 7944 2803
0207 512 7449
0207 270 5347
saravana.namasivayam@hm-treasury.x.gsi.gov.uk
020 7 2112122
sue.bullen@culture.gsi.gov.uk
0207 238 1276 [01904 456365] Stephanie.betton@defra.gsi.gov.uk [anita.collier@defra.gsi.gov.uk ]

efra.gsi.gov.uk ]

Potrebbero piacerti anche