BRIGHT ELECTRICAL WORKS LLC

72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY


METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

S.
No.

Date

Description

12-03-2014 Method Statement for


DB Dressing and cable
glanding

3/7

Prepared by

Checked by

Mr. Naufal
Nazim

Mr. Sharkawy

BRIGHT ELECTRICAL WORKS LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY
METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

CONTENTS

1. PURPOSE
2. SCOPE
3. REFERENCES
4. DEFINITIONS
5. SAFETY
6. RESPONSIBILITIES
7. PROCEDURE
8. QA/QC PROCEDURE
9. ATTACHMENTS

3/7

BRIGHT ELECTRICAL WORKS LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY
METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

1.PURPOSE
To ensure that DB Dressing and Cable Glanding are executed safely and in
accordance with the contract requirements and that all quality assurance / control
activities required for the same are conducted in a systematic manner, works are
inspected and conformance is verified and documented.

2.SCOPE OF WORKS/METHOD
2.1 This procedure is applicable to the following works associated with the project
titled 72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY

Installation of Meter Cabinet, MDB & DB Dressing and Cable Glanding

3. REFERENCES
3.1 Approved material submittals:
3.2

Latest Approved Shop Drawings

3.3

Inspection and Test plan

3/7

BRIGHT ELECTRICAL WORKS LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY
METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

3 DEFINITIONS

4.1 EMPLOYER:

JARVIS CORPORATION

4.2 ENGINEER:

DIAR CONSULTANT

4.3 CONTRACTOR:

BHATIA GENERAL CONTRACTING CO. L.L.C.

4.4 MEPCONTRACTOR:
4.5 PROJECT:

BRIGHT ELECTRICAL WORKS EST LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY

4.6 HSE:

HEALTH, SAFETY AND ENVIRONMENT

4.7 ITR:

INSPECTION TEST REQUEST

4.8 ITP:

INSPECTION AND TEST PLAN

4.9 QA/QC:

QUALITY ASSURANCE / QUALITY CONTROL

4 SAFETY

Tool box talk has to be conducted all the hazards have to be identified before
starting the work.
Personnel Protective Equipments (PPE) to be worn by the Task force during
execution at site.
Clear the obstructions from the surrounding area to avoid Near misses and
accidents.
Manufacturers recommendation has to be followed on health and safety if
applicable.
Any Process adopted and may have a particular safety risk will be assessed
and addressed as required.

5 RESPONSIBILITIES
6.1

Project Engineer
To be the focal point for interfaces and other communications with the
ENGINEER and Contractors as required during execution of work.
He shall ensure that adequate quality measures are being undertaken.
He shall ensure that the proper tools and tackles are available for the timely
completion of the job in a quality manner.
3/7

BRIGHT ELECTRICAL WORKS LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY
METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

He shall ensure all inspection are conducted as per the contract specifications

and ITPs. To ensure all inspections, proper tools & tackles and manpower are
used at all stages of work. To ensure all current issues of procedures,
Approved Material and shop drawings and standards are available at the
point of use. He should also ensure the works complies with the contract
requirements / approved shop drawings. He shall be responsible for the total
quality control for installation work. He shall liaise with ENGINEER for
inspection of installations works.

Inspect for any damage during, handling and storage.


Monitor the quality of work & ensure that fulfillment of specified requirement

and that all quality records related to work are completed.

Ensure the work is completed as per quality requirements. Contractor shall

inspect the same work prior to initiate ITR for ENGINEER approval.
Maintain

Comprehensive inspection and test records for any further


documentation.

Reviews the Method Statement before starting the work, explains the same
to the subordinates and prepares program for the daily job. Aware of all code
of practices, Standards & Specifications and HSE plan and to appreciate the
workforce to perform a time bound and quality job.
He shall originate ITR for completed installation works and companies.
6.3

Site Foreman (Electrical)

Check
Check
Check
Check
Check

with the approved material submittal and shop drawing


the location and level.
the Installation and Cable termination.
the cable glanding
the sizes of the enclosure for the MDB, DBs, Meter Cabinet etc.

6 PROCEDURE
7.1

Equipments:
Standard Hand tools Drilling Machine, Hole saw Cutter, Wire Cutter, Marker,
Crimbing tools Grinder, Chisel, Hammer, Water Level, Measuring Tape etc.

7.2

Handling
During transportation, material must not be handled roughly, it should be
protected properly with the covers.
3/7

BRIGHT ELECTRICAL WORKS LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY
METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

Use of improper machinery / handling equipment for lifting must be avoided.


7.3

Transportation:
The transporting vehicle must ideally have a flat bed, free for any rough
surfaces or corrugation and material to be covered properly during
transportation.

7.4

Storage
Material should be stored in covered store with locking facility.

7 QA/QC PROCEDURE
All inspection / Testing as defined in related Inspection and Test Plan (ITP) shall
be conducted. Related check sheets shall be completed. All standards and
measure related to service provider to be checked.

3/7

BRIGHT ELECTRICAL WORKS LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY
METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

8 ATTACHMENTS
8.1

CHECK LIST FOR DB DRESSING AND CABLE GLANDING.


DB Dressing and Cable Glanding

Drawing No:

Report No:

Location:

Date:

CHECK LIST FOR DB


DRESSING AND CABLE
GLANDING

SL.
NO

1.

Check that the material is as


per approved submittal.

2.

Checking the approved shop


drawing.

3.

Checking the Installation.

4.

Accepte
d

Date

SubContract
or

Rejecte
d

Contract
or

Consulta
nt

BHATIA

DIAR

Remark
s

Checking the Glanding.

6.

Checking the Termination of


Cable.
Checking the earthing.

7.

Checking the identification.

5.

STATUS

REMARKS:

For SUB- CONTRACTOR


APPROVALS

For CONTRACTOR

For CONSULTANT

QA/QC

DIAR

SITE ENGINEER
(ELECTRICAL)

SIGNATURE
NAME
DATE

3/7

BRIGHT ELECTRICAL WORKS LLC


72 GALLERY TOWNHOUSES PHASE 2 IN DUBAI SPORTS CITY
METHOD STATEMENT FOR DB DRESSING AND CABLE GLANDING

3/7

Potrebbero piacerti anche