Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DETAILS
OF
ISOKINETIC SOURCE-SAMPLINGEQUIPMENT
INTRODUCTION
The
following
local
air
This
equipment
U. S.
Environmental
In
pollution
a field
malfunctions.
and
Operation--the
i
.
_ riety
A
for
the
ideas
and
been
*Formerly
order
own
bee n used
-4gencys
Air
Pollution
for
two
24-hour
No.
APTD-0576,
run
Publication
- __
that
interested
persons
ilp
eqk&pment.
source-Sam;
has
was
becomes
in
2Li.r
of.---. Is okine$c-Source-Sampling
-_.- -. _ -._-.-.
since
1967
by
employees
Control
Office
periods
EruI->ment,
is
of the
(APCO).
without
Maintenance
----..
in
encountering
recommended
for
use
tests
on
operational.
experiences
of numero:.s
contributed
to the
satisfactory
in most
people,
design
gained
of this
instances,
this
from
many
equipment.
Although
equipment,
like
permost,
can
improved.
similar
set
approximately
meter
equipment
prepared
builu
and
Protection
APCO
has
be
might
designeJ
of sources,
iormance
still
was
equipment
The
aas
agencies
test,
any
when
discussion
box,
of equipment
$2,200
umbilical
the
Nationai
is
! 1 3y7
cord,
Air
available
p-ice).
srmple
Pollution
box
commercially.
The
commercial
with
glassware,
Control
Administration.
It
package
and
is being
includes
a probe.
marketed
the
out
the
according
of casein
Cut
out
and
glue
and
the
nail
them
l/2-inch-thick
insertion
of the
the
head
screws.
holes
according
some
of the
the
frame
from
Table
exterior
1 and
these
three
assembly.
inside
of the
Apply
together
the
panel
Next,
cut
make
3/B-inch-thick
1.
parts
case.
and
grade
Figure
Cut
plywood,
attach
the
from
of the
the
Figure
out
nail
to this
exterior
bottom
and
Cut
figure
to
in
and
back
of each
piece;
case
the
a good
with
grade
1 -inch
supports
out
ply-
brads.
from
the
pine,
bottom
l/4-inch-wide
(Figure
groove
for
l),
weld
panel.
underside
each
of the
glue,
attach
and
top
specifications
resorcinol
2) from
the
and
to the
or
Cut
sides
four
panel
frame
l-inch
to the
and
and
hole
of equipment
and
countersink
of the
details
for
pattern
Check
in
differ
sizes
and
12 holes,
with
meter
Masonite,
shown
may
(Table
bottom
the
tempered
diameters
changes.
angle
underside
l/4-inch-thick
dimensions
aluminum
Drill
construction
from
components
by
corners.
2 shows
to the
because
l-
3 in
l/2-inch
flat-
box
case
bottom.
* and
drill
the
Figure
3.
Dimensions
in
from
those
size
before
making
the
of
on the
holes.
PLUMBING PARTS
Table
ing.
2 shows
Bolt
the
pump
comes
with
Attach
a l/4-inch
let
ports
the
of the
Install
support
fit
the
Modify
the
and
male
two
install
with
necessary
l/4-
for
by
l-inch
the
installation
bolts.
a l/4-inch-diameter
to the
valves
and
temporarily
from
the
the
oiler
by drilling
capillary
are
bottom
pipe
pipe
desired
that
Remove
plug
3 /8-inch
sweat
l/2-inch
quick
of the
in the
adaptors
in
the
oiler
the
plumboiler
inlet
top
that
hole.
inlet
and
out-
pump.
panel
for
parts
to the
pump
the
cleaner
*Mention
U. S.
the
a wick.
quick
The
action
of a specific
Environmental
the
in place
disconnect
a l/4-inch
wick
of oil.
company
Protection
should
Attach
while
the
up to the
hole
point
or product
Agency.
and
the
the
not
to the
constitute
panel;
located.
over
body
direction
assembly
on the
is being
valves
does
piping
through
in
this
disconnect
and
vacuum
inserting
of airflow
tee
Cut
to the
and
they
gauge.
a pipe
to achieve
between
endorsement
the
the
valves,
by the
and
join
it
solder
to the
all
meter
can
side
as it
cycles.
be
order
of the
must
enlarged
after
so that
it
Keep
the
mstall
be used
size
of the
in the
of ways;
the
in
a better
be
clear
Swagelok
in
on calibration.
to avoid
mechanism
The
with
can
procedure
of Pentafoam
meter
interference
Teflon
orifice
a piece
the
to
on the
with
This
between
use
out
meter
4.
Shape
the
drilled
fittings
Figure
and
used
the
calibration.
wedge
is by
thermometer
to
as shown
to a minimum
simplest
The
order
Tighten
meter.
must
in the
as a shock-absorbing
foam
joints.
thermometers
orifice
section
to the
threaded
secured
the
up
stems.
to achieFve
further
can
the
slightly
are
construction
be discussed
hold
bent
the--nometers
and
on all
thermometer
be
piping
a number
that
the
the
tape
in
fittings
me:*r
Fabricate
ferrules.
Teflon
to hold
The
installing
attached
The
in
inlet
will
use
adaptors.
5/32-inch
be
continue
connections;
The
of pipe
pump;
and
the
the
pump.
cooling
air-
flow.
Attach
optional
the
manometer
solenoid
to the
back
orifice
and
to the
valves
on a piece
of the
panel.
Complete
of the
pitot
completes
the
soldered
to the
panel
of
The
tws
l/4-inch
the
disconnects
piping.
with
l/4-
fan
is attached
a list
of the
2 -inch
plywood,
attachment
to the
by
solenoid
to the
and
attach
of the
Tygon
valves
and
plumbing
bolts.
Mount
this
tubing
the
assembly
from
the
manometer.
This
by means
of clips
tubing.
ELECTRICAL HOOKUP
Refer
the
panel
to Table
from
Begin
on it.
tions
in
the
the
Figure
frame
of the
the
timer
frame.
orientation.
meter
drill
Amphenol
light
Replace
the
mount
Also
ground
hook
or
up
Plug
voltmeter
pump
and
to the
test
all
check
the
operation
the
for
the
timer
pump
circuits
connection
15 seconds
and
at the
fan
timer,
the
to the
switch
components.
cord,
behind
in and
Adjust
connect
power
wiring
SPDT
to
approximately
panel,
the
the
the
the
electrical
switches,
of metal
Double-check
assembly.
with
a piece
timer.
necessary
lights,
hookup
Insert
connector.
operate
and
electrical
Then
zero
electric
base,
5.
the
3 for
wires,
powerstat,
and
follow
powerstat,
timer
to the
Amphenol
of the
and
power
cord
on the
operation.
powerstat
so that
start
ground
the
of each
test.
for
5-minute
it
and
to
through
proper
manoUse
through
buzzer
buzzer
instruc-
and
valves
proper
and
wiring
fittings
solenoid
for
Remove
the
pilot
interval.
an
FINISH DETAILS
Place
Cut
out
the
the
case
fan
thermometer
holes,
as desired.
meter,
and
the
inlay
the
edge
inch-diameter
leads
Figure
6.
through
and
the
errors
in
Figure
1.
for
the
Secure
the
even
manometer
frame.
panel
Mark
the
instrument
the
is now
ready
Attach
with
controls
for
of the
connect
device
3/4-inch
wood
to the
painting
Bore
leveling
quick
and
the
1/4-
the
lines
as shown
in
screws
identification
front
out
screws.
panel.
and
holes.
of mano-
machine
panel,
the
supports
for
place.
portion
Z-inch
the
angle
Cut
into
edge
fan
choice.
unnecessary
the
Install
aluminum
glue
by
through
block.
to the
Attach
with
lines
valve
, and
l/4-
and
of your
any
with
thermometer
grill
disks
panel
the
or
a bandsaw,
manometer
panel
switching.
Plexiglas
on the
locate
a screen
with
solenoid
aluminum
The
the
latter
and
with
away,
of the
holes
to pitot
assembly,
cover
Cut
mount
right
the
and
windows,
handles
Keep
over
to avoid
cover,
as shown
in
calibration.
purpose
of this
more
conveniently
manometer
around
$50;
The
Three
and
it
is not,
solenoid
two-way
one
s olenoid
L : do-.-*tream
flow
- blocked
allow
the
be done
the
solenoid
is
pressure
during
manometer
assembly
taps
are
located
on the
When
test,
test
of the
these
valves
to manually
and
and
Tygon
bring
tubing
rezero
meter
is
running.
The
operation
of the
sampler.
shown
in
be
in
open
box
installed
this
as
assembly;
solenoid
upstream
manometer
the
used
the
to the
should
One
to equalize
the
the
essential
closed.
the
to allow
while
valves
tap.
inLa
is
however,
valve
is usually
valve,
device
tap
are
the
and
usually
the
can
the
by
closed
manometer
be temporarily
are
of the
solenoid
to zero.
unit
is
7.
usually
open,
by
a closed
solenoid
closing
the
Figure
followed
open
energized
to zero
cost
two
valves,
an
operator
valve
the
on
switch,
valve
the
opens
If leveling
disconnected
to
must
from
manometer.
to Figures
view
of the assembled
Begin
construction
8, 6, and 4; attach
and heater
7,
section
While
attachment
num
of part
is given
in Table
housing,
shield
and attach
3.
around
with
glass
tape
install
the heating
part
for
11).
reflection:
15
9); attach
1 and
and knob
to part
a wiring
socket
10.
it to the blower.
Pentafoam
Paint
also
of
Screw
Form
the inside
coats
for
the
the ther-
Remove
part
3,
of the fan
onto parts
of the heater
the exterior
parts
an alumi-
the wiring
insulation
paint
two
An electrical
diagram.
Complete
2; add hinges
to part
(shaded
to provide
at least
1.
glue
attach
area
and resin
the fan
with
brads,
bath
and apply
place.
(part
cloth
3 to parts
servicing
and small
parts
and attach
Glue
heat
glass
attach
3.
number
for
(part
glue
on all joints
into
part
the impinger
fiber
and probe
and thermostat
paint
point,
12 shows
coil,
support
Using
a catch
fitting,
and replace
aluminum
with
is curing,
Also
impinger
3.
At this
be lined
Attach
add bottom
part
4, and Figure
the blower
and thermostat,
with
Pkce
Amphenol
10 is a three-dimen-
3 can be removed
assembly,
order.
11) should
the fiber
Figure
so that part
To this
compartment.
resin.
mostat
screws
at the joint
on Figure
numbers.
parts.
water-tight
list
with
except
part
by cutting
components.
and screws
parts
8 and 9 for
6 and
compart-
of the box.
5 is
may
be made
sure
drop;
each
25 feet
The
in
for
cord
Starting
2 feet
from
the
the
other
the
sample
by
screwing
I/4-inch
male
using
the
quick
Amphenol
a female
end;
or
end
thread
disconnects
connector.
Am-hen01
be
the
plastic
end
attached
vacuum
of the
l/4-inch
to the
fitting
pipe
the
and
in a clear
lines
sample
and
end,
quick
together
by
one
into
the
cords,
cord.
hose,
working
area.
a suitable
the
specifying
of
cord
tape
up to 2 feet
a meter
meter
end
box,
and
and
box.
a l/2-inch
the
hose.
solder
attach
disconnects.
21
with
Wrap
pres-
umbilical
together
attach
into
the
components-vacuum
be plugged
sample
hose,
pitot
cord
should
to the
of the
On
of the
for
tape.
cord
a number
of the
components
electrical
ends
meter
them
umbilical
a prohibitive
to make
details
lengths
laying
the
the
is preferable
25-foot
The
encountering
construction
wrap
tape
should
meter
end,
Orient
a sample
end
cutting
construction.
without
it
tubing-and
one
end.
feet
13 shows
pitot
cloth
200
cord
however,
by
from
umbilical
up to
Figure
and
other
the
for
convenience,
Mystic
At
list
length
is fabricated
wires,
as
any
long.
electric
such
a parts
male
Attach
the
the
quick
the
electric
fittings
in
two
disconnect
male
cords
into
the
same
the
way,
PITOBE CONSTRUCTION
Refer
any
to Table
length
from
sampling.
The
Swagelok
the
that
it
end
is
in
will
10 feet
first
step
where
cut
a notch
cut
the
onto
The
temperature
arc
welding
tube.
shaft
as
with
be
for
the
F;
if
On
the
weld
must
be
Figure
if
the
probe
square
ensure
will
not
be
temperatures
opposite
probe
14 will
higher
of
during
and
nut
in
solder
1, 000
wire
length
shown
silver
Pitobes
problems
The
necessary.
electric
construction.
desired
of the
exceeds
will
the
to the
end
done
pitobe
encountering
sheath
of a pilot
be
the
for
without
one
use
may
to clear
necessary
be used
to
nut
Welding
encountered,
sheath,
is
tube.
square.
parts
may
ferrule
of the
stacks
be
the
2 to
5/8-inch
with
used
6 for
heat
as
end
of the
shown
in the
figure.
PITOT
The
pitot
stainless
been
cut,
and
in
the
length
the
last
When
by bending
steel
tube
cutting
they
are
as good
weld
pieces
of
inches
from
during
sampling.
tube
glass
two
steps
front
of the
be
closer
than
ends
slightly
have
been
determine
probe
sheath
the
quick
probe
will
be
nut
the
with
the
will
in
be
the
center
so that
the
end,
the
welded
pitot
be
L minus
then
sheath,
and
in
Figure
sheath
using
must
be
will
be
short
3-l
/2
adjacent
various
parts,
length
of the
pitot
length
of the
the
2 inches,
along
disconnects.
nozzle
of the
apart
shown
opening
and
on;
the
to the
pitot
relationship
nut
1 foot
as
have
directions
of quick
pitot
of the
opposite
than
attachment
weld
of these
about
shorter
from
of a 3/6-inch
two
facing
2 inches
length
end
After
should
6 inches
The
disconnects
L plus
welds
completed,
sheath
14.
ends
to facilitate
steel.
of the
cut
be
on the
Figure
the
The
should
angle
in
with
pitot
To
without
shown
The
stainless
the
as
together
not
l/4-inch
a 45-degree
as possible.
pitot.
the
above
L = length
welded
shouid
out
the
and
alignment
of the
Bend
14.
is made
and
the
ball
joint
let
2 inches.
PROBE GLASS
The
The
latter
is
attached,
the
glass
mically
glass
insert
usually
must
a No.
tube.
wound
must
be
custom-made
7 rubber
After
onto
length
the
the
be
stopper,
stopper
glass
and
determined
by
bored
is
held
as
place
23
the
a glassblower.
in place,
in
before
shown
After
in
a 25-foot
with
glass
Figure
Nichrome
electrical
is attached.
the
14,
ball
joint
is slipped
wire
tape.
is
onto
logarithThe
wire
along
is doubled,
the
and
length
on to hold
of the
the
wound
with
of the
Nichrome
the
wire
winding
wire,
it
is
wire
As
probe.
as the
then
are
is begun
winding
each
is
few
inches
with
to
After
the
the
from
is wound,
continued.
rewound
soldered
1 inches
about
glass
zipcord,
the
the
end
a piece
entire
and
continued
of tape
probe
tape.
The
remaining
which
plugs
into
has
PITOBE
6.
PARTS
the
sample
LIST
Part
Description
1 union
25-ft
wire
2 male
quick
1 rubber
1 ball
2-ft
disconnects
stopper
lOlO-
Nichrome
26
Swagelok
400-l
No.
electrical
cord
tape
B & S Curtin
glass
16-gauge
Male,
1 roll
/4
Scotch
No.
QC-200
28
2-conductor
electrical
p tot
tubinga
3/8-in.-OD
thin-wall
I-ft
glmass
tubea
5/8-in.-OD
Pyrex
l-ft
probe
sheatha
I-in.-OD
Seamless
aPer
foot
pitobe.
zipcord
2-prong
2-ft
of
22870
Ground
joint
1 Plug
24
Swagelok
by
0.035
Sunmerii
No.
27
4EGT
stainless
wall
nib-T-8504
AWTR 304
been
two
box.
Table
is put
steel
G784T
ends
GLASSWARE
Refer
directly
to
to
Table
a cyclone
g.lzs s ball
The
filter
holder
is held
num.
This
which
can be made
filter
From
A set
of three
Refer
to
have
been
8 for
modified
from
the
pulling
require
done
the
use
modified
as
16) that
with
most
by
shown
has
a clamp
contains
a glass
gasket
then
the
impinger
leads
that
is fabricated
and
is
connected
of No.
fitted
also
is
25/15
ball
to a
joints.
from
has
ground-
attached
with
the
into
The
l/E-inch
a silicone
the
list.
alumi-
rubber
valve
filter.
All
If the
fitting
the
last
impinger
can
be
also
is
to prevent
of this
impinger.
impingers
attached
backpressure
glass
sampling
PARTS
first
modification
situation
does
used.
LIST
Description
Cyc 1one
Specially
Fi 1 ter
Fabricated
Impinger
6800
Connectors
Fabricated
Ball
Corning
No.
6762
ball
Socket
Corning
No.
6764
socket
C 1 amps
Ball
joints
fabricated
as
shown
in
Figure
15
- Corning
and
gasket,
impingers.
These
a check
GLASSWARE
into
remaining
The
a bypass
7.
three
joints.
glassblower.
then
leads
parts
contains
Table
probe
15,
been
through
of ball
liquids
of a cyclone,
addition
also
connector
that
by a competent
the
connector
addition
connector
The
companies.
impinger
the
list.
in Figure
frit
a ball-joint-fitted
by
cord
be
by
parts
built
together
connectors
Table
been
(Figure
filter,
an umbilical
should
has
holder
the
glassware
cyclone,
holder
filter
the
that
joints.
modified
7 for
from
socket
ball
joint
joint
and
glass
28/12
28/12
clamp
27
l/2-in.-ID
size
No.
28
tubing
not
to
before
dry
test
gauge.
check
trial
test:
should
pump,
meter,
thermometers,
Vacuum
should
be made
pump
oil,
quick
lights,
be tested
of the
following
disconnects,
buzzer,
for
parts
valves,
Amphenol,
leakage
for
proper
opera.
manometers,
Variac,
and
vacuum
at 27 inches.
TERMINOLOGY
cfm
ft3 /min
AH@
Orifice
pressure
differential
cfm
of air
at
meter
differential,
in
70 * F and
29.
92 in.
in.
H20
Dry
Pb
Barometric
CF,
Wet
test
meter
reading,
ft3
CFd
Dry
test
meter
reading,
ft3
T,
Temperature,
ITd
Input
OTd
Output
TdaVg
(ITd
Time,
WTM
Wet
pressure,
in.
wet
test
temperature,
meter,
that
gives
0.75
Hg
dry,
+ oTd)/2,
of water
Hg
dry,
temperature,
inches
minutes
test
meter
PROCEDURES
With
per
the
meter
revolution),
become
allow
wetted
screw
in
the
and
the
enclosed
equipment
(approximately
lower
front
us
switch
in the
the
warmup
period,
run
H20
and
hour).
corner.
a wet
up
Level
Then
position;
a trial
of 10 to obtain
and
to warm
l/2
right
manometer
CF,
pump
adjust
test
at an
AH@ and
Y.
test
orifice
attached
(1 cubic
and
the
dry
parts
of the
the
box
by
turning
the
zero
the
meter
the
fluid
manometer
level
manometer
WTM
setting
to
adjusting
by placing
if necessary.
fool
the
After
of 2 inches
Step 1
Calculate
AH@ by
AH@
0.03
using
the
formula
17 (manometer
orifice)
pb (OTd
+ 460)
31
(T,
c 460)t
CFW
1
2
(1)
Lf the
value
is
not
of
l/64
increments
orifice
should
within
be
I. 6 to 2.1
inch
to lower
(1. 84 desired),
the
replaced
and
the
Y by using
the
formula
value;
the
if the
procedure
orifice
Mlue
repeated
can
is below
in
be
drilled
1. 6,
then
in
the
calibration.
Step 2
Calculate
CF,
Y
* Pb
CFd(Pb
Y is
and
obtained
during
remove
and
expose
ire
in position.
iecrease
naking
the
1. 01 (1. 00 desired),
neter,
the
the
the
the
(Td
avg
+ 460)
adjustment,
trial
along
run
screws
mechanism
To
value
(T,
adjust
of
Y and
with
have
on the
top
to make
the
meter,
the
lid
AH@.
and
If the
to be made
of the
sure
counterclockwise
replace
(2)
+ 460)
adjustments
four
iever
+ 0. 147)
and
value
to the
meter,
is not
within
meter.
carefully
To
adjust
remove
the
lid,
and
that
the
adjusting
nuts
are
turned
clockwise
to increase
the
screws
and
run
value
another
0. 99
of Y.
trial
to
After
test.
the