430.00
Speed corresponding to
road condition KMPH
Sand
3
Crusher
m3
3a Gravel
Bhumai
30
Crusher
m3
Crusher
2a Sand (local)
Total
Earthen
Unit
Gravel
Source
BT
Item
70.80
680
200
650
LEAD (KM)
S.N.
Total
Travel
Time
Resources
Labour
(Unit : mandays)
Unskilled Skilled
qty
qty
12
13
Equipments
(Type :Truck for
transportation
Unit : Hr )
Amount
Qty
Amount
Qty
Amount
14=12*B6+
13*I6
15
16=15*M6
17
18=17*Q6
10
11
0.13
0.00
0.00
0.25
0.30
129.00
0.43
30.09
0.13
Total
Transportati
on cost
19=14+16+18
88.40
247.49
247.49
Labour Unskilled
Md
Amount
20
21=20*B6
0.00
0.13
0.00
0.00
0.25
0.30
129.00
0.43
30.09
0.13
88.40
31
0.75
0.00
0.10
1.70
0.50
215.00
3.57
252.74
0.39
266.56
734.30 0.50
0.13
0.00
0.00
0.25
0.50
215.00
0.53
37.17
0.16
108.80
m3
0.13
0.00
0.00
0.25
0.50
215.00
0.53
37.17
0.16
m3
30
31
0.75
0.00
0.10
1.70
0.50
215.00
4.59
324.96
Cement
Ton
0.03
0.00
0.00
0.05
0.40
172.00
0.08
a Reinforcement Steel
Bhairahwa
Collection cost
Materials
(Type :Fuel ,
Unit : Lit )
Contract
Royalties
T=2(8+9+10)
Name of Project :
22
0.00
Material
Basic
Cost
Material
including
Cost
transportati
including
on and
royalties
royalties
23=21+22
0.00
24=19+23
247.49
0.00
0.00
0.00
247.49
221.45
158.76
380.21
1114.51
360.97
0.00
0.00
0.00
360.97
108.80
360.97
0.00
0.00
0.00
360.97
0.51
349.86
889.82
442.90
158.76
601.66
1491.48
5.31
0.10
65.28
242.59
242.59
1.00
0.03
0.00
0.00
0.05
0.60
258.00
0.08
5.31
0.10
65.28
328.59
328.59
0.00
0.00
0.00
0.00
0.30
129.00
0.00
0.00
0.08
56.10
0.00
0.00
Fabricated Structural
12 Timber
m3
0.00
0.00
0.00
0.00
0.50
215.00
0.00
0.00
0.19
127.50
0.00
0.00
0.03
0.00
0.00
0.05
0.08
5.31
0.16
106.08
2883.39
2883.39
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.09
61.20
0.00
21.24
0.11
0.05
77.52
10.00
Bhairahwa
Ton
Ton
17 Water
1000 Lit
0.00
0.10
0.00
0.20
0.10 0.01
430.00
49.50
0.30
158.26
0.00
158.26
Prepared by
Checked By
Approved by
525.0
a
b
...
...
...
a/b
...
...
0.02 a/c
...
...
0.01 a/c
...
...
...
...
1. Ownership cost
Depreciation cost per hour
Sub total of 1
2. Operation cost
A. Maintenance cost per hour
Overhauling cost
0.55 a/b
...
...
0.23 a/b
...
...
...
...
Sub total of A
B. Net operationg cost per hour
i) Fuel and lubrication cost
H.S. Diesel
@ 5.5 lit/hr
...
...
389.38
Mobil
@0.1 lit/hr
...
...
59.20
Gear oil
@0.03 lit/hr
...
...
17.26
Grease
@0.015 Kg/hr
...
...
8.30
...
...
474.14
Sub total of i
ii) Spare parts
Life span of tyres
L hrs
T Rs
6T/L
2000
14500
...
approx 8% of 6T/L
Sub total of ii
...
...
...
...
iii) Salary
Working hours, hrs.
...
...
...
...
...
...
...
iv) Improvement and other minor repair expenses, apporx 25% of (0.23a/b)
Sub total of B ( i +ii + iii + iv )
...
...
...
...
0.05 a/c
...
...
999.14
...
430.00
0.00
0//
0.00
0.000
2400.00
0.00
0.00
0.00
Per thousand
0.00
0.00
2. STONE
Distance average , km
Time (T), hrs
31.00
30//1
2.45
1.602
3.50
2447.89
699.40
688.86
Per 1 cu.m.
3. CEMENT
Distance average , km
1.00
0.221
799.31
1388.26
1//
0.80
6.00
133.22
95.03
Per m.t.
4. REINFORCEMENT
Distance average, km
Time (T), hrs
228.25
1.00
1//
0.80
0.221
6.00
799.31
133.22
95.03
Per m.t.
5. SAL WOOD
Distance average, km
Time (T), hrs
228.25
0.00
0.00
0.000
6.00
0.00
0.00
//
0.00
850.00
Per m.t.
0.00
Per cu.m.
0.00
7. BITUMEN
Distance average, km
Time (T), hrs
5.00
1.00
0.406
6.00
999.14
166.52
174.58
Per m.t.
341.10
Per kg
0.34
5.00
5//
1.00
0.406
4.69
999.14
213.04
174.58
Per cu.m.
...
387.62
5.00
1.00
0.375
4.87
999.14
205.16
5//
161.25
...
...
Per cu.m.
...
366.41
12. SAND(Coarse)
Distance average, km
Time (T), hrs
5.00
5//
1.00
0.375
5.38
999.14
185.71
161.25
Per cu.m.
...
346.96
12. SAND(Local)
Distance average, km
Time (T), hrs
5.00
5//
1.00
0.375
5.38
999.14
185.71
161.25
Per cu.m.
...
346.96
14. Gravel
Distance average, km
Time (T), hrs
30//1
2.45
1.602
4.69
31.00
...
2447.89
521.94
688.86
Per cu.m.
1210.80
FY 072/73
Technical OfficeRupadehi
Mode
Normes for Transportation
Contract
DOR
Reference Bhairahawa
Unit
Rate
S.N.
A. LABOUR RATE
Description
Unit
TranspDOR
Basic
no.
12.80
Rate Incl
Transp
0
12.80
Lead
B/G/E
0//
650.00
44
Stone
cu.m.
601.66
889.81
1491.47 30//1
Painter
"
650.00
45
Aggregate 10 mm
cu.m.
1234.80
360.96
1595.76
5//
Unskilled
"
430.00
46
Aggregate 20mm
cu.m.
1587.60
360.96
1948.56
5//
Helper
"
430.00
47
Aggregate 40mm
cu.m.
1587.60
360.96
1948.56
5//
48
Gravel 10 mm
cu.m.
1234.80
360.96
1595.76
5//
49
Gravel 20mm
cu.m.
1622.88
360.96
1983.84
5//
645.60
50
Gravel 40mm
cu.m.
1587.60
360.96
1948.56
5//
12.70
51
Natural gravel
cu.m.
380.21
734.3
215.20
52
Coarse Sand
cu.m.
1587.60
247.48
1835.08
5//
190
53
Sand Local
cu.m.
705.60
247.48
953.08
5//
B. MATERIAL RATE
5
Glass - 4mm
sq.m.
Wooden Listi
Rm.
Commercial plywood - 4 mm
sq.m.
Bamboo
sq.m.
505.72
54
cu.m.
221.76
221.76
pc
1114.51 30//1
sq.m.
645.60
55
cu.m.
362.88
362.88
11 Hinges 3"
no.
18.00
56
Sal wood
cu.m.
167580.00
167580.00
//
12 Hinges - 4"
no.
24.00
57
Sisam wood
cu.m.
88200.00
88200.00
//
13 Bolts - 4"
no.
26.00
58
Kukath
cu.m.
39337.20
39337.20
//
14
1//
no.
41.00
59
Cement OPC(NEP)
bag
15 Holdfast*
no.
15.00
60
Cement OPC(NEP)
bag
620.00
12.12
632.12
16 Lock Rollan
no.
572.00
61
Cement OPC(NEP)
m3
18600.00
363.88
18963.88
17 Handle Almumium
no.
32.00
62
Cement OPC(NEP)
mt
12400.00
242.58
12642.58
18 Door spring
no.
138.00
63
Cement white
mt
21000.00
242.58
21242.58
1//
19 Nails
kg
108.00
64
Reinforcement (Fe-415)
Mt
73500.00
328.58
73828.58
1//
20 Screw*
no.
0.40
65
kg
90.00
0.32
90.32
5//
no.
5.00
66
kg
120.00
2.88
122.88
1//
22 J - hook*
no.
10.00
67
kg
120.00
2.88
122.88
1//
23 Bitumen washer*
no.
0.60
68
Rm.
12.43
0.05
12.48
5//
24 Nut bolt *
no
2.50
69
kg
110.00
2.88
112.88
1//
sq.m.
401.53
401.53
25
"
- 6"
26
"
- expanded
sq.m.
441.16
70
sq.m.
269.00
71
sq.m.
451.92
451.92
cu.m.
18850
72
Rm.
406.73
406.73
28 Oxalic acid
kg
90.00
73
Rm.
133.00
133.00
29 Wax polish
kg
90.00
74
"
"
- 3/4"
Rm.
170.00
170.00
m2
1506.40
75
"
"
- 1"
Rm.
258.00
258.00
31 Lime
kg
16.00
76
HDPE pipe
Kg
228.00
228.00
32 Snowcem(cem. paint)
kg
47.00
33 Gum Adhesive
kg
126.00
78 Truck/Tipper 8 mt
Hr
680.00
680.00
34 Enamel
litre
446.00
79 Truck/Tipper 6 mt
Hr
525.00
525.00
35 Varnish
litre
158.00
80 Truck/Tipper 5 mt
Hr
450.00
450.00
36 Aluminium paint
litre
473.00 81 Truck/Tipper 3 mt
Hr
315.00
315.00
37 Tarpentile
litre
116.00
80 Water Pump
Hr
200.00
200.00
kg
81.00
81 Water Tank
Hr
550.00
550.00
39 Primer
litre
263.00
82 Kerosene*
litre
70.80
70.80
40 Red oxide
kg
263.00
83 Deisel
litre
70.80
70.80
41 Sand paper*
nos
5.00
84 Mobil
litre
592.04
592.04
42 Karborandum stone
nos
150
85 Gear oil
litre
575.22
575.22
86 Grease
Kg
553.10
553.10
//
* Market Rates
Prepared by
Checked by
Approved By
Technical OfficeRupandehi
Reference Bhairahawa
SUMMARY of RATE ANALYSIS FOR Buildings FY 072/73
S.N.
Items
Unit
Contract
S.N.
1. EARTHWORK
1.1 E/W exc.a)in gen. - soft
1.2
- BMS
1.3
b) in foun .- soft
1.4
- BMS
1.5 Filling
Items
Unit
Contract
6. ROOFING WORK
m3
356.53
6.1
- 26 #
m2
739.32
"
407.47
6.2
- 24#
Rm
924.37
"
509.34
6.3
m2
3206.01
"
809.84
"
254.67
7. STEEL WORK
1.6
- stone
"
2799.98
7.1
Rm
51.01
1.7
- sand
"
1551.80
7.2
kg
129.81
m3
560.70
7.3
kg
129.81
m2
782.88
8.1
m2
328.90
"
1417.28
8.2
- 1:4 wall
"
277.85
- 1:6 wall
"
257.49
m3
12572.45
8.4
"
379.33
8.5
"
167.12
8.6
"
196.79
8.7
"
201.76
8.8
3 mm cement punning
"
201.55
"
1955.39
"
2132.34
1.8
8. PLASTERING WORK
- Edge
a) For ground floor
8.3
- 1:4
"
12157.39
2.5a
- 1:6
"
11763.43
m3
2.4b
- 1:4
"
12412.06
2.5b
- 1:6
"
12018.10
3. STONE WORK
9. PAINTING WORK
9.1
m2
26.14
21.98
9.2
- in wall
"
9.3
"
59.69
m3
2628.46
9.4
"
107.76
"
8741.78
9.5
"
155.18
3.3
"
8013.43
9.6
"
235.82
"
216.77
Rm
200.44
- 3/4"
"
242.99
- 1"
"
361.70
- 1:6
9.7
3.4 Dry Stone Masonry
"
3623.21
9.8
4. WOODEN WORK
4.1 Sal wood
4.2
- chaukhat
- beam
- aluminium
- red oxide
"
10 SANITARY WORK
m3
"
216451.05 10.2
m2
11893.70 10.3
- 0.5"
4.4
- 4mm glazed
"
"
37.41
4.5
- 4mm plywood
"
6375.43 10.5
"
515.02
4.6
- GI plain sheet
"
6930.07
"
m2
53.41
"
987.49 11.2
- wall in mud
m3
524.17
"
4989.68 11.3
- wall in c.m.
"
1048.34
"
872.41 11.4
- PCC
"
1978.00
11.5
- RCC
"
5. CONCRETE WORK
5439.50
5.1 PCC
5.2
"
10186.02
"
m2
5419.43
5.3b
"
346.02
5.4
- PCC1:1:3 gravel
"
kg
113.99
5.5
- Reinforcement bar
kg
105.09
m2
473.21
846.68
5.8
m2
584.14
5.9
"
685.91
5.10
"
924.19
80.42
12. MISCELLANEOUS
Checked by
Approved by
Contract
Items
Descript.
Unit
Quantity
U.Rate
Amount
1. EARTHWORK
Unskilled
All type of Excavation work in soft clay & silty soils including
disposal upto 10m lead and 1.5m lift
Item No.
1.1
1
Norms - 2(1) page 4
Earthwork in excav. : soft soil
3%of labour
Sub-Total
Contract Rate
per
cu.m.
per
Sub-Total
Contract Rate
cu.m.
m.d.
Unskilled
Sub-Total
Contract Rate
cu.m.
Prepared By
m.d.
per
cu.m.
cu.m.
430.00
344.00
354.32
407.47
cu.m.
1.00
407.47
430.00
430.00
12.90
442.90
509.34
cu.m.
1.59
509.34
430.00
683.70
20.51
704.21
809.84
cu.m.
0.50
809.84
430.00
215.00
221.45
254.67
1.15
cu.m.
254.67
Unskilled
m.d.
1.50
430.00
645.00
Block stone
cu.m.
1.00
1491.47
1491.47
Bond stone
Sub-Total
Contract Rate
cu.m.
0.20
1491.47
298.29
2434.76
2799.98
1.15
per
0.80
356.53
6.45
cu.m.
3% of Labor
Item No.
1.7
301.00
9.03
310.03
356.53
1.15
Unskilled
m.d.
Excavation for foundation drain, Pipe line etc.in boulder mixed soil,
Equipment
disposal (upto 10m lead and 1.5m lift)
3%of labour
Item No.
per
Sub-Total
1.4
1
cu.m.
Contract Rate
1.15
Norms - 2(14) page 7
Unit Rate Excluding
VAT per
Earthwork in excav. : B.M.Soil
Item No.
1.6
1
Norms - 6(5) page 27
Filling - stone
430.00
10.32
Unskilled
m.d.
Excavation of pit in soft soil, disposal upto 10m lead and 1.5m lift in
Equipment
foundation
3%of labour
Item No.
per
Sub-Total
1.3
1
cu.m.
Contract Rate
1.15
Norms - 2(9) page 6
Unit Rate Excluding
VAT per
E/W excav.in found.- soft soil
Item No.
1.5
1
Norms - 2(25a) page 11
Earth filling - compaction work
0.70
1.15
Unskilled
All type of excavation work in hard clay and soils mixed with soft
Equipment
moorum stones (upto 30mm size) including disposal upto 10m lead
3%of labour
and 1.5m lift
Item No.
1.2
1
Norms - 2(2) page 4
Earthwork in excav. : B.M.Soil
m.d.
Equipment
cu.m.
2799.98
Unskilled
m.d.
0.70
430.00
301.00
Sand
cu.m.
1.10
953.08
1048.39
Sub-Total
Contract Rate
Checked By
1.15
1349.39
1551.80
Approved By
Prepared By
Contract
Descript.
Unit
Checked By
Quantity
cu.m.
U.Rate
Amount
1551.80
Approved By
Contract
Items
Descript.
Unskilled
Tran soil
m3
Quantity
0.50
U.Rate
430.00
Amount
215.00
1.20
221.76
266.11
per
1
Unit
m.d.
6.45
Sub-Total
cu.m.
Contract Rate
487.56
1.15
560.70
cu.m.
560.70
2. BRICK WORKS
Dry brick laying (soling) in sand
a) flat
Item No.
2.1
10
Norms - 11(15a) page 65
per
m.d.
Unskilled
Brick
Sand
Sub-Total
Contract Rate
sq.m.
0.50
650.00
m.d.
1.00
430.00
430.00
nos.
420.00
12.80
5376.00
cu.m.
0.71
953.08
676.69
6807.69
7828.84
1.15
Item No.
2.2
10
Norms - 11(15b) page 65
Skilled
Skilled
m.d.
1.00
650.00
650.00
m.d.
3.25
430.00
1397.50
nos.
750.00
12.80
9600.00
cu.m
0.71
953.08
676.69
12324.19
14172.81
Sand
Sub-Total
Contract Rate
sq.m.
1.15
782.88
Unskilled
Brick
per
sq.m.
325.00
sq.m.
1417.28
cu.m.
Prepared By
1.50
650.00
Unskilled
Brick
m.d.
2.20
430.00
946.00
nos.
530.00
12.80
6784.00
Cement
m.t.
0.13
12642.40
1643.51
Sand
cu.m
0.27
1835.08
495.47
Add.unkill
m.d.
0.20
430.00
86.00
3% of add. Unskilled
per
cu.m.
Skilled
m.d.
Unskilled
Brick
975.00
2.58
10932.56
12572.45
1.15
Item No.
2.4a
1
Norms - 5(1.b.2 & 2a) page 23 & 24
m.d.
Scaffolding
Sub-Total
Contract Rate
per
2.3a
1
Norms - 5(1.b.1 & 2a) page 23 & 24
Skilled
cu.m.
12572.45
1.50
650.00
m.d.
2.20
430.00
946.00
nos.
530.00
12.80
6784.00
Cement
m.t.
0.10
12642.40
1264.24
Sand
cu.m
0.28
1835.08
513.82
Add.unkill
m.d.
0.20
430.00
86.00
Scaffolding
Sub-Total
Contract Rate
3% of add. Unskilled
1.15
Checked By
cu.m.
975.00
2.58
10571.64
12157.39
12157.39
Approved By
Contract
Items
Descript.
Skilled
Unit
m.d.
Quantity
1.50
U.Rate
650.00
Amount
975.00
Unskilled
m.d.
2.20
430.00
946.00
Brick
nos.
530.00
12.80
6784.000
Cement
m.t.
0.07
12642.40
884.97
Sand
cu.m
0.30
1835.08
550.52
m.d.
0.20
430.00
86.00
Add.unkill
Item No.
2.5a
1
Norms - 5(1.b.3 & 2a) page 23 & 24
Scaffolding
Sub-Total
Contract Rate
per
cu.m.
3% of add. Unskilled
1.15
2.58
10229.07
11763.43
cu.m.
11763.43
Skilled
m.d.
1.50
650.00
Unskilled
Brick
m.d.
2.20
430.00
946.00
nos.
530.00
12.80
6784.00
Cement
m.t.
0.13
12642.40
1643.51
Sand
cu.m
0.27
1835.08
495.47
Add.unkill
m.d.
0.70
430.00
301.00
Scaffolding
Item No.
2.3b
1
Norms - 5(1.b.1 & 2b) page 23 & 24
per
Sub-Total
Contract Rate
cu.m.
3% of add. Unskilled
cu.m.
Skilled
m.d.
1.50
Unskilled
m.d.
2.20
Brick
nos.
530.00
Chimney (bhatta) brick masonry works along with supplying bricks
making cement sand mortar and construction of brick wall including
Cement
m.t.
0.10
haulage distance upto 30m a) 1:4
Sand
cu.m
0.28
Add.unkill
m.d.
0.70
Scaffolding 3% of add. Unskilled
Item No.
per
Sub-Total
2.4b
1
cu.m.
Contract Rate
1.15
Norms - 5(1.b.2 & 2b) page 23 & 24
Unit Rate Excluding
cu.m.
VAT per
Brick work in c.m. - 1:4
Item No.
2.5b
1
Norms - 5(1.b.3 & 2b) page 23 & 24
per
cu.m.
12827.12
650.00
430.00
12.80
12642.40
1835.08
430.00
975.00
946.00
6784.00
1264.24
513.82
301.00
9.03
10793.09
12412.06
12412.06
Skilled
m.d.
1.50
650.00
975.00
Unskilled
m.d.
2.20
430.00
946.00
Brick
nos.
530.00
12.80
6784.00
Cement
m.t.
0.07
12642.40
884.97
Sand
cu.m
0.30
1835.08
550.52
Add.unkill
m.d.
0.70
430.00
301.00
Scaffolding
Sub-Total
Contract Rate
3% of add. Unskilled
9.03
10450.52
12018.10
1.15
9.03
11154.01
12827.12
1.15
975.00
cu.m.
12018.10
3. STONE WORKS
Dry stone laying (soling) in foundation
Item No.
Prepared By
per
Skilled
m.d.
0.00
650.00
0.00
Unskilled
m.d.
1.50
430.00
645.00
stone
cu.m
1.10
1491.47
1640.62
Sand
Sub-Total
cu.m
0.00
953.08
0.00
2285.62
Checked By
Approved By
Prepared By
cu.m.
Contract
Descript.
Contract Rate
Unit Quantity
1.15
Checked By
cu.m.
U.Rate
Amount
2628.46
2628.46
Approved By
Contract
Items
Item No.
3.2
1
Norms - 6a(2) page 25
per
cu.m.
Quantity
1.50
U.Rate
650.00
Amount
975.00
Unskilled
m.d.
5.00
430.00
2150.00
cement
m.t.
0.159
12642.40
2010.14
Sand
cu.m
0.45
1835.08
825.79
block stone
"
1.00
1491.47
1491.47
bond st.
Sub-Total
Contract Rate
"
0.10
1491.47
149.15
7601.54
8741.78
1.15
cu.m.
per
cu.m.
Unskilled
m.d.
cement
m.t.
Sand
cu.m
0.47
1835.08
862.49
bl.stone
"
1.00
1491.47
1491.47
"
0.10
1491.47
149.15
6968.20
8013.43
650.00
975.00
5.00
430.00
2150.00
0.106
12642.40
1340.09
1.15
cu.m.
8013.43
Skilled
m.d.
1.00
650.00
650.00
Unskilled
m.d.
2.00
430.00
860.00
bl.stone
cu.m
1.00
1491.47
1491.47
cu.m
0.10
1491.47
149.15
3150.62
3623.21
bond st.
Sub-Total
Contract Rate
1.15
1.50
8741.78
m.d.
cu.m.
Skilled
bond st.
Sub-Total
Contract Rate
per
Item No.
3.4
1
Norms - 6(2.1) page 26
Unit
m.d.
Item No.
3.3
1
Norms - 6a(3) page 25
Descript.
Skilled
cu.m.
3623.21
4. WOODEN WORKS
Making and fixing seasoned sal Wood chaukhat Wooden size (100
mm*75 mm)
Item No.
4.1
1
Norms - 10(1) page 49
cu.m.
Prepared By
34.00
650.00
22100.00
m.d.
3.40
430.00
1462.00
Wood
cu.m
1.10
167580.00
184338.00
holdfast
nos.
92.00
15.00
1380.00
nos.
184.00
0.40
73.60
209353.60
240756.64
1.15
Making beams, rafter, purlin cross beams from seasoned sal Wood
with fitting and fixing ( it is for 9 m span)
m.d.
screw
Sub-Total
Contract Rate
per
Item No.
4.2
1
Norms - 10(17) page 56
Skilled
Unskilled
per
cu.m.
cu.m.
240756.64
Skilled
m.d.
17.65
650.00
11472.50
Unskilled
m.d.
1.76
430.00
756.80
Wood
cu.m
1.05
167580.00
175959.00
Killa
Sub-Total
Contract Rate
L.S.
1.15
Checked By
30.00
188218.30
216451.05
cu.m.
216451.05
Approved By
Contract
Items
Making and fixing sal Wood panelled shutters using 38 mm thick sal
Wood frame
Descript.
Unit
Skilled
m.d.
Quantity
10.00
U.Rate
650.00
Amount
6500.00
Unskilled
m.d.
1.00
430.00
430.00
Wood
cu.m
0.084
167580.00
14076.72
Shutter size:
hinges
nos.
6.00
144.00
bolt_1
nos.
1.00
24.00
26.00
bolt_2
nos.
1.00
41.00
lock
nos.
1.00
41.00
572.00
572.00
handle
nos.
2.00
32.00
64.00
Screws
Sub-Total
Contract Rate
per
sq.m.
Making and fixing 4 mm thick glazed shutter using sal Wood shutter
of the size : 38 mm x 75 mm
(Shutter size: 1.829m*1.22m = 2.23 sq.m)
sq.m.
11893.70
m.d.
9.00
650.00
5850.00
Unskilled
m.d.
0.90
430.00
387.00
Wood
cu.m
0.049
167580.00
8211.42
glass
sq.m.
1.085
645.60
700.48
hinges
nos.
8.00
nos.
4.00
24.00
26.00
192.00
bolts
nos.
L.S.
2.00
32.00
64.00
10.00
15518.90
17846.73
1.15
sq.m.
Skilled
handle
screws
Sub-Total
Contract Rate
per
10.00
21863.72
25143.28
1.15
L.S.
26.00
sq.m.
104.00
8003.02
Skilled
m.d.
7.00
650.00
4550.00
Unskilled
m.d.
0.70
430.00
301.00
Wood
cu.m
0.0346
167580.00
5798.27
Shutter size :
Plywwod
sq.m.
4.65
215.20
1000.68
hinges
nos
3.00
24.00
72.00
bolts
nos
2.00
26.00
52.00
nos
1.00
572.00
572.00
- special
hinges
- 100 mm
bolts
- 150 mm
Item No.
4.5
2.245
Norms - 10(7) page 51
lock
screws
Sub-Total
Contract Rate
per
sq.m.
Skilled
Making and fixing 18 # CGI plain sheet flush shutters (CGI sheet
both sides) in 38 mm sal Wood frame.
Shutter size :
lock
- special
4.6
per
2.245
Prepared By
7.00
650.00
4550.00
m.d.
0.70
430.00
301.00
cu.m
0.0346
167580.00
5798.27
sheet
sq.m.
4.65
451.92
2101.43
hinges
nos
3.00
24.00
72.00
bolts
nos
2.00
26.00
52.00
lock
nos
1.00
572.00
572.00
handle
nos
1.00
32.00
32.00
screws
L.S.
50.00
Sub-Total
sq.m.
6375.43
Wood
hinges - 100 mm
Item No.
m.d.
sq.m.
Unskilled
100.00
12445.95
14312.84
1.15
bolts
L.S.
Contract Rate
13528.70
1.15
Checked By
15558.00
sq.m.
6930.07
Approved By
Contract
Items
Descript.
Skilled
Unit
m.d.
Quantity
0.06
U.Rate
650.00
Amount
39.00
Unskilled
m.d.
0.006
430.00
2.58
mosquito net
sq.m.
1.05
441.16
463.22
r.m.
4.05
12.70
51.44
listi
Item No.
4.7
1
Norms - similar to 10(12) page 53
Mosquito net + listi
nails
Sub-Total
Contract Rate
per
sq.m.
m.d.
0.06
650.00
39.00
m.d.
0.006
430.00
2.58
sq.m.
1.05
441.16
463.22
1.05
269.00
282.45
4.05
12.70
51.44
net
exp.net
Making and fixing mosquito proof wire mesh net with expended
metal net flush shutter in 38 mm thick sal Wood frame.
Shutter size:
hinges - 100 mm
L.S.
sq.m.
1.15
5.00
650.00
3250.00
0.50
430.00
215.00
Wood
cu.m.
0.026
167580.00
4357.08
Mosq. net
sq.m.
2.13
441.16
939.67
exp. net
sq.m.
2.13
269.00
572.97
hinges
nos
3.00
24.00
72.00
bolt
nos
2.00
41.00
82.00
spring
nos
1.00
138.00
138.00
handle
nos
2.00
32.00
64.00
L.S.
50.00
9740.72
11201.83
1.15
sq.m.
4989.68
m.d.
0.06
650.00
Unskilled
m.d.
0.006
430.00
2.58
glass
sq.m.
1.00
645.60
645.60
r.m.
4.05
12.70
51.44
listi
nails
Sub-Total
Contract Rate
L.S.
39.00
20.00
758.62
872.41
1.15
987.49
m.d.
Skilled
sq.m.
sq.m.
m.d.
per
20.00
858.69
987.49
Skilled
screws
Sub-Total
Contract Rate
per
Item No.
4.1
1
Norms-10 (11.b) page 52, 53
r.m.
Unskilled
bolts - 150 mm
Item No.
4.9
2.245
Norms-10(10) page 52
sq.m.
662.67
Skilled
nails
Sub-Total
Contract Rate
sq.m.
sq.m.
Unskilled
listi
per
20.00
576.24
662.67
1.15
Fixing mosquito proof mesh net with expended metal net using listi
Item No.
4.8
1
Norms - similar to 10(12) page 53
L.S.
sq.m.
872.41
5. CONCRETE WORKS
Concreting of foundation, vertical faces walls (cement concrete)
including supply of materials and haulage distance upto 30m.
a) P.C.C.(1:3:6)
Item No.
5.1
Prepared By
per
1
cu.m.
Skilled
m.d.
1.00
650.00
650.00
Unskilled
m.d.
4.00
430.00
1720.00
cement
m.t.
0.22
12642.40
2781.33
Gravel 40mm
cu.m.
0.65
1948.56
1266.56
Gravel 20mm
cu.m.
0.24
1983.84
476.12
cu.m.
0.47
1835.08
862.49
7756.50
8919.98
sand
Sub-Total
Contract Rate
Checked By
1.15
Approved By
Prepared By
Contract
Descript.
Unit
Checked By
Quantity
cu.m.
U.Rate
Amount
8919.98
Approved By
10
Contract
Items
Concreting of foundation, vertical faces walls (cement concrete)
including supply materials and haulage distance upto 30m
a) P.C.C.(1:2:4)
Item No.
5.2
1
Norms-7.2(d) page 31
per
cu.m.
a) P.C.C. 1:2:4
per
cu.m.
cu.m.
Unskilled
m.d.
4.00
430.00
1720.00
cement
m.t.
0.32
12642.40
4045.57
Gravel 40mm
cu.m.
0.52
1948.56
1013.25
Gravel 20mm
cu.m.
0.22
1983.84
436.44
Gravel 10mm
cu.m.
0.11
1595.76
175.53
cu.m.
0.445
1835.08
816.61
8857.41
10186.02
1.15
a) P.C.C. 1:1.5:3
m.d.
0.80
Unskilled
m.d.
cement
m.t.
Agg 40mm
Agg 20mm
Agg 10mm
sand
Sub-Total
Contract Rate
cu.m.
520.00
7.00
430.00
3010.00
0.32
12642.40
4045.57
cu.m.
0.52
1948.56
1013.25
cu.m.
0.22
1948.56
428.68
cu.m.
0.11
1595.76
175.53
cu.m.
0.445
1835.08
816.61
10009.65
11511.09
1.15
cu.m.
m.d.
0.80
Unskilled
m.d.
cement
m.t.
Gravel 40mm
11511.09
650.00
520.00
7.00
430.00
3010.00
0.32
12642.40
4045.57
cu.m.
0.52
1948.56
1013.25
Gravel 20mm
cu.m.
0.22
1983.84
436.44
Gravel 10mm
cu.m.
0.11
1595.76
175.53
cu.m.
0.445
1835.08
816.61
10017.41
11520.02
1.15
cu.m.
Skilled
m.d.
0.80
Unskilled
m.d.
cement
m.t.
Gravel 20mm
Gravel 10mm
11520.02
650.00
520.00
7.00
430.00
3010.00
0.40
12642.40
5056.96
cu.m.
0.57
1983.84
1130.79
cu.m.
0.29
1595.76
462.77
cu.m.
0.425
1835.08
779.91
10960.43
12604.49
1.15
10186.02
650.00
Skilled
sand
Sub-Total
Contract Rate
per
cu.m.
Skilled
Prepared By
Amount
650.00
sand
Sub-Total
Contract Rate
per
Item No.
5.5
1000
Norms-7.5 page 33
U.Rate
650.00
Item No.
5.4
1
Norms-7(4.b) page 32
Quantity
1.00
Item No.
5.3b
1
Norms-7(4.a) page 32
Unit
m.d.
sand
Sub-Total
Contract Rate
Item No.
5.3a
1
Norms-7(4.a) page 32
Descript.
Skilled
cu.m.
12604.49
Skilled
m.d.
12.00
650.00
7800.00
Unskilled
m.d.
12.00
430.00
5160.00
Reinforment
m.t.
1.05
73828.58
77520.01
bind.wire
Sub-Total
Contract Rate
kg
10.00
90.32
903.20
91383.21
105090.69
1.15
kg
105.09
Approved By
11
Prepared By
Contract
Descript.
Unit
Unit
Rate Excluding
VAT per
Checked By
Quantity
kg
U.Rate
Amount
105.09
Approved By
12
Contract
Items
38 mm thick Damp Proof Course of cement concrete of the ratio
1:2:4
Note :-
Descript.
Skilled
Unit
m.d.
Quantity
1.00
U.Rate
650.00
Amount
650.00
Unskilled
m.d.
2.00
430.00
860.00
cement
m.t.
0.12
12642.40
1517.09
sand
cu.m.
0.17
1835.08
311.96
gravel_12mm
cu.m.
0.34
1595.76
542.56
kg
2.88
81.00
233.28
4114.89
4732.12
Item No.
5.6
10
Norms-18(9) page 128
W.P.C.
Sub-Total
Contract Rate
per
sq.m.
per
sq.m.
m.d.
1.25
Unskilled
m.d.
cement
m.t.
sand
gravel 20 mm
Sub-Total
Contract Rate
473.21
650.00
812.50
3.00
430.00
1290.00
0.26
12642.40
3287.02
cu.m.
0.34
1835.08
623.93
cu.m.
0.68
1983.84
1349.01
7362.46
8466.83
1.15
sq.m.
Skilled
1.15
sq.m.
846.68
Form Works
Making Wooden form work for slab and floor including supply and
selection of materials fixing, nailing according to drawings, applying
Primer, placing separa- tors, dismantling forms and hauling upto 30
m distance
Skilled
m.d.
1.72
650.00
1118.00
Unskilled
m.d.
2.57
430.00
1105.10
Wood
cu.m.
0.066
39337.20
2586.42
Nails
kg
2.50
108.00
270.00
Item No.
5.8
10
Norms-8(2.a) page 37
Form work for slab
per
Sub-Total
Contract Rate
sq.m.
per
Prepared By
per
sq.m.
2.400
584.14
650.00
1560.00
m.d.
3.60
430.00
1548.00
Wood
cu.m.
0.066
39337.20
2586.42
Nail
kg
2.50
108.00
270.00
Skilled
5964.42
6859.08
1.15
Item No.
5.1
10
Norms-8(4.a) page 38
m.d.
sq.m.
Unskilled
Sub-Total
Contract Rate
sq.m.
5079.52
5841.45
1.15
m.d.
sq.m.
4.00
685.91
650.00
2600.00
Unskilled
m.d.
6.00
430.00
2580.00
Wood
cu.m.
0.066
39337.20
2586.42
kg
2.50
108.00
270.00
8036.42
9241.88
Nails
Sub-Total
Contract Rate
1.15
Checked By
sq.m.
924.19
Approved By
13
Contract
Items
Descript.
Unit
Quantity
U.Rate
Amount
6. ROOFING WORKS
Item No.
6.1
10
Norms-9(1) page 46
sq.m.
1.10
650.00
715.00
m.d.
1.25
430.00
537.50
CGIsheet
sq.m.
12.00
401.53
4818.33
nutbolt
nos.
30.00
2.50
75.00
J-hook
nos.
25.00
10.00
250.00
nos.
55.00
0.60
33.00
6428.83
7393.15
1.15
Making ridge of 24 gauge C.G.I. plain sheet and fitting with supply
of materials all complete
per
r.m.
Skilled
m.d.
sq.m.
2.00
650.00
1300.00
m.d.
3.00
430.00
1290.00
r.m.
12.00
451.92
5423.04
nutbolt
Sub-Total
Contract Rate
nos.
10.00
2.50
25.00
8038.04
9243.75
1.15
Rm.
924.37
Skilled
m.d.
23.00
650.00
14950.00
Unskilled
m.d.
2.30
430.00
989.00
Wood
cu.m.
0.45
167580.00
75411.00
plyWood
sq.m.
37.50
215.20
8070.00
L.S.
50.00
99470.00
114390.50
1.15
Ceiling - 3 mm plyWood
739.32
Unskilled
listi, Killa
Sub-Total
Contract Rate
per
sq.m.
plain sheet
Item No.
6.3
35.68
Norms-10(16.a) page 55, 56
m.d.
bit.washer
Sub-Total
Contract Rate
per
Item No.
6.2
10
Norms-9(2) page 46
Skilled
Unskilled
sq.m.
3206.01
7. STEEL WORKS
G.I. barbed wire 12 # fencing with supply of materials and fitting all
complete
1kg = 7m
Item No.
7.1
100
Norms-24(6) page 164
Skilled
m.d.
Unskilled
barb.wire
Nails
Sub-Total
Contract Rate
per
m
grill
Supply, fixing and fitting of MS grill with painting over Primer all
complete
per
1
Sub-Total
Contract Rate
kg
Supply, fixing and fitting iron angle with painting over Primer all
complete
per
1
699.40
m.d.
5.380
430.00
2313.40
Rm
110.00
12.48
1372.64
L.S.
kg
Ms angle
Sub-Total
Contract Rate
kg
Rm.
1.000
51.01
112.88
kg
112.88
112.88
129.81
1.15
kg
1.000
129.81
112.88
112.88
112.88
129.81
1.15
50.00
4435.44
5100.76
1.15
Item No.
7.3
650.00
Item No.
7.2
1.076
kg
129.81
Approved By
14
Prepared By
Contract
Descript.
Checked By
Unit
Quantity
U.Rate
Amount
Approved By
15
Contract
Descript.
Unit
Quantity
U.Rate
Amount
Skilled
m.d.
15.00
650.00
9750.00
Unskilled
m.d.
20.00
430.00
8600.00
m.t.
0.625
12642.40
7901.50
cu.m
1.28
1835.08
2348.90
28600.40
32890.46
8. PLASTERING WORKS
12.5 mm thick cement sand plastering works in ceiling
a) Cement sand ratio - 1:3
Item No.
8.1
100
Norms-12(1.b) page 67
cement
per
sq.m.
per
sq.m.
a) In brick masonry
per
sq.m.
m.d.
cement
m.t.
cu.m
sand
Sub-Total
Contract Rate
650.00
7800.00
16.00
430.00
6880.00
0.538
12642.40
6801.61
1.46
1835.08
2679.22
24160.83
27784.95
sq.m.
Skilled
m.d.
12.00
Unskilled
m.d.
cement
m.t.
cu.m
sand
Sub-Total
Contract Rate
328.90
1.15
277.85
650.00
7800.00
16.00
430.00
6880.00
0.382
12642.40
4829.40
1.57
1835.08
2881.08
22390.47
25749.04
1.15
sq.m.
257.49
Skilled
m.d.
14.00
650.00
9100.00
Unskilled
m.d.
19.00
430.00
8170.00
m.t.
0.960
12642.40
12136.70
cu.m
1.95
1835.08
3578.41
32985.11
37932.88
sand
Sub-Total
Contract Rate
1.15
sq.m.
379.33
Skilled
m.d.
10.50
650.00
6825.00
Unskilled
m.d.
12.00
430.00
5160.00
cement
m.t.
0.155
12642.40
1959.57
cu.m
0.32
1835.08
587.23
14531.80
16711.57
sand
Sub-Total
Contract Rate
1.15
Prepared By
Unskilled
Item No.
8.6
100
Norms-14(1.c) page 74
12.00
cement
Item No.
8.5
100
Norms-14(1.c) page 74
m.d.
sq.m.
Skilled
Item No.
8.3
100
Norms-12(1.d) page 67
1.15
Item No.
8.2
100
Norms-12(1.c) page 67
sand
Sub-Total
Contract Rate
sq.m.
Skilled
m.d.
10.50
Unskilled
m.d.
cement
m.t.
cu.m
sand
Sub-Total
Contract Rate
Checked By
650.00
6825.00
18.00
430.00
7740.00
0.155
12642.40
1959.57
0.32
1835.08
587.23
17111.80
19678.57
1.15
167.12
sq.m.
196.79
Approved By
16
Prepared By
Contract
Descript.
Unit
Unit
Rate Excluding
VAT per
Checked By
Quantity
sq.m.
U.Rate
Amount
196.79
Approved By
17
per
sq.m.
Descript.
Skilled
Unit
m.d.
Quantity
10.00
U.Rate
650.00
Amount
6500.00
Unskilled
m.d.
14.00
430.00
6020.00
cement
m.t.
0.306
12642.40
3868.57
cu.m
0.630
1835.08
1156.10
17544.67
20176.38
sand
Sub-Total
Contract Rate
Skilled
m.d.
Unskilled
cement
Sub-Total
Contract Rate
sq.m.
650.00
m.d.
1.00
430.00
430.00
kg
53.20
12.64
672.58
1752.58
2015.46
1.15
sq.m.
13.00
650.00
8450.00
m.d.
4.50
430.00
1935.00
tile
sq.m
11.00
505.72
5562.92
cement
m.t.
0.056
12642.40
707.97
sand
cu.m
0.152
1835.08
278.93
kg
3.228
21.24
68.57
17003.40
19553.91
wh.cement
Sub-Total
Contract Rate
1.15
m.d.
sq.m.
1955.39
13.00
650.00
8450.00
Unskilled
m.d.
4.50
430.00
1935.00
Tile
sq.m
11.00
645.60
7101.60
cement
m.t.
0.056
12642.40
707.97
sand
cu.m
0.152
1835.08
278.93
kg
3.228
21.24
68.57
18542.08
21323.39
wh.cement
Sub-Total
Contract Rate
1.15
201.55
m.d.
sq.m.
Skilled
Skilled
Item No.
8.9b
10
Norms-11(7) page 63
650.00
201.76
Unskilled
sq.m.
1.00
Item No.
8.9a
10
Norms-11(7) page 63
1.15
Item No.
8.8
10
Norms-11(20) page 66
Contract
sq.m.
2132.34
9. PAINTING WORKS
2 coat white washing with gum in new surface
a) in ceiling
Item No.
9.1
100
Norms-13(1.b) page 70
per
Prepared By
sq.m.
Skilled
m.d.
1.875
650.00
1218.75
Unskilled
m.d.
1.375
430.00
591.25
Chuna
kg
22.00
16.00
352.00
Gum Adhesive
Sub-Total
Contract Rate
kg
0.88
126.00
110.88
2272.88
2613.81
1.15
sq.m.
26.14
Skilled
m.d.
1.50
650.00
975.00
Unskilled
m.d.
1.10
430.00
473.00
Chuna
kg
22.00
16.00
352.00
Gum Adhesive
kg
0.88
126.00
110.88
Checked By
Approved By
18
Prepared By
per
sq.m.
Contract
Descript.
Sub-Total
Contract Rate
Unit
1.15
Checked By
Quantity
sq.m.
U.Rate
Amount
1910.88
2197.51
21.98
Approved By
19
Contract
Items
Water proof cement paint (Snowcem) application
a) in one coat
Item No.
9.3
100
Norms-13(12.a) page 72
sq.m.
sq.m.
Amount
2275.00
Unskilled
m.d.
3.50
430.00
1505.00
kg
30.00
47.00
1410.00
5190.00
5968.50
1.15
sq.m.
m.d.
6.50
650.00
4225.00
m.d.
6.50
430.00
2795.00
kg
50.00
47.00
2350.00
9370.00
10775.50
1.15
sq.m.
m.d.
8.00
650.00
5200.00
m.d.
5.00
430.00
2150.00
Primer
litre
8.10
263.00
2130.30
litre
9.00
446.00
4014.00
13494.30
15518.45
1.15
155.18
m.d.
12.00
650.00
7800.00
Unskilled
m.d.
8.00
430.00
3440.00
Primer
litre
8.10
263.00
2130.30
litre
16.00
446.00
7136.00
20506.30
23582.25
1.15
sq.m.
235.82
Skilled
m.d.
10.75
650.00
6987.50
Unskilled
m.d.
10.75
430.00
4622.50
Primer
litre
8.10
263.00
2130.30
Alum. Paint
litre
10.76
473.00
5089.48
Sand paper
Sub-Total
Contract Rate
nos.
4.00
5.00
20.00
18849.78
21677.25
1.15
sq.m.
Skilled
107.76
Skilled
Enamel
Sub-Total
Contract Rate
per
sq.m.
Unskilled
59.69
Skilled
Enamel
Sub-Total
Contract Rate
per
sq.m.
Unskilled
Item No.
9.7
100
Norms-13(6) page 71
U.Rate
650.00
Snowcem
Sub-Total
Contract Rate
per
a) in 2 coats
Item No.
9.6
100
Norms-13(5) page 71
Quantity
3.50
a) in one coat
Item No.
9.5
100
Norms-13(5a,b) page 117
Unit
m.d.
Snowcem
Sub-Total
Contract Rate
per
a) in 2 coats
Item No.
9.4
100
Norms-13(12a,b) page 73
Descript.
Skilled
sq.m.
216.77
15mm (0.5") dia. G.I. Pipe ('B' class) laying including fixing and
fitting
plumber
m.d.
0.50
650.00
325.00
Helper
m.d.
1.00
430.00
430.00
Unskilled
m.d.
1.00
430.00
430.00
Read Lead
Miscellaneous
Item No.
10.1
30
Norms-17(4.a.1) page 123
Prepared By
per
r.m.
Pipe
Sub-Total
Contract Rate
of Unskilled
43.00
0.025 of Unskilled
0.10
10.75
r.m.
1.15
30.00
Rm.
133.00
3990.00
5228.75
6013.06
200.44
Approved By
20
Prepared By
Contract
Descript.
Unit
Unit
Rate Excluding
VAT per
Checked By
Quantity
Rm.
U.Rate
Amount
200.44
Approved By
21
Contract
Items
20mm (3/4") dia. G.I. Pipe ('B' class) laying including fixing and
fitting
Descript.
plumber
Unit
m.d.
Quantity
0.50
U.Rate
650.00
Amount
325.00
Helper
m.d.
1.00
430.00
430.00
Unskilled
m.d.
1.00
430.00
430.00
Read Lead
Miscellaneous
Item No.
10.2
30
Norms-17(4.a.1) page 122
Pipe
Sub-Total
Contract Rate
per
r.m.
25mm (1") dia. G.I. Pipe ('B' class) laying including fixing and
fitting
43.00
10.75
r.m.
r.m.
1.15
20mm (1/2") dia. HDPE Pipe laying with butt welded joints
including fittings wt (Kg) per rm( 10 kg/Sq.m.) 0.134
325.00
Helper
m.d.
1.50
430.00
645.00
Unskilled
m.d.
1.50
430.00
645.00
Read Lead
0.10
110mm (4") dia. HDPE Pipe laying with butt welded joints including
fittings
64.50
0.025 of Unskilled
r.m.
30.00
16.13
258.00
1.15
Rm.
7740.00
9435.63
10850.97
361.70
m.d.
1.00
650.00
650.00
Helper
Unskilled
Fuel
m.d.
m.d.
litre
1.00
2.00
0.25
430.00
430.00
70.80
430.00
860.00
17.70
r.m.
1000.00
30.55
30552.00
2.51% of Unskilled
21.59
32531.29
37410.98
1.15
of Unskilled
plumber
Pipe
r.m.
242.99
650.00
Miscellaneous
Sub-Total
Contract Rate
per
Rm.
5100.00
6338.75
7289.56
0.50
170.00
m.d.
Pipe
Sub-Total
Contract Rate
per
30.00
plumber
Miscellaneous
Item No.
10.4
1000
Norms-17(2.a.1) page 120
0.10
Item No.
10.3
30
Norms-17(4.a.2) page 180
of Unskilled
0.025 of Unskilled
Rm.
37.41
plumber
m.d.
1.50
650.00
975.00
Helper
m.d.
1.50
430.00
645.00
Unskilled
m.d.
3.00
430.00
1290.00
Fuel
litre
0.50
70.80
35.40
Pipe
r.m.
50.00
388.28
19414.20
Item No.
10.5
50
Norms-17(2.b.2) page 120
per
r.m.
225mm dia. HDP Pipe laying, fitting and fixing all complete
Prepared By
2.51% of Unskilled
r.m.
32.38
22391.98
25750.77
1.15
Item No.
per
10.6
50
Norms-17(2) page 178
225mm dia.HDP Pipe laying and fixing
Miscellaneous
Sub-Total
Contract Rate
Rm.
515.02
Plumber
m.d.
2.00
650.00
1300.00
Helper
m.d.
2.00
430.00
860.00
Unskilled
m.d.
4.00
430.00
1720.00
Equipment
days
2.00
100.00
200.00
Fuel
litre
1.00
70.80
70.80
43.17
8.33
4159.13
4783.00
Rm.
95.66
Approved By
22
Prepared By
Contract
Descript.
Checked By
Unit
Quantity
U.Rate
Amount
Approved By
23
Contract
Items
Descript.
Unit
Unskilled
m.d.
Quantity
U.Rate
Amount
per
Sub-Total
Contract Rate
sq.m.
per
Sub-Total
Contract Rate
cu.m.
Unskilled
Sub-Total
Contract Rate
cu.m.
per
Unskilled
Sub-Total
Contract Rate
cu.m.
m.d.
Sq.m.
1.06
53.41
430.00
m.d.
455.80
455.80
524.17
cu.m.
2.12
524.17
430.00
911.60
911.60
1048.34
cu.m.
4.00
1048.34
430.00
1720.00
1720.00
1978.00
1.15
cu.m.
11.00
1978.00
430.00
4730.00
4730.00
5439.50
1.15
Dismanling : R.C.C.
sq.m.
1.15
Item No.
11.6
1
Norms - 2041 Item 19(6) (Page130)
Unskilled
Sub-Total
Contract Rate
cu.m.
Dismanling : P.C.C.
Item No.
11.5
1
Norms-19(3) page 130
m.d.
46.44
46.44
53.41
1.15
Item No.
11.4
1
Norms-19(4) page 130
m.d.
Item No.
11.3
1
Norms-19(2) page 130
Unskilled
430.00
1.15
0.108
cu.m.
5439.50
Skilled
m.d.
0.054
650.00
35.10
Unskilled
m.d.
0.081
430.00
34.83
Sub-Total
Contract Rate
69.93
80.42
1.15
Sq.m.
80.42
12. MISCELLANEOUS
25mm th. SalWood Eaves board work
Prepared By
Skilled
m.d.
1.43
650.00
929.50
Unskilled
m.d.
0.143
430.00
61.49
Wood
m3
0.275
167580.00
46084.50
Killa
L.S.
Checked By
50.00
Approved By
24
per
Prepared By
Sq.m.
Contract
Descript.
Sub-Total
Contract Rate
Unit
1.15
Checked By
Quantity
Sq.m.
U.Rate
Amount
47125.49
54194.31
5419.43
Approved By
25
Contract
Skilled
m.d.
0.108
650.00
Unskilled
m.d.
0.011
430.00
4.73
PlyWood
sq.m.
md
md
md
md
L.S.
1.05
0.67
0.10
0.04
0.10
215.20
225.96
Skilled
Skilled
Skilled
Nails
Sub-Total
Contract Rate
per
sq.m.
per
kg
Quantity
U.Rate
Amount
70.20
300.89
346.02
1.15
Prepared By
Unit
Skilled
Item No.
12.3
1000
Norms-10.21 page 58
Descript.
Items
sq.m.
346.02
Skilled
m.d.
20.00
Unskilled
m.d.
20.00
430.00
8600.00
m.t.
1.05
73828.58
77520.01
99120.01
113988.01
Rebars
Sub-Total
Contract Rate
1.15
Checked By
kg
650.00
13000.00
113.99
Approved By
Government of Nepal
Ministry of Fedaral Affairs & Local Development
Analysis of Rates
Building
Contract
FY 072/73
l;=g+=
1
PsfO{
cf=j=
07.07 sf]
b//]^
1.01
k|yd >])fL
k|lt xhf/
12800
1.02
/lj;
k|lt ^s
2450
1.03
k|lt xhf/
11947
1.04
k|lt xhf/
12390
1.05
k|lt xhf/
11947
1.06
k|lt xhf/
12832
k|lt uf]^f
11.50
1.08
594.00
1.09
693.00
1.10
693.00
1.11
770.00
1.12
k|lt ^s
8316.00
('+uf
2.01
w'nf]
k|lt #=lkm=
2.02
af]N*/
k|lt #=lkm=
df^f]
3.01
a'^jndf
k|lt ^s
2200
3.02
l;=g=kf=df
k|lt ^s
1800
3.03
cGo If]qdf
k|lt ^s
1100
luL
4.01
k|lt #=lkm=
46
4.02
k|lt #=lkm=
45
4.03
k|lt #=lkm=
45
4.04
k|lt #=lkm=
45
k|lt #=lkm=
35
4.06
k|lt #=lkm=
35
afn"jf
5.01
v;|f] afn"jf
k|lt #=lkm=
5.02
afn"jf nf]sn
k|lt #=lkm=
20
5.03
k|lt #=lkm=
45
sf&
6.01
;fn sf&
k|lt #=lkm=
4750
6.02
l;;}f sf&
k|lt #=lkm=
2500
6.03
s'sf&
k|lt #=lkm=
1115
6.04
bfp/f
k|lt s]=hL=
11.50
7.01
uf=la=;= If]qdf
k|lt #gf
190
7.02
g=kf= If]qdf
k|lt #gf
250
k|lt uf]^f
1325.00
k|lt s]=hL=
200.00
k|lt uf]^f
4.00
8
8.01
8.02
8.03
k|lt hfnLls=dL=
1.75
8.04
k|lt hfnLls=dL=
2.30
28+1/14
l;=g+=
8.05
PsfO{
cf=j=
07.07 sf]
b//]^
k|lt hfnL
8.00
k|lt hfnL
1926
8.07
k|lt hfnL
2749
8.08
k|lt hfnL
2735
8.09
k|lt hfnL
3881
k|lt hfnL
4038
k|lt hfnL
5686
8.1
8.11
9
9.01
lk=lk=;L= g]kfnL
k|lt af]/f
525
9.02
lk=lk=;L= ef/lto
k|lt af]/f
612
9.03
cf]=lk=l;= g]kfnL
k|lt af]/f
620
9.04
cf]=lk=l;= ef/lto
k|lt af]/f
645
9.05
k|lt af]/f
840
9.06
9.07
10
k|lt s]=lh=
315
k|lt af]/f
4.00
kmnfd] %* -Pg=P;=_
10.01
k|lt s]=hL=
75
10.02
k|lt s]=hL=
72
10.03
11
k|lt s]=hL=
74
k|lt s]=hL=
120
12
k|lt s]=hL=
120
13
k|lt s]=hL=
110
14
k|lt s]=hL=
87
15
k|lt s]=hL=
90
16
16.01
x]eL sf]^]*
k|lt s]=hL=
90
16.02
d]l*od sf]^]*
k|lt s]=hL=
86
16.03
sdl;{on
k|lt s]=hL=
82
17
k|lt s]=hL=
75
18
k|lt s]=hL=
75
19
k|lt s]=hL=
70
20
ANofs kfO{ksf] ^;, knL{g, /fkm\^/ tyf kf]i^ cflb kmnfd] ;fdu|Lx?sf]
km]la|s]zg tyf h*fg sfo{ Hofnf
k|lt s]=hL=
45
21
21.01
4 " nfdf]
k|lt uf]^f
21
21.02
6 " nfdf]
k|lt uf]^f
47
22
22.01
4 " nfdf]
k|lt uf]^f
26
22.02
6 " nfdf]
k|lt uf]^f
41
22.03
12 " nfdf]
k|lt uf]^f
64
23
k|lt uf]^f
572
24
x]G*n ( ISI )
24.01
kmnfd] 6 "
k|lt uf]^f
26
24.02
cfNd'lgod 6 "
k|lt uf]^f
32
24.03
cfNd'lgod 12 "
k|lt uf]^f
75
29+1/14
l;=g+=
PsfO{
cf=j=
07.07 sf]
b//]^
k|lt uf]^f
143
24.04
(f]sfsf] /f]ng
24.05
*f]/ :kL|
k|lt uf]^f
138
24.06
lsnf sf+^L
k|lt s]=hL=
108
24.07
k|lt s]=hL=
160
25
25.01
ef/lto
k|lt a=lkm=
41
25.02
PS;k]G*]* -x]eL_
k|lt a=lkm=
25
25.03
s'v'/] hfnL
k|lt a=lkm=
14
26
l;=lh=cfO{=l;^ -;fbf_
26.01
k|lt a)*n
9106
26.02
k|lt a)*n
7982
26.03
k|lt a)*n
7372
26.04
k|lt a)*n
6717
26.05
k|lt a)*n
6425
26.06
k|lt a)*n
5796
26.07
k|lt a)*n
5292
26.08
k|lt a)*n
4973
26.09
k|lt a)*n
4761
l;=lh=cfO{=l;^ -/Lg_
26.10
k|lt a)*n
10920
26.11
k|lt a)*n
10566
26.12
k|lt a)*n
9071
26.13
k|lt a)*n
8381
26.14
k|lt a)*n
7982
26.15
k|lt a)*n
7230
26.16
k|lt a)*n
6717
26.17
k|lt a)*n
6363
26.18
k|lt a)*n
6044
Kn]g l;^
26.19
k|lt a=lkm=
41
26.20
k|lt a=lkm=
49
26.21
k|lt a=lkm=
34
26.22
k|lt a=lkm=
42
27
k|lt a=lkm=
11
28
28.01
3 Pd=Pd=
k|lt j=lkm
50.00
28.02
4 Pd=Pd=
k|lt j=lkm
60
28.03
5 Pd=Pd=
k|lt j=lkm
80
29
KnfOpm* sdl;{on
29.01
3 Pd=Pd= df]^fO{
k|lt j=lkm
16
29.02
4 Pd=Pd= df]^fO{
k|lt j=lkm
20
29.03
6 Pd=Pd= df]^fO{
k|lt j=lkm
32
29.04
k|lt j=lkm
85
29.05
k|lt j=lkm
94
29.06
k|lt j=lkm
108
29.07
k|lt j=lkm
137
k|lt j=lkm
210
;fwf/)f
30+1/14
l;=g+=
PsfO{
cf=j=
07.07 sf]
b//]^
29.09
k|lt j=lkm
240
29.10
k|lt j=lkm
288
29.11
k|lt j=lkm
328
l^s KnfO{
29.11
4 Pd=Pd=
k|lt j=lkm
31
29.12
6 Pd=Pd=
k|lt j=lkm
59
29.13
9 Pd=Pd=
k|lt j=lkm
91
29.14
12 Pd=Pd=
k|lt j=lkm
112
30
lh=cfO{=kfO{k -Pg=P;_
30.01
k|lt /=dL=
133
30.02
k|lt /=dL=
170
30.03
k|lt /=dL=
258
30.04
k|lt /=dL=
337
30.05
k|lt /=dL=
387
30.06
k|lt /=dL=
532
30.07
k|lt /=dL=
678
30.08
k|lt /=dL=
845
30.09
k|lt /=dL=
1265
30.10
k|lt /=dL=
1653
30.11
k|lt /=dL=
2000
30.12
k|lt /=dL=
968
30.13
k|lt /=dL=
1465
30.14
k|lt /=dL=
1885
30.15
k|lt /=dL=
2133
31
31.01
k|lt /=dL=
182
31.02
k|lt /=dL=
260
31.03
k|lt /=dL=
387
32
32.01
k|lt /=dL=
87
32.02
k|lt /=dL=
112
32.03
k|lt /=dL=
175
32.04
k|lt /=dL=
217
32.05
k|lt /=dL=
251
32.06
k|lt /=dL=
341
32.07
k|lt /=dL=
443
32.08
k|lt /=dL=
546
32.09
k|lt /=dL=
859
32.10
k|lt /=dL=
1095
32.11
k|lt /=dL=
1300
32.12
k|lt /=dL=
2319
32.13
k|lt /=dL=
1003
32.14
k|lt /=dL=
1267
32.15
k|lt /=dL=
1500
32.16
k|lt /=dL=
2919
32
k|lt s]=hL=
173
33
k|lt s]=hL=
228
31+1/14
l;=g+=
34
PsfO{
cf=j=
07.07 sf]
b//]^
34.01
15 ;]=dL= *fold^/
k|lt /=dL=
1870
34.02
20 ;]=dL= *fold^/
k|lt /=dL=
2310
34.03
25 ;]=dL= *fold^/
k|lt /=dL=
2805
34.04
30 ;]=dL= *fold^/
k|lt /=dL=
3190
34.05
35 ;]=dL= *fold^/
k|lt /=dL=
3575
34.06
40 ;]=dL= *fold^/
k|lt /=dL=
4070
34.07
45 ;]=dL= *fold^/
k|lt /=dL=
4675
34.08
50 ;]=dL= *fold^/
k|lt /=dL=
5225
34.09
60 ;]=dL= *fold^/
k|lt /=dL=
6270
34.1
70 ;]=dL= *fold^/
k|lt /=dL=
7920
34.11
75 ;]=dL= *fold^/
k|lt /=dL=
9020
34.12
80 ;]=dL= *fold^/
k|lt /=dL=
10120
34.13
90 ;]=dL= *fold^/
k|lt /=dL=
11495
34.14
k|lt /=dL=
12760
34.15
k|lt /=dL=
14960
34.16
k|lt /=dL=
22000
15 ;]=dL= *fold^/
k|lt /=dL=
688
34.18
20 ;]=dL= *fold^/
k|lt /=dL=
825
34.19
25 ;]=dL= *fold^/
k|lt /=dL=
935
34.20
30 ;]=dL= *fold^/
k|lt /=dL=
1100
34.22
40 ;]=dL= *fold^/
k|lt /=dL=
1815
34.23
45 ;]=dL= *fold^/
k|lt /=dL=
2145
34.24
50 ;]=dL= *fold^/
k|lt /=dL=
2255
34.25
60 ;]=dL= *fold^/
k|lt /=dL=
3630
34.26
70 ;]=dL= *fold^/
k|lt /=dL=
3850
34.27
75 ;]=dL= *fold^/
k|lt /=dL=
4290
34.28
80 ;]=dL= *fold^/
k|lt /=dL=
4730
34.29
90 ;]=dL= *fold^/
k|lt /=dL=
5610
34.30
k|lt /=dL=
6710
34.31
k|lt /=dL=
7590
34.32
k|lt /=dL=
12540
34.33
35
k|lt uf]^f
;*s ;DjlGw
k|lt j=dL=
95.00
k|lt s]=hL=
75.00
35.03
k|lt s]=hL=
35.04
k|lt s]=hL=
68.15
35.05
k|lt s]=hL=
320.00
35.06
k|lt uf]^f
766.00
35.07
Thermoplastic Paint
k|lt s]=hL=
249.00
35.08
Glass Bit
k|lt s]=hL=
242.00
35.09
k|lt /f]n
5420.00
35.10
Cats Eye
k|lt uf]^f
596.00
35.01
35.02
32+1/14
l;=g+=
PsfO{
cf=j=
07.07 sf]
b//]^
35.11
Solar Lead Street Light (Single Arm) with 12 watt Lead Battery
k|lt uf]^f
86720.00
35.12
Solar Lead Street Light (Single Arm) with 12 watt * 2 Lead Battery
k|lt uf]^f
114904.00
36
36.01
k|lt ;]^
600
36.02
k|lt ;]^
1500
36.03
k|lt ;]^
3000
36.04
k|lt uf]^f
3250
36.05
k|lt uf]^f
1200
36.06
k|lt uf]^f
1500
37
o'/Lgn Un]H*
37.01
k|lt uf]^f
950
37.02
k'?if Nano
k|lt uf]^f
1200
37.03
k|lt uf]^f
1200
37.04
dlxnf 9 "
k|lt uf]^f
1000
38
jf; a];Lg
800
38.01
k|lt uf]^f
38.02
k|lt uf]^f
950
k|lt ;]^
1100
38.03
39
lsr]g l;+s
39.01
k|lt uf]^f
1250
39.02
k|lt uf]^f
1600
39.03
k|lt uf]^f
2150
40
^fon
40.01
k|lt a=lkm=
60
40.02
k|lt a=lkm=
90
40.03
k|lt a=lkm=
47
41
dfa{n
41.01
k|lt a=lkm=
140
41.02
k|lt a=lkm=
280
41.03
k|lt a=lkm=
350
41.04
dfa{n lrK;
s]=hL=
13
41.05
dfa{n kfp*/
s]=hL=
10
42
km]G;L ^fjn /*
42.01
k|lt uf]^f
440
42.02
k|lt uf]^f
220
43
k|lt uf]^f
125
44
k|lt uf]^f
460
45
k|lt uf]^f
440
46
46.01
k|lt uf]^f
500
46.02
k|lt uf]^f
275
46.03
k|lt uf]^f
525
46.04
k|lt uf]^f
525
46.05
k|lt uf]^f
525
47
47.01
k|lt uf]^f
420
47.02
0.75" *fold^/
k|lt uf]^f
525
47.03
1 " *fold^/
k|lt uf]^f
840
33+1/14
l;=g+=
47.04
48
48.01
PsfO{
cf=j=
07.07 sf]
b//]^
k|lt uf]^f
1470
k|lt uf]^f
1800
48.02
o'lg;]km df]*]n
k|lt uf]^f
6300
48.03
23 s]=hL= x]*
k|lt uf]^f
3150
48.04
21 s]=hL= x]*
k|lt uf]^f
2950
;fwf/)f 14 s]=hL=
k|lt uf]^f
1980
48.05
49
49.01
k|lt uf]^f
4725
49.02
k|lt uf]^f
8243
49.03
k|lt uf]^f
2048
49.04
k|lt uf]^f
3098
49.05
k|lt uf]^f
9975
49.06
k|lt uf]^f
24885
50
50.01
vfg]kfgL ^\ofG
kf]lnlyg kfgL ^\ofG ;fwf/)f
k|lt ln^/
50.02
k|lt ln^/
10
50.03
k|lt ln^/
27
50.04
:^]gn]; :^Ln kfgL ^\ofGs 1000 ln= jf ;f] eGbf a(L Ifdtfsf]
k|lt ln^/
17
51
//f]ug
51.01
r'gf
k|lt s]=hL=
17
51.02
k|lt s]=hL=
47
51.03
u'b km]ljsf]n
k|lt s]=hL=
126
51.04
rk|f rf}/L
k|lt s]=hL=
1213
51.05
sf]N^f/
k|lt s]=hL=
32
51.06
k'l^g
k|lt s]=hL=
53
51.07
^f/lkg t]n
k|lt ln=
116
51.08
O{gfd]n
k|lt ln=
446
51.09
k|fO{d/
k|lt ln=
263
51.10
k|lt ln=
420
51.11
jf;]jn l*:^]Dk/
k|lt ln=
158
51.12
k|lt ln=
566
51.13
k|lt s]=hL=
16
51.14
k|lt ln=
92
51.15
jfg{];
k|lt ln=
158
51.16
;/];
k|lt ln=
208
51.17
cfNd'lgod k]G^
k|lt ln=
473
51.18
/]* cS;fO{*
k|lt ln=
263
51.19
jf^/k'|km sDkfp)*
51.20
;]kmls|^
52
k|lt s]=hL=
81
k|lt ln=
263
52.01
k|lt yfg
30
52.02
53
k|lt yfg
40
53.01
6 lkm^ nfdf]
k|lt yfg
963
53.02
7 lkm^ nfdf]
k|lt yfg
1100
34+1/14
l;=g+=
PsfO{
cf=j=
07.07 sf]
b//]^
8 ld^/ nfdf]
k|lt yfg
6380
53.04
9 ld^/ nfdf]
k|lt yfg
7040
53.05
11 ld^/ nfdf]
k|lt yfg
13970
54
laB"t / afo/L
()
()
()
()
()
dL
dL
dL
dL
dL
sf]
sf]
sf]
sf]
sf]
/f]n
/f]n
/f]n
/f]n
/f]n
54.01
54.02
54.03
54.04
54.05
54.06
k|lt KjfO{G^
55
54.07
k|lt KjfO{G^
40
55
1200
1900
2712
4410
1000
l;+rfO ;DaGwL
l*h]n kDk;]^ -lsnf]{;s/ jf ;f] ;/x_
kDk;]^ -1500 cf/=lk=Pd=_ -^nL, a])*, lgKKfn, s'ln kfO{k ;d]t
sdlKn^ ;]^_ Eof^ gnfUg]
55.01
k|lt ;]^
52000
55.02
k|lt ;]^
52000
55.03
k|lt ;]^
56000
k|lt ;]^
16000
55.05
k|lt ;]^
21000
55.06
k|lt ;]^
34900
55.07
k|lt ;]^
46000
55.08
k|lt ;]^
33000
55.09
k|lt ;]^
42500
56
l(sL kDk
k|lt yfg
1250
57
57.01
k|lt uf]^f
7.50
57.02
k|lt uf]^f
16.00
58
58.21
k|lt #=lkm=
16.75
58.22
k|lt #=lkm=
21.50
58.23
k|lt ;f]/xL
345.00
58.24
k|lt s]=hL=
300.00
0.00
s_ :^Dk sl^
58.25
58.26
1_ l^s
k|lt uf]^f
7.75
2_ cGo hft
k|lt uf]^f
5.40
0.00
kf]nLyLg y}nf]df
58.27
59
1_ l;/L;, jsfOgf], skf;, d;nf, l;dn, jj'/, sf+luof], Olkn,^f+sL, sf]O/fnf] cflb
-kf]nLlyg y}nf]df_
k|lt uf]^f
k|lt uf]^f
9.30
k|lt uf]^f
14.75
k|lt uf]^f
135.00
l;+rfO{ ;DaGwL
35+1/14
7.15
l;=g+=
59.01
59.02
59.03
59.04
59.05
PsfO{
cf=j=
07.07 sf]
b//]^
ld^/
1100
ld^/
715
s]=lh=
237
;]^
10450
;]^
20900
59.06
;]^
31900
59.07
;]^
41800
59.08
60
la^'ldg k])^
ln^/
160
('jfgL ;+aGwL
1_ law't ;DaGwL ("jfgL
^fG;kmd{/ 25 s]=eL=P= b]vL 200 s]=eL=P= ;Dd
60.01
g=kf= leq
k|lt yfg
900
60.02
g=kf= aflx/
k|lt yfg
1800
5 ls=ld= ;Dd
60.03
kfO{ksf]
d'Nodf yk k|
ltzt
kfO{ksf]
d'Nodf yk k|
ltzt
10
10 ls=ld= ;Dd
kf]nsf] d'Nodf
yk k|ltzt
60.7
5 ls=ld= ;Dd
kf]nsf] d'Nodf
yk k|ltzt
60.09
60.10
61
61.01
61.02
61.03
10
k|lt 50
s]=hL= s:tL
af]/f
25 s]=hL s:tL
"
36+1/14
k|lt 50
s]=hL= s:tL
af]/f
4.50
2.50
4.50
l;=g+=
61.04
61.05
"
61.07
25 s]=hL s:tL
"
61.06
"
"
k|lt 25
s]=hL= s:tL
af]/f
k|lt 50
s]=hL= s:tL
af]/f
"
k|lt 25
s]=hL= s:tL
af]/f
61.08
PsfO{
k|lt 50
s]=hL= s:tL
af]/f
"
cf=j=
07.07 sf]
b//]^
2.50
3.00
3.00
2.00
3.00
61.09
k|lt uf]bfd
120.00
61.10
k|lt uf]^f
0.70
61.11
k|lt 100
s]=hL=
23.00
61.12
Ps ^+sL -15
nL=_
125.00
61.13
k|lt n^
250.00
61.14
61.15
62
k|lt 25
s]=hL= s:tL
af]/f
nf]l*+u
k|lt 25
s]=hL= s:tL
af]/f
cgnf]l*+u
4.00
4.00
62.01
set
375
62.02
1*40 watt Tube light mirror optic wipro / philips HPF or eqvt.
set
3700
62.03
1*40 watt Tube light box type wipro /philips HPF or eqvt.
set
1050
62.04
2*40 watt mirror optic Tube light wipro / philips HPF or eqvt.
set
4500
62.05
set
380
62.06
Indicator light for O.T.room red & green color etc all complete.
set
90
62.07
set
215
set
2400
62.09
set
2000
set
215
62.11
set
185
62.12
set
195
37+1/14
l;=g+=
PsfO{
cf=j=
07.07 sf]
b//]^
62.13
set
450
62.14
set
480
62.15
set
625
62.16
set
650
62.17
set
215
62.18
Junction box made of metal withcover size 6"*4" etc all complete
set
100
Accessories: screws,grips,nut,bolt,cu bus bar,earth bus bar, neutral bus bar, fuse,
porcelin base, cu strip for connection, cable shoe, phase bar, pvc tape etc all
complete
panel board made of mild steel sheet double cover floor mount suitable color push
type lock size 12" *36" *48" suitable for housing the following items all complete
(space for 4 no MCCB)
set
20790
62.20
62.21
no
4500
no
3900
62.22
62.23
Ammeter 0-500A
no
500
no
500
62.24
62.25
no
600
no
150
62.26
Selector switch
set
450
62.27
Distribution board 8 way TPN made of mild steel sheet double cover locable of
approved compny .Flush type etc all complete
set
3500
62.28
6,16, 25 Amps TP MCCB of approved company for light and power circuit
no
2250
62.29
no
2750
62.30
D ) PANEL BOARD / DB
62.19
1150
E ) POINT WIRING
Accessories;HDPEpolythenepipe,screws,pvc, tape, grips, circular box etc all
complete
62.31
2*3/20 pvc cu.wire for light and fan point 1/2" HDPE polythene pipe
point
375
62.32
point
600
62.33
2*7/22+1*3/22 pvc cu.wire for power point in 3/4" in HDPE polythene pipe
2*7/20+1*3/22 pvc cu. Wire with A / C socket in 3/4" in HDPE polythene pipe for
A/C etc all complete
point
1700
62.34
10mm sq.4 core unarmoured copper cable for DB in HDPE polythene pipe or
through channel etc all complete
R.M.
300
62.35
8 swg cu.wire in HDPE polythene pipe for earth continuity from panel board to DB
etc all complete
R.M.
65
F ) TELECOM SYSTEM
Accessories;HDPE pipe screws,pvc tape grips etc all complete
62.36
point
272
62.37
5 pair telephone cable for main in (25mm) HDPE polythene pipe from junction box
to telephone DB
meter
31
62.38
10 pair telephone cable for mainin (25mm) HDPE polythene pipe/ cable tray
meter
40
62.39
point
62
62.40
point
80
62.41
set
336
62.42
Telephone junction box6"*8" made of mild steel sheet with connector fuse type etc
all complete
set
120
38+1/14
PsfO{
cf=j=
07.07 sf]
b//]^
set
1680
set
31600
unit
8000
sq.ft
510
sq.ft
540
sq.ft
576
sq.ft
540
sq.ft
600
sq.ft
696
sq.ft
600
sq.ft
660
sq.ft
360
sq.ft
131
sq.ft
137
R.ft.
363
R.ft.
477
Sq.Ft
587
l;=g+=
62.43
62.44
Main DB made of mild steel sheetwith connector fuse typeetc all complete
Matrix portion 308 EPABX systemexpandable 3 co line 8 single line extension,
automatic STD,ISD lock call duration control external call forwardingor eqvt
G ) EARTHING
62.45
63
63.01
63.02
63.03
63.04
63.05
63.06
63.07
63.08
63.09
64
Earthing with cu.plate size 65cm*65cm*3.15mm with G.N.8 copper wire for earth
continuity from panel board to earthing site etc all complete
Aluminium Windows/Door/Partition
UPVC Roofing
64.01
64.02
64.03
3 MM Thick Composite Carbon Fibre UPVC Ridge Cover Sheet (Regular Profile)
64.04
3 MM Thick Composite Carbon Fibre UPVC Ridge Cover Sheet (Tile Profile)
65
65.01
UPVC Door/Windows
UPVC Sliding Windows Frame (80/50mm), Sliding window sash (38/62mm) with
net all complete inside 1.5 mm galvanized reinforcement, 5 mm clear glass (white
colour) including the cost of materials and labour and fixing and fitting all complete
39+1/14
l;=g+=
65.02
UPVC Door Frame (80/50mm), door frame 112/42 mm door sash 80*200mm
pannel, inside 1.5 mm galvanized reinforcement, 5 mm clear glass (White colour)
including the cost of materials and labour and fixing and fitting all complete
65.03
65.04
66
PsfO{
cf=j=
07.07 sf]
b//]^
Sq.Ft
604
Sq.Ft
604
Sq.Ft
719
66.01
R.ft
81
66.02
R.ft
109
66.03
R.ft
144
66.04
Stainless Steel Railing with 2" dia top, 1.5" dia middle and bottom pipe in 4 rows
total, 2" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete
R.ft
1470
66.05
Stainless Steel Railing with 2" dia top, 1" dia middle and bottom pipe in 4 rows
total, 2" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete
R.ft
1208
66.06
Stainless Steel Railing with 2" dia top, 1" dia middle and bottom pipe in 3 rows
total, 2" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete
R.ft
1076
Stainless Steel Railing with 1.5" dia top, 1" dia middle and bottom pipe in 3 rows
total, 1.5" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete
R.ft
945
66.07
67
67.01
Grader ( 80 to 145 HP )
k|lt #)^f
1600
67.02
k|lt #)^f
400
67.03
k|lt #)^f
6810
67.04
Asphalt Paver
k|lt #)^f
1400
67.05
k|lt #)^f
1000
67.06
k|lt #)^f
260
67.07
k|lt #)^f
250
67.08
k|lt #)^f
2100
67.09
k|lt #)^f
2000
67.10
Bitumin Distributor ( 4 to 6 KI )
k|lt #)^f
1300
67.11
Bitumin Heater ( Up to 2 KL )
k|lt #)^f
140
67.12
k|lt #)^f
1200
67.13
k|lt #)^f
1800
67.14
k|lt #)^f
1000
67.15
k|lt #)^f
1200
67.16
k|lt #)^f
1500
67.17
Backhoe Loader ( UP to 85 HP )
k|lt #)^f
1000
67.18
k|lt #)^f
200
67.19
k|lt #)^f
500
67.20
Roller Pneumatic ( up to 20 to )
k|lt #)^f
1200
67.21
k|lt #)^f
110
67.22
k|lt #)^f
550
67.23
k|lt #)^f
900
67.24
k|lt #)^f
1500
67.25
Water Tanker ( Up to 6 KL )
k|lt #)^f
550
40+1/14
l;=g+=
PsfO{
cf=j=
07.07 sf]
b//]^
67.26
k|lt #)^f
130
67.27
Tractor
k|lt #)^f
300
67.28
Trailor
k|lt #)^f
67.29
Truck / Tipper 8 Mt
k|lt #)^f
140
680
67.30
Truck / Tipper 6 Mt
k|lt #)^f
525
67.31
Truck / Tipper 5 Mt
k|lt #)^f
450
67.32
MIni Truck
k|lt #)^f
315
67.33
k|lt #)^f
1200
67.34
k|lt #)^f
3000
67.35
Vibrator (Needle)
k|lt #)^f
100
67.36
Vibrator (Engine)
k|lt #)^f
120
600
68
68.01
k|lt uf]^f
68.02
k|lt uf]^f
800
68.03
k|lt uf]^f
1000
/=lkm=
225
/=lkm=
225
/=lkm=
450
69.00
69.01
69.02
69.03
69
ljlaw
69.01
h}
k|lt s]=lh=
100
69.02
al;{d
k|lt s]=lh=
320
69.03
e]r
k|lt s]=lh=
180
69.04
l^of];]G^L
k|lt s]=lh=
140
69.05
afh/f
k|lt s]=lh=
120
69.06
;"*fg
k|lt s]=lh=
140
69.07
:^fOnf] s"s
k|lt s]=lh=
700
69.08
:^fOnf] xdf^f
k|lt s]=lh=
400
69.09
d"nf^f] ?^ l:nk
k|lt s]=lh=
69.10
kf:kfnd ?^ l:nk
k|lt s]=lh=
gf]^M
? dfly pNn]lvt b//]^df d"No clea[l$ s/ -VAT_ ;dfj]z ul/Psf] %}g\ .
?
^s eGgfn]
Ifdtfsf]
lgdf{)f ;fdfu|L
ug]{nfO{
hgfp+% .cflwsf/Ls b//]^ cg";f/
? Ps
g]kfndf
pTkfbg 175
x"g]#=lkm=
cGo kfO{k
/ lkml^;x?sf]
xsdf cf];f/k;f/
g]kfn u")f:t/
k|fKt sf/vfgfsf]
x"g]% .
? dfyL gk/]sf cfO{^dx?sf b//]^sf xsdf k|rlnt sfg'gsf k|lqmof cg";f/ b//]^ sfod ug{ ;lsg]% .
kbflwsf/L
k|=lh=c= >L lji)f" k|;fb (sfn
- cWoIf
- ;b:o
- ;b:o
41+1/14
l;=g+=
42+1/14
PsfO{
cf=j=
07.07 sf]
b//]^
sfdbf/sf] lsl;d
HofdL ;fwf/0f
;j]{ x]Nk/r]gd]g
KnDa/ x]Nk/
PsfO{
k|lt
JolQm
k|lt lbg
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
cf=j=
072.073 sf]
Hofnf b/
650
440
430
430
480
430
430
430
430
10
11
12
13
14
15
16
;jf/L x]Nk/
17
sDKo'6/ ck/]6/
18
cl;i6]06 ;aO{lGhlgo/
19
;aO{lGhlgo/
20
O{lGhlgo/
21
cg'alGwt HofdL
285
@gf]6 M
pk/f]Qm kbsf sfdbf/x? afx]s cGo kbx?df Hofnfbf/Ldf sfd u/fpg]
ePdf h'g kbdf sfd u/fpg] xf] ;f] sf] g]kfn ;/sf/sf] z'? tnanfO{ cfwf/
dfgL b}lgs Hofnf sfod ug]{ .
43/14
430
480
430
335
455
590
380
505
590
700
960
Number /m3
wastage@ 4%
0.001378944 m3
0.001850 m3
110
60 mm3
0.001485
120
70 mm3
0.001974
540
27
567
506
25.3
531.3
As per normes
Chimney
Machine
560
take
530
530
per
sq.m.
Unit
m.d.
m.d.
Lit
kg
a) in wall
per
sq.m.
Skilled
Unskilled
Primer
Plastic Emulsion
Sub-Total
Contract Rate
Unit Rate per
Quantity
15.000
10.000
8.10
16.00
U.Rate
650.00
430.00
400.00
1.15
Item No.
1
100
Norms-13(5)
2 coat Emulsion painting in wall
Contract
Descript.
Skilled
Unskilled
Primer
Plastic Emulsion
Sub-Total
Contract Rate
sq.m.
m.d.
m.d.
Lit
kg
12.000
8.000
8.10
16.00
1.15
sq.m.
Amount
9750.00
4300.00
0.00
6400.00
20450.00
23517.50
204.50
650.00
430.00
400.00
7800.00
3440.00
0.00
6400.00
17640.00
20286.00
176.40
F/Y 2072.73
Rate/kg
228.00
Unit Weight
(kg/m.)
Outer Dia.
(in mm)
Rate
(with out
vat and
transportation)
2.5 kg/cm2
16
20
25
32
40
50
63
75
90
110
125
140
160
180
200
225
250
280
315
355
400
1.530
1.897
2.453
3.148
3.875
4.822
6.012
7.471
9.417
11.957
15.281
Unit Weight
(kg/m.)
348.84
432.52
559.28
717.74
883.50
1099.42
1370.74
1703.39
2147.08
2726.20
3484.07
Rate
(with out
vat and
transportation)
kg/cm2
0.251
0.378
0.585
0.846
1.220
1.703
2.289
2.901
3.773
4.762
5.890
7.445
9.187
11.455
14.508
18.382
23.342
Unit Weight
(kg/m.)
57.23
86.18
133.38
192.89
278.16
388.28
521.89
661.43
860.24
1085.74
1342.92
1697.46
2094.64
2611.74
3307.82
4191.10
5321.98
Rate
(with out
vat and
transportation)
kg/cm2
0.226
0.350
0.542
0.850
1.191
1.715
2.454
3.293
4.150
5.355
6.800
8.391
10.544
13.041
16.327
20.694
26.243
33.309
Unit Weight
(kg/m.)
Rate
(with out
vat and
transportation)
10 kg/cm2
51.53
79.80
123.58
193.80
271.55
391.02
559.51
750.80
946.20
1220.94
1550.40
1913.15
2404.03
2973.35
3722.56
4718.23
5983.40
7594.45
0.092
0.134
0.202
0.334
0.514
0.796
1.269
1.782
2.568
3.801
4.962
6.209
8.079
10.256
12.620
16.014
19.757
24.708
31.160
39.635
50.344
20.98
30.55
46.06
76.15
117.19
181.49
289.33
406.30
585.50
866.63
1131.34
1415.65
1842.01
2338.37
2877.36
3651.19
4504.60
5633.42
7104.48
9036.78
11478.43
skilled
unskilled
helper
650.00
430.00
430.00
1.5"
0-20
20-30
30-40
40-50
50-60
60-70
2.50
1.85
2.50
3.50
4.50
5.50
650.0
650.0
650.0
650.0
650.0
650.0
1625.00
1202.50
1625.00
2275.00
2925.00
3575.00
4.0
3.0
4.0
6.0
8.0
10.0
430.0
430.0
430.0
430.0
430.0
430.0
1720.0
1290.0
1720.0
2580.0
3440.0
4300.0
8.0
6.0
8.0
12.0
16.0
20.0
430.0
430.0
430.0
430.0
430.0
430.0
3440.0
2580.0
3440.0
5160.0
6880.0
8600.0
: 1. 4"
2.
6785.00
5072.50
6785.00
10015.00
13245.00
16475.00
6785.00
11857.50
18642.50
28657.50
41902.50
58377.50
..
3345.00
5837.50
9182.50
14037.50
20402.50
28277.50
3440.0
6020.0
9460.0
14620.0
21500.0
30100.0
167.25
194.58
229.56
280.75
340.04
403.96
172.00
200.67
236.50
292.40
358.33
430.00
0-20
0-30
0-40
0-50
0-60
0-70
m
m
m
m
m
m
..
..
..
..
..
..
..
..
..
..
..
..
10
11
12
13
14
15
1450
20
2.500
4.140
5.000
0.210
0.254
0.298
0.344
0.386
0.044
0.221
1450
30
2.690
4.480
5.380
0.204
0.246
0.289
0.332
0.375
0.043
0.214
1600
25
2.340
3.900
4.690
0.221
0.267
0.313
0.370
0.406
0.046
0.232
1450
35
2.790
4.650
4.580
0.221
0.267
0.313
0.370
0.406
0.046
0.232
1600
30
2.440
4.060
4.870
0.204
0.246
0.289
0.332
0.375
0.043
0.214
1450
40
2.890
4.830
5.790
0.221
0.267
0.313
0.360
0.406
0.046
0.232
1000
35
4.050
6.750
8.100
0.221
0.267
0.313
0.360
0.406
0.046
0.232
2400
40
1.750
2.920
3.500
0.221
0.267
0.313
0.370
0.406
0.046
0.232
2400
50
1.880
3.130
3.760
0.221
0.267
0.313
0.370
0.406
0.046
0.232
1200
2000
2400
0.221
0.267
0.313
0.370
0.406
0.046
0.232
3 ..
0.168
0.203
0.238
0.274
0.306
0.035
0.176
10
11
12
13
14
15
....
16
..
.
..