District Technical Office Rupandehi

CONSTRUCTION MATERIAL COST AT SITE Using 8 MT capacity truck (DOR pg 8-9)


Reference Bhairahawa

Fill yellow colored cell only

430.00

Speed corresponding to
road condition KMPH

Sand

3
Crusher

m3

3a Gravel

Bhumai

30

3b river shingle/round agg

Crusher

m3

3c broken stone aggregates

Crusher

2a Sand (local)

Total

Earthen

Unit
Gravel

Source

BT

Item

Water Pump (NRs per Hr)

70.80

680

200

650
LEAD (KM)

S.N.

Truck (NRs per Hr)

Black Gravel Earthe


top at at 20 n at 10
40
Kmph Kmph
Kmph speed speed
speed
40
20
10

Total
Travel
Time

Resources

Labour
(Unit : mandays)
Unskilled Skilled
qty
qty

12

13

Equipments
(Type :Truck for
transportation
Unit : Hr )

Amount

Qty

Amount

Qty

Amount

14=12*B6+
13*I6

15

16=15*M6

17

18=17*Q6

10

11

0.13

0.00

0.00

0.25

0.30

129.00

0.43

30.09

0.13

Total
Transportati
on cost

19=14+16+18

88.40

247.49
247.49

Labour Unskilled

Md

Amount

20

21=20*B6

0.00

0.13

0.00

0.00

0.25

0.30

129.00

0.43

30.09

0.13

88.40

31

0.75

0.00

0.10

1.70

0.50

215.00

3.57

252.74

0.39

266.56

734.30 0.50

0.13

0.00

0.00

0.25

0.50

215.00

0.53

37.17

0.16

108.80

m3

0.13

0.00

0.00

0.25

0.50

215.00

0.53

37.17

0.16

Boulder, Cobbles, quarry


Bhumai
stone

m3

30

31

0.75

0.00

0.10

1.70

0.50

215.00

4.59

324.96

Cement

Ton

0.03

0.00

0.00

0.05

0.40

172.00

0.08

Reinforcement Steel and gabion wire


Ton

a Reinforcement Steel

Bhairahwa

Collection cost

Materials
(Type :Fuel ,
Unit : Lit )

Contract

Cap of Truck (MT)

Royalties

Skilled Labour (NRs per md)

Unskilled Labour Cost (NRs Per mandays)

Diesel (NRs per Lit)

T=2(8+9+10)

Name of Project :

22
0.00

Material
Basic
Cost
Material
including
Cost
transportati
including
on and
royalties
royalties

23=21+22

0.00

24=19+23

247.49

0.00

0.00

0.00

247.49

221.45

158.76

380.21

1114.51

360.97

0.00

0.00

0.00

360.97

108.80

360.97

0.00

0.00

0.00

360.97

0.51

349.86

889.82

442.90

158.76

601.66

1491.48

5.31

0.10

65.28

242.59

242.59

1.00

0.03

0.00

0.00

0.05

0.60

258.00

0.08

5.31

0.10

65.28

328.59

328.59

11 Timber for temporary works

0.00

0.00

0.00

0.00

0.30

129.00

0.00

0.00

0.08

56.10

0.00

0.00

Fabricated Structural
12 Timber

m3

0.00

0.00

0.00

0.00

0.50

215.00

0.00

0.00

0.19

127.50

0.00

0.00

0.03

0.00

0.00

0.05

0.40 4.00 2772.00

0.08

5.31

0.16

106.08

2883.39

2883.39

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.09

61.20

0.00

21.24

0.11
0.05

77.52
10.00

Bhairahwa

13 Fabricated Structural Steel Bhairahwa

Ton

14 RCC Precast Element

Ton

17 Water

1000 Lit

0.00

0.10

0.00

0.20

0.10 0.01

430.00
49.50

0.30

158.26

0.00
158.26

Royalty =NRs 4/cft, River Entry fee = NRs.50/100 cft

Prepared by

Checked By

Approved by

TRUCK HIRING COST 21(2) page 146-149

Truck hiring cost per hour

525.0

Cost of truck of 6 m.t. capacity


Total working hours

a
b

...
...

Working hours per year

...

a/b

...

...

Insurance cost per hour

0.02 a/c

...

...

Interest tax per hour

0.01 a/c

...

...

...

...

1. Ownership cost
Depreciation cost per hour

Sub total of 1

2. Operation cost
A. Maintenance cost per hour
Overhauling cost

0.55 a/b

...

...

Repair and maintenance cost

0.23 a/b

...

...

...

...

Sub total of A
B. Net operationg cost per hour
i) Fuel and lubrication cost
H.S. Diesel

@ 5.5 lit/hr

...

...

389.38

Mobil

@0.1 lit/hr

...

...

59.20

Gear oil

@0.03 lit/hr

...

...

17.26

Grease

@0.015 Kg/hr

...

...

8.30

...

...

474.14

Sub total of i
ii) Spare parts
Life span of tyres

L hrs

Cost of one tyre

T Rs

Cost of tyres per hour

6T/L

Other Lump sum

2000
14500
...

approx 8% of 6T/L

Sub total of ii

...

...
...
...

iii) Salary
Working hours, hrs.

Driver (Wages per day/8)

...

...

Helper (Wages per day/8)

...

...

...

...

Sub total of iii

...

iv) Improvement and other minor repair expenses, apporx 25% of (0.23a/b)
Sub total of B ( i +ii + iii + iv )

...

...

Sub total 2 per hour ( A + B )

...

...

3. Supervision and overhead expenses per hour


Sub total of 3

0.05 a/c
...

...

TOTAL TRANSPORTATION COST per hour, H= (1 + 2 + 3)

999.14

MATERIAL TRANSPORTATION COST


Unskilled Labour

...

430.00

Time per trip by truck = (2*distance/speed + loading & unloading time)


Loading and unloading time = 0.75
1. BRICKS
Distance average, km

Time (T), hrs

Load unloading coefficient, K

0.00

Capacity of truck per trip, nos. of bricks


Transportation cost (H*T)

0//

0.00
0.000
2400.00

0.00

For 1000 nos. of bricks (H*T/2400*1000)

0.00

Load. & unload. cost (K*unskill. labour wage/day)

0.00

Per thousand

0.00

Per unit brick

0.00

2. STONE
Distance average , km
Time (T), hrs

31.00

30//1

2.45

Load unloading coefficient, K

1.602

Capacity of truck per trip, cu.m.

3.50

Transportation cost (H*T)

For 1cu.m. (H*T/3.5)

2447.89
699.40

Load. & unload. cost (K*unskill. labour wage/day)

688.86
Per 1 cu.m.

3. CEMENT
Distance average , km

1.00

0.221

Transportation cost (H*T)

799.31

For 1m.t. (H*T/6)

Time (T), hrs

1388.26

Load unloading coefficient,K

1//

0.80

Capacity of truck per trip, m.t.

6.00
133.22

Loading & unloading cost (K*unskilled labour wages/day)

95.03

Per m.t.
4. REINFORCEMENT
Distance average, km
Time (T), hrs

228.25
1.00

1//

0.80

Load unloading coefficient, K

0.221

Truck capacity per trip, m.t.

6.00

Transportation cost (H*T)

799.31

For 1m.t. (H*T/6)

133.22

Loading & unloading cost (K*unskilled labour wages/day)

95.03

Per m.t.
5. SAL WOOD
Distance average, km
Time (T), hrs

228.25
0.00

0.00

Load unloading coefficient, K

0.000

Truck capacity per trip, m.t.

6.00

Transportation cost (H*T)

0.00

For 1m.t. (H*T/6)

0.00

Loading & unloading cost (K*unskilled labour wages/day)


Density of sal (d), kg/cu.m.

//

Trans. cost of 1 cum. (tran cost of 1mt*d/1000)

0.00
850.00

Per m.t.

0.00

Per cu.m.

0.00

7. BITUMEN
Distance average, km
Time (T), hrs

5.00

1.00

Load unloading coefficient, K

0.406

Capacity of truck per trip, m.t.

6.00

Transportation cost (H*T)

For 1m.t. (H*T/6)

999.14
166.52

Load. & unload. cost (K*unskill. labour wage/day)

174.58

Per m.t.

341.10

Per kg

0.34

8. RIVER AGGREGATE (10 mm, 20mm & 40mm)


Distance average, km
Time (T), hrs

5.00

5//

1.00

Load unloading coefficient, K

0.406

Capacity of truck per trip, cu.m.

4.69

Transportation cost (H*T)

For 1cu.m. (H*T/4.69)

999.14
213.04

Load. & unload. cost (K*unskill. labour wage/day)

174.58
Per cu.m.

...

387.62

11. BROKEN AGGREGATE (crushed)


Distance average, km
Time (T), hrs

5.00

1.00

Load unloading coefficient, K

0.375

Capacity of truck per trip, cu.m.

4.87

Transportation cost (H*T)

For 1cu.m. (H*T/4.87)

999.14
205.16

Load. & unload. cost (K*unskill. labour wage/day)


Price of 1cu.m. river aggregate
Per cu.m.

5//

161.25
...

...

Per cu.m.

...

366.41

12. SAND(Coarse)
Distance average, km
Time (T), hrs

5.00

5//

1.00

Load unloading coefficient, K

0.375

Capacity of truck per trip, cu.m.

5.38

Transportation cost (H*T)

For 1cu.m. (H*T/5.38)

999.14
185.71

Load. & unload. cost (K*unskill. labour wage/day)


Price of 1cu.m. sand

161.25

Per cu.m.

...

346.96

12. SAND(Local)
Distance average, km
Time (T), hrs

5.00

5//

1.00

Load unloading coefficient, K

0.375

Capacity of truck per trip, cu.m.

5.38

Transportation cost (H*T)

For 1cu.m. (H*T/5.38)

999.14
185.71

Load. & unload. cost (K*unskill. labour wage/day)


Price of 1cu.m. sand

161.25

Per cu.m.

...

346.96

14. Gravel
Distance average, km
Time (T), hrs

30//1

2.45

Load unloading coefficient, K

1.602

Capacity of truck per trip, cu.m.

4.69

Transportation cost (H*T)

For 1cu.m. (H*T/4.69)

Load. & unload. cost (K*unskill. labour wage/day)


Price of 1cu.m. sand

31.00

...

2447.89
521.94
688.86

Per cu.m.

1210.80

Ministry of Fedaral Affairs and Local DevelopmentOffice

of District Development CommitteeDistrict

FY 072/73

Summary of RATE of CONSTRUCTION MATERIALS

Technical OfficeRupadehi

Mode
Normes for Transportation

Name of the Project :


S.N. Description

Contract
DOR

Reference Bhairahawa
Unit

Rate

S.N.

A. LABOUR RATE

Description

Unit

43 Bricks 1st class incl. Transport


m.d.

TranspDOR

Basic

no.

12.80

Rate Incl
Transp
0

12.80

Lead
B/G/E
0//

Skilled (carpenter, mason, Plumber)

650.00

44

Stone

cu.m.

601.66

889.81

1491.47 30//1

Painter

"

650.00

45

Aggregate 10 mm

cu.m.

1234.80

360.96

1595.76

5//

Unskilled

"

430.00

46

Aggregate 20mm

cu.m.

1587.60

360.96

1948.56

5//

Helper

"

430.00

47

Aggregate 40mm

cu.m.

1587.60

360.96

1948.56

5//

48

Gravel 10 mm

cu.m.

1234.80

360.96

1595.76

5//

49

Gravel 20mm

cu.m.

1622.88

360.96

1983.84

5//

645.60

50

Gravel 40mm

cu.m.

1587.60

360.96

1948.56

5//

12.70

51

Natural gravel

cu.m.

380.21

734.3

215.20

52

Coarse Sand

cu.m.

1587.60

247.48

1835.08

5//

190

53

Sand Local

cu.m.

705.60

247.48

953.08

5//

B. MATERIAL RATE
5

Glass - 4mm

sq.m.

Wooden Listi

Rm.

Commercial plywood - 4 mm

sq.m.

Bamboo

Porcelin Glazed wall tile (Indian)

sq.m.

505.72

54

Transported soil in village

cu.m.

221.76

221.76

10 Porcelin Glazed floor tile (Indian)

pc

1114.51 30//1

sq.m.

645.60

55

Transported soil in Si. Na. Pa.

cu.m.

362.88

362.88

11 Hinges 3"

no.

18.00

56

Sal wood

cu.m.

167580.00

167580.00

//

12 Hinges - 4"

no.

24.00

57

Sisam wood

cu.m.

88200.00

88200.00

//

13 Bolts - 4"

no.

26.00

58

Kukath

cu.m.

39337.20

39337.20

//

14

1//

no.

41.00

59

Cement OPC(NEP)

bag

15 Holdfast*

no.

15.00

60

Cement OPC(NEP)

bag

620.00

12.12

632.12

16 Lock Rollan

no.

572.00

61

Cement OPC(NEP)

m3

18600.00

363.88

18963.88

17 Handle Almumium

no.

32.00

62

Cement OPC(NEP)

mt

12400.00

242.58

12642.58

18 Door spring

no.

138.00

63

Cement white

mt

21000.00

242.58

21242.58

1//

19 Nails

kg

108.00

64

Reinforcement (Fe-415)

Mt

73500.00

328.58

73828.58

1//

20 Screw*

no.

0.40

65

M.S. binding wire

kg

90.00

0.32

90.32

5//

21 Nut bolt 8mm*

no.

5.00

66

Collapsible shutter incl fitting

kg

120.00

2.88

122.88

1//

22 J - hook*

no.

10.00

67

Rolling shutter 18 # incl fitting

kg

120.00

2.88

122.88

1//

23 Bitumen washer*

no.

0.60

68

Barbed wire12 # (1kg = 7m)

Rm.

12.43

0.05

12.48

5//

24 Nut bolt *

no

2.50

69

MS grill Incl fitting

kg

110.00

2.88

112.88

1//

sq.m.

401.53

401.53

25

"

- 6"

Mosquito net - Indian

26

"

- expanded

27 3mm marble chips(~1450kg/cum)

sq.m.

441.16

70

CGI sheet 26 # (6'x2'6") medium


(0.38mm)

sq.m.

269.00

71

GI plain sheet 24 # (T=0.5mm)

sq.m.

451.92

451.92

cu.m.

18850

72

GI plain sheet 24 # (3' wide)

Rm.

406.73

406.73

28 Oxalic acid

kg

90.00

73

GI pipe 'B' class - 1/2"

Rm.

133.00

133.00

29 Wax polish

kg

90.00

74

"

"

- 3/4"

Rm.

170.00

170.00

30 Marble ordinary (130)

m2

1506.40

75

"

"

- 1"

Rm.

258.00

258.00

31 Lime

kg

16.00

76

HDPE pipe

Kg

228.00

228.00

32 Snowcem(cem. paint)

kg

47.00

33 Gum Adhesive

kg

126.00

78 Truck/Tipper 8 mt

Hr

680.00

680.00

34 Enamel

litre

446.00

79 Truck/Tipper 6 mt

Hr

525.00

525.00

35 Varnish

litre

158.00

80 Truck/Tipper 5 mt

Hr

450.00

450.00

36 Aluminium paint

litre

473.00 81 Truck/Tipper 3 mt

Hr

315.00

315.00

37 Tarpentile

litre

116.00

80 Water Pump

Hr

200.00

200.00

38 Water proof compound

kg

81.00

81 Water Tank

Hr

550.00

550.00

39 Primer

litre

263.00

82 Kerosene*

litre

70.80

70.80

40 Red oxide

kg

263.00

83 Deisel

litre

70.80

70.80

41 Sand paper*

nos

5.00

84 Mobil

litre

592.04

592.04

42 Karborandum stone

nos

150

85 Gear oil

litre

575.22

575.22

86 Grease

Kg

553.10

553.10

//

Equipment, Fuel, lubricants

* Market Rates
Prepared by

Checked by

Approved By

Ministry of Fedaral Affairs and Local DevelopmentOffice

of District Development CommitteeDistrict

Technical OfficeRupandehi

Name of the Project

Reference Bhairahawa
SUMMARY of RATE ANALYSIS FOR Buildings FY 072/73
S.N.

Items

Unit

Contract

S.N.

1. EARTHWORK
1.1 E/W exc.a)in gen. - soft
1.2

- BMS

1.3

b) in foun .- soft

1.4

- BMS

1.5 Filling

Items

Unit

Contract

6. ROOFING WORK

- B/F Earth compact

m3

356.53

6.1

CGI sheet roof

- 26 #

m2

739.32

"

407.47

6.2

CGI sheet ridge

- 24#

Rm

924.37

"

509.34

6.3

4mm ply.in 1.5" sal fr-ceiling

m2

3206.01

"

809.84

"

254.67

7. STEEL WORK

1.6

- stone

"

2799.98

7.1

Barbed wire fencing 12#

Rm

51.01

1.7

- sand

"

1551.80

7.2

M.S. grill + paint

kg

129.81

m3

560.70

7.3

Iron angle with red oxide pa.

kg

129.81

m2

782.88

8.1

12.5mm c.plaster - 1:3 ceiling

m2

328.90

"

1417.28

8.2

- 1:4 wall

"

277.85

- 1:6 wall

"

257.49

m3

12572.45

8.4

20mm cement plaster - 1:3

"

379.33

8.5

Flush cem.pointing1:3- brick

"

167.12

8.6

Ruled cem.pointing1:3- brick

"

196.79

8.7

Flush cem point 1:3-stone

"

201.76

8.8

3 mm cement punning

"

201.55

8.9a Porcelain glazed tile (wall)

"

1955.39

12827.12 8.9b Porcelain glazed tile (floor)

"

2132.34

1.8

Filling with transported soil, watering, ramming


2. BRICK WORK

8. PLASTERING WORK

2.1 Brick soling in sand - flat


2.2

- Edge
a) For ground floor

8.3

2.3a Brick masonry in cm - 1:3


2.4a

- 1:4

"

12157.39

2.5a

- 1:6

"

11763.43

b) Above ground floor


2.3b Brick masonry.in c.m. - 1:3

m3

2.4b

- 1:4

"

12412.06

2.5b

- 1:6

"

12018.10

3. STONE WORK

9. PAINTING WORK
9.1

2 Coat white wash - in ceiling

m2

26.14
21.98

9.2

- in wall

"

9.3

1 coat snocem (cement paint)

"

59.69

3.1 Stone soling in foundation

m3

2628.46

9.4

2 coat snocem (cement paint)

"

107.76

3.2 Stone masonry.in c.m. - 1:4

"

8741.78

9.5

1 coat paint - enamel

"

155.18

3.3

"

8013.43

9.6

2 coat paint - enamel

"

235.82

"

216.77

Rm

200.44

- 3/4"

"

242.99

- 1"

"

361.70

- 1:6

9.7
3.4 Dry Stone Masonry

"

3623.21

9.8

4. WOODEN WORK
4.1 Sal wood
4.2

- chaukhat
- beam

4.3 1.5" salwood frame - shutters

- aluminium
- red oxide

"

10 SANITARY WORK
m3

240756.64 10.1 GI Pipe laying

"

216451.05 10.2

m2

11893.70 10.3

- 0.5"

4.4

- 4mm glazed

"

8003.02 10.4 1/2" dia 'HDP Pipe laying 10 kg/cm2

"

37.41

4.5

- 4mm plywood

"

6375.43 10.5

"

515.02

4.6

- GI plain sheet

"

6930.07

4" dia 4 kg/cm2


11. DEMOLISHING WORK

4.7 Mosquito net +listi

"

662.67 11.1 Demolishing - cem.plaster

m2

53.41

4.8 Mosquito net +expanded metal+listi

"

987.49 11.2

- wall in mud

m3

524.17

4.9 Mosquit.net+expenanded metal.+1.5"s.fr

"

4989.68 11.3

- wall in c.m.

"

1048.34

4.10 4mm glazed fixing+listi

"

872.41 11.4

- PCC

"

1978.00

11.5

- RCC

"

5. CONCRETE WORK

8919.98 11.6 Demolishing - slate roof

5439.50

5.1 PCC

- 1:3:6 with gravel

5.2

- 1:2:4 with gravel

"

10186.02

5.3a For RCC - PCC 1:2:4 with Agg

"

11511.09 12.1 25mm Sal Eaves board work

m2

5419.43

5.3b

- PCC 1:2:4 with gravel

"

11520.02 12.2 In 1.5"sal fr.- 4mm ply.sh.repl

346.02

5.4

- PCC1:1:3 gravel

"

12604.49 12.3 Reinf. For Window Chaukhat

kg

113.99

5.5

- Reinforcement bar

kg

105.09

5.6 1.5" DPC 1:2:4 - with gravel

m2

473.21

5.70 75mm PCC 1:2:4 with complete finish

846.68

5.8

- form work slab

m2

584.14

5.9

- form work colum

"

685.91

5.10

- form work beam

"

924.19

80.42

12. MISCELLANEOUS

*Cement OPC(NEP)/Transportation with 8Mt truck


Prepared by

Checked by

Approved by

RATE ANALYSIS for FY 072/73 Building

Contract

Items

Descript.

Unit

Quantity

U.Rate

Amount

1. EARTHWORK
Unskilled

All type of Excavation work in soft clay & silty soils including
disposal upto 10m lead and 1.5m lift
Item No.
1.1
1
Norms - 2(1) page 4
Earthwork in excav. : soft soil

3%of labour
Sub-Total
Contract Rate

per
cu.m.

per

Sub-Total
Contract Rate

cu.m.

m.d.

Unit Rate Excluding


VAT per

Unskilled

Backfilling with ordinary soil in 15 cm thick layer and hand


compaction (haulage distance 10m) with sprinkling water with
rammers
per

Sub-Total
Contract Rate

cu.m.

Prepared By

m.d.

per
cu.m.

cu.m.

430.00

344.00

354.32
407.47
cu.m.

1.00

407.47

430.00

430.00
12.90
442.90
509.34

cu.m.
1.59

509.34
430.00

683.70
20.51
704.21
809.84

cu.m.
0.50

809.84
430.00

215.00

221.45
254.67

1.15
cu.m.

254.67

Unskilled

m.d.

1.50

430.00

645.00

Block stone

cu.m.

1.00

1491.47

1491.47

Bond stone
Sub-Total
Contract Rate

cu.m.

0.20

1491.47

298.29
2434.76
2799.98

1.15

Unit Rate Excluding


VAT per

per

0.80

356.53

6.45

Unit Rate Excluding


VAT per

Filling by sand and hand compaction (haulage distance 10m) with


sprinkling water

cu.m.

3% of Labor

Filling by stones in the foundation and levelling including haulage


distance upto 30m

Item No.
1.7

301.00
9.03
310.03
356.53

1.15

Unskilled
m.d.
Excavation for foundation drain, Pipe line etc.in boulder mixed soil,
Equipment
disposal (upto 10m lead and 1.5m lift)
3%of labour
Item No.
per
Sub-Total
1.4
1
cu.m.
Contract Rate
1.15
Norms - 2(14) page 7
Unit Rate Excluding
VAT per
Earthwork in excav. : B.M.Soil

Item No.
1.6
1
Norms - 6(5) page 27
Filling - stone

430.00

10.32

Unskilled
m.d.
Excavation of pit in soft soil, disposal upto 10m lead and 1.5m lift in
Equipment
foundation
3%of labour
Item No.
per
Sub-Total
1.3
1
cu.m.
Contract Rate
1.15
Norms - 2(9) page 6
Unit Rate Excluding
VAT per
E/W excav.in found.- soft soil

Item No.
1.5
1
Norms - 2(25a) page 11
Earth filling - compaction work

0.70

1.15

Unit Rate Excluding


VAT per

Unskilled
All type of excavation work in hard clay and soils mixed with soft
Equipment
moorum stones (upto 30mm size) including disposal upto 10m lead
3%of labour
and 1.5m lift
Item No.
1.2
1
Norms - 2(2) page 4
Earthwork in excav. : B.M.Soil

m.d.

Equipment

cu.m.

2799.98

Unskilled

m.d.

0.70

430.00

301.00

Sand

cu.m.

1.10

953.08

1048.39

Sub-Total
Contract Rate
Checked By

1.15

1349.39
1551.80
Approved By

RATE ANALYSIS for FY 072/73 Building


Items
Norms - 2(42) page 15
Filling - sand

Prepared By

Contract

Descript.

Unit

Unit Rate Excluding


VAT per

Checked By

Quantity
cu.m.

U.Rate

Amount
1551.80

Approved By

RATE ANALYSIS for FY 072/73 Building

Contract

Items

Descript.
Unskilled

Filling with transported soil in 15 cm thick layer and hand


compaction (haulage distance 10m) with sprinkling water with
rammers
Item No.
1.5

Tran soil

m3

Quantity
0.50

U.Rate
430.00

Amount
215.00

1.20

221.76

266.11

T&P @3% of labour

per
1

Unit
m.d.

6.45

Sub-Total
cu.m.

Contract Rate

Norms - 2(25a) page 11

487.56
1.15

Unit Rate Excluding


VAT per

Earth filling - compaction work

560.70
cu.m.

560.70

2. BRICK WORKS
Dry brick laying (soling) in sand

a) flat

Item No.
2.1
10
Norms - 11(15a) page 65

per

m.d.

Unskilled
Brick
Sand
Sub-Total
Contract Rate

sq.m.

0.50

650.00

m.d.

1.00

430.00

430.00

nos.

420.00

12.80

5376.00

cu.m.

0.71

953.08

676.69
6807.69
7828.84

1.15

Unit Rate Excluding


VAT per

Brick soling - flat

Dry brick laying (soling) in sand a) on edge (vertical)

Item No.
2.2
10
Norms - 11(15b) page 65

Skilled

Skilled

m.d.

1.00

650.00

650.00

m.d.

3.25

430.00

1397.50

nos.

750.00

12.80

9600.00

cu.m

0.71

953.08

676.69
12324.19
14172.81

Sand
Sub-Total
Contract Rate

sq.m.

1.15

Unit Rate Excluding


VAT per

Brick soling - vertical

782.88

Unskilled
Brick

per

sq.m.

325.00

sq.m.

1417.28

a. BRICK WORK IN MORTAR (for ground floor)

Chimney (bhatta) brick masonry works along with supplying bricks


making cement sand mortar and construction of brick wall including
haulage distance upto 30 m
a) 1:3

cu.m.

Chimney (bhatta) brick masonry works along with supplying bricks


making cement sand mortar and construction of brick wall including
haulage distance upto 30m
a) 1:4

Brick work in c.m. - 1:4

Prepared By

1.50

650.00

Unskilled
Brick

m.d.

2.20

430.00

946.00

nos.

530.00

12.80

6784.00

Cement

m.t.

0.13

12642.40

1643.51

Sand

cu.m

0.27

1835.08

495.47

Add.unkill

m.d.

0.20

430.00

86.00

3% of add. Unskilled

per
cu.m.

Skilled

m.d.

Unskilled
Brick

975.00

2.58
10932.56
12572.45

1.15

Unit Rate Excluding


VAT per

Brick work in c.m. - 1:3

Item No.
2.4a
1
Norms - 5(1.b.2 & 2a) page 23 & 24

m.d.

Scaffolding
Sub-Total
Contract Rate

per
2.3a
1
Norms - 5(1.b.1 & 2a) page 23 & 24

Skilled

cu.m.

12572.45

1.50

650.00

m.d.

2.20

430.00

946.00

nos.

530.00

12.80

6784.00

Cement

m.t.

0.10

12642.40

1264.24

Sand

cu.m

0.28

1835.08

513.82

Add.unkill

m.d.

0.20

430.00

86.00

Scaffolding
Sub-Total
Contract Rate

3% of add. Unskilled
1.15

Unit Rate Excluding


VAT per

Checked By

cu.m.

975.00

2.58
10571.64
12157.39
12157.39

Approved By

RATE ANALYSIS for FY 072/73 Building

Contract

Items

Chimney (bhatta) brick masonry works along with supplying bricks


making cement sand mortar and construction of brick wall including
haulage distance upto 30m a) 1:6

Descript.
Skilled

Unit
m.d.

Quantity
1.50

U.Rate
650.00

Amount
975.00

Unskilled

m.d.

2.20

430.00

946.00

Brick

nos.

530.00

12.80

6784.000

Cement

m.t.

0.07

12642.40

884.97

Sand

cu.m

0.30

1835.08

550.52

m.d.

0.20

430.00

86.00

Add.unkill
Item No.
2.5a
1
Norms - 5(1.b.3 & 2a) page 23 & 24

Scaffolding
Sub-Total
Contract Rate

per
cu.m.

3% of add. Unskilled
1.15

Unit Rate Excluding


VAT per

Brick work in c.m. - 1:6

2.58
10229.07
11763.43

cu.m.

11763.43

b. BRICK WORK IN MORTAR (above ground floor)

Chimney (bhatta) brick masonry works along with supplying bricks


making cement sand mortar and construction of brick wall including
haulage distance upto 30m a) 1:3

Skilled

m.d.

1.50

650.00

Unskilled
Brick

m.d.

2.20

430.00

946.00

nos.

530.00

12.80

6784.00

Cement

m.t.

0.13

12642.40

1643.51

Sand

cu.m

0.27

1835.08

495.47

Add.unkill

m.d.

0.70

430.00

301.00

Scaffolding
Item No.
2.3b
1
Norms - 5(1.b.1 & 2b) page 23 & 24

per

Sub-Total
Contract Rate

cu.m.

3% of add. Unskilled

cu.m.

Skilled
m.d.
1.50
Unskilled
m.d.
2.20
Brick
nos.
530.00
Chimney (bhatta) brick masonry works along with supplying bricks
making cement sand mortar and construction of brick wall including
Cement
m.t.
0.10
haulage distance upto 30m a) 1:4
Sand
cu.m
0.28
Add.unkill
m.d.
0.70
Scaffolding 3% of add. Unskilled
Item No.
per
Sub-Total
2.4b
1
cu.m.
Contract Rate
1.15
Norms - 5(1.b.2 & 2b) page 23 & 24
Unit Rate Excluding
cu.m.
VAT per
Brick work in c.m. - 1:4

Chimney (bhatta) brick masonry works along with supplying bricks


making cement sand mortar and construction of brick wall including
haulage distance upto 30m a) 1:6

Item No.
2.5b
1
Norms - 5(1.b.3 & 2b) page 23 & 24

per
cu.m.

12827.12

650.00
430.00
12.80
12642.40
1835.08
430.00

975.00
946.00
6784.00
1264.24
513.82
301.00
9.03
10793.09
12412.06
12412.06

Skilled

m.d.

1.50

650.00

975.00

Unskilled

m.d.

2.20

430.00

946.00

Brick

nos.

530.00

12.80

6784.00

Cement

m.t.

0.07

12642.40

884.97

Sand

cu.m

0.30

1835.08

550.52

Add.unkill

m.d.

0.70

430.00

301.00

Scaffolding
Sub-Total
Contract Rate

3% of add. Unskilled

9.03
10450.52
12018.10

1.15

Unit Rate Excluding


VAT per

Brick work in c.m. - 1:6

9.03
11154.01
12827.12

1.15

Unit Rate Excluding


VAT per

Brick work in c.m. - 1:3

975.00

cu.m.

12018.10

3. STONE WORKS
Dry stone laying (soling) in foundation

Item No.
Prepared By

per

Skilled

m.d.

0.00

650.00

0.00

Unskilled

m.d.

1.50

430.00

645.00

stone

cu.m

1.10

1491.47

1640.62

Sand
Sub-Total

cu.m

0.00

953.08

0.00
2285.62

Checked By

Approved By

RATE ANALYSIS for FY 072/73 Building


Items
3.1
1
Norms - 6(5) page 39
Stone soling in sand

Prepared By

cu.m.

Contract

Descript.
Contract Rate

Unit Quantity
1.15

Unit Rate Excluding


VAT per

Checked By

cu.m.

U.Rate

Amount
2628.46
2628.46

Approved By

RATE ANALYSIS for FY 072/73 Building

Contract

Items

Rubble masonry work including supply of hard stone blocks


preparing cement sand mortar and construction of the wall upto 5 m
high haulage distance upto 10 m
a)
cement sand mortar 1:4

Item No.
3.2
1
Norms - 6a(2) page 25

per
cu.m.

Rubble masonry work including supply of hard stone blocks


preparing cement sand mortar and construction of the wall upto 5 m
high haulage distance upto 10 m
a)
cement sand mortar 1:6

Quantity
1.50

U.Rate
650.00

Amount
975.00

Unskilled

m.d.

5.00

430.00

2150.00

cement

m.t.

0.159

12642.40

2010.14

Sand

cu.m

0.45

1835.08

825.79

block stone

"

1.00

1491.47

1491.47

bond st.
Sub-Total
Contract Rate

"

0.10

1491.47

149.15
7601.54
8741.78

1.15

cu.m.

per
cu.m.

Unskilled

m.d.

cement

m.t.

Sand

cu.m

0.47

1835.08

862.49

bl.stone

"

1.00

1491.47

1491.47

"

0.10

1491.47

149.15
6968.20
8013.43

650.00

975.00

5.00

430.00

2150.00

0.106

12642.40

1340.09

1.15
cu.m.

8013.43

Skilled

m.d.

1.00

650.00

650.00

Unskilled

m.d.

2.00

430.00

860.00

bl.stone

cu.m

1.00

1491.47

1491.47

cu.m

0.10

1491.47

149.15
3150.62
3623.21

bond st.
Sub-Total
Contract Rate

1.15

Unit Rate Excluding


VAT per

Stone work - Dry wall

1.50

8741.78

m.d.

Unit Rate Excluding


VAT per

Rubble masonry work including supply of hard stone blocks and


construction of the wall upto 5m high haulage distance up to 30m.
a)
Dry wall

cu.m.

Skilled

bond st.
Sub-Total
Contract Rate

per

Stone work in c.m. - 1:6

Item No.
3.4
1
Norms - 6(2.1) page 26

Unit
m.d.

Unit Rate Excluding


VAT per

Stone work in c.m. - 1:4

Item No.
3.3
1
Norms - 6a(3) page 25

Descript.
Skilled

cu.m.

3623.21

4. WOODEN WORKS
Making and fixing seasoned sal Wood chaukhat Wooden size (100
mm*75 mm)

Item No.
4.1
1
Norms - 10(1) page 49

cu.m.

Prepared By

34.00

650.00

22100.00

m.d.

3.40

430.00

1462.00

Wood

cu.m

1.10

167580.00

184338.00

holdfast

nos.

92.00

15.00

1380.00

nos.

184.00

0.40

73.60
209353.60
240756.64

1.15

Unit Rate Excluding


VAT per

Making beams, rafter, purlin cross beams from seasoned sal Wood
with fitting and fixing ( it is for 9 m span)

Sal Wood work - beam, rafter etc.

m.d.

screw
Sub-Total
Contract Rate

per

Sal Wood work - chaukhat

Item No.
4.2
1
Norms - 10(17) page 56

Skilled
Unskilled

per
cu.m.

cu.m.

240756.64

Skilled

m.d.

17.65

650.00

11472.50

Unskilled

m.d.

1.76

430.00

756.80

Wood

cu.m

1.05

167580.00

175959.00

Killa
Sub-Total
Contract Rate

L.S.
1.15

Unit Rate Excluding


VAT per

Checked By

30.00
188218.30
216451.05
cu.m.

216451.05

Approved By

RATE ANALYSIS for FY 072/73 Building

Contract

Items
Making and fixing sal Wood panelled shutters using 38 mm thick sal
Wood frame

Descript.

Unit

Skilled

m.d.

Quantity
10.00

U.Rate
650.00

Amount
6500.00

Unskilled

m.d.

1.00

430.00

430.00

Wood

cu.m

0.084

167580.00

14076.72

Shutter size:

hinges

nos.

6.00

144.00

1.07m * 1.982 m=2.114 sq.m.

bolt_1

nos.

1.00

24.00
26.00

Hinges (Kabja) - 100 mm

bolt_2

nos.

1.00

41.00

bolt _1(Chheskini) - 150 mm

lock

nos.

1.00

41.00
572.00

572.00

bolt _2(Chheskini) - 300 mm

handle

nos.

2.00

32.00

64.00

250 mm ( lock , handle, screws)


Item No.
4.3
2.114
Norms - 10(2) page 49

Screws
Sub-Total
Contract Rate

per
sq.m.

Making and fixing 4 mm thick glazed shutter using sal Wood shutter
of the size : 38 mm x 75 mm
(Shutter size: 1.829m*1.22m = 2.23 sq.m)

sq.m.

11893.70

m.d.

9.00

650.00

5850.00

Unskilled

m.d.

0.90

430.00

387.00

Wood

cu.m

0.049

167580.00

8211.42

glass

sq.m.

1.085

645.60

700.48

hinges

nos.

8.00

nos.

4.00

24.00
26.00

192.00

bolts

nos.
L.S.

2.00

32.00

64.00
10.00
15518.90
17846.73

1.15

Unit Rate Excluding


VAT per

In 1.5" sal frame - 4 mm glazed

sq.m.

Skilled

handle
screws
Sub-Total
Contract Rate

per

10.00
21863.72
25143.28

1.15

Unit Rate Excluding


VAT per

In 1.5" sal frame - shutters

hinges (Kabja) - 100 mm


bolts (Chheskini) - 100 mm
Item No.
4.4
2.23
Norms - 10(4) page 50

L.S.

26.00

sq.m.

104.00

8003.02

Making and fixing 4 mm commercial plyWood flush shutter


( plyWood both sides ) in 38 mm sal Wood frame.

Skilled

m.d.

7.00

650.00

4550.00

Unskilled

m.d.

0.70

430.00

301.00

Wood

cu.m

0.0346

167580.00

5798.27

Shutter size :

Plywwod

sq.m.

4.65

215.20

1000.68

hinges

nos

3.00

24.00

72.00

bolts

nos

2.00

26.00

52.00

nos

1.00

572.00

572.00

1.092*2.058 = 2.245 sq.m


lock

- special

hinges

- 100 mm

bolts
- 150 mm
Item No.
4.5
2.245
Norms - 10(7) page 51

lock
screws
Sub-Total
Contract Rate

per
sq.m.

Skilled
Making and fixing 18 # CGI plain sheet flush shutters (CGI sheet
both sides) in 38 mm sal Wood frame.
Shutter size :

lock

- special

4.6

per
2.245

Norms - 10(9) page 52


In 1.5" sal frame - GI plain sheet

Prepared By

7.00

650.00

4550.00

m.d.

0.70

430.00

301.00

cu.m

0.0346

167580.00

5798.27

sheet

sq.m.

4.65

451.92

2101.43

hinges

nos

3.00

24.00

72.00

bolts

nos

2.00

26.00

52.00

lock

nos

1.00

572.00

572.00

handle

nos

1.00

32.00

32.00

screws

L.S.

50.00

Sub-Total
sq.m.

6375.43

Wood

hinges - 100 mm

Item No.

m.d.

sq.m.

Unskilled

1.092*2.058 = 2.245 sq.m.


- 150 mm

100.00
12445.95
14312.84

1.15

Unit Rate Excluding


VAT per

In 1.5"sal fr.- 3 mm plyWood shutter

bolts

L.S.

Contract Rate

13528.70
1.15

Unit Rate Excluding


VAT per

Checked By

15558.00
sq.m.

6930.07

Approved By

RATE ANALYSIS for FY 072/73 Building

Contract

Items

Fixing mosquito proof mesh net using listi.

Descript.
Skilled

Unit
m.d.

Quantity
0.06

U.Rate
650.00

Amount
39.00

Unskilled

m.d.

0.006

430.00

2.58

mosquito net

sq.m.

1.05

441.16

463.22

r.m.

4.05

12.70

51.44

listi
Item No.
4.7
1
Norms - similar to 10(12) page 53
Mosquito net + listi

nails
Sub-Total
Contract Rate

per
sq.m.

m.d.

0.06

650.00

39.00

m.d.

0.006

430.00

2.58

sq.m.

1.05

441.16

463.22

1.05

269.00

282.45

4.05

12.70

51.44

net
exp.net

Making and fixing mosquito proof wire mesh net with expended
metal net flush shutter in 38 mm thick sal Wood frame.

Shutter size:

hinges - 100 mm

L.S.

sq.m.

1.15

5.00

650.00

3250.00

0.50

430.00

215.00

Wood

cu.m.

0.026

167580.00

4357.08

Mosq. net

sq.m.

2.13

441.16

939.67

exp. net

sq.m.

2.13

269.00

572.97

hinges

nos

3.00

24.00

72.00

bolt

nos

2.00

41.00

82.00

spring

nos

1.00

138.00

138.00

handle

nos

2.00

32.00

64.00

L.S.

50.00
9740.72
11201.83

1.15
sq.m.

4989.68

m.d.

0.06

650.00

Unskilled

m.d.

0.006

430.00

2.58

glass

sq.m.

1.00

645.60

645.60

r.m.

4.05

12.70

51.44

Making and fixing 4 mm thick glass using necessary listi.

listi
nails
Sub-Total
Contract Rate

L.S.

39.00

20.00
758.62
872.41

1.15

Unit Rate Excluding


VAT per

4 mm glazed fixing with listi

987.49

m.d.

Skilled

sq.m.

sq.m.

m.d.

Unit Rate Excluding


VAT per

per

20.00
858.69
987.49

Skilled

screws
Sub-Total
Contract Rate

per

Mosquito net+expended net+frame

Item No.
4.1
1
Norms-10 (11.b) page 52, 53

r.m.

Unskilled

1.092*2.058 = 2.245 sq.m.

bolts - 150 mm
Item No.
4.9
2.245
Norms-10(10) page 52

sq.m.

Unit Rate Excluding


VAT per

Mosquito net + expended net+listi

662.67

Skilled

nails
Sub-Total
Contract Rate

sq.m.

sq.m.

Unskilled

listi
per

20.00
576.24
662.67

1.15

Unit Rate Excluding


VAT per

Fixing mosquito proof mesh net with expended metal net using listi

Item No.
4.8
1
Norms - similar to 10(12) page 53

L.S.

sq.m.

872.41

5. CONCRETE WORKS
Concreting of foundation, vertical faces walls (cement concrete)
including supply of materials and haulage distance upto 30m.
a) P.C.C.(1:3:6)

Item No.
5.1
Prepared By

per
1

cu.m.

Skilled

m.d.

1.00

650.00

650.00

Unskilled

m.d.

4.00

430.00

1720.00

cement

m.t.

0.22

12642.40

2781.33

Gravel 40mm

cu.m.

0.65

1948.56

1266.56

Gravel 20mm

cu.m.

0.24

1983.84

476.12

cu.m.

0.47

1835.08

862.49
7756.50
8919.98

sand
Sub-Total
Contract Rate
Checked By

1.15

Approved By

RATE ANALYSIS for FY 072/73 Building


Items
Norms-7.2(c) page 30
P.C.C. - 1:3:6 with gravel

Prepared By

Contract

Descript.

Unit

Unit Rate Excluding


VAT per

Checked By

Quantity
cu.m.

U.Rate

Amount
8919.98

Approved By

10

RATE ANALYSIS for FY 072/73 Building

Contract

Items
Concreting of foundation, vertical faces walls (cement concrete)
including supply materials and haulage distance upto 30m
a) P.C.C.(1:2:4)

Item No.
5.2
1
Norms-7.2(d) page 31

per
cu.m.

a) P.C.C. 1:2:4

per
cu.m.

Concreting works of super structure deck slabs, beams including


supply of materials and haulage distance upto 30m.
a) P.C.C. 1:2:4

cu.m.

Unskilled

m.d.

4.00

430.00

1720.00

cement

m.t.

0.32

12642.40

4045.57

Gravel 40mm

cu.m.

0.52

1948.56

1013.25

Gravel 20mm

cu.m.

0.22

1983.84

436.44

Gravel 10mm

cu.m.

0.11

1595.76

175.53

cu.m.

0.445

1835.08

816.61
8857.41
10186.02

1.15

a) P.C.C. 1:1.5:3

m.d.

0.80

Unskilled

m.d.

cement

m.t.

Agg 40mm
Agg 20mm
Agg 10mm
sand
Sub-Total
Contract Rate

cu.m.

520.00

7.00

430.00

3010.00

0.32

12642.40

4045.57

cu.m.

0.52

1948.56

1013.25

cu.m.

0.22

1948.56

428.68

cu.m.

0.11

1595.76

175.53

cu.m.

0.445

1835.08

816.61
10009.65
11511.09

1.15

Cutting, bending, placing in position as shown in the drawing &


binding by MS wire of reinforcement steel bar for RCC works incl.
haulage dist. upto 30m
per
kg

cu.m.

m.d.

0.80

Unskilled

m.d.

cement

m.t.

Gravel 40mm

11511.09

650.00

520.00

7.00

430.00

3010.00

0.32

12642.40

4045.57

cu.m.

0.52

1948.56

1013.25

Gravel 20mm

cu.m.

0.22

1983.84

436.44

Gravel 10mm

cu.m.

0.11

1595.76

175.53

cu.m.

0.445

1835.08

816.61
10017.41
11520.02

1.15
cu.m.

Skilled

m.d.

0.80

Unskilled

m.d.

cement

m.t.

Gravel 20mm
Gravel 10mm

11520.02

650.00

520.00

7.00

430.00

3010.00

0.40

12642.40

5056.96

cu.m.

0.57

1983.84

1130.79

cu.m.

0.29

1595.76

462.77

cu.m.

0.425

1835.08

779.91
10960.43
12604.49

1.15

Unit Rate Excluding


VAT per

PCC for RCC (1:1:3) with gravel

10186.02
650.00

Skilled

sand
Sub-Total
Contract Rate

per

cu.m.

Skilled

Unit Rate Excluding


VAT per

Concreting works of super structure deck slabs, beams including


supply of materials and haulage distance upto 30m.

Prepared By

Amount
650.00

sand
Sub-Total
Contract Rate

per

PCC for RCC (1:2:4) with gravel

Item No.
5.5
1000
Norms-7.5 page 33

U.Rate
650.00

Unit Rate Excluding


VAT per

PCC for RCC (1:2:4) with aggregate

Item No.
5.4
1
Norms-7(4.b) page 32

Quantity
1.00

Unit Rate Excluding


VAT per

Concreting works of super structure deck slabs, beams including


supply of materials and haulage distance upto 30m.

Item No.
5.3b
1
Norms-7(4.a) page 32

Unit
m.d.

sand
Sub-Total
Contract Rate

P.C.C. - 1:2:4 with gravel

Item No.
5.3a
1
Norms-7(4.a) page 32

Descript.
Skilled

cu.m.

12604.49

Skilled

m.d.

12.00

650.00

7800.00

Unskilled

m.d.

12.00

430.00

5160.00

Reinforment

m.t.

1.05

73828.58

77520.01

bind.wire
Sub-Total
Contract Rate

kg

10.00

90.32

903.20
91383.21
105090.69

1.15

Unit Rate Excluding


VAT per
Checked By

kg

105.09
Approved By

11

RATE ANALYSIS for FY 072/73 Building


Items
Iron rod( TOR steel) for RCC

Prepared By

Contract

Descript.
Unit
Unit
Rate Excluding
VAT per

Checked By

Quantity
kg

U.Rate

Amount
105.09

Approved By

12

RATE ANALYSIS for FY 072/73 Building

Contract

Items
38 mm thick Damp Proof Course of cement concrete of the ratio
1:2:4
Note :-

Descript.
Skilled

Unit
m.d.

Quantity
1.00

U.Rate
650.00

Amount
650.00

Unskilled

m.d.

2.00

430.00

860.00

cement

m.t.

0.12

12642.40

1517.09

sand

cu.m.

0.17

1835.08

311.96

gravel_12mm

cu.m.

0.34

1595.76

542.56

kg

2.88

81.00

233.28
4114.89
4732.12

Sieved gravel round

Item No.
5.6
10
Norms-18(9) page 128

W.P.C.
Sub-Total
Contract Rate

per
sq.m.

Unit Rate Excluding


VAT per

1.5" D.P.C. (1:2:4)


75 mm thick plain cement concrete of ratio 1:2:4 with cement
punning all finish for floor
Note :-

per
sq.m.

m.d.

1.25

Unskilled

m.d.

cement

m.t.

sand
gravel 20 mm
Sub-Total
Contract Rate

473.21

650.00

812.50

3.00

430.00

1290.00

0.26

12642.40

3287.02

cu.m.

0.34

1835.08

623.93

cu.m.

0.68

1983.84

1349.01
7362.46
8466.83

1.15

Unit Rate Excluding


VAT per

75mm thick P.C.C. (1:2:4) with finish

sq.m.

Skilled

Sieved gravel round


Item No.
5.7
10
Norms-11(1.d) page 60

1.15

sq.m.

846.68

Form Works
Making Wooden form work for slab and floor including supply and
selection of materials fixing, nailing according to drawings, applying
Primer, placing separa- tors, dismantling forms and hauling upto 30
m distance

Skilled

m.d.

1.72

650.00

1118.00

Unskilled

m.d.

2.57

430.00

1105.10

Wood

cu.m.

0.066

39337.20

2586.42

Nails

kg

2.50

108.00

270.00

(Salvage value after using 6 times 0.25%i.e. 0.526*0.75/6)

Item No.
5.8
10
Norms-8(2.a) page 37
Form work for slab

per

Sub-Total
Contract Rate

sq.m.

Unit Rate Excluding


VAT per
Skilled

Making Wooden form work including supply and selection of


materials fixing, nailing according to drawings, placing separa- tors,
dismantling forms and hauling upto 30 m distance Column height 3 4m
Item No.
5.9
10
Norms-8(3.c) page 38

per

Making Wooden form work including supply and selection of


materials fixing, nailing according to drawings, placing separa- tors,
dismantling forms and hauling upto 30 m distance (beam height upto
0.30m)

Form work for beam

Prepared By

per
sq.m.

2.400

584.14
650.00

1560.00

m.d.

3.60

430.00

1548.00

Wood

cu.m.

0.066

39337.20

2586.42

Nail

kg

2.50

108.00

270.00

Skilled

5964.42
6859.08

1.15

Unit Rate Excluding


VAT per

Form work for column

Item No.
5.1
10
Norms-8(4.a) page 38

m.d.

sq.m.

Unskilled

Sub-Total
Contract Rate

sq.m.

5079.52
5841.45

1.15

m.d.

sq.m.

4.00

685.91

650.00

2600.00

Unskilled

m.d.

6.00

430.00

2580.00

Wood

cu.m.

0.066

39337.20

2586.42

kg

2.50

108.00

270.00
8036.42
9241.88

Nails
Sub-Total
Contract Rate

1.15

Unit Rate Excluding


VAT per

Checked By

sq.m.

924.19

Approved By

13

RATE ANALYSIS for FY 072/73 Building

Contract

Items

Descript.

Unit

Quantity

U.Rate

Amount

6. ROOFING WORKS

26 gause C.G.I. sheet roofing works with supply of materials all


complete

Item No.
6.1
10
Norms-9(1) page 46

sq.m.

1.10

650.00

715.00

m.d.

1.25

430.00

537.50

CGIsheet

sq.m.

12.00

401.53

4818.33

nutbolt

nos.

30.00

2.50

75.00

J-hook

nos.

25.00

10.00

250.00

nos.

55.00

0.60

33.00
6428.83
7393.15

1.15

Unit Rate Excluding


VAT per

Making ridge of 24 gauge C.G.I. plain sheet and fitting with supply
of materials all complete
per
r.m.

Skilled

m.d.

Making various types of false ceiling in sal Wood frame of size


50mm*75mm (with 600*900 mm frame size) using 4 mm
commercial plyWood
Ceiling size : 9.75 x 3.65 = 35.68 sq.m.

sq.m.

2.00

650.00

1300.00

m.d.

3.00

430.00

1290.00

r.m.

12.00

451.92

5423.04

nutbolt
Sub-Total
Contract Rate

nos.

10.00

2.50

25.00
8038.04
9243.75

1.15
Rm.

924.37

Skilled

m.d.

23.00

650.00

14950.00

Unskilled

m.d.

2.30

430.00

989.00

Wood

cu.m.

0.45

167580.00

75411.00

plyWood

sq.m.

37.50

215.20

8070.00

L.S.

50.00
99470.00
114390.50

1.15

Unit Rate Excluding


VAT per

Ceiling - 3 mm plyWood

739.32

Unskilled

listi, Killa
Sub-Total
Contract Rate

per

sq.m.

plain sheet

Unit Rate Excluding


VAT per

CGI sheet ridge - 26 # (3' wide)

Item No.
6.3
35.68
Norms-10(16.a) page 55, 56

m.d.

bit.washer
Sub-Total
Contract Rate

per

CGI sheet roofing - 26 #

Item No.
6.2
10
Norms-9(2) page 46

Skilled
Unskilled

sq.m.

3206.01

7. STEEL WORKS
G.I. barbed wire 12 # fencing with supply of materials and fitting all
complete
1kg = 7m
Item No.
7.1
100
Norms-24(6) page 164

Skilled

m.d.

Unskilled
barb.wire
Nails
Sub-Total
Contract Rate

per
m

grill

Supply, fixing and fitting of MS grill with painting over Primer all
complete
per
1

Sub-Total
Contract Rate

kg

Supply, fixing and fitting iron angle with painting over Primer all
complete
per
1

Iron angle with painting over Primer


Prepared By

699.40

m.d.

5.380

430.00

2313.40

Rm

110.00

12.48

1372.64

L.S.

kg

Ms angle
Sub-Total
Contract Rate

kg

Rm.

1.000

51.01

112.88

kg

112.88
112.88
129.81

1.15
kg

1.000

129.81

112.88

112.88
112.88
129.81

1.15

Unit Rate Excluding


VAT per
Checked By

50.00
4435.44
5100.76

1.15

Unit Rate Excluding


VAT per

MS grill with painting with Primer

Item No.
7.3

650.00

Unit Rate Excluding


VAT per

Barbed wire 12# fencing

Item No.
7.2

1.076

kg

129.81
Approved By

14

RATE ANALYSIS for FY 072/73 Building


Items

Prepared By

Contract

Descript.

Checked By

Unit

Quantity

U.Rate

Amount

Approved By

15

RATE ANALYSIS for FY 072/73 Building


Items

Contract

Descript.

Unit

Quantity

U.Rate

Amount

Skilled

m.d.

15.00

650.00

9750.00

Unskilled

m.d.

20.00

430.00

8600.00

m.t.

0.625

12642.40

7901.50

cu.m

1.28

1835.08

2348.90
28600.40
32890.46

8. PLASTERING WORKS
12.5 mm thick cement sand plastering works in ceiling
a) Cement sand ratio - 1:3
Item No.
8.1
100
Norms-12(1.b) page 67

cement
per
sq.m.

12.5 mm thick cement sand plastering works


a) Cement sand ratio - 1:4
per
sq.m.

12.5 mm thick cement sand plastering works


a) Cement sand ratio - 1:6
per
sq.m.

20 mm thick cement sand plastering works


a) Cement sand ratio - 1:3
Item No.
8.4
100
Norms-12(4.a) page 68

per
sq.m.

a) In brick masonry
per
sq.m.

m.d.

cement

m.t.
cu.m

sand
Sub-Total
Contract Rate

Ruled cement pointing works in cement sand ratio 1:3


a) In brick masonry
per
sq.m.

650.00

7800.00

16.00

430.00

6880.00

0.538

12642.40

6801.61

1.46

1835.08

2679.22
24160.83
27784.95

sq.m.

Skilled

m.d.

12.00

Unskilled

m.d.

cement

m.t.
cu.m

sand
Sub-Total
Contract Rate

328.90

1.15

277.85

650.00

7800.00

16.00

430.00

6880.00

0.382

12642.40

4829.40

1.57

1835.08

2881.08
22390.47
25749.04

1.15
sq.m.

257.49

Skilled

m.d.

14.00

650.00

9100.00

Unskilled

m.d.

19.00

430.00

8170.00

m.t.

0.960

12642.40

12136.70

cu.m

1.95

1835.08

3578.41
32985.11
37932.88

sand
Sub-Total
Contract Rate

1.15
sq.m.

379.33

Skilled

m.d.

10.50

650.00

6825.00

Unskilled

m.d.

12.00

430.00

5160.00

cement

m.t.

0.155

12642.40

1959.57

cu.m

0.32

1835.08

587.23
14531.80
16711.57

sand
Sub-Total
Contract Rate

1.15

Unit Rate Excluding


VAT per

Flush cement pointing 1:3 - in brick wall

Prepared By

Unskilled

Unit Rate Excluding


VAT per

Flush cement pointing works in cement sand ratio 1:3

Item No.
8.6
100
Norms-14(1.c) page 74

12.00

cement

20 mm cement plaster in c.m. - 1:3

Item No.
8.5
100
Norms-14(1.c) page 74

m.d.

Unit Rate Excluding


VAT per

1/2" cement plaster in c.m. - 1:6

sq.m.

Skilled

Unit Rate Excluding


VAT per

12.5mm cement plaster in c.m. - 1:4

Item No.
8.3
100
Norms-12(1.d) page 67

1.15

Unit Rate Excluding


VAT per

12.5mm cem. plaster in c.m. - 1:3 ceiling

Item No.
8.2
100
Norms-12(1.c) page 67

sand
Sub-Total
Contract Rate

sq.m.

Skilled

m.d.

10.50

Unskilled

m.d.

cement

m.t.
cu.m

sand
Sub-Total
Contract Rate

Checked By

650.00

6825.00

18.00

430.00

7740.00

0.155

12642.40

1959.57

0.32

1835.08

587.23
17111.80
19678.57

1.15

Unit Rate Excluding


VAT per

167.12

sq.m.

196.79
Approved By

16

RATE ANALYSIS for FY 072/73 Building


Items
Ruled cement pointing 1:3 - in brick

Prepared By

Contract

Descript.
Unit
Unit
Rate Excluding
VAT per

Checked By

Quantity
sq.m.

U.Rate

Amount
196.79

Approved By

17

RATE ANALYSIS for FY 072/73 Building


Items
Flush ruled pointing works in cement sand ratio 1:3
a) In stone masonry
Item No.
8.7
100
Norms-14(2.c) page 75

per
sq.m.

Descript.
Skilled

Unit
m.d.

Quantity
10.00

U.Rate
650.00

Amount
6500.00

Unskilled

m.d.

14.00

430.00

6020.00

cement

m.t.

0.306

12642.40

3868.57

cu.m

0.630

1835.08

1156.10
17544.67
20176.38

sand
Sub-Total
Contract Rate

3 mm thick fine cement rubbing works


per
sq.m.

Skilled

m.d.

Unskilled
cement
Sub-Total
Contract Rate

Porcelain glazed tile (wall) in 1:4 cement sand mortar


Note:-

sq.m.

650.00

m.d.

1.00

430.00

430.00

kg

53.20

12.64

672.58
1752.58
2015.46

1.15

Porcelain glazed tile(Floor) in 1:4 cement sand mortar


Note:-

sq.m.

13.00

650.00

8450.00

m.d.

4.50

430.00

1935.00

tile

sq.m

11.00

505.72

5562.92

cement

m.t.

0.056

12642.40

707.97

sand

cu.m

0.152

1835.08

278.93

kg

3.228

21.24

68.57
17003.40
19553.91

wh.cement
Sub-Total
Contract Rate

1.15

m.d.

sq.m.

1955.39

13.00

650.00

8450.00

Unskilled

m.d.

4.50

430.00

1935.00

Tile

sq.m

11.00

645.60

7101.60

cement

m.t.

0.056

12642.40

707.97

sand

cu.m

0.152

1835.08

278.93

kg

3.228

21.24

68.57
18542.08
21323.39

wh.cement
Sub-Total
Contract Rate

1.15

Unit Rate Excluding


VAT per

Porcelain glazed tile in 1:4 (Floor)

201.55

m.d.

tile- porcelain glazed tile 4" x 4"


per

sq.m.

Skilled

Skilled

Item No.
8.9b
10
Norms-11(7) page 63

650.00

Unit Rate Excluding


VAT per

Porcelain glazed tile in 1:4 (wall)

201.76

Unskilled

tile- porcelain glazed tile 4" x 4"


per

sq.m.

1.00

Unit Rate Excluding


VAT per

3mm cement punning

Item No.
8.9a
10
Norms-11(7) page 63

1.15

Unit Rate Excluding


VAT per

Flush cement pointing 1:3 - in stone

Item No.
8.8
10
Norms-11(20) page 66

Contract

sq.m.

2132.34

9. PAINTING WORKS
2 coat white washing with gum in new surface
a) in ceiling
Item No.
9.1
100
Norms-13(1.b) page 70

per

2 coat white washing a) in ceiling

2 coat white washing with gum in new surface


a) in wall

Prepared By

sq.m.

Skilled

m.d.

1.875

650.00

1218.75

Unskilled

m.d.

1.375

430.00

591.25

Chuna

kg

22.00

16.00

352.00

Gum Adhesive
Sub-Total
Contract Rate

kg

0.88

126.00

110.88
2272.88
2613.81

1.15

Unit Rate Excluding


VAT per

sq.m.

26.14

Skilled

m.d.

1.50

650.00

975.00

Unskilled

m.d.

1.10

430.00

473.00

Chuna

kg

22.00

16.00

352.00

Gum Adhesive

kg

0.88

126.00

110.88

Checked By

Approved By

18

RATE ANALYSIS for FY 072/73 Building


Items
Item No.
9.2
100
Norms-13(1.b) page 70
2 coat white washing in wall

Prepared By

per
sq.m.

Contract

Descript.
Sub-Total
Contract Rate

Unit
1.15

Unit Rate Excluding


VAT per

Checked By

Quantity

sq.m.

U.Rate

Amount
1910.88
2197.51
21.98

Approved By

19

RATE ANALYSIS for FY 072/73 Building

Contract

Items
Water proof cement paint (Snowcem) application
a) in one coat
Item No.
9.3
100
Norms-13(12.a) page 72

sq.m.

sq.m.

Amount
2275.00

Unskilled

m.d.

3.50

430.00

1505.00

kg

30.00

47.00

1410.00
5190.00
5968.50

1.15

sq.m.

m.d.

6.50

650.00

4225.00

m.d.

6.50

430.00

2795.00

kg

50.00

47.00

2350.00
9370.00
10775.50

1.15

Prepared Enamel paint application in addition to one base or lining


coat (Primer)

sq.m.

m.d.

8.00

650.00

5200.00

m.d.

5.00

430.00

2150.00

Primer

litre

8.10

263.00

2130.30

litre

9.00

446.00

4014.00
13494.30
15518.45

1.15

Prepared alluminium paint application work


a) in 2 coats
per
sq.m.

155.18

m.d.

12.00

650.00

7800.00

Unskilled

m.d.

8.00

430.00

3440.00

Primer

litre

8.10

263.00

2130.30

litre

16.00

446.00

7136.00
20506.30
23582.25

1.15
sq.m.

235.82

Skilled

m.d.

10.75

650.00

6987.50

Unskilled

m.d.

10.75

430.00

4622.50

Primer

litre

8.10

263.00

2130.30

Alum. Paint

litre

10.76

473.00

5089.48

Sand paper
Sub-Total
Contract Rate

nos.

4.00

5.00

20.00
18849.78
21677.25

1.15

Unit Rate Excluding


VAT per

2 coats Alum. Painting

sq.m.

Skilled

Unit Rate Excluding


VAT per

2 coats Enamel painting

107.76

Skilled

Enamel
Sub-Total
Contract Rate

per

sq.m.

Unskilled

Unit Rate Excluding


VAT per

1 coat Enamel painting

59.69

Skilled

Enamel
Sub-Total
Contract Rate

per

sq.m.

Unskilled

Unit Rate Excluding


VAT per

Prepared Enamel paint application in addition to one base or lining


coat (Primer)

Item No.
9.7
100
Norms-13(6) page 71

U.Rate
650.00

Snowcem
Sub-Total
Contract Rate

per

2 coats Snowcem painting

a) in 2 coats
Item No.
9.6
100
Norms-13(5) page 71

Quantity
3.50

Unit Rate Excluding


VAT per

Water proof cement paint (Snowcem) application

a) in one coat
Item No.
9.5
100
Norms-13(5a,b) page 117

Unit
m.d.

Snowcem
Sub-Total
Contract Rate

per

1 coat Snowcem painting

a) in 2 coats
Item No.
9.4
100
Norms-13(12a,b) page 73

Descript.
Skilled

sq.m.

216.77

10. SANITARY WORKS

15mm (0.5") dia. G.I. Pipe ('B' class) laying including fixing and
fitting

plumber

m.d.

0.50

650.00

325.00

Helper

m.d.

1.00

430.00

430.00

Unskilled

m.d.

1.00

430.00

430.00

Read Lead
Miscellaneous

Item No.
10.1
30
Norms-17(4.a.1) page 123
Prepared By

per
r.m.

Pipe
Sub-Total
Contract Rate

of Unskilled

43.00

0.025 of Unskilled

0.10

10.75

r.m.
1.15

Unit Rate Excluding


VAT per
Checked By

30.00

Rm.

133.00

3990.00
5228.75
6013.06
200.44
Approved By

20

RATE ANALYSIS for FY 072/73 Building


Items
" dia. G.I. Pipe ('B' class) laying

Prepared By

Contract

Descript.
Unit
Unit
Rate Excluding
VAT per

Checked By

Quantity
Rm.

U.Rate

Amount
200.44

Approved By

21

RATE ANALYSIS for FY 072/73 Building

Contract

Items

20mm (3/4") dia. G.I. Pipe ('B' class) laying including fixing and
fitting

Descript.
plumber

Unit
m.d.

Quantity
0.50

U.Rate
650.00

Amount
325.00

Helper

m.d.

1.00

430.00

430.00

Unskilled

m.d.

1.00

430.00

430.00

Read Lead
Miscellaneous

Item No.
10.2
30
Norms-17(4.a.1) page 122

Pipe
Sub-Total
Contract Rate

per
r.m.

25mm (1") dia. G.I. Pipe ('B' class) laying including fixing and
fitting

43.00
10.75

r.m.

r.m.

1.15

20mm (1/2") dia. HDPE Pipe laying with butt welded joints
including fittings wt (Kg) per rm( 10 kg/Sq.m.) 0.134

325.00

Helper

m.d.

1.50

430.00

645.00

Unskilled

m.d.

1.50

430.00

645.00

Read Lead

0.10

110mm (4") dia. HDPE Pipe laying with butt welded joints including
fittings

64.50

0.025 of Unskilled
r.m.

30.00

16.13
258.00

1.15
Rm.

7740.00
9435.63
10850.97
361.70

m.d.

1.00

650.00

650.00

Helper
Unskilled
Fuel

m.d.
m.d.
litre

1.00
2.00
0.25

430.00
430.00
70.80

430.00
860.00
17.70

r.m.

1000.00

30.55

30552.00

2.51% of Unskilled

21.59
32531.29
37410.98

1.15

Unit Rate Excluding


VAT per

1/2"dia.H.D.P. Pipe laying

of Unskilled

plumber

Pipe

r.m.

242.99
650.00

Miscellaneous
Sub-Total
Contract Rate

per

Rm.

5100.00
6338.75
7289.56

0.50

Unit Rate Excluding


VAT per

1" dia. G.I. Pipe laying

170.00

m.d.

Pipe
Sub-Total
Contract Rate

per

30.00

plumber

Miscellaneous

Item No.
10.4
1000
Norms-17(2.a.1) page 120

0.10

Unit Rate Excluding


VAT per

3/4" dia. G.I. Pipe laying

Item No.
10.3
30
Norms-17(4.a.2) page 180

of Unskilled

0.025 of Unskilled

Rm.

37.41

plumber

m.d.

1.50

650.00

975.00

Helper

m.d.

1.50

430.00

645.00

4 kg/Sq.m. ( 1.703 Kg/m)

Unskilled

m.d.

3.00

430.00

1290.00

6 Kg/Sq.m. (2.454 Kg/m)

Fuel

litre

0.50

70.80

35.40

10 Kg/Sq.m. ( 3.801 Kg/m)

Pipe

r.m.

50.00

388.28

19414.20

Item No.
10.5
50
Norms-17(2.b.2) page 120

per
r.m.

225mm dia. HDP Pipe laying, fitting and fixing all complete

Prepared By

2.51% of Unskilled

r.m.

32.38
22391.98
25750.77

1.15

Unit Rate Excluding


VAT per

4"dia.H.D.P. Pipe laying

Item No.
per
10.6
50
Norms-17(2) page 178
225mm dia.HDP Pipe laying and fixing

Miscellaneous
Sub-Total
Contract Rate

Rm.

515.02

Plumber

m.d.

2.00

650.00

1300.00

Helper

m.d.

2.00

430.00

860.00

Unskilled

m.d.

4.00

430.00

1720.00

Equipment

days

2.00

100.00

200.00

Fuel

litre

1.00

70.80

70.80

43.17

8.33
4159.13
4783.00

Miscellaneous 2.51% of labor


Sub-Total
Contract Rate
1.15
Unit Rate Excluding
VAT per
Checked By

Rm.

95.66

Approved By

22

RATE ANALYSIS for FY 072/73 Building


Items

Prepared By

Contract

Descript.

Checked By

Unit

Quantity

U.Rate

Amount

Approved By

23

RATE ANALYSIS for FY 072/73 Building

Contract

Items

Descript.

Unit

Unskilled

m.d.

Quantity

U.Rate

Amount

11. DISMANTLING WORKS


Dismantling cement or mortared plaster and removing materials
upto 10 m away from the site
Item No.
11.1
1
Norms-19(5) page 130

per

Sub-Total
Contract Rate

sq.m.

Dismantling mud mortared masonry wall and removing materials


upto 10 m away from the site
Item No.
11.2
1
Norms-19(1) page 130

per

Sub-Total
Contract Rate

cu.m.

Unskilled

Dismantling cement mortared masonry wall and removing


materials upto 10 m away from
per

Sub-Total
Contract Rate

cu.m.

Dismantling P.C.C. or mortared concrete and removing materials


upto 10 m away from the site
per

per

Unskilled

Sub-Total
Contract Rate

cu.m.

m.d.

Dismantling of tile (slate) roofing work including removing, upto


10m and stacking in proper place
per

Dismanling of tile(slate) roofing

Sq.m.

1.06

53.41
430.00

m.d.

455.80

455.80
524.17
cu.m.

2.12

524.17

430.00

911.60

911.60
1048.34
cu.m.

4.00

1048.34

430.00

1720.00

1720.00
1978.00

1.15
cu.m.

11.00

1978.00

430.00

4730.00

4730.00
5439.50

1.15

Unit Rate Excluding


VAT per

Dismanling : R.C.C.

sq.m.

1.15

Unit Rate Excluding


VAT per

Dismanling R.C.C. or R.B.C. works and removing materials upto


10 m away from the site

Item No.
11.6
1
Norms - 2041 Item 19(6) (Page130)

Unskilled

Sub-Total
Contract Rate

cu.m.

Dismanling : P.C.C.

Item No.
11.5
1
Norms-19(3) page 130

m.d.

46.44

46.44
53.41

1.15

Unit Rate Excluding


VAT per

Dismantling: wall in cement mortar

Item No.
11.4
1
Norms-19(4) page 130

m.d.

Unit Rate Excluding


VAT per

Demolishing : wall in mud

Item No.
11.3
1
Norms-19(2) page 130

Unskilled

430.00

1.15

Unit Rate Excluding


VAT per

Dismantling : cement plaster

0.108

cu.m.

5439.50

Skilled

m.d.

0.054

650.00

35.10

Unskilled

m.d.

0.081

430.00

34.83

Sub-Total
Contract Rate

69.93
80.42

1.15

Unit Rate Excluding


VAT per

Sq.m.

80.42

12. MISCELLANEOUS
25mm th. SalWood Eaves board work

Prepared By

Skilled

m.d.

1.43

650.00

929.50

Unskilled

m.d.

0.143

430.00

61.49

Wood

m3

0.275

167580.00

46084.50

Killa

L.S.

Checked By

50.00
Approved By

24

RATE ANALYSIS for FY 072/73 Building


Items
Item No.
12.1
10
Norms - 2041 Item 10.19 (Page 56)

per

25mm th. SalWood Eaves board work

Prepared By

Sq.m.

Contract

Descript.
Sub-Total
Contract Rate

Unit
1.15

Unit Rate Excluding


VAT per

Checked By

Quantity

Sq.m.

U.Rate

Amount
47125.49
54194.31
5419.43

Approved By

25

RATE ANALYSIS for FY 072/73 Building

Contract

Changing of old damaged plyWood & re-fixing 4mm th.commercial


plyWood in door all complete
additional for Lock replacing per no
additional for handle replacing per no
additional for bolt replacing per no
additional for spring fitting per no
Item No.
12.20
1
Norms - 10(20.c) page 57

Skilled

m.d.

0.108

650.00

Unskilled

m.d.

0.011

430.00

4.73

PlyWood

sq.m.
md
md
md
md
L.S.

1.05
0.67
0.10
0.04
0.10

215.20

225.96

Skilled
Skilled
Skilled

Nails
Sub-Total
Contract Rate

per
sq.m.

per

Reinforcement for Window Chaukhats

kg

Quantity

U.Rate

Amount
70.20

300.89
346.02

1.15

Unit Rate Excluding


VAT per

Supply, Cutting and Fixing Reinforecement ( 16-20 mm) bars for


Window Chaukhats

Prepared By

Unit

Skilled

In 1.5"sal fr.- 4mm plyw. shutter replace

Item No.
12.3
1000
Norms-10.21 page 58

Descript.

add as per case

Items

sq.m.

346.02

Skilled

m.d.

20.00

Unskilled

m.d.

20.00

430.00

8600.00

m.t.

1.05

73828.58

77520.01
99120.01
113988.01

Rebars
Sub-Total
Contract Rate

1.15

Unit Rate Excluding


VAT per

Checked By

kg

650.00

13000.00

113.99

Approved By

Government of Nepal
Ministry of Fedaral Affairs & Local Development

Office of District Development Committee

District Technical Office


Rupandehi

Analysis of Rates
Building
Contract

FY 072/73

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=
1

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

O{^f -("jfgL ;d]t_

1.01

k|yd >])fL

k|lt xhf/

12800

1.02

/lj;

k|lt ^s

2450

1.03

d]l;g d]* 65120240MM sf]/]sf]

k|lt xhf/

11947

1.04

d]l;g d]* 65120240MM Four side finishing

k|lt xhf/

12390

1.05

d]l;g d]* 55120240MM sf]/]sf]

k|lt xhf/

11947

1.06

d]l;g d]* 55120240MM Four side finishing

k|lt xhf/

12832

k|lt uf]^f

11.50

s+lqm^ O{^f / O{G^/ns


1.07

slqm^ O{^f (220mmX110mmX65mm)

1.08

60 dL=dL= df]^fO{sf] O{G^/ns (laleGg :ffO{hsf]) ;fbf

k|lt au{ dL=

594.00

1.09

60 dL=dL= df]^fO{sf] O{G^/ns (laleGg :ffO{hsf]) /lg

k|lt au{ dL=

693.00

1.10

80 dL=dL= df]^fO{sf] O{G^/ns (laleGg :ffO{hsf]) ;fbf

k|lt au{ dL=

693.00

1.11

80 dL=dL= df]^fO{sf] O{G^/ns (laleGg :ffO{hsf]) /lg

k|lt au{ dL=

770.00

1.12

k|yd >])fL O{^fsf] ^'qmf -175 #=lkm=sf] ^s_

k|lt ^s

8316.00

('+uf

2.01

w'nf]

k|lt #=lkm=

2.02

af]N*/

k|lt #=lkm=

df^f]

3.01

a'^jndf

k|lt ^s

2200

3.02

l;=g=kf=df

k|lt ^s

1800

3.03

cGo If]qdf

k|lt ^s

1100

luL

4.01

rfn]sf] kvfn]sf] -km]S^Ldf_ 20 Pd=Pd=

k|lt #=lkm=

46

4.02

rfn]sf] kvfn]sf] -km]S^Ldf_ 40 Pd=Pd=

k|lt #=lkm=

45

4.03

tf]*]sf] -km]S^Ldf_ 20 Pd=Pd=

k|lt #=lkm=

45

4.04

tf]*]sf] -km]S^Ldf_ 40 Pd=Pd=

k|lt #=lkm=

45

lh/f -lrK; dl;gf]_


4.05

rfn]sf] kvfn]sf] -km]S^Ldf_ 10 Pd=Pd=

k|lt #=lkm=

35

4.06

tf]*]sf] -km]S^Ldf_ 10 Pd=Pd=

k|lt #=lkm=

35

afn"jf

5.01

v;|f] afn"jf

k|lt #=lkm=

5.02

afn"jf nf]sn

k|lt #=lkm=

20

5.03

afn"jf kvfn]sf] -km]S^Ldf_

k|lt #=lkm=

45

sf&

6.01

;fn sf&

k|lt #=lkm=

4750

6.02

l;;}f sf&

k|lt #=lkm=

2500

6.03

s'sf&

k|lt #=lkm=

1115

6.04

bfp/f

k|lt s]=hL=

11.50

af+; -7 ld^/ #gf_

7.01

uf=la=;= If]qdf

k|lt #gf

190

7.02

g=kf= If]qdf

k|lt #gf

250

k|lt uf]^f

1325.00

k|lt s]=hL=

200.00

k|lt uf]^f

4.00

8
8.01

hn pTkGg k|sf]k lgoGq)f


gfO{ng hfln -3m x 1m x 1m), wire dia 4mm, mesh size 150150mm rectangular
gfO{ng *f]/L

8.02

af; uf*\g] sfo{ -kfO{ln_

8.03

a'g]sf] tf/ hfnL ('jfgL -lkr ;*s_

k|lt hfnLls=dL=

1.75

8.04

a'g]sf] tf/ hfnL ('jfgL -u|fe]n, slRr ;*sdf_

k|lt hfnLls=dL=

2.30

28+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=
8.05

lgdf{)f ;fdfu|Lsf] ljj/)f


tf/ hfnL nf]* cgnf]l*

PsfO{

cf=j=
07.07 sf]
b//]^

k|lt hfnL

8.00

d]lzgd]* tf/ hfnL-Mesh type 10cm*12cm,mesh wire 3 mm dia,selvedge


wire 3.9 mm dia,Lacing wire 2.4 mm dia,Heavy Zinc Coating)
8.06

Box Size (2m*1m*0.5m)

k|lt hfnL

1926

8.07

Box Size (3m*1m*0.5m)

k|lt hfnL

2749

8.08

Box Size (2m*1m*1m)

k|lt hfnL

2735

8.09

Box Size (3m*1m*1m)

k|lt hfnL

3881

Box Size (3m*1.5m*0.5m)

k|lt hfnL

4038

Box Size (3m*1.5m*1m)

k|lt hfnL

5686

8.1
8.11
9

l;d]G^ -50 s]=hL=_ NS / ISI

9.01

lk=lk=;L= g]kfnL

k|lt af]/f

525

9.02

lk=lk=;L= ef/lto

k|lt af]/f

612

9.03

cf]=lk=l;= g]kfnL

k|lt af]/f

620

9.04

cf]=lk=l;= ef/lto

k|lt af]/f

645

9.05

;]tf] l;d]G^ -40 s]=hL= af]/f_

k|lt af]/f

840

9.06

l;lnsf l;d]G^ P*ldSZfr/

9.07

l;d]G^ nf]* jf cgnf]* Hofnf -50 s]=hL= af]/f_

10

k|lt s]=lh=

315

k|lt af]/f

4.00

kmnfd] %* -Pg=P;=_

10.01

4=75 b]vL 8=00 ld=ld= ;Dd

k|lt s]=hL=

75

10.02

10, 12, 16, 20 ld=ld= ;Dd

k|lt s]=hL=

72

10.03
11

25 ld=ld= b]vL dfyL 32 ld=ld= ;Dd

k|lt s]=hL=

74

Pd= P;= sf]nfK;Ljn ;^/ lkml^ ;xLt

k|lt s]=hL=

120

12

Pd= P;= /f]nL ;^/ 18 u]h lkml^ ;xLt

k|lt s]=hL=

120

13

Pd=P;= u|Ln lkml^ ;xLt

k|lt s]=hL=

110

14

sf+*+] tf/ 12 u]h

k|lt s]=hL=

87

15

Pd=P;= afWg] tf/

k|lt s]=hL=

90

16

lh=cfO{= u]ljog afo/

16.01

x]eL sf]^]*

k|lt s]=hL=

90

16.02

d]l*od sf]^]*

k|lt s]=hL=

86

16.03

sdl;{on

k|lt s]=hL=

82

17

Pd= P;= P+n ISI

k|lt s]=hL=

75

18

Pd= P;= ANofs xnf] ;]S;g -Pg=P;=_

k|lt s]=hL=

75

19

Pd= P;= l;^

k|lt s]=hL=

70

20

ANofs kfO{ksf] ^;, knL{g, /fkm\^/ tyf kf]i^ cflb kmnfd] ;fdu|Lx?sf]
km]la|s]zg tyf h*fg sfo{ Hofnf

k|lt s]=hL=

45

21

sAhf ;fwf/)f (ISI)

21.01

4 " nfdf]

k|lt uf]^f

21

21.02

6 " nfdf]

k|lt uf]^f

47

22

l%:sLgL ;fwf/)f (ISI)

22.01

4 " nfdf]

k|lt uf]^f

26

22.02

6 " nfdf]

k|lt uf]^f

41

22.03

12 " nfdf]

k|lt uf]^f

64

23

df]l^{; ns ldl*od ( ISI )

k|lt uf]^f

572

24

x]G*n ( ISI )

24.01

kmnfd] 6 "

k|lt uf]^f

26

24.02

cfNd'lgod 6 "

k|lt uf]^f

32

24.03

cfNd'lgod 12 "

k|lt uf]^f

75

29+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

k|lt uf]^f

143

24.04

(f]sfsf] /f]ng

24.05

*f]/ :kL|

k|lt uf]^f

138

24.06

lsnf sf+^L

k|lt s]=hL=

108

24.07

g^ af]N^ jf;/ ;xLt

k|lt s]=hL=

160

25

lh=cfO{=g]^, dR%/ hfnL

25.01

ef/lto

k|lt a=lkm=

41

25.02

PS;k]G*]* -x]eL_

k|lt a=lkm=

25

25.03

s'v'/] hfnL

k|lt a=lkm=

14

26

l;=lh=cfO{=l;^ -;fbf_

26.01

24 u]h x]le -0=52 Pd=Pd=_

k|lt a)*n

9106

26.02

24 u]h d]l*od -0=50 Pd=Pd=_

k|lt a)*n

7982

26.03

26 u]h x]le -0=41 Pd=Pd=_

k|lt a)*n

7372

26.04

26 u]h ldl*od -0=38 Pd=Pd=_

k|lt a)*n

6717

26.05

26 u]h nfO{^ -0=35 Pd=Pd=_

k|lt a)*n

6425

26.06

28 u]h x]le -0=31 Pd=Pd=_

k|lt a)*n

5796

26.07

28 u]h ldl*od -0=28 Pd=Pd=_

k|lt a)*n

5292

26.08

28 u]h nfO{^ -0=26 Pd=Pd=_

k|lt a)*n

4973

26.09

30 u]h x]le -0=24 Pd=Pd=_

k|lt a)*n

4761

l;=lh=cfO{=l;^ -/Lg_
26.10

24 u]h x]le -0=52 Pd=Pd=_

k|lt a)*n

10920

26.11

24 u]h d]l*od -0=50 Pd=Pd=_

k|lt a)*n

10566

26.12

26 u]h x]le - 0=41 Pd=Pd= _

k|lt a)*n

9071

26.13

26 u]h ldl*od -0=38 Pd=Pd=_

k|lt a)*n

8381

26.14

26 u]h nfO{^ -0=35 Pd=Pd=_

k|lt a)*n

7982

26.15

28 u]h x]le -0=31 Pd=Pd=_

k|lt a)*n

7230

26.16

28 u]h ldl*od -0=28 Pd=Pd=_

k|lt a)*n

6717

26.17

28 u]h nfO{^ -0=26 Pd=Pd=_

k|lt a)*n

6363

26.18

30 u]h x]le -0=24 Pd=Pd=_

k|lt a)*n

6044

Kn]g l;^
26.19

26 u]h x]eL -0.40 Pd=Pd_ /+lug

k|lt a=lkm=

41

26.20

24 u]h ldl*od -0.5 Pd=Pd_ /+uLg

k|lt a=lkm=

49

26.21

26 u]h x]eL -0.40 Pd=Pd_ ;fbf

k|lt a=lkm=

34

26.22

24 u]h ldl*od -0.5 Pd=Pd_ ;fbf

k|lt a=lkm=

42

27

^f/ km]N^ -lj^'ldg l;^_

k|lt a=lkm=

11

28

;L;f ;fwf/)f -cfO{=P;=cfO{=_

28.01

3 Pd=Pd=

k|lt j=lkm

50.00

28.02

4 Pd=Pd=

k|lt j=lkm

60

28.03

5 Pd=Pd=

k|lt j=lkm

80

29

KnfOpm* sdl;{on

29.01

3 Pd=Pd= df]^fO{

k|lt j=lkm

16

29.02

4 Pd=Pd= df]^fO{

k|lt j=lkm

20

29.03

6 Pd=Pd= df]^fO{

k|lt j=lkm

32

29.04

10 Pd=Pd= df]^fO{ jf^/k|"km (Shikhar or Equivalant)

k|lt j=lkm

85

29.05

12 Pd=Pd= df]^fO{ jf^/k|"km (Shikhar or Equivalant)

k|lt j=lkm

94

29.06

19 Pd=Pd= df]^fO{ ;fwf/)F (Shikhar or Equivalant)

k|lt j=lkm

108

29.07

19 Pd=Pd= df]^fO{ jf^/k|"km (Shikhar or Equivalant)

k|lt j=lkm

137

k|lt j=lkm

210

30 Pd=Pd= df]^fO{ tof/L KnfO{pm* *f]/ ;^/


29.08

;fwf/)f

30+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

29.09

b"O{ ;fO{* ;fbf jf^/ k|"km (Shikhar or Equivalant)

k|lt j=lkm

240

29.10

Ps ;fO{* l^scsf]{ ;fO{* ;fbf jf^/ k|"km (Shikhar or Equivalant)

k|lt j=lkm

288

29.11

b"O{ ;fO{* l^s (Shikhar or Equivalant)

k|lt j=lkm

328

l^s KnfO{
29.11

4 Pd=Pd=

k|lt j=lkm

31

29.12

6 Pd=Pd=

k|lt j=lkm

59

29.13

9 Pd=Pd=

k|lt j=lkm

91

29.14

12 Pd=Pd=

k|lt j=lkm

112

30

lh=cfO{=kfO{k -Pg=P;_

30.01

0.5 " *f= ldl*od

k|lt /=dL=

133

30.02

0.75 " *f= ldl*od

k|lt /=dL=

170

30.03

1 " *f= ldl*od

k|lt /=dL=

258

30.04

1.25 " *f= ldl*od

k|lt /=dL=

337

30.05

1.5 " *f= ldl*od

k|lt /=dL=

387

30.06

2 " *f= ldl*od

k|lt /=dL=

532

30.07

2.5 " *f= ldl*od

k|lt /=dL=

678

30.08

3 " *f= ldl*od

k|lt /=dL=

845

30.09

4 " *f= ldl*od

k|lt /=dL=

1265

30.10

5 " *f= ldl*od

k|lt /=dL=

1653

30.11

6 " *f= ldl*od

k|lt /=dL=

2000

30.12

3 " *f= x]eL

k|lt /=dL=

968

30.13

4 " *f= x]Elf

k|lt /=dL=

1465

30.14

5 " *f= x]eL

k|lt /=dL=

1885

30.15

6 " *f= x]eL

k|lt /=dL=

2133

31

l;=lk=le=l;= kfO{k (ASTMD-2846)

31.01

0.5 " *f= SDR 11

k|lt /=dL=

182

31.02

0.75 " *f= SDR 11

k|lt /=dL=

260

31.03

1 " *f= SDR 11

k|lt /=dL=

387

32

Pd=P;= ANofs kfO{k -Pg=P;=_

32.01

0.50" *fold^/ ldl*od

k|lt /=dL=

87

32.02

0.75" *fold^/ ldl*od

k|lt /=dL=

112

32.03

1 " *fold^/ ldl*od

k|lt /=dL=

175

32.04

1.25" *fold^/ ldl*od

k|lt /=dL=

217

32.05

1.5" *fold^/ ldl*od

k|lt /=dL=

251

32.06

2" *fold^/ ldl*od

k|lt /=dL=

341

32.07

2.5" *fold^/ ldl*od

k|lt /=dL=

443

32.08

3" *fold^/ ldl*od

k|lt /=dL=

546

32.09

4" *fold^/ ldl*od

k|lt /=dL=

859

32.10

5" *fold^/ ldl*od

k|lt /=dL=

1095

32.11

6" *fold^/ ldl*od

k|lt /=dL=

1300

32.12

8" *fold^/ ldl*od

k|lt /=dL=

2319

32.13

4" *fold^/ x]eL

k|lt /=dL=

1003

32.14

5" *fold^/ x]eL

k|lt /=dL=

1267

32.15

6" *fold^/ x]eL

k|lt /=dL=

1500

32.16

8" *fold^/ x]eL

k|lt /=dL=

2919

32

o""=lk=eL=;L= kfO{k -Pg=P;=_

k|lt s]=hL=

173

33

Pr= l*= lk= kfO{k -Pg=P;=_

k|lt s]=hL=

228

31+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=
34

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

x|o"d kfO{k Pg=lk= 3 Snf;

34.01

15 ;]=dL= *fold^/

k|lt /=dL=

1870

34.02

20 ;]=dL= *fold^/

k|lt /=dL=

2310

34.03

25 ;]=dL= *fold^/

k|lt /=dL=

2805

34.04

30 ;]=dL= *fold^/

k|lt /=dL=

3190

34.05

35 ;]=dL= *fold^/

k|lt /=dL=

3575

34.06

40 ;]=dL= *fold^/

k|lt /=dL=

4070

34.07

45 ;]=dL= *fold^/

k|lt /=dL=

4675

34.08

50 ;]=dL= *fold^/

k|lt /=dL=

5225

34.09

60 ;]=dL= *fold^/

k|lt /=dL=

6270

34.1

70 ;]=dL= *fold^/

k|lt /=dL=

7920

34.11

75 ;]=dL= *fold^/

k|lt /=dL=

9020

34.12

80 ;]=dL= *fold^/

k|lt /=dL=

10120

34.13

90 ;]=dL= *fold^/

k|lt /=dL=

11495

34.14

100 ;]=dL= *fold^/

k|lt /=dL=

12760

34.15

120 ;]=dL= *fold^/

k|lt /=dL=

14960

34.16

150 ;]=dL= *fold^/

k|lt /=dL=

22000

Xo"d kfO{k Pg=lk= 2 Snf;


34.17

15 ;]=dL= *fold^/

k|lt /=dL=

688

34.18

20 ;]=dL= *fold^/

k|lt /=dL=

825

34.19

25 ;]=dL= *fold^/

k|lt /=dL=

935

34.20

30 ;]=dL= *fold^/

k|lt /=dL=

1100

34.22

40 ;]=dL= *fold^/

k|lt /=dL=

1815

34.23

45 ;]=dL= *fold^/

k|lt /=dL=

2145

34.24

50 ;]=dL= *fold^/

k|lt /=dL=

2255

34.25

60 ;]=dL= *fold^/

k|lt /=dL=

3630

34.26

70 ;]=dL= *fold^/

k|lt /=dL=

3850

34.27

75 ;]=dL= *fold^/

k|lt /=dL=

4290

34.28

80 ;]=dL= *fold^/

k|lt /=dL=

4730

34.29

90 ;]=dL= *fold^/

k|lt /=dL=

5610

34.30

100 ;]=dL= *fold^/

k|lt /=dL=

6710

34.31

120 ;]=dL= *fold^/

k|lt /=dL=

7590

34.32

150 ;]=dL= *fold^/

k|lt /=dL=

12540

34.33

x\o"d kfO{k sn/ -;s]^_

35

k|lt uf]^f

;*s ;DjlGw
k|lt j=dL=

95.00

cnsqf 80100 u|]* -("jflg jfx]s_

k|lt s]=hL=

75.00

35.03

cnsqf 6070 u|]* -("jflg jfx]s_

k|lt s]=hL=

35.04

O{dN;g Medium Setting with 65% Bitumen (M/S 65%)

k|lt s]=hL=

68.15

35.05

PlG^ l:^lk Pl*l^E;

k|lt s]=hL=

320.00

35.06

Retrorective Delineator (900 mm height,50 mm dia.)

k|lt uf]^f

766.00

35.07

Thermoplastic Paint

k|lt s]=hL=

249.00

35.08

Glass Bit

k|lt s]=hL=

242.00

35.09

Reflective Sheet(150 ft*2")

k|lt /f]n

5420.00

35.10

Cats Eye

k|lt uf]^f

596.00

35.01

Geotextile Polypropylene Nonwoven (TS-30 equivalent)

35.02

32+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

35.11

Solar Lead Street Light (Single Arm) with 12 watt Lead Battery

k|lt uf]^f

86720.00

35.12

Solar Lead Street Light (Single Arm) with 12 watt * 2 Lead Battery

k|lt uf]^f

114904.00

36

Kofg sdf]* / l;:^g{

36.01

Kofg kf];L{lng Un]H* 16 " x 22 " ;fwf/)f

k|lt ;]^

600

36.02

Kofg kf];L{lng Un]H* 16 " x 22 " -k]l/, lxGb jf ;f] ;/x_

k|lt ;]^

1500

36.03

sdf]* Un]H* ;fwf/)f -se/ ;xLt_

k|lt ;]^

3000

36.04

sdf]* Un]H* -se/ ;xLt_ -k]l/, lxGb jf ;f] ;/x_

k|lt uf]^f

3250

36.05

l;:^{g sDKnL^ ;]^ -lk=le=;L=_ l;+un kmn;

k|lt uf]^f

1200

36.06

l;:^{g sDKnL^ ;]^ -lk=le=;L=_ *jn kmn;

k|lt uf]^f

1500

37

o'/Lgn Un]H*

37.01

k'?if 9 " Flat Back

k|lt uf]^f

950

37.02

k'?if Nano

k|lt uf]^f

1200

37.03

kf]/l;lng Un]H* o"l/gn kfl^{zg

k|lt uf]^f

1200

37.04

dlxnf 9 "

k|lt uf]^f

1000

38

jf; a];Lg

800

38.01

12 " x 18 " Un]H*

k|lt uf]^f

38.02

16 " x 22 " Un]H*

k|lt uf]^f

950

k|lt ;]^

1100

38.03
39

Wash basin pedestal

lsr]g l;+s

39.01

:^Ln ( 16" x 18" )

k|lt uf]^f

1250

39.02

:^Ln ( 24" x 18" )

k|lt uf]^f

1600

39.03

:^Ln ( 37" x 18" )

k|lt uf]^f

2150

40

^fon

40.01

km\nf]/ ^fon -ef/lto_

k|lt a=lkm=

60

40.02

km]G;L ^fon l*lh^n -ef/lto_

k|lt a=lkm=

90

40.03

;fwf/)f jfn ^fon -ef/lto_

k|lt a=lkm=

47

41

dfa{n

41.01

dfa{n ;fwf/)f -13 b]vL 15 dLdL df]^fO{_

k|lt a=lkm=

140

41.02

dfa{n u|]gfO{^ /fh:yfgL -25 dLdL df]^fO{_

k|lt a=lkm=

280

41.03

dfa{n u|]gfO{^ a}+unf]/ -25 dLdL df]^fO{_

k|lt a=lkm=

350

41.04

dfa{n lrK;

s]=hL=

13

41.05

dfa{n kfp*/

s]=hL=

10

42

km]G;L ^fjn /*

42.01

x]eL ;fO{h -2 lkm^_

k|lt uf]^f

440

42.02

;fwf/)f -1=5 lkm^_

k|lt uf]^f

220

43

;f]k s]; ;fwf/)f

k|lt uf]^f

125

44

;fj/ l^N^] 3.5 " *fold^/

k|lt uf]^f

460

45

km]G;L P]gf 16 "x 22"

k|lt uf]^f

440

46

wf/f tyf cGo

46.01

/fd|f] a|f; -400 u|fd_

k|lt uf]^f

500

46.02

/fd|f] a|f; -200 u|fd_

k|lt uf]^f

275

46.03

Ordinary type C.P. Bibcock 15 mm dia.

k|lt uf]^f

525

46.04

Ordinary type C.P.angle valve 15 mm dia.

k|lt uf]^f

525

46.05

60 cm.C.P. Glass Shelf

k|lt uf]^f

525

47

u]^ eNa -ug d]^n_ cfO{=P;=cfO{=Pg=P;=

47.01

0.5 " *fold^/

k|lt uf]^f

420

47.02

0.75" *fold^/

k|lt uf]^f

525

47.03

1 " *fold^/

k|lt uf]^f

840

33+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=
47.04
48
48.01

lgdf{)f ;fdfu|Lsf] ljj/)f


1.5 " *fold^/

PsfO{

cf=j=
07.07 sf]
b//]^

k|lt uf]^f

1470

k|lt uf]^f

1800

rfkfsn x]* 4 g+=


;fwf/)f g]kfnL
rfkfsn x]* 6 g+=

48.02

o'lg;]km df]*]n

k|lt uf]^f

6300

48.03

23 s]=hL= x]*

k|lt uf]^f

3150

48.04

21 s]=hL= x]*

k|lt uf]^f

2950

;fwf/)f 14 s]=hL=

k|lt uf]^f

1980

48.05
49

kfgL tfGg] d];Lg -cfO{=P;=cfO{=_

49.01

0=5 xif{kfj/ -l;+un km]h_ ef/tLo

k|lt uf]^f

4725

49.02

1=0 xif{kfj/ -l;+un km]h_ ef/tLo

k|lt uf]^f

8243

49.03

0=5 xif{kfj/ -l;+un km]h_ rfO{gLh

k|lt uf]^f

2048

49.04

1=0 xif{kfj/ -l;+un km]h_ rfO{gLh

k|lt uf]^f

3098

49.05

1=5 xif{kfj/ -l;+un km}h_ ;jdl;{jn rfO{gLh

k|lt uf]^f

9975

49.06

1=5 xif{kfj/ -l;+un km}h_ ;jdl;{jn ef/tLo

k|lt uf]^f

24885

50
50.01

vfg]kfgL ^\ofG
kf]lnlyg kfgL ^\ofG ;fwf/)f

k|lt ln^/

50.02

kf]lnlyg kfgL ^\ofG Pg=P;=

k|lt ln^/

10

50.03

:^]gn]; :^Ln kfgL ^\ofGs 500 ln=

k|lt ln^/

27

50.04

:^]gn]; :^Ln kfgL ^\ofGs 1000 ln= jf ;f] eGbf a(L Ifdtfsf]

k|lt ln^/

17

51

//f]ug

51.01

r'gf

k|lt s]=hL=

17

51.02

:gf];]d -l;d]G^ k]G^_

k|lt s]=hL=

47

51.03

u'b km]ljsf]n

k|lt s]=hL=

126

51.04

rk|f rf}/L

k|lt s]=hL=

1213

51.05

sf]N^f/

k|lt s]=hL=

32

51.06

k'l^g

k|lt s]=hL=

53

51.07

^f/lkg t]n

k|lt ln=

116

51.08

O{gfd]n

k|lt ln=

446

51.09

k|fO{d/

k|lt ln=

263

51.10

Knfl:^s O{dN;g k]G^- d]l*od_

k|lt ln=

420

51.11

jf;]jn l*:^]Dk/

k|lt ln=

158

51.12

Apex coat (water profing paint)

k|lt ln=

566

51.13

Plaster of Paris Paint

k|lt s]=hL=

16

51.14

l*=la= lnG;]* cfon

k|lt ln=

92

51.15

jfg{];

k|lt ln=

158

51.16

;/];

k|lt ln=

208

51.17

cfNd'lgod k]G^

k|lt ln=

473

51.18

/]* cS;fO{*

k|lt ln=

263

51.19

jf^/k'|km sDkfp)*

51.20

;]kmls|^

52

k|lt s]=hL=

81

k|lt ln=

263

xf]nf] l;d]G^ Ans

52.01

16 " x 6 " x 8 "

k|lt yfg

30

52.02
53

16 " x 8 " x 8 "

k|lt yfg

40

53.01

6 lkm^ nfdf]

k|lt yfg

963

53.02

7 lkm^ nfdf]

k|lt yfg

1100

cf/=l;=l;= km]G;L kf]n 10 x 10 ;]]=dL= ^k / 12 x 12 ;]=dL= a^d ;fOhsf]


8 ld=ld= kmnfd] %* ;d]t tof/L

34+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

cf/=l;=l;= ljw't kf]n


53.03

8 ld^/ nfdf]

k|lt yfg

6380

53.04

9 ld^/ nfdf]

k|lt yfg

7040

53.05

11 ld^/ nfdf]

k|lt yfg

13970

54

laB"t / afo/L

()
()
()
()
()

dL
dL
dL
dL
dL

sf]
sf]
sf]
sf]
sf]

/f]n
/f]n
/f]n
/f]n
/f]n

54.01

ljw't jfol/ tf/ #x@@ -Pg=P;_

54.02

ljw't jfol/ tf/ #x@) -Pg=P;_

54.03

ljw't jfol/ tf/ &x@@ -Pg=P;_

54.04

ljw't jfol/ tf/ &x@) -Pg=P;_

54.05

ljw't cly{ tf/ !x!* -Pg=P;_

54.06

;fdfg afx]s sG;LN* afo/L ug]{ sfo{sf] Hofnf

k|lt KjfO{G^

55

54.07

;fdfg afx]s ;km]{; afo/L ug]{ sfo{sf] Hofnf

k|lt KjfO{G^

40

55

1200
1900
2712
4410
1000

l;+rfO ;DaGwL
l*h]n kDk;]^ -lsnf]{;s/ jf ;f] ;/x_
kDk;]^ -1500 cf/=lk=Pd=_ -^nL, a])*, lgKKfn, s'ln kfO{k ;d]t
sdlKn^ ;]^_ Eof^ gnfUg]

55.01

5 xif{ kfj/ 3 " x 3 " kDk

k|lt ;]^

52000

55.02

5 xif{ kfj/ 3 " x 2.5 " kDk

k|lt ;]^

52000

55.03

5 xif{ kfj/ 4 " x 4 " kDk

k|lt ;]^

56000

O{n]S^Ls kDk;]^ -lsnf]{zs/ jf ;f] ;/x_


55.04

1=5 xif{ kfj/ 2 " x 2 " -1 km]h_ kDk

k|lt ;]^

16000

55.05

2=0 xif{ kfj/ 3 " x 3 " -1 km]h_ kDk

k|lt ;]^

21000

55.06

3=0 xif{ kfj/ 4 " x 4 " / 3"x3" -1 km]h_ kDk

k|lt ;]^

34900

55.07

5=0 xif{ kfj/ 4 " x 4 " -1 km]h_ kDk

k|lt ;]^

46000

55.08

3=0 xif{ kfj/ 3 " x 3 " -3 km]h_ kDk

k|lt ;]^

33000

55.09

5=0 xif{ kfj/ 4 " x 4 " -3 km]h_ kDk

k|lt ;]^

42500

56

l(sL kDk

k|lt yfg

1250

57

l;d]G^sf] vfnL af]/f

57.01

l;d]G^ vfnL af]/f -KNff:^Ls_

k|lt uf]^f

7.50

57.02

l;d]G^ gof af]/f -KNff:^Ls_

k|lt uf]^f

16.00

58

ag tyf e';+/If)f ;+aGwL


g;{/Lsf] nfuL dlnnf] df^f] -;+sng nf]* ("jfgL ;d]t u/fO{ g;{/L If]qdf vl/b ug]{_

58.21

a"^jn / agsf] 7 ls=dL= leq

k|lt #=lkm=

16.75

58.22

l;=g=kf= / cGo If]qdf

k|lt #=lkm=

21.50

58.23

v/gfkf] -16 d'&f_

k|lt ;f]/xL

345.00

58.24

kf]nLyLg y}nf] -200 u]h_

k|lt s]=hL=

300.00
0.00

s_ :^Dk sl^
58.25
58.26

1_ l^s

k|lt uf]^f

7.75

2_ cGo hft

k|lt uf]^f

5.40
0.00

kf]nLyLg y}nf]df
58.27

59

1_ l;/L;, jsfOgf], skf;, d;nf, l;dn, jj'/, sf+luof], Olkn,^f+sL, sf]O/fnf] cflb
-kf]nLlyg y}nf]df_

k|lt uf]^f

2_ l^s -37_ ;fO{h

k|lt uf]^f

9.30

3_ l^s -37_ ;fO{h -Ps aif{ eGbf a(L pd]/sf]_

k|lt uf]^f

14.75

4_ ;a} hftsf] Ps aif{ eGbf a(L pd]/sf] lj?jf -1012 ;fO{h_

k|lt uf]^f

135.00

l;+rfO{ ;DaGwL

35+1/14

7.15

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

59.01

/a/l;n 9" / 10"

59.02

/a/l;n 5" / 6"

59.03

xfO{*f]lns :^Ln u]^

59.04
59.05

PsfO{

cf=j=
07.07 sf]
b//]^

ld^/

1100

ld^/

715

s]=lh=

237

u]^ u}o/ sdlKn^ ;]^ 5~10 ^g Ifdtf ePsf]

;]^

10450

u]^ u}o/ sdlKn^ ;]^ 10~15 ^g Ifdtf ePsf]

;]^

20900

59.06

u]^ u}o/ sdlKn^ ;]^ 15~20 ^g Ifdtf ePsf]

;]^

31900

59.07

u]^ u}o/ sdlKn^ ;]^ 20~25 ^g Ifdtf ePsf]

;]^

41800

59.08
60

la^'ldg k])^

ln^/

160

('jfgL ;+aGwL
1_ law't ;DaGwL ("jfgL
^fG;kmd{/ 25 s]=eL=P= b]vL 200 s]=eL=P= ;Dd

60.01

g=kf= leq

k|lt yfg

900

60.02

g=kf= aflx/

k|lt yfg

1800

2_ x\o"dkfO{k ;DaGwL ("jfgL


kfO{ksf]
d'Nodf yk k|
ltzt

5 ls=ld= ;Dd
60.03

kfO{ksf]
d'Nodf yk k|
ltzt

5 b]lv 10 ls=ld= ;Dd


60.04

kfO{ksf]
d'Nodf yk k|
ltzt

10 ls=ld= eGbf dfly


60.05

10

3_ km]G;L kf]n ;DalGw ("jfgL


kf]nsf] d'Nodf
yk k|ltzt
60.6

10 ls=ld= ;Dd
kf]nsf] d'Nodf
yk k|ltzt

60.7

10 ls=ld= eGbf dfly

4_ ljB't kf]n ;DalGw ("jfgL


kf]nsf] d'Nodf
yk k|ltzt
60.08

5 ls=ld= ;Dd
kf]nsf] d'Nodf
yk k|ltzt

60.09

5 b]lv 10 ls=ld= ;Dd


kf]nsf] d'Nodf
yk k|ltzt

60.10
61

61.01
61.02

61.03

10 ls=ld= eGbf dfly

10

g]kfn vfB ;+:yfg ;DaGwL

uf]bfdaf^ dfn;fdfg / vfBfGg ufl*df nf]* ug]{ sfo{sf] Hofnf


"

k|lt 50
s]=hL= s:tL
af]/f
25 s]=hL s:tL

"

uf]bfdaf^ dfn;fdfg / vfBfGg ufl*df cgnf] ug]{ sfo{sf] Hofnf

36+1/14

k|lt 50
s]=hL= s:tL
af]/f

4.50
2.50

4.50

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

61.04

61.05

"

61.07

25 s]=hL s:tL

"

dfn;fdfg / vfBfGg :^f]/df rf}sfO{ kN^fO{ ug]{ sfo{sf] Hofnf

61.06

"

"

k|lt 25
s]=hL= s:tL
af]/f
k|lt 50
s]=hL= s:tL
af]/f

"

k|lt 25
s]=hL= s:tL
af]/f

dfn;fdfg / vfBfGg tf}nfO{ ug]{ sfo{sf] Hofnf

61.08

PsfO{

k|lt 50
s]=hL= s:tL
af]/f

"

cf=j=
07.07 sf]
b//]^

2.50

3.00

3.00

2.00

3.00

61.09

vfBfGg ;+lrt u/]sf] uf]bfd ;kmfO{ 1000 d]= ^g

k|lt uf]bfd

120.00

61.10

vfBfGgsf] s:tL jf]/f l;nfO{

k|lt uf]^f

0.70

61.11

gu/kfnLsf leq nf]sn ('jfgL

k|lt 100
s]=hL=

23.00

61.12

vfBfGgdf cfifwL :k|] ug]{

Ps ^+sL -15
nL=_

125.00

61.13

cf}ifwL lkmlds]zg u/]sf]

k|lt n^

250.00

a'^jn uf]bfdsf nflu

61.14

61.15
62

k|lt 25
s]=hL= s:tL
af]/f

nf]l*+u

k|lt 25
s]=hL= s:tL
af]/f

cgnf]l*+u

4.00

4.00

ELECTRICAL WORKS (Supply and fitting all complete)


A) LUMINAIRES (FIXTURES)
Accessories, screws, grips, pvc tape, choke, starter, Tube, bulbs, holder, flexible
wire etc all complete.

62.01

Dome light 8" with heavy carier Homedec or eqvt.

set

375

62.02

1*40 watt Tube light mirror optic wipro / philips HPF or eqvt.

set

3700

62.03

1*40 watt Tube light box type wipro /philips HPF or eqvt.

set

1050

62.04

2*40 watt mirror optic Tube light wipro / philips HPF or eqvt.

set

4500

62.05

Mirror light decorative philips or eqvt.

set

380

62.06

Indicator light for O.T.room red & green color etc all complete.

set

90

62.07

Electrical bell musical type of different sounds

set

215

B ) FAN / EXHAUST FAN


Accessories nut,bolt,hook,clamp,regulator,flexible wire etc all complete.
62.08

42" ceiling fan USHA or eqvt.

set

2400

62.09

9" exhaust fan Usha or eqvt.

set

2000

C ) SOCKET, SWITCH, JUNCTION BOX


Accessories: metal box, screw, grips, pvc tape, etc all complete
62.10

16/6 Amps combined S/ socket flush type

set

215

62.11

1 gang 1,2 way switch philips or eqvt

set

185

62.12

2 gang 1,2 way switch philips or eqvt

set

195

37+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

62.13

3 gang 1,2 way switch philips or eqvt

set

450

62.14

4 gang 1,2 way switch philips or eqvt

set

480

62.15

5 gang 1,2 way switch philips or eqvt

set

625

62.16

6 gang 1,2 way switch philips or eqvt

set

650

62.17

1 gang one bell push Philips or eqvt.

set

215

62.18

Junction box made of metal withcover size 6"*4" etc all complete

set

100

Accessories: screws,grips,nut,bolt,cu bus bar,earth bus bar, neutral bus bar, fuse,
porcelin base, cu strip for connection, cable shoe, phase bar, pvc tape etc all
complete
panel board made of mild steel sheet double cover floor mount suitable color push
type lock size 12" *36" *48" suitable for housing the following items all complete
(space for 4 no MCCB)

set

20790

62.20
62.21

100A TP MCCB of standard company

no

4500

40-50A TP MCCB of standard company

no

3900

62.22
62.23

Ammeter 0-500A

no

500

volt meter 0-500 v

no

500

62.24
62.25

CT coil of suitable ratio for panel board

no

600

Indicator lamp for fuse

no

150

62.26

Selector switch

set

450

62.27

Distribution board 8 way TPN made of mild steel sheet double cover locable of
approved compny .Flush type etc all complete

set

3500

62.28

6,16, 25 Amps TP MCCB of approved company for light and power circuit

no

2250

62.29

40-63 Amps TP MCCB of approved company for main

no

2750

62.30

6,16,25 Amps TP MCB of approved company for main

D ) PANEL BOARD / DB

62.19

1150

E ) POINT WIRING
Accessories;HDPEpolythenepipe,screws,pvc, tape, grips, circular box etc all
complete
62.31

2*3/20 pvc cu.wire for light and fan point 1/2" HDPE polythene pipe

point

375

62.32

point

600

62.33

2*7/22+1*3/22 pvc cu.wire for power point in 3/4" in HDPE polythene pipe
2*7/20+1*3/22 pvc cu. Wire with A / C socket in 3/4" in HDPE polythene pipe for
A/C etc all complete

point

1700

62.34

10mm sq.4 core unarmoured copper cable for DB in HDPE polythene pipe or
through channel etc all complete

R.M.

300

62.35

8 swg cu.wire in HDPE polythene pipe for earth continuity from panel board to DB
etc all complete

R.M.

65

F ) TELECOM SYSTEM
Accessories;HDPE pipe screws,pvc tape grips etc all complete
62.36

2 pair telephone cable for telephone point in 1/2"(20mm) polythene pipe

point

272

62.37

5 pair telephone cable for main in (25mm) HDPE polythene pipe from junction box
to telephone DB

meter

31

62.38

10 pair telephone cable for mainin (25mm) HDPE polythene pipe/ cable tray

meter

40

62.39

15 pair telephone cable for telephone point in 1/2"(20mm) polythene pipe

point

62

62.40

20 pair telephone cable for telephone point in 1/2"(20mm) polythene pipe

point

80

62.41

Telephone socket North west or eqvt.

set

336

62.42

Telephone junction box6"*8" made of mild steel sheet with connector fuse type etc
all complete

set

120

38+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

PsfO{

cf=j=
07.07 sf]
b//]^

set

1680

set

31600

unit

8000

Aluminium Sliding Window without ventilation with naturally anodized


aluminium (section 101.6mm*44mm*1.5 mm) with 5mm th. clear glass and steel
net including materials and labour and fixing and fitting all complete (Size >30 Sq.
ft)

sq.ft

510

Aluminium Sliding Window with fixed ventilation with naturally anodized


aluminium (section 101.6mm*44mm*1.5 mm) with 5mm th. clear glass and steel
net including materials and labour and fixing and fitting all complete (Size >30 Sq.
ft)

sq.ft

540

Aluminium Sliding Window with sliding ventilation with naturally anodized


aluminium (section 101.6mm*44mm*1.5 mm) with 5mm th. clear glass and steel
net including materials and labour and fixing and fitting all complete (Size >30 Sq.
ft)

sq.ft

576

Aluminium Sliding Window without ventilation with naturally anodized


aluminium (section 101.6mm*44mm*1.5 mm) with 5mm th. clear glass and steel
net including materials and labour and fixing and fitting all complete (Size 20-30
Sq. ft)

sq.ft

540

Aluminium Sliding Window with fixed ventilation with naturally anodized


aluminium (section 101.6mm*44mm*1.5 mm) with 5mm th. clear glass and steel
net including materials and labour and fixing and fitting all complete (Size 20-30
Sq. ft)

sq.ft

600

Aluminium Sliding Window with sliding ventilation with naturally anodized


aluminium (section 101.6mm*44mm*1.5 mm) with 5mm th. clear glass and steel
net including materials and labour and fixing and fitting all complete (Size 20-30
Sq. ft)

sq.ft

696

Aluminium Swing Door with naturally anodized aluminium (section


101.6mm*44mm*1.5 mm) with 5mm th. clear glass including materials and labour
and fixing and fitting all complete (Size > 21Sq. ft)

sq.ft

600

Aluminium Ventilation Louver with naturally anodized aluminium (section


101.6mm*44mm*1.5 mm) with 5mm th. clear glass including materials and labour
and fixing and fitting all complete

sq.ft

660

Aluminium Partition with naturally anodized aluminium (section


62mm*38mm*1.5mm) with 5mm th. clear glass including materials and labour
and fixing and fitting all complete

sq.ft

360

sq.ft

131

sq.ft

137

R.ft.

363

R.ft.

477

Sq.Ft

587

l;=g+=

62.43
62.44

lgdf{)f ;fdfu|Lsf] ljj/)f

Main DB made of mild steel sheetwith connector fuse typeetc all complete
Matrix portion 308 EPABX systemexpandable 3 co line 8 single line extension,
automatic STD,ISD lock call duration control external call forwardingor eqvt
G ) EARTHING

62.45
63
63.01

63.02

63.03

63.04

63.05

63.06

63.07

63.08

63.09
64

Earthing with cu.plate size 65cm*65cm*3.15mm with G.N.8 copper wire for earth
continuity from panel board to earthing site etc all complete
Aluminium Windows/Door/Partition

UPVC Roofing

64.01

3 MM Thick Composite Carbon Fibre UPVC Roofing Sheet (Weight 5.5 to 6


Kg/sq.m) with PMMA Coating and glass fibre mesh (Regular Profile)

64.02

3 MM Thick Composite Carbon Fibre UPVC Roofing Sheet (Weight 5.5 to 6


Kg/sq.m) with PMMA Coating and glass fibre mesh (Tile Profile)

64.03

3 MM Thick Composite Carbon Fibre UPVC Ridge Cover Sheet (Regular Profile)

64.04

3 MM Thick Composite Carbon Fibre UPVC Ridge Cover Sheet (Tile Profile)

65
65.01

UPVC Door/Windows
UPVC Sliding Windows Frame (80/50mm), Sliding window sash (38/62mm) with
net all complete inside 1.5 mm galvanized reinforcement, 5 mm clear glass (white
colour) including the cost of materials and labour and fixing and fitting all complete

39+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

65.02

UPVC Door Frame (80/50mm), door frame 112/42 mm door sash 80*200mm
pannel, inside 1.5 mm galvanized reinforcement, 5 mm clear glass (White colour)
including the cost of materials and labour and fixing and fitting all complete

65.03

UPVC casement Window(60*72mm), sash inside 1.5 mm galvanized


reinforcement, 5 mm clear glass (White colour) including the cost of materials and
labour and fixing and fitting all complete

65.04
66

UPVC door Frame (60*58mm),Sash 102*60mm (Special), door pannel 18*200


mm, inside 1.5 mm galvanized reinforcement, 5 mm clear glass (White colour)
including the cost of materials and labour and fixing and fitting all complete

PsfO{

cf=j=
07.07 sf]
b//]^

Sq.Ft

604

Sq.Ft

604

Sq.Ft

719

Stainless Steel / Stainless Steel Railing Indian standard

66.01

Stainless Steel pipe 1" Diameter

R.ft

81

66.02

Stainless Steel pipe 1.5" Diameter

R.ft

109

66.03

Stainless Steel pipe 2" Diameter

R.ft

144

66.04

Stainless Steel Railing with 2" dia top, 1.5" dia middle and bottom pipe in 4 rows
total, 2" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete

R.ft

1470

66.05

Stainless Steel Railing with 2" dia top, 1" dia middle and bottom pipe in 4 rows
total, 2" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete

R.ft

1208

66.06

Stainless Steel Railing with 2" dia top, 1" dia middle and bottom pipe in 3 rows
total, 2" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete

R.ft

1076

Stainless Steel Railing with 1.5" dia top, 1" dia middle and bottom pipe in 3 rows
total, 1.5" dia posts at ~1m c/c finish clear height including the cost of materials
and labour and fixing and ftting all complete

R.ft

945

66.07
67

x]le OlSjkd])^ -O{Gwg afx]s_

67.01

Grader ( 80 to 145 HP )

k|lt #)^f

1600

67.02

Asphalt plant ( up to 10 Ton )

k|lt #)^f

400

67.03

Asphalt plant (40 Ton )

k|lt #)^f

6810

67.04

Asphalt Paver

k|lt #)^f

1400

67.05

Ashalt mixer ( Bel MIx )

k|lt #)^f

1000

67.06

Broom Road, Towed

k|lt #)^f

260

67.07

Air compressor ( 150 to 275 CFM )

k|lt #)^f

250

67.08

Dozer, wheel ( 150+ to 225 HP )

k|lt #)^f

2100

67.09

Dozer, Track ( 120 to 125 HP )

k|lt #)^f

2000

67.10

Bitumin Distributor ( 4 to 6 KI )

k|lt #)^f

1300

67.11

Bitumin Heater ( Up to 2 KL )

k|lt #)^f

140

67.12

Excavator, Track ( Up to 110 HP )

k|lt #)^f

1200

67.13

Excavator, Track ( 111 to 150 HP )

k|lt #)^f

1800

67.14

Loader wheel ( 1 to 1.75 CuM)

k|lt #)^f

1000

67.15

Loader wheel ( 1.8 to 2.3 CuM)

k|lt #)^f

1200

67.16

Loader wheel ( 2.2 to 2.5 CuM)

k|lt #)^f

1500

67.17

Backhoe Loader ( UP to 85 HP )

k|lt #)^f

1000

67.18

Water pump ( Up to 6" Dia. )

k|lt #)^f

200

67.19

Roller 3 wheel ( Up to 12 ton )

k|lt #)^f

500

67.20

Roller Pneumatic ( up to 20 to )

k|lt #)^f

1200

67.21

Roller Vib, Pedestrain ( Up to 0.50 ton )

k|lt #)^f

110

67.22

Roller vib, Self propelled ( 3 ton )

k|lt #)^f

550

67.23

Roller vib, Self propelled ( 3 ton + )

k|lt #)^f

900

67.24

Spreader chips , self propelled

k|lt #)^f

1500

67.25

Water Tanker ( Up to 6 KL )

k|lt #)^f

550

40+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

PsfO{

cf=j=
07.07 sf]
b//]^

67.26

Compactor Hand Towed ( 350 to 450 KG )

k|lt #)^f

130

67.27

Tractor

k|lt #)^f

300

67.28

Trailor

k|lt #)^f

67.29

Truck / Tipper 8 Mt

k|lt #)^f

140
680

67.30

Truck / Tipper 6 Mt

k|lt #)^f

525

67.31

Truck / Tipper 5 Mt

k|lt #)^f

450

67.32

MIni Truck

k|lt #)^f

315

67.33

Boring Rig (TONE)

k|lt #)^f

1200

67.34

Pile Driver 10 Ton

k|lt #)^f

3000

67.35

Vibrator (Needle)

k|lt #)^f

100

67.36

Vibrator (Engine)

k|lt #)^f

120
600

68

rkL{sf] nflu s+lqm^ l/ %* ;d]t

68.01

^\jfO{n]^sf] l/ -75 ;]=dL= *fold^/, 30 ;]=dL= prfO{_

k|lt uf]^f

68.02

^\jfO{n]^sf] l/ -95 ;]=dL= *fold^/, 30 ;]=dL= prfO{_

k|lt uf]^f

800

68.03

^\jfO{n]^sf] l/ -110 ;]=dL= *fold^/, 30 ;]=dL= prfO{_


Readymade
RCC
door door,
and window
frame and
of section
Readymade
RCC
window
arc 4"*2.75"
frameswith concrete mix
design of 1:1:1 proporotion and 2 Nos of 7 mm diameter rebar including
arrangement of necessary holes and safety plates all complete
Readymade RCCventilation frame of section 4"*2.75" with concrete mix design of
1:1:1 proporotion and 2 Nos of 7 mm diameter rebar including arrangement of
Readymade
RCCand
door
and window
frame(semi circular) of section 4"*2.75"
necessary holes
safety
plates allArc
complete
with concrete mix design of 1:1:1 proporotion and 2 Nos of 7 mm diameter rebar
including arrangement of necessary holes and safety plates all complete

k|lt uf]^f

1000

/=lkm=

225

/=lkm=

225

/=lkm=

450

69.00
69.01
69.02
69.03

69

ljlaw

69.01

h}

k|lt s]=lh=

100

69.02

al;{d

k|lt s]=lh=

320

69.03

e]r

k|lt s]=lh=

180

69.04

l^of];]G^L

k|lt s]=lh=

140

69.05

afh/f

k|lt s]=lh=

120

69.06

;"*fg

k|lt s]=lh=

140

69.07

:^fOnf] s"s

k|lt s]=lh=

700

69.08

:^fOnf] xdf^f

k|lt s]=lh=

400

69.09

d"nf^f] ?^ l:nk

k|lt s]=lh=

69.10

kf:kfnd ?^ l:nk

k|lt s]=lh=

gf]^M
? dfly pNn]lvt b//]^df d"No clea[l$ s/ -VAT_ ;dfj]z ul/Psf] %}g\ .
?
^s eGgfn]
Ifdtfsf]
lgdf{)f ;fdfu|L
ug]{nfO{
hgfp+% .cflwsf/Ls b//]^ cg";f/
? Ps
g]kfndf
pTkfbg 175
x"g]#=lkm=
cGo kfO{k
/ lkml^;x?sf]
xsdf cf];f/k;f/
g]kfn u")f:t/
k|fKt sf/vfgfsf]
x"g]% .
? dfyL gk/]sf cfO{^dx?sf b//]^sf xsdf k|rlnt sfg'gsf k|lqmof cg";f/ b//]^ sfod ug{ ;lsg]% .

kbflwsf/L
k|=lh=c= >L lji)f" k|;fb (sfn

- cWoIf

lhNnf k|zf;g sfof{no, ?kGb]xL


k|=sf]=lg= >L lbks !jfnL

- ;b:o

sf]if tyf n]vf lgoGqs sfof{no, ?kGb]xL


:yf=lj=c= >L ljZj k|sfz cof{n - ;b:o
lh=lj=;=sf] sfof{no, ?kGb]xL
d =;= >L leid k|;fb Go}fkfg]

- ;b:o

pwf]u afl)fHo ;+# l;Wbfy{gu/, ?kGb]xL


cWoIf = >L ^f]k axfb"/ /fodflem - ;b:o
n"lDalg lgdf{)f Aoj;foL ;+#, ?kGb]xL

41+1/14

?kGb]xL lhNnfsf] cf=j= 072073 sf] nflu lgdf{)f ;fdfu|Lsf] b//]^

l;=g+=

lgdf{)f ;fdfu|Lsf] ljj/)f

of]=c=tyf k|=c=>L lji)f" k|;fb ("+ufgf - ;b:o


lh=lj=;=sf] sfof{no, ?kGb]xL
k| =lh=O{= >L k"is/ k|;fb kf]v|]n - ;b:o ;lrj
lh=k|f= sfof{no, ?kGb]xL

42+1/14

PsfO{

cf=j=
07.07 sf]
b//]^

?kGb]xL lhNnfdf cf=a= )&@.)&# sf nflu lgdf{{0f ;fdu|L / 9'jfgLsf]


Hofnf b//]6, d]lzg tyf pks/0fsf] ef8f / sfdbf/sf] Hofnf lgwf{/0fsf nflu ldlt
@)&@.$.@^ ut] a;]sf] b//]6 lgwf{/0f ;ldltsf] a}7ssf] lg0f{ocg';f/ lhNnf
e/L nfu" x'g] ul/ lgDgcg';f/sf] b//]6 sfod ul/of] .
qm=
;=

sfdbf/sf] lsl;d

8sdL{, l;sdL{, gsdL{, KnDa/, lrqsf/, k]G6/,


l8n/ ld:qL, d]sflgSz, O{n]S6Llzog, Uofljog
hfnL a'GG]f ld:qL
HofdL gfO{s]

HofdL ;fwf/0f

;'k/efO{h/ >]0fL ljlxg

;'k/efOh/ - P;=Pn=l;= jf ;f] ;/x_ _

l8n/ . d]sflgsn x]Nk/

;j]{ x]Nk/r]gd]g

O{n]S6Ll;og x]Nk/nfO{g Dofg

KnDa/ x]Nk/

PsfO{

k|lt
JolQm
k|lt lbg

,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,

cf=j=
072.073 sf]
Hofnf b/

650
440
430
430
480
430
430
430
430

10

rf}lsbf/, g;{/L gfOs], ag x]/fn'

11

l;lgo/ Nofa 6]lSgl;og

12

h'lgo/ Nofa 6]lSgl;og

13

:jLk/ - k"/f sfof{no ;do _

14

xNsf ;jf/L rfns

15

x]le ;jf/L rfns

16

;jf/L x]Nk/

17

sDKo'6/ ck/]6/

18

cl;i6]06 ;aO{lGhlgo/

19

;aO{lGhlgo/

20

O{lGhlgo/

21

cg'alGwt HofdL
285
@gf]6 M
pk/f]Qm kbsf sfdbf/x? afx]s cGo kbx?df Hofnfbf/Ldf sfd u/fpg]
ePdf h'g kbdf sfd u/fpg] xf] ;f] sf] g]kfn ;/sf/sf] z'? tnanfO{ cfwf/
dfgL b}lgs Hofnf sfod ug]{ .

43/14

430
480
430
335
455
590
380
505
590
700
960

Number of briks required for Brick Masonary


Chimney bhatta bricks
brick size as per normes
224
108
57 mm3
add 10mm mortar
234
118
67 mm3
Actual Size avg
225
add 10mm mortar
235

Number /m3

Total Number Incl wastages

wastage@ 4%

0.001378944 m3
0.001850 m3

110

60 mm3

0.001485

120

70 mm3

0.001974

540

27

567

506

25.3

531.3

Total Number Incl wastages

As per normes
Chimney
Machine
560

take

530

530

RATE ANALYSIS for FY 072/73 Building


Items
2 coat Emulsion painting
a) in ceiling
Item No.
1
100
Norms-13(5)
2 coat Emulsion painting in ceiling

per
sq.m.

Unit
m.d.
m.d.
Lit
kg

a) in wall
per
sq.m.

Skilled
Unskilled
Primer
Plastic Emulsion
Sub-Total
Contract Rate
Unit Rate per

Quantity
15.000
10.000
8.10
16.00

U.Rate
650.00
430.00
400.00

1.15

Unit Rate per

2 coat Emulsion painting

Item No.
1
100
Norms-13(5)
2 coat Emulsion painting in wall

Contract

Descript.
Skilled
Unskilled
Primer
Plastic Emulsion
Sub-Total
Contract Rate

sq.m.

m.d.
m.d.
Lit
kg

12.000
8.000
8.10
16.00

1.15
sq.m.

Amount
9750.00
4300.00
0.00
6400.00
20450.00
23517.50
204.50

650.00
430.00
400.00

7800.00
3440.00
0.00
6400.00
17640.00
20286.00
176.40

Rate & Unit Weight of HDPE Pipes


Di = Do2-1327.674*W mm

F/Y 2072.73
Rate/kg
228.00

Di=Inner diameter of pipe in mm


Do=Outer diameter of pipe in mm
W=Unit weight of pipe per meter

Unit Weight
(kg/m.)
Outer Dia.
(in mm)

Rate

(with out
vat and
transportation)

2.5 kg/cm2

16
20
25
32
40
50
63
75
90
110
125
140
160
180
200
225
250
280
315
355
400

1.530
1.897
2.453
3.148
3.875
4.822
6.012
7.471
9.417
11.957
15.281

Unit Weight
(kg/m.)

348.84
432.52
559.28
717.74
883.50
1099.42
1370.74
1703.39
2147.08
2726.20
3484.07

Rate

(with out
vat and
transportation)

kg/cm2

0.251
0.378
0.585
0.846
1.220
1.703
2.289
2.901
3.773
4.762
5.890
7.445
9.187
11.455
14.508
18.382
23.342

Unit Weight
(kg/m.)

57.23
86.18
133.38
192.89
278.16
388.28
521.89
661.43
860.24
1085.74
1342.92
1697.46
2094.64
2611.74
3307.82
4191.10
5321.98

Rate

(with out
vat and
transportation)

kg/cm2

0.226
0.350
0.542
0.850
1.191
1.715
2.454
3.293
4.150
5.355
6.800
8.391
10.544
13.041
16.327
20.694
26.243
33.309

Unit Weight
(kg/m.)

Rate

(with out
vat and
transportation)

10 kg/cm2

51.53
79.80
123.58
193.80
271.55
391.02
559.51
750.80
946.20
1220.94
1550.40
1913.15
2404.03
2973.35
3722.56
4718.23
5983.40
7594.45

0.092
0.134
0.202
0.334
0.514
0.796
1.269
1.782
2.568
3.801
4.962
6.209
8.079
10.256
12.620
16.014
19.757
24.708
31.160
39.635
50.344

20.98
30.55
46.06
76.15
117.19
181.49
289.33
406.30
585.50
866.63
1131.34
1415.65
1842.01
2338.37
2877.36
3651.19
4504.60
5633.42
7104.48
9036.78
11478.43

Boring Tubewell By Sludger method


District Development Committee, District Technical Office, Rupandehi

skilled
unskilled

Normes : ws guideline vol 11/item no 1,2,3,4&5 (page 2-1)

helper

650.00
430.00
430.00

1.5"

0-20
20-30
30-40
40-50
50-60
60-70

2.50
1.85
2.50
3.50
4.50
5.50

650.0
650.0
650.0
650.0
650.0
650.0

1625.00
1202.50
1625.00
2275.00
2925.00
3575.00

4.0
3.0
4.0
6.0
8.0
10.0

430.0
430.0
430.0
430.0
430.0
430.0

1720.0
1290.0
1720.0
2580.0
3440.0
4300.0

8.0
6.0
8.0
12.0
16.0
20.0

430.0
430.0
430.0
430.0
430.0
430.0

3440.0
2580.0
3440.0
5160.0
6880.0
8600.0

: 1. 4"
2.

6785.00
5072.50
6785.00
10015.00
13245.00
16475.00

6785.00
11857.50
18642.50
28657.50
41902.50
58377.50

..

3345.00
5837.50
9182.50
14037.50
20402.50
28277.50

3440.0
6020.0
9460.0
14620.0
21500.0
30100.0

167.25
194.58
229.56
280.75
340.04
403.96

172.00
200.67
236.50
292.40
358.33
430.00

0-20
0-30
0-40
0-50
0-60
0-70

m
m
m
m
m
m

..
..

..

..

..


..


..


..


..


..

..

..

10

11

12

13

14

15

1450

20

2.500

4.140

5.000

0.210

0.254

0.298

0.344

0.386

0.044

0.221

1450

30

2.690

4.480

5.380

0.204

0.246

0.289

0.332

0.375

0.043

0.214

1600

25

2.340

3.900

4.690

0.221

0.267

0.313

0.370

0.406

0.046

0.232

1450

35

2.790

4.650

4.580

0.221

0.267

0.313

0.370

0.406

0.046

0.232

1600

30

2.440

4.060

4.870

0.204

0.246

0.289

0.332

0.375

0.043

0.214

1450

40

2.890

4.830

5.790

0.221

0.267

0.313

0.360

0.406

0.046

0.232

1000

35

4.050

6.750

8.100

0.221

0.267

0.313

0.360

0.406

0.046

0.232

2400

40

1.750

2.920

3.500

0.221

0.267

0.313

0.370

0.406

0.046

0.232

2400

50

1.880

3.130

3.760

0.221

0.267

0.313

0.370

0.406

0.046

0.232

1200

2000

2400

0.221

0.267

0.313

0.370

0.406

0.046

0.232

3 ..

0.168

0.203

0.238

0.274

0.306

0.035

0.176

10
11
12
13
14
15




....

16

..



.

..

Potrebbero piacerti anche